Top Banner
Statoil slug control Gisle Otto Eikrem, Statoil RDI Guest lecture at NTNU - 24/3-2014
39

2014Eikrem (Slug)

Dec 13, 2015

Download

Documents

achmadh_2010

This is a case example of slug occurrence in subsea pipeline for refence and inforamtion onl
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2014Eikrem (Slug)

Statoil slug control

Gisle Otto Eikrem, Statoil RDIGuest lecture at NTNU - 24/3-2014

Page 2: 2014Eikrem (Slug)

Outline

•Riser slugging

•Slugging in gas-lift wells

•Slug control

•Slug control at Åsgard A

Page 3: 2014Eikrem (Slug)

Riser sluggingRiser slugging – cyclic unstable flow. Liquid blockage at riser foot, pressure build-up, blow out, back-flow

Page 4: 2014Eikrem (Slug)

Stabilized riser flow

Stabilized by feedback control from subsea pressure (Schmidt et.al. 1979)

Page 5: 2014Eikrem (Slug)

Slugging

Fixed choking, Riserslugging Active slug control, Even flow Examples from experiments at Sintef Lab at Tiller

•Uneven flow: liquid slugs and gas bobbles in multiphase pipelines•In slug control we simplify to two main types of slug flow:

–small slugs (< 5 min. periode): limited effect on receiving facilities–Often hydrodynamic or short terrain induced, water slugging

–severe slugs (10-180 min. periode): can result in shut down–Riser slugging, well slugging, transient slugging during start-up

Page 6: 2014Eikrem (Slug)

Hydro dynamic slugsMade when waves hit the top of the pipe, liquid blocks gas flow, wave tops combine to slugs

Short slugs with high frequency (typ. 10-20 seconds)

Gas rate, liquid rate, pressure, gas volume, topandraphy decide degree of slugging

May trig riser slugging

Example from Tiller.

Page 7: 2014Eikrem (Slug)

Stable Single Gas-Lift Well

Page 8: 2014Eikrem (Slug)

Multiphase Video IVideo of controlled multiphase flow

Stable flow

Page 9: 2014Eikrem (Slug)

Unstable Single Gas-Lift Well

Page 10: 2014Eikrem (Slug)

Multiphase Video IIVideo of severe slugging in gas lift well

Page 11: 2014Eikrem (Slug)

Gas-Lift Wells

0 2 4 6 8 10 12 14 160

50

100

150

200

250

300

350Total Production for Unstable Well

Time (hour)

Pro

duct

ion

(m3 /h

our)

Page 12: 2014Eikrem (Slug)

Effects of slug flow•Reduced production•Large variations in liquid rates into 1st stage separator

–Level variations: alarms, shut downs–Bad separation/water cleaning:

•WiO: carry-over, emulsions•OiW: hydro cyclones do no handle rate variations well

–Pressure pulses, vibrations and eqipment wear–Fiscal rate metering problems

•Variations in gas rate–Pressure variations – high pressure protection gives shut down–Liquid carry over into gas system–Flaring–Fiscal gas rate measuring problems

Page 13: 2014Eikrem (Slug)

Gas-Lift Wells

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 120

30

40

50

60

70

80Production from Gas-Lift Well

Pro

duct

ion

(m3 /h

)

Choke Opening (-)

Stable ProductionUnstable Production

Page 14: 2014Eikrem (Slug)

Methods for for slug reduction and handling•Design changes for new projects

–Increase processing capacity, f.ex. separator size–Slug Catcher (expensive and space demanding)–Increase velocities by reduced pipe diameter: several pipes or

reduced prod. by increased pressure drop–Gas lift in riser-foot or in well

•Operational changes and procedures for existing fields–Topside choking: increase receival pressure, reduces prod. –Shut in wells

•Slug control, where active use of topside choke is used to–Reduce and avoid slug flow

•Advanced control of receiving facilities to improve handling and reduce consequenses of slugs

–Model based control (MPC)

0.5-2 MNOK/pipe?

