LINKS FOR ELECTRONIC NAVIGATION OF THE: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION (Adopted October 1, 2005) Note: This page does not exist in the hard-copy, spiral bound edition of the 2006 Standard Specifications for Highway Construction (Adopted October 1, 2005). This page has been added to the electronic version of the Standard Specifications to help guide the user by providing automated links, which are identified by blue text. “Click” on the desired location from the following: SECTION TITLES TABLE OF CONTENTS (VOLUME 1) TABLE OF CONTENTS (VOLUME 2) INDEX OF STANDARD DRAWINGS (VOLUME 1) INDEX OF STANDARD DRAWINGS (VOLUME 2) We made every effort to ensure that this on-line publication is accurate and current. However, we provide this electronic file only as a convenience. In case of discrepancies between the electronic version and the paper document, the paper document has precedence.
570

2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

Apr 24, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

LINKS FOR ELECTRONIC NAVIGATION OF THE:

2006 STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION

(Adopted October 1, 2005)

Note: This page does not exist in the hard-copy, spiral bound edition of the 2006 Standard Specifications for Highway Construction (Adopted October 1, 2005).

This page has been added to the electronic version of the Standard Specifications to help guide the user by providing automated links, which are identified by blue text.

“Click” on the desired location from the following:

SECTION TITLES

TABLE OF CONTENTS (VOLUME 1)

TABLE OF CONTENTS (VOLUME 2)

INDEX OF STANDARD DRAWINGS (VOLUME 1)

INDEX OF STANDARD DRAWINGS (VOLUME 2)

We made every effort to ensure that this on-line publication is accurate and current. However, we provide this electronic file only as a convenience. In case of discrepancies between the electronic version and the paper document, the paper document has precedence.

Page 2: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

Note:

This page does not exist in the hard-copy, spiral bound edition of the 2006 Standard Specifications for Highway Construction (Adopted October 1, 2005).

This page has been added to the electronic version of the Standard Specifications to maintain even and odd numbered pages.

Page 3: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

2006 STANDARD SPECIFICATIONS FOR

HIGHWAY CONSTRUCTION

Adopted October 1, 2005

Construction Engineering Section Construction and Maintenance Branch

Ministry of Transportation

Page 4: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

Canadian Cataloguing in Publication Data British Columbia. Ministry of Transportation and Highways. Standard specifications for highway construction effective February 1,...-- 1991 - Annual. ISSN 1188-0120 = Standard specifications for highway construction (Victoria) 1. Roads - Specifications - British Columbia. I. Title.

TE27.B7B74 625.7 C91-092305-1

Page 5: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

NOTICE TO USERS

SECTIONS 101 to 586 - VOLUME ONE

SECTIONS 604 to 991 - VOLUME TWO

All text changed or added since the 2004 edition is shown with single underlining and a vertical bar in the margin. To obtain the Standard Specifications for Highway Construction Volume - 1 & 2 - 2006

Order online at http://www.publications.gov.bc.ca/ , click on general public go shopping button and in the “search” field type in 7680002028, the Queen’s Printer stock number, select the item and click the “add to shopping cart” button. You will require a Visa or MasterCard to process this order. (Visa and/or MasterCard information is stored on our secure server)

Mail in a Company Cheque, Money Order or Certified Cheque payable to the Minister of Finance to:

Queen’s Printer, Government Publication Services, Box 9452, Stn Prov Govt Victoria BC V8W 9V7

Phone toll free 1 800 663-6105 or locally in Victoria at 387-6409, with your Visa or MasterCard Number and we will place the order for you.

To view the electronic version of these specifications go to:

http://www.th.gov.bc.ca/Publications/const_maint/contract_serv/standardspecs.htm For technical content please contact:

Construction Contracts Engineer Construction and Maintenance Branch Ministry of Transportation 940 Blanshard Street Level 4C PO Box 9850 STN PROV GOVT Victoria BC V8W 9T5 Telephone: (250) 387-7752 Facsimile: (250) 356-7276

BC - MOT 2006 III

Page 6: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

THIS PAGE IS LEFT INTENTIONALLY BLANK

2006 BC - MOT IV

Page 7: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 V

SECTION TITLES

VOLUME ONE CONTAINS THE FOLLOWING SECTIONS:

SECTION 101 - QUALITY MANAGEMENT NEW

SECTION 108 - SAMPLE FORMS

SECTION 125 - VALUE ENGINEERING - PROPOSAL GUIDELINES

SECTION 135 - CONSTRUCTION SITE SAFETY

SECTION 145 - GENERAL REQUIREMENTS FOR HIGHWAY, BRIDGE AND MARINE CONSTRUCTION

SECTION 165 - PROTECTION OF THE ENVIRONMENT

SECTION 194 - TRAFFIC MANAGEMENT FOR WORK ZONES

SECTION 200 - CLEARING AND GRUBBING

SECTION 201 - ROADWAY AND DRAINAGE EXCAVATION NEW

SECTION 202 - GRANULAR SURFACING, BASE AND SUB-BASES

SECTION 204 - ROCK CUTS

SECTION 205 - RIPRAP

SECTION 206 - ROCK BOLTS

SECTION 207 - SLOPE MESH FOR ROCK CUTS

SECTION 208 - DRAINS FOR ROCK CUTS

SECTION 209 - SHOTCRETE FOR ROCK CUTS

SECTION 211 - PORTLAND CEMENT CONCRETE

SECTION 213 - TIMBER BRIDGES - CONSTRUCTION

SECTION 214 - TIMBER PILING CONSTRUCTION

SECTION 215 - BRIDGES

SECTION 216 - COATING OF STEELWORK NEW

SECTION 218 - CONCRETE FOR MINOR WORKS

SECTION 232 - METAL BIN-WALL

SECTION 303 - CULVERTS

SECTION 308 - COATING SYSTEMS NEW

SECTION 312 - STEEL TRAFFIC BARRIERS AND WOOD POSTS

SECTION 316 - STEEL AND WIRE FENCE MATERIALS

SECTION 317 - P.E. PLASTIC DRAINAGE PIPE

SECTION 318 - PVC PLASTIC DRAINAGE PIPE

SECTION 320 - CORRUGATED STEEL PIPE

SECTION 321 - TRAFFIC PAINT

SECTION 407 - FOUNDATION EXCAVATION

SECTION 412 - REINFORCING STEEL

SECTION 413 - BRIDGE DECKS AND CONCRETE OVERLAYS

Page 8: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE SECTION TITLES

VI 2006 BC - MOT

SECTION 415 - MANUFACTURE AND ERECTION OF PRECAST AND PRESTRESSED CONCRETE MEMBERS

SECTION 416 - MANUFACTURE AND INSTALLATION OF POST-TENSIONED CONCRETE MEMBERS

SECTION 418 - CONCRETE BRIDGE DECK SEALANTS - SILANE SURFACE TREATMENT OF NEW PORTLAND CEMENT CONCRETE

SECTION 419 - CONCRETE BRIDGE DECK WATERPROOFING SYSTEM - PREFABRICATED MEMBRANE

SECTION 421 - STRUCTURAL STEELWORK

SECTION 422 - MISCELLANEOUS STEELWORK

SECTION 501 - HOT MIXED ASPHALT PAVEMENT

SECTION 502 - END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT

CONSTRUCTION

SECTION 503 - BASE PREPARATION AND BASE PROCESSING

SECTION 504 - PAVEMENT DRAINAGE

SECTION 507 - PRODUCTION AND STOCKPILING OF ASPHALT MIX

SECTION 508 - END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT NEW

SECTION 511 - COLD MILLING

SECTION 514 - HOT IN-PLACE RECYCLE

SECTION 515 - END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYCLED ASHPALT PAVEMENT

SECTION 521 - ASPHALT STABILIZED BASE COURSE MIXED IN PLACE

SECTION 531 - ASPHALT SURFACE TREATMENTS

SECTION 536 - PAVEMENT CRACK SEALING

SECTION 541 - RUBBLE MASONRY

SECTION 582 - CONCRETE CURB AND GUTTER AND STORM DRAINAGE

SECTION 586 - PLANT MIXED PORTLAND CEMENT TREATED BASE COURSE

Page 9: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 VII

SECTION TITLES

VOLUME TWO CONTAINS THE FOLLOWING SECTIONS:

SECTION 604 - STEEL TRAFFIC BARRIER CONSTRUCTION

SECTION 635 - ELECTRICAL AND SIGNING

SECTION 741 - FENCE CONSTRUCTION

SECTION 751 - TOPSOIL AND LANDSCAPE GRADING

SECTION 754 - PLANTING OF TREES, SHRUBS, AND GROUND COVERS

SECTION 757 - REVEGETATION SEEDING

SECTION 766 - IRRIGATION

SECTION 769 - PROTECTION AND RETENTION OF VEGETATION

SECTION 903 - TIMBER - MATERIALS

SECTION 904 - TIMBER (TREATED AND UNTREATED) - FABRICATION AND HANDLING

SECTION 905 - TIMBER - GLUED LAMINATED

SECTION 906 - ROUND TIMBER PILES

SECTION 908 - PRESERVATIVE TREATMENT - WOOD PRODUCTS

SECTION 909 - TREATED WOOD FENCE POSTS

SECTION 911 - STEEL AND IRON - NEW

SECTION 913 - REINFORCEMENT FOR CONCRETE

SECTION 917 - WIRE ROPE

SECTION 931 - PORTLAND CEMENT

SECTION 933 - ADMIXTURES FOR PORTLAND CEMENT CONCRETE

SECTION 941 - PRECAST REINFORCED CONCRETE BARRIERS

SECTION 951 - ASPHALT AND PAVING MATERIALS FOR HIGHWAY USE

SECTION 952 - CONTRACTOR SUPPLY ASPHALT AND PAVING MATERIALS FOR HIGHWAY USE

SECTION 971 - PLASTIC TRAFFIC CONES

SECTION 991 - CALCIUM CHLORIDE AND SODIUM CHLORIDE

Page 10: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME TWO SECTION TITLES

VIII 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 11: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 IX

TABLE OF CONTENTS VOLUME ONE

NOTE: ______ = CHANGED OR ADDED

SECTION 101 – QUALITY MANAGEMENT NEW!

101.01 General .................................................................................................................................................. 101-1 101.02 Quality Control Plan (QC Plan)............................................................................................................. 101-1 101.03 Quality Assurance Plan.......................................................................................................................... 101-4 101.04 Quality Audit ......................................................................................................................................... 101-4 101.05 Non-Conformance Reports (NCRs)....................................................................................................... 101-5 101.06 Appeal..................................................................................................................................................... 101-5 101.07 Payment................................................................................................................................................... 101-5

SECTION 108 – SAMPLE FORMS

PART A - GENERAL...................................................................................................................................... 108-1 108.01 General .................................................................................................................................................. 108-1 PART B – STATUTORY DECLARATIONS .............................................................................................. 108-1 108.11 Major Works ......................................................................................................................................... 108-1 108.12 Minor Works And Operational Services .............................................................................................. 108-1

SECTION 125 - VALUE ENGINEERING - PROPOSAL GUIDELINES

125.01 Definitions...................................................................................................................................... 125-1 125.02 Guiding Principles for VEP Evaluation ......................................................................................... 125-1 125.03 Value Engineering Proposal Submissions...................................................................................... 125-1 125.04 Implementation of a VEP ............................................................................................................... 125-2

SECTION 135 – CONSTRUCTION SITE SAFETY

135.01 Definitions...................................................................................................................................... 135-1 135.02 Base Safety Program ...................................................................................................................... 135-1 135.03 Prime Contractor – The Site ........................................................................................................... 135-2 135.04 Designated Prime Contractor – The Specified Area ...................................................................... 135-3 135.05 Site and Specified Area Notice Process ......................................................................................... 135-4 135.06 Contractor Obligations to Coordinate with the Designated Prime Contractor – The Specified Area

.......................................................................................................................................................... 135-5 135.07 Contractor’s Health and Safety Records ........................................................................................ 135-6

