Top Banner
Preparing for your S/4HANA Migration John Appleby GM, Bluefin Solutions Inc. Brian S. Freed, CFA VP, In Memory Architecture, SGI
26

2015 04 Preparing for the SAP S/4HANA Migration

Jul 16, 2015

Download

Technology

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2015 04 Preparing for the SAP S/4HANA Migration

Preparing for yourS/4HANA Migration

John Appleby

GM, Bluefin Solutions Inc.

Brian S. Freed, CFA

VP, In Memory Architecture, SGI

Page 2: 2015 04 Preparing for the SAP S/4HANA Migration

• S/4HANA Introduction Differences between Suite on HANA and S/4HANA

Deployment Options

• Preparing for your S/4HANA Migration Building an integrated schedule

Sandboxing and prototypying

Housekeeping & Solution Manager

Change Management & Test Management

Sizing, Architecture, HA, DR, Backup & Recovery

What you will learn today

2

Page 3: 2015 04 Preparing for the SAP S/4HANA Migration

S/4HANA Introduction

Page 4: 2015 04 Preparing for the SAP S/4HANA Migration

• The next version of SAP Business Suite

• New SKU and Code Fork Only supported with the SAP HANA DB

• S/4HANA themes: Renewed interface with Fiori UX

Simplified structure with SAP HANA

Cloud deployment first

What is S/4HANA

4

Page 5: 2015 04 Preparing for the SAP S/4HANA Migration

S/4HANA Deployment Options

5

Public Cloud

• Shared HANA multi-tenant DB

• HANA Cloud Platform Extensions

• Quarterly Release Schedule

• 100% Managed by SAP

• Automatic Updates

Managed Cloud

• Managed HANA DB and network

• HANA Cloud Platform Extensions

• ABAP Customization

• Quarterly Release Schedule

• 100% Managed by SAP

• Scheduled Updates

On-Premises

• On-Premises or Hosted

• ABAP Customization

• Yearly Release Schedule

• Managed by Customer/Partner

• Update schedule defined by customer

Page 6: 2015 04 Preparing for the SAP S/4HANA Migration

SAP S/4HANA Roadmap

6

http://www.sap.com/bin/sapcom/en_us/downloadasset.2015-03-mar-02-23.sap-s-4hana-frequently-asked-questions-pdf.bypassReg.html

Page 7: 2015 04 Preparing for the SAP S/4HANA Migration

SAP S/4HANA Customer Journey

7

http://www.sap.com/bin/sapcom/en_us/downloadasset.2015-03-mar-02-23.sap-s-4hana-frequently-asked-questions-pdf.bypassReg.html

Page 8: 2015 04 Preparing for the SAP S/4HANA Migration

Planning for your migration

Page 9: 2015 04 Preparing for the SAP S/4HANA Migration

• Most Customers look for a technical migration first To S/4HANA or Suite on HANA

• Out of Scope: HANA Live / Analytics

Simple Finance (i.e. S/4HANA)

• Suite on HANA is the stepping stone to S/4HANA Then perform code changes, activate S/4HANA extensions

• S/4HANA direct migration expected late 2015 N.B. Migrating to SoH is a great first step to S/4HANA!

Project Scope

9

Page 10: 2015 04 Preparing for the SAP S/4HANA Migration

• Cover all Technical Migration activities Upgrade to ECC 6.0 EhP7 (if necessary)

Unicode Conversion (if necessary)

HANA Migration

• Restitution “As fast, faster, or much faster”

ABAP code optimization (some things will be slower)

Technical Scope

10

ECC EHP 7 Upgrade

ECC to HANA MIgration

Future Projects

ECC on HANA

Page 11: 2015 04 Preparing for the SAP S/4HANA Migration

• Build one Integrated Schedule Weekly goals

• Include all teams above And partners!

Assign ownership

• Agree schedule with all teams Takes time (1-2 weeks)

Aligns with project prep phase

The Integrated Schedule

11

Page 12: 2015 04 Preparing for the SAP S/4HANA Migration

Who is involved?

12

Functional

PMOBasis

ReleaseManagement

BW/Analytics

Integration

ChangeManagement

TestManagement

Business Owners

Sponsors

ABAP

Infrastructure

EnterpriseSecurity

SAPSecurity

Page 13: 2015 04 Preparing for the SAP S/4HANA Migration

• Build first sandbox immediately Recent production copy

Production sized!

Include integration environment (if possible)

• Include test cycle Unit testing

Integration testing

Performance/Stress testing

Sandboxes & Prototyping

13

Page 14: 2015 04 Preparing for the SAP S/4HANA Migration

• Production-sized hardware Loan hardware

Try & Buy programs

• Use the hardware vendor you plan Plan to keep the hardware

Hardware Options for Sandbox

14

Page 15: 2015 04 Preparing for the SAP S/4HANA Migration

• Business Suite systems often venerable Housekeeping is not always done

A clean system is #1 way to de-risk your project!

