Top Banner
CONSTRUCTION DAILY REPORT CONTRATISTA: No 00047 PROCOPET SITUCHE NORTE 4X GENERAL INFORMATION: WORK PROGRESS: (%) BUDGET USD$: Estimated Executed FUEL CONSUMPTION: FLIGHT HOURS CHARGED: Initial Date 5/13/2011 Working days: 47 Estimated : 40.43 Lump Sum 2,582,760.79 691,885.07 D2 Gasoil MI-17 MI-8 Chinook Other Termination Date 9/28/2011 Working hours: 270 Current: 6.45 - - - Daily - - Daily Report Date 6/28/2011 Accum Manhours 5200 Others - - Accum. ### 175.00 Accum. - 24.0 9.8 - INCIDENTS / ACCIDENTS: SN4X: - OTHER: Manhours worked since last accident ### Total LTA since initial Date - Description: No incidents / accidents reported LUMP SUM CONTRACT INCIDENCE % DESCRIPTION LAST ACCUM. DAY PROGRESS CURRENT ACCUM. DAY ESTIMATED 1 16.26% Preliminary Works (mobilization/demob) 0.813 - 4.797 7.562 2 5.42% Clearing/Cleaning & Soil Movement - 0.095 1.653 5.421 3 5.39% Cuttings & Water Pits - - - 2.154 4 0.46% Grease Pits - - - 0.040 5 4.82% Burning Pit - - - - 6 5.00% Drainage System - - - 4.397 7 21.21% Rig Skid Piles Driving and H beam Frame - - - 5.037 8 10.74% Chemical Warehouse - - - 7.734 9 2.51% Helipads - - - 2.506 10 4.45% Dura base (mating) instalation - - - 0.891 11 0.72% Containment Pits for fuel tanks and pums - - - - 12 3.68% Grounding and Lightning rods - - - 1.839 13 1.36% Cellars and 30in Conductor pipe - - - 1.084 14 2.12% Water intake hose - - - 1.764 15 15.87% Foundations for Mud tanks - - - - 16 17 18 19 WORK FORCE (SITUCHE NORTE 4X) QTY QTY 20 Talisman Supervision 1 Welder 0 21 Construction Engineer 1 Welder Assitant 0 22 Planner Engineer 0 Heavy Equipment Operator 4 23 HSE supervisor 1 Construction workers and Car 0 24 Doctor 1 General Laborer 4 25 Administrator / Warehouse man 1 CCNN Laborers 0 26 Construction Foreman 1 Mechanics & Electricians 3 27 Topographer 1 Catering Personnel 2 28 Riggers 0 Geomembrane operator 0 29 Chainsaw Operator 2 Pile driving personnel 0 100.00% 0.813 0.095 6.450 40.428 Operators (Plant, Incinerator, etc) 0 Other 5 Assembler 0 COMPLEMENTARY WORKS: TOTAL PERSONNEL 27 INCIDENCE % DESCRIPTION LAST ACCUM. DAY PROGRESS CURRENT ACCUM. DAY ESTIMATED 1 0% - - - - - EQUIPMENT (SITUCHE NORTE 4X) HOURS HOURS 2 0% - - - - - Caterpillar tractor 6 Minor equipment 0 3 0% - - - - - Chainsaw 0 Mixer 0 4 0% - - - - - Crane 0 Retro excavator 0 0.00% - - - - Electric generator 12 Roller 0 Excavator 6 Welding Machine 0 MAIN ACTIVITIES: Frontal Loader 0 Wood chipper 0 Geomembrane welding equip. 0 Others 0 Manlift 0 TOTAL HOURS 24 COMMENTS: PICTURES: Roots extraction for emergency heliport finished a Cleaning of emergency heliport area finished fuel pit for minors equipments relocated heavy equipment (excavator 320D) assembly culminated CONTRACTOR SUPERVISOR TALISMAN SUPERVISOR ENG. LUIS FERNANDO COBLENTZ ENG. ERICK JAUREGUI Cleaning of heliport emergency area.Advance 50%. Fuel pit for minor equipments relocated,finished heavy equipment assembly. Topography activities Morning activities were suspended because they had no equipment and operators in their respective certifications and sent us campo.Luego operations continued. CAMP CLEAN PETREX 40% 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec 0 10 20 30 40 50 60 70 80 90 100 Work Progress Comparative Curve Current Estimated Completed %
229
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2011.06.28 SN4X Construction Report-Anterior

CONSTRUCTION DAILY REPORT CONTRATISTA:

No 00047PROCOPETSITUCHE NORTE 4XGENERAL INFORMATION: WORK PROGRESS: (%) BUDGET USD$: Estimated Executed FUEL CONSUMPTION: FLIGHT HOURS CHARGED: Initial Date 5/13/2011 Working days: 47 Estimated : 40.43 Lump Sum 2,582,760.79 691,885.07 D2 Gasoil MI-17 MI-8 Chinook OtherTermination Date 9/28/2011 Working hours: 270 Current: 6.45 - - - Daily - - DailyReport Date 6/28/2011 Accum Manhours 5200 Others - - Accum. 1,055.00 175.00 Accum. - 24.0 9.8 -

INCIDENTS / ACCIDENTS: SN4X: - OTHER: Manhours worked since last accident: 5,200 Total LTA since initial Date: - Description: No incidents / accidents reported

LUMP SUM CONTRACT

Nº INCIDENCE % DESCRIPTION LAST ACCUM. DAY PROGRESS CURRENT ACCUM. DAY ESTIMATED

1 16.26% Preliminary Works (mobilization/demob) 0.813 - 4.797 7.562

2 5.42% Clearing/Cleaning & Soil Movement - 0.095 1.653 5.421

3 5.39% Cuttings & Water Pits - - - 2.154

4 0.46% Grease Pits - - - 0.040

5 4.82% Burning Pit - - - -

6 5.00% Drainage System - - - 4.397

7 21.21% Rig Skid Piles Driving and H beam Frame - - - 5.037

8 10.74% Chemical Warehouse - - - 7.734

9 2.51% Helipads - - - 2.506

10 4.45% Dura base (mating) instalation - - - 0.891

11 0.72% Containment Pits for fuel tanks and pums - - - -

12 3.68% Grounding and Lightning rods - - - 1.839

13 1.36% Cellars and 30in Conductor pipe - - - 1.084

14 2.12% Water intake hose - - - 1.764

15 15.87% Foundations for Mud tanks - - - -

16

17

18

19 WORK FORCE (SITUCHE NORTE 4X) QTY QTY

20 Talisman Supervision 1 Welder 0

21 Construction Engineer 1 Welder Assitant 0

22 Planner Engineer 0 Heavy Equipment Operator 4

23 HSE supervisor 1 Construction workers and Carpente 0

24 Doctor 1 General Laborer 4

25 Administrator / Warehouse man 1 CCNN Laborers 0

26 Construction Foreman 1 Mechanics & Electricians 3

27 Topographer 1 Catering Personnel 2

28 Riggers 0 Geomembrane operator 0

29 Chainsaw Operator 2 Pile driving personnel 0100.00% 0.813 0.095 6.450 40.428 Operators (Plant, Incinerator, etc) 0 Other 5

Assembler 0

COMPLEMENTARY WORKS: TOTAL PERSONNEL 27

Nº INCIDENCE % DESCRIPTION LAST ACCUM. DAY PROGRESS CURRENT ACCUM. DAY ESTIMATED

1 0% - - - - - EQUIPMENT (SITUCHE NORTE 4X) HOURS HOURS

2 0% - - - - - Caterpillar tractor 6 Minor equipment 0

3 0% - - - - - Chainsaw 0 Mixer 0

4 0% - - - - - Crane 0 Retro excavator 00.00% - - - - Electric generator 12 Roller 0

Excavator 6 Welding Machine 0

MAIN ACTIVITIES: Frontal Loader 0 Wood chipper 0Geomembrane welding equip. 0 Others 0Manlift 0

TOTAL HOURS 24

COMMENTS:

PICTURES:

Roots extraction for emergency heliport finished at 50% Cleaning of emergency heliport area finished at 50% fuel pit for minors equipments relocated heavy equipment (excavator 320D) assembly culminated

CONTRACTOR SUPERVISOR TALISMAN SUPERVISORENG. LUIS FERNANDO COBLENTZ ENG. ERICK JAUREGUI

Cleaning of heliport emergency area.Advance 50%. Fuel pit for minor equipments relocated,finished heavy equipment assembly. Topography activities

Morning activities were suspended because they had no equipment and operators in their respective certifications and sent us campo.Luego operations continued.

CAMP CLEAN PETREX 40%

30-D

ec2-

Mar

2-M

ay2-

Jul

2-Se

p2-

Nov

2-Ja

n2-

Mar

2-M

ay2-

Jul

2-Se

p2-

Nov

2-Ja

n2-

Mar

2-M

ay2-

Jul

2-Se

p2-

Nov

2-Ja

n2-

Mar

2-M

ay2-

Jul

2-Se

p2-

Nov

2-Ja

n2-

Mar

2-M

ay2-

Jul

2-Se

p2-

Nov

2-Ja

n2-

Mar

2-M

ay2-

Jul

2-Se

p2-

Nov

2-Ja

n2-

Mar

2-M

ay2-

Jul

2-Se

p2-

Nov

2-Ja

n2-

Mar

2-M

ay2-

Jul

2-Se

p2-

Nov

2-Ja

n2-

Mar

2-M

ay2-

Jul0

10

20

30

40

50

60

70

80

90

100

Work Progress Comparative CurveCurrent Estimated

Com

plet

ed %

Page 2: 2011.06.28 SN4X Construction Report-Anterior

SITUCHE NORTE 4X

LISTA DE PARTIDAS Inci

de

nci

a

1.1 Movilización y Desmovilización de Equipos y Personal 8.52% 0.53

1.2 7.74% 0.26

1TRABAJOS PRELIMINARES 16.26% 0.79

2.1 Trazo y Replanteo 0.77% 0.01

2.2 0.77% 0.04 2.3 Corte y relleno compensado 1.94% -

2.4 Relleno compactado estructural 1.94% -

2MOVIMIENTO DE TIERRAS 5.42% 0.05

3.1 Trazo y Replanteo 0.25% - 3.2 Excavación en Terreno Natural 0.72% - 3.3 Eliminación de Material Excedente 0.20% - 3.4 Relleno compactado con material impermeable 0.36% - 3.5 Nivelado y compactación e=0.20m 0.32% - 3.6 Suministro y colocación de geomembrana HDPE=1.5mm 1.02% -

3.7 Suministro y colocación de tubería de acero sch.40. D=10in 1.23% -

3.8 Suministro y colocación de planchas de apoyo de columnas 0.77% -

3.9 Montaje de techo metálico en Poza de Cortes 0.52% -

3POZA DE LODOS Y AGUA 5.39% -

4.1 Trazo y Replanteo 0.02% - 4.2 Excavación en Terreno Natural 0.08% - 4.3 Eliminación de Material Excedente 0.02% - 4.4 Relleno con material propio (incl. compactación) 0.01% - 4.5 Nivelado y Compactado e=0.20 m. 0.01% -

4.6 Suministro y colocación de geomembrana HDPE e=1.5 mm 0.13% -

4.7 Construcción de trampas de grasa al ingreso de cada poza 0.19% -

4POZA DE GRASAS 0.46% -

5.1 Trazo y replanteo 0.21% - 5.2 Excavación en Terreno Natural 1.16% - 5.3 Eliminación de Material Excedente 0.39% - 5.4 Relleno compactado con material impermeable 0.46% - 5.5 Nivelado y compactación e=0.20m 0.39% -

5.6 Suministro y colocación de geomembrana HDPE e=1.5 mm 1.16% - 5.7 Suministro y colocación de tubería de acero SCH40 d=8in 0.14% - 5.8 Suministro y colocación de tubería de acero SCH40 d=10in 0.71% - 5.9 Suministro y colocación de codos de 90. 0.19% -

5.10 Montaje de estructura metálica y cortina de agua 0.00% -

5POZA DE QUEMA 4.82% -

6.1 Trazo y replanteo 0.29% -

Ava

nce

P

on

de

rad

o

Movilización, desmovilización, campamento provisional, alimentación por 90 días

Deforestación de área de plataforma (tala, desbroce y limpieza)

Page 3: 2011.06.28 SN4X Construction Report-Anterior

6.2 Excavación en Terreno Natural 1.13% - 6.3 Eliminación de Material Excedente 0.41% -

6.4 Suministro y colocación de geomembrana HDPE e=1.5 mm 2.40% -

6.5 Suministro y colocación de alcantarillas en accesos 0.77% -

6SISTEMA DE DRENAJE PLUVIAL 5.00% -

7.1 Colocación y compactación de Relleno Estructural 0.01% - 7.2 Suministro y acondicionamiento de pilotes 10in 10.53% - 7.3 Izaje, colocación e hincado de pilotes 10in 5.28% - 7.4 Suministro, frabricación y montaje de estructura de vigas H 2.13% -

7.5 0.03% -

7.6 2.27% - 7.7 Suministro de grating para cuneta de drenaje interno 0.77% -

7.8 0.19% -

7PILOTAJE PATINES DE PLATAFORMA 21.21% -

8.1 Trazo y replanteo 0.02% - 8.2 Suministro y acondicionamiento de pilotes 10in 4.39% - 8.3 Izaje, colocación e hincado de pilotes 10in 2.20% - 8.4 Excavación en Terreno Natural 0.01% - 8.5 Colocación y compactación de Relleno Estructural 0.22% -

8.6 Suministro y colocación de geomembrana HDPE e=1.5 mm 0.20% - 8.7 Colocación de Mating Dura-Base 1.94% - 8.8 Montaje de estructura metálica y techo 0.52% - 8.9 Montaje de Vinilona 1.16% -

8.10 0.08% -

8ALMACEN DE QUIMICA 10.74% -

9.1 Excavación en Terreno Natural 0.11% - 9.2 Colocación y compactación de Relleno Estructural 0.17% - 9.3 Colocación e instalación de geomembrana HDPE 1.5mm 0.08% - 9.4 Drenajes 1.57% - 9.5 Colocación de Pavimento Flexible-Mating 0.39% -