Page 12: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT X

SECTION 145 – GENERAL REQUIREMENTS FOR HIGHWAY, BRIDGE AND MARINE CONSTRUCTION

145.01 General Requirements..................................................................................................................... 145-1 145.02 Reference Information .................................................................................................................... 145-1 145.03 Value Engineering Proposals.......................................................................................................... 145-1 145.04 Scope of Work ................................................................................................................................ 145-1 145.05 Quantities and Dimensions ............................................................................................................. 145-1 145.06 Unit Prices ...................................................................................................................................... 145-1 145.07 Pre-construction Meeting................................................................................................................ 145-1 145.08 Mobilization.................................................................................................................................... 145-1 145.09 Authority of the Ministry Representative ....................................................................................... 145-2 145.10 Power, Telegraph, Telephone Lines and Other Utilities................................................................. 145-2 145.11 Permits ............................................................................................................................................ 145-2 145.12 Inspection of Work ......................................................................................................................... 145-2 145.13 “Ministry Representative’s Instruction” and “Contractor’s Declaration” ...................................... 145-3 145.14 Protection and Restoration of the Work ......................................................................................... 145-3 145.15 Materials Supplied by the Contractor ............................................................................................. 145-3 145.16 Materials Supplied by the Ministry ................................................................................................ 145-4 145.17 Operation of Pavement Brooms on Highway ................................................................................. 145-5 145.18 Supply and Maintain Facilities ....................................................................................................... 145-5 145.19 Weighing Materials ........................................................................................................................ 145-6 145.20 Weather........................................................................................................................................... 145-6 145.21 Layout of Work and Calculation of Quantities............................................................................... 145-7 145.22 Access to Site.................................................................................................................................. 145-8 145.23 Accommodation of Traffic ............................................................................................................. 145-8 145.24 Alterations to Drawings and Plans.................................................................................................. 145-8 145.25 Use of Explosives ........................................................................................................................... 145-8 145.26 Work in Ministry Pits or Quarries................................................................................................... 145-9 145.27 Highway Right-of-Way ................................................................................................................ 145-10 145.28 Protection of Land Subdivision Monuments, Roads and Property............................................... 145-11 145.29 Haul Routes and Overloads .......................................................................................................... 145-12 145.30 Health and Safety.......................................................................................................................... 145-12 145.31 Faulty Work .................................................................................................................................. 145-13 145.32 Temporary Excavation.................................................................................................................. 145-13 145.33 General Sign Requirements .......................................................................................................... 145-13

SECTION 165 - PROTECTION OF THE ENVIRONMENT

165.01 General ......................................................................................................................................... 165-1 165.02 Planning and Scheduling .............................................................................................................. 165-2 165.03 Compliance, Enforcement and Payment ....................................................................................... 165-5 165.04 Erosion, Sediment, and Drainage Control .................................................................................... 165-6 165.05 Clearing and Grubbing ................................................................................................................. 165-9 165.06 Stripping Operations ................................................................................................................... 165-10 165.07 Earthwork Operations (Subgrade Construction) ......................................................................... 165-10 165.08 Borrow and Sand / Gravel Pits ................................................................................................... 165-11 165.09 Detour, Access and Haul Roads ................................................................................................. 165-12 165.10 Instream Works ........................................................................................................................... 165-12 165.11 Ditch Maintenance ...................................................................................................................... 165-14

Page 13: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XI

165.12 Bridge Maintenance ................................................................................................................... 165-14 165.13 Servicing and Operation of Equipment ...................................................................................... 165-14 165.14 Waste Disposal and Toxic/Hazardous Materials ........................................................................ 165-15 165.15 Pesticides .................................................................................................................................... 165-17 165.16 Air and Noise Pollution .............................................................................................................. 165-17 165.17 Use of Water ............................................................................................................................... 165-17 165.18 Support Facilities ........................................................................................................................ 165-17 165.19 Protection of Livestock and Wildlife ......................................................................................... 165-18 165.20 Archaeological and Paleontological Discoveries ......................................................................... 165-18 165.21 Resolution of Disputes ................................................................................................................. 165-19

SECTION 194 - TRAFFIC MANAGEMENT FOR WORK ZONES

PART A - GENERAL ............................................................................................................................... 194-1 194.01 General ........................................................................................................................................... 194-1 194.02 Definitions...................................................................................................................................... 194-1 194.03 Standard Documents....................................................................................................................... 194-1 194.04 Traffic Control Supervisor.............................................................................................................. 194-1 194.05 Compliance with Acts and Regulations.......................................................................................... 194-1 PART B – PLANNING AND SCHEDULING ........................................................................................ 194-1 194.11 Provide Traffic Management Plan.................................................................................................. 194-1 194.12 Traffic Management Plan Review .................................................................................................. 194-2 PART C – TRAFFIC MANAGEMENT OPERATIONAL DETAILS................................................. 194-2 194.21 Speed Zones.................................................................................................................................... 194-2 194.22 Use of Channelling Devices and Taper Rates ................................................................................ 194-2 194.23 Equipment on the Travelled Way ................................................................................................... 194-2 194.24 Roadway Configuration.................................................................................................................. 194-3 194.25 Roadway Condition ........................................................................................................................ 194-3 194.26 Closures .......................................................................................................................................... 194-3 194.27 Detours............................................................................................................................................ 194-3 194.28 Access to Property .......................................................................................................................... 194-3 194.29 Winter Lay-Up................................................................................................................................ 194-3 194.30 Delays ............................................................................................................................................. 194-3 PART D – TRAFFIC CONTROL DEVICES ......................................................................................... 194-3 194.41 Traffic Signals ................................................................................................................................ 194-3 194.42 Pilot Cars ........................................................................................................................................ 194-4 194.43 Use of Flagpersons ......................................................................................................................... 194-4

194.44 Traffic Signs................................................................................................................................... 194-4 194.45 Barricades, Lights, Delineators, Trafffic Lines .............................................................................. 194-5

194.46 Changeable Message Signs ............................................................................................................ 194-5 PART E – GENERAL MAINTENANCE................................................................................................ 194-6 194.51 Maintenance.................................................................................................................................... 194-6 PART F - PAYMENT ............................................................................................................................... 194-6 194.61 Payment .......................................................................................................................................... 194-6

Page 14: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XII

SECTION 200 - CLEARING AND GRUBBING

200.01 Clearing........................................................................................................................................... 200-1 200.02 Disposal of Material........................................................................................................................ 200-1 200.03 Grubbing ......................................................................................................................................... 200-1 200.04 Danger Trees................................................................................................................................... 200-2 200.05 Payment for Danger Trees .............................................................................................................. 200-2 200.06 Mail Boxes...................................................................................................................................... 200-2 200.07 Removal of Existing Signs and Symbols........................................................................................ 200-2 200.08 Quantities and Payment .................................................................................................................. 200-2

SECTION 201 - ROADWAY AND DRAINAGE EXCAVATION

DESCRIPTION 201.01 General............................................................................................................................................ 201-1 201.02 Extent of Work ............................................................................................................................... 201-1 MATERIALS 201.11 Description of Material Types ........................................................................................................ 201-1 201.12 Unsuitable Material......................................................................................................................... 201-2 CONSTRUCTION 201.31 Rock Cuts........................................................................................................................................ 201-2 201.32 Dangerous, Loose and Overhanging Rock ..................................................................................... 201-2 201.33 Overbreak in Solid Rock ................................................................................................................ 201-2 201.34 Surplus Material.............................................................................................................................. 201-2 201.35 Enlargement of Excavation............................................................................................................. 201-3 201.36 Rock Embankments ........................................................................................................................ 201-3 201.37 Earth Embankments........................................................................................................................ 201-3 201.38 Frozen Material............................................................................................................................... 201-4 201.39 Snow Removal................................................................................................................................ 201-4 201.40 Bridge End Fill................................................................................................................................. 201-4 201.41 Transition Sections ......................................................................................................................... 201-4 201.42 Slopes and Slides ............................................................................................................................ 201-4 201.43 Ditches ............................................................................................................................................ 201-4 201.44 Borrow ........................................................................................................................................... 201-4 201.45 Haul and Overhaul .......................................................................................................................... 201-4 201.46 Watering ......................................................................................................................................... 201-4 201.47 Finishing of Roadway..................................................................................................................... 201-5 201.48 Surcharge Pre-consolidation ........................................................................................................... 201-5 201.49 Back Slope Stabilization................................................................................................................. 201-5 MEASUREMENT 201.81 Borrow ........................................................................................................................................... 201-5 201.82 Excavation ...................................................................................................................................... 201-5 201.83 Overhaul ......................................................................................................................................... 201-5 201.84 Watering ......................................................................................................................................... 201-5 201.85 Compaction..................................................................................................................................... 201-5 PAYMENT 201.91 Borrow ........................................................................................................................................... 201-6 201.92 Excavation ...................................................................................................................................... 201-6 201.93 Overhaul ......................................................................................................................................... 201-6

Page 15: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XIII

201.94 Watering ......................................................................................................................................... 201-6 201.95 Allowable Overbreak ..................................................................................................................... 201-6 201.96 Embankment................................................................................................................................... 201-6 201.97 Compaction .................................................................................................................................... 201-7 201.98 Surcharge Removal ........................................................................................................................ 201-7

SECTION 202 - GRANULAR SURFACING, BASE AND SUB-BASES NEW

PART A - SCOPE OF SPECIFICATION .............................................................................................. 202-1 202.01 Preliminary and General................................................................................................................. 202-1 PART B - MATERIALS ........................................................................................................................... 202-1 202.02 Aggregate Classification ................................................................................................................ 202-1 202.03 General Description of Work ......................................................................................................... 202-1 202.04 Aggregate Quality .......................................................................................................................... 202-1 202.05 Aggregate Gradation ...................................................................................................................... 202-3 PART C - USE OF MINISTRY PROVIDED PITS OR QUARRIES ................................................ 202-3 202.06 General............................................................................................................................................ 202-3 202.07 Source of Supply ............................................................................................................................ 202-4 202.08 Development of Pit or Quarry......................................................................................................... 202-4 202.09 Use of All Materials ....................................................................................................................... 202-4 202.10 Unsuitable Materials....................................................................................................................... 202-5 202.11 Change of Ministry Provided Pit or Quarry ................................................................................... 202-5 202.12 Pit Cleanup ..................................................................................................................................... 202-5 202.13 Work in Ministry Pits or Quarries.................................................................................................. 202-5 PART D - CONTRACTOR SUPPLIED AGGREGATES .................................................................... 202-5 202.14 Preliminary and General.................................................................................................................. 202-5 202.15 Development and Clean Up of Private Pits or Quarries................................................................. 202-5 202.16 Contractor to Pay All Costs............................................................................................................ 202-6 PART E - PRODUCTION OF CRUSHED AGGREGATE .................................................................. 202-6 202.17 Equipment and Plant ...................................................................................................................... 202-6 202.18 Working of Pit ................................................................................................................................ 202-6 202.19 Crushing Operations....................................................................................................................... 202-6 202.20 Crusher Gradation Control ............................................................................................................. 202-6 202.21 Stockpiling ..................................................................................................................................... 202-8 PART F - CONSTRUCTION METHOD................................................................................................ 202-8 202.22 Weather and Job Conditions........................................................................................................... 202-8 202.23 Bridge End Fill ............................................................................................................................... 202-9 202.24 Thickness of Granular Courses....................................................................................................... 202-9 202.25 Construction of 75mm Sub-Base ................................................................................................... 202-9 202.26 Construction of 25mm Crushed Base Course ................................................................................ 202-10 202.27 Equipment for Watering................................................................................................................. 202-10 202.29 Proof Rolling and Stabilization ...................................................................................................... 202-11 202.30 Benkelman Beam Testing................................................................................................................ 202-11 PART G - MEASUREMENT AND PAYMENT ............................................................................. ....... 202-11 202.31 Water Applied to the Highway ....................................................................................................... 202-11 202.32 Development and Cleanup of Ministry-Provided Pits and Quarries .............................................. 202-11 202.33 Stockpile Reject Aggregate ........................................................................................................... . 202-11 202.34 Blending Materials for Stabilizing Aggregates on the Highway................................................... . 202-11 202.35 Crushed Aggregate Supplied in Stockpile Only............................................................................. 202-12 202.36 Aggregates Supplied in Place...................................................................................................... ... 202-12

Page 16: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XIV

202.37 Stockpile Volume Determination ............................................................................................... ... 202-13

SECTION 204 - ROCK CUTS

DESCRIPTION 204.01 Scope............................................................................................................................................. 204-1 204.02 Definitions..................................................................................................................................... 204-1 204.03 Quality Control ............................................................................................................................. 204-2 204.04 Submittals ..................................................................................................................................... 204-2 MATERIALS 204.11 Explosives and Related Products.................................................................................................. 204-4 CONSTRUCTION 204.31 Permits and Regulations ............................................................................................................... 204-4 204.32 Supervision ................................................................................................................................... 204-4 204.33 Personnel....................................................................................................................................... 204-4 204.34 Safety ............................................................................................................................................ 204-4 204.35 Flyrock Control............................................................................................................................. 204-4 204.36 Other Damage ............................................................................................................................... 204-4 204.37 Subgrade and Ditch Areas............................................................................................................. 204-4 204.38 Blasting Test Section(s) ................................................................................................................ 204-5 204.39 Overburden Removal and Setback................................................................................................ 204-5 204.40 Backline and Production Holes..................................................................................................... 204-5 204.41 Backline Holes .............................................................................................................................. 204-5 204.42 Presplit Blasting ............................................................................................................................ 204-6 204.43 Cushion Blasting........................................................................................................................... 204-6 204.44 Production Blasting....................................................................................................................... 204-7 204.45 Vibration Control and Monitoring................................................................................................ 204-7 204.46 Air Concussion and Noise Control ............................................................................................... 204-7 204.47 Excavation Backslope Stabilization.............................................................................................. 204-8 204.48 Special Use of Excavated Rock .................................................................................................... 204-8 MEASUREMENT 204.81 Type A Excavation ....................................................................................................................... 204-8 204.82 Excavation Backslope (Smooth Wall) .......................................................................................... 204-8 PAYMENT 204.91 Type A Excavation........................................................................................................................ 204-8 204.92 Excavation Backslope (Smooth Wall) .......................................................................................... 204-8

