2011 CAPITAL IMPROVEMENT PROJECT Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment: Addressing the existing facilities that are at the end of their useful life; are of the magnitude beyond the capabilities of the district staff; will have consequential damages if not addressed; or are asbestos-related in areas that we are doing work.
31

2011 CAPITAL IMPROVEMENT PROJECT Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Feb 25, 2016

Download

Documents

jalila

2011 CAPITAL IMPROVEMENT PROJECT Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment : - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

2011 CAPITAL IMPROVEMENT PROJECT

Priority #1 ItemsHealth, Safety, Code, Security and Preservation of the Existing Investment:

Addressing the existing facilities that are at the end of their useful life; are of the magnitude beyond the capabilities of the district staff; will have consequential damages if not addressed; or are asbestos-related in areas that we are doing work.

Page 2: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

ITEM IMPACT BUILDING (s)

FIRE ALARM SYSTEM

CODE REQUIREMENT

ALL SCHOOL BUILDINGS

SECURITY SECURITY ALL SCHOOL BUILDINGSTUBMAN

HVAC PRESERVATION AHS & AJHSGENESEE ELEMENTARYCASEY PARK ELEMENTARY

EMERGENCY POWER

CODE REQUIREMENT

AJHS & TUBMANALL SCHOOLS EXCEPT SEWARD

PRIORITY #1 ITEMS

Page 3: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

ITEM IMPACT BUILDING (s)

WATER SANITATION HEALTH & SAFETY

CASEY PARKGENESEE & AHS

ROOFING PRESERVATION TUBMAN & AHSSEWARD & HERMAN

PLUMBING & DRAINAGE SYSTEMS

CODE REQUIREMENT, HEALTH & SAFETY

AHS, AJHS & SEWARDCASEY, GENESEE, OWASCO

AIR HANDLING, VENTILATION,& COOLING

PRESERVATION TUBMANGENESEE, AJHS & AHSOWASCO, SEWARD

PRIORITY #1 ITEMS

Page 4: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

ITEM IMPACT BUILDING (s)

INTERIOR DOORS CODE REQUIREMENT

SEWARD, AHS, AJHS,HERMAN & GENESEE

ASBESTOS PRESERVATION AHS, HERMAN, OWASCO, GENESEE, CASEY

TOILET ROOMS HEALTH & SAFETY

SEWARD, AHS & CASEY PARK

CATCH BASINS HEALTH & SAFETY

SEWARD, AJHS, GENESEE, OWASCO, & CASEY PARK

DOOR HARDWARE/CORES

SECURITY & CODE REQUIREMENT

DISTRICT WIDE

PRIORITY #1 ITEMS

Page 5: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

ITEM IMPACT BUILDING (s)

AUDITORIUM CODE REQUIREMENT & PRESERVATION

CASEY PARK, AHS & AJHS

FRONT ENTRANCE DOORS

HEALTH & SECURITY AJHS, OWASCO, GENESEE

WINDOWS & SHADES

HEALTH & SAFETY, PRESERVATION

AJHS- (windows), AHS- (shades)

GYMNASIUM- CEILING, EXT. ROOF, WALL PADS

HEALTH & SAFETYPRESERVATION

HERMAN, OWASCO, AJHS

CEILING TILES HEALTH & SAFETY GENESEE

PRIORITY #1 ITEMS

Page 6: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

ITEM IMPACT BUILDING (s)

INTERIOR STAIRS & TERRAZZO

CODE REQUIREMENT & PRESERVATION

AJHS

BUS LOOP HEALTH & SAFETY AJHS

TENNIS COURTS- resurfacing

PRESERVATION AHS

ELEVATOR CODE REQUIREMENTS (ADA) AHS

CARPET & FLOORING

PRESERVATION SEWARD, AJHS, AHS, GENESEE

PRIORITY #1 ITEMS

Page 7: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

ITEM IMPACT BUILDING (s)

RETAINING WALL, FENCING, BRICK WALL/TUCK POINTING

PRESERVATION, SECURITY

CASEY PARK

EXTERIOR ENVELOPE, EXTERIOR WALLS, EXTERIOR STAIRS

PRESERVATION GENESEE

EXTERIOR STEPS, STAIRS & RAMPS(ADA)

