Waukegan Harbor CitizensAdvisory Group WAUKEGAN HARBOR US AREA OF CONCERN USEPA SUPERFUND DREDGE Season 1 approx. 40,000 cu yds!!!!! TARGET REACHED!!! GO TEAM!!!
13

2012-11 Harbor Dredge Season 1

Mar 08, 2016

Download

Documents

Lisa May

2012-11 Harbor Dredge Season 1
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2012-11 Harbor Dredge Season 1

Waukegan Harbor Citizens’ Advisory Group

WAUKEGAN HARBOR

US AREA OF CONCERN

USEPA SUPERFUND DREDGE

Season 1 – approx. 40,000 cu yds!!!!! TARGET REACHED!!! GO TEAM!!!

Page 2: 2012-11 Harbor Dredge Season 1

Dredge in harbor on a very grey day.

Page 3: 2012-11 Harbor Dredge Season 1

Looking at new sea wall where sediment leaves harbor (approximately) for treatment.

Page 4: 2012-11 Harbor Dredge Season 1

A good look at the new sea wall.

Page 5: 2012-11 Harbor Dredge Season 1

Containment cell can hold up to 180,000 cubic yards of sediment. Dredge will be completed by fall 2013 !!!

Page 6: 2012-11 Harbor Dredge Season 1

Liner was sewn together by workers using a sewing machine during the long hot summer of 2012!!! The containment cell is the size of three football fields and is surrounded by lights so that the workers can help open the membranes in the geotubes as they are filled - all night during the dredge season.

Page 7: 2012-11 Harbor Dredge Season 1

Two geo-tubes folded up before being installed in the containment cell.

Page 8: 2012-11 Harbor Dredge Season 1

GEO – TUBES being filled with sediment!!!!!

Page 9: 2012-11 Harbor Dredge Season 1

The 2012 fall season of geo-tubes!!! Dredging will resume in the spring – approximately April 1, 2013. The geo-tubes will be stacked four high when completed.

Page 10: 2012-11 Harbor Dredge Season 1

“Big Blue” water treatment system. It is located north of Triax building on OMC Plant 2 site.

It will operate 24/5 “in-season” with maintenance on weekends and return clean water to the harbor.

Page 11: 2012-11 Harbor Dredge Season 1

Interior of treatment system in Triax building: Will also be used during the non-dredge season to treat weep water from containment cell.

Page 12: 2012-11 Harbor Dredge Season 1

.

Rest of water treatment system inside Triax building.

New containment cell for harbor sediment.

Triax Building – site of water treatment system