Page 1: 2014-4849-1M-1006 Rev D
Page 2: 2014-4849-1M-1006 Rev D

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING SUPPORT

SERVICES

COMMENT RESPONSE SHEET FOR DATASHEET FOR COOLING WATER CIRCULATION

PUMPS

Doc. No.: 2014-4849-1M-1006

Rev: C

Page 1 of 1

Item Clause/ Section

Comments (Reviewer) Reviewer

Initials Action Undertaken (Originator)

Close Out(Y/N)

1 Liquid Check Vapor Pressure CLJOC Noted and revise to KPa in next revision Y

2 Welding and Repair, material specification

Update CLJOC

This section is to specify the alternative method for welding and material inspection, it is not compulsory by API 610, but is optional only. This option is not necessary. This is applicable only if specified by Purchaser.

Y

3 Note

Coupling guard instead of Coupling CLJOC Noted and Incorporated in next revision Y

4 Motor Datasheet Temperature Rise : check CLJOC We have checked already. Temperature rise from -20 deg C to 40 deg C is correct. Y

5 Motor Datasheet Max sound pressure level : 79 instead of 85

CLJOC Noted and Incorporated in next revision Y

6 Motor Datasheet Max S.C.KVA@ Motor Bus : 30 kA instead of 20 kA

CLJOC 20 kA as latest motor datasheet. Y

7 Motor Datasheet Starting Method : Soft Starter CLJOC Noted and Incorporated in next revision Y

8 Motor Datasheet Update for Starting section CLJOC Vendor data is not available till now. Y

9 Motor Datasheet Mounting : Horizontal CLJOC Noted and Incorporated in next revision Y

10 Mechanical Seal Check for consistency CLJOC We have checked already. Seal arrangement is 1CW-FX. The seal faces is CS and Reaction Bonded Silicon Carbide. Seal chamber is Floating Throat Bushing.

Y

Page 3: 2014-4849-1M-1006 Rev D

Equipment Title: COOLING WATER CIRCULATION PUMPS 2014-4849-1M-1006

Type: API CENTRIFUGAL PUMP

PBE-4915 A/B

2 C 20-07-15

3 D Approved for Purchase 28-07-15

Issued for Review ( Incorporated proposed vendor data )

REVISION RECORD SHEET

No. Rev. No Date of Revision

1 B 28-01-15Approved for Design

D

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION PUMPS

Document No.:

Revision:

Equipment Tag No.: Sheet: 2 of 16

Page 4: 2014-4849-1M-1006 Rev D

Equipment Title:

Type:

Equipment Tag No.:

1

2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)

3 PUMP TYPE: (4.1) SPECIFICATION NO.

4 OH2 OH3 OH6 OTHER_____________ PUMP:

5 CASING MOUNTING: PRIMER

6 CENTERLINE IN-LINE OTHER_____________ FINISH COAT

7 BASEPLATE: (6.3.17)

8 CASING TYPE: PRIMER

9 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER FINISH COAT

10 CASE PRESSURE RATING: DETAILS OF LIFTING DEVICES(6.3.20)

11 OH6 PUMP SUCTION REGION DESIGNED FOR MAWP (5.3.6) SHIPMENT: (7.4.1)

12 MAX. ALLOWABLE WORKING PRESSURE (bar) DOMESTIC EXPORT EXPORT BOXING REQUIRED

13 @ (°C) OUTDOOR STORAGE MORE THAN 12 MONTHS

14 HYDROTEST PRESSURE (bar) SPARE ROTOR ASSEMBLY PACKAGED FOR:

15 NOZZLE CONNECTIONS: (5.4.2) HORIZONTAL STORAGE VERTICAL STORAGE

16 TYPE OF SHIPPING PREPARATION

17

18 SUCTION HEATING AND COOLING

19 DISCHARGE HEATING JACKET REQ'D. (5.8.9)

20 COOLING REQ'D.

21 PRESSURE CASING AUX. CONNECTIONS: (5.4.3) COOLING WATER (C.W.) PIPING PLAN (6.5.3.1)

22 C.W. PIPING:

23 DRAIN 1 1" PIPE TUBING; FITTINGS

24 VENT C.W. PIPING MATERIALS:

25 PRESS. GAUGE S. STEEL C. STEEL GALVANIZED

26 TEMP. GAUGE COOLING WATER REQUIREMENTS:

27 WARM-UP BEARING HOUSING (m3/h)

28 BALANCE / LEAK-OFF HEAT EXCHANGER (m3/h)

29 CYLINDRICAL THREADS REQUIRED (5.4.3.3) TOTAL COOLING WATER (m3/h)

30 ROTOR: HEAT PIPING: STEAM OTHER

31 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) HEATING PIPING: TUBING PIPE

32 COUPLINGS: (6.2.2) ( Note 16 ) BEARINGS AND LUBRICATION ( Note 15 )

33MANUFACTURER MODEL BEARING (TYPE/NUMBER) (5.10.1): ( Note 15 )

34 RATING (kW per100 r/min) RADIAL /

35 SPACER LENGTH 178 (mm) SERVICE FACT. 2 THRUST /

36 COUPLING BALANCED TO ISO 1940-1 G6.3 (6.2.3) LUBRICATION (5.11.3, 5.11.4):

37 COUPLING WITH PROPRIETARY CLAMPING DEVICE (6.2.11) GREASE OIL FLINGER

38 COUPLING PER ISO 14691 (6.2.4) PURE OIL MIST PURGE OIL MIST

39 COUPLING PER ISO 10441 (6.2.4) CONSTANT LEVEL OILER PREFERENCE (5.10.2.2):

40 COUPLING PER API 671 (6.2.4) ASME B15.1 OIL VISC. ISO GRADE

41 NON-SPARK COUPLING GUARD (6.2.14c) INSTRUMENTATION

42 COUPLING GUARD STANDARD PER (6.2.14a) ACCELEROMETER(S) (6.4.2.1)

43 BASEPLATES: PROVISION FOR MOUNTING ONLY (5.10.2.11)

44 API BASEPLATE NUMBER VTA (ANNEX D) FLAT SURFACE REQ'D (5.10.2.12)

45 NON-GROUT CONSTRUCTION (6.3.13) TEMP. GAUGES (WITH THERMOWELLS) (8.1.3.6)

46 OTHER Common baseplate for pump and driver PRESSURE GAUGE TYPE

47 MECHANICAL SEAL: (5.8.1)

48 SEE ATTACHED ISO 21049/API 682 DATA SHEET

49 REMARKS:

50

51 MASSES (kg)

52 PUMP 771

53 BASEPLATE 771

54 DRIVER VTA

55 TOTAL VTA

56

Revis

ion

Jonh Crane

TYPE

FF

Ball Single

SIZE FLANGE RATING FACING

Ball Single

10" ( VTC ) ASME #300 RF SIDE

10" ( VTC ) ASME #300 RF TOP

POSITION

(IN)

36.75

55.16

D

PBE-4915 A/B Sheet: 4 of 16

NO. SIZE (DN)

CONSTRUCTION SURFACE PREPARATION AND PAINT

TSKS-0230-X077-1778

(VTC)

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION

PUMPS

COOLING WATER CIRCULATION PUMPS Document No.: 2014-4849-1M-1006

API CENTRIFUGAL PUMP Revision:

Page 5: 2014-4849-1M-1006 Rev D

Equipment Title:

