2011 2012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility Standard Options Identify preferred alternate mobility standard Local Adoption Compile technical work into the Facility Plan Project Schedule Project advisory committee meeting Public Open House Newport South Beach Facility Plan
11

20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

Mar 27, 2015

Download

Documents

Miguel McGuire
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

2011 2012

Public Involvement Open Houses

Develop Problem Statement

Review plans, policies, regulations, and standards

Identify and assess Alternate Mobility Standard Options

Identify preferred alternate mobility standard

Local Adoption

Compile technical work into the Facility Plan

Oregon Transportation Commission Adoption

Project Schedule

Project advisory committee meeting

Public Open HouseNewport South Beach Facility Plan

Page 2: 20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

South Beach Study AreaFrom Yaquina Bay Bridge south to SW 62nd Street

35th Street

40th Street

50th Street (Current alignment)

50th Street (New alignment)

South Beach State Park

32nd Street

Newport South Beach Facility Plan

Page 3: 20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

• The Yaquina Bay Bridge constrains traffic on US 101. Today, on summer weekends and on special fishing seasons such as opening day

for halibut. At planning horizon, the bridge will be a constraint much more frequently.

• Significant congestion and delays, especially in summer, expected to exceed 2012 ODOT mobility targets.

• Conditions closer to the bridge expected to be worse.

• Highway traffic demand near bridge could exceed highway capacity up to 8 hours per day during summer.

• Even with improvements, traffic would exceed 2012 OHP mobility targets.

Future Traffic Conditions: Year 2030

Newport South Beach Facility Plan

Page 4: 20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

Traffic Growth

• Future development adds about 3,900 trips by 2030

• 70% of new trips assumed to head north, 30% south.

• Major improvements to US 101 and local system needed to support development.

Newport South Beach Facility Plan

Page 5: 20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

Assumed Improvements on US 101

Projections of future traffic conditions assume the following projects will occur (some are funded through the URD, others are unfunded):

•Intersection upgrades including new traffic signals

•US 101 widening (4 lanes)

•Off-highway local roadway connections

Newport South Beach Facility Plan

Page 6: 20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

• South Beach Urban Renewal District• Anticipated $5 Million over 20 years to pay for projects in URD

Plan

• ODOT/FHWA• No funding is known at this time

• Property Developers• Frontage improvements; local network improvements

• What about the Yaquina Bay Bridge?• No funds currently identified to address this need

Funding: How will projects be paid for?

Newport South Beach Facility Plan

Page 7: 20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

• Management tool to balance land development and traffic congestion on US 101

• Allows more traffic congestion given lack of funds for major highway projects

• Provides greater predictability for developers and the City about acceptable level of land development

• Creates an agreement among City, County, and ODOT about future growth in South Beach.

• Replaces current stop-gap management of S 40th Street.

Alternate Mobility Standards

Newport South Beach Facility Plan

Page 8: 20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

• Traffic Mobility – Optimize travel reliability• Provides expectation for summertime tourist season and off-season

congestion along US 101.

•Accessibility• Provides an interconnected network of off-highway streets for local

travel and property access.

• Land Development Predictability• Provides a common understanding among the jurisdictions, land

owners and developers.

•Flexibility – adaptable to changing conditions• Allow for monitoring and periodic updates to adjust traffic and

population assumptions

•Ability to fund• Link facility improvements with property development.

Alternate Mobility Standards: Goals & Objectives

Newport South Beach Facility Plan

Page 9: 20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

1. Location: Where will the standards be implemented? At signalized intersections? Unsignalized intersections? All intersections? A

corridorstandard? Separate directional standards (north vs. south)?

2. Analysis Period: What time period is to be used? The summer time weekday peak hour (high congestion)? The annual average

traffic(comparable to May or October)? Off-season peak?

3. When are the Standards Implemented? At adoption? When roadway projects are completed? When intersections are

signalizedand upgraded?

4. Allowed Congestion Level: What will the level of congestion be? Extremely congested and over capacity? Somewhat congested? Similar to currentstandards?

5. Land Use Policy Changes: How can development in South Beach be managed so that it does not exceed the alternate mobility standard? Trip caps? Trip budgets? Overlay zones? Phased development?

Alternate Mobility Standards: Common Elements

Newport South Beach Facility Plan

Page 10: 20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

1. Location: Where will the standards be implemented? At signalized intersections. Measured at SE32nd Street now; at S 35th, S 40th

andSE 50th /South Beach State Park in the future

2. Analysis Period: What time period is used for analysis? The annual average traffic (shoulder tourist season). It involves fewer

analysisassumptions than Off-Season, so less likely to create problematic TIAs.

3. When are the Standards Implemented? At adoption. A single time point rather than multiple points.

4. Allowed Congestion Level: What will the level of congestion be? Dependent upon proximity to the bridge--extremely congested and over

capacitynear the bridge; somewhat congested further away.

5. Land Use Policy Changes: How to manage development in South Beach? Use trip budgets and reserve fund, and plan for most likely development

Alternate Mobility Standards: Decisions

Newport South Beach Facility Plan

Page 11: 20112012 Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.

• Total trip budget from planned development identified.• Trip Budget for each TAZ created, plus a South Beach

Trip Reserve Fund.• Reserve Fund usable in any TAZ after TAZ Budget is

exceeded. Reserve Fund is 10% of total trip budget• South Beach Overlay Zone – Implementation

mechanism for the trip budget without affecting similarly zoned land elsewhere in Newport

• Phased development – Each TAZ to develop to extent projected—this is not full development of South Beach.

Alternate Mobility Standards: Implementation

Newport South Beach Facility Plan