1-3 MNOK/pipe?

100-1000 MNOK/pipe?

100 MNOK/year/pipe?

Page 15: 2014Eikrem (Slug)

Slug control•Objectives of slug control:

1. Improved regularity: stabile rater and redusert risiko for trip2. Reduced pipeline pressure: increased and prolonged tail production

and increased recovery

•Available inputs: – fast topside choke (f.ex. <3 min closing time)

•Measurements:– subsea pressure transmitter (<20 km away, time delay, etc)– pressure up- and downstream topside choke– multiphase meter, or densitometer and diff.press., for topside choke

•Solution: active control to stabilize pressure and rates and to smear out transient slugs during start-up/rate changes

Page 16: 2014Eikrem (Slug)

Available Measurements

Page 17: 2014Eikrem (Slug)

Control Structure

Page 18: 2014Eikrem (Slug)

Shell Gas-Lift LaboratoryProduction

Tubes

Control Panel

ReservoirValve and Gas Injection

Shell Gas-Lift Laboratory, Rijswijk, the Netherlands

Page 19: 2014Eikrem (Slug)

Experiment – DHP Control

0 5 10 15 20 25 30 352

2.2

2.4

2.6

2.8

3Downhole Pressure

Time (min)

Pre

ssur

e (b

ara)

0 5 10 15 20 25 30 350.5

0.6

0.7

0.8

0.9

1Valve Opening

Ope

ning

(-)

Time (min)

Page 20: 2014Eikrem (Slug)

Production

50 60 70 80 90 1001.8

2

2.2

2.4

2.6

2.8

3

3.2Production from Laboratory Gas Lift Well

Prod

uctio

n (k

g/m

in)

Valve Opening (%)

Production wo/ ControlProduction w/ Control

Page 21: 2014Eikrem (Slug)

Process modelling for control•Complicated and complex to model multiphase flow

–nonlinear, partioned system

•OLGA is the world leading transient multiphase flow simulator:

–must be tuned to reproduce field data

–some times not possible to reproduce results (ex. Tordis water slugging)

–used to investigate potential for slug flow

–not suitable for controller design (black box model, hidden equations)

– can be used to test controllers

• Simpler models have been developed to reproduce riser slugging:

–better suited for controller design

–not suited to predict flow regime

Page 22: 2014Eikrem (Slug)

Model of Single Gas-Lift Well

Page 23: 2014Eikrem (Slug)

Model of Single Gas-Lift Well

Page 24: 2014Eikrem (Slug)

Model of Single Gas-Lift Well

Page 25: 2014Eikrem (Slug)

Simulation vs. Laboratory

0 2 4 6 8 10 12 14 16 18 200

0.2

0.4

0.6

0.8

1Opening of Production Choke

Val

ve O

peni

ng (-

)

Time (min)

0 5 10 15 20 251

1.5

2

2.5

3Downhole Pressure

Time (min)

Pre

ssur

e (b

ara)

ModelLaboratory

Page 26: 2014Eikrem (Slug)

Statoil’s slug controller

•Removes severe slugging

•Reduces smaller slugs

•Controls the pressure at the subsea manifold by the pipeline inlet•Helps liquid up by opening choke •Limits pressure increase after slug by choking•Pressure controller gives set point to rate controller•Controls flow into separator - ensures even flow•Automatic start-up and shut down of single wells

Subsea wells

Inlet separator

FT

FCQP-SP

uP

Riser

Topsidechoke

PT

PCPB-SP

PB

Subseachoke

QP

Pi

PW

uSub

PTPSep

QSub

Topside choke is used for control

Page 27: 2014Eikrem (Slug)

Multiphase flow test facilities at Tiller

Laboppsett3" rør, 200m, 15 m riserReguleringsventil på toppen av riserRiser og flere rørstrekk i PVC (gjennomsiktig)9 tetthetsmåler, 6 trykktransmittereXoil, SF6.sluggtyper (tyngdedominert, hydrodynamisk, transient)