9.6 Pintado de helipuertos según norma Peruana 0.19% -

9HELIPUERTOS 2.51% -

10.1 Trazo y replanteo 0.39% - 10.2 Colocación y compactación de Relleno Estructural 0.58% - 10.3 Acabado, refine y compactación de plataforma 1.16% - 10.4 Colocación e instalación de geomembrana HDPE 1.5mm 0.39% - 10.5 Colocación de Pavimento Flexible-Mating 0.77% -

10.6 Colocación de pavimento Unimat 1.16% -

10SUMINISTRO Y COLOCACION DE DURABASE 4.45% -

11.1 Trazo y replanteo 0.04% - 11.2 Construcción de diques en madera 0.39% -

11.3 Suministro e instalación de geomembrana HDPE e=1,5mm 0.30% -

11CONSTRUCCION DE PITS DE CONTENCION DE TANQUES DE COMB 0.72% -

Construcción de losa de mortero armado de 20cm alrededor de cellar según plano

Construcción de cunetas de drenaje interno alrededor de cellar y equipos de tratamiento de lodos

Construcción de trampa de grasa previo ingreso de cuneta interior al cellar

Relleno de espacios libres entre mating y pilotes con tablones de madera

Page 4: 2011.06.28 SN4X Construction Report-Anterior

12.1 Suministro e instalación de postes de luz 1.94% -

12.20.39% -

12.3 Pararrayo en campamento de perforación 0.77% -

12.40.58% -

12NSTALACIONES ELECTRICAS; PUESTAS A TIERRA Y PARARRAYO 3.68% -

13.1 0.77% -

13.2 0.58% -

13CONSTRUCCIÓN DE CELLAR Y CONDUCTORA DE 30in 1.36% -

14.1 Trazo y Replanteo 0.04% -

14.2 0.04% -

14.3 Suministro e instalación de geomembrana HDPE e=1,5mm 0.14% - 14.4 Colocación de Pavimento Flexible-Mating 0.35% -

14.51.16% -

14.60.39% -

14TOMA Y TENDIDO DE LINEA DE AGUA 2.12% -

15.1 8.52% - 15.2 Hincado pilotes 10in 3.87% - 15.3 Soldado de vigas WF12x6 1/2in 1.16% - 15.4 Relleno interior con suelo cemento e=15cm 0.39% -

15.5 1.94% -

15CIMENTACION DE TANQUES DE LODO 15.87% -

Total de incidencia 100% Avance por díaAvance Acumulado

Avance Total

COMPLEMENTARY WORKS1.1 - 5% - 1.2 5% - 1.3 20% - 1.4 10% - 1.5 5% - 1.6 5% - 1.7 15% - 1.8 10% - 1.9 15% -

1.10 5% -

Suministro e instalación de pozos a tierra para sistema de comunicaciones TLM, campamento y pararrayos (por separado - ohmiaje máximo 5ohm)

Tendido de tuberías de paso de 6in en la locación para paso de cableado eléctrico y de comunicación (según plano)

Suministro e instalación de 02 cellar metálicos pre fabricados (de acuerdo a plano)

Suministro e instalación y cementación de 02 tuberías conductoras de 35pie x 30in

Limpieza de trocha y deforestación de área de bombas, construcción de pit

Suministro, tendido y colocación de tubería HDPE 3in, incluye líneas dentro de locación (aprox. 1200m Tee y válvulas de derivación)

Instalación de casing de 9 5/8in como conductoras para los pozos de inyección de agua - a ser hincados con martillo delmag - TLM proveerá el casing de 9 5/8in

Suministro y habilitación de pilotes 10in y vigas WF 12x6 1/2in

Instalación de geomembrana con cuneta de drenaje y trampa de grasa

Page 5: 2011.06.28 SN4X Construction Report-Anterior

1.11 5% -

1- 100.00% -

Current AccumulatedEstimated Dayly

Estimated Accumulated2.1 - 5% - 2.2 5% - 2.3 20% - 2.4 10% - 2.5 5% - 2.6 5% - 2.7 15% - 2.8 10% - 2.9 15% -

2.10 5% - 2.11 5% -

2- 100.00% -

Current AccumulatedEstimated Dayly

Estimated Accumulated3.1 - 5% - 3.2 5% - 3.3 20% - 3.4 10% - 3.5 5% - 3.6 5% - 3.7 15% - 3.8 10% - 3.9 15% - 3.1' 5% -

3.11 5% -

3- 100.00% -

Current AccumulatedEstimated Dayly

Estimated Accumulated4.1 - 5% - 4.2 5% - 4.3 20% - 4.4 10% - 4.5 5% - 4.6 5% - 4.7 15% - 4.8 10% - 4.9 15% -

4.10 5% - 4.11 5% -

4- 100.00% -

Current AccumulatedEstimated Dayly

Estimated Accumulated

Page 6: 2011.06.28 SN4X Construction Report-Anterior

13/m

ay/2

011

14/m

ay/2

011

15/m

ay/2

011

16/m

ay/2

011

17/m

ay/2

011

18/m

ay/2

011

19/m

ay/2

011

20/m

ay/2

011

21/m

ay/2

011

22/m

ay/2

011

38.00

21.00 29.50 - - - - - - - - - -

- - - - - - - - - - 30

92

0

0 30.50 - - - - - - - - - -

- - - - - - - - - - 0

0

0

0

0

0

0

0

0 - - - - - - - - - - -

- - - - - - - - - - -

-

-

-

-

-

- - - - - - - - - - - -

- - - - - - - - - - -

-

-

-

-

-

-

-

-

- - - - - - - - - - - -

- - - - - - - - - - -

Ava

nce

p

or

act

ivid

ad

Page 7: 2011.06.28 SN4X Construction Report-Anterior

-

-

-

- - - - - - - - - - - -

- - - - - - - - - - -

-

-

-

-

-

-

- - - - - - - - - - - -

- - - - - - - - - - -

-

-

-

-

-

-

-

-

- - - - - - - - - - - -

- - - - - - - - - - -

-

-

-

-

- - - - - - - - - - - -

- - - - - - - - - - -

-

-

-

-

- - - - - - - - - - - -

- - - - - - - - - - -

-

- - - - - - - - - - - -

- - - - - - - - - -

Page 8: 2011.06.28 SN4X Construction Report-Anterior

-

-

-

- - - - - - - - - - - -

- - - - - - - - - -

-

- - - - - - - - - - - -

- - - - - - - - - - -

-

-

-

-

- - - - - - - - - - - -

- - - - - - - - - -

-

-

-

-

- - - - - - - - - - - -

- - - - - - - - - - Avance por día - - - - - - - - - -

Avance Acumulado - - - - - - - - - - Avance Total 4.00%

-

-

-

-

-

-

-

-

-

-

Page 9: 2011.06.28 SN4X Construction Report-Anterior

-

- - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - -

-

-

-

-

-

-

-

-

-

-

-

- - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - -

-

-

-

-

-

-

-

-

-

-

-

- - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - -

-

-

-

-

-

-

-

-

-

-

-

- - - - - - - - - - - - - - - - - - - - -

100.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00

Page 10: 2011.06.28 SN4X Construction Report-Anterior

23/m

ay/2

011

24/m

ay/2

011

25/m

ay/2

011

26/m

ay/2

011

27/m

ay/2

011

28/m

ay/2

011

29/m

ay/2

011

30/m

ay/2

011

31/m

ay/2

011

1/ju

n/20

11

2/ju

n/20

11

3/ju

n/20

11

10 1 1 1

- - - - - 0.81 - - - 0.08 0.08 0.08 - - - - - 0.81 0.81 0.81 0.81 0.89 0.98 1.06

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 11: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 12: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.81 - - - 0.08 0.08 0.08 - - - - - 0.81 0.81 0.81 0.81 0.89 0.98 1.06

Page 13: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Page 14: 2011.06.28 SN4X Construction Report-Anterior

4/ju

n/20

11

5/ju

n/20

11

6/ju

n/20

11

7/ju

n/20

11

8/ju

n/20

11

9/ju

n/20

11

10/ju

n/20

11

11/ju

n/20

11

12/ju

n/20

11

13/ju

n/20

11

14/ju

n/20

11

15/ju

n/20

11

1 1 1 2 1 5

5 0 0 1 5 0.08 0.49 0.08 0.16 0.16 - - - - 0.81 - - 1.14 1.63 1.71 1.87 2.03 2.03 2.03 2.03 2.03 2.85 2.85 2.85

2.00 2.00 2.00 10.00 4.00 2.00

0.50 7.00 2.00 4.50 4.50 10.00 12.00 11.50 8.00 6.00

- - 0.03 0.12 0.05 0.20 0.12 0.16 0.16 0.16 0.11 0.08 - - 0.03 0.16 0.21 0.41 0.52 0.68 0.85 1.00 1.11 1.19

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 15: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 16: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - 0.08 0.49 0.12 0.28 0.22 0.20 0.12 0.16 0.16 0.97 0.11 0.08 1.14 1.63 1.74 2.03 2.24 2.44 2.55 2.72 2.88 3.85 3.96 4.04

Page 17: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Page 18: 2011.06.28 SN4X Construction Report-Anterior

16/ju

n/20

11

17/ju

n/20

11

18/ju

n/20

11

19/ju

n/20

11

20/ju

n/20

11

21/ju

n/20

11

22/ju

n/20

11

23/ju

n/20

11

24/ju

n/20

11

25/ju

n/20

11

26/ju

n/20

11

27/ju

n/20

11

2 1 1 2 2 2 2 2

1 3 1 1 1 1 2 - - - 0.24 0.08 0.33 0.24 0.24 0.24 0.24 0.33 - 2.85 2.85 2.85 3.09 3.17 3.50 3.74 3.98 4.23 4.47 4.80 4.80

3.00

10.00 4.00 4.00 2.00 1.00 1.00 2.00

0.14 0.05 0.05 0.03 - - - - 0.01 0.01 - 0.07 1.33 1.38 1.44 1.46 1.46 1.46 1.46 1.46 1.48 1.49 1.49 1.56

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 19: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 20: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - 0.14 0.05 0.05 0.27 0.08 0.33 0.24 0.24 0.26 0.26 0.33 0.07 4.17 4.23 4.28 4.55 4.63 4.96 5.20 5.45 5.71 5.96 6.29 6.36

Page 21: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Page 22: 2011.06.28 SN4X Construction Report-Anterior

28/ju

n/20

11

29/ju

n/20

11

30/ju

n/20

11

1/ju

l/201

1

2/ju

l/201

1

3/ju

l/201

1

4/ju

l/201

1

5/ju

l/201

1

6/ju

l/201

1

7/ju

l/201

1

8/ju

l/201

1

9/ju

l/201

1

- - - - - - - - - - - - 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80

5

2

0.09 - - - - - - - - - - - 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 23: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 24: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - 0.09 - - - - - - - - - - - 6.45 - - - - - - - - - - -

Page 25: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

100.00 - - - - - - - - - - -

Page 26: 2011.06.28 SN4X Construction Report-Anterior

10/ju

l/201

1

11/ju

l/201

1

12/ju

l/201

1

13/ju

l/201

1

14/ju

l/201

1

15/ju

l/201

1

16/ju

l/201

1

17/ju

l/201

1

18/ju

l/201

1

19/ju

l/201

1

20/ju

l/201

1

21/ju

l/201

1

- - - - - - - - - - - - 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80

- - - - - - - - - - - - 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 27: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 28: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 29: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

Page 30: 2011.06.28 SN4X Construction Report-Anterior

22/ju

l/201

1

23/ju

l/201

1

24/ju

l/201

1

25/ju

l/201

1

26/ju

l/201

1

27/ju

l/201

1

28/ju

l/201

1

29/ju

l/201

1

30/ju

l/201

1

31/ju

l/201

1

1/ag

o/20

11

2/ag

o/20

11

- - - - - - - - - - - - 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80

- - - - - - - - - - - - 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 31: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 32: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 33: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

Page 34: 2011.06.28 SN4X Construction Report-Anterior

3/ag

o/20

11

4/ag

o/20

11

5/ag

o/20

11

6/ag

o/20

11

7/ag

o/20

11

8/ag

o/20

11

9/ag

o/20

11

10/a

go/2

011

11/a

go/2

011

12/a

go/2

011

13/a

go/2

011

14/a

go/2

011

- - - - - - - - - - - - 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80

- - - - - - - - - - - - 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 35: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 36: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 37: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

Page 38: 2011.06.28 SN4X Construction Report-Anterior

15/a

go/2

011

16/a

go/2

011

17/a

go/2

011

18/a

go/2

011

19/a

go/2

011

20/a

go/2

011

21/a

go/2

011

22/a

go/2

011

23/a

go/2

011

24/a

go/2

011

25/a

go/2

011

26/a

go/2

011

- - - - - - - - - - - - 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80

- - - - - - - - - - - - 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 39: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 40: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 41: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

Page 42: 2011.06.28 SN4X Construction Report-Anterior

27/a

go/2

011

28/a

go/2

011

29/a

go/2

011

30/a

go/2

011

31/a

go/2

011

1/se

p/20

11

2/se

p/20

11

3/se

p/20

11

4/se

p/20

11

5/se

p/20

11

6/se

p/20

11

7/se

p/20

11

- - - - - - - - - - - - 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80

- - - - - - - - - - - - 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 43: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 44: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 45: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

Page 46: 2011.06.28 SN4X Construction Report-Anterior

8/se

p/20

11

9/se

p/20

11

10/s

ep/2

011

11/s

ep/2

011

12/s

ep/2

011

13/s

ep/2

011

14/s

ep/2

011

15/s

ep/2

011

16/s

ep/2

011

17/s

ep/2

011

18/s

ep/2

011

19/s

ep/2

011

- - - - - - - - - - - - 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80

- - - - - - - - - - - - 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 47: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 48: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 49: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

Page 50: 2011.06.28 SN4X Construction Report-Anterior

20/s

ep/2

011

21/s

ep/2

011

22/s

ep/2

011

23/s

ep/2

011

24/s

ep/2

011

25/s

ep/2

011

26/s

ep/2

011

27/s

ep/2

011

28/s

ep/2

011

29/s

ep/2

011

30/s

ep/2

011

1/oc

t/201

1

- - - - - - - - - - - - 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80

- - - - - - - - - - - - 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 51: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 52: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 53: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