Type:

Equipment Tag No.:

1

2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)

3 PUMP TYPE: (4.1) SPECIFICATION NO.

4 OH2 OH3 OH6 OTHER_____________ PUMP:

5 CASING MOUNTING: PRIMER

6 CENTERLINE IN-LINE OTHER_____________ FINISH COAT

7 BASEPLATE: (6.3.17)

8 CASING TYPE: PRIMER

9 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER FINISH COAT

10 CASE PRESSURE RATING: DETAILS OF LIFTING DEVICES(6.3.20)

11 OH6 PUMP SUCTION REGION DESIGNED FOR MAWP (5.3.6) SHIPMENT: (7.4.1)

12 MAX. ALLOWABLE WORKING PRESSURE (bar) DOMESTIC EXPORT EXPORT BOXING REQUIRED

13 @ (°C) OUTDOOR STORAGE MORE THAN 12 MONTHS

14 HYDROTEST PRESSURE (bar) SPARE ROTOR ASSEMBLY PACKAGED FOR:

15 NOZZLE CONNECTIONS: (5.4.2) HORIZONTAL STORAGE VERTICAL STORAGE

16 TYPE OF SHIPPING PREPARATION

17

18 SUCTION HEATING AND COOLING

19 DISCHARGE HEATING JACKET REQ'D. (5.8.9)

20 COOLING REQ'D.

21 PRESSURE CASING AUX. CONNECTIONS: (5.4.3) COOLING WATER (C.W.) PIPING PLAN (6.5.3.1)

22 C.W. PIPING:

23 DRAIN 1 1" PIPE TUBING; FITTINGS

24 VENT C.W. PIPING MATERIALS:

25 PRESS. GAUGE S. STEEL C. STEEL GALVANIZED

26 TEMP. GAUGE COOLING WATER REQUIREMENTS:

27 WARM-UP BEARING HOUSING (m3/h)

28 BALANCE / LEAK-OFF HEAT EXCHANGER (m3/h)

29 CYLINDRICAL THREADS REQUIRED (5.4.3.3) TOTAL COOLING WATER (m3/h)

30 ROTOR: HEAT PIPING: STEAM OTHER

31 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) HEATING PIPING: TUBING PIPE

32 COUPLINGS: (6.2.2) ( Note 16 ) BEARINGS AND LUBRICATION ( Note 15 )

33MANUFACTURER MODEL BEARING (TYPE/NUMBER) (5.10.1): ( Note 15 )

34 RATING (kW per100 r/min) RADIAL /

35 SPACER LENGTH 178 (mm) SERVICE FACT. 2 THRUST /

36 COUPLING BALANCED TO ISO 1940-1 G6.3 (6.2.3) LUBRICATION (5.11.3, 5.11.4):

37 COUPLING WITH PROPRIETARY CLAMPING DEVICE (6.2.11) GREASE OIL FLINGER

38 COUPLING PER ISO 14691 (6.2.4) PURE OIL MIST PURGE OIL MIST

39 COUPLING PER ISO 10441 (6.2.4) CONSTANT LEVEL OILER PREFERENCE (5.10.2.2):

40 COUPLING PER API 671 (6.2.4) ASME B15.1 OIL VISC. ISO GRADE

41 NON-SPARK COUPLING GUARD (6.2.14c) INSTRUMENTATION

42 COUPLING GUARD STANDARD PER (6.2.14a) ACCELEROMETER(S) (6.4.2.1)

43 BASEPLATES: PROVISION FOR MOUNTING ONLY (5.10.2.11)

44 API BASEPLATE NUMBER VTA (ANNEX D) FLAT SURFACE REQ'D (5.10.2.12)

45 NON-GROUT CONSTRUCTION (6.3.13) TEMP. GAUGES (WITH THERMOWELLS) (8.1.3.6)

46 OTHER Common baseplate for pump and driver PRESSURE GAUGE TYPE

47 MECHANICAL SEAL: (5.8.1)

48 SEE ATTACHED ISO 21049/API 682 DATA SHEET

49 REMARKS:

50

51 MASSES (kg)

52 PUMP 771

53 BASEPLATE 771

54 DRIVER VTA

55 TOTAL VTA

56

Revis

ion

Jonh Crane

TYPE

FF

Ball Single

SIZE FLANGE RATING FACING

Ball Single

10" ( VTC ) ASME #300 RF SIDE

10" ( VTC ) ASME #300 RF TOP

POSITION

(IN)

36.75

55.16

D

PBE-4915 A/B Sheet: 4 of 16

NO. SIZE (DN)

CONSTRUCTION SURFACE PREPARATION AND PAINT

TSKS-0230-X077-1778

(VTC)

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION

PUMPS

COOLING WATER CIRCULATION PUMPS Document No.: 2014-4849-1M-1006

API CENTRIFUGAL PUMP Revision:

Page 6: 2014-4849-1M-1006 Rev D

Equipment Title:

Type:

Equipment Tag No.:

1 SPARE PARTS (TABLE 18) QA INSPECTION AND TESTING (CONT.)

2 START-UP NORMAL MAINTENANCE TEST NON-WIT WIT OBSERVE

3 SPECIFY OPERATION SPARE HYDROSTATIC (7.3.2)

4 PERFORMANCE (7.3.3)

5 OTHER PURCHASER REQUIREMENTS NPSH (7.3.4.2) (ONE PUMP ONLY)

6 COORDINATION MEETING REQUIRED (9.1.3) RETEST ON SEAL LEAKAGE (7.3.3.2d)

7 MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) RETEST REQUIRED AFTER FINAL

8 MAX RELATIVE DENSITY HEAD ADJUSTMENT (7.3.3.5b)

9 MAX DIA. IMPELLERS AND/OR NO OF STAGES COMPLETE UNIT TEST (7.3.4.3)

10 OPERATION TO TRIP SPEED SOUND LEVEL TEST (7.3.4.4)

11 CONNECTION DESIGN APPROVAL (5.12.3.4) CLEANLINESS PRIOR TO FINAL

12 INERT GAS INHIBITED STORAGE - SPARE CARTRIDGE (8.2.8.4) ASSEMBLY (7.2.2.2)

13 TORSIONAL ANALYSIS REQUIRED (5.9.2.1) NOZZLE LOAD TEST (6.3.6)

14 TORSIONAL ANALYSIS REPORT (5.9.2.6) CHECK FOR CO-PLANAR

15 PROGRESS REPORTS (9.3.3) MOUNTING PAD SURFACES (6.3.3)

16 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5) MECHANICAL RUN UNTIL OIL

17 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.1.1f) TEMP. STABLE (7.3.4.7.1)

18 LATERAL ANALYSIS REQUIRED (8.2.4.1 / 8.2.4.1.3) 4 HR. MECHANICAL RUN AFTER

19 DYNAMIC BALANCE ROTOR (8.2.4.2) OIL TEMP. STABLE (7.3.4.7.3)

20 PIPING AND APPURTENANCES 4 HR. MECH. RUN TEST(7.3.4.7.2)

21 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) TRUE PEAK VELOCITY DATA (7.3.3.4d)

22 VENT DRAIN COOLING WATER BRG HSG RESONANCE TEST (7.3.4.6)

23 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) REMOVE / INSPECT HYDRODYNAMIC

