Public Works and Transportation Committee April 27, 2011 2011-2016 Proposed Highway Improvement Program 1
44

2011-2016 Proposed Highway Improvement Program

Feb 24, 2016

Download

Documents

cato

2011-2016 Proposed Highway Improvement Program. Public Works and Transportation Committee April 27, 2011. 2011-2016 Five Year Highway Improvement Program. Management philosophy sets system priorities : Preservation Modernization Expansion. Priority One: Preservation. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2011-2016 Proposed Highway Improvement Program

1Public Works and Transportation Committee

April 27, 2011

2011-2016Proposed Highway

Improvement Program

Page 2: 2011-2016 Proposed Highway Improvement Program

2

Management philosophy sets system priorities:

1. Preservation2. Modernization3. Expansion

2011-2016 Five Year Highway Improvement Program

Page 3: 2011-2016 Proposed Highway Improvement Program

3

Developing a set of projects ARGUS Pavement Management Software

Keeping tabs on the system Asset Inventories

$1.6 billion to build

Priority One: Preservation

Page 4: 2011-2016 Proposed Highway Improvement Program

4

ARGUS Pavement Management System……

……Today is an introduction to ARGUS

Developing the Project Set

Page 5: 2011-2016 Proposed Highway Improvement Program

5

Make cost effective decisionsFor given 5 year budget levels:

Where repairs are needed

What repair strategies to use

When the repairs should be done

Pavement Management Goal

Page 6: 2011-2016 Proposed Highway Improvement Program

6

County highway databaseAutomated pavement testingRepair strategies with costsPavement aging predictionOptimization program

Pavement ManagementSystem Components:

Page 7: 2011-2016 Proposed Highway Improvement Program

7

Contains information on…

Surface type

Surface width

Section area

Traffic volumes

Percentage of trucks

County Highway Database

Page 8: 2011-2016 Proposed Highway Improvement Program

8

About 848 lane miles in system

County is divided into quadrants

One quadrant is tested each year

Entire county is covered in four years

Automated Pavement Testing

Page 9: 2011-2016 Proposed Highway Improvement Program

9

First: Laser Road Surface Tester (RST)

measures…

Cracking

Rutting

Ride quality

Automated Pavement Testing

Page 10: 2011-2016 Proposed Highway Improvement Program

10

Automated Pavement Testing

Second: Dynaflect deflection tester measures…

Strength and condition of pavement

Strength and condition of subgrade

Page 11: 2011-2016 Proposed Highway Improvement Program

11

Two Groups of Roadway Priorities:(starting with 2012-2016 program analysis)

Four lane roads - 53 milesTwo lane roads - 242 miles

Repair Strategies and Costs

Page 12: 2011-2016 Proposed Highway Improvement Program

12

Four resurfacing strategiesThree “3R” strategiesThree reconstruction strategiesAssociated per-square-yard costs

Repair Strategies and Costs

Page 13: 2011-2016 Proposed Highway Improvement Program

13

Pavement Aging Prediction Costs

Page 14: 2011-2016 Proposed Highway Improvement Program

14

Pavement Management System does…

Assess the present condition of the systemEstimate future road conditionsIdentify and rank road projectsMaximize the condition of the system

within the given budget

ARGUS Summary

Page 15: 2011-2016 Proposed Highway Improvement Program

15

Pavement Management System does not…

Replace professional judgmentProvide certain detailed project-specific

information

ARGUS Summary …

Page 16: 2011-2016 Proposed Highway Improvement Program

16

Started in 1986System condition has improved from a

rating of 68 to 78 (on 100 scale)

