2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R Program Office Code 416, Building 6, Room C200 NASA Goddard Space Flight Center Greenbelt, MD 20771 [email protected]http://www.goes-r.gov/
16
Embed
2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Current Milestone Deliverable Integration / Test GSP Slack ConstructionPlanned Available Date
Fiscal YearTask #
GOES-R Program Milestones1
GOES-R Ground Segment
DOST
2
GSP SI&T
Core Ground Segment3
RMM Upgrade (RMMU)
Enterprise Infrastructure (EI)
Initial Product Sets (IPS)
MM Flight Ready (MMFR)
Final Product Sets (FPS)
Antenna System4
ESPDS / PDA5
Facility Upgrades - NSOF & WCDAS
8
IT Security A & A11
4/14
MOR
5/14
SIR
6/14
ETE1
9/14
ETE2
12/14
ETE3
4/15
FOR
6/15
ETE4
8/15
ETE5
9/15
ORR
10/15
MRRLPD10/15
Form DOST 8/13 2/14
GSIR
6/15
Pre-DOT
7/15
DOT-1DOT-29/15
5/15
GSIT1
6/15
GSIT2
8/15
GSIT3
7/13
RelMM
RMMU4/14
9/14
EI
11/14
IPS
3/15
HarrisMMFR
4/15
MMFR & FPS Need
9/16
PLU
2/14
Builds Complete
FT & PSR 2/14
PAD4/14
7/14
EB 4.0
1/15
EB 5.0
6/13
BuildsComplete
12/13
FT & PSR
PAD 8/14
11/13
BuildsComplete
5/14
FT & PSR
PAD 10/14
6/14
Builds Complete
9/14
FT & PSR
PAD 3/15
6/14
Builds Complete
9/14
FT & PSR
PAD 3/15
9/13
Phase 1FAT
Phase 2 SIT05/14
Phase 1PAD 5/14
8/14
Phase 2 PAD 7/14
3/15
Phase 3 SIT
Phase 3PAD 5/15
1/14
Inc 1 ORR
5/14
Inc 2 TRR
10/14
5/13
NSOFRMM InstallReadiness
11/13
WCDAS EI Install
Readiness
1/14
NSOFEI Install
Readiness
WCDASConstruction
Comp 2/14
6/14
NSOF Building/ Facility Comp
8/13
RMM Update
12/14
Final A&A
7/15
SARComplete
9/15
ATOGranted
Notes:
CA: Contract Award CDR: Critical Design Review DOT: Data Operational Testing ETE: End to End Test MOR: Mission Operations Review ORR: Operational Readiness Review PDR: Preliminary Design Review PSR: Pre-Ship Review SIR: Systems Integration Review TRR: Test Readiness Review
1. Increment Integration: Each L2+ algorithm is implemented separately following descriptions provided in the ATBDs – Software Item Qualification Test (SIQT) is the test event where individual algorithm
requirements are verified2. Build Integration: L2+ algorithms that pass SIQT are integrated in precedence
– Software Build tests (ABIL2, R2ALG) verify that the data can be processed in precedence
• Products are created in NetCDF consistent with product definitions that are documented in the Product Definition and Users’ Guide (PUG)
• Metadata consistent with GOES-R Metadata Model3. Release Integration: Multiple Ground System elements (Mission Management, Product
Generation, Product Distribution and Enterprise Management) are integrated during different Releases.– Releases are deployed at site (NSOF, WCDAS, RBU), verified and handed over to NOAA– Initial Product Set Release includes Cloud & Moisture Imagery product generation and
distribution to AWIPS– Final Product Set Release includes remaining L2+ products (Clouds, Aerosols, Winds,
• ABI Product Generation Algorithms are implemented in a phased manner1. Develop L0→L1b →GRB (completed)2. Develop L0→L1b →GRB →CMI (In work)3. Develop L2+ Science software (completed for all algorithms)4. Operationalize L2+ algorithms – Process in precedence to
meet latency and refresh; create end products to send to externals (PDA, AWIPS)
a) Completed CMI, Air Quality, Soundings, Cloudsb) Hydrology, Aviation, Winds, Land, Ocean and Radiation
Products to be completed in 3/20145. End to End Capabilities to ingest L0 data from Mission
Management to process higher L2+ products (In work)
• Science data provided by AWG with 100% ATBDs was meant to test correct implementation of science– Only CMI data is realistic representation of ABI– Test data for all other products came from SEVIRI/MODIS/GOES-12
• Adequate for science testing one algorithm at a time. – Very good results achieved during science software development (see following
slides for examples)
• Not representative of ABI– Harris has been using WRF simulated data (Triplet) provided by AWG
for testing product precedence• AWG has been helping validate the products• Initial results look promising• There are some known artifacts/issues with metadata, data quality –
Harris has opened Problem Tracking Reports (PTRs) to fix them; ongoing process