INTRODUCTION
The purpose of this document is to assist in deriving pricing for the Modular aspects of 5 No. purpose designed houses and Hotel components for the Papua New Guinea market.
The pricing exercise covers the modular aspects of the construction only. All other aspects are not intended to be covered in this document which would include the following;
• Foundation Works.• Roofing.• External Works.
The design and specification contained within this document assumes compliance is required to Australian Standards and local Papua New Guinea building codes.
These buildings are to be designed and constructed in keeping with sustainable design principles.
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
HOUSE TYPE A
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE A – PERSPECTIVE
NADZAB COMMUNITY DEVELOPMENT
A
A
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE A – PREFABRICATION MODULES
12200 X 4000
6100 X 4000 6100 X 4000
6100 X 4000
6100 X 3600
6100 X 360012200 X 4000
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE A – ELEVATIONS
Note: All External Walls to be Rendered Masonry Finish as per specifications.
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE A – ELEVATIONS
Note: All External Walls to be Rendered Masonry Finish as per specifications.
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE A – ELEVATIONS
Note: All External Walls to be Rendered Masonry Finish as per specifications.
NADZAB COMMUNITY DEVELOPMENT
HOUSE TYPE B
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE B – PERSPECTIVE
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE B – LOWER FLOOR PLAN
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE B – PREFABRICATED MODULES
Lower Level Floor Plan
12200 x 400012200 x 4000
6100 x 4000
6100 x 3600
6100 x 3600
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE B – UPPER FLOOR PLAN
NADZAB COMMUNITY DEVELOPMENT
Upper Level Floor Plan
12200 x 4000
6100 x 4000
12200 x 4000
HOUSE TYPE B – PREFABRICATED MODULES
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE B – ELEVATIONS
Note: All Lower Level External Walls to be Rendered Masonry Finish. All Upper level external walls to be metal sheet finish.
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE B – ELEVATIONS
Note: All Lower Level External Walls to be Rendered Masonry Finish. All Upper level external walls to be metal sheet finish.
NADZAB COMMUNITY DEVELOPMENT
HOUSE TYPE C
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE C - PERSPECTIVE
NADZAB COMMUNITY DEVELOPMENT
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE C – PREFABRICATED MODULES
12200 x 400012200 x 4000
6100 x 3600
6100 x 360012200 x 4000
House Area: 147 sqmGarage Area: 45 sqm
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE C – ELEVATIONS
Note: All External Walls to be Rendered Masonry Finish as per specifications.
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE C – ELEVATIONS
Note: All External Walls to be Rendered Masonry Finish as per specifications.
NADZAB COMMUNITY DEVELOPMENT
HOUSE TYPE D
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE D – PERSPECTIVE
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE D – GROUND FLOOR PLAN
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE D – GROUND FLOOR - MODULES
6100 X 3600
6100 X 3600
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE D – FIRST FLOOR PLAN
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE D – FIRST FLOOR - MODULES
14200 X 4000
14200 X 4000
12200 X 3600
12200 X 3600 6100 X 4000
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE D – ELEVATIONS
Note: All External Walls to be Rendered Masonry Finish as per specifications.
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE D – ELEVATIONS
Note: All External Walls to be Rendered Masonry Finish as per specifications.
NADZAB COMMUNITY DEVELOPMENT
HOUSE TYPE E
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE E – PERSPECTIVE
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE E– GROUND FLOOR PLAN
A
A
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE E– GROUND FLOOR - MODULES
14200 X 4000
14200 X 4000
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE E – FIRST FLOOR PLAN
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE E – FIRST FLOOR - MODULE
14200 X 4000
14200 X 4000
14200 X 4000
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE E – ELEVATIONS
Note: All External Walls to be Rendered Masonry Finish.
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE E – ELEVATIONS
Note: All External Walls to be Rendered Masonry Finish.
NADZAB COMMUNITY DEVELOPMENTHOUSE TYPE E – ELEVATIONS
NADZAB COMMUNITY DEVELOPMENT
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
MATERIAL SPECIFICATIONS INTRODUCTION
The following material specifications are intended for pricing purposes and are not the final specification for construction.
The specifications cover the pre-fabricated aspects of the housing only. The other aspects are not covered in this specification and are to be priced separately.
The specification details branded products that may be substituted with equivalent standard products sourced in China or elsewhere.
The design and specification assumes compliance is required to Australian Standards and local building codes.
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
EXTERNAL WALL (Rendered Masonry appearance)
1 layer of 12.5mm Exterior Cement Board, taped and jointed using Exterior Joint Filler and Exterior Tape 10cm, with Breather Membrane behind. Render Finish to exterior wall using 7mm Exterior Basecoat with embedded reinforcing mesh / Exterior grade primer / Coloured Exterior Mineral Finish Plaster. (External wall system to be Knauf Aquapanel system or approved equivalent). http://manual.knaufdrywall.co.uk/knauf-systems/page_670/page_740/page_743.html
Min 75mm Steel studs at 600mm maximum centres to manufacturers specification.Cavity insulation with R2.5 Rockwool.