Page 54: 2011.06.28 SN4X Construction Report-Anterior

2/oc

t/201

1

3/oc

t/201

1

4/oc

t/201

1

5/oc

t/201

1

6/oc

t/201

1

7/oc

t/201

1

8/oc

t/201

1

9/oc

t/201

1

10/o

ct/2

011

11/o

ct/2

011

12/o

ct/2

011

13/o

ct/2

011

- - - - - - - - - - - - 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80

- - - - - - - - - - - - 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 55: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 56: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 57: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

Page 58: 2011.06.28 SN4X Construction Report-Anterior

14/o

ct/2

011

15/o

ct/2

011

16/o

ct/2

011

17/o

ct/2

011

18/o

ct/2

011

19/o

ct/2

011

20/o

ct/2

011

21/o

ct/2

011

22/o

ct/2

011

23/o

ct/2

011

24/o

ct/2

011

25/o

ct/2

011

- - - - - - - - - - - - 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80

- - - - - - - - - - - - 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 59: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 60: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 61: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

Page 62: 2011.06.28 SN4X Construction Report-Anterior

26/o

ct/2

011

27/o

ct/2

011

28/o

ct/2

011

29/o

ct/2

011

30/o

ct/2

011

31/o

ct/2

011

1/no

v/20

11

2/no

v/20

11

3/no

v/20

11

4/no

v/20

11

5/no

v/20

11

6/no

v/20

11

- - - - - - - - - - - - 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80 4.80

- - - - - - - - - - - - 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 63: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 64: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Page 65: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - -

Page 66: 2011.06.28 SN4X Construction Report-Anterior

7/no

v/20

11

8/no

v/20

11

- - 4.80 4.80

- - 1.65 1.65

- - - -

- - - -

- - - -

Page 67: 2011.06.28 SN4X Construction Report-Anterior

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

Page 68: 2011.06.28 SN4X Construction Report-Anterior

- - - -

- - - -

- - - -

- - - - - - - -

Page 69: 2011.06.28 SN4X Construction Report-Anterior

- - - -

- -

- - - -

- -

- - - -

- -

- - - -

- -

Page 70: 2011.06.28 SN4X Construction Report-Anterior

Horas de Trabajo diarias: 1 2 3 4 5 6 7 8 9 10

10

13/m

ay/2

011

14/m

ay/2

011

15/m

ay/2

011

16/m

ay/2

011

17/m

ay/2

011

18/m

ay/2

011

19/m

ay/2

011

20/m

ay/2

011

21/m

ay/2

011

22/m

ay/2

011

PERSONAL Ingresar la cantidad de trabajadores de SN4X. En el caso de existir dos o más trabajadores del mismo cargo, colocar el total en el recuadro correspondiente

PERS

ON

AL E

N S

ITU

CHE

NO

RTE

4X

1 Talisman Supervision 1 1 1 1 1 12 Construction Engineer

3 Planner Engineer

4 HSE supervisor

5 Doctor

6 Administrator / Warehouse man

7 Construction Foreman

8 Topographer

9 Riggers

10 Chainsaw Operator

11 Operators (Plant, Incinerator, etc)

12 Assembler

13 Welder

14 Welder Assitant

15 Heavy Equipment Operator

16 Construction workers and Carpenters

17 General Laborer

18 CCNN Laborers

19 Mechanics & Electricians

20 Catering Personnel

21 Geomembrane operator

22 Pile driving personnel

23 Other

SITUCHE NORTE 4X 1 1 1 1 1 1 0 0 0 0

OTROS 0 0 0 0 0 0 0 0 0 0

TOTAL SN4X & OTROS 1 1 1 1 1 1 0 0 0 0

Total Manhours 10 10 10 10 10 10 0 0 0 0

Accumulated Manhours 10 20 30 40 50 60 60 60 60 60

EQUIPOS Ingresar las horas laboradas por equipo tanto para SN4X. En el caso de existir dos o más equipos del mismo tipo, sumar las horas trabajadas y colocarlas en el recuadro correspondiente

HRS

PO

R EQ

UIP

O E

N S

ITU

CHE

NO

RTE

4X 1 Caterpillar tractor2 Chainsaw3 Crane4 Electric generator 5 Excavator6 Frontal Loader7 Geomembrane welding equip.8 Manlift9 Minor equipment

10 Mixer11 Retro excavator12 Roller13 Welding Machine14 Wood chipper15 Others

SITUCHE NORTE 4X 0 0 0 0 0 0 0 0 0 0

OTROS 0 0 0 0 0 0 0 0 0 0

TOTAL SN4X & OTROS 0 0 0 0 0 0 0 0 0 0

FUEL

COMBUSTIBLE ENTREGADO POR TLM (Ingresar la cantidad en galones entregados en el día por TLM a la contratista para efectuar sus actividades)

1 Diesel Diario (gln) 0 0 0 0 0 0 0 0

2 Gasolina Diario (gln) 0 0 0 0 0 0 0 0

Acumulado Diesel (gln) 0 0 0 0 0 0 0 0 0 0

Page 71: 2011.06.28 SN4X Construction Report-Anterior

FUEL

Acumulado Gasolina (gln) 0 0 0 0 0 0 0 0 0 0IN

CID

ENTE

S /

ACCI

DEN

TES

EN E

L PR

OYE

CTO

.

ACCIDENTES DEL PROYECTO (Ingresar el número de accidentes considerados con tiempo perdido o incapacitantes en la fecha correspondiente y luego ingresar una breve descripción líneas abajo)

1 SITUCHE NORTE 4X 0 0 0 0 0 0 0 0

2 -Total 0 0 0 0 0 0 0 0 0 0

Total Acumulado 0 0 0 0 0 0 0 0 0 0

HH-desde último accidente 10 20 30 40 50 60 60 60 60 60

Fecha Descripción del Accidente (Máx 1500 caracteres) - Presionar Alt+Enter para salto de línea dentro de la celda5/13/20115/14/20115/15/20115/16/20115/17/20115/18/20115/19/20115/20/20115/21/20115/22/20115/23/20115/24/20115/25/20115/26/20115/27/20115/28/20115/29/20115/30/20115/31/2011 No incidents / accidents reported

6/1/2011 No incidents / accidents reported6/2/2011 No incidents / accidents reported6/3/2011 No incidents / accidents reported6/4/2011 No incidents / accidents reported6/5/2011 No incidents / accidents reported6/6/2011 No incidents / accidents reported6/7/2011 No incidents / accidents reported6/8/2011 No incidents / accidents reported6/9/2011 No incidents / accidents reported

6/10/2011 No incidents / accidents reported6/11/2011 No incidents / accidents reported6/12/2011 No incidents / accidents reported6/13/2011 No incidents / accidents reported6/14/2011 No incidents / accidents reported6/15/2011 No incidents / accidents reported6/16/2011 No incidents / accidents reported6/17/2011 No incidents / accidents reported6/18/2011 No incidents / accidents reported6/19/2011 No incidents / accidents reported6/20/2011 No incidents / accidents reported6/21/2011 No incidents / accidents reported6/22/2011 No incidents / accidents reported6/23/2011 No incidents / accidents reported6/24/2011 No incidents / accidents reported6/25/2011 No incidents / accidents reported6/26/2011 No incidents / accidents reported6/27/2011 No incidents / accidents reported6/28/2011 No incidents / accidents reported6/29/2011 No incidents / accidents reported6/30/2011 No incidents / accidents reported

7/1/2011 No incidents / accidents reported7/2/2011 No incidents / accidents reported7/3/2011 No incidents / accidents reported

Page 72: 2011.06.28 SN4X Construction Report-Anterior

INCI

DEN

TES

/ AC

CID

ENTE

S EN

EL

PRO

YECT

O

.

7/4/2011 No incidents / accidents reported7/5/2011 No incidents / accidents reported7/6/2011 No incidents / accidents reported7/7/2011 No incidents / accidents reported7/8/2011 No incidents / accidents reported7/9/2011 No incidents / accidents reported

7/10/2011 No incidents / accidents reported7/11/2011 No incidents / accidents reported7/12/2011 No incidents / accidents reported7/13/2011 No incidents / accidents reported7/14/2011 No incidents / accidents reported7/15/2011 No incidents / accidents reported7/16/2011 No incidents / accidents reported7/17/2011 No incidents / accidents reported7/18/2011 No incidents / accidents reported7/19/2011 No incidents / accidents reported7/20/20117/21/20117/22/20117/23/20117/24/20117/25/20117/26/20117/27/20117/28/2011 No incidents / accidents reported7/29/20117/30/20117/31/2011

8/1/20118/2/20118/3/20118/4/20118/5/20118/6/20118/7/20118/8/20118/9/2011

8/10/20118/11/20118/12/20118/13/20118/14/20118/15/20118/16/20118/17/20118/18/20118/19/20118/20/20118/21/20118/22/20118/23/20118/24/20118/25/20118/26/20118/27/20118/28/20118/29/20118/30/20118/31/2011

9/1/20119/2/20119/3/20119/4/20119/5/20119/6/2011

Page 73: 2011.06.28 SN4X Construction Report-Anterior

INCI

DEN

TES

/ AC

CID

ENTE

S EN

EL

PRO

YECT

O

.

9/7/20119/8/20119/9/2011

9/10/20119/11/20119/12/20119/13/20119/14/20119/15/20119/16/20119/17/20119/18/20119/19/20119/20/20119/21/20119/22/20119/23/20119/24/20119/25/20119/26/20119/27/20119/28/20119/29/20119/30/201110/1/201110/2/201110/3/201110/4/201110/5/201110/6/201110/7/201110/8/201110/9/2011

10/10/201110/11/201110/12/201110/13/201110/14/201110/15/201110/16/201110/17/201110/18/201110/19/201110/20/201110/21/201110/22/201110/23/201110/24/201110/25/201110/26/201110/27/201110/28/201110/29/201110/30/201110/31/2011

11/1/201111/2/201111/3/201111/4/201111/5/201111/6/201111/7/2011

Page 74: 2011.06.28 SN4X Construction Report-Anterior

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

23/m

ay/2

011

24/m

ay/2

011

25/m

ay/2

011

26/m

ay/2

011

27/m

ay/2

011

28/m

ay/2

011

29/m

ay/2

011

30/m

ay/2

011

31/m

ay/2

011

1/ju

n/20

11

2/ju

n/20

11

3/ju

n/20

11

4/ju

n/20

11

5/ju

n/20

11

6/ju

n/20

11

7/ju

n/20

11

8/ju

n/20

11

9/ju

n/20

11

Ingresar la cantidad de trabajadores de SN4X. En el caso de existir dos o más trabajadores del mismo cargo, colocar el total en el recuadro correspondiente1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

2 2 2 2 2 2 2 2 2

4 4 4 4 4 4 4 4 45 5 5 5 5 5 5 5 5

2 2 2 2 2 2 2 2 2

0 0 0 0 0 0 0 0 0 16 16 17 17 17 17 17 17 17

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 16 16 17 17 17 17 17 17 17

0 0 0 0 0 0 0 0 0 160 160 170 170 170 170 170 170 170

60 60 60 60 60 60 60 60 60 220 380 550 720 890 1060 1230 1400 1570

Ingresar las horas laboradas por equipo tanto para SN4X. En el caso de existir dos o más equipos del mismo tipo, sumar las horas trabajadas y colocarlas en el recuadro correspondiente

12 10 8 10

5 10 10 8 12

0 0 0 0 0 0 0 0 0 0 0 0 0 5 22 20 16 22

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 5 22 20 16 22

(Ingresar la cantidad en galones entregados en el día por TLM a la contratista para efectuar sus actividades)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 120 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 75: 2011.06.28 SN4X Construction Report-Anterior

0 0 0 0 0 0 0 0 0 0 0 120 120 120 120 120 120 120

(Ingresar el número de accidentes considerados con tiempo perdido o incapacitantes en la fecha correspondiente y luego ingresar una breve descripción líneas abajo)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

60 60 60 60 60 60 60 60 60 220 380 550 720 890 1060 1230 1400 1570

Descripción del Accidente (Máx 1500 caracteres) - Presionar Alt+Enter para salto de línea dentro de la celda

Page 76: 2011.06.28 SN4X Construction Report-Anterior

29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

10/ju

n/20

11

11/ju

n/20

11

12/ju

n/20

11

13/ju

n/20

11

14/ju

n/20

11

15/ju

n/20

11

16/ju

n/20

11

17/ju

n/20

11

18/ju

n/20

11

19/ju

n/20

11

20/ju

n/20

11

21/ju

n/20

11

22/ju

n/20

11

23/ju

n/20

11

24/ju

n/20

11

25/ju

n/20

11

26/ju

n/20

11

27/ju

n/20

11

1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 0 1 1

1 1 11 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 45 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 0

1 1 3 32 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

1 1 1 1 5

17 17 17 17 17 17 16 16 16 19 19 18 18 18 18 21 28 27

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17 17 17 17 17 17 16 16 16 19 19 18 18 18 18 21 28 27

170 170 170 170 170 170 160 160 160 190 190 180 180 180 180 210 280 270

1740 1910 2080 2250 2420 2590 2750 2910 3070 3260 3450 3630 3810 3990 4170 4380 4660 4930

5 8 9 9 6 6 8 4 4 8 8 8 8 8 8 8 8 8

12 12 15 15 15 15 12 5 8 12 12 12 12 12 12 12 12 126

17 20 24 24 21 21 20 9 12 20 20 20 20 20 20 20 20 26

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17 20 24 24 21 21 20 9 12 20 20 20 20 20 20 20 20 26

0 0 0 0 0 0 0 0 0 55 0 0 0 0 0 0 1000 0

0 0 0 0 0 0 55 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 55 55 55 55 55 55 55 1055 1055

Page 77: 2011.06.28 SN4X Construction Report-Anterior

120 120 120 120 120 120 175 175 175 175 175 175 175 175 175 175 175 175

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1740 1910 2080 2250 2420 2590 2750 2910 3070 3260 3450 3630 3810 3990 4170 4380 4660 4930