24 FLANGES REQ'D IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) BEARING AFTER TEST (8.2.7.5)

25 INSTALLATION LIST IN PROPOSAL (9.2.3L) AUXILIARY EQUIPMENT TEST (7.3.4.5)

26 CONNECTION BOLTING CHARPY TEST (EN 13445/ASME VIII))

27 PTFE COATING ASTM A153 GALVANIZED

28 PAINTED SS

29

30 SHOP INSPECTION (7.1.4) VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c)

31 PERFORMANCE CURVE APPROVAL VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5)

32 TEST WITH SUBSTITUTE SEAL (7.3.3.2b) VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3e)

33 MATERIAL CERTIFICATION REQUIRED (5.12.1.8) INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)

34 CASING IMPELLER SHAFT RECORD FINAL ASSEMBLY RUNNING CLERANCES

35 OTHER Note 6 COMPLETION OF INSPECTION CHECK LIST (7.1.6)

36 CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5)

37 INSPECTION REQUIRED FOR CONNECTION WELDS (5.12.3.4e)

38 MAG PARTICLE LIQUID PENETRANT

39 RADIOGRAPHIC ULTRASONIC

40 INSPECTION REQUIRED FOR CASTINGS (7.2.1.3 / 5.12.1.5)

41 MAG PARTICLE LIQUID PENETRANT

42 RADIOGRAPHIC ULTRASONIC

43 HARDNESS TEST REQUIRED: (7.2.2.3)

44 ADDITIONAL SUBSURFACE EXAMINATION FOR 7.2.1.3

45 FOR

46 METHOD

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

Re

vis

ion

Sheet:

2014-4849-1M-1006

D

5 of 16

QA INSPECTION AND TESTING

REMARKS

PBE-4915 A/B

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION PUMPS

COOLING WATER CIRCULATION PUMPS

API CENTRIFUGAL PUMP

Document No.:

Revision:

Page 7: 2014-4849-1M-1006 Rev D

Equipment Title: COOLING WATER CIRCULATION PUMPS 2014-4849-1M-1006

Type: API CENTRIFUGAL PUMP D

PBE-4915 A/B

1 PRESSURE DESIGN CODES WELDING REQUIREMENTS PURCHASER DEFINED MATERIAL IN SECTIONS

2 APPLICABLE TO: PROPOSALS PURCHASE AS BUILT

3 UNIT 2 (TWO) x 100% COOLING WATER CIRCULATION PUMPS

4 SERVICE COOLING WATER

5 NOTES: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER

6

7 THESE REFERENCES MUST BE LISTED BY THE MANUFACTURER

8 CASTING FACTORS USED IN DESIGN (5.3.4) (TABLE 3)

9 SOURCE OF MATERIAL PROPERTIES

10

11 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. (DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCES STATED)

12 ALTERNATE WELDING CODES AND STANDARDS (5.12.3.1)

13 Welding Requirements (Applicable Code or Standard) Purchaser Defined Default per Table 10

14 Welder Operator Qualification

15 Welding Procedure Qualification

16 Non-pressure retaining structural welding such as base plate or supports

17 Magnetic particle or liquid penetrant examination of the plate edges

18 Postweld heat treatment

19 Post weld heat treatment of casing fabrication welds

20

21 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. (DEFAULT TO TABLE 13 IF NO PURCHASER PREFERENCES STATED)

22 ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 13)

23 Type of Inspection Methods Fabrications Castings

24 Radiography

25 Ultrasonic Inspection

26 Magnetic Particle Inspection

27 Liquid Penetrant Inspection

28

29

30

31

32

33

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION PUMPS

Document No.:

Revision:

Equipment Tag No.: Sheet:

Re

vis

ion

6 of 16

REMARKS

PRESSURE VESSEL DESIGN CODE REFERENCES

WELDING AND REPAIRS (5.12.3)

MATERIAL INSPECTION (7.2.2.1) (7.2.1.3)

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

Page 8: 2014-4849-1M-1006 Rev D

Equipment Title: COOLING WATER CIRCULATION PUMPS 2014-4849-1M-1006

Type: API CENTRIFUGAL PUMP D

PBE-4915 A/B

1 1) VENDOR to complete the pump data sheet. VTC : Vendor to confirm.

2 2) Motors shall be suitable for auto-start with discharge valve open and also for end of curve operation.

4 3) Deleted

5

6 4) Deleted

7

8 5) Nozzles connection to pump casing shall be subject to 100% MPI/DPI and 10% minimum Radiographic / Ultrasonic Inspection.

9 6) Certified Material Test Report (CMTR) shall be provided by VENDOR. Casing, impeller, shaft, seal wearing and base plate will be cert 3.1

10 7) Deleted

11 8) The pump shall be designed for the wind and transportation load as specified in COMPANY Datasheet 2014-4800-9M-0010,

12 "Environmental Conditions and Utility Available Datasheet".

13 9) * : VENDOR to advise.

14 10) Pump shall be in compliance with API 610 and COMPANY Specification : 2014-4800-1L-0006, "API Centrifugal Pump Specification".

15 11) Deleted

16 12) Deleted

17 13) Refer P&ID 2014-4849-01-0064 " Cooling Water Circulation Pump "

18 14) Material of other components as below :

19 - Motor casing : Cast iron

20 - Base plate : Fabricated Steel

21 - Casing stud & nuts : A 193 Gr B7 4140, A194 Gr 2H

22 - Coupling Guard: Brass

23 15) Pump bearing housing shall be rigid shell molded vast steel construction.

24 Bearing housing shall be sealed by INPRO seal type and seal parts material shall be non-sparking type.

25 16) Coupling hubs shall be supplied with zinc or manganese phosphate finish. Hub bolts shall be ISO Gr12.9 Alloy Steel.

26 Coupling hub shall be heated and fitted into shaft with key

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

Equipment Tag No.: Sheet:

Re

vis

ion

7 of 16

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION PUMPS

Document No.:

Revision:

Page 9: 2014-4849-1M-1006 Rev D

Equipment Title: COOLING WATER CIRCULATION PUMP - MOTOR Document No.: 2014-4849-1M-1006

Type: MEDIUM VOLTAGE MOTOR Revision: D

Equipment Tag No.: ZDE - 4915 A/B Sheet: 8 of 16

By Supplier if not provided by Purchaser By Supplier Option- check mark indicates selection