SECTION 205 - RIPRAP

205.01 General.......................................................................................................................................... 205-1 205.02 Material......................................................................................................................................... 205-1 205.03 Preparation.................................................................................................................................... 205-1 205.04 Foundations................................................................................................................................... 205-1 205.05 Filter Blankets............................................................................................................................... 205-1 205.06 Loose Riprap................................................................................................................................. 205-1 205.07 Hand-Laid Riprap ......................................................................................................................... 205-2 205.08 Grouted Riprap ............................................................................................................................. 205-2 205.09 Measurement and Payment ........................................................................................................... 205-2

Page 17: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XV

SECTION 206 - ROCK BOLTS

DESCRIPTION 206.01 Scope ............................................................................................................................................. 206-1 206.02 Codes and Standards ..................................................................................................................... 206-1 206.03 Quality Control.............................................................................................................................. 206-1 206.04 Submittals...................................................................................................................................... 206-1 MATERIALS 206.11 Materials........................................................................................................................................ 206-1 CONSTRUCTION 206.31 Execution....................................................................................................................................... 206-2 MEASUREMENT 206.81 Rock Bolts ..................................................................................................................................... 206-3 PAYMENT 206.91 Rock Bolts ..................................................................................................................................... 206-3

SECTION 207 - SLOPE MESH FOR ROCK CUTS

DESCRIPTION 207.01 Scope .............................................................................................................................................. 207-1 MATERIALS 207.11 Slope Meshing Materials................................................................................................................ 207-1 207.12 Grout............................................................................................................................................... 207-1 207.13 Conformance Documents ............................................................................................................... 207-1 CONSTRUCTION 207.31 Anchor Installation ......................................................................................................................... 207-1 207.32 Soil Anchors................................................................................................................................... 207-2 207.33 Cable and Mesh Installation ........................................................................................................... 207-2 MEASUREMENT 207.81 Slope Mesh.................................................................................................................................... 207-2 PAYMENT 207.91 Slope Mesh..................................................................................................................................... 207-2

SECTION 208 - DRAINS FOR ROCK CUTS

DESCRIPTION 208.01 Scope ............................................................................................................................................. 208-1 MATERIALS 208.11 PVC Pipe Materials ....................................................................................................................... 208-1 CONSTRUCTION 208.31 Drilling .......................................................................................................................................... 208-1 208.32 PVC Pipe Installation .................................................................................................................... 208-1 MEASUREMENT 208.81 Lined Drains.................................................................................................................................. 208-1 PAYMENT 208.91 Lined Drains.................................................................................................................................. 208-1

Page 18: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XVI

SECTION 209 - SHOTCRETE FOR ROCK CUTS

DESCRIPTION 209.01 General............................................................................................................................................ 209-1 209.02 Quality Control ............................................................................................................................... 209-1 209.03 Submittals ....................................................................................................................................... 209-1 209.04 Definitions ...................................................................................................................................... 209-2 MATERIALS 209.11 Materials ......................................................................................................................................... 209-3 209.12 Performance Requirements............................................................................................................. 209-5 CONSTRUCTION 209.31 Batching, Mixing and Conveyance................................................................................................. 209-5 209.32 Preconstruction Testing .................................................................................................................. 209-5 209.33 Weather Conditions ........................................................................................................................ 209-6 209.34 Surface Preparation...........................................................................................................................209-6 209.35 Drainage............................................................................................................................................209-6 209.36 Existing Rock Bolts ..........................................................................................................................209-7 209.37 Application .......................................................................................................................................209-7 209.38 Curing and Protection ..................................................................................................................... 209-8 209.39 Construction Testing....................................................................................................................... 209-8 209.40 Shotcrete Deficiencies and Repair ................................................................................................ 209-10 209.41 Shotcrete Evaluation ..................................................................................................................... 209-10 MEASUREMENT 209.81 Shotcrete ....................................................................................................................................... 209-10 PAYMENT 209.91 Shotcrete .........................................................................................................................................209-10

SECTION 211 - PORTLAND CEMENT CONCRETE

211.01 General............................................................................................................................................ 211-1 211.02 Applicable Standards ...................................................................................................................... 211-1 211.03 Concrete Mix Designs and Submission Requirements ................................................................... 211-1 211.04 Materials ......................................................................................................................................... 211-3 211.05 Storage and handling of Materials - General .................................................................................. 211-8 211.06 Batching.......................................................................................................................................... 211-9 211.07 Mixing .......................................................................................................................................... 211-11 211.08 Delivery ........................................................................................................................................ 211-12 211.09 Quality Control Inspection, Testing and Acceptance.................................................................... 211-13 211.10 Placing of Concrete....................................................................................................................... 211-16 211.11 Falsework and Formwork ............................................................................................................. 211-17 211.12 Construction Joints ....................................................................................................................... 211-19 211.13 Consolidation................................................................................................................................ 211-19 211.14 Finishing ....................................................................................................................................... 211-20 211.15 Curing ........................................................................................................................................... 211-21 211.16 Dimensional Tolerances ............................................................................................................... 211-21 211.17 Finishing Formed Surfaces ........................................................................................................... 211-22 211.18 Hot Weather Concreting ............................................................................................................... 211-24 211.19 Cold Weather Concreting ............................................................................................................. 211-26 211.20 Underwater Concreting................................................................................................................. 211-27 211.21 Measurement and Payment ........................................................................................................... 211-28

Page 19: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XVII

SECTION 213 - TIMBER BRIDGES - CONSTRUCTION

213.01 Materials......................................................................................................................................... 213-1 213.02 Logs for Cribs and Log Stringers ................................................................................................... 213-1 213.03 Work Practice ................................................................................................................................. 213-1 213.04 Handling and Storing Materials ..................................................................................................... 213-1 213.05 Framing .......................................................................................................................................... 213-1 213.06 Field Treatment .............................................................................................................................. 213-1 213.07 Preparation of Laminated Decks for Wearing Surface................................................................... 213-2 213.08 Basis of Payment ............................................................................................................................ 213-3

SECTION 214 - TIMBER PILING CONSTRUCTION

214.01 Materials......................................................................................................................................... 214-1 214.02 Pile Lengths.................................................................................................................................... 214-1 214.03 Handling of Piles ............................................................................................................................ 214-1 214.04 Hammer .......................................................................................................................................... 214-1 214.05 Leads .............................................................................................................................................. 214-1 214.06 Preparation for Driving .................................................................................................................. 214-1 214.07 Driving ........................................................................................................................................... 214-2 214.08 Additional Equipment .................................................................................................................... 214-2 214.09 Accuracy of Driving....................................................................................................................... 214-2 214.10 Pile Heads....................................................................................................................................... 214-3 214.11 Surplus Treated Piling .................................................................................................................... 214-3 214.12 Payment.......................................................................................................................................... 214-3

SECTION 215 - BRIDGES

215.01 General ........................................................................................................................................... 215-1

SECTION 216 – COATING OF STEELWORK NEW

216.1 Scope ................................................................................................................................................ 216-1 216.2 Definitions........................................................................................................................................ 216-1 216.3 Reference Standards ......................................................................................................................... 216-2 216.4 Environmental Agencies Affected ................................................................................................... 216-4 216.5 Containment of Coating Operations................................................................................................. 216-4 216.6 Construction Site Safety................................................................................................................... 216-5 216.7 Surface Preparation .......................................................................................................................... 216-5 216.8 Application of Coating Materials ..................................................................................................... 216-7 216.9 Inspection ......................................................................................................................................... 216-8 216.10 Application Methods (Excluding Metallizing and Hot Dip Galvanizing) ..................................... 216-10 216.11 Application Methods (Metallizing and Hot Dip Galvanizing)....................................................... 216-12 216.12 Application of Coatings ................................................................................................................. 216-13 216.13 Touch-up Coating........................................................................................................................... 216-17 216.14 Damage to Adjacent Property ........................................................................................................ 216-19 216.15 Cleanup........................................................................................................................................... 216-19 216.16 Measurement and Payment............................................................................................................. 216-19

Page 20: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XVIII

SECTION 218 - CONCRETE FOR MINOR WORKS

218.01 General............................................................................................................................................ 218-1 218.02 Cement ............................................................................................................................................ 218-1 218.03 Aggregates ...................................................................................................................................... 218-1 218.04 Grading of Aggregates.................................................................................................................... 218-1 218.05 Classes of Concrete......................................................................................................................... 218-1 218.06 Classification and Proportioning of Concrete Mixtures ................................................................. 218-1 218.07 Machine Mixing.............................................................................................................................. 218-2 218.08 Duration of Mixing ......................................................................................................................... 218-2 218.09 Hand Mixing................................................................................................................................... 218-2 218.10 Retempering.................................................................................................................................... 218-2 218.11 Forms .............................................................................................................................................. 218-2 218.12 Depositing Concrete ....................................................................................................................... 218-3 218.13 Basis of Payment ............................................................................................................................ 218-3

SECTION 232 - METAL BIN-WALL

232.01 Scope............................................................................................................................................... 232-1 232.02 Provision of Metal Bin-Wall........................................................................................................... 232-1 232.03 Materials ......................................................................................................................................... 232-1 232.04 Construction.................................................................................................................................... 232-1 232.05 Measurement and Payment ............................................................................................................. 232-1

SECTION 303 - CULVERTS

DESCRIPTION 303.01 Scope............................................................................................................................................... 303-1 MATERIALS 303.11 Concrete Pipe.................................................................................................................................. 303-1 303.12 Corrugated Steel Pipe ..................................................................................................................... 303-1 303.13 Polyethylene Pipe ........................................................................................................................... 303-1 303.14 PVC Pipe ........................................................................................................................................ 303-1 303.15 Structural Plate Corrugated Steel Pipe/Pipe-Arch (Field Assembled) Culverts ............................. 303-1 CONSTRUCTION 303.31 Concrete, Corrugated Steel and Plastic Pipes ................................................................................. 303-1 303.32 Structural Plate Corrugated Steel Pipe/Pipe-Arch Culverts............................................................ 303-2 MEASUREMENT 303.81 Concrete, Corrugated Steel and Plastic Pipe Culverts .................................................................... 303-2 303.82 Structural Plate Corrugated Steel Pipe/Pipe-Arch Culverts............................................................ 303-2 PAYMENT 303.91 Concrete, Corrugated Steel and Plastic Pipe Culverts .................................................................... 303-2 303.92 Structural Plate Corrugated Steel Pipe/Pipe-Arch Culverts............................................................ 303-2

SECTION 308 - COATING SYSTEMS NEW

308.01 Scope............................................................................................................................................... 308-1 308 02 Not Used.......................................................................................................................................... 308-1

Page 21: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XIX

308.03 Standards and Specifications.......................................................................................................... 308-1 308.04 System Selection Table .................................................................................................................. 308-1 308.05 Not Used......................................................................................................................................... 308-3 308.06 System Selection Criteria ............................................................................................................... 308-3 308.07 Coating Systems............................................................................................................................. 308-3

SECTION 312 - STEEL TRAFFIC BARRIERS AND WOOD POSTS

312.01 Scope .............................................................................................................................................. 312-1 312.02 Standards of Reference................................................................................................................... 312-1 312.03 General ........................................................................................................................................... 312-1 312.04 Steel Beam Guardrail ..................................................................................................................... 312-1 312.05 Guardrail Accessories..................................................................................................................... 312-3 312.06 Wood Posts..................................................................................................................................... 312-4

SECTION 316 - STEEL AND WIRE FENCE MATERIALS

316.01 Scope .............................................................................................................................................. 316-1 316.02 Applicable Documents ................................................................................................................... 316-1 316.03 Type A & B Fence Fabrics............................................................................................................. 316-1 316.04 Type D Fence Chain Link Fabric ................................................................................................... 316-2 316.05 Chain Link Fabric and Accessories on Rock Slopes...................................................................... 316-4 316.06 Barbed Wire ................................................................................................................................... 316-4 316.07 High-tensile Wire ........................................................................................................................... 316-5 316.08 Brace, Tension and Tie Wire.......................................................................................................... 316-5 316.09 Steel Fence Posts on Rock (Excluding Chain Link Fence) ............................................................ 316-5 316.10 Steel Pipe Posts, Rails and Braces - Chain Link Fencing ............................................................. 316-5 316.11 Gates and Hardware ....................................................................................................................... 316-7 316.12 Accessory Material......................................................................................................................... 316-8 316.13 Packaging and Marking.................................................................................................................. 316-9 316.14 Inspection ....................................................................................................................................... 316-9 316.15 Sampling......................................................................................................................................... 316-9 316.16 Rejection and Retests ..................................................................................................................... 316-9

