Top Banner
Assignment 02 option 2. IN SITU-interim submission address:329 Melbourne Road Newport Victoria 3015 634091 Vicky Li Constructing Environments Semester 2 2013
7

2013 Assignment 02 interim submission

Mar 23, 2016

Download

Documents

Melon

Assignment 02 interim submission Constructing Environments University of Melbourne
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2013 Assignment 02 interim submission

Assignment 02 option 2. IN SITU-interim submission address:329 Melbourne Road Newport

Victoria 3015

634091 Vicky Li

Constructing Environments Semester 2 2013

Page 2: 2013 Assignment 02 interim submission

Structural Concepts

Masonry structural system

Constructing Environments Semester 2 2013

Concrete structural system

Timber structural system -Wall system require diagonal bracing for lateral stability(Ching 2008 page5.03)

Page 3: 2013 Assignment 02 interim submission

Timber--good tensile strength & compressive strength

Materials & Construction

Constructing Environments Semester 2 2013

Masonry(eg:Bricks)-- good compressive strength

Page 4: 2013 Assignment 02 interim submission

Materials & Construction Constructing Environments Semester 2 2013

Masonry ------ mass construction

Timber ------ frame construction

Page 5: 2013 Assignment 02 interim submission

Aesthetic design & Function Constructing Environments Semester 2 2013

Page 6: 2013 Assignment 02 interim submission

More Information

• Three stories • budget: $200,000 • Archtect: Kenny Le

Constructing Environments Semester 2 2013

Page 7: 2013 Assignment 02 interim submission

References

Ching F 2008, Building Construction illustrated (4th edition),John Wiley&Sons, Hoboken

Constructing Environments Semester 2 2013