1

2 Basic Data Starting Continued:

3 Type of Motor General Purpose Special Purpose No. of Cold/Hot starts per hour

4 Volts Phase Hertz P.F at starting

5 Rated Output Service Factor Starting current @ 100% Voltage

6 Fault Withstand Poles Starting current @ 80% Voltage

7 Insulation Class and Type Starting time @ 100% Voltage

8 Temperature Rise : ºC Above ºC Ambient Starting time @ 80% Voltage

9 @ SF BY: Resistance RTD Load, PU 0.50 0.75 1.0

10 Min % Overspeed Current, Amp

11 Bearing Type: Hydrodynamic Antifriction Percent Efficiency

12 Max Driven-Equipment Vertical Thrust : Percent Power Factor

13 Duty type (e.g S1 for "Continuous") : Speed, RPM

14 Differential Protection To Be Applied Mounting :

15 Manufacturer SO Frame size Horizontal Vertical Shaft Up Shaft Down

16 Site Data Foot Mounted Flange Mounted. Type of mounting

17 Area Classification Mounting Position

18 Zone 2 Group IIA Non-Classified Baseplate Furnished By

19 Ignition Temperature ºC Temp. Class Soleplate Furnished By

20 Elevation M Enclosure :

21 Ambient Temperature: Max ºC Min ºC Open-DripProof IP56 IP68

22 Relative Humidity: Max % Min % Weather Protected Type I Type II

23 Indoor Outdoor Heated Unheated TEFC TEWAC IC 411

24 Roof Over Motor No Roof Over Motor Explosion Proof ( Exd ) Other Type

25 Non-Massive Foundation Description TEAAC-Tubes Copper Copper Alloy

26 Aluminum Stainless Steel Aluminum Alloy

27 Max Sound Pressure Level dBA AISI 300 Series Hardware

28 Unusual Conditions: TEWAC Heat Exchanger:

29 Abrasive Dust Tube Material

30 External Forces & Moments Tube Construction Double Tube Single Tube

31 Seismic loading Air Temperature Sensor Yes No

32 Corrosive Agents RTD Type TC Type

33 Other Cooling Water Conditions Yes No

34 Electric System Conditions: If No, Specify Differences

35 Max S.C. KVA @ Motor Bus

36 I²t Let-Through Energy Flow Sensor Local Indicator

37 Min S.C. KVA @ Motor Bus Outer Tube on Double Tube Coolers Leak Detection

38 X/R Ratio Type

39 Type of System Earthing Resistance Reactance Drive System:

40 UnEarthed Solid Direct Connected Gear

41 Earth Fault Amperes Type of Coupling

42 Starting : Starting Method: Furnished By

43 Torques in Excess of IEC 60034-12 Rotation Required by Driven Equipment When Facing Motor

44 Full Voltage % Reduced Voltage & Type Opposite Drive End: Clockwise CounterClockwise

45 Loaded (100%) Partially Loaded % Driven Equip. Wk² kg-m² @ RPM

46 Other Load Re-Acceleration Rq'd. Yes No

47 Load Curve If Yes, Provide:

48 Voltage at Locked Rotor Min % of Rated: Max Voltage Interruption (Cycles)

49 Maximum Number of Full-Voltage Starts Per Hour Voltage @ Motor Terminals on Reclosure

50 Capability in Excess of IEC 60034-12 Load Speed-Torque Reference Curve No.

51 Specify Other

Revis

ion

4160±10%

SS

3 cold, 2 hot

N/A

N/A

Driven Equipment Manufacturer

10 A

Note 2 Note 2

80

N/A

None ( See below)

Salt Laden Moisture

20 kA for 0.25 sec.

TBA

79 @ 1 M

N/A

No

19.5

35 19

100 80

Offshore Platform

No

WEG

Equipment Mfgr.

T3

S1

N/A

F, VPI, Enduraseal (See Note 4)

40 -20

1.0 0.0 0.25

Note 11 1

4

MOTOR DESIGN DATA

3 60

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION PUMPS

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

Page 10: 2014-4849-1M-1006 Rev D

Equipment Title: COOLING WATER CIRCULATION PUMP - MOTOR Document No.: 2014-4849-1M-1006

Type: MEDIUM VOLTAGE MOTOR Revision: D

Equipment Tag No.: ZDE - 4915 A/B Sheet: 9 of 16

1

2 Reciprocating Compressor Load: Miscellaneous (Continued):

3 Crank-Effort Diagram Curve No. List of Materials to be Identified with Applicable ANSI, ASTM, or

4 Miscellaneous: ASME Numbers :

5 Special Low-Temperature Material Requirements :

6

7 Evaluation factor (EF) $/KW Special Identification :

8 Federal, State, or Local Codes or Special Rules :

9

10

11

12 Winding Temperature Detectors : Vibration Detectors (Continued):

13 RTD Type: Pt 100 No. / Phase Bearing Housing Seismic Sensors N/A

14 Resistance Material Ohms Provisions Only Installed

15 3-Wire 2-Wire Earth 1 Lead Yes No Sensor Type Model

16 Other Output Transducer Model

17 Note 6 No. per Bearing Location (H,V,A)

18 Provision Only Per API 670 Pt 100 Vibration Switch Manual Reset Electric Reset

19 RTD Type: Material Ohms Switch Type Model

20 Other Space Heaters : Note 7

21 Terminal Head or Box Volts Phase Hertz

22 Bearing Housing Temp. Indicators Rq'd. : Max Sheath Temperature ºC

23 Lubrication System: Terminal Junction Box (Note 5)

24 Self Lube Forced Lube Box Location Oversized Box

25 Bearing Oil Rings for Coastdown Required Main Supply Leads: Conductor Size Type

26 Oil Mist Insulation No. Per Motor

27 Bearing Constant-Level Sight Feed Oilers Required : Enter From Above Below Side (R/L)

28 Type Gland Plate Drilled Undrilled

29 Special Seals for Gas Purge Current Transformers for Differential Protection ( N/A )

30 Lube System Common with Driven Equipment Accuracy Class

31 Supplied By Mounted By

32 Type of Oil Pressure PSIG Quantity Ratio

33 Pressure Lube System Surge Capacitors

34 Per API 614 Manufacturer's Standard Mounted By 0.25 m F/Phase 0.50 m F/Phase

35 Main Oil Pump Required Surge Arresters :

36 Standby Oil Pump Required Mounted By Rated KV

37 Filter Element : Phase Current Transformers for Local Ammeter N/A

38 Manufacturer Model No. Accuracy Class

39 Duplex Oil Filters Req'd. Oil Cooler Req'd. Quantity Ratio

40 Oil Heater Required Voltage Transformers for Local Voltmeter

41 Vibration Detectors : * See Note 3 Accuracy Class

42 Non-Contact Probes Mounted By

43 Provisions Only Installed Quantity Ratio

44 Probe Type Size Fuses Required

45 Transmitter Model Bushing Studs or Receptacles

46 No. per Bearing Two Four Space for Stress Cones

47 Thermal Insulation

Re

vis

ion

MECHANICAL DATA SHEET FOR COOLING WATER

CIRCULATION PUMPS

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

N/A

N/A

Yes

N/A

* Note 3 * Note 3

EPR * Note 3

N/A

Top TYPE II

* Note 3 3-C ARM'D

230 V 1 60

Bearing Temperature Detectors :

Platinum 100

ACCESSORY EQUIPMENT

3 / 3

Platinum 100

N/A

Per Specification 2014-4869-3L-0004

MOTOR DESIGN DATA (CONTINUED)

NONE

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

Page 11: 2014-4849-1M-1006 Rev D

Equipment Title: COOLING WATER CIRCULATION PUMP - MOTOR Document No.: 2014-4849-1M-1006