Internal wall lining to be 16mm Plasterboard (CSR “Gyprock” or approved equivalent).
100mm MDF Moulded Skirting.
Finish Internal Plasterboard walls and skirting painted with low sheen wash and wear acrylic.
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
EXTERNAL WALL (Metal Sheeting finish)
1 x layer of 0.48 mm aluminium/zinc alloy-coated steel sheet with Colourbond pre-applied finish in “Mini-orb” profile. Install sheets horizontally with lapped joints to manufacturers specification. Adopt external valley fixings. (Lysaught Colourbond Miniorb sheeting or approved equivalent).
Min 75mm Steel studs at 600mm maximum centres to manufacturers specification.Cavity insulation with R2.5 Rockwool.
Internal wall lining to be 16mm Plasterboard (CSR “Gyprock” or approved equivalent).
100mm MDF Moulded Skirting.
Finish Internal Plasterboard walls and skirting painted with low sheen wash and wear acrylic.
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
WINDOWS & SLIDING DOORS(As per external elevations)
24mm double glazed windows and sliding doors.2400mm high unless shown otherwise.Glass to be tinted to assist sun reflection.
All windows and sliding doors to be designed to withstand the local wind loading codes.
Powder coated aluminium frames.
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
INTERNAL PARTITION WALLS (Standard Internal Walls)
1 layer x 16mm Plasterboard (CSR “Gyprock” or approved equivalent)
Steel studs at 600mm maximum centres to manufacturers specification.
1 layer x 16mm Plasterboard (CSR “Gyprock” or approved equivalent)
100mm MDF Moulded Skirting.
Plasterboard walls and skirting painted with low sheen wash and wear acrylic.
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
INTERNAL PARTITION WALLS (Wet Area Internal Walls: Laundry/Kitchen/Bathrooms)
1 layer x 13mm Water-resistant Plasterboard (Gyprock Aquachek or approved equivalent)
Steel studs at 600mm maximum centres to manufacturers specification.
1 layer x 13mm Plasterboard (CSR “Gyprock” or approved equivalent)
100mm MDF Moulded Skirting.
Dry side Plasterboard walls finished with walls and skirting painted with low sheen wash and wear acrylic.
Dry side Plasterboard walls and skirting finished with water resistant low sheen wash and wear acrylic.
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
CEILINGS
1 x layer x 13mm Plasterboard (CSR “Gyprock ” or approved equivalent)
Steel joists to manufacturers specification. Insulated with R 1.5 Rockwool fully encapsulated batts (CSR Bradford or approved equivalent)
10mm Shadowline joints at cornice.
Plasterboard and Plaster Covered Cornice painted with low sheen wash and wear acrylic
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
TIMBER FLOORS
Steel joists to structural engineers specification, with 12mm Acoustic Pad Lining insulated with 75mm Glasswool fully encapsulated partition batts.
1 x layer x 18mm of Compressed Fibre Cement sheeting.
Floor finish with Solid Strand Woven Bamboo Flooring planks (Planks 1830 x 130 x 12mm) fastened with Uniclic system.
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
GRANITE FLOORS
Steel joists to structural engineers specification, with 12mm Acoustic Pad Lining insulated with 75mm Glasswool fully encapsulated partition batts.
1 x layer x 18mm of Compressed Fibre Cement sheeting.
Floor finished with 16mm Granite floor panels in 600 x 2100 modules. All joints to be flush.
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
TILED FLOORS(Toilet/Bathrooms/Laundry)
Steel joists to structural engineers specification, with 12mm Acoustic Pad Lining insulated with 75mm Glasswool fully encapsulated partition batts.
1 x layer x 18mm of Compressed Fibre Cement sheeting.
Floors finished with high grade floor tiles to future specification.
MATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENT
HOTEL ASPECTS
NADZAB COMMUNITY DEVELOPMENTMATERIAL SPECIFICATIONS
NADZAB COMMUNITY DEVELOPMENTHOTEL BLOCK PLANS
NADZAB COMMUNITY DEVELOPMENTHOTEL BLOCK PLANS
NADZAB COMMUNITY DEVELOPMENTHOTEL MODULE STRATEGY
12200 x 4000 14200 x 4000
NADZAB COMMUNITY DEVELOPMENTHOTEL SECTION
NADZAB COMMUNITY DEVELOPMENTHOTEL MODULE STRATEGY
12200 x 4000 14200 x 4000
12200 x 4000 14200 x 4000
Note: Masonry Wall to be part of the foundations contract.
NADZAB COMMUNITY DEVELOPMENTHOTEL VILLA SITE PLAN
HOTEL VILLA
NADZAB COMMUNITY DEVELOPMENTHOTEL VILLA - PERSPECTIVE
NADZAB COMMUNITY DEVELOPMENTHOTEL VILLA - PLAN
Each Villa comprisestwo 12,200 x 4,000 mmprefabricated units.