• DRAM is expensive! Basis tables alone cost ~150GB of DRAM below

Multiplied by N production sized systems! TB!

• Run HANA sizing guide SAP Note 1736976 (BW)

SAP Note 1793345 (ECC)

Look for Big Basis Tables

SAP Note 706478

• Include in Schedule

Housekeeping

15

Page 16: 2015 04 Preparing for the SAP S/4HANA Migration

• Disk Databases are inexpensive Data Reduction rarely considered

• Top 100 tables usually 90% of DB space Run HANA sizing guide

SAP Note 1736976 (BW)

SAP Note 1793345 (ECC)

• Analyze Top 100 tables Create action plan

PSA, DSO Change Log deletion (BW)

IDOC, Old Functional Areas, Data Archiving (ECC)

• Remember every GB saved is 10-20GB stored!

Data Reduction

16

Page 17: 2015 04 Preparing for the SAP S/4HANA Migration

• Test Management is critical Some customers have a mature strategy

Some do not

• Revise your test management strategy Test Automation

Test Coverage

Test Prioritization

• Reduce your time to complete testing! How long does it take to complete regression test?

Change Management & Test Management

Page 18: 2015 04 Preparing for the SAP S/4HANA Migration

• Make sure you are on the latest latest SP! http://scn.sap.com/community/abap/custom-code-management

• Custom Code Management Tools (CCMT) Custom Code Management Cockpit (CDMC)

Usage & Procedure Logging (UPL)

CloneFinder

• Use these tools in combination with: Testing

Process prioritization by business users

Solution Manager is your friend!

18

TestStrategy

Priority

Testing

Clones CDMCUPL

Page 19: 2015 04 Preparing for the SAP S/4HANA Migration

• Complete Sizing Sandbox system is a great way to size accurately

Sizing tools are good alternative

• Consider technical architecture HANA supports database multi-tenancy

Architecting for S/4HANA

Page 20: 2015 04 Preparing for the SAP S/4HANA Migration

• HANA supports system replication Active/Passive Synchronous (HA)

Multi-tier Asynchronous (DR)

SUSE Linux supports automated host failover

• Very low cost to implement As compares to e.g. RAC

Most HANA systems are HA

• Even lower cost options Share QA & DR

Architect for HA/DR

Page 21: 2015 04 Preparing for the SAP S/4HANA Migration

Seamless Single-Node Scalability

21

4 Socket (3TB)*Available Today!

4-Socket Units

8 Socket (6TB)*Available Today!

16 Socket (12TB)*Controlled Availability

Planned Q2:15

32 Socket (24TB)*Co-Innovation Effort with SAP

on-going

Backup Storage+ *timing is subject to change+Scale Kit

+Scale Kit

UV for SAP HANA Scales as ONE and the same Single Node*

Page 22: 2015 04 Preparing for the SAP S/4HANA Migration

• SGI supports in-place upgrades

• CPU Ivy Bridge-EX (today)

Haswell (expected H2 2015)

Broadwell (future)

• DRAM DDR-3 (today)

DDR-4 (future)

Most HANA systems are HA

• Preserve Customer Capex

Architect for the future

Page 23: 2015 04 Preparing for the SAP S/4HANA Migration

Architect for resilience

System Data path checking (including single bit

correct)

Firmware provisioning

Redundant chassis controllers

FRU failure analysis

Online diagnostics

Uptime management

Interconnect LLP, CRC and retry support

Hot connect / disconnect

Lane failover and redundant routing

Dynamic reconfigurations

Alpha immune latches

Processors Dynamic and boot time isolation

Memory DRAM failure analysis

Page migration

Boot time disable

Tiered failure containment

Power and

Cooling

Redundant, hot-swappable power

supplies and cooling fans.

Redundant line cords

Online fault detection and ACPI support

Extending Intel® Xeon® RAS, SGI UVTM also provides the following :

Page 24: 2015 04 Preparing for the SAP S/4HANA Migration

S/4HANA Try & Buy Program

Page 25: 2015 04 Preparing for the SAP S/4HANA Migration

• Enabling customer adoption in partnership Customer looking to build the business case for SAP HANA

SAP providing the trial product

SGI providing loan hardware

Bluefin providing migration services

• Quickly complete a SAP HANA migration Benchmark before and answer and show success

Identify critical analytic processes which can be improved

Ensure any product concerns are alleviated

• Build the business case to move ahead Accelerate adoption

S/4 Try & Buy Program

25

Page 26: 2015 04 Preparing for the SAP S/4HANA Migration

John [email protected]

@applebyj

bluefinsolutions.com/johnappleby

Brian [email protected]

@brianfreed

sgi.com