Type: MEDIUM VOLTAGE MOTOR Revision: D

Equipment Tag No.: ZDE - 4915 A/B Sheet: 10 of 16

1

2 Terminal Junction box (Continued): Coupling

3 Breathers Taper Fit Cylindrical Fit

4 Drains Coupling Supplied By

5 Provisions for Purging Vendor Model

6 Removable Links Coupling Data Sheet Numbers

7 Silver-Plated Bus Joints Silver-plated Cu bus bars Mounted By: Motor Mfr Driven-Equip Mfr Purchaser

8 Earth Bus Internal and External Idling Adapter/Mass Moment Simulator Supplied By

9 Fault Withstand Coupling to be Used for Test Contract Shop None

10 Other Terminal Box Requirements Insulated Standoffs Painting:

11 Oil Resistant Leads Vendor's Standard Extra Cost @ Shipment

12 Space Heaters : User's Special Paint

13 Volts Phase 1 Hertz 60 Shipment:

14 Max Sheath Temperature ºC Domestic Export

15 Air Filters : Export Boxing Required

16 Provisions Only - WP I Required - WP I or WP II Outdoor Storage for More Than 12 months

17 Filter Type Special Shipping Bearings

18 Differential Pressure Device Required Mounted on Skid

19 Type Other Requirements:

20 Bearing Heaters : Any External Forces on Motor Housing That May Affect Site

21 Type Performance

22 Volts Phase Hertz Data Required on Current Variation and Effeciency for Variable

23 Miscellaneous Torque Load

24 Epoxy Grout to be Used Type Vendor's Representative to be Present During Initial

25 Nameplate Material Stainless Steel Monel Equipment Alignment Check

26 Special Nameplate for Identification Motor Tag Number Special Weather Protection Requirements

27 Quantity of Special Tools Required Vendor's Review and Comments on the Purchaser's Foundation

28 Proof of Non-Sparking, Corrosion-Resistant Fan Drawings

29 Shaft Seals of Electrically Non-Conducting Materials Guaranteed Eff. & PF Req'd.

30 Location of Aux. Junction Boxes Erection Supervisor Costs

31 MOC of Aux. Junction Boxes Stainless Steel Assembly Photographs Required

32 Switches with Contacts Rated for DC Yes No Motor Thermal Time Constant (minutes)

33 Vendor Documents

34 This data sheet duly filled up Thermal Limit Curves (Hot & Cold)

35 Certificate of Compliance Motor and Accessory Connection Diagrams

36 Certified GA Drawing and Dimension Sheet Equivalent Circuit Data

37 Terminal Box and accessories Drawing RTD Settings

38 Speed vs. Torque and Current Curves Test Certificates

39 Torque vs. slip and current curves Instruction Manual

40

41

Re

vis

ion

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION

PUMPS

No

Yes

No

No

No

No

No

230V, Note 7

Yes

Yes

N/A

Zone 2, IIA, T3, IP56 min

ACCESSORY EQUIPMENT (CONTINUED)

Yes

Yes Equipment Mfgr

John Crane

20 Ka 0.25 sec

Page 12: 2014-4849-1M-1006 Rev D

Equipment Title: COOLING WATER CIRCULATION PUMP - MOTOR Document No.: 2014-4849-1M-1006

Type: MEDIUM VOLTAGE MOTOR Revision: D

Equipment Tag No.: ZDE - 4915 A/B Sheet: 11 of 16

1

2 Required Witnessed Observed

3 Acceptance Criteria

4 Lateral Critical Speed Analysis By

5 Design Review Meeting

6 Torsional Analysis By

7 Shop Inspection

8 Data Preservation

9 Material Certifications (for shaft)

10 Assembly, Maintenance and Running Clearances

11 Painting Deferred

12 Surface & SubSurface Inspection of Parts

13 Radiographic Test Parts:

14 Ultrasonic Test Parts:

15 Magnetic Particle Test Parts:

16 Liquid Penetrant Test Parts:

17 Hardness Test Parts:

18 Optional ASTM Tests to be Proposed by Vendor

19 Balance in Minimum of Three Planes

20 Check Balance with Half Coupling

21 Inspection for Cleanliness per API 614

22 Review of Quality Control Program

23 Stator Inspection Prior to Vacuum-Pressure Impregnation

24 Residual UnBalance Test

25 Routine Test @

26 Polarization Index Voltage: 1,000V 2,500V 5,000V @

27 Vibration Recording @

28 Stator Core Test

29 Special Surge Test on Sample Coils

30 Power Factor Tip-Up Test Wound Stator Sacrificial Coils

31 Sealed Winding Conformance Test

32 DC High-Potential Test

33 Complete Test @

34 Rated Rotor Temperature Vibration Test When Complete Test Not Specified

35 Bearing Inspection at Completion of Test

36 UnBalance Response Test

37 Bearing Housing Natural Frequency Test

38 Certified Data Prior to Shipment

39 Test Equipment Supplied By Purchaser

40 Test Equipment / Data Acquisition Accuracy to be Demonstrated Prior to Test

41 Other

42

43

44

45

46

47

48

49

Re

vis

ion

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION PUMPS

@ Routine Tests, Polarization Index Test and Vibration checking are included

in Complete Test.

ANALYSIS, SHOP INSPECTION, AND TESTS

Driver Equipment Manufacturer

Driver Equipment Manufacturer

Page 13: 2014-4849-1M-1006 Rev D

1

2 POWER SYSTEM STUDY DATA (TO BE COMPLETED BY VENDOR):

3

4 i) Description:

5 1 Rated output: kW

6 2 Rated Voltage: kV

7 3 Frame size:

8 4 Base kVA: kVA

9 5 Stator resistance (R1):

10 a) at oC p.u.

11 b) at oC p.u.

12 6 Stator leakage reactance (X1): p.u.

13 7 Magnetising reactance (Xm): p.u.

14 8 Rotor standstill:

15 a) Resistance (Rs): p.u.

16 b) Reactance (Xs): p.u.

17 9 Rotor running:

18 a) Resistance (Rr): p.u.

19 b) Reactance (Xr): p.u.

20 10 Synchronous reactance (Xd): p.u.

21 11 Transient reactance (X'd): p.u.

22 12 Sub-transient reactance (X"d): p.u.

23 13 Open circuit time constant (T'do): secs.

24 14 Transient short circuit time constant (T'd): secs.

25 15 Sub-transient short circuit time constant (T"d): secs.

26 16 D.C. short circuit time constant (Ta): secs.

27 17 Inertia constant (H):

28 a) Motor: kW secs / kVA

29 b) Driven equipment: kW secs / kVA

30 18 Synchronous speed: rpm

31 19 Slip at full load: %

32

33

34

35

36 ii) Characteristics: Curve Nos.

37 1 Speed/torque curve for motor and load at 80% and 100% volts:

38 2 Current/time curve at 80% and 100% volts:

39 3 Speed/time curve at 80% and 100% volts:

40 4 Current/speed curve at 80% and 100% volts:

41 5 Power factor/speed curve at 80% and 100% volts:

42

43 Notes:

44 1. Vendor to submit certified motor dimensional drawing.

45 2. Vendor to complete the required data when applicable.

46 3. TBA : To be advised later; N/A : Not Applicable;

47 4. The insulation system shall be capable of withstanding the lightning impulse voltage as per IEC 60034-15.

48 5. Separate Terminal Boxes shall be provided for Main Power, Space Heater and RTD connections. Terminal Box / Junction Box shall be IP56 as minimum.

49 6. MV motors rated at 1200kW or greater and using hydrodynamic radial bearings shall have 2 RTD elements per bearing.

50 Vertical mounted motors shall have RTD elements on the thrust bearing.

51 7. Space heaters shall be rated at 230 VAC and Operated at 110 VAC. For Submerged motor no Space Heater required.

52 8. For MV Submersible Motor Data Sheet refer to 2014-4872-3M-0004.

