Page 1: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

2011

HOWARD BRANDSTONDESIGN PROJECT

Asher HarderYuduo Zhao

1

Page 2: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

Renovation of historical landmark (old library)

• Redesigned entrance• Addition of contemporary

glass and steel canopy and balcony

Currently owned by the Public Theater

• “Devoted to developing and presenting new theatrical work, innovative productions of the classics, and the showcasing of both established and rising musical talent.”

Project Description

2011 HB

2

http://www.publictheater.org/

http://www.publictheater.org/

Page 3: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

Facade• Respect and highlight

neoclassical elements• Complementing contemporary

glass and steel balcony• Evening visibility from the street

• Illuminate flags

Entrance• Circulation visibility

• 5-10fc on horizontal entrance surfaces

Design Requirements and considerations: Exterior

2011 HB

3

http://www.publictheater.org/

http://www.publictheater.org/

Page 4: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

Design Requirements and considerations: Interior

2011 HB

Lobby• Highlight neoclassical detailing• Complement contemporary glass

and steel balcony • Visible and exciting from the

exterior• Way finding to ticket office, stairs,

and theater• Illumination requirements: 20 fc

4

http://www.publictheater.org/

http://www.publictheater.org/

Page 5: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

Design Requirements and considerations: Interior

2011 HB

Mezzanine• Donor wall visible from front door• Active gathering space• Illumination Requirements: 10fc

Ticket office• Attract patrons attention• Illumination Requirements: 30fc

Corridor• Attract use by patrons• Saturated wall colors• Illumination Requirements: 10fc

5

http://www.publictheater.org/

http://www.publictheater.org/

Page 6: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

Inspiration:

2011 HB

http://www.collativelearning.com

http://electroland.net/

• Interactive lighting design

• Simple lighting via planes

6

Page 7: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

Overall Concept:

2011 HBLighting using simple geometric

shapes

Planes• Backlit frosted

glass canopy• Illuminated flags

• Graze vertical voids in between three main sections of façade

• Light top most cornice

Lines

7

Page 8: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

Equipment Selection:

2011 HBExterior

8

Page 9: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

Equipment Selection:

2011 HBInterior

9

Page 10: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

Equipment Selection:

2011 HBInterior

10

Page 11: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

2011 HBArea Avg. Avg./Min

Lobby 20.71 207.1Ticket Office 31.45 1.58Circulation 11.36 7.1Mezzanine 16.11 161.1

11

Allowable Watts

Design Watts

11060 4092*

*excluding watts from floor “art installation”

Page 12: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

2011 HB

FixtureQuantit

y

Watts per

luminaire

Total Watts

ERCO 17W 31 18 558ERCO 26W 19 26 494Mark Arch. 32 32 1024Globe 12 168 2016

12

Fixture Quantity

Watts per

luminaire

Total Watt

sSensacell Panels – Floor 8119 1.08 8768Sensacell Panels – Mezz. Ceiling 1792 1.08 1935

Page 13: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

Program Solution

Results

2011 HBEntrance Avg. Illuminance: 4.75fc

Average Illuminance adjacent to rails: 9.0fc

Allowable Watts

Design Watts

5391 3554

13

Page 14: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

2011

HOWARD BRANDSTONDESIGN PROJECT

Asher HarderYuduo Zhao

14

Thank You!Questions?

Page 15: 2011 HOWARD BRANDSTON DESIGN PROJECT Asher Harder Yuduo Zhao 1.

2011

HOWARD BRANDSTONDESIGN PROJECT

15

Images:erco.comklicksystems.comlouispoulsen.comsensacell.compublictheater.org