HEALTH & SAFETY HERMAN

DESIGN CANOPY, CONCRETE FOUNDATION REPAIR, EXT WALLS & CHIMNEY, EXT DOORS & STEPS

PRESERVATION,HEALTH & SAFETY

OWASCO

ROOFING, STEPS, CHIMNEYS PRESERVATION SEWARD

PRIORITY #1 ITEMS- EXTERIOR RENOVATIONS

Page 8: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

ITEM IMPACT BUILDING (s)

STEPS, STAIRS, RAMPS, SIDEWALKS, CHIMNEY, DOORS PRESERVATION AJHSSIDEWALKS, DOORS, ROOF, RETAINING WALL, LOADING DOCK

PRESERVATION AHS

PRIORITY #1 ITEMS- EXTERIOR RENOVATIONS cont.

Page 9: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

ITEM IMPACT BUILDING (s)

SCOREBOARD HEALTH & SAFETY HOLLAND STADIUMPRESS BOX HEALTH & SAFETY HOLLAND STADIUMSTADIUM LIGHTING HEALTH & SAFETY HOLLAND STADIUM

CONCRETE STEPS & SEATS

HEALTH & SAFETY HOLLAND STADIUM

DRAINAGE HEALTH & SAFETY HOLLAND STADIUM

SECURITY SECURITY HOLLAND STADIUM

PRIORITY #1 ITEMS- HOLLAND STADIUM

Page 10: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

FINANCIAL INFORMATION

• Projection as it currently stands will not increase local taxes.

• This is due to the fact that our bonded indebtedness is decreasing and we have $1.025 million in a capital reserve fund.

• Additionally, we are applying for EXCEL aid of $45,000.

Page 11: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :
Page 12: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Proposed Capital ProjectQuestions/Answers

July 26, 2011

Page 13: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Are the fire alarm strobes required by state law for existing school buildings?

A. Yes, they are required; the law changed a couple of years ago.

Q. Are the high school roof repairs under warranty since they were done recently?

A. This part of the roof was not included in the last project; this is a water penetration issue where the driving rain comes in between the siding and the flashing.

Page 14: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. The cost of $5,000 per shower stall for each of the boys shower stalls seems very high since they will be similar to the girls shower stalls. Those stalls indicated to be built are similar to campground stalls and $5,000 seems high.

A. Codes have changed, the position of the stalls have to be such that runoff from a person showering can not go into an adjacent stall. $5k seems a little high but remember these are estimates. The floor must be ripped up and replaced, as well as adding mixing valves and drains.

Page 15: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. I think Harriet Tubman repairs should be delayed until we decide what building to close next.

We improved West and then closed the building after substantial improvements. Was a boiler installed at West? New windows? unit ventilators?

A. No new boiler at West. Yes, new windows. No unit ventilators. Closing Tubman is not cost effective. There is no room in any of our buildings to move all of our warehouse, cold storage and heated storage, record storage, athletic storage, maintenance garage, and transportation (including bus parking).

Page 16: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. How can a foundation be missing at Owasco?A. It is a small corner that has been missing for 5-6

years. This is a small masonry project but should be completed by a skilled mason.

Q. How can a scoreboard be a priority 1 item?A. The scoreboard was added with the rest of the

items; the underground wire going to the scoreboard is no longer useable. We have a temporary wire going across the back of the stadium seats to the corner of the stadium and overhead to the scoreboard. This wire is reaching the end of its useful life.

Page 17: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Why is a new bus loop at Auburn Junior High School needed as a priority 1 item?A. The Auburn Police Dept has brought to our

attention their safety concerns and we agree with them. We are in need of an inner loop so that parents can safely pick up and drop off their children. Also, this was suggested by community members during the transition meetings.

Q. Didn’t we just repaint the gym ceiling at Herman?A. No, we have not done anything.

Page 18: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Are 500 classroom doors at the high school in such disrepair that they need to be replaced with new hardware?A. All of the classroom doors and hardware are

original 1970 items. Yes, they are in disrepair; some are worse than others.

Q. Is the elevator at the high school in such disrepair?

A. We only have one elevator in the building; it gets a lot of use by students/staff. It is a 1970 original and many parts have been replaced; floor is asbestos; elevator needs ADA update.

Page 19: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. During the March Facilities Committee meeting, the Admin Building was removed from the

capital project. Why is it in this project?A. This was discussed, but there was never a formal

agreement to delete.