53 9. Test Requirements:

54 - Type Test: Certificate only required (certification by a recognized testing authority, the test documents shall include Winding temperature rise,

55 Locked rotor current and torque tests).

56 - Performance Test: IEC60034.

57 - Routine Test: IEC60034.

58 Other tests listed in IEC 60034 and Induction Motors Specification (Medium Voltage & Low Voltage) 2014-4869-3L-0004 shall be performed.

59 10. VENDOR to fill in one motor datasheet for each typical motor.

60 11. Minimum recommend motor rating is 176 kW.

Re

vis

ion

MEDIUM VOLTAGE MOTOR Revision: D

Equipment Tag No.: ZDE - 4915 A/B Sheet: 12 of 16

Value: Tolerence (%)

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION PUMPS

Equipment Title: COOLING WATER CIRCULATION PUMP - MOTOR Document No.: 2014-4849-1M-1006

Type:

Page 14: 2014-4849-1M-1006 Rev D

Equipment Title: COOLING WATER CIRCULATION PUMP - MECHANICAL SEAL 2014-4849-1M-1006

Type: API CENTRIFUGAL PUMP D

PBE-4915 A/B

1 DEFAULT SELECTION DATA SUPPLIED: CUSTOMARY UNIT SI UNIT

2 INDICATES DATA COMPLETED BY PURCHASER HARDWARE SUPPLIED: CUSTOMARY UNIT SI UNIT

3 BY SEAL VENDOR STANDARD APPLICABLE: PRIMARY REFERENCE (5.2)

4 BY SEAL VENDOR OR PURCHASER SECONDARY REFERENCE (5.2)

5

6 CATEGORY SEAL CATEGORY 1 (4.1.2) SEAL CATEGORY 2 (4.1.2) SEAL CODE (ANNEX D)

7 TYPE TYPE A (3.73) TYPE B (3.74) ALTERNATE STATIONARY (TYPE A & B)

8 (CODE-CW) TYPE C (3.75) ALTERNATE ROTATING (TYPE C) SINGLE SPRING (TYPE A)

9 ARR'GT

10 1(3.2) 1CW-FX 1CW-FL DIST. FLUSH 01 11 14 23 32 51 62

11 ALTERNATE BUSH 02 13 21 31 41 61

12 LIQUID 2CW-CW FX DIST. FLUSH 01 13 23 41 62 75

13 2 (3.3) TANGENTIAL LBO CONN. 02 14 31 52 71 76

14 GAS 2CW-CS 2NC-CS FX 11 21 32 61 72

15 LIQUID 3CW-FB 3CW-BB FX 01 13 53B 61

16 3(3.4) 3CW-FF TANG.LBO 02 32 53C 62

17 GAS 3NC-BB 3NC-FF 3NC-FB 11 53A 54 74

18 SLEEVE-SHAFT DRIVE SET SCREW ONTO SHAFT ALTERNATE (6.1.3.13) - SPECIFY :

19

20

21 FKM FFKM CARBON VS SIC UNS N10276 (TYPE B) UNS N10276 UNS S31600 / S31635

22 SPIRAL-W GASKET SIC VS SIC UNS N07718 (TYPE C) OR N06455 UNS N10276

23 NBR EPM/EPDM SS - SIC RB-SIC UNS N08020 UNS S31600 UNS N08020

24 OTHER : CS VS RB SIC OTHER : OR S31635 OTHER :

25

26 SEAL VENDOR John Crane ALTERNATE SEAL FOR PUMP PERFORMANCE TEST

27 DATA REQUIREMENTS FORM (ANNEX G) DYNAMIC SEALING PRESSURE RATING (3.19) bar(g)

28 SIZE / TYPE * / 1648 STATIC SEALING PRESSURE RATING (3.74) bar(g)

29 SEAL DRAWING NUMBER MAXIMUM ALLOWABLE TEMPERATURE (3.39)oC

30 VENDOR'S SEAL CODE C2A1A MINIMUM DESIGN METAL TEMPERATUREoC

31 MODIFIED FACES FOR PUMP PERFORMANCE TEST

32

33 ASME B73.1 & 2 CYLINDRICALHXN/DVT TAPERED ISO 13709 ISO 3069-C OTHER, SPECIFY

BOLT-ON CHAMBER (6.1.2.5) SEAL CHAMBER FLUSH PORT REQ'D SEAL CHAMBER VENT REQUIRED

35 FLOATING THROAT BUSH FIXED THROAT BUSH CHAMBER HEATING /COOLING H C

36

37 PUMP DESIGN MANUFACTURER CLYDE UNION PUMP MODEL 10 x 10 x 15A FRAME/SIZE CASE M'TL A743 Gr.CF3M

38 PUMP OPERATING PRESSURE SUCTION PRESS.(RATED) bar(g) DISCHARGE PRESS. bar(g)

39 SEAL CHAMBER NORMAL * bar(g) MIN/MAX (3.41) * / * bar(g) MSSP(3.43) * bar(g)

40 SHAFT DIA. VTC mm SHAFT SPEED 1780 r/min SHAFT DIRECT. (FROM DRIVER) CW CCW

41

42 PUMPED STREAM (REFER TO PAGE 3 OF 16 FOR PROCESS CONDITION) HAZARDOUS FLAMMABLE

43 TYPE OR NAME COOLING WATER CONC'N % FLUID SOLID @ AMBIENT

44 DISSOLVE CONTAMINANT H2S ml/m3

WET SOLIDIFIES@oC POUR POINT

oC

45 Cl2 ml/m3

OTHER @ ml/m3

PUMPED STREAM SOLIDIFIES UNDER SHEAR

46 SOLID CONTAMINANT PUMP STRAM CONTAINS AGENTS THAT POLYMERIZE

47 CONCENTRATION (MASS FRACTION) SPECIFY AGENTS @ TEMP oC

48 PUMPING TEMPERATURE PUMPED STREAM CAN PLATE OUT OR DECOMPOSE:

49 MIN.oC NORM.

oC MAX

oC SPECIFY CONDITION :

50 RELATIVE DENSITY (TO WATER @25 OC) AT REF. TEMP. PUMPED STREAM IS REGULATED FOR FUGITIVE OR

51 @ NORMAL TEMPERATURE @' MAX TEMP. OTHER EMISSIONS. REGULATION LEVEL ml/m3

52 ABSOLUTE VAPOR PRESSURE AT REFERENCE TEMP. SPECIAL PUMP CLEANING PROCEDURES

53 NORMAL TEMP. bar MAX. TEMP. bar SPECIFY:

54 ATMOSPHERIC BOILING POINToC ALTERNATE PROCESS FLUIDS & CONCENTRATION

55 VISCOSITY @ NORMAL PUMPING TEMP. cP (INCL. COMMISSIONING)

56 FLUSH FLUID If flush fluid is pumpage, then flush fluid data is not required

57 TYPE OR NAME CONC'N % ABSOLUTE VAPOR PRESSURE AT REFERENCE TEMPERATURE

58 SEAL VENDOR REVIEW REQUIRED NORMAL TEMP. bar MAX. TEMP. bar

59 FLUID TEMPERATURE ATMOSPHERIC BOILING POINT.oC

60 MINoC NORMAL

oC MAX

oC VISCOSITY @ NORMAL PUMPING TEMPERATURE Pa.s

61 RELATIVE DENSITY (TO WATER @ 25 OC AT REF. TEMP. FLOWRATE REQ'D MAX/MIN / l/min

62 @ NORMAL TEMP. @ MAX. TEMP. PRESSURE REQ'D MAX/MIN / bar(g)