SECTION 317 - P.E. PLASTIC DRAINAGE PIPE

317.01 Scope .............................................................................................................................................. 317-1 317.02 Applicable Documents ................................................................................................................... 317-1 317.03 Materials......................................................................................................................................... 317-1 317.04 Joining Systems.............................................................................................................................. 317-1 317.05 Requirements.................................................................................................................................. 317-2 317.06 Marking .......................................................................................................................................... 317-2 317.07 Test Methods .................................................................................................................................. 317-2 317.08 Inspection ....................................................................................................................................... 317-3 317.09 Quality Assurance .......................................................................................................................... 317-3

Page 22: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XX

SECTION 318 - PVC PLASTIC DRAINAGE PIPE

318.01 Scope .............................................................................................................................................. 318-1 318.02 Applicable Documents.................................................................................................................... 318-1 318.03 Materials ......................................................................................................................................... 318-1 318.04 Quality of Work.............................................................................................................................. 318-1 318.05 Joining System................................................................................................................................ 318-2 318.06 Requirements .................................................................................................................................. 318-2 318.07 Physical Properties.......................................................................................................................... 318-4 318.08 Marking........................................................................................................................................... 318-4 318.09 Test Methods .................................................................................................................................. 318-5 318.10 Inspection........................................................................................................................................ 318-5 318.11 Quality Assurance........................................................................................................................... 318-5

SECTION 320 - CORRUGATED STEEL PIPE

320.01 Scope............................................................................................................................................... 320-1 320.02 Materials ......................................................................................................................................... 320-1 320.03 Fabrication from Culvert Sheet....................................................................................................... 320-3 320.04 Coupler Systems ............................................................................................................................. 320-8 320.05 Pipe Arch Corrugated Steel Pipe Construction............................................................................. 320-10 320.06 Perforated Corrugated Steel Pipe.................................................................................................. 320-10 320.07 Structural Plate Corrugated Steel Pipe Construction .................................................................... 320-11 320.08 Asphalt Coated Pipe ..................................................................................................................... 320-13 320.09 Inspection, Quality of Work, and Quality Control ....................................................................... 320-14

SECTION 321 - TRAFFIC PAINT

321.01 Scope............................................................................................................................................... 321-1 321.02 Not Used ......................................................................................................................................... 321-1 321.03 General Requirements..................................................................................................................... 321-1 321.04 Detailed Requirements.................................................................................................................... 321-1 321.05 Packaging........................................................................................................................................ 321-2 321.06 Delivery .......................................................................................................................................... 321-2 321.07 Release for Shipment ...................................................................................................................... 321-2 321.08 Labelling ......................................................................................................................................... 321-2 321.09 Rejection ......................................................................................................................................... 321-3 321.10 Non-Delivery Penalty ..................................................................................................................... 321-3 321.11 Qualification Procedures and Ministry Test Methods .................................................................... 321-3

SECTION 407 - FOUNDATION EXCAVATION

407.01 Scope............................................................................................................................................... 407-1 407.02 Extent of Work ............................................................................................................................... 407-1 407.03 Description of Material Types ........................................................................................................ 407-1 407.04 Method of Measurement................................................................................................................. 407-1 407.05 Quantities and Payment .................................................................................................................. 407-1

Page 23: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XXI

SECTION 412 - REINFORCING STEEL

DESCRIPTION 412.01 Scope .............................................................................................................................................. 412-1 MATERIALS 412.11 General ........................................................................................................................................... 412-1 CONSTRUCTION 412.31 Bending .......................................................................................................................................... 412-2 412.32 Handling and Storage ..................................................................................................................... 412-2 412.33 Placing and Fastening..................................................................................................................... 412-3 412.34 Splicing of Bars.............................................................................................................................. 412-5 MEASUREMENT 412.81 General ........................................................................................................................................... 412-5 PAYMENT 412.91 General ........................................................................................................................................... 412-6

SECTION 413 - BRIDGE DECKS AND CONCRETE OVERLAYS

DESCRIPTION 413.01 General ........................................................................................................................................... 413-1 413.31 Bridge Decks .................................................................................................................................. 413-1 413.32 Concrete Overlays .......................................................................................................................... 413-4

SECTION 415 - MANUFACTURE AND ERECTION OF PRECAST AND PRESTRESSEDCONCRETE MEMBERS

DESCRIPTION 415.01 Scope .............................................................................................................................................. 415-1 415.02 General ........................................................................................................................................... 415-1 415.03 Prefabrication Meeting ................................................................................................................... 415-1 415.04 Working Drawings ......................................................................................................................... 415-1 415.05 Alternative Details.......................................................................................................................... 415-2 415.06 Quality Control…………………………………………………………………………………… 415-2 415.07 Quality Assurance .......................................................................................................................... 415-2 MATERIALS 415.11 Materials Supplied by the Contractor............................................................................................. 415-3 415.12 Storage of Materials ....................................................................................................................... 415-3 415.13 Premixed Aggregates ..................................................................................................................... 415-3 415.14 Forms.............................................................................................................................................. 415-3 415.15 Ministry’s Office ............................................................................................................................ 415-4 CONSTRUCTION 415.31 Reinforcing Steel............................................................................................................................ 415-4 415.32 Stressing ......................................................................................................................................... 415-4 415.33 Forms.............................................................................................................................................. 415-4 415.34 Admixtures ..................................................................................................................................... 415-5 415.35 Measurement of Materials.............................................................................................................. 415-5 415.36 Mix Requirements .......................................................................................................................... 415-5 415.37 Batching and Mixing...................................................................................................................... 415-5

Page 24: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XXII

415.38 Handling and Placing Concrete ...................................................................................................... 415-6 415.39 Vibration ......................................................................................................................................... 415-6 415.40 Test Cylinders................................................................................................................................. 415-6 415.41 Surface Finish ................................................................................................................................. 415-7 415.42 Curing ............................................................................................................................................. 415-7 415.43 Draped Strands................................................................................................................................ 415.8 415.44 Transfer of Force to Concrete Members......................................................................................... 415-8 415.45 Protective Coating for Ends of Strands........................................................................................... 415-8 415.46 Tolerances....................................................................................................................................... 415-8 415.47 Repairs to Members ........................................................................................................................ 415-8 415.48 Handling, Storing and Loading of Members .................................................................................. 415-8 415.49 Placement of Concrete in Keyways ................................................................................................ 415-9 415.50 Post-Tensioning .............................................................................................................................. 415-9 QUALITY CONTROL PROGRAM 415.61 Quality Control Program ................................................................................................................ 415-9 415.62 Quality Objectives and Policies...................................................................................................... 415-9 415.63 Scope of the Quality Control Program ......................................................................................... 415-10 415.64 Range of Capability ...................................................................................................................... 415-10 415.65 Drawings and Specifications ........................................................................................................ 415-10 415.66 Material Control............................................................................................................................ 415-10 415.67 Pre-Pour Inspection and Reporting............................................................................................... 415-11 415.68 Concrete Control........................................................................................................................... 415-11 415.69 Post Pour Inspection and Reporting.............................................................................................. 415-11 415.70 Correction of Non-Conformities................................................................................................... 415-11 415.71 Welding......................................................................................................................................... 415.12 415.72 Calibration of Measurement and Test Equipment ........................................................................ 415.12 415.73 Records Retention......................................................................................................................... 415.12 415.74 Hold Points ................................................................................................................................... 415.12 MEASUREMENT 415.81 Precast Concrete Members ........................................................................................................... 415-12 PAYMENT 415.91 Supply and Fabrication ................................................................................................................. 415-12 415.92 Shipping and Erection................................................................................................................... 415-13

SECTION 416 - MANUFACTURE AND INSTALLATION OF POST- TENSIONEDCONCRETEMEMBERS

DESCRIPTION 416.01 Scope............................................................................................................................................... 416-1 416.02 General Requirements..................................................................................................................... 416-1 MATERIALS 416.11 Anchorages ..................................................................................................................................... 416-1 416.12 Ducts ............................................................................................................................................... 416-1 416.13 Condition ........................................................................................................................................ 416-1 416.14 Epoxy.............................................................................................................................................. 416-1 416.15 Grout ............................................................................................................................................... 416-1 EQUIPMENT 416.21 Stressing Equipment ....................................................................................................................... 416-2 416.22 Grout ............................................................................................................................................... 416-2 CONSTRUCTION 416.31 Anchorages ..................................................................................................................................... 416-2

Page 25: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XXIII

416.32 Ducts............................................................................................................................................... 416-2 416.33 Placement and Protection of the Tendons and Other Accessories ................................................. 416-2 416.34 Stressing ......................................................................................................................................... 416-3 416.35 Grouting ......................................................................................................................................... 416-3 416.36 Cropping......................................................................................................................................... 416-4 416.37 Anchorage Recesses ....................................................................................................................... 416-4

SECTION 418 - CONCRETE BRIDGE DECK SEALANTS SILANE SURFACE TREATMENT OF NEW PORTLAND CEMENT CONCRETE

418.01 Scope .............................................................................................................................................. 418-1 418.02 Silane Solution ............................................................................................................................... 418-1 418.03 Contractor's Qualification............................................................................................................... 418-1 418.04 Job Site Conditions......................................................................................................................... 418-1 418.05 Surface Preparation ........................................................................................................................ 418-1 418.06 Silane Application .......................................................................................................................... 418-1 418.07 Safety and Health Hazards ............................................................................................................. 418-2 418.08 Measurement and Payment ............................................................................................................ 418-2

SECTION 419 - CONCRETE BRIDGE DECK WATERPROOFING SYSTEM PREFABRICATED MEMBRANE

DESCRIPTION 419.01 Scope .............................................................................................................................................. 419-1 MATERIALS 419.11 General ........................................................................................................................................... 419-1 419.12 Delivery and Storage...................................................................................................................... 419-1 419.13 Quality Assurance .......................................................................................................................... 419-1 CONSTRUCTION 419.31 Applicator's Qualification............................................................................................................... 419-1 419.32 Job Site Conditions......................................................................................................................... 419-1 419.33 Surface Preparation ........................................................................................................................ 419-1 419.34 Priming ........................................................................................................................................... 419-2 419.35 Membrane Application................................................................................................................... 419-2 419.36 Paving............................................................................................................................................. 419-3 419.37 Protection of the Environment ....................................................................................................... 419-4 419.38 Safety and Health Hazards ............................................................................................................. 419-4 MEASUREMENT 419.81 General ........................................................................................................................................... 419-4 PAYMENT 419.91 General ........................................................................................................................................... 419-4

SECTION 421 - STRUCTURAL STEELWORK

DESCRIPTION 421.01 Scope .............................................................................................................................................. 421-1 421.02 Prefabrication Meeting ................................................................................................................... 421-1 421.03 Alternative Details.......................................................................................................................... 421-1

Page 26: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XXIV

421.04 Working Drawings.......................................................................................................................... 421-1 421.05 Quality Control ............................................................................................................................... 421-2 421.06 Quality Assurance........................................................................................................................... 421-2 421.07 Quality and Details of Welds.......................................................................................................... 421-3 421.08 Design Specifications ..................................................................................................................... 421-3 MATERIALS 421.11 Materials ......................................................................................................................................... 421-3 421.12 Material Storage and Care .............................................................................................................. 421-4 421.13 Fabrication ...................................................................................................................................... 421-4 421.14 Ministry's Plant Office.................................................................................................................... 421-4 EQUIPMENT 421.21 Qualifications and Equipment ........................................................................................................ 421-4 421.22 Welding Procedures........................................................................................................................ 421-4 421.23 Butt Joints ....................................................................................................................................... 421-5 421.24 Assembly and Welding Sequences ................................................................................................. 421-5 CONSTRUCTION 421.31 Preparation of Material ................................................................................................................... 421-5 421.32 Marking........................................................................................................................................... 421-6 421.33 Assembly of Weldments ................................................................................................................. 421-6 421.34 Preheat and Interpass Temperatures ............................................................................................... 421-6 421.35 Welding........................................................................................................................................... 421-6 421.36 Shear Connector Studs.................................................................................................................... 421-6 421.37 High-Strength Bolts ........................................................................................................................ 421-6 421.38 Bent Plates ...................................................................................................................................... 421-7 421.39 Shop Assembly of Bolted Connections .......................................................................................... 421-7 421.40 Dimensional Tolerances ................................................................................................................. 421-7 421.41 Machined Surfaces.......................................................................................................................... 421-7 421.42 Galvanizing or Metallizing (if required)......................................................................................... 421-7 421.43 Shop Painting.................................................................................................................................. 421-7 421.44 Marking and Shipping .................................................................................................................... 421-8 421.45 Field Assembly ............................................................................................................................... 421-8 421.46 Straightening Bent Material after Fabrication ................................................................................ 421-8 421.47 Misfits ............................................................................................................................................. 421-8 421.48 Erection Tolerances ........................................................................................................................ 421-8 421.49 Field Painting.................................................................................................................................. 421-9 421.50 Unpainted Weathering Steel ........................................................................................................... 421-9 421.51 Touch-up of Galvanizing and Metallizing...................................................................................... 421-9 QUALITY CONTROL PROGRAM 421.61 Quality Control Program ................................................................................................................ 421-9 421.62 Quality Objectives and Policies...................................................................................................... 421-9 421.63 Scope of the Quality Control Program ......................................................................................... 421-10 421.64 Range of Capability ...................................................................................................................... 421-10 421.65 Drawings and Specifications ........................................................................................................ 421-10 421.66 Material Control............................................................................................................................ 421-11 421.67 In-Progress Inspection and Reporting........................................................................................... 421-11 421.68 Correction of Non-conformance................................................................................................... 421-11 421.69 Welding......................................................................................................................................... 421-11 421.70 Heat Treatment ............................................................................................................................. 421-12 421.71 Non-destructive Testing................................................................................................................ 421-12 421.72 Calibration of Measurement and Test Equipment ........................................................................ 421-12 421.73 Records Retention......................................................................................................................... 421-12

