Top Banner
2010 Wisconsin Safe Routes to School Funding
33

2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Jan 11, 2016

Download

Documents

Sheila Hall
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

2010 Wisconsin Safe Routes to School

Funding

Page 2: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

2010 SRTS Project Application Cycle

• Applications available January 2010• Applications due April 2, 2010

• Approximately $6 million awarded

Page 3: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Eligible Projects

• Within two miles of a grade or middle school (kindergarten through eighth grade)

• Benefit is for walking/biking

• Can include education, encouragement, enforcement, engineering and evaluation.

• Projects are 100% fundable to the limit of the project award.

• For Infrastructure and Non-Infrastructure projects communities will be required to complete the project and then request reimbursement from WisDOT.

Page 4: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Eligible Applicants• Planning

– Municipality, School, Indian Tribe – Non-Profit organization

• Infrastructure: – State, local, or regional governmental unit

with jurisdiction over property– Indian Tribe with jurisdiction over property

• Non-infrastructure:– Municipality, School, Indian Tribe – Non-Profit organization

Page 5: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Project Timeline• Planning – Projects will begin in Fall 2010• Infrastructure - Small Infrastructure projects

with few issues and completed design may be able to begin construction in late 2011. The majority of Infrastructure projects should plan for construction in 2012 or 2013.

• Non-Infrastructure – Projects should anticipate starting no sooner than Spring 2011. Some projects may want to request funds for some activities before construction and some after.

Page 6: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Application Options

• Planning Assistance

OR• Non-Infrastructure and Infrastructure

Projects

Page 7: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Planning Assistance

• Communities will receive the services of a Wisconsin DOT hired consulting firm or their RPC/MPO

• Firm will assist with tasks such as:– Walk/Bike Audits– Community Meeting facilitation– Existing conditions evaluation– Survey data analysis– Report Writing

Page 8: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Non-Infrastructure and Infrastructure Projects

Activities that include:• Education• Encouragement• Enforcement• Engineering• Evaluation

Page 9: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Safe Routes to School Selection Committee

Committee comprised of program experts from the following type of organizations -

• DOT Bureau of Transit and Local Roads• DOT Bureau of Transportation Safety• Department of Health and Family Service • Department of Public Instruction• A Police Department • A Health Department • A Safe Routes to School Program • Safe Kids Coalition• Bicycle Federation of Wisconsin

Page 10: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Planning Assistance

Page 11: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Selection CriteriaPlanning Assistance

• Strength of Task Force – 30%• Potential for development of successful

SRTS Program – 20%• Severity of identified problems – 20%• Community and school support for

SRTS, biking and walking – 15%• Community need for assistance and

community demographics – 15%

Page 12: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Strength of Task Force

Committee looked for:• Inclusion of committee members from key areas such

as schools, engineering/public works department, health, and police.

• Diversity of committee membership such as bringing in parents, business owners, or other members that bring important perspectives.

• Activities committee has already undertaken that show their ability to successfully undertake the planning

process.

Page 13: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Potential for development of successful SRTS Program

Things committee looked for include:• Showing how SRTS will fit into larger city planning.• Activities they are already undertaking to build support

for SRTS.• Other programs related to physical activity, wellness or

safety that the school or community has started and that has been successful.

• Recognition of need for continuing evaluation and updating of plan.

• Success with similar planning efforts or programming efforts.

Page 14: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Severity of identified problems

Things committee looked for include:• Crash or injuries near school or in community involving children.• Lack of or poorly maintained bicycle or pedestrian facilities.• Documented traffic problems such as speeding or high traffic

volume roads near school.• High level of parent concerns shown by conducting survey.• Lack of any children that currently walk or bike.• Hazard bussing situations.

Page 15: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Community and school support for SRTS, biking and walking

Things committee looked for include:• Bicycle and pedestrian friendly policies (or willingness

to change or add policies as part of planning process).• Wellness policy that promotes physical activity.• Involvement with programs such as the Green and

Healthy Schools, Governor’s School Health Award, Movin’ and Muchin’ Program or other programs that promote issues of physical fitness, health, etc.

• Promotion of biking and walking through Walk to School Day, bike rodeos, physical education classes or other similar events.

Page 16: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Community need for assistance and community demographics

Things committee looked for include:• High percentage of low-income students in school

(based on number of students eligible for free or reduced cost lunch).

• Community has few professional staff that could provide the necessary planning assistance.

• Community would be unlikely to be able to undertake the planning process without a grant.