Page 78: 2011.06.28 SN4X Construction Report-Anterior

47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

28/ju

n/20

11

29/ju

n/20

11

30/ju

n/20

11

1/ju

l/201

1

2/ju

l/201

1

3/ju

l/201

1

4/ju

l/201

1

5/ju

l/201

1

6/ju

l/201

1

7/ju

l/201

1

8/ju

l/201

1

9/ju

l/201

1

10/ju

l/201

1

11/ju

l/201

1

12/ju

l/201

1

13/ju

l/201

1

14/ju

l/201

1

15/ju

l/201

1

11

11111

2

4

4032

5

27 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

27 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

270 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

6

126

24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0

0

1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055

Page 79: 2011.06.28 SN4X Construction Report-Anterior

175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175

0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

Page 80: 2011.06.28 SN4X Construction Report-Anterior

65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82

16/ju

l/201

1

17/ju

l/201

1

18/ju

l/201

1

19/ju

l/201

1

20/ju

l/201

1

21/ju

l/201

1

22/ju

l/201

1

23/ju

l/201

1

24/ju

l/201

1

25/ju

l/201

1

26/ju

l/201

1

27/ju

l/201

1

28/ju

l/201

1

29/ju

l/201

1

30/ju

l/201

1

31/ju

l/201

1

1/ag

o/20

11

2/ag

o/20

11

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055

Page 81: 2011.06.28 SN4X Construction Report-Anterior

175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

Page 82: 2011.06.28 SN4X Construction Report-Anterior

83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100

3/ag

o/20

11

4/ag

o/20

11

5/ag

o/20

11

6/ag

o/20

11

7/ag

o/20

11

8/ag

o/20

11

9/ag

o/20

11

10/a

go/2

011

11/a

go/2

011

12/a

go/2

011

13/a

go/2

011

14/a

go/2

011

15/a

go/2

011

16/a

go/2

011

17/a

go/2

011

18/a

go/2

011

19/a

go/2

011

20/a

go/2

011

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055

Page 83: 2011.06.28 SN4X Construction Report-Anterior

175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

Page 84: 2011.06.28 SN4X Construction Report-Anterior

101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118

21/a

go/2

011

22/a

go/2

011

23/a

go/2

011

24/a

go/2

011

25/a

go/2

011

26/a

go/2

011

27/a

go/2

011

28/a

go/2

011

29/a

go/2

011

30/a

go/2

011

31/a

go/2

011

1/se

p/20

11

2/se

p/20

11

3/se

p/20

11

4/se

p/20

11

5/se

p/20

11

6/se

p/20

11

7/se

p/20

11

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055

Page 85: 2011.06.28 SN4X Construction Report-Anterior

175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

Page 86: 2011.06.28 SN4X Construction Report-Anterior

119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136

8/se

p/20

11

9/se

p/20

11

10/s

ep/2

011

11/s

ep/2

011

12/s

ep/2

011

13/s

ep/2

011

14/s

ep/2

011

15/s

ep/2

011

16/s

ep/2

011

17/s

ep/2

011

18/s

ep/2

011

19/s

ep/2

011

20/s

ep/2

011

21/s

ep/2

011

22/s

ep/2

011

23/s

ep/2

011

24/s

ep/2

011

25/s

ep/2

011

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055

Page 87: 2011.06.28 SN4X Construction Report-Anterior

175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

Page 88: 2011.06.28 SN4X Construction Report-Anterior

137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154

26/s

ep/2

011

27/s

ep/2

011

28/s

ep/2

011

29/s

ep/2

011

30/s

ep/2

011

1/oc

t/201

1

2/oc

t/201

1

3/oc

t/201

1

4/oc

t/201

1

5/oc

t/201

1

6/oc

t/201

1

7/oc

t/201

1

8/oc

t/201

1

9/oc

t/201

1

10/o

ct/2

011

11/o

ct/2

011

12/o

ct/2

011

13/o

ct/2

011

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055

Page 89: 2011.06.28 SN4X Construction Report-Anterior

175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

Page 90: 2011.06.28 SN4X Construction Report-Anterior

155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172

14/o

ct/2

011

15/o

ct/2

011

16/o

ct/2

011

17/o

ct/2

011

18/o

ct/2

011

19/o

ct/2

011

20/o

ct/2

011

21/o

ct/2

011

22/o

ct/2

011

23/o

ct/2

011

24/o

ct/2

011

25/o

ct/2

011

26/o

ct/2

011

27/o

ct/2

011

28/o

ct/2

011

29/o

ct/2

011

30/o

ct/2

011

31/o

ct/2

011

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055 1055

Page 91: 2011.06.28 SN4X Construction Report-Anterior

175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200

Page 92: 2011.06.28 SN4X Construction Report-Anterior

173 174 175 176 177 178 179 180

1/no

v/20

11

2/no

v/20

11

3/no

v/20

11

4/no

v/20

11

5/no

v/20

11

6/no

v/20

11

7/no

v/20

11

8/no

v/20

11

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

1055 1055 1055 1055 1055 1055 1055 1055

Page 93: 2011.06.28 SN4X Construction Report-Anterior

175 175 175 175 175 175 175 175

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

5200 5200 5200 5200 5200 5200 5200 5200

Page 94: 2011.06.28 SN4X Construction Report-Anterior
Page 95: 2011.06.28 SN4X Construction Report-Anterior
Page 96: 2011.06.28 SN4X Construction Report-Anterior

NoFecha Actividad (Máximo 10 actividades por fecha) - Usar Alt+Enter para salto de renglón Comentarios - Usar Alt+Enter para salto de renglón

1 5/13/2011 Contract Signed between TALISMAN ENERGY and PROCOPET2 5/14/20113 5/15/20114 5/16/20115 5/17/20116 5/18/20117 5/19/20118 5/20/20119 5/21/2011

10 5/22/201111 5/23/201112 5/24/201113 5/25/201114 5/26/201115 5/27/2011

165/28/2011

17 5/29/201118 5/30/2011

19

5/31/2011

206/1/2011

Procopet/Ingecon crew arrived at Sgto Puño from S2X at noon.

216/2/2011

22

6/3/2011

236/4/2011

24

6/5/2011

25

6/6/2011

26

6/7/2011

276/8/2011

286/9/2011

NNCC monitor supports the forest inventory activities.

29

6/10/2011

30

6/11/2011

316/12/2011

-

32

6/13/2011

Today at 15:30 hours M/F Maricarmen departed from Iquitos to Sgto Puño loaded with 67 M Tons of PROCOPET cargo for Situche and Puño.The estimated date of arrival (ETA) Sgto Puño is 9th of June,2011.

Note:This is a 100% efficient transport due to shallow draft - volume cargo. Containers 20ft and 40ft, airconditoners, potable water plant, transformer and compressor.

Today at 14:30 hours M/F San Martin IV departed from Iquitos to Sgto Puño loaded with 30 Tons of Procopet cargo. ETA June 12th 2011.

Cargo: Plantas de tratamiento de aguas grises/negras, tanque metálico de almacenamiento 4500 gln, balancin metálico – sprider, motosoldadoras cd – 1073, compresor de aire nro 326709uam288, luminaria, caja de herramientas metálicas, skid de estructuras para caseta generador, skid de estructuras para caseta taller, skid con pisos para carpa obreros, congeladoras

This crew came from SC2X - they were performing the Scouting, Soil and geotechnical studies for SC5.

Due to bad weather conditions TLM could not arrive at Sgto Puño. Safety induction to Procopet/Ingecon crew regarding Fatal accident on block 123 - Tree felling techniques discussed.

TLM Supervisor arrives at Sgto Puño.Meeting with SN4X crew supervisor about the activities to be held when arriving at SN1X and then to SN4X.Flight plan agreed with Naranjal Camp boss.All food, fuel and equipment ready to be sent to SN1X.

120 gasoil gallons given to Procopet/Ingecon for SN4X activities20 gal SAE 40 and 5 gal 2 times oils were given to Procopet/Ingecon.

Safety meeting about activities to be developed for jobs at SN1X and SN4X.Inspection to materials, equipment, food and medicines for SN4X. OK

Personnel and equipment ready to travel to SN1X-SN4X. Flight cancelled due to bad weather

Two flights from Sgto Puño to SN1X with Pax, food and equipment.SN1X temporary camp installed.An advance crew reach SN4X and opened the pathway. GPS points at SN4X found broken - Will be re installed making a new survey from SN1X.

No Incidents/Accidents Registered.Communication by radio clearly established. Trying to establish internet connection.Flight hours consider the mobilization from and to Naranjal. 399gln of JP1 consumed.

GPS points at SN4X reinstalled.Boundaries marking activities at SN4XTree felling activities started in the camp area. An approx. Area of 30m x 50m cleared today. We estimate to clear the camp and helipad areas by Wednesday.

It takes a total of 4hrs going back and forth to from SN1X to SN4X.Coordination with Naranjal in order to move the camp from SN1X to SN4X as soon as the camp and helipad areas are cleared.Internet conection not available yet. Communication held by Radio and Phone.

Boundaries marking continueTree felling activities in the camp area finished. Area of the emergency helipad cleared and ready to move the temporary camp from SN1X to SN4X.E/F Maricarmen arrived at Puño with Portakamps and water plant for SN4X.

It's been programmed to have two flights to move camp and pax from SN1X to SN4X.

Continue with boundaries marking activities.Two flights held today - SN1X temporary camp moved on SN4X. Camp installed. Tree felling activities in the runway area of the lease.

Camp successfully moved on. No incidents reported.Area on SN1X was cleaned and no waste were left there.Flight hours charged: 1.35hrs. JP1 consumption: 203 gal.

Boundaries marking activities finished.Tree felling activities in the runway area of the lease finished. Continue with the forest inventory.

Tree felling activities continue: Operations helipad cleared. Working on approximation areas. See the diagram below for the tree felling progress. Continue with the forest inventory.

One chainsaw is broken - we need to replace two bolts in the blade. Temporary camp has been placed in the walkway in order to avoid damages when helicopters land in the camp area.

Continue with tree felling activities: Approximation areas completed - Started in shot point area towards cuttings pit - Water captation area identified and marked.Continue with forest inventory.Intermittent rain all day.

Departure of Rescue boat with personnel of Procopet for crew change delayed due to lack of insurance documents of personnel. Crew change date was moved on June 16th.

Continue with tree felling activities: Continue cutting trees in lease area nearby cuttings pit and chemical warehouse. Continue with forest inventory.

Tree felling activities continue: Camp, Operations and Emergency helipads and platform area cleared. Still pending: Burning pit and water intake areas. After finishing trees feeling we will proceed to clean all areas out - starting on helipads.Trees inventory continue.

We expect Procopet people to depart tomorrow from Nauta in the Rescue I boat.Crew change and food supply for SN4X: Flight scheduled on June 16th

Page 97: 2011.06.28 SN4X Construction Report-Anterior

33

6/14/2011

Tree felling activities at SN4X: Still pending 50% of Burning pit and water intake area. We started chipping logs and clearing all areas out.Delays due to rain in the morning.Trees inventory continue - Documents signed by NNCC monitor.

Procopet people departed from Nauta today morning in the Rescue I boat.Food and other supplies also departed in a fast boat from Nauta today afternoon. ETA at Puño Thr. 16th.

Page 98: 2011.06.28 SN4X Construction Report-Anterior

346/15/2011

35

6/16/2011

366/17/2011

376/18/2011

38

6/19/2011

396/20/2011

406/21/2011

Comunication telephone& internet it´s finished ok

416/22/2011

426/23/2011

436/24/2011

446/25/2011

456/26/2011

466/27/2011

476/28/2011

48 6/29/201149 6/30/201150 7/1/201151 7/2/201152 7/3/201153 7/4/201154 7/5/201155 7/6/201156 7/7/201157 7/8/201158 7/9/201159 7/10/201160 7/11/201161 7/12/201162 7/13/201163 7/14/201164 7/15/201165 7/16/201166 7/17/201167 7/18/201168 7/19/201169 7/20/201170 7/21/201171 7/22/201172 7/23/201173 7/24/201174 7/25/201175 7/26/201176 7/27/201177 7/28/201178 7/29/201179 7/30/201180 7/31/201181 8/1/201182 8/2/201183 8/3/201184 8/4/201185 8/5/201186 8/6/2011

Tree felling activities at SN4X: Water intake area completed. Clearing main helipad area in order to receive the MI-8 flight tomorrow.Continue with trees inventory.

Procopet workers arrived today at San Lorenzo. We expect them to arrive tomorrow.

Is completed cutting down the burning pit area.The total area of the location of this cut SN4XPlace wooden platform auxiliary and main heliportcontinuous with clean camping area Petrex 40%monumentation of landmarks N1 and N2

Procopet workers arrived today at Puño. They must enter the day tomorrow

Cleaning camp Petrex 95%Inspection of equipment and materials of Procopet en Puño

Cleaning camp Petrex 100%Preparation of external load of Puno SN4X

Rain continued all day longSuspend the change over in by bad weather SN4X

cleaning are for equipment unloadingCrew shift today 09 peolple left, 12 went inOne external cargo flight with fuel,scafolds, camp floor

A Archealogist went there today(Mr Pavel Tello).Satellite internet and telephone installation 50%water pump and shower installation 100%Bathroom was fixed

Main Procopet camp& comunication system mounting. Cleaning areas to receive heavy equipment from Sgto. Puño

Five flights programmed for tomorrow with generator, bedroom furniture, geommebrane.

Main Procopet camp mounting. Cleaning areas to receive disassembled heavy equipment(Excavators&tractors)

Main Procopet camp mounting. Cleaning areas to receive heavy equipment, material and small camp equipment.

Five flight at least are programmed for tomorrow to transport procopet material and a Talisman&Procopet Supervision visit in order to inspect activities advance.

Main Procopet camp mounting. Cleaning areas for Procopet fuel tanks mounting. Temporary heliport area enlargement and cleaning

No flights to SN4X due bad weather. One flight to SN4X is programmed for tomorrow to transport Procopet people(Engs, technicians, others).

Cleaning of plataform access. Cleaning of areas for Procopet fuel tanks installation. Procopet camp generator installation.

Procopet camp installation. Temporary dike construction for Procopet fuel tanks. Heavy equipment, camp containers and materials reception.