Page 27: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XXV

421.74 Hold Points................................................................................................................................... 421-12 421.75 Transportation and Installation Procedures .................................................................................. 421-13 PAYMENT 421.91 Payment........................................................................................................................................ 421-13

SECTION 422 - MISCELLANEOUS STEELWORK

DESCRIPTION 422.01 Scope .............................................................................................................................................. 422-1 422.02 Adherence to Drawings .................................................................................................................. 422-1 422.03 Working Drawings ......................................................................................................................... 422-1 422.04 Inspection ....................................................................................................................................... 422-1 422.05 Rejections ....................................................................................................................................... 422-1 MATERIALS 422.11 Materials......................................................................................................................................... 422-1 422.12 Storage of Materials ....................................................................................................................... 422-1 CONSTRUCTION 422.31 Welding .......................................................................................................................................... 422-1 422.32 Welders and Welding Operators .................................................................................................... 422-1 422.33 Flame Cutting ................................................................................................................................. 422-1 422.34 Bent Plates...................................................................................................................................... 422-1 422.35 Shop Painting ................................................................................................................................. 422-1 422.36 Galvanizing (if required) ................................................................................................................ 422-2 422.37 Metallizing (if required) ................................................................................................................. 422-2 422.38 Installation...................................................................................................................................... 422-2 422.39 Field Painting (if required) ............................................................................................................. 422-2 422.40 Touch-Up of Galvanizing and Metallizing .................................................................................... 422-2 422.41 Clean-up .......................................................................................................................................... 422-3 PAYMENT 422.91 Payment.......................................................................................................................................... 422-3

SECTION 501 - HOT MIXED ASPHALT PAVEMENT

PART A - GENERAL ............................................................................................................................... 501-1 501.01 Preliminary and General................................................................................................................. 501-1 501.02 General Description of Work ......................................................................................................... 501-1 501.03 Asphalt Pavement Classifications ................................................................................................. 501-1 PART B - MATERIALS ........................................................................................................................... 501-1 501.11 Definitions...................................................................................................................................... 501-1 501.12 Supply and Handling of Asphalt Materials .................................................................................... 501-2 501.13 Standard Tests ................................................................................................................................ 501-2 501.14 Asphalt Mix Aggregate Requirements ........................................................................................... 501-2 501.15 Asphalt Mix Design ....................................................................................................................... 501-4 501.16 Asphalt Mix Requirements............................................................................................................. 501-5 501.17 Asphalt Pavement........................................................................................................................... 501-6 PART C - EQUIPMENT AND PLANT .................................................................................................. 501-6 501.21 Requirements for the Pressure Distributor and Liquid Asphalt Storage ........................................ 501-6 501.22 Requirements for all Mixing Plants................................................................................................ 501-7 501.23 Requirements for Batch Plants and Continuous Plants .................................................................. 501-7

Page 28: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XXVI

501.24 Special Requirements for Batch Plants........................................................................................... 501-8 501.25 Special Requirements for Continuous Plants.................................................................................. 501-8 501.26 Special Requirements for Drum Mixers ......................................................................................... 501-9 501.27 Requirements for Hot Storage Silos ............................................................................................. 501-10 501.28 Requirements for Mixing Plants Producing Sulphur Extended Asphalt Mix............................... 501-10 PART D - CONSTRUCTION................................................................................................................. 501-10 501.31 Spray Prime Coat and Tack Coat.................................................................................................. 501-10 501.32 Stockpiling Aggregates................................................................................................................. 501-11 501.33 Mixing Plant Operation ................................................................................................................ 501-11 501.34 Hauling the Asphalt Mix............................................................................................................... 501-12 501.35 Placing the Asphalt Mix ............................................................................................................... 501-12 501.36 Compacting the Asphalt Mix........................................................................................................ 501-13 501.37 Shouldering................................................................................................................................... 501-14 PART E - PAYMENT AND DEDUCTIONS ........................................................................................ 501-14 501.41 General.......................................................................................................................................... 501-14 501.42 Schedule Items.............................................................................................................................. 501-15 501.43 Surplus Aggregate in Stockpile .................................................................................................... 501-16 501.44 Supplementary Aggregate............................................................................................................. 501-17 501.45 Blending Additives ....................................................................................................................... 501-18 501.46 Adjustment for Haul ..................................................................................................................... 501-18 501.47 Extra Handwork............................................................................................................................ 501-18 501.48 Single Stockpile ............................................................................................................................ 501-18 501.49 Reducing of Top Size of Aggregate ............................................................................................. 501-18 501.50 Accommodation for Inspection Trailer including Supply of Water and Electricity..................... 501-18 501.51 Surplus Mix .................................................................................................................................. 501-18

SECTION 502 – END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

PART A - GENERAL................................................................................................................................ 502-1 502.01 Preliminary and General ................................................................................................................. 502-1 502.02 General Description of Work.......................................................................................................... 502-1 502.03 Definitions Relevant to End Product Specification ........................................................................ 502-1 502.04 Quality Control ............................................................................................................................... 502-2 502.05 Supply of Aggregates, Asphalt Materials, Ashpalt Mix Design and Job Mix Formula ................. 502-5 PART B – PAYMENT ADJUSTMENTS ................................................................................................ 502-9 502.11 Density............................................................................................................................................ 502-9 502.12 Asphalt Content ............................................................................................................................ 502-11 502.13 Aggregate Gradation..................................................................................................................... 502-12 502.14 Material Application Rate............................................................................................................. 502-13 502.15 Surface Segregation ...................................................................................................................... 502-13 502.16 Smoothness ................................................................................................................................... 502-14 PART C – ACCEPTANCE AND REJECTION ................................................................................... 502-16 502.21 Acceptance at Reduced or Adjusted Payment .............................................................................. 502-16 502.22 Rejection For Workmanship Defects............................................................................................ 502-17 502.23 Appeal Testing.............................................................................................................................. 502-17 502.24 Overlays as a Corrective Measure ................................................................................................ 502-18 PART D – PAYMENT ............................................................................................................................ 502-18 502.31 General.......................................................................................................................................... 502-18 502.32 Surplus Aggregate In Stockpile .................................................................................................... 502-19

Page 29: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XXVII

SECTION 503 - BASE PREPARATION AND BASE PROCESSING

503.01 Base Preparation............................................................................................................................. 503-1 503.02 Base Processing.............................................................................................................................. 503-1

SECTION 504 - PAVEMENT DRAINAGE

DESCRIPTION 504.01 Scope .............................................................................................................................................. 504-1 MATERIALS 504.11 Materials......................................................................................................................................... 504-1 CONSTRUCTION 504.31 Asphalt Curbs................................................................................................................................. 504-1 504.32 Location of Drainage Outlets ......................................................................................................... 504-1 504.33 Excavation...................................................................................................................................... 504-1 504.34 Drainage Outlets............................................................................................................................. 504-2 504.35 Dishing, Spillways and Completion............................................................................................... 504-2 MEASUREMENT 504.81 Pavement Drainage Outlets ............................................................................................................ 504-2 504.82 Corrugated Metal Pipe.................................................................................................................... 504-2 504.83 Asphalt Concrete Mix .................................................................................................................... 504-2 504.84 Asphalt Curb .................................................................................................................................. 504-2 PAYMENT 504.91 Pavement Drainage Outlets ............................................................................................................ 504-2 504.92 Corrugated Metal Pipe.................................................................................................................... 504-2 504.93 Asphalt Concrete Mix .................................................................................................................... 504-3 504.94 Asphalt Curb .................................................................................................................................. 504-3

SECTION 507 - PRODUCTION AND STOCKPILING OF ASPHALT MIX

507.01 General ........................................................................................................................................... 507-1 507.02 Aggregate ....................................................................................................................................... 507-1 507.03 Asphalt Material ............................................................................................................................. 507-2 507.04 Mix Design..................................................................................................................................... 507-2 507.05 Mixing Requirements ..................................................................................................................... 507-2 507.06 Hauling ........................................................................................................................................... 507-2 507.07 Stockpiling ..................................................................................................................................... 507-2 507.08 Measurement .................................................................................................................................. 507-3 507.09 Payment.......................................................................................................................................... 507-3

SECTION 508 – END PRODUCT SPECIFICATION FOR GRADED AGGEGATE SEAL COAT NEW!

PART A - GENERAL ............................................................................................................................... 508-1 508.01 Preliminary and General................................................................................................................. 508-1 508.02 General Description of Work ......................................................................................................... 508-1 508.03 Definitions………………………………...…………………………………………………….... 508-1 508.04 Graded Aggregate Seal General Usage…………………………………………………...……… 508-1 PART B – SUPPLY OF MATERIALS ................................................................................................... 508-1

Page 30: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XXVIII

508.11 Asphalt Materials............................................................................................................................ 508-1 508.12 Aggregates ...................................................................................................................................... 508-1 508.13 Graded Aggregate Seal Design....................................................................................................... 508-3 PART C – EQUIPMENT .......................................................................................................................... 508-3 508.20 General………………………………………………………………………...…………………. 508-3 508.21 Equipment Guidelines..................................................................................................................... 508-3 PART D – CONSTRUCTION .................................................................................................................. 508-4 508.31 Daylight Hours Only....................................................................................................................... 508-4 508.32 Traffic Control and Signing............................................................................................................. 508-4 508.33 Temperature and Weather................................................................................................................ 508-5 508.34 Grade Preparation............................................................................................................................ 508-5 508.35 Joints................................................................................................................................................ 508-5 508.36 Communications.............................................................................................................................. 508-5 508.37 Sweeping......................................................................................................................................... 508-5 508.38 Repair.............................................................................................................................................. 508-5 508.39 Double Seal, Second Pass............................................................................................................... 508-5 PART E – QUALITY CONTROL AND QUALITY ASSURANCE..................................................... 508-5 508.41 Quality Control by the Contractor .................................................................................................. 508-5 508.42 Quality and Quantity Control Records............................................................................................ 508-6 PART F – END PRODUCT ASSESMENT ............................................................................................. 508-6 508.51 General............................................................................................................................................ 508-6 508.52 Surface Deficiency Definitions....................................................................................................... 508-6 508.53 End Product Evaluation .................................................................................................................. 508-7 508.54 Deficiency Repair and Replacement............................................................................................... 508-7 508.55 Attention to Potential Safety Hazards............................................................................................. 508-7 PART G – MEASUREMENT AND PAYMENT.................................................................................... 508-7 508.61 Surface Seals................................................................................................................................... 508-7 508.62 Asphalt Emulsion............................................................................................................................ 508-7 508.63 Aggregates....................................................................................................................................... 508-7 508.64 Stockpile Bases................................................................................................................................ 508-8 508.65 Claims for Vehicular Damage.......................................................................................................... 508-8

SECTION 511 - COLD MILLING

DESCRIPTION 511.01 Scope............................................................................................................................................... 511-1 EQUIPMENT 511.21 Milling Machine ............................................................................................................................. 511-1 511.22 "Kill" Switch................................................................................................................................... 511-1 511.23 Audible Back Up Warning Device ................................................................................................. 511-1 CONSTRUCTION 511.31 Traffic Control Person .................................................................................................................... 511-1 511.32 Pavement Removal ......................................................................................................................... 511-1 511.33 Disposal of Material........................................................................................................................ 511-1 MEASUREMENT 511.81 General............................................................................................................................................ 511-2 PAYMENT 511.91 General............................................................................................................................................ 511-2 511.92 Asphalt Mix .................................................................................................................................... 511-2 511.93 Contractor ....................................................................................................................................... 511-2

Page 31: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XXIX

SECTION 514 - HOT IN-PLACE RECYCLE

DESCRIPTION 514.01 Scope .............................................................................................................................................. 514-1 MATERIALS 514.11 Rejuvenating Agent-Requirements ................................................................................................ 514-1 514.12 Asphalt Mix.................................................................................................................................... 514-1 EQUIPMENT 514.21 General ........................................................................................................................................... 514-1 514.22 Processing Equipment .................................................................................................................... 514-1 514.23 Rejuvenating Agent Equipment ..................................................................................................... 514-2 CONSTRUCTION 514.31 Preliminary ..................................................................................................................................... 514-2 514.32 Recycling........................................................................................................................................ 514-2 514.33 Compaction and Finishing.............................................................................................................. 514-2 MEASUREMENT 514.81 General ........................................................................................................................................... 514-3 514.82 Rejuvenating Agent........................................................................................................................ 514-3 514.83 Additional Virgin Mix.................................................................................................................... 514-3 PAYMENT 514.91 General ........................................................................................................................................... 514-3 514.92 Rejuvenating Agent........................................................................................................................ 514-3 514.93 Additional Virgin Mix.................................................................................................................... 514-3