Page 17: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Infrastructure and Non-Infrastructure Projects

Page 18: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Infrastructure Questions• Historic buildings or area• Wetlands • Railroad within 1000 feet of project• Recreational area, park or wildlife refuge• State or Federal Highway• Real Estate Issues

Page 19: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Selection CriteriaInfrastructure and Non-infrastructure

• SRTS Plan or similar assessment – 25%• Severity of identified problems – 15%• Effective and Comprehensive Solutions – 15%• Increases walking, biking and/or safety – 15%• Community and school support for SRTS, biking

and walking and future sustainability of SRTS efforts – 15%

• Community need – 5%• Overall quality and creativity of projects/activities

– 4%• Evaluation plan – 4%• Time table – 2%

Page 20: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

SRTS Plan or similar assessment

Things committee looked for include:• Community has a completed SRTS Plan that assesses

the issues that keep children from biking and walking to school. The requested projects and activities were recommended actions in the plan.

• The community has a Bicycle and/or Pedestrian Plan or Comprehensive Plan that looked at pedestrian and bicycle issues near the community’s schools. The

requested projects or activities were recommended actions in the plan.

• The community has undertaken some planning efforts such as walk or bike audits, assessment of the school facilities and problems at pick-up and drop-off time, parent surveys, traffic volume and speed studies or other SRTS assessments.

Page 21: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Severity of identified problems

Things committee looked for include:• Crash or injuries near school or in community involving

children.• Lack of or unsafe bicycle or pedestrian facilities.• Documented traffic problems such as speeding or high

traffic volume roads near school.• High level of parent concerns shown by conducting

survey.• Hazard bussing situations.

Page 22: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Effective and Comprehensive Solutions

Things committee looked for include:• The project or activity described addresses the

problems that were identified.• Community/school has given consideration to

necessary engineering, education, enforcement and encouragement that is needed to encourage and enable children to walk and bike to school safely.

Page 23: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Increases walking, biking and/or safety

Things committee looked for include:• Project has strong potential to get more children

walking and biking to school. • Project will significantly increase the safety of children

who are currently walking to school.

Page 24: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Community and school support for SRTS, biking and walking and future

sustainability of SRTS efforts

Things committee looked for include:• Bicycle and pedestrian friendly policies (or plan in

place to change policies) at school and community level.

• Wellness policy that promotes physical activity.• Involvement with programs such as the Green and

Healthy Schools, Governor’s School Health Award, Movin’ and Muchin’ Program or other programs that promote issues of physical fitness, health, etc.

• Promotion of biking and walking through Walk to School Day, bike rodeos, physical education classes or other similar events.

• Activities they are already undertaking that support for SRTS.

Page 25: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Community and school support for SRTS, biking and walking and future

sustainability of SRTS efforts

• Other programs related to physical activity, wellness or safety that the school or community has started and that has been successful.

• Recognition of need for continuing evaluation and updating of plan.

• Success with similar planning efforts or programming efforts.

• Policies related to sidewalk provision or development of trails for new developments

• Prior provision of facilities such as sidewalks, traffic calming, trails, etc

Page 26: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Community need

Things committee looked for include:• High percentage of low-income students in school

(based on number of students eligible for free or reduced cost lunch or other provided data).

• Community would be unlikely to be able to undertake the project without SRTS funding.

Page 27: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Overall quality and creativity of projects/activities

Things committee looked for include: • Community has shown that they understand their

community’s specific needs and have approached the solution creatively.

In addition, consideration was given to the federal objectives of:

• Project likely to decrease traffic congestion.• Project likely to improve childhood health.• Project likely to reduce childhood obesity.• Project likely to encourage a healthy and active

lifestyle.• Project likely to improve partnerships between schools,

municipalities, parents and other community groups.• Project likely to increase a community’s interest in

bicycle/pedestrian facilities.

Page 28: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Overall quality and creativity of projects/activities

• Project likely to improve air quality.• Project likely to improve community safety.• Project likely to reduce fuel consumption.• Project likely to increase community security.• Project likely to enhance community accessibility.• Project likely to increase community involvement.

Page 29: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Evaluation plan

Things committee looked for include:• Community will be able to complete required Student

and Parent surveys.• Project includes additional evaluation activities that are

appropriate to the size and complexity of the project.

Page 30: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Time table

Things committee looked for include:• Project has necessary approvals to begin as soon as

funding is available.• Project can be completed within three years.

Page 31: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Other WisDOT Resources

• Transportation Enhancements

• Contact John Duffe• [email protected]

Page 32: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Contacts

Renee [email protected]

Page 33: 2010 Wisconsin Safe Routes to School Funding. 2010 SRTS Project Application Cycle Applications available January 2010 Applications due April 2, 2010 Approximately.

Website

www.dot.wisconsin.gov/localgov/aid/saferoutes.htm