Procopet camp installation. Helipad plataform enlargement. Procopet camp loads reception (containers, materials, fuel tank, potable water treatment plant, sewage plants, etc)

The chinock flights were done in the afternoon due bad weather in the morning.

Heavy equipment assembly. Procopet camp installation Aserrado de madera para base de contenedores varios

Cleaning of heliport emergency area.Advance 50%. Fuel pit for minor equipments relocated,finished heavy equipment assembly. Topography activities

Morning activities were suspended because they had no equipment and operators in their respective certifications and sent us campo.Luego operations continued.

Page 99: 2011.06.28 SN4X Construction Report-Anterior

87 8/7/201188 8/8/201189 8/9/201190 8/10/201191 8/11/201192 8/12/201193 8/13/201194 8/14/201195 8/15/201196 8/16/201197 8/17/201198 8/18/201199 8/19/2011

100 8/20/2011101 8/21/2011102 8/22/2011103 8/23/2011104 8/24/2011105 8/25/2011106 8/26/2011107 8/27/2011108 8/28/2011109 8/29/2011110 8/30/2011111 8/31/2011112 9/1/2011113 9/2/2011114 9/3/2011115 9/4/2011116 9/5/2011117 9/6/2011118 9/7/2011119 9/8/2011120 9/9/2011121 9/10/2011122 9/11/2011123 9/12/2011124 9/13/2011125 9/14/2011126 9/15/2011127 9/16/2011128 9/17/2011129 9/18/2011130 9/19/2011131 9/20/2011132 9/21/2011133 9/22/2011134 9/23/2011135 9/24/2011136 9/25/2011137 9/26/2011138 9/27/2011139 9/28/2011140 9/29/2011141 9/30/2011142 10/1/2011143 10/2/2011144 10/3/2011145 10/4/2011146 10/5/2011147 10/6/2011148 10/7/2011149 10/8/2011150 10/9/2011151 10/10/2011152 10/11/2011153 10/12/2011154 10/13/2011155 10/14/2011156 10/15/2011157 10/16/2011158 10/17/2011159 10/18/2011160 10/19/2011161 10/20/2011162 10/21/2011163 10/22/2011164 10/23/2011

Page 100: 2011.06.28 SN4X Construction Report-Anterior

165 10/24/2011166 10/25/2011167 10/26/2011168 10/27/2011169 10/28/2011170 10/29/2011171 10/30/2011172 10/31/2011173 11/1/2011174 11/2/2011175 11/3/2011176 11/4/2011177 11/5/2011178 11/6/2011179 11/7/2011180 11/8/2011

Page 101: 2011.06.28 SN4X Construction Report-Anterior

HORAS DE VUELO

13/m

ay/2

011

14/m

ay/2

011

15/m

ay/2

011

16/m

ay/2

011

17/m

ay/2

011

18/m

ay/2

011

19/m

ay/2

011

20/m

ay/2

011

21/m

ay/2

011

22/m

ay/2

011

23/m

ay/2

011

24/m

ay/2

011

25/m

ay/2

011

1 MI-17 0 0 0 0 0 0 0 0 0 0 0 0 0

2 MI-8 0 0 0 0 0 0 0 0 0 0 0 0 0

3 Chinook 0 0 0 0 0 0 0 0 0 0 0 0 0

4 Other 0 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0

1 MI-17 0 0 0 0 0 0 0 0 0 0 0 0 0

2 MI-8 0 0 0 0 0 0 0 0 0 0 0 0 0

3 Chinook 0 0 0 0 0 0 0 0 0 0 0 0 0

4 Other 0 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0

FECHA DETALLE DE LOS VUELOS - DESCRIBIR PORQUE EL VUELO FUE CARGADO A CONSTRUCCIONES - Usar Alt+Enter para salto de renglón 5/10/20115/11/20115/12/20115/13/20115/14/20115/15/20115/16/20115/17/20115/18/20115/19/20115/20/20115/21/20115/22/20115/23/20115/24/20115/25/20115/26/20115/27/20115/28/20115/29/20115/30/20115/31/2011

6/1/20116/2/20116/3/20116/4/20116/5/2011 First flight to SN4X: Naranjal - Puño 0.8 hrs Puño-SN1X-Puño 0.6 hrs Puño-SN1X 0.4 hrs (external load) SN1X - Puño 0.3 hrs Puño - Naranjal : 0.8 hrs TOTAL: 2.9 hrs - Fuel consumption: 399 gln JP16/6/2011 No flights today6/7/2011 No flights to SN1X/SN4X today - the 0.5hrs is equivalent to the flight from Naranjal to Puño shared with SC2X activities. Fuel consumption 879 gal Total flight hours 4.3 - Fuel consumption for SN4X: 102gal JP1

HORAS DE VUELO

ACUMULADAS

Page 102: 2011.06.28 SN4X Construction Report-Anterior

6/8/2011 Two flights to move SN1X camp on SN4X - total flight hours: 6.3 hrs - Shared with Coproe: SC2X: 4.9hrs SN4X: 1.4hrs. Fuel consumption 948 gal Total - SC2X: 737 gal and SN4X 211 gal JP16/9/2011 No flights held today, however it was charged 0.5 hrs of flight for the flight the MI-8 performed to return to Naranjal

6/10/2011 No flights today6/11/2011 No flights today6/12/2011 No flights today6/13/2011 No flights today6/14/2011 No flights today6/15/2011 Twin otter 30% charge to construction TLM supervisors and Three procopet.. Iquitos to Puño-Iquitos6/16/2011 Two flights to move Puno on SN4X - total flight hours: 2.3 hrs -Naranjal-Puño 0.8 hrs Puño-SN4X-Puño 0.7 hrs Puño- SN4X -Puño 0.8 hrs. Fuel consumption 135 gal JP1 Total 6/17/2011 No flights today6/18/2011 No flights today6/19/2011 6.3 hours 50 % charge to Procopet 14 pax from Iquitos, 50% demobilizationingecon peol´ple and one cargo flight from puño to sn4x. Fuel consumption 420 gal JP16/20/2011 No flights today6/21/2011 Five flight from Puño to SN4X with Procopet camp materials & 125KW generator. First flight with Talisman and Procopet Engineers 6/22/2011 No flyghts to SN4X today6/23/2011 No flights to SN4X today6/24/2011 No flights to SN4X today6/25/2011 twelve chinock flights from Puño transporting PROCOPET heavy equipment, containers and materials + one MI8 flight with people from Puño6/26/2011 Six chinock flights from Puño transporting PROCOPET containers, materials and others.6/27/2011 One MI8 people flight from SN4X to Puño - 1.3 flight hours - 319 gal of JP16/28/2011 No flights to SN4X today6/29/20116/30/2011

7/1/20117/2/20117/3/20117/4/20117/5/20117/6/20117/7/20117/8/20117/9/2011

7/10/20117/11/20117/12/20117/13/20117/14/20117/15/20117/16/20117/17/20117/18/20117/19/20117/20/20117/21/20117/22/20117/23/20117/24/20117/25/2011

Page 103: 2011.06.28 SN4X Construction Report-Anterior

7/26/20117/27/20117/28/20117/29/20117/30/20117/31/2011

8/1/20118/2/20118/3/20118/4/20118/5/20118/6/20118/7/20118/8/20118/9/2011

8/10/20118/11/20118/12/20118/13/20118/14/20118/15/20118/16/20118/17/20118/18/20118/19/20118/20/20118/21/20118/22/20118/23/20118/24/20118/25/20118/26/20118/27/20118/28/20118/29/20118/30/20118/31/2011

9/1/20119/2/20119/3/20119/4/20119/5/20119/6/20119/7/20119/8/20119/9/2011

9/10/20119/11/2011

Page 104: 2011.06.28 SN4X Construction Report-Anterior

9/12/20119/13/20119/14/20119/15/20119/16/20119/17/20119/18/20119/19/20119/20/20119/21/20119/22/20119/23/20119/24/20119/25/20119/26/20119/27/20119/28/20119/29/20119/30/201110/1/201110/2/201110/3/201110/4/201110/5/201110/6/201110/7/201110/8/201110/9/2011

10/10/201110/11/201110/12/201110/13/201110/14/201110/15/201110/16/201110/17/201110/18/201110/19/201110/20/201110/21/201110/22/201110/23/201110/24/201110/25/201110/26/201110/27/201110/28/201110/29/2011

Page 105: 2011.06.28 SN4X Construction Report-Anterior

10/30/201110/31/2011

11/1/201111/2/201111/3/201111/4/201111/5/2011

Page 106: 2011.06.28 SN4X Construction Report-Anterior

26/m

ay/2

011

27/m

ay/2

011

28/m

ay/2

011

29/m

ay/2

011

30/m

ay/2

011

31/m

ay/2

011

1/ju

n/20

11

2/ju

n/20

11

3/ju

n/20

11

4/ju

n/20

11

5/ju

n/20

11

6/ju

n/20

11

7/ju

n/20

11

8/ju

n/20

11

9/ju

n/20

11

10/ju

n/20

11

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 2.9 0 0.5 1.4 0.5 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 2.9 0 0.5 1.4 0.5 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 2.9 2.9 3.4 4.8 5.3 5.3

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 2.9 2.9 3.4 4.8 5.3 5.3

DETALLE DE LOS VUELOS - DESCRIBIR PORQUE EL VUELO FUE CARGADO A CONSTRUCCIONES - Usar Alt+Enter para salto de renglón

First flight to SN4X: Naranjal - Puño 0.8 hrs Puño-SN1X-Puño 0.6 hrs Puño-SN1X 0.4 hrs (external load) SN1X - Puño 0.3 hrs Puño - Naranjal : 0.8 hrs TOTAL: 2.9 hrs - Fuel consumption: 399 gln JP1No flights todayNo flights to SN1X/SN4X today - the 0.5hrs is equivalent to the flight from Naranjal to Puño shared with SC2X activities. Fuel consumption 879 gal Total flight hours 4.3 - Fuel consumption for SN4X: 102gal JP1

Page 107: 2011.06.28 SN4X Construction Report-Anterior

Two flights to move SN1X camp on SN4X - total flight hours: 6.3 hrs - Shared with Coproe: SC2X: 4.9hrs SN4X: 1.4hrs. Fuel consumption 948 gal Total - SC2X: 737 gal and SN4X 211 gal JP1No flights held today, however it was charged 0.5 hrs of flight for the flight the MI-8 performed to return to NaranjalNo flights todayNo flights todayNo flights todayNo flights todayNo flights todayTwin otter 30% charge to construction TLM supervisors and Three procopet.. Iquitos to Puño-IquitosTwo flights to move Puno on SN4X - total flight hours: 2.3 hrs -Naranjal-Puño 0.8 hrs Puño-SN4X-Puño 0.7 hrs Puño- SN4X -Puño 0.8 hrs. Fuel consumption 135 gal JP1 Total No flights todayNo flights today6.3 hours 50 % charge to Procopet 14 pax from Iquitos, 50% demobilizationingecon peol´ple and one cargo flight from puño to sn4x. Fuel consumption 420 gal JP1No flights todayFive flight from Puño to SN4X with Procopet camp materials & 125KW generator. First flight with Talisman and Procopet Engineers No flyghts to SN4X todayNo flights to SN4X todayNo flights to SN4X todaytwelve chinock flights from Puño transporting PROCOPET heavy equipment, containers and materials + one MI8 flight with people from PuñoSix chinock flights from Puño transporting PROCOPET containers, materials and others.One MI8 people flight from SN4X to Puño - 1.3 flight hours - 319 gal of JP1No flights to SN4X today

Page 108: 2011.06.28 SN4X Construction Report-Anterior
Page 109: 2011.06.28 SN4X Construction Report-Anterior
Page 110: 2011.06.28 SN4X Construction Report-Anterior
Page 111: 2011.06.28 SN4X Construction Report-Anterior

11/ju

n/20

11

12/ju

n/20

11

13/ju

n/20

11

14/ju

n/20

11

15/ju

n/20

11

16/ju

n/20

11

17/ju

n/20

11

18/ju

n/20

11

19/ju

n/20

11

20/ju

n/20

11

21/ju

n/20

11

22/ju

n/20

11

23/ju

n/20

11

24/ju

n/20

11

25/ju

n/20

11

26/ju

n/20

11

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 2.3 0 0 6.3 0 5.9 0 0 1.3 1.6 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.6 3.2

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 2.3 0 0 6.3 0 5.9 0 0 1.3 8.2 3.2

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5.3 5.3 5.3 5.3 5.3 7.6 7.6 7.6 13.9 13.9 19.8 19.8 19.8 21.1 22.7 22.7

0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.6 9.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5.3 5.3 5.3 5.3 5.3 7.6 7.6 7.6 13.9 13.9 19.8 19.8 19.8 21.1 29.3 32.5

DETALLE DE LOS VUELOS - DESCRIBIR PORQUE EL VUELO FUE CARGADO A CONSTRUCCIONES - Usar Alt+Enter para salto de renglón

First flight to SN4X: Naranjal - Puño 0.8 hrs Puño-SN1X-Puño 0.6 hrs Puño-SN1X 0.4 hrs (external load) SN1X - Puño 0.3 hrs Puño - Naranjal : 0.8 hrs TOTAL: 2.9 hrs - Fuel consumption: 399 gln JP1No flights todayNo flights to SN1X/SN4X today - the 0.5hrs is equivalent to the flight from Naranjal to Puño shared with SC2X activities. Fuel consumption 879 gal Total flight hours 4.3 - Fuel consumption for SN4X: 102gal JP1

