7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
1/22
, ,&benefits.Indiancontext
ve a a+919799394943
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
2/22
IndianContextUtilityConcernGrowing Normal energy demand
The demand is likely to grow at a pace
more than envisaged because of growing
economy.
Long Load shedding hours
Deficit at the end of the 11th Plan and
perhaps even after 12th Plan may remain
considering our track record in meeting
targets
Consumers lack of visibil it to mana e
energy consumption.
Long meter reading, Billing, Collection
c cle.
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
3/22
IndianContextUtilityConcernConsumer reliabil ity and quality.
uick action on break downs outa es.
Aging utility work forceLack of skilled Manpower
Work force technology savvy?
Motivation factor
Enabling real time communication betweenconsumers and utility
Aging infrastructure
Meeting increased demand without adding
infrastructure.
Implement renewable energy sources.
particularly carbon emissions
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
4/22
ConsumerexpectationQuick
Grievance
RedressalPayment
Convenience
Consumer
Relationship
Correct
Billing
Daily Meter
Reading
information
as er au
Removal
Reliable &
Quality PowerReconnect/
Disconnect
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
5/22
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
6/22
SmartMeteringbydefinition
Infrastructureofmeteringsystems
Automatesmosto t emeteringcentre repetitive
activities
dynamicpricingmechanisms
New
a mentand
customer
service
o tions
Controlofelectricalloadcontrolwithinthehomeandor
businessestoimprovesystemdiversity
The communications hardware , software, associated system anddata management software that creates a network between
and distribution of information to customers and the utility.
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
7/22
SmartMeteringComponents
AdvanceSmartMeter
InHomedisplay
Suitabletwo
way
communication
system
Networkmana ements stem NMS
MeterDataManagement(MDM)
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
8/22
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
9/22
SmartMeteringComponents AdvanceSmart
Electronicmeterwith
Twoway
communication,
Timedifferentiatedregisters
Pricebaseddemand
Connect
/
Disconnect
Switch ,
interfacewithInHomedevices.
communicationtechnology.
,
and
theft
detection
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
10/22
SmartMeteringComponents:InHome
anduser
friendly
manner.
metertocreateaHomeAreaNetworkvia
HardwireconnectionbetweenthemeterandIHD
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
11/22
SmartMeteringComponents:Network
usedto
monitor
and
administer
anetwork.
Whatthissystemneedstodo?
Managealarm,eventsandothernotifications
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
12/22
Demand Side ManagementMainDrivers#1:India
.
ToFlatten
demand
for
losses.
stability.
Makin useoflow rices
VisibilityofDemand&Supply
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
13/22
Main
Drivers
#
2:
India
Reducing Energy losses.
Accurate measurement
Energy loss today = 40%
Smart metering
Automatic daily energy audit toidentify un-metered connections
potential to reduce mostnon-technical losses
(~30%)
Instant alarm in case of metertamper detection
Reduced line losses due to
Monetary benefits outof 30% loss reductionshould pay for the priceof Smart Grid
reduced maximum demand
Reduced line losses due toreduced reactive ower flow
deployment over 5years, besidesnumerous otherbenefits not consideredhere.
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
14/22
Main
Drivers
#
3:
India
Eliminate unscheduled load shedding Inverters are inefficient.
y ynamc oa con ro
Smart metering has the feature to
only half of what it takes.
Removing inverters wouldut se t e power system n ne to t eavailability. Which means, rather thanblack out, the customers still gets
partial electricity as they get from
re eve t e powercompanies from inefficiencyand capital expenditure for
customers.e r nver ers .
Inverters uses Leadbatteries which needs
causing seriousenvironmental issues.
Every consumer should have Power to cater Essential Load sacrificing
Desirable Load.
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
15/22
MoredriversIndia
Reliabilitymonitoringbecauseof:
Economicexpansion.
Risingpopulation
growth.
Increasingaffluenceleadingtohighconsumption.
Increasingdigitalworldrequirequalitypower
S stemautomation
Consumerinvolvement
Consumersatisfaction.
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
16/22
MajorchallengeswithSmartmeteringde lo ment
in
India.
Huge geographical area with dif ficult terrain & varying temperature
conditions
Dedicated prioritized Data communication channel for Utility Operations
by NSP.
Regulatory frame-work which rewards for un-interrupted quality services.
Customer participation on efficiency improvement programs.
Lack of experience gaining exercises like pilots/ customer behavior
Slow decision making & Implementation/ Utility will for delivery
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
17/22
MajorchallengeswithSmartmeteringde lo ment
in
India.
Location of meters inside the house difficult for communication
/Re lacement
Home/Local area Communication through concrete walls.
Specific communication protocol
Varying expectations/requirements from utility to utility
Standardization of different parameter requirement across different
consumers & utili ties.
Different communication modes available like Zigbee, WiFi, LPR etc.
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
18/22
MajorchallengeswithSmartmeteringde lo ment
in
India.
Systematic planned approach.
.
End to end understanding/knowledge of deployment architecture
- .
Interoperability :- control commands & other data formats should be
interoperable with AMI infrastructure
Project Finance: A fresh investment would be required at all levels.
Benefit would accrue only after successful turn.
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
19/22
MajorchallengeswithSmartmeteringde lo ment
in
India.
Educating consumer for change of scenario.
.
Utility trade Unions Concurrence
-
consumers will be collected .
Privacy of data collected.
Acceptance of Different TOU tariff to Low end consumer.
Change of mindset Thinking unconventional/data centric approach
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
20/22
BenefitsofSmartMetering
Eliminationofmanualmeterreadingcosts
Customersatisfactionbecauseofeliminationofmeterreading
related
issues
and
call
center
traffic.
UtilitiescanhaveinnovativeTODpriceofferstosuitconsumers
needs.
Improvedcash
flow.
Intervalwisedatacollectionhelpstodetectsupplyfaultsand
respondthemmorequickly Fasteroutagedetectionand
proactiverestoration
DailyenergybalancingforeachDT
rans ormer oa managemen
RC/DCfrom
remote
location
without
going
to
site.
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
21/22
MoreBenefits.
Reducessafetyincidentsduetofewerfieldtrips
Enablesenvironmentalimprovement
Decreasedgreenhouse
gas
emissions
Improvedenergyefficiency
Reducedfieldtripsandvehicleemissions
Aids
in
outage
detection I ent esmetere accountsnot e ng e an meter
malfunctions
Providespotentialnewrevenuefromvalueadded
products,services
Advanced Metering Infrastructure
Reducescongestioninpowerlines balanceddistribution
loadmanagement
7/28/2019 2011 Nov Vivek Pathak Smart Metering Concern Challenges Benefits Indian Context
22/22