SECTION 515 – END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYLED ASPHALT PAVEMENT

PART A – GENERAL .............................................................................................................................. 515-1 515.01 General ........................................................................................................................................... 515-1 515.02 General Description of Work ......................................................................................................... 515-1 515.03 Definitions Relevent to End Product Specification........................................................................ 515-1 515.04 Quality Control............................................................................................................................... 515-2 515.05 Supply of Virgin Aggregates, Asphalt Materials, Asphalt Admix Design and Job Mix Formula . 515-5 PART B – PAYMENT ADJUSTMENTS................................................................................................ 515-6 515.11 Density ........................................................................................................................................... 515-6 515.12 Smoothness..................................................................................................................................... 515-7 PART C – ACCEPTANCE AND REJECTION..................................................................................... 515-8 515.21 Acceptance at Reduced or Adjusted Payment................................................................................ 515-8 515.22 Rejection for Workmanship Defects .............................................................................................. 515-8 515.23 Appeal Testing ............................................................................................................................... 515-9 515.24 Cold Milling and Re-Paving as a Corrective Measure ................................................................... 515-9 PART D – PAYMENT ............................................................................................................................ 515-10 515.31 General ......................................................................................................................................... 515-10 515.32 Surplus Aggregate in Stockpile.................................................................................................... 515-11

SECTION 521 - ASPHALT STABILIZED BASE COURSE MIXED IN PLACE

DESCRIPTION 521.01 Scope .............................................................................................................................................. 521-1

Page 32: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XXX

EQUIPMENT 521.21 General Condition of Plant and Equipment .................................................................................... 521-1 521.22 Pressure Distributor ........................................................................................................................ 521-1 521.23 Blade Graders ................................................................................................................................. 521-2 521.24 Pulverizing and Rotary Mixing Machines ...................................................................................... 521-2 521.25 Compaction Equipment .................................................................................................................. 521-2 CONSTRUCTION 521.31 Method I.......................................................................................................................................... 521-3 521.32 Method II ........................................................................................................................................ 521-4 MEASUREMENT 521.81 Spray Asphalt.................................................................................................................................. 521-4 521.82 Process Base Gravel........................................................................................................................ 521-4 PAYMENT 521.91 Payment .......................................................................................................................................... 521-4

SECTION 531 - ASPHALT SURFACE TREATMENTS

DESCRIPTION 531.01 Scope............................................................................................................................................... 531-1 531.02 Description of Work ....................................................................................................................... 531-1 531.03 Types of Chip Seals ........................................................................................................................ 531-1 531.04 Types of Graded Aggregate Seals .................................................................................................. 531-1 MATERIALS 531.11 Asphalt Materials............................................................................................................................ 531-1 531.12 Coating and Anti-Stripping Additives ............................................................................................ 531-1 531.13 Mineral Aggregate Supply.............................................................................................................. 531-1 531.14 Mineral Aggregate - Method of Test .............................................................................................. 531-1 531.15 Mineral Aggregate - Physical Requirements .................................................................................. 531-1 531.16 Chip Seal Aggregates - Requirements ............................................................................................ 531-2 531.17 Graded Aggregate Seal - Requirements.......................................................................................... 531-2 531.18 Presealing Sand............................................................................................................................... 531-3 531.19 Blinding Sand ................................................................................................................................. 531-3 EQUIPMENT 531.21 General............................................................................................................................................ 531-3 531.22 Pressure Distributor ........................................................................................................................ 531-4 531.23 Mechanical Spreader....................................................................................................................... 531-5 531.24 Rollers............................................................................................................................................. 531-5 531.25 Power Brooms ................................................................................................................................ 531-6 531.26 Blade Graders ................................................................................................................................. 531-6 531.27 Water Truck .................................................................................................................................... 531-6 531.28 Sign Truck ...................................................................................................................................... 531-6 531.29 Tanks, Mobile Asphalt Heating, & Storage.................................................................................... 531-6 CONSTRUCTION 531.31 Temperature and Weather............................................................................................................... 531-7 531.32 Traffic Control ................................................................................................................................ 531-7 531.33 Preparation of Roadway ................................................................................................................. 531-7 531.34 Sweeping......................................................................................................................................... 531-8 531.35 Patching .......................................................................................................................................... 531-8 531.36 Pre-Seal Treatment ......................................................................................................................... 531-8 531.37 Single Pass Surface Treatment........................................................................................................ 531-8

Page 33: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XXXI

531.38 Double Pass Surface Treatment.................................................................................................... 531-10 MEASUREMENT 531.81 Surface Treatment ........................................................................................................................ 531-10 531.82 Flag Persons ................................................................................................................................. 531-10 531.83 Pilot Cars ...................................................................................................................................... 531-10 531.84 Asphalt Binder.............................................................................................................................. 531-10 531.85 Aggregates.................................................................................................................................... 531-10 531.86 Stockpile Bases ............................................................................................................................ 531-10 PAYMENT 531.91 Surface Treatment ........................................................................................................................ 531-11 531.92 Flag Persons ................................................................................................................................. 531-11 531.93 Pilot Cars ...................................................................................................................................... 531-11 531.94 Asphalt Binder.............................................................................................................................. 531-11 531.95 Aggregates.................................................................................................................................... 531-11 531.96 Stockpile Bases ............................................................................................................................ 531-11

SECTION 536 - PAVEMENT CRACK SEALING

DESCRIPTION 536.01 Scope ............................................................................................................................................. 536-1 536.02 Purpose ........................................................................................................................................... 536-1 MATERIALS 536.11 Asphaltic......................................................................................................................................... 536-1 536.12 Sand................................................................................................................................................ 536-1 536.13 Dust Cover...................................................................................................................................... 536-1 EQUIPMENT 536.21 Router ............................................................................................................................................. 536-1 536.22 Cleaner ........................................................................................................................................... 536-1 536.23 Melter ............................................................................................................................................. 536-1 536.24 Filler Tools ..................................................................................................................................... 536-1 CONSTRUCTION 536.31 General ........................................................................................................................................... 536-1 536.32 Rubberized and Elasticized Asphalt Sealants................................................................................. 536-2 536.33 High Float Emulsified Asphalt....................................................................................................... 536-2 536.34 Warranty......................................................................................................................................... 536-2 MEASUREMENT 536.81 General ........................................................................................................................................... 536-2 PAYMENT 536.91 General ........................................................................................................................................... 536-2

SECTION 541 - RUBBLE MASONRY

DESCRIPTION 541.01 Scope .............................................................................................................................................. 541-1 MATERIALS 541.11 Materials......................................................................................................................................... 541-1 CONSTRUCTION 541.31 Preparation ..................................................................................................................................... 541-1 541.32 Construction ................................................................................................................................... 541-1

Page 34: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XXXII

MEASUREMENT 541.81 General............................................................................................................................................ 541-1 PAYMENT 541.91 General............................................................................................................................................ 541-1

SECTION 582 - CONCRETE CURB AND GUTTER AND STORM DRAINAGE

DESCRIPTION 582.01 Scope............................................................................................................................................... 582-1 MATERIALS 582.11 Drain Pipe ....................................................................................................................................... 582-1 582.12 Salt Glazed Clay Sewer Pipe .......................................................................................................... 582-1 582.13 Concrete Pipe.................................................................................................................................. 582-1 582.14 Corrugated Steel Pipe ..................................................................................................................... 582-1 CONSTRUCTION 582.31 Portland Cement Concrete Curb and Gutter ................................................................................... 582-1 582.32 Catch Basins ................................................................................................................................... 582-1 582.33 Manholes......................................................................................................................................... 582-1 582.34 Storm Drains ................................................................................................................................... 582-1 582.35 Placing ............................................................................................................................................ 582-1 582.36 Special Jointing Material ................................................................................................................ 582-2 582.37 Bedding and Backfilling ................................................................................................................. 582-2 582.38 Concrete End Walls ........................................................................................................................ 582-2 MEASUREMENT 582.81 Portland Cement Concrete Curb and Gutter ................................................................................... 582-2 582.82 Catch Basins ................................................................................................................................... 582-2 582.83 Manholes......................................................................................................................................... 582-2 582.84 Storm Drains ................................................................................................................................... 582-2 582.85 Bedding and Backfill ...................................................................................................................... 582-2 582.86 Concrete End Walls ........................................................................................................................ 582-2 PAYMENT 582.91 Portland Cement Concrete Curb and Gutter ................................................................................... 582-2 582.92 Catch Basins ................................................................................................................................... 582-2 582.93 Manholes......................................................................................................................................... 582-2 582.94 Storm Drains ................................................................................................................................... 582-2 582.95 Bedding and Backfill ...................................................................................................................... 582-2 582.96 Concrete End Walls ........................................................................................................................ 582-2

SECTION 586 - PLANT MIXED PORTLAND CEMENT TREATED BASE COURSE

DESCRIPTION 586.01 Preliminary and General ................................................................................................................. 586-1 586.02 General Description of Work.......................................................................................................... 586-1 MATERIALS 586.11 Cement ............................................................................................................................................ 586-1 586.12 Water............................................................................................................................................... 586-1 586.13 Aggregate..........................................................................................................................................586-1 EQUIPMENT 586.21 Mixing Plant ................................................................................................................................... 586-1

Page 35: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TABLE OF CONTENTS VOLUME ONE

BC - MOT 2006 XXXIII

586.22 Cement Treated Base Spreader ...................................................................................................... 586-1 586.23 Water Distributors .......................................................................................................................... 586-2 CONSTRUCTION 586.31 Mixing ............................................................................................................................................ 586-2 586.32 Spreading and Compaction ............................................................................................................ 586-2 586.33 Protection and Cover ...................................................................................................................... 586-3 586.34 Maintenance ................................................................................................................................... 586-3 MEASUREMENT 586.81 Cement Treated Base...................................................................................................................... 586-3 586.82 Water .............................................................................................................................................. 586-3 PAYMENT 586.91 Cement Treated Base...................................................................................................................... 586-3 586.92 Water .............................................................................................................................................. 586-3

Page 36: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE TABLE OF CONTENTS

2006 BC - MOT XXXIV

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 37: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 XXXV

INDEX OF STANDARD DRAWINGS VOLUME ONE SP135-01 Construction Site Safety Sign

SP145-01 Scale House

SP201-01 Special Slope Treatment

SP207-01 Slope Mesh Layout SP207-02 Slope Mesh - Sections SP207-03 Slope Mesh - Details SP207-04 Slope Mesh - Details SP207-05 Soil Anchor Concrete and Reinforcement for Slope Mesh Installations

SP209-01 Shotcrete Test Panel Form SP209-02 Shotcrete Spider Plate Detail

SP211-01 Surface Evaporation Rate

SP214-01 Pile Shoe Type A

SP218-01 Typical Retaining Wall

1-SP232 Metal Bin Wall Type 2 Designs A, B, & C 2-SP232 Metal Bin Wall Type 2 Designs D, E, & F 3-SP232 Metal Bin Wall Type 1

SP303-05 Concrete Cradle for Culvert Pipe SP303-06 Subdrain SP303-07 Subdrain Flushout

1-SP312 W-Beam Barriers on Timber Posts G4 and Thrie-Beam Barrier on Timber Posts G9 2-SP312 BCT - Breakaway Cable Terminal Assembly (Timber Posts) 6-SP312 Steel Guardrail Beam Parts 7-SP312 Steel Guardrail BCT End Assembly Parts 8-SP312 Steel Guardrail BCT Assembly Parts 9-SP312 Steel Guardrail TBT Assembly Parts 10-SP312 Steel Post Typical Details - Steel Guardrails SP312-11 Curved Rails

SP419-01 Bridge Deck - Membrane Application Typical Detail Work - Curb, Parapet or Barrier SP419-02 Bridge Deck - Membrane Application Typical Detail Work - Bridge Deck Edge SP419-03 Bridge Deck - Membrane Application Typical Detail Work - Drain and Weep Hole SP419-04 Bridge Deck - Membrane Application Typical Detail Work - Joint and Cracks SP419-05 Bridge Deck - Membrane Application Typical Detail Work - Bridge End SP419-06 Bridge Deck - Membrane Application Typical Detail Work - Bridge End SP419-07 Bridge Deck - Membrane Application Typical Detail Work - Bridge End SP419-08 Bridge Deck - Membrane Application Typical Detail Work - Bridge End

SP501-01 Diagrammatic Asphalt Circulating and Proportioning System - Drum Mix Plants SP501-02 Diagrammatic Asphalt Circulating and Proportioning System - Batch Mixing Plants SP501-03 Diagrammatic Asphalt Circulating and Proportioning System – Continuous Mix Plants SP501-04 Tar Paper Let Down

Page 38: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

VOLUME ONE INDEX OF STANDARD DRAWINGS

XXXVI 2006 BC - MOT

SP504-01 Drainage Curbs Type-A, Type-B & Integral Asphalt SP504-02 Installation of Asphalt Spillways SP504-03 Installation of Curb, Barrier and Cast Iron Catch Basin

SP531-01 Grading Chart for Seal-Coat Cover Aggregates

SP541-01 Typical Section Thru Rock Paving

SP582-01.01 Combined Curb and Gutter SP582-01.02 Mountable Curb and Gutter SP582-01.03 Valley Curb and Gutter SP582-01.04 Island or Median Curb SP582-02.01 Precast Reinforced Concrete Catch Basin SP582-02.02 Precast Reinforced Concrete Variable Depth Catch Basin SP582-02.03 Cast in Place Concrete Catch Basin SP582-02.04 Corrugated Steel Catch Basin SP582-02.05 Cast Iron Catch Basin Box and Adaptor Plate SP582-03.01 Precast Reinforced Concrete Manhole SP582-03.02 Cast in Place Concrete Manhole SP582-03.03 Prefabricated Concrete Tee Manholes Pipe Sizes – 300 mm to 675 mm SP582-03.04 Prefabricated Concrete Tee Manholes Pipe Sizes – 300 mm to 675 mm SP582-03.05 Prefabricated Concrete Tee Manholes Pipe Sizes – 750 mm to 3050 mm SP582-03.06 Prefabricated Concrete Tee Manholes Pipe Sizes – 750 mm to 3050 mm SP582-03.07 Corrugated Steel Manhole - Main Smaller than Riser SP582-03.08 Corrugated Steel Manhole - Main Larger than Riser SP582-04.01 Cast in Place Inlet Structure SP582-05.01 Type ‘A’ Catch Basin Grate (Freeway Grate) SP582-05.02 Type ‘B’ Catch Basin Grate (Bicycle Safe Grate) SP582-05.03 Single Inlet Catch Basin Frame SP582-05.04 Twin-Inlet Catch Basin Frame SP582-05.05 Grate Installation - Depressed Gutter SP582-05.06 Trapping Hood SP582-05.07 Asphalt Apron SP582-06.01 Manhole Cover SP582-06.02 Manhole Frame SP582-07.01 Concrete Sidewalk and Driveway Entrance SP582-07.02 Sidewalk Ramp SP582-07.03 Island Ramp SP582-08.01 Reinforced Concrete Steps

Page 39: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 101 (1 of 6)

SECTION 101

QUALITY MANAGEMENT

101.01 General All work on Ministry projects shall be undertaken through a total quality management process, utilizing Ministry, Contractor and third-party resources, as necessary. The Ministry accepts the following definitions associated with Quality Management:

• Quality Control (QC): The process of checking specific product or service results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory product or service performance.

• Quality Assurance (QA): The process of evaluating overall product or service, by persons or companies independent of those doing the Work, on a regular basis to provide confidence that the product or service satisfies the relevant quality standards.

The quality management program has two key components as follows:

• Quality Control – the Contractor’s responsibility

• Quality Assurance – the Ministry’s responsibility

Each component of the program must address materials, processes, products, and documentation.

The Contractor shall provide unrestricted access to all Quality Control operations and documentation produced by or on behalf of the Contractor and shall allow the Ministry full access at any time during working hours.

The Ministry Representative will review the Contractor’s performance of the Work and determine the acceptability of the Work based on the Ministry’s Quality Assurance results and, where deemed appropriate by the Ministry Representative, supplemented by the Contractor’s Quality Control results.

Work failing to meet the conditions of the Contract shall be considered Unacceptable Work.

The Ministry Representative may consider all Work from the last acceptable Quality Assurance testing as Unacceptable Work. The Contractor shall not be entitled to payment for Work that lacks the appropriate Quality Control documentation, verified by the QC Manager, as required by the Contract.

The Contractor shall implement a well-coordinated approach to all operations related to the Work and will organize its team and operations in keeping with the goal of doing things right the first time.

101.02 Quality Control Plan (QC Plan)

101.02.01 QC Plan General Requirements The Contractor shall be responsible for all Quality Control during the performance of the Work. QC work includes monitoring, inspecting and testing the means, methods, materials, workmanship, processes and products of all aspects of the Work as necessary to ensure conformance with the Contract. The Contractor shall prepare a Quality Control Plan (QC Plan) in accordance with the Contract provisions and shall submit the complete QC Plan to the Ministry Representative a minimum of two weeks in advance of commencement of any element of Work covered by the plan.

The QC Plan shall be structured around the ISO 9001:2000 program (although ISO registration is not required), and clearly demonstrate the Contractor’s understanding and commitment to ISO’s eight principles of quality management:

• Customer focused organization • Leadership • Involvement of people • Process approach • System approach to management • Continual improvement • Factual approach to decision-making • Mutually beneficial supplier relationships. The QC Plan must also include sections detailing the Contractor’s methodology associated with each of the relevant sections of ISO 9001:2000 as listed in Table 101-A.

No Work shall be undertaken on any element of Work (including payment Items and incidental Work, or submittals for review) for which there are QC Plan submission requirements until the Ministry has accepted the base portion of the QC Plan and the specific details for that element of Work.

Subject to the submission requirements outlined in SS 101.02.03, the QC Plan is required to cover the Work in its entirety, including without limitation all materials the Contractor and Subcontractors are supplying, and all items and phases of construction on the Project.

The plan may be operated wholly or in part by a qualified Subcontractor or an independent agency/organization. However, the plan’s administration (including conformance with the plan and its modifications) and the quality of the Work remain the responsibility of the Contractor.

Table 101-A: ISO Section Headings

Page 40: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 101 QUALITY MANAGEMENT

§ ISO 9001:2000 Section Heading 4 Quality Management System

4.1 General Requirements 4.2 Documentation Requirements 5 Management Responsibility

5.1 Management commitment 5.2 Customer focus 5.3 Quality policy 5.4 Planning 5.5 Administration: 5.6 Management review: 6 Resource Management

6.1 Provision of resources 6.2 Human resources 6.3 Facilities 6.4 Work environment 7 Product Realization

7.1 Planning of realization processes 7.2 Customer-related processes 7.3 Design and/or development: 7.4 Purchasing 7.5 Production and service operations 7.6 Control of measuring and monitoring devices 8 Measurement, Analysis and Improvement

8.1 Planning 8.2 Measurement and monitoring 8.3 Control of nonconformity 8.4 Analysis of data 8.5 Improvement

• All testing equipment is calibrated, properly maintained, and in good operating condition.

• All testing and inspection is performed in accordance with appropriate standards of the Contract.

• Submission to the Ministry Representative, within twenty-four (24) hours, of daily reports for all tests and inspections that indicate non-conformance of the material being tested.

• Production, within forty-eight (48) hours, of daily reports for all tests and inspections that indicate conformance of the material being tested and the availability of back-up documentation to substantiate test results when required.

• Organization, compilation and submission of all project QC documentation within 14 days of issuance of the Completion Certificate.

The Contractor shall designate one person as the Quality Control Manager (QC Manager) who shall be responsible for the implementation of the QC Plan. The QC Manager shall be a qualified Professional Engineer, Certified Engineering Technician, or Applied Science Technologist, or other person with knowledge, skills and abilities acceptable to the Ministry Representative.

The QC Manager shall be at arms length from the productivity part of the Contractor’s organization and specifically shall not be the Project Manager or the Project Superintendent. On Minor Works contracts, this requirement will, upon request by the Contractor and where the candidate is deemed acceptable under the foregoing paragraph, generally be waived by the Ministry Representative.

The Contractor’s QC program and the Work shall be undertaken in accordance with the QC Plan and shall be well managed, with testing results representative of actual operations. Results will be reported accurately and in a timely manner.

The Ministry recognizes the Contractor’s Project Manager and Superintendent as the personnel responsible for making the product meet the contractual requirements, but the QC Manager’s duties include being responsible to measure conformance and to ensure that quality is not compromised by production pressures. The Contractor shall also ensure that all workers are

familiar with the Quality Management Plans, its goals, and their role under it, as well as with the Contract specifications associated with the Work they are to undertake.

The QC Manager, or a designated replacement acceptable to the Ministry Representative empowered and able to perform all of the QC Manager’s relevant duties, shall remain on Site at all times the Contractor is performing Work which must be tested or inspected in-process, and must be readily accessible and able to return when off-Site.

101.02.02 QC Plan Quality Control Staff and Equipment Submission Requirements The Contractor shall provide all resources and take all actions necessary to ensure:

The QC Plan will include the following information:

• the name of the QC Manager and qualifications establishing a proven capability to provide the specific services required for the Project;

• Provision of sufficient inspection or testing staff, with adequate equipment and technical support to perform all Quality Control functions in an accurate and timely manner.

• the name of QC testing agencies and their proven capability to provide the specific services required for the Project; • That QC staff perform only inspections and tests for

which they are qualified.

101 (2 of 6) 2006 BC - MOT

Page 41: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

QUALITY MANAGEMENT SECTION 101

• a listing of QC staff (including names, qualifications and relevant experience) and their assigned roles and work scheduling in performing QC duties;

• respond to each Non-Conformance Report (NCR) issued by the Ministry Representative within the time specified in the NCR;

• a list of testing equipment to be used for the Work. • schedule testing and inspection services in coordination with the Contractor’s superintendent and foremen;

The QC Plan must include an organizational chart showing details of the flow of information, “hold” points, rectification of deficiencies and other relationships and responsibilities necessary to assure Project quality requirements are met.

• monitor QC testing and inspection procedures including those of the Subcontractors;

• work directly with the Ministry Representative on matters related to QC;

• ensure required approvals and permits from the Ministry Representative and others are obtained as and when required;

The QC Plan should describe how the QC staff are allocated to Project requirements, the tasks assigned to each, and how their work will be coordinated.

• verify that all testing equipment is properly maintained and kept in good working order; Without limitation, the Contractor’s QC Manager shall:

• keep an organized filing system to ensure that quality records are easily accessible so that auditors can obtain necessary information;

• implement the Contractor’s QC Plan; • be responsible for measuring conformance with all

aspects of the contract quality; • review issued for construction drawings, calculations, and shop drawings and ensure that all concerned Contractor staff have current versions of documents applicable to their part of the Work;

• stop work when materials, product, processes or submittals are deficient;

• develop inspection and testing plans for each element of Work; • notify the Ministry Representative of any changes in

survey layout, location, line, grade, etc., for approval; notify the company principles of any issues that compromise the integrity or function of the Quality Management System, and

• develop acceptance/non-acceptance reports and quality control checklists for each element of Work in sufficient detail to gauge conformance with all significant contractual requirements;

• ensure the requirements for quality management (including an overview of how the QC Plan operates, the worker’s role in it, contractual specifications for the Work, and work procedures) are known to, understood by, and adhered to by all workers on the Site;

• provide an auditable trail for survey computations to the Ministry Representative.

101.02.03 QC Plan Submission Requirements (Contract–Specific)

• ensure that all QC checklists are signed-off by competent and responsible parties as close to the actual work as appropriate to the nature of the Work (e.g. by the actual worker or a foreman for most work; by a Professional Engineer for falsework erection; etc.)

(i) Full Submission

Unless otherwise specified in the Special Provisions, the Contractor’s QC plan shall provide details of the means, methods, and frequencies of Quality Control measures for all elements of Work (whether payment Items or incidental) in the Contract. • review, sign, and be responsible for all reports

(materials and testing results); (ii) Partial Submission • consult with field inspectors regarding materials and

testing issues; On projects considered by the Ministry to be of low complexity and/or risk, and only where explicitly invoked by the Special Provisions, the Ministry will accept a partial QC Plan submission.

• receive notification by inspectors re deficiencies and ensure re-testing or rejection;

• provide weekly and monthly summary reports on testing and inspection results; Notwithstanding any such reduced submission

requirements, the Contractor remains responsible for QC for all aspects of the Work.

• initiate the non-conformance process when materials or product do not meet the required specifications and, inform the Ministry Representative of such non-conformance; The Contractor’s partial QC Plan submission to the

Ministry Representative is only required to address the details of the following types of Work: • consult with the Contractor Representative and initiate

corrective action on non-conformance; • Traffic Control • Survey/layout

BC - MOT 2006 101 (3 of 6)

Page 42: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 101 QUALITY MANAGEMENT

• Materials incorporated into the Work (concrete barrier, culverts, filter cloth, lock-blocks, etc.)

• Compaction (subgrade, embankments, granular aggregates, culvert backfill, etc.)

• Aggregate gradation • Plus any other elements identified in the Special

Provisions as a submission requirement.

The Contractor shall initiate such other Quality Control procedures as are necessary for ensuring the production of a quality product and may include them in the Quality Control Plan submission.

(iii) For Both Full and Partial Submissions

The initial QC Plan shall be submitted to the Ministry Representative a minimum of seven (7) days in advance of the Project pre-construction meeting and must provide details of all elements of Work anticipated to be undertaken within the Contractor’s first thirty (30) days on Site.

