Top Banner
2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A J O J A J O J A J O J A J O J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) * Joint RCNP/TRIUMF/Acsion effort Remove BL1B, Core M13 block Shielding UCN APPARATUS: Spallation Target * UCN Source BEAMLINE: Kicker Septum Dipole Beamline (incl quads, PS, etc…) Design & Review Order/Fabricate/Deliver Install Test Test Install Install Order/Mod Order/Fabricate Design Design Order/Fabricate Install Test Install Design/Prototype/Fabricate Design/Fabricate Install UnInstall Procure shielding blocks Design Install COMMISSION @ TRIUMF Beamline Commissioning HELIUM LIQUEFIER: Upgrade He Liquefier He Liquefier System Procure UCN Source Commissioning Install/Test & Run @ RCNP Procure/Install Install
11

2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.

Dec 30, 2015

Download

Documents

Marcus Wilkins
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.

2011 2015201420132012 2016 2017ACTIVITY

J A J OJ A J O J A J OJ A J O J A J OJ A J O J A

Schedule( 2010-2016 )UCN Timeline & Major Milestones2011 2015201420132012 2016 2017

Remove M11/13; CleanupM11/13 front-end,septum,1AQ9

MESON HALL CLEAN-UP: MILESTONES

Activities at TRIUMF

Activities Elsewhere(KEK, RCNP, CERN, Acsion)

* Joint RCNP/TRIUMF/Acsion effort

Remove BL1B, Core M13 block

Shielding

UCN APPARATUS:Spallation Target *UCN Source

BEAMLINE:KickerSeptumDipoleBeamline (incl quads, PS, etc…)

Design & Review Order/Fabricate/Deliver Install

Test

Test

Install

Install

Order/Mod

Order/Fabricate

Design

Design Order/Fabricate InstallTest

InstallDesign/Prototype/Fabricate

Design/Fabricate InstallUnInstall

Procure shielding blocksDesign Install

COMMISSION @ TRIUMFBeamline Commissioning

HELIUM LIQUEFIER:

Upgrade He Liquefier

He Liquefier SystemProcure

UCN Source Commissioning

Install/Test & Run @ RCNP

Procure/Install

Install

Page 2: 2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.

2011 2015201420132012 2016 2017ACTIVITY

J A J OJ A J O J A J OJ A J O J A J OJ A J O J A

Schedule( 2010-2016 )UCN Timeline & Major Milestones2011 2015201420132012 2016 2017

Remove M11/13; CleanupM11/13 front-end,septum,1AQ9

MESON HALL CLEAN-UP: MILESTONES

Activities at TRIUMF

Activities Elsewhere(KEK, RCNP, CERN, Acsion)

* Joint RCNP/TRIUMF/Acsion effort

Remove BL1B, Core M13 block

Shielding

UCN APPARATUS:Spallation Target *UCN Source

BEAMLINE:Kicker

SeptumDipoleBeamline (incl quads, PS, etc…)

Design & Review Order/Fabricate/Deliver Install

Test

Test

Install

Install

Order/Mod

Order/Fabricate

Design

Design Order/Fabricate InstallTest

InstallDesign/Prototype/Fabricate

Design/Fabricate InstallUnInstall

Procure shielding blocksDesign Install

COMMISSION @ TRIUMFBeamline Commissioning

HELIUM LIQUEFIER:

Upgrade He Liquefier

He Liquefier SystemProcure

UCN Source Commissioning

Install/Test & Run @ RCNP

Procure/Install

Install

Kicker Ceramic Beamtube InstallDesign/Order Fabricate

Install

Page 3: 2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.

2011 2015201420132012 2016 2017ACTIVITY

J A J OJ A J O J A J OJ A J O J A J OJ A J O J A

Schedule( 2010-2016 )UCN BL1U KICKER2011 2015201420132012 2016 2017

Remove M11/13; CleanupM11/13 front-end,septum,1AQ9

MESON HALL CLEAN-UP: MILESTONES

Activities at TRIUMF

Activities Elsewhere(KEK, RCNP, CERN, Acsion)

Remove BL1B, Core M13 block

KICKER:Kicker Design & Review Order/Fabricate/Deliver Install

Design & Out for quotes (8)

Bid Time & Place Order (29)

Vendor final design & Fabr. (324)

Acceptance tests & Receive (60)

Unpack & Test (19)

Ceramic Beamtube & Stands

Finalize design & Order (71)

Fabricate/Assemble (136)

Prepare to Install (15)

Design & Review (117)

Design/Order Fabricate Install

Install

Page 4: 2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.

2011 2015201420132012 2016 2017ACTIVITY

J A J OJ A J O J A J OJ A J O J A J OJ A J O J A

Schedule( 2010-2016 )UCN BL1U SEPTUM2011 2015201420132012 2016 2017

Remove M11/13; CleanupM11/13 front-end,septum,1AQ9

MESON HALL CLEAN-UP: MILESTONES

Activities at TRIUMF

Activities Elsewhere(KEK, RCNP, CERN, Acsion)

Remove BL1B, Core M13 block

SEPTUM:

Septum Test InstallOrder/ModDesign

Review & Finalize design (129)

Place Order (15)

Fabricate Septum Mods (80)

Receive & Assemble Septum (110)

Map & Test Septum (60)

Vacuum Box & StandReview & Finalize design (45)

Place Order (15)

Fabricate (95)

Assemble (20)

Prepare to Install (10)

Prepare to Install (40)

Page 5: 2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.

2011 2015201420132012 2016 2017ACTIVITY

J A J OJ A J O J A J OJ A J O J A J OJ A J O J A

Schedule( 2010-2016 )UCN Timeline & Major Milestones2011 2015201420132012 2016 2017

Remove M11/13; CleanupM11/13 front-end,septum,1AQ9

MESON HALL CLEAN-UP: MILESTONES

Activities at TRIUMF

Activities Elsewhere(KEK, RCNP, CERN, Acsion)

* Joint RCNP/TRIUMF/Acsion effort

Remove BL1B, Core M13 block

Shielding

UCN APPARATUS:Spallation Target *UCN Source

BEAMLINE:Kicker

SeptumDipoleBeamline (incl quads, PS, etc…)

Design & Review Order/Fabricate/Deliver Install

Test

Test

Install

Install

Order/Mod

Order/Fabricate

Design

Design Order/Fabricate InstallTest

InstallDesign/Prototype/Fabricate

Design/Fabricate InstallUnInstall

Procure shielding blocksDesign Install

COMMISSION @ TRIUMFBeamline Commissioning

HELIUM LIQUEFIER:

Upgrade He Liquefier

He Liquefier SystemProcure

UCN Source Commissioning

Install/Test & Run @ RCNP

Procure/Install

Install

Kicker Ceramic Beamtube InstallDesign/Order Fabricate

Install

Page 6: 2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.

List of Major Milestones2012 – Dec UCN Source & Spallation Target installation at RCNP.

UCN/nEDM prototyping & commissioning begins.

2014 – Apr Kicker (or Kicker Ceramic Beamtube) Installation completed.

2014 – Aug UCN/nEDM RCNP phase completed.Uninstall & transport to TRIUMF.

2014 – Dec Meson Hall Clean-up completed.

2015 – Apr UCN Source & Spallation Target received at TRIUMF.Installation of Target & Source.

2016 – Mar UCN Beamline (BL1U) Installation completed.

2016 – Mar Commission UCN Facility using low intensity beam.

Page 7: 2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.

Kicker

Page 8: 2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.

Septum

Page 9: 2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.

Dipole

Page 10: 2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.
Page 11: 2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.