2010 Workplan, Budget and Activity Reports Project Implementation Review Workshop and the second Steering Committee Meeting of the UNEP/GEF Project “Piloting Integrated Processes and Approaches to Facilitate National Reporting to Rio Conventions” (FNR_Rio) 26-28 January 2011, Port Louis – Mauritius Asghar M. FAZEL Global Project Coordinator
10
Embed
2010 Workplan, Budget and Activity Reports Project Implementation Review Workshop and the second Steering Committee Meeting of the UNEP/GEF Project “Piloting.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
2010 Workplan, Budget
and Activity Reports
Project Implementation Review Workshop
and the second Steering Committee Meeting of the UNEP/GEF Project “Piloting Integrated Processes and Approaches to Facilitate National Reporting to Rio Conventions”
(FNR_Rio)
26-28 January 2011, Port Louis – Mauritius
Asghar M. FAZELGlobal Project Coordinator
Component 1: Situational Analysis and Reporting Process Design
UNEP Line
Output Activity Resources Q1 Q2 Q3 Q4
Output 1.1: Inventory and analysis report of reporting
requirements
1101Project coordination support at national level
support to NPCs (one in each country) x x
1202International support for situation analysis, report design
Study by ICx x
1102Project technical and administrative support at national level
support to NPAs (one in each country) x x
Output 1.2: National-level analyses and
recommendations for data
management
1201
6 national studies, incl. country-specific recommendations
Studies by NCs (one in each country)
x
3301
Project Inception meeting/workshop and Stakeholder input meeting (budgeted with the 1st TWG)
budgeted with the Project Inception Workshop + 6 national workshops (one in each country)
x
1202
Output 1.3: Manual produced on piloting integrated reporting
Synthesis of outputs and development of global recommendations and supporting national manual development
IC (technical support to the NCs and NPCs) x x
1201
Develop 6 national manuals on integrated reporting in pilot countries
Developing National Manuals by NCs (under technical supervision of the IC)
x
5201
Preparation and dissemination of the 6 National Manuals
Printing
1103
Project coordination support at international level
GPC
x x
5301
Communications & postage Communications (global level only) x x
2
Component 2: Implementation UNEP Line
Output Activity Resources Q1 Q2 Q3 Q4
1203Output 2.1: Strengthened institutional frameworks for reporting
Develop and implement country-specific implementations of global recommendations
Studies by NCs (one in each country) x x
1204Compile feedback and evaluate for each country IC
1206Project technical and administrative support at national level
support to NPAs (one in each country) x x
1208 Output 2.2: Strengthened national
systems for monitoring, reporting
country-specific implementations support to NCs (one in each country)
1207 Project coordination support at international level GPC x x x
1204Compile feedback and evaluate for each country and national training specific needs reviewed
IC x x
1601GPC field visits GPC Travel and
subsistence x x x
1203
Output 2.3: Enhanced capacity for data
collection and analysis
Needs analysis & approach developed for each country (training and technology)
NCs x x
4201
Technology (see indicative amount in table 16 of the PRODOC. To be determined by Needs analysis & approach)
Technology
x x
3201
Training delivered (see indicative list in table 7 of the PRODOC. To be determined by Needs analysis & approach)
6 national training workshops (one in each country)
x x
1205Project coordination support at national level support to NPCs (one in
each country) x x
1203
Output 2.4: Reporting quality assessed
Reports for each country on the quality of reporting to each convention
NCs
1204Global synthesis of pilot country experience IC
5201Preparation and dissemination of the 6 national reports
Printing
5203Internet presence & communication Internet (global level only) x x
3
Component 3: Sharing of Experience and Upscaling
UNEP Line Output Activity Resources Q1 Q2 Q3 Q4
1206
Output 3.1: Technical Working Group meetings
Project technical and administrative support at national level
support to NPAs (one in each country)
3301
Project Inception workshop + 1st Steering Committee meeting (3-4 days in total) + National meetings (TWG, Inception, NSC)
the Project Inception and PSC meetings+ National Inception, TWG and NSC meetings
x x
1205
Project coordination support at national level support to NPCs (one in each country)
x x
3302
2nd PSC (2-3 days), PSC meeting
3303
3rd PSC (2-3 days), PSC meeting
1207Project coordination support at international level
GPC x x
Output 3.2: International events to share experience
5202Preparation and dissemination of the project reports
Printing
3304
3 Rio Conventions side-events International meetings (workshops, side events)
x x
5203Internet presence & communication Internet (global
level only) x x4
Administration (management and financial)
Global Secretariat set-up (GPC and IC)
Appointment of 6 NCs and 6 NPAs
Drafting 2010 workplan and budget
Project Inception Workshop and 1st PSC (9-11 Feb 2010)
Financial planning and management (SSFA)
Financial transactions (DGEF > WCMC > NEA/UNDP)
Recruitment of 6 NCs
Submitting quarterly and half-year reports
5
Administration (meetings/missions)
Organising/attending several events (NO cost to
Project):
Trondheim, Conference, Feb, Trondheim
Nordic Symposium on Synergies , Apr, Helsinki
SBSTTA/14, May, Nairobi
CBD Regional workshop on Reporting, Jun, Budapest
CBD/COP, Oct, Nagoya (cancelled)
GPC travel to Asmara
6
Administration (communications)
Keeping open lines of e-mail communications (24/7)
Organising several remote meetings (tel/Skype) maintenance and updating on-line services: