2012 Process Safety KPIs DSM Vicente da Cunha DSM PS competence manager
12

2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

Oct 08, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

2012 Process Safety KPIs

DSM

Vicente da Cunha

DSM PS competence manager

Page 2: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

Page 1 Vicente Golin da Cunha

DSM House of Process Safety

• Process Safety Network

• Process Safety is held up by 3 pillars, integrity

elements

– Operations: Training, Personal Discipline,

Operability Limits, SOPs

– Plant: Hardware design, Maintenance,

Construction, Reliability

– Design: Process design, SHE, Engineering

• Pillars are supported by 3 Bases

– Requirements: Authorities, OSHA, EPA, PSN-GN,

DSM SHE

– Competence and Expertise: Identification of roles

and qualification of people

– Performance Measurement: Key Performance

Indicators, indicators triggering continuous

improvement

Operation

Integrity

Requirements (internal, external)

Competence & Expertise

Performance Measurement

Process Safety

Plant

Integrity Design

Integrity

Page 3: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

Page 2 Vicente Golin da Cunha

After using own thresholds, DSM adopted the reporting of Process Safety Incidents (PSI) as defined per CEFIC definition and targets reduction were defined compared to base year 2010 (193 PSI) 50 % in 5 years 75% in 10 years

Looking at PSI only is not sufficient… Key performance indicators make process safety visible To support the plant/sites with the improvement of their process safety performance and consequently achieve the target reduction PSI is a low number (magnitude 1 incident per site per year)

PSI reporting

Page 4: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

Page 3 Vicente Golin da Cunha

New KPI Work Process Steps/Decisions

Decide to Implement

2) Selection of PS Key Performance Indicators

3) Collection of Data

4) Monitor & Evaluate

One example: a running pilot

at a DSM site

Page 5: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

Page 4 Vicente Golin da Cunha

House of Process Safety Barrier or RCS Suggested KPI's

1Number of emergency MoC’s, Number of MoC’s and the % of in a reporting period ((# of MoC’s)/(#

of MoC’s + # of emergency MoC’s))

2Percentage of plant change actions undertaken where an adequate risk assessment was carried

out before change*

3 Number of demands on safety provisions

4 Measurement of process control capability e.g. Cpk’s of critical process safety parameters

5 Risk Assessment Number of open actions related to HAZOP (use of % is recommended)

6Percentage of work permits issued on which the hazards, risks and control measures were

sufficiently specified e.g. checks by the plant staff and operators themselves on a sample basis

7Percentage of work conducted in accordance with permit conditions e.g. checks by the plant staff

and operators themselves on a sample basis

8 Operational instructions Percentage of procedures (relevant to SHE aspects) that when used, proved to be effective, i.e.

covering the correct scope (key actions and tasks) and/or sufficient detail.

9 Overriding Total number of overrides and number of RL safety provisions overrides

10 Alarm Management Number of alarms per control room operator per hour

11Number of RL provisions that fails to operate as designed either in use or while being tested during

a reporting period

12Percentage of SHE & regulatory PPM inspections completed within due date (MAT 21)/ total

number of SHE & regulatory PPM maintenance orders

13 PS Training Percentage of planned PS training programs

14 Percentage of roles allocated within the PSLC (quarterly reporting is recommended)

15 Percentage of roles trained (quarterly reporting is recommended)

16Performance

Measurement

Analysis and number of

incidentsNumber of LOPC below corporate reporting threshold

Design integrity

Operational integrity

Plant integrity

Competence & Expertise Process Safety Life

Cycle

MoC

Process design & control

Work Permit

Inspection/maintenance

(2) Selection on suggested PS KPIs

Make an assessment of 2010 & 2011

incidents, and categorize them

based on the “Barrier” Column

Page 6: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

Page 5 Vicente Golin da Cunha

2.1 Reality check: analysis of recent incidents

2010 & 2011 Data

DCNA North Augusta

35% 34%

20%

8% 6% 1%1%0%

5%

10%

15%

20%

25%

30%

35%

40%O

pera

tional

Instr

uctio

ns

Inspectio

n/

Main

tenance

Pro

cess D

esig

n

& C

ontr

ol

PS

Tra

inin

g

Work

Perm

it

Ala

rm M

anagem

ent

Ris

k A

ssessm

ent

Barrier

% o

f P

SIs

Page 7: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

Page 6 Vicente Golin da Cunha

2.1 Reality check: analysis of recent incidents

DCNA North Augusta

35% 34%

20%

8% 6% 1%1%0%

5%

10%

15%

20%

25%

30%

35%

40%

Opera

tional

Instr

uctio

ns

Inspectio

n/

Main

tenance

Pro

cess D

esig

n

& C

ontr

ol

PS

Tra

inin

g

Work

Perm

it

Ala

rm M

anagem

ent

Ris

k A

ssessm

ent

Barrier

% o

f P

SIs

2010 & 2011 Data

• No Operating instruction KPI

• SHE Inspection KPIs in place

DCNA North Augusta

35% 34%

20%

8% 6% 1%1%0%

5%

10%

15%

20%

25%

30%

35%

40%

Opera

tional

Instr

uctio

ns

Inspectio

n/

Main

tenance

Pro

cess D

esig

n

& C

ontr

ol

PS

Tra

inin

g

Work

Perm

it

Ala

rm M

anagem

ent

Ris

k A

ssessm

ent

Barrier

% o

f P

SIs

2010 & 2011 Data

• No Operating instruction KPI

• SHE Inspection KPIs in place

2010 & 2011 Data

• No Operating instruction KPI

• SHE Inspection KPIs in place

Page 8: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

Page 7 Vicente Golin da Cunha

2.1 Reality check: analysis of recent incidents DCNA North Augusta

35% 34%

20%

8% 6% 1%1%0%

5%

10%

15%

20%

25%

30%

35%

40%O

pera

tional

Instr

uctio

ns

Inspectio

n/

Main

tenance

Pro

cess D

esig

n

& C

ontr

ol

PS

Tra

inin

g

Work

Perm

it

Ala

rm M

anagem

ent

Ris

k A

ssessm

ent

Barrier

% o

f P

SIs

2010 & 2011 Data

No KPIs in place

Control Loop Failure

Improper Design, including alarm

management

DCNA North Augusta

35% 34%

20%

8% 6% 1%1%0%

5%

10%

15%

20%

25%

30%

35%

40%O

pera

tional

Instr

uctio

ns

Inspectio

n/

Main

tenance

Pro

cess D

esig

n

& C

ontr

ol

PS

Tra

inin

g

Work

Perm

it

Ala

rm M

anagem

ent

Ris

k A

ssessm

ent

Barrier

% o

f P

SIs

2010 & 2011 Data

No KPIs in place

Control Loop Failure

Improper Design, including alarm

management

Page 9: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

Page 8 Vicente Golin da Cunha

Selection of Process Safety KPIs

House of Process Safety Barrier or RCS DSM Suggested KPI’s

Design Integrity

Process Design &

Control

• Number of demands on safety provisions

• Measurement of process control capability of

critical process safety parameters

Risk Assessment Number open actions related to HAZOP

Operational Integrity

Operational

Instructions

Percentage of procedures that when used,

proved to be effective, i.e. covering the

correct scope and/or sufficient detail

Alarm

Management

Number of alarms per control room operator

per hour

Work Permit

Percentage of work permits issued on which

the hazards, risks and control measures were

sufficiently specified

Plant Integrity Inspection/

Maintenance

Number of RL Provisions that fail to operate as

designed either in use or while being tested

during a reporting period

Competence & Expertise PS Training Percentage of planned PS Training Programs

Page 10: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

Page 9 Vicente Golin da Cunha

(4) Monitor & Evaluate: What the site opted for:

• Implement KPI for Operating Instructions

– Definition in progress

• Assess effectiveness of Maintenance integrity KPIs

– Assessment in progress

Focus Areas

Control Loops in Manual Mode

Lagging Indicator

Assessed Alarm Management

Looked at gaps and corrective actions

Lagging Indicator

Monitoring

Focus areas may change as Process Safety is

improved

Page 11: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification

Page 10 Vicente Golin da Cunha

• Effective measurements of operating instruction KPIs?

• How to balance maintenance integrity vs Business

Environment?

• Long term monitoring required; follow up on PSI

reduction

Challenges:

What is your experience in implementing

KPI for operating instructions?

Other comments?

Page 12: 2012 Process Safety KPIsevents/PSPI+Conference...• Pillars are supported by 3 Bases – Requirements: Authorities, OSHA, EPA, PSN-GN, DSM SHE – Competence and Expertise: Identification