Page 112: 2011.06.28 SN4X Construction Report-Anterior

Two flights to move SN1X camp on SN4X - total flight hours: 6.3 hrs - Shared with Coproe: SC2X: 4.9hrs SN4X: 1.4hrs. Fuel consumption 948 gal Total - SC2X: 737 gal and SN4X 211 gal JP1No flights held today, however it was charged 0.5 hrs of flight for the flight the MI-8 performed to return to NaranjalNo flights todayNo flights todayNo flights todayNo flights todayNo flights todayTwin otter 30% charge to construction TLM supervisors and Three procopet.. Iquitos to Puño-IquitosTwo flights to move Puno on SN4X - total flight hours: 2.3 hrs -Naranjal-Puño 0.8 hrs Puño-SN4X-Puño 0.7 hrs Puño- SN4X -Puño 0.8 hrs. Fuel consumption 135 gal JP1 Total No flights todayNo flights today6.3 hours 50 % charge to Procopet 14 pax from Iquitos, 50% demobilizationingecon peol´ple and one cargo flight from puño to sn4x. Fuel consumption 420 gal JP1No flights todayFive flight from Puño to SN4X with Procopet camp materials & 125KW generator. First flight with Talisman and Procopet Engineers No flyghts to SN4X todayNo flights to SN4X todayNo flights to SN4X todaytwelve chinock flights from Puño transporting PROCOPET heavy equipment, containers and materials + one MI8 flight with people from PuñoSix chinock flights from Puño transporting PROCOPET containers, materials and others.One MI8 people flight from SN4X to Puño - 1.3 flight hours - 319 gal of JP1No flights to SN4X today

Page 113: 2011.06.28 SN4X Construction Report-Anterior
Page 114: 2011.06.28 SN4X Construction Report-Anterior
Page 115: 2011.06.28 SN4X Construction Report-Anterior
Page 116: 2011.06.28 SN4X Construction Report-Anterior

27/ju

n/20

11

28/ju

n/20

11

29/ju

n/20

11

30/ju

n/20

11

1/ju

l/201

1

2/ju

l/201

1

3/ju

l/201

1

4/ju

l/201

1

5/ju

l/201

1

6/ju

l/201

1

7/ju

l/201

1

8/ju

l/201

1

9/ju

l/201

1

10/ju

l/201

1

11/ju

l/201

1

12/ju

l/201

1

0

1.3

0

0

1.3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8

Page 117: 2011.06.28 SN4X Construction Report-Anterior

13/ju

l/201

1

14/ju

l/201

1

15/ju

l/201

1

16/ju

l/201

1

17/ju

l/201

1

18/ju

l/201

1

19/ju

l/201

1

20/ju

l/201

1

21/ju

l/201

1

22/ju

l/201

1

23/ju

l/201

1

24/ju

l/201

1

25/ju

l/201

1

26/ju

l/201

1

27/ju

l/201

1

28/ju

l/201

1

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8

Page 118: 2011.06.28 SN4X Construction Report-Anterior

29/ju

l/201

1

30/ju

l/201

1

31/ju

l/201

1

1/ag

o/20

11

2/ag

o/20

11

3/ag

o/20

11

4/ag

o/20

11

5/ag

o/20

11

6/ag

o/20

11

7/ag

o/20

11

8/ag

o/20

11

9/ag

o/20

11

10/a

go/2

011

11/a

go/2

011

12/a

go/2

011

13/a

go/2

011

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8

Page 119: 2011.06.28 SN4X Construction Report-Anterior

14/a

go/2

011

15/a

go/2

011

16/a

go/2

011

17/a

go/2

011

18/a

go/2

011

19/a

go/2

011

20/a

go/2

011

21/a

go/2

011

22/a

go/2

011

23/a

go/2

011

24/a

go/2

011

25/a

go/2

011

26/a

go/2

011

27/a

go/2

011

28/a

go/2

011

29/a

go/2

011

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8

Page 120: 2011.06.28 SN4X Construction Report-Anterior

30/a

go/2

011

31/a

go/2

011

1/se

p/20

11

2/se

p/20

11

3/se

p/20

11

4/se

p/20

11

5/se

p/20

11

6/se

p/20

11

7/se

p/20

11

8/se

p/20

11

9/se

p/20

11

10/s

ep/2

011

11/s

ep/2

011

12/s

ep/2

011

13/s

ep/2

011

14/s

ep/2

011

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8

Page 121: 2011.06.28 SN4X Construction Report-Anterior

15/s

ep/2

011

16/s

ep/2

011

17/s

ep/2

011

18/s

ep/2

011

19/s

ep/2

011

20/s

ep/2

011

21/s

ep/2

011

22/s

ep/2

011

23/s

ep/2

011

24/s

ep/2

011

25/s

ep/2

011

26/s

ep/2

011

27/s

ep/2

011

28/s

ep/2

011

29/s

ep/2

011

30/s

ep/2

011

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8

Page 122: 2011.06.28 SN4X Construction Report-Anterior

1/oc

t/201

1

2/oc

t/201

1

3/oc

t/201

1

4/oc

t/201

1

5/oc

t/201

1

6/oc

t/201

1

7/oc

t/201

1

8/oc

t/201

1

9/oc

t/201

1

10/o

ct/2

011

11/o

ct/2

011

12/o

ct/2

011

13/o

ct/2

011

14/o

ct/2

011

15/o

ct/2

011

16/o

ct/2

011

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8

Page 123: 2011.06.28 SN4X Construction Report-Anterior

17/o

ct/2

011

18/o

ct/2

011

19/o

ct/2

011

20/o

ct/2

011

21/o

ct/2

011

22/o

ct/2

011

23/o

ct/2

011

24/o

ct/2

011

25/o

ct/2

011

26/o

ct/2

011

27/o

ct/2

011

28/o

ct/2

011

29/o

ct/2

011

30/o

ct/2

011

31/o

ct/2

011

1/no

v/20

11

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8 9.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8 33.8

Page 124: 2011.06.28 SN4X Construction Report-Anterior

2/no

v/20

11

3/no

v/20

11

4/no

v/20

11

5/no

v/20

11

6/no

v/20

11

7/no

v/20

11

8/no

v/20

11

0 0 0 0 0 0 0

0 0 0 0 0 0 0

24 24 24 24 24 24 24

9.8 9.8 9.8 9.8 9.8 9.8 9.8

0 0 0 0 0 0 0

33.8 33.8 33.8 33.8 33.8 33.8 33.8

Page 125: 2011.06.28 SN4X Construction Report-Anterior

VALORIZACIONES

SN4X LEASE CONSTRUCTION % Adelanto Saldo a la Fecha

Item Descripción 5/10/201120%

5/12/2011 6/15/2011 6/20/2011 7/15/2011 7/30/2011 8/7/2011 6/28/2011 6/28/20111 Construcción SN4X - Lump sum 2,582,760.79 516,552.16 83,440.00 91,892.91 - - - 691,885.07 - 1,890,875.72

- % Adelanto Saldo a la Fecha

Item Descripción 5/10/201110%

5/11/2011 5/30/2011 6/29/2011 7/29/2011 8/28/2011 9/23/2011 6/28/2011 6/28/20112 - - - - - - - - - -

- % Adelanto Saldo a la Fecha

Item Descripción 5/10/201110%

5/12/2011 6/11/2011 7/11/2011 8/10/2011 9/9/2011 9/23/2011 6/28/2011 6/28/20113 - - - - - - - - - -

- % Adelanto Saldo a la Fecha

Item Descripción 5/10/201110%

5/12/2011 6/11/2011 7/11/2011 8/10/2011 9/9/2011 9/23/2011 6/28/2011 6/28/20114 - - - - - - - - - -

- % Adelanto Saldo a la Fecha

Item Descripción 5/10/201110%

5/12/2011 6/11/2011 7/11/2011 8/10/2011 9/9/2011 9/23/2011 6/28/2011 6/28/20115 - - - - - - - - - -

Monto Presupuestado

Fecha de entrega de adelanto

Fecha Primera Valorización

Fecha Segunda Valorización

Fecha Tercera Valorización

Fecha Cuarta Valorización

Fecha Valorización Final de Cierre

Pagado a la fecha

Monto Presupuestado

Fecha de entrega de adelanto

Fecha Primera Valorización

Fecha Segunda Valorización

Fecha Tercera Valorización

Fecha Cuarta Valorización

Fecha Valorización Final de Cierre

Pagado a la fecha

Monto Presupuestado

Fecha de entrega de adelanto

Fecha Primera Valorización

Fecha Segunda Valorización

Fecha Tercera Valorización

Fecha Cuarta Valorización

Fecha Valorización Final de Cierre

Pagado a la fecha

Monto Presupuestado

Fecha de entrega de adelanto

Fecha Primera Valorización

Fecha Segunda Valorización

Fecha Tercera Valorización

Fecha Cuarta Valorización

Fecha Valorización Final de Cierre

Pagado a la fecha

Monto Presupuestado

Fecha de entrega de adelanto

Fecha Primera Valorización

Fecha Segunda Valorización

Fecha Tercera Valorización

Fecha Cuarta Valorización

Fecha Valorización Final de Cierre

Pagado a la fecha

Page 126: 2011.06.28 SN4X Construction Report-Anterior

SITUCHE NORTE 4X

LISTA DE PARTIDAS Inci

de

nci

a

1.1 Movilización y Desmovilización de Equipos y Personal 9% 1.39 100.00

1.2 8% 1.26 100.00

1TRABAJOS PRELIMINARES ### 2.64 100.00

2.1 Trazo y Replanteo 1% 0.04 100

2.2 1% 0.04 100

2.3 Corte y relleno compensado 2% 0.10 100

2.4 Relleno compactado estructural 2% 0.10 100

2MOVIMIENTO DE TIERRAS 5.42% 0.29 100.00

3.1 Trazo y Replanteo 0% 0.01 100

3.2 Excavación en Terreno Natural 1% 0.04 100

3.3 Eliminación de Material Excedente 0% 0.01 100

3.4 Relleno compactado con material impermeable 0% 0.02 100

3.5 Nivelado y compactación e=0.20m 0% 0.02 100

3.6 Suministro y colocación de geomembrana HDPE=1.5mm 1% 0.06 100

3.7 Suministro y colocación de tubería de acero sch.40. D=10in 1% 0.07 100

3.8 Suministro y colocación de planchas de apoyo de columnas 1% 0.04 100

3.9 Montaje de techo metálico en Poza de Cortes 1% 0.03 100

3POZA DE LODOS Y AGUA 5.39% 0.29 100.00

4.1 Trazo y Replanteo 0% 0.00 100.00

4.2 Excavación en Terreno Natural 0% 0.00 100.00

4.3 Eliminación de Material Excedente 0% 0.00 100.00

4.4 Relleno con material propio (incl. compactación) 0% 0.00 100.00

4.5 Nivelado y Compactado e=0.20 m. 0% 0.00 100.00

4.6 Suministro y colocación de geomembrana HDPE e=1.5 mm 0% 0.00 100.00

4.7 Construcción de trampas de grasa al ingreso de cada poza 0% 0.00 100.00

4POZA DE GRASAS 0.46% 0.00 100.00

5.1 Trazo y replanteo 0% 0.01 100.00

5.2 Excavación en Terreno Natural 1% 0.06 100.00

5.3 Eliminación de Material Excedente 0% 0.02 100.00

5.4 Relleno compactado con material impermeable 0% 0.02 100.00

5.5 Nivelado y compactación e=0.20m 0% 0.02 100.00

5.6 Suministro y colocación de geomembrana HDPE e=1.5 mm 1% 0.06 100.00

5.7 Suministro y colocación de tubería de acero SCH40 d=8in 0% 0.01 100.00

5.8 Suministro y colocación de tubería de acero SCH40 d=10in 1% 0.03 100.00

5.9 Suministro y colocación de codos de 90. 0% 0.01 100.00

5.10 Montaje de estructura metálica y cortina de agua 0% 0.00 100.00

5POZA DE QUEMA 4.82% 0.23 100.00

6.1 Trazo y replanteo 0% 0.01 100.00

Ava

nce

P

on

de

rad

o

Ava

nce

p

or

act

ivid

ad

Movilización, desmovilización, campamento provisional, alimentación por 90 días

Deforestación de área de plataforma (tala, desbroce y limpieza)

Page 127: 2011.06.28 SN4X Construction Report-Anterior

6.2 Excavación en Terreno Natural 1% 0.06 100.00

6.3 Eliminación de Material Excedente 0% 0.02 100.00

6.4 Suministro y colocación de geomembrana HDPE e=1.5 mm 2% 0.12 100.00

6.5 Suministro y colocación de alcantarillas en accesos 1% 0.04 100.00

6SISTEMA DE DRENAJE PLUVIAL 5.00% 0.25 100.00

7.1 Colocación y compactación de Relleno Estructural 0% 0.00 100.00

7.2 Suministro y acondicionamiento de pilotes 10in 11% 2.23 100.00

7.3 Izaje, colocación e hincado de pilotes 10in 5% 1.12 100.00

7.4 Suministro, frabricación y montaje de estructura de vigas H 2% 0.45 100.00

7.5 0% 0.01 100.00

7.6 2% 0.48 100.00

7.7 Suministro de grating para cuneta de drenaje interno 1% 0.16 100.00

7.8 0% 0.04 100.00

7PILOTAJE PATINES DE PLATAFORMA ### 4.50 100.00

8.1 Trazo y replanteo 0% 0.00 100.00

8.2 Suministro y acondicionamiento de pilotes 10in 4% 0.47 100.00

8.3 Izaje, colocación e hincado de pilotes 10in 2% 0.24 100.00

8.4 Excavación en Terreno Natural 0% 0.00 100.00

8.5 Colocación y compactación de Relleno Estructural 0% 0.02 100.00

8.6 Suministro y colocación de geomembrana HDPE e=1.5 mm 0% 0.02 100.00

8.7 Colocación de Mating Dura-Base 2% 0.21 100.00

8.8 Montaje de estructura metálica y techo 1% 0.06 100.00

8.9 Montaje de Vinilona 1% 0.12 100.00

8.10 0% 0.01 100.00

8ALMACEN DE QUIMICA ### 1.15 100.00

9.1 Excavación en Terreno Natural 0% 0.00 100.00

9.2 Colocación y compactación de Relleno Estructural 0% 0.00 100.00

9.3 Colocación e instalación de geomembrana HDPE 1.5mm 0% 0.00 100.00

9.4 Drenajes 2% 0.04 100.00

9.5 Colocación de Pavimento Flexible-Mating 0% 0.01 100.00

9.6 Pintado de helipuertos según norma Peruana 0% 0.00 100.00

9HELIPUERTOS 2.51% 0.06 100.00

10.1 Trazo y replanteo 0% 0.02 100.00

10.2 Colocación y compactación de Relleno Estructural 1% 0.03 100.00

10.3 Acabado, refine y compactación de plataforma 1% 0.05 100.00

10.4 Colocación e instalación de geomembrana HDPE 1.5mm 0% 0.02 100.00

10.5 Colocación de Pavimento Flexible-Mating 1% 0.03 100.00

10.6 Colocación de pavimento Unimat 1% 0.05 100.00

10SUMINISTRO Y COLOCACION DE DURABASE 4.45% 0.20 100.00

11.1 Trazo y replanteo 0% 0.00 100.00

11.2 Construcción de diques en madera 0% 0.00 100.00

11.3 Suministro e instalación de geomembrana HDPE e=1,5mm 0% 0.00 100.00

11CONSTRUCCION DE PITS DE CONTENCION DE TANQUES DE 0.72% 0.01 100.00

Construcción de losa de mortero armado de 20cm alrededor de cellar según plano

Construcción de cunetas de drenaje interno alrededor de cellar y equipos de tratamiento de lodos