• Lab set- up:

– 3” pipe, 200m length, 15m riser height

– Control valve at riser top

– Riser and parts of pipe in PVC

– 9 densitometers, 6 pressure transmitters

– Xoil and SF6

– slug types: gravity dominated, hydro dynamic, transient

Page 28: 2014Eikrem (Slug)

Results from Tiller•Control of inlet pressure, volumetric rate and cascade control.•OLGA slug periode 50-200 sec verified experimentally•Flow map and valve characteristics•Controller tuning•Control based only on topside measurements, i.e. without inlet

pressure•”Slow” ventiler: max closing time?

Page 29: 2014Eikrem (Slug)

Experiment with inlet pressure controller

Slugging stopped effectively Step response in closed loop

Page 30: 2014Eikrem (Slug)

Statfjord

Huldra

Snøhvit

Kristin

Barentshavet

Norskehavet

Nordsjøen

Tyrihans

Slug control in Statoil

ÅsgardHeidrun

Norne

Gullfaks

Heidrun Åsgard A Norne

HuldraGullfaks CStatfjord C Snorre BHuldra

Snorre

Page 31: 2014Eikrem (Slug)

Åsgard Q - 3 types of terrain slugging from well and riser

Åsgard A test separator

PT

PT

Q template

Well Q-2A

16 km long pipeline

Possible slugging in well with typical periode 6-7 hours and 20-40 bar variation in down hole pressure

Possible slugging in riser with typical periode 30 minutes and 5-10 bar variation in manifold pressure

Possible slugging in low point in S-riser with typcal periode 5 minutes and 1 bar variation in manifold pressure (neglectable)

Page 32: 2014Eikrem (Slug)

Pressure variations without slug control

Downstream pressure varies from 220-260 barg

Temperature topside varies from 25-35 degrees

Topside choke 53%

Pressure downstream subsea choke varies from 85-98 barg

Page 33: 2014Eikrem (Slug)

Åsgard A –slug control 06-24.11.05

Control of pressure downstream subsea chokeTopside choke in manual

Control of downstream pressure

Downstream pressure

Controller set point

Controlled pressure downstream subsea choke

Page 34: 2014Eikrem (Slug)

Slug control downstream subsea choke

Pressure downstream subsea choke varies from 92-94 barg

Topside choke 20-70%

Downstream pressure varies from 220-250 barg

Page 35: 2014Eikrem (Slug)

Tuning slug control of downstream pressure

controller tuning periode Stability achieved

Page 36: 2014Eikrem (Slug)

Fast variations from slugging in S-riser

Topside choke 31-35% with 5 min periode

Pressure upstream topside choke varies 70-77 barg with 5 min periode

Downstream pressure +-0.5 barg with 5 min periode

Page 37: 2014Eikrem (Slug)

Oscillations restart when controller is turned off

controller turned off

DHP starts to oscillate

controller in auto

DHP stabilized at set point

Page 38: 2014Eikrem (Slug)

Åsgard A test separator

PC

PT

PT

Q template

Well Q-2A

16 km long pipeline

Even better solution to handle well slugging:Downstream pressure stabilized by control with subsea choke

Set into operation 08.02.2006

Pressure controller (PID)

New method to stabilize well Q-2A

Page 39: 2014Eikrem (Slug)

Summary• Good results achived at several offshore installations from 2001 with simple PI-

controllers that control inlet (subsea) pressure and rate into receiving facilities with topside choke – simple and inexpensive solution

• Qualified technology after more than 5 years in operation• Achives even rates and reduced pipeline pressure and improves regularity and makes

it possible to increase and prolonge production, since it then is possible to operate closer to given constraints, f.ex. bubble point pressure, max sand free rate, hydrate temp., etc.

• Well: results indicate that it is possible to stabilize wells by control of the downstream pressure with topside or subsea choke and a PI controller

• Extended to handle other types of flow:– Gas dominated flow with surge waves

– Start-up slugs

• Subsea production facilities