Top Banner
2014 Key Issues – National Security John C. Rose Deputy Director, Public Policy Region 6 Chair, National Security Sub-Committee
6

2014 Key Issues – National Security John C. Rose Deputy Director, Public Policy Region 6 Chair, National Security Sub-Committee.

Dec 15, 2015

Download

Documents

Tucker Nute
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2014 Key Issues – National Security John C. Rose Deputy Director, Public Policy Region 6 Chair, National Security Sub-Committee.

2014 Key Issues – National Security

John C. RoseDeputy Director, Public Policy Region 6Chair, National Security Sub-Committee

Page 2: 2014 Key Issues – National Security John C. Rose Deputy Director, Public Policy Region 6 Chair, National Security Sub-Committee.

DEVELOPING A SEAMLESS NATIONAL CYBERSECURITY POLICY

2

In relation to national security space systems, increasingly all segments of the architecture—ground, space, and user equipment—are using commodity hardware, software, and protocols to accomplish their missions. -Aerospace Corp.

The annual losses are likely to be comparable to the current annual level of U.S. exports to Asia—over $300 billion.

Page 3: 2014 Key Issues – National Security John C. Rose Deputy Director, Public Policy Region 6 Chair, National Security Sub-Committee.

DEVELOPING A SEAMLESS NATIONAL CYBERSECURITY POLICY

3

Recommendations:

•Assess vulnerabilities throughout the supply chain relative to space-based and ground-based

equipment, especially considering recent relaxing of ITAR restrictions in the area of satellites.

•Develop a roadmap for protection of critical space-based and related ground-based assets that

are vital from both a national security and critical infrastructure perspective. •Review/propose guidelines related to cybersecurity skills, s/w, and h/w provided to companies and nation-states that could be used against the United States and our interests here and abroad. •Specific protocol for protecting GPS and other vital hardware should be included as part of the roadmap.

•Increase the emphasis of STEM initiatives for the purpose of developing a “cyber cadre” that

can address skill shortages and the growing need for cyber-capable individuals.

•Develop policies that encourage public/private cooperation to forge viable strategies that

address the multiple areas of cybersecurity that ensure the integrity of global positioning systems

technology and other space-based assets, national air traffic management systems, supply

chain, etc.

Page 4: 2014 Key Issues – National Security John C. Rose Deputy Director, Public Policy Region 6 Chair, National Security Sub-Committee.

ACCESS FOR UAVs IN THE NATIONAL AEROSPACE SYSTEM

4

“The agency will not meet the September 2015 deadline for safe (drone) integration and it is uncertain when this will be achieved,” Calvin Scovel III, the Transportation Department’s inspector general, told the House Transportation subcommittee on aviation.

Gerald Dillingham, director of civil aviation for the Government Accountability Office, said the FAA hasn’t defined the safety and performance standards it needs from the six test groups, or how data will be collected and analyzed.

8 Feb 2014

Q. What is the timeline for selecting the test sites?A.We expect to make the selections late in 2012 and for the first site to be operational in 2013.Press Release – FAA Selects Unmanned Aircraft Systems Research and Test Sites – 12/30/2013

“These three perspectives—Accommodation, Integration, and Evolution—transcend specific timelines and examine the complex relationship of activities necessary to integrate UAS into the NAS.”

-FAA UAV Roadmap

Page 5: 2014 Key Issues – National Security John C. Rose Deputy Director, Public Policy Region 6 Chair, National Security Sub-Committee.

ACCESS FOR UAVs IN THE NATIONAL AEROSPACE SYSTEM

5

Recommendations:

•Direct the Federal Aviation Administration to shorten its “mid-term” and “long-term” task period of

performance from “5–10 years” and “2022–2026”, respectively.

•Accelerate the effort to define the required sensors and approved approach (ABSSA, GBSSA, etc.)

that will allow for safe vehicle operation within the NAS.

•FAA to review and issue a report, within 180 days, addressing the status of on NextGen being able

to accommodate UAV/UAS, specifically secure Control and Communications (C2).

•Identify areas of concern that risk delays and work to create public/private partnerships that can be

leveraged to minimize impacts to the overall integration effort.

•Investigate international examples of functioning UAV/UAS integration (Israel, Canada, etc.) to

leverage Lessons Learned.

Page 6: 2014 Key Issues – National Security John C. Rose Deputy Director, Public Policy Region 6 Chair, National Security Sub-Committee.