Construcción de trampa de grasa previo ingreso de cuneta interior al cellar

Relleno de espacios libres entre mating y pilotes con tablones de madera

Page 128: 2011.06.28 SN4X Construction Report-Anterior

12.1 Suministro e instalación de postes de luz 2% 0.07 100.00

12.20% 0.01 100.00

12.3 Pararrayo en campamento de perforación 1% 0.03 100.00

12.41% 0.02 100.00

12NSTALACIONES ELECTRICAS; PUESTAS A TIERRA Y PARARR 3.68% 0.14 100.00

13.1 1% 0.01 100.00

13.2 1% 0.01 100.00

13CONSTRUCCIÓN DE CELLAR Y CONDUCTORA DE 30in 1.36% 0.02 100.00

14.1 Trazo y Replanteo 0% 0.00 100.00

14.2 0% 0.00 100.00

14.3 Suministro e instalación de geomembrana HDPE e=1,5mm 0% 0.00 100.00

14.4 Colocación de Pavimento Flexible-Mating 0% 0.01 100.00

14.51% 0.02 100.00

14.60% 0.01 100.00

14TOMA Y TENDIDO DE LINEA DE AGUA 2.12% 0.04 100.00

15.1 9% 1.35 100.00

15.2 Hincado pilotes 10in 4% 0.61 100.00

15.3 Soldado de vigas WF12x6 1/2in 1% 0.18 100.00

15.4 Relleno interior con suelo cemento e=15cm 0% 0.06 100.00

15.5 2% 0.31 100.00

15CIMENTACION DE TANQUES DE LODO ### 2.52 100.00

Total de incidencia 100% Avance por díaAvance Acumulado

Avance Total

Suministro e instalación de pozos a tierra para sistema de comunicaciones TLM, campamento y pararrayos (por separado - ohmiaje máximo 5ohm)

Tendido de tuberías de paso de 6in en la locación para paso de cableado eléctrico y de comunicación (según plano)

Suministro e instalación de 02 cellar metálicos pre fabricados (de acuerdo a plano)

Suministro e instalación y cementación de 02 tuberías conductoras de 35pie x 30in

Limpieza de trocha y deforestación de área de bombas, construcción de pit

Suministro, tendido y colocación de tubería HDPE 3in, incluye líneas dentro de locación (aprox. 1200m Tee y válvulas de derivación)

Instalación de casing de 9 5/8in como conductoras para los pozos de inyección de agua - a ser hincados con martillo delmag - TLM proveerá el casing de 9 5/8in

Suministro y habilitación de pilotes 10in y vigas WF 12x6 1/2in

Instalación de geomembrana con cuneta de drenaje y trampa de grasa

Page 129: 2011.06.28 SN4X Construction Report-Anterior

13/m

ay/2

011

14/m

ay/2

011

15/m

ay/2

011

16/m

ay/2

011

17/m

ay/2

011

18/m

ay/2

011

19/m

ay/2

011

20/m

ay/2

011

21/m

ay/2

011

22/m

ay/2

011

23/m

ay/2

011

24/m

ay/2

011

1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.33 0.49 0.65 0.81 0.98 1.14 1.30 1.46 1.63 1.79 1.95

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 130: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 131: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

20 20 60

25 35 40

50 5050 50

25 35 40

0.07 0.07 0.21 0.09 0.12 0.32 0.18 0.18 0.18 0.09 0.12 0.14 0.07 0.14 0.35 0.44 0.56 0.88 1.06 1.23 1.41 1.50 1.62 1.76

- - - - - - - - - - - - - - - - - - - - - - - - 0.23 0.23 0.37 0.25 0.29 0.48 0.34 0.34 0.34 0.25 0.29 0.30 0.23 0.47 0.84 1.09 1.38 1.86 2.20 2.54 2.87 3.13 3.41 3.72 100.00%

Page 132: 2011.06.28 SN4X Construction Report-Anterior

25/m

ay/2

011

26/m

ay/2

011

27/m

ay/2

011

28/m

ay/2

011

29/m

ay/2

011

30/m

ay/2

011

31/m

ay/2

011

1/ju

n/20

11

2/ju

n/20

11

3/ju

n/20

11

4/ju

n/20

11

5/ju

n/20

11

1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 2.11 2.28 2.44 2.60 2.76 2.93 3.09 3.25 3.41 3.58 3.74 3.90

10.00 20.00 30.00 40.00

5.00 10.00 10.00 10.00

- - - - - - - - 0.20 0.41 0.54 0.68 - - - - - - - - 0.20 0.61 1.15 1.83

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 133: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 134: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76

- - - - - - - - - - - - - - - - - - - - - - - - 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.37 0.57 0.70 0.84 3.88 4.04 4.20 4.37 4.53 4.69 4.85 5.02 5.38 5.95 6.66 7.50

Page 135: 2011.06.28 SN4X Construction Report-Anterior

6/ju

n/20

11

7/ju

n/20

11

8/ju

n/20

11

9/ju

n/20

11

10/ju

n/20

11

11/ju

n/20

11

12/ju

n/20

11

13/ju

n/20

11

14/ju

n/20

11

15/ju

n/20

11

16/ju

n/20

11

17/ju

n/20

11

1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.08 0.16 4.07 4.23 4.39 4.55 4.72 4.88 5.04 5.20 5.37 5.53 5.61 5.77

10.00 10.00 10.00 10.00 10.00 15.00 10.00 20.00 30.00 30.00 10.00 10.00 20.00 30.00 30.00 10.00

0.14 0.14 0.41 0.68 0.95 1.02 0.27 - - - - - 1.96 2.10 2.51 3.18 4.13 5.15 5.42 5.42 5.42 5.42 5.42 5.42

25.00 35.00 40.00 10.00 10.00 10.00 10.00 10.00

- - - - 0.15 0.21 0.24 0.06 0.06 0.06 0.06 0.06 - - - - 0.15 0.36 0.60 0.66 0.72 0.78 0.84 0.90

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - 25.00 25.00 25.00 25.00

Page 136: 2011.06.28 SN4X Construction Report-Anterior

5.00 5.00 5.00 5.00 10.00 10.00 10.00 10.00 10.00

5.00 5.00 5.00 5.00 5.00 20.00

0.25 0.25 0.25 0.30 0.05 0.05 0.05 0.15 0.15 0.15 0.15 0.35 0.25 0.50 0.75 1.05 1.10 1.15 1.20 1.35 1.50 1.65 1.80 2.15

- - - - - - - - - - - - - - - - - - - - - - - -

50 5015 15 15 15 15 15 10

20 20 20 20 2025 25 25 25

25 25

- - - - 0.70 0.70 0.16 0.38 0.64 0.64 0.86 0.75 - - - - 0.70 1.40 1.56 1.93 2.58 3.22 4.08 4.83

25 25 25 2525 25 25 25

30 30 30 1025 25 20 20 10

- - - 0.10 0.21 0.21 0.21 0.21 0.23 0.21 0.21 0.08 - - - 0.10 0.31 0.52 0.73 0.94 1.17 1.38 1.59 1.67

- - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - -

Page 137: 2011.06.28 SN4X Construction Report-Anterior

20 20 20 2025 25 25 25

- - - - 0.41 0.41 0.41 0.41 - - - - - - - - 0.41 0.83 1.24 1.66 1.66 1.66 1.66 1.66

10 10 10 10 10

- - - - - - - 0.07 0.07 0.07 0.07 0.07 - - - - - - - 0.07 0.14 0.20 0.27 0.34

- - - - - - - - - - - - 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76

- - - - - - - - - - - - - - - - - - - - - - - - 0.55 0.55 0.82 1.24 2.63 2.76 1.51 1.44 1.31 1.29 1.43 1.48 8.04 8.59 9.41 10.66 13.29 16.05 17.55 18.99 20.31 21.60 23.03 24.50

Page 138: 2011.06.28 SN4X Construction Report-Anterior

18/ju

n/20

11

19/ju

n/20

11

20/ju

n/20

11

21/ju

n/20

11

22/ju

n/20

11

23/ju

n/20

11

24/ju

n/20

11

25/ju

n/20

11

26/ju

n/20

11

27/ju

n/20

11

28/ju

n/20

11

29/ju

n/20

11

1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 5.94 6.10 6.26 6.42 6.59 6.75 6.91 7.07 7.24 7.40 7.56 7.72

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

10.00 10.00 10.00 10.00 10.00

20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00

0.06 0.06 0.06 0.06 0.18 0.12 0.12 0.12 0.24 0.12 0.12 0.12 0.96 1.02 1.08 1.14 1.32 1.44 1.56 1.68 1.91 2.03 2.15 2.27

30.00 30.00 40.00 20.00

- - - - - - - - - 0.02 0.02 0.04 - - - - - - - - - 0.02 0.04 0.08

- - - - - - - - - - - - - - - - - - - - - - - -

Page 139: 2011.06.28 SN4X Construction Report-Anterior

10.00 5.00 5.00 5.00 5.00 25.00 25.00 25.00 25.00

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 20.00 20.00

0.15 0.35 0.35 0.35 0.35 0.25 0.05 0.05 0.05 0.25 0.05 0.05 2.30 2.65 3.00 3.35 3.70 3.95 4.00 4.05 4.10 4.35 4.40 4.45

25.00 25.00 25.00 25.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00

10.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

- - - - - 1.06 1.06 1.06 1.06 0.40 0.40 0.66 - - - - - 1.06 2.12 3.18 4.24 4.64 5.04 5.70

25 25

25 25 25 2530 30 40

10 10 20

0.27 0.27 0.27 0.27 0.27 0.27 0.32 0.32 0.43 0.11 0.11 0.21 5.10 5.37 5.64 5.91 6.18 6.45 6.77 7.09 7.52 7.63 7.73 7.95

33 33 3450 50

0.14 0.14 0.14 0.21 0.21 - - - - - - - 1.81 1.95 2.09 2.30 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

20 20 20 20 205 5 5 5 10

5

- - - 0.15 0.15 0.15 0.15 0.19 0.04 0.04 0.04 0.11 - - - 0.15 0.30 0.45 0.59 0.78 0.82 0.85 0.89 1.00

- - - - - - - - - - - - - - - - - - - - - - - -

Page 140: 2011.06.28 SN4X Construction Report-Anterior

10 10

- - - - - 0.09 0.09 - - - - - 1.66 1.66 1.66 1.66 1.66 1.75 1.84 1.84 1.84 1.84 1.84 1.84

10 10 10 10 10

10 10 10 10 10 10 10 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.41 0.47 0.54 0.61 0.68 0.75 0.81 0.88 0.95 1.02 1.08 1.15

- - - - - - - - - - - - 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76

- - - - - - - - - - - - - - - - - - - - - - - - 0.85 1.05 1.05 1.27 1.39 2.17 2.02 1.97 2.05 1.16 0.96 1.43 25.35 26.39 27.45 28.71 30.10 32.27 34.29 36.26 38.30 39.47 40.43 41.86

Page 141: 2011.06.28 SN4X Construction Report-Anterior

30/ju

n/20

11

1/ju

l/201

1

2/ju

l/201

1

3/ju

l/201

1

4/ju

l/201

1

5/ju

l/201

1

6/ju

l/201

1

7/ju

l/201

1

8/ju

l/201

1

9/ju

l/201

1

10/ju

l/201

1

11/ju

l/201

1

1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 0.16 0.16 0.16 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 7.89 8.05 8.21 8.29 8.37 8.46 8.54 8.62 8.70 8.78 8.86 8.94

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

100.00

20.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00

20.00 20.00 20.00

0.12 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.18 0.18 0.72 2.39 2.45 2.51 2.57 2.63 2.69 2.75 2.81 2.87 3.05 3.23 3.95

10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00

25.00 25.00 25.00 25.00 25.00 25.00

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.03 0.03 0.09 0.09 0.10 0.11 0.11 0.12 0.13 0.13 0.15 0.17 0.20 0.23 50.00 50.00

25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00

10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00

0.24 0.24 0.24 0.24 0.24 0.24 0.10 0.10 0.10 0.10 0.10 0.10 0.24 0.48 0.72 0.96 1.20 1.45 1.54 1.64 1.73 1.83 1.93 2.02

Page 142: 2011.06.28 SN4X Construction Report-Anterior

5.00 5.00 5.00 20.00 20.00

0.05 0.05 0.25 - - - 0.20 - - - - - 4.50 4.55 4.80 4.80 4.80 4.80 5.00 5.00 5.00 5.00 5.00 5.00

10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

0.66 0.66 0.66 0.40 0.40 0.40 0.40 0.40 0.40 0.13 0.13 0.13 6.36 7.03 7.69 8.09 8.48 8.88 9.28 9.68 10.07 10.21 10.34 10.47

20 20 2020 20 20 20 20

10 10 30 30 10 10 0.21 0.43 0.43 0.21 0.21 0.21 0.11 0.11 0.32 0.32 0.11 0.11 8.16 8.59 9.02 9.24 9.45 9.67 9.78 9.88 10.20 10.53 10.63 10.74

- - - - - - - - - - - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

10 10 10 10 5 5 5 5 5 55 5 5 10 10 10 10 10 10 5 5 5

5 5 5 5 10 10 10 1010 10 10

0.11 0.11 0.11 0.15 0.15 0.15 0.15 0.15 0.19 0.22 0.19 0.19 1.11 1.22 1.34 1.48 1.63 1.78 1.93 2.08 2.26 2.49 2.67 2.86