Q. Appendix F in the project packet is illegible. Communication and Transparency are goals when presenting to the public. Can this be fixed?

A. A more legible copy was requested from consultants and sent to Board members.

Page 20: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. When will we know if the Holland Stadium portion is eligible for state aid?

A. We found the building blueprints and sent them to the architect to send on to the State Education Dept. It is not known how long it will take for a decision.

Q. Was the comment field corrected in regard to HS-6 and HS-7?

A. These fields were corrected.

Page 21: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. What will we be saving if we do not do a capital project (The amount that could possibly go

toward the deficit we will be facing)?A. On page 11 of the project packet, the next-to-last

line at the bottom says “Proposed $20,900,000 Capital Project”. These amounts represent the district’s share of payments on the proposed project. For example, in 2013, $40,000 will be spent; in 2014, $72,784 will be spent. These are the amounts that would be ‘saved’ if we don’t do a project. However, if items are critically necessary, they would have to be done using 100% General Fund dollars.

Page 22: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Can we see the estimated bond percentage if Holland Stadium ends up not being aidable?A. We have asked the consultant and will provide

the answer when received.

Q. What do the following terms mean:gc – General Contractor;site – Work outside of a building;asb – Asbestos

Page 23: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Why was the clerk of works changed from $300,000 to $775,000?A. This is a projection for a construction

management company. Our former clerk of the works is deceased.

Q. Why was the financial consultant changed from $80,000 to $120,000?

B. There is a cushion built into the total.

Q. Why did general admin go from $0 to $50k?A. The funds are included if they are needed.

Page 24: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Shouldn’t building Principals, Union reps and maintenance mechanics be given a walk-through and shown the scope of the project?A. Union reps will be invited to the public forum on

August 2 and asked to contact the Superintendent if they would like to schedule a walk-through.

Q. What happens with the extra money if we don’t spend it on the project?

A. Either additional (priority #2) items could be added to the scope of the project or the money would just not be expended.

Page 25: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Proposed Capital ProjectAdditional Questions/Answers

August 2, 2011

Page 26: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Are 1832 door lock cores and keys needed?A. The patent on the cores is up and the system has

been compromised. Anyone will be able to make a duplicate key. Systems are changed every 10-15 years.

Q. If we replace auditorium seats at Casey, then will we have to do asbestos abatement and floor tile replacement?

A. There are 284 seats and they are in very poor condition. Asbestos tile flooring will have to be removed because the seats are screwed in to the floor.

Page 27: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Does every emergency generator need new switches?A. Every emergency generator has to have 2

switches; this was recently changed in an update in code with SED requirements.

Q. Do catch basins have to be adjusted in the asphalt pavement at almost all buildings (except the High School and Herman)?

A. The list of catch basins needing repair is getting smaller because several have already had to be fixed due to safety concerns; paid for with 100% local dollars.

Page 28: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Do we need to repaint the gym ceiling at Herman?A. Tiles are starting to become loose. Rather than

spend 100% local dollars, it’s better to take care of this in a capital project.

Q. Can’t we replace the gym wall pads at the Junior High ourselves?

A. We have been replacing these ourselves, as necessary. There is not much left to do in the project.

Page 29: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Are the following burner/boiler replacements really necessary?

High School – 3Junior High – 2Genesee – 1

A. Burner replacements are necessary because the Gordon Piatt company is no longer in business. This makes it very expensive, if not impossible,

to get replacement parts.

Page 30: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Have the steps at the Junior High been removed from the project since we’re fixing them

now?A. One set of steps will be removed, but the other

set still needs to be repaired.Q. Is there any wiggle room in the project timeline?A. The latest we can have the voting machines

(prior to the November general election) is October 18. This is 2 weeks later than our original vote date of October 4. So, the board could push back their vote on the project by 2 weeks, moving the vote to August 23. If we push the vote back any later, the timeframe to put bids out is not optimal.

Page 31: 2011 CAPITAL IMPROVEMENT PROJECT  Priority #1 Items Health, Safety, Code, Security and Preservation of the Existing Investment :

Q. Why are there no cost estimates listed on the website?

A. At the suggestion of SWBR, cost estimates were not included because (1) we only have

estimates until the project is actually designed; (2) if included, contractors may review the cost estimates and base their bids on those.