Area of backlog and failing pavement has

been reduced from 55% to 15%

LCDOT ARGUS results

Page 17: 2011-2016 Proposed Highway Improvement Program

17

The following charts to appear in Section 2 Preservation Projects

2011 – 2016Proposed Highway Improvement Program

Page 18: 2011-2016 Proposed Highway Improvement Program

18

2011 Traffic Volumes

Page 19: 2011-2016 Proposed Highway Improvement Program

19

Definitions of Pavement Condition

Page 20: 2011-2016 Proposed Highway Improvement Program

20

Current Pavement Condition = 78

Page 21: 2011-2016 Proposed Highway Improvement Program

21

2011 Pavement Conditions

Page 22: 2011-2016 Proposed Highway Improvement Program

22

ARGUS optimizes improvements

Page 23: 2011-2016 Proposed Highway Improvement Program

23

Multiple treatments evaluated

Page 24: 2011-2016 Proposed Highway Improvement Program

24

System Recommendations

Page 25: 2011-2016 Proposed Highway Improvement Program

25

System Preservation Projects 2012-2016

Page 26: 2011-2016 Proposed Highway Improvement Program

26

2012 ProjectsStreet Name From To Project Type

Buffalo Grove Road Pavement Change Lake Cook Road Reconstruction

Buffalo Grove Road At Sandalwood Road Resurfacing

Deerfield Parkway Busch Parkway Barclay Boulevard Resurfacing

Kenosha Road 9th Street IL Route 173 Resurfacing

Lewis Avenue Russell Road 9th Street Resurfacing

Lewis Avenue 9th Street North of 21st Street Resurfacing

Lewis Avenue Wadsworth Road Beach Road Resurfacing

Lewis Avenue Beach Road Everett Street Resurfacing

Lewis Avenue Everett Street York House Road Resurfacing

Petite Lake Road Fairfield Road IL Route 83 Reconstruction

Quentin Road Old McHenry Road IL Route 22 Resurfacing

Page 27: 2011-2016 Proposed Highway Improvement Program

27

2013 ProjectsStreet Name From To Project Type

Darrell Road IL Route 176 Riverwalk Lane Resurfacing

Delany Road 21st Street Wadsworth Road Resurfacing

Dilleys Road Wadsworth Road Stearns School Road Resurfacing

Dilleys Road Stearns School Road IL Route 132 Resurfacing

Greenwood Avenue Golf Road Sheridan Road Resurfacing

Monaville Road Cedar Lake Road IL Route 83 Resurfacing

Rollins Road Washington Avenue Wilson Road Resurfacing

Rollins Road Wilson Road Fairfield Road Resurfacing

Sunset Avenue IL Route 131 Golf Road Resurfacing

Wadsworth Road Dilleys Road CP Railroad Tracks Resurfacing

Page 28: 2011-2016 Proposed Highway Improvement Program

28

2014 ProjectsStreet Name From To Project Type

Center Street IL Route 83 US Route 45 Resurfacing

Fairfield Road Petite Lake Road IL Route 132 Reconstruction

Lewis Avenue Glen Flora Avenue IL Route 132 Reconstruction

Midlothian Road Winchester Road IL Route 176 Resurfacing

Pulaski Drive IL Route 131 Sheridan Road Resurfacing

Page 29: 2011-2016 Proposed Highway Improvement Program

29

Street Name From To Project Type

21st Street IL Route 131 Kenosha Road Resurfacing

9th Street Kenosha Road Lewis Avenue Resurfacing

Cedar Lake Road IL Route 134 IL Route 120 Reconstruction

Deep Lake Road Grass Lake Road Gelden Road Resurfacing

Deep Lake Road Gelden Road IL Route 132 Resurfacing

Kilbourne Road Wisconsin State Line Russell Road Resurfacing

Petite Lake Road IL Route 59 Fairfield Road Reconstruction

Russell Road Kilbourne Road IL Route 131 Resurfacing

Sand Lake Road IL Route 132 US Route 45 Resurfacing

Washington Street UP Railroad Bridge IL Route 131 Resurfacing

2015 Projects

Page 30: 2011-2016 Proposed Highway Improvement Program

30

Street Name From To Project Type

Deep Lake Road North Avenue IL Route 173 Resurfacing

Hunt Club Road IL Route 173 Wadsworth Road Resurfacing

Lewis Avenue Dugdale Road IL Route 137 Resurfacing

2016 Projects

Page 31: 2011-2016 Proposed Highway Improvement Program

31

Pavement and bike facilities, guardrailBridges and railroad crossingsSignals and signsDrainage and stormwater facilitiesMore…

Keeping Tabs on the System:Asset Inventories

Page 32: 2011-2016 Proposed Highway Improvement Program

32

Program resurfaces about 9 miles per year

Page 33: 2011-2016 Proposed Highway Improvement Program

33

Many roads initially built in the 1950s

Page 34: 2011-2016 Proposed Highway Improvement Program

34

Inventory: Lane Miles

Page 35: 2011-2016 Proposed Highway Improvement Program

35

Age of Highway Bridges

Page 36: 2011-2016 Proposed Highway Improvement Program

36

Age of Bridge Deck Surface

Page 37: 2011-2016 Proposed Highway Improvement Program

37

Age of Bike and Pedestrian Bridges

Page 38: 2011-2016 Proposed Highway Improvement Program

38

Bridges: Sufficiency Ratings

Page 39: 2011-2016 Proposed Highway Improvement Program

39

Stormwater Management Facilities

Page 40: 2011-2016 Proposed Highway Improvement Program

40

By the NumbersInventory: Non-Pavement Assets

14,226

Storm sewer structures

544 Culverts

183 Miles of storm sewer pipe

18,577

Feet of fencing

9,058 Feet of retaining wall

51 Miles of 4’ paved shoulder

18 Miles of guardrail

April 2011

Page 41: 2011-2016 Proposed Highway Improvement Program

41

Inventory: Signs

Page 42: 2011-2016 Proposed Highway Improvement Program

42

Inventory: Railroad Crossings

Page 43: 2011-2016 Proposed Highway Improvement Program

43

Inventory: Signal Controllers

Page 44: 2011-2016 Proposed Highway Improvement Program

44

Developing a set of projectsARGUS Pavement Management Software

Keeping tabs on the systemAsset Inventories

Next Program Presentation:Priority Two – System ModernizationPriority Three – System Expansion

Priority One: Preservation