- - - - - - - - - - - - - - - - - - - - - - - -

Page 143: 2011.06.28 SN4X Construction Report-Anterior

20

50 50 - - 0.46 0.46 - - - - - - - 0.18 1.84 1.84 2.30 2.76 2.76 2.76 2.76 2.76 2.76 2.76 2.76 2.94

10 10 10 0.07 0.07 0.07 - - - - - - - - - 1.22 1.29 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

50 50 - - - - - - - - - 0.18 0.18 - 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.94 2.12 2.12

10 10 10 10 10 10

- - - - - - 0.32 0.32 0.32 0.32 0.32 0.32 - - - - - - 0.32 0.63 0.95 1.27 1.59 1.90 1.64 1.79 2.45 1.61 1.15 1.15 1.41 1.22 1.48 1.55 1.31 1.86 43.49 45.28 47.74 49.34 50.49 51.64 53.06 54.27 55.75 57.30 58.61 60.46

Page 144: 2011.06.28 SN4X Construction Report-Anterior

12/ju

l/201

1

13/ju

l/201

1

14/ju

l/201

1

15/ju

l/201

1

16/ju

l/201

1

17/ju

l/201

1

18/ju

l/201

1

19/ju

l/201

1

20/ju

l/201

1

21/ju

l/201

1

22/ju

l/201

1

23/ju

l/201

1

1 1 1 1 1 1 1 1 1 1 1 1 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 9.03 9.11 9.19 9.27 9.35 9.43 9.51 9.59 9.68 9.76 9.84 9.92

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

20.00 20.00

20.00 20.00 20.00 20.00 20.00 10.00 10.00 10.00 10.00 10.00

0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.06 0.06 0.06 0.06 0.06 4.07 4.19 4.31 4.43 4.55 4.67 4.79 4.85 4.91 4.97 5.03 5.09

100.00

25.00 25.00

20.00 10.00 10.00 10.00 10.00 10.00 10.00 20.00

20.00 20.00 20.00 0.02 0.02 0.08 0.01 0.01 0.01 0.01 0.01 0.01 0.03 0.01 0.01 0.25 0.26 0.34 0.35 0.36 0.36 0.37 0.38 0.38 0.41 0.42 0.44

10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00

10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00

0.10 0.10 0.10 0.10 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 2.12 2.22 2.31 2.41 2.60 2.79 2.99 3.18 3.37 3.57 3.76 3.95

Page 145: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

5.00

15.00 15.00 15.00 15.00 15.00 15.00 10.00

15.00 15.00 15.00 15.00 15.00 15.00 10.00 25.00 25.00 25.00 25.00

25.00 25.00 50.00 0.13 0.80 0.80 1.46 1.46 2.78 1.46 1.19 0.66 - - - 10.60 11.40 12.19 13.65 15.11 17.89 19.35 20.55 21.21 21.21 21.21 21.21

- - - - - - - - - - - - 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74

- - - - - - - - - - - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

510 10 5 5 5 510 10 10 10 10 10 1010 10 10 10 10 10 10 10 10 10

0.26 0.22 0.19 0.19 0.19 0.19 0.15 0.07 0.07 0.07 - - 3.12 3.34 3.52 3.71 3.90 4.08 4.23 4.30 4.38 4.45 4.45 4.45

- - - - - - - - - - - - - - - - - - - - - - - -

Page 146: 2011.06.28 SN4X Construction Report-Anterior

20 20 20 20

0.18 0.18 0.18 0.18 - - - - - - - - 3.13 3.31 3.49 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68

- - - - - - - - - - - - 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

- - - - - - - - - - - - 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12

10 10 10 1030 10 10 10 10 10 10 10

10 10 10 10 10 10 10 10

0.32 0.32 1.27 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.32 0.32 2.22 2.54 3.81 4.44 5.08 5.71 6.35 6.98 7.62 8.25 8.57 8.89 1.21 1.83 2.81 2.77 2.68 4.00 2.64 2.24 1.71 1.07 0.66 0.66 61.67 63.50 66.31 69.08 71.76 75.76 78.41 80.65 82.36 83.43 84.09 84.76

Page 147: 2011.06.28 SN4X Construction Report-Anterior

24/ju

l/201

1

25/ju

l/201

1

26/ju

l/201

1

27/ju

l/201

1

28/ju

l/201

1

29/ju

l/201

1

30/ju

l/201

1

31/ju

l/201

1

1/ag

o/20

11

2/ag

o/20

11

3/ag

o/20

11

4/ag

o/20

11

1 1 1 1 2 2 2 2 2 2 2 2 0.08 0.08 0.08 0.08 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 10.00 10.08 10.16 10.24 10.41 10.57 10.73 10.90 11.06 11.22 11.38 11.55

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

10.00 10.00 10.00 10.00 10.00 0.06 0.06 0.06 0.06 0.06 - - - - - - - 5.15 5.21 5.27 5.33 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39

20.00 20.00 0.01 0.01 - - - - - - - - - - 0.45 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46

10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00

5.00 5.00 5.00 5.00 5.00 5.00 5.00 10.00 10.00 10.00 0.19 0.19 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.05 0.05 0.05 4.14 4.34 4.36 4.39 4.41 4.43 4.46 4.48 4.51 4.55 4.60 4.65

Page 148: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

- - - - - - - - - - - - 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21

- - - - - - - - - - - - 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74

- - - - - - - - - - - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

- - - - - - - - - - - - 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45

50 5020 20 20

- - - - - - - 0.12 0.12 0.05 0.05 0.05 - - - - - - - 0.12 0.24 0.29 0.34 0.38

Page 149: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68

- - - - - - - - - - - - 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

- - - - - - - - - - - - 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12

10 1020 20 20 20 20

20 20 20 20 20 0.32 0.95 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 - 9.21 10.16 10.79 11.43 12.06 12.70 13.33 13.97 14.60 15.24 15.87 15.87 0.66 1.30 0.80 0.80 0.88 0.82 0.82 0.94 0.94 0.89 0.89 0.26 85.42 86.72 87.52 88.32 89.21 90.03 90.85 91.79 92.73 93.63 94.52 94.78

Page 150: 2011.06.28 SN4X Construction Report-Anterior

5/ag

o/20

11

6/ag

o/20

11

7/ag

o/20

11

8/ag

o/20

11

9/ag

o/20

11

10/a

go/2

011

11/a

go/2

011

12/a

go/2

011

13/a

go/2

011

14/a

go/2

011

15/a

go/2

011

16/a

go/2

011

10 10 10 10 10

2 2 1 1 1 1 0.16 0.98 0.89 0.89 0.89 0.89 - - - - - - 11.71 12.68 13.58 14.47 15.37 16.26 16.26 16.26 16.26 16.26 16.26 16.26

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

- - - - - - - - - - - - 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39

- - - - - - - - - - - - 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46

10.00 5.00 5.00 5.00 5.00 5.00 0.05 0.02 0.02 0.02 0.02 0.02 - - - - - - 4.70 4.72 4.75 4.77 4.79 4.82 4.82 4.82 4.82 4.82 4.82 4.82

Page 151: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

- - - - - - - - - - - - 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21

- - - - - - - - - - - - 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74

- - - - - - - - - - - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

- - - - - - - - - - - - 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45

20 20

20 20 20 20 20 0.05 0.10 0.05 0.05 0.05 0.05 - - - - - - 0.43 0.53 0.58 0.62 0.67 0.72 0.72 0.72 0.72 0.72 0.72 0.72

Page 152: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68

- - - - - - - - - - - - 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

- - - - - - - - - - - - 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12

- - - - - - - - - - - - 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 0.26 1.10 0.97 0.97 0.97 0.97 - - - - - - 95.04 96.13 97.10 98.07 99.03 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Page 153: 2011.06.28 SN4X Construction Report-Anterior

17/a

go/2

011

18/a

go/2

011

19/a

go/2

011

20/a

go/2

011

21/a

go/2

011

22/a

go/2

011

23/a

go/2

011

24/a

go/2

011

25/a

go/2

011

26/a

go/2

011

27/a

go/2

011

28/a

go/2

011

- - - - - - - - - - - - 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

- - - - - - - - - - - - 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39

- - - - - - - - - - - - 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46

- - - - - - - - - - - - 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82

Page 154: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

- - - - - - - - - - - - 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21

- - - - - - - - - - - - 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74

- - - - - - - - - - - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

- - - - - - - - - - - - 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45

- - - - - - - - - - - - 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72

Page 155: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68

- - - - - - - - - - - - 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

- - - - - - - - - - - - 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12

- - - - - - - - - - - - 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 - - - - - - - - - - - - 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Page 156: 2011.06.28 SN4X Construction Report-Anterior

29/a

go/2

011

30/a

go/2

011

31/a

go/2

011

1/se

p/20

11

2/se

p/20

11

3/se

p/20

11

4/se

p/20

11

5/se

p/20

11

6/se

p/20

11

7/se

p/20

11

8/se

p/20

11

9/se

p/20

11

- - - - - - - - - - - - 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

- - - - - - - - - - - - 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39

- - - - - - - - - - - - 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46

- - - - - - - - - - - - 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82

Page 157: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

- - - - - - - - - - - - 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21

- - - - - - - - - - - - 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74

- - - - - - - - - - - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

- - - - - - - - - - - - 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45

- - - - - - - - - - - - 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72

Page 158: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68

- - - - - - - - - - - - 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

- - - - - - - - - - - - 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12

- - - - - - - - - - - - 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 - - - - - - - - - - - - 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Page 159: 2011.06.28 SN4X Construction Report-Anterior

10/s

ep/2

011

11/s

ep/2

011

12/s

ep/2

011

13/s

ep/2

011

14/s

ep/2

011

15/s

ep/2

011

16/s

ep/2

011

17/s

ep/2

011

18/s

ep/2

011

19/s

ep/2

011

20/s

ep/2

011

21/s

ep/2

011

- - - - - - - - - - - - 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

- - - - - - - - - - - - 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39

- - - - - - - - - - - - 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46

- - - - - - - - - - - - 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82

Page 160: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

- - - - - - - - - - - - 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21

- - - - - - - - - - - - 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74

- - - - - - - - - - - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

- - - - - - - - - - - - 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45

- - - - - - - - - - - - 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72

Page 161: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68

- - - - - - - - - - - - 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

- - - - - - - - - - - - 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12

- - - - - - - - - - - - 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 - - - - - - - - - - - - 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Page 162: 2011.06.28 SN4X Construction Report-Anterior

22/s

ep/2

011

23/s

ep/2

011

24/s

ep/2

011

25/s

ep/2

011

26/s

ep/2

011

27/s

ep/2

011

28/s

ep/2

011

29/s

ep/2

011

30/s

ep/2

011

1/oc

t/201

1

2/oc

t/201

1

3/oc

t/201

1

- - - - - - - - - - - - 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

- - - - - - - - - - - - 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39

- - - - - - - - - - - - 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46

- - - - - - - - - - - - 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82

Page 163: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

- - - - - - - - - - - - 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21

- - - - - - - - - - - - 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74

- - - - - - - - - - - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

- - - - - - - - - - - - 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45

- - - - - - - - - - - - 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72

Page 164: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68

- - - - - - - - - - - - 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

- - - - - - - - - - - - 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12

- - - - - - - - - - - - 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 - - - - - - - - - - - - 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Page 165: 2011.06.28 SN4X Construction Report-Anterior

4/oc

t/201

1

5/oc

t/201

1

6/oc

t/201

1

7/oc

t/201

1

8/oc

t/201

1

9/oc

t/201

1

10/o

ct/2

011

11/o

ct/2

011

12/o

ct/2

011

13/o

ct/2

011

14/o

ct/2

011

15/o

ct/2

011

- - - - - - - - - - - - 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

- - - - - - - - - - - - 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39

- - - - - - - - - - - - 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46

- - - - - - - - - - - - 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82

Page 166: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

- - - - - - - - - - - - 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21

- - - - - - - - - - - - 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74

- - - - - - - - - - - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

- - - - - - - - - - - - 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45

- - - - - - - - - - - - 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72

Page 167: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68

- - - - - - - - - - - - 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

- - - - - - - - - - - - 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12

- - - - - - - - - - - - 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 - - - - - - - - - - - - 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Page 168: 2011.06.28 SN4X Construction Report-Anterior

16/o

ct/2

011

17/o

ct/2

011

18/o

ct/2

011

19/o

ct/2

011

20/o

ct/2

011

21/o

ct/2

011

22/o

ct/2

011

23/o

ct/2

011

24/o

ct/2

011

25/o

ct/2

011

26/o

ct/2

011

27/o

ct/2

011

- - - - - - - - - - - - 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

- - - - - - - - - - - - 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39

- - - - - - - - - - - - 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46

- - - - - - - - - - - - 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82

Page 169: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

- - - - - - - - - - - - 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21

- - - - - - - - - - - - 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74

- - - - - - - - - - - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

- - - - - - - - - - - - 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45

- - - - - - - - - - - - 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72

Page 170: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68

- - - - - - - - - - - - 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

- - - - - - - - - - - - 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12

- - - - - - - - - - - - 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 - - - - - - - - - - - - 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

Page 171: 2011.06.28 SN4X Construction Report-Anterior

28/o

ct/2

011

29/o

ct/2

011

30/o

ct/2

011

31/o

ct/2

011

1/no

v/20

11

2/no

v/20

11

3/no

v/20

11

4/no

v/20

11

5/no

v/20

11

6/no

v/20

11

7/no

v/20

11

8/no

v/20

11

- - - - - - - - - - - - 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26 16.26

- - - - - - - - - - - - 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42

- - - - - - - - - - - - 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39 5.39

- - - - - - - - - - - - 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46

- - - - - - - - - - - - 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82 4.82

Page 172: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

- - - - - - - - - - - - 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21 21.21

- - - - - - - - - - - - 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74 10.74

- - - - - - - - - - - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51

- - - - - - - - - - - - 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45

- - - - - - - - - - - - 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72

Page 173: 2011.06.28 SN4X Construction Report-Anterior

- - - - - - - - - - - - 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68

- - - - - - - - - - - - 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

- - - - - - - - - - - - 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12

- - - - - - - - - - - - 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 15.87 - - - - - - - - - - - - 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00