Re

vis

ion

13 of 16

MATERIALS (REFERENCE 6.1.6 & ANNEX C)

SECONDARY SEALS SEAL FACES METAL BELLOWS

MECHANICAL SEAL DATA

SEAL CHAMBER DATA (REFERENCE 6.1.2.4)

PUMP DATA (REFER TO PUMP DATA SHEET FOR MORE DETAIL, PAGE 3 )

6.5 12.1

FLUID DATA (FOR QUENCH, BUFFER AND BARRIER FLUID DATA, SEE NEXT PAGE)

SPRINGS METAL PARTS

SEAL SPECIFICATION - (REF CLAUSE 1.2, FIGURES 1 TO 6)

DEFAULT CONFIGURATION ALTERNATE DESIGN FLUSH PLANS (SEE ANNEX D)

BU

FF

ER

BA

RR

IER

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION PUMPS

Document No.:

Revision:

Equipment Tag No.: Sheet:

Page 15: 2014-4849-1M-1006 Rev D

Equipment Title: COOLING WATER CIRCULATION PUMP - MECHANICAL SEAL 2014-4849-1M-1006

Type: API CENTRIFUGAL PUMP D

PBE-4915 A/B

1 INDICATES DATA COMPLETED BY PURCHASER BY SEAL VENDOR BY SEAL VENDOR OR PURCHASER

2

3 QUENCH MEDIUM SUPPLY TEMPERATURE MAX/MIN /oC

4 TYPE OR NAME FLOWRATE REQ'D MAX / MIN / l/min

5 BUFFER / BARRIER MEDIUM

6 TYPE OR NAME RELATIVE DENSITY (TO WATER @ 25 oC) AT REF. TEMP.

7 PURCHASER SELECTION SEAL VENDOR SELECT'N @ NORMAL TEMP @ MAX TEMP

8 SEAL VENDOR REVIEW PURCHASER REVIEW ABSOLUTE VAPOR PRESSURE AT REFERENCE TEMPER.

9 FLOW RATE REQ'D MAX / MIN / l/min @ NORMAL TEMP bar @ MAX TEMP bar

10 COOLING / HEATING REQ'D (+ OR -) kW ATMOSPHERIC BOILING POINT (LIQUID)oC

11 SUPPLY PRESSURE MAX / MIN * / * bar(g) VISCOSITY @ NORMAL TEMP. (LIQUID) Pa.s

12 FLUID OPERATING TEMPERATURE SPECIFIC HEAT CAPACITY @ CONSTANT PRESSURE

13 MINoC NORMAL *

oC MAX

oC FOR LIQUID @ NORMAL TE,MPERATURE J/Kg.K

14

15 CONTROL VOLTAGE V PHASE HERTZ COOLING H2O SUPPLY TEMP.oC Cl2 ml/m

3

16 ELECTRICAL AREA CL. GR. DIV. TEM. CLASS COOLING H2O PRESS. NORM. / DES. / bar(g)

17 DESIGN AMBIENT MIN./MAX. 19 / 35oC EXPLOSIVE AREA CLASS (DIRECTIVE 94/9/EC)

18

19 GENERAL PLAN 52 AND 53 SYSTEM - CONTINUED

20 JOINT USER / VENDOR LAYOUT OF EQUIPMENT (8.1.4) EQUIPMENT SUPPORT VENDOR ` FILLING SYSTEM VENDOR

21 SPECIAL REQUIREMENTS FOR HAZARDOUS SERVICE ASME CODE STAMP REQUIRED

22 SPECIAL CLEANING AND DECONTAMINATION REQ'TS RESERVOAR CAPACITY (8.5.4.3.1) l

23 UTILITY MANIFOLD CONNECTION REQUIRED (8.4.4) NLL TO GLAND PLATE HEIGHT (8.5.4.2.3) m

24 TYPE AND SPEC. OF HEAT TRACING (8.6.5.8) PRESSURE CASING MAWP (3.40) bar(g) @oC

25 THERMAL RELIEF VALVES REQUIRED (9.8.3) SET PRESSURE RANGE, MAX / MIN. / bar(g)

26 COOLING SYSTEM SYSTEM HOLD-UP PERIOD (PLANS 53B & 53C) DAYS

27 HEAT EXCHANGER VENDOR PRESSURE SWITCH (8.5.4.2.7) TO ACTIVE ON:

28 WATER COOLED AIR COOLED ASME B31.3 RISING PRESSURE (ARR.,2) SET @

29 EQUIPMENT REFERENCE / CODE FALLING PRESSURE (ARR.,3) SET @

30 COOLING WATER LINES VENDOR HIGH LEVEL ALARM REQUIRED (8.5.4.2.8)

31 TUBING GALVANIZED PIPING (8.4.2) FLANGED SS 316L PIPING H/Q CURVE FOR INTERNAL CIRCULATING DEVICE (8.6.2.1)

32 COOLING WATER FLOWRATE l/min TEST BASED H/Q CURVE FOR INTERNAL CIRC. DEVICE

33 SIGHT FLOW INDICATORS (8.4.3) OPEN CLOSED EXTERNAL CIRCULATING PUMP (8.6.3.1)

PLAN 11, 12, 13, 31 AND 41 PLAN 72 & 74 SYSTEM

35 CONNECTING LINES VENDOR EQUIPMENT VENDOR HIGH FLOW ALARM SWITCH (8.6.6.5)

36 TUBING PIPING (8.5.2.1) ( Note b ) PLAN 75 & 76 SYSTEM

37 RESTRICTION ORIFICE NIPPLE IN FLUSH LINE (8.5.2.3) EQUIPMENT VENDOR

38 CYCLONE SEPARATOR VENDOR HIGH LEVEL ALARM SWITCH FOR PLAN 75 (8.6.5.3) TEST CONNECTION (8.6.5.4)

39 PLAN 52 AND 53 SYSTEMS INSTRUMENTATION

40 STANDARD (FIG. D.26) ALTERNATE (FIG. D27) USER SPECIFICATION REFERENCE FOR - INSTRUMENTATION / CONTROLS

41 DIMENSIONAL VARIATIONS TO STANDARD (FIG. D26) PRESSURE GAUGES (9.4) OIL FILLED PRESSURE GAUGES (9.4.3)

42 DIMENSIONAL VARIATIONS TO ALTERNATE (FIG. D27) PRESSURE SWITCHES (9.5.2) TRANSMITTER (9.5.2.3)

43 ALTERNATE FABRICATION STANDARD LEVEL SWITCHES (9.5.3)

44 PRIMARY EQUIPMENT VENDOR HYDROSTATIC CAPACITANCE ULTRASONIC

45 VENDOR REFERENCE / CODE LEVEL INDICATORS (9.6) TRANSMITTER (9.5.3.2)

46 CONNECTING LINES VENDOR WELD PAD EXTERNAL REMOVABLE (9.6.2)

47 TUBING FLANGED SS 316L PIPING (8.5.4.4.9) FLOW INDICATOR (9.7) TRANSMITTER (9.7.2)

48

49 PURCHASER PARTICIPATION IN INSPECTION & TEST SPECIFY : 100% INSPECTION OF ALL WELDS (6.1.6.10.5.1) USING:

50 INSPECTOR'S CHECK LIST (10.1.7 & ANNEX E) MAGNETIC PARTICLE LIQUID PENETRANT

51 OPTIONAL QUALIFICATION TESTING REQ'D (10.3.1.1.2) RADIOGRAPHIC ULTRASONIC

52 PURCHASER APPROVAL REQUIRED FOR WELDED MODIFIED FACES FOR PUMP TEST (10.3.5.2.1)

53 CONNECTION DESIGNS (6.1.6.10.5.4) ALTERNATE SEAL PUMP TEST (10.3.5.2.2)

54 HARDNESS TEST (10.2.14) REQUIRED FOR :

55 NOTES a) VENDOR to complete the data sheet and advise mechanical seal construction, materials selection and seal flushing plan.

