2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development
19

2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Jan 04, 2016

Download

Documents

Hilda Sullivan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

2014 Project Updates

Building the Port of the Future

Gina BarroBusiness Development Manager

Trade Development Division

Page 2: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Port of Long Beach Premier gateway for U.S. - Asia trade

Major Southern California economic engine

Page 3: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Investing in the Future $4 billion in projects

Page 4: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Middle Harbor $1.3 billion

First half set to open in late 2015

Page 5: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Ship-to-Shore Cranes Four on site

8 more of the most advanced cranes on the way

Page 6: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Before Construction

Pier E Pier F

2011 2012 2013 2014 2015 2016 2017 2018 2019

E 26 E 24 E 22

F 6

F 10

1 million-TEU capacity

Page 7: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Middle Harbor 3 million-TEU capacity

Most technologically advanced in N. America

Page 8: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

$1 billion Gerald Desmond Bridge Replacement

Iconic Bridge $1.3 billion project

Opening to westbound traffic as early as 2017

Page 9: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Clearing the Path Ramp demolition

For information, download our LB Bridge app.

Page 10: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

ITS Terminal Redevelopment2nd Phase will include slip development, south rail yard renovation and demolition of old terminal buildings.

Page 11: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Sustainability Green Port Policy

81%Drop in Diesel

Emissions since 2005

Page 12: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Shore Power Container ships plug in

Page 13: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Pier J

Pier G

Pier T

Pier A

Middle Harbor

14 Shore Power Berths

Page 14: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Upgrading Rail Green Port Gateway

Page 15: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Rail Improvements

Ocean Blvd. Track Realignment

Middle Harbor On-Dock Rail*

*Future project

Pier G Rail Yard

Pier B On-Dock Rail

Support Facility

Page 16: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

New Fireboat Stations

LB Fire Station #15

LB Fire Station #20

Desmond Bridge Replacement

Project

Middle Harbor Redevelopment

Project

Page 17: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Maintenance Dredging Projects

Page 18: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Capital Dredging Projects

Page 19: 2014 Project Updates Building the Port of the Future Gina Barro Business Development Manager Trade Development Division.

Bright Future Long Beach -- a great place to live and work