56 b) Flush pipe material shall be 316L

57

58

59

60

61

62

Re

vis

ion

14 of 16

FLUID DATA - (QUENCH, BUFFER AND BARRIER FLUID DATA, LIQUID AND GAS)

SITE AND UTILITIES (REFER TO PUMP DATA SHEET, PAGE 3 OF 16)

ACCESSORIES (CLAUSES 8 AND 9)

INSPECTION AND TESTING

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION PUMPS

Document No.:

Revision:

Equipment Tag No.: Sheet:

Page 16: 2014-4849-1M-1006 Rev D

Equipment Title: COOLING WATER CIRCULATION PUMP - NOISE 2014-4849-1M-1006

Type: API CENTRIFUGAL PUMP D

PBE-4915 A/B

1 APPLICABLE TO : PROPOSALS PURCHASE AS BUILT

2 CUULONG JOINT OPERATING COMPANY

3 SU TU TRANG PIP

4 COOLING WATER

5

6 THE OVERALL MAXIMUM PERMISSIBLE SOUND LEVEL FOR THE EQUIPMENT IS SPECIFIED IN THE TABLE BELOW.

7 VENDOR SHALL COMPLETE THE TABLE BELOW.

8 ALL SOUND DATA FOR THIS TABLE IS :

9 SOUND PRESSURE LEVELS IN dB dBA (RE 0.0002 MICROBAR)

10 AT METRE FROM MAJOR EQUIPMENT BOUNDING SURFACES.

11 SOUND POWER LEVELS IN dB dBA (RE 10^-12 WATT)

12

13

14

15

16

17

18

19 VENDOR SHALL COMPLETE THE TABLE BELOW.

20 ALL SOUND DATA FOR THIS TABLE IS :

21 SOUND PRESSURE LEVELS IN dB dBA (RE 0.0002 MICROBAR)

22 AT METRE FROM MAJOR EQUIPMENT BOUNDING SURFACES.

23 SOUND POWER LEVELS IN dB dBA (RE 10^-12 WATT)

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39 DESCRIPTION OF SPECIAL DESIGN

40

41

42 DESCRIPTION OF ACOUSTIC TREATMENT

43

44

45 REMARKS :

46 a) The maximum permissible sound levels apply to the equipment over it's entire operating range.

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

Re

vis

ion

8000

4000

2000

1000

500

250

125

SPECIAL DESIGNWITH ACOUSTIC

TREATMENTFREQUENCY

(Hz)

63

1.0

OCTAVE BAND MANUFACTURER'S ESTIMATED MAXIMUM MANUFACTURER'S GUARANTEED MAXIMUM

CENTER

NORMAL DESIGN SPECIAL DESIGN

NORMAL

WITH ACOUSTIC

TREATMENTNORMAL DESIGN

85 dBA

MANUFACTURER'S ESTIMATED MAXIMUM

WITH ACOUSTIC

SOUND LEVEL DESIGN DESIGN TREATMENT DESIGN DESIGN TREATMENT

PERMISSIBLE

FOR

SPECIAL WITH ACOUSTIC NORMAL SPECIAL

SERVICE

1.0

OVERALL SOUND LEVEL DATA

OVERALL MAX.

SITE

MANUFACTURER'S GUARANTEED MAXIMUM

OCTAVE BAND SOUND LEVEL DATA

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION PUMPS

Document No.:

Revision:

Equipment Tag No.: Sheet: 15 of 16

Page 17: 2014-4849-1M-1006 Rev D

Equipment Title: COOLING WATER CIRCULATION PUMP - WEIGHT 2014-4849-1M-1006

Type: API CENTRIFUGAL PUMP D

PBE-4915 A/B

1 APPLICABLE TO : PROPOSAL 1ST ESTIMATE (AFTER P.O.) DETAILED ESTIMATES AS BUILT

2 UNIT

3 RFQ / P.O. NO.

4 VENDOR

5

6

7

8

9

10 kg

11 kg

12 kg

13 kg

14

15 kg

16 kg

17 kg

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33 HXN/DVT

34

35

36

37

38 MEASUREMENT STATUS

39

40

41

42

43

44

45

46 a) VENDOR TO SPECIFY MAXIMUM EQUIPMENT / SKID DIMENSIONS.

47 b) VENDOR TO SPECIFY MINIMUM MAINTENANCE ENVELOPE DIMENSIONS.

48 c) ALL DIMENSIONS SHALL BE IN mm AND REF. POINT BE CLEARLY INDENTIFIED ON DRAWINGS AND EQUIPMENT / SKID.

49 d) PURCHASER SHALL SPECIFY THE TARGET WEIGHT UNCERTAINTY FOR EACH EQUIPMENT / SKID.

50 e) VENDOR SHALL ADVISE THE REASONS AND PROPOSE RECTIFICATION ACTIONS, IF THE WEIGHT ESTIMATE IS OUTSIDE.

51

52

53

54

55

56

57

58

Re

vis

ion

EQUIPMENT / SKID DIMENSIONS AND C.O.G. DATA

DIMENSION 'Z'

DIMENSION 'W'

REMARKS

DIMENSION 'X'

DIMENSION 'Y'

DIMENSION 'H'

EQUIPMENT / SKID ENVELOPE C.O.G LOCATION

PROPOSAL PRELIMINARY EST. DETAILED EST. AS BUILT

DIMENSION 'L'

MAINTENANCE WEIGHT OF COMPONENTS :

TRANSPORT WEIGHT

HYDROTEST WEIGHT

DRY WEIGHT 2941 ( VTC )

OPERATING WEIGHT

TARGET WEIGHT UNCERTAINTY 15% 8% 6% 2%

VENDOR WEIGHT UNCERTAINTY

SERVICE COOLING WATER

WEIGHT DATA

WEIGHT STATUS PRELIMINARY & IFC AFC AS BUILT WEIGHED

FOR CUULONG JOINT OPERATING COMPANY PBE-4915 A/B

SITE SU TU TRANG PIP

16 of 16

SU TU TRANG FULL FIELD DEVELOPMENT – PHASE 1

DETAILED ENGINEERING AND PROCUREMENT ENGINEERING

SUPPORT SERVICES

MECHANICAL DATA SHEET FOR COOLING WATER CIRCULATION PUMPS

Document No.:

Revision:

Equipment Tag No.: Sheet:

C.O.G.

'L'

'X'

FRONT

'W'

'Y'

PLANREF. POINT (DATUM)

C.O.G.

'H'

'Z'

ELEVATIONREF. POINT (DATUM)

EQUIPMENT / SKID