Detailed submissions for the balance of the Work must be received a minimum of seven (7) days prior to the anticipated first day of Work on each element covered by the submission.

The initial submission, as well as any subsequent submission or revision, must be accompanied by the Contractor’s QC checklist for Quality Management, verifying that the submission meets all relevant contractual requirements.

Improved procedures may be introduced after the start of work as necessary as amendments to the Quality Control Plan. All amendments require the written acceptance of the Ministry Representative.

The type and frequency of QC tests shall be established by the Contractor and shall be in conformance with the requirements of the Contract, including the minimum frequencies specified in the Special Provisions and/or Standard Specifications

(for those listed items applicable to the Work), and the current acceptable practice of the industry.

When materials or equipment are specified by standard or performance specifications the Contractor shall obtain from suppliers or manufacturers independent test reports, or test certificates stating that the materials or equipment meet or exceed specified requirements. The Contractor shall provide back-up documentation of actual testing results upon request by the Ministry Representative.

101.03 Quality Assurance Plan The Ministry will prepare and implement a Quality Assurance Plan, based in part on the effectiveness and reliability of the Contractor’s

Quality Control Plan. The Ministry may also undertake random and systematic inspections of the Work and of the Contractor’s QC documentation. The purpose of the QA Plan and inspectional activities is to ensure that payment is made only for acceptable works in place, and may be based on a limited amount of sampling and testing.

The Ministry Representative will monitor the Contractor’s operations and the Quality Control program to assure that standards are being met and to assess what payments have been earned under the terms of the Contract.

Any instances of Unacceptable Work discovered will result in a Non-Conformance Report being issued to the Contractor.

The QA program activities will not relieve the Contractor of Quality Control responsibilities under the terms of the Contract.

The frequency of QA inspection and testing will generally be approximately zero to ten percent (0 – 10%) of the frequencies undertaken by the Contractor in its QC Plan and will initially be set at a level commensurate with the Ministry Representative’s confidence in the anticipated effectiveness of the Contractor’s QC program.

The Ministry Representative may increase or decrease the frequency of QA inspection and testing during the course of the Work, based in part on the actual effectiveness of the Contractor’s QC Plan.

101.04 Quality Audit The Ministry may have one or more auditors on the Project, supplementing the work of the Ministry QA staff. When utilized, the auditor(s) will report to the Ministry Representative and provide a systematic and independent assessment of whether or not the materials and Project activities and related results comply with the Contract, the Contractor’s QC Plan, and the Ministry’s QA Plan. These auditors may be Ministry employees but will be assigned from resources which have not otherwise been involved with the Work. The objective of Quality Auditing is to have an independent opinion on both QC and QA activities and be proactive in avoiding or reducing quality related issues by requiring the process of conformance verification to be systematic.

The auditor(s) will be allowed unrestricted access to the Site and all activities therein, to all testing and documentation of the work done by the Ministry, Contractor and their agents and suppliers.

101 (4 of 6) 2006 BC - MOT

Page 43: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

QUALITY MANAGEMENT SECTION 101

101.05 Non-Conformance Reports (NCRs) The Contractor shall and the Ministry may review the Work to determine conformance with the contractual requirements.

The Contractor is encouraged to review the findings and undertake such modifications to the QC Plan and the work procedures as necessary to address the issue.

Non-conformances found shall be dealt with as follows. An OFI will not affect payment for Quality Management or for the Work itself.

101.06 Appeal If the Contractor disputes the validity of a finding in an NCR, the Contractor may file an appeal with the Ministry Representative. The Ministry Representative and the Contractor Representative will use all reasonable efforts to refine the area of dispute and to resolve the determination of conformance with the Contract.

101.05.01 Contractor’s Internal NCR Should the Contractor’s QC reporting indicate that the Work is not in conformance, the QC Manager shall issue in internal Non-Conformance Report (NCR) to the Contractor, with a copy to the Ministry, including a response time. The Contractor shall then respond to the QC Manager, with a copy to the Ministry Representative, with respect to the NCR, within the specified time, with proposed resolutions and corrective actions. The Contractor and/or the QC Manager may consult with the Ministry Representative on the resolutions but is not required to do so.

If the Ministry Representative and the Contractor Representative cannot come to a mutually agreeable resolution, the Work that is the subject of the Non-Conformance Report shall be re-evaluated by an independent third-party, selected by the Ministry Representative in consultation with the Contractor, at a test frequency equivalent to twice that specified in the Contract or to such other frequency as may be mutually agreed between the Ministry Representative and the Contractor.

Payment for a Quality Management will not be affected by internal NCRs, as long as the issue is diligently pursued and resolved.

If the appeal testing confirms the non-conformance determination, all appeal testing costs will be borne by the Contractor. If the appeal testing shows that the Work did in fact meet the requirements of the Contract, all appeal testing costs will be borne by the Ministry.

Payment for the Work itself may be withheld until the NCR issue is resolved.

101.05.02 Ministry-Issued NCR Should the Ministry’s QA reporting indicate that the Work is not in conformance, the Ministry Representative will issue to the Contractor a NCR, including a response time.

101.07 Payment The Lump Sum Price bid for Quality Management shall be full compensation for all costs resulting from the Quality Management requirements set out in the Contract.

The Contractor shall then respond to that NCR, within the specified time, with proposed resolutions and corrective actions.

Payment will be made on a monthly basis prorated for the percentage of the total Work completed as determined by the Ministry Representative, subject to the Contractor being totally compliant with the requirements of this Section and with its own Quality Control Plan.

The Ministry Representative will accept or reject the proposed resolution and corrective action proposal.

Assurance testing and inspection will be performed to determine if the corrective action has provided an acceptable product. Acceptance and rejection will continue until the Ministry Representative determines that a quality product has been achieved.

The Ministry Representative may deduct an amount from any monthly payment so computed, for any quality management work required but not satisfactorily undertaken during that month. The Ministry Representative may also reduce the total Lump Sum payable by the value of any quality management work required but not satisfactorily undertaken during the Term of the Contract. The foregoing determinations will be made in the sole discretion of the Ministry Representative.

A portion of the payment for a Quality Management may be withheld until the NCR issue is resolved or, in accordance with SS 101.07, may be withheld permanently.

Payment for the Work itself may be withheld until the NCR issue is resolved.

Inspection or testing by the Ministry Representative will be at the Ministry’s cost. However, re-inspection or re-testing by the Ministry for repaired deficient details shall be at the Contractor’s cost.

101.05.03 Opportunity for Improvement Should the QA review indicate that the Work is not in conformance, but the variance is deemed minor by the Ministry Representative, the Ministry Representative may issue an Opportunity for Improvement (OFI) report.

BC - MOT 2006 101 (5 of 6)

Page 44: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 101 QUALITY MANAGEMENT

101 (6 of 6) 2006 BC - MOT

Work that is deemed unacceptable in accordance with SS 101.01 will not be eligible for payment from the applicable Item for that Work.

The Completion Certificate will not be issued if there are any unresolved Non-Conformance Reports.

Page 45: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 108

SAMPLE FORMS

PART A – GENERAL

108.01 General -This Section provides sample copies of forms which the Contractor may be required to execute and submit to the Ministry in accordance with the Contract. Blank copies of these forms are available from the Ministry Representative.

PART B – STATUTORY DECLARATIONS

108.11 Major Works – The form attached as Appendix “A” (Ministry form H0394A) is used to meet the Statutory Declaration requirements of the Major Works General Conditions.

108.12 Minor Works and Operational Services – The form attached as Appendix “B” (Ministry form H0394F) is used to meet the Statutory Declaration requirements of the Minor Works General Conditions or Operational Services General Conditions.

BC - MOT 2006 108 (1 of 4)

Page 46: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 108 SAMPLE FORMS

APPENDIX A – MAJOR WORKS

STATUTORY DECLARATION IN THE MATTER OF THE EVIDENCE ACT, 1996 RSBC c.124 AND IN THE MATTER OF CERTAIN DISBURSEMENTS TO BE MADE IN CONNECTION WITH THE CONTRACT dated the ______________ day of _________________________ , __________ between:

HER MAJESTY THE QUEEN IN RIGHT OF THE PROVINCE OF BRITISH COLUMBIA, AS REPRESENTED BY THE MINISTER OF TRANSPORTATION (the Province)

and:

_________________________________________________________________________

_________________________________________________________________________

_________________________________________________________________________ (the Contractor)

pertaining to Project Number _________________________ Contract ID ___________________ I, _________________________________________________________________________, being a (PRINT OR TYPE FULL NAME AND POSITION OR TITLE) duly authorized representative of and agent for the Contractor on the above-referenced Project do solemnly declare and attest that, all of the Contractor's obligations under the Contract arising as of this date have been performed and that all accounts for labour, subcontracts, products, materials, construction machinery, equipment and any other indebtedness and obligations which may have been incurred by the Contractor up to the date the previous Progress Estimate have been paid in full or remain in good standing.

I MAKE THESE SOLEMN DECLARATIONS, conscientiously believing them to be true and knowing that they are of the same legal force and effect as if made under Oath.

DECLARED BEFORE ME AT THE ) ) ______________________________________ ) ) of ______________________________ , in the ) ___________________________________ ) Signature of Contractor's Authorized Representative Province of British Columbia, on this ) ) ______ day of __________________ , ______ ) ) ______________________________________ ) A Commissioner for taking Affidavits for British Columbia ) STATUTORY DECLARATION CONTRACTOR - PROGRESS PAYMENT/HOLDBACK RELEASE H0394A (2004/04/19)

108 (2 of 4) 2006 BC - MOT

Page 47: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SAMPLE FORMS SECTION 108

APPENDIX B – MINOR WORKS and OPERATIONAL SERVICES

STATUTORY DECLARATION

IN THE MATTER OF THE EVIDENCE ACT, 1996 RSBC c.124 AND IN THE MATTER OF CERTAIN DISBURSEMENTS MADE IN CONNECTION WITH THE CONTRACT dated the ________________ day of ________________________ , __________ between:

HER MAJESTY THE QUEEN IN RIGHT OF THE PROVINCE OF BRITISH COLUMBIA, AS REPRESENTED BY THE MINISTER OF TRANSPORTATION

(the Province)

BC - MOT 2006

and:

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________ (the Contractor)

pertaining to Project Number: ______________________ Contract ID _______________________ I, ___________________________________________________________________________ , being the (PRINT OR TYPE FULL NAME AND POSITION OR TITLE) duly authorized representative of and agent for the Contractor, solemnly declare and attest that all of the Contractor's obligations under the Contract have been performed as of this date.

I MAKE THIS SOLEMN DECLARATION, conscientiously believing it to be true and knowing that it is of the same legal force and effect as if made under Oath.

DECLARED BEFORE ME AT THE ) ) ___________________________________________ ) ) of ___________________________________ , in the ) ____________________________________ ) Signature of Contractor's Authorized Representative ) Province of British Columbia, on this ) ) _________ day of ______________________ , _____ ) ) ) ___________________________________________ ) A Commissioner for taking Affidavits for British Columbia ) STATUTORY DECLARATION MINOR WORKS CONSTRUCTION CONTRACTS/OPERATIONAL SERVICES CONTRACTS H0394F (2004/04/19)

108 (3 of 4)

Page 48: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 108 SAMPLE FORMS

THIS PAGE IS LEFT INTENTIONALLY BLANK

108 (4 of 4) 2006 BC - MOT

Page 49: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 125 (1 of 2)

SECTION 125

VALUE ENGINEERING - PROPOSAL GUIDELINES

125.01 Definitions

125.01.01 VEP means a value engineering proposal which has been set out in writing by the Contractor to the Ministry in accordance with these guidelines.

125.01.02 Summary VEP means a brief summary of a VEP, including the anticipated cost and timing of developing the VEP, submitted by the Contractor to the Ministry.

125.01.03 Implemented VEP means a value engineering proposal which has been accepted and implemented by means of a Supplemental Agreement or Work Order.

125.01.04 Net Cost Savings means an amount determined by the Ministry on the basis of the Contract Price before implementation of the VEP minus the adjusted Contract Price determined after the implementation of the VEP less the following costs, which are subject to negotiation:

• the Contractor's costs of developing the VEP. • the Ministry's costs of evaluating the VEP. • the anticipated additional administration and project

management costs to the Ministry resulting from the implementation of the VEP.

125.01.05 Value Engineering Incentive means an amount calculated pursuant to written agreement between the Ministry and the Contractor, which will generally be equal to 50 percent of the Net Cost Savings realized by the Ministry due to the implementation of the VEP.

125.02 Guiding Principles for VEP Evaluation

125.02.01 To be considered, a VEP must be perceived by the Ministry to provide a tangible benefit to the Ministry, such as:

a) a reduction in the total cost of the Project; or

b) an improvement to the product which the Ministry expects will reduce the life cycle costs; or

c) a change in the Construction Schedule which will be beneficial to the Ministry; or

d) a reduction or transfer of risk which will benefit the Ministry;

and should result in a product which is functionally equal or superior to that which would result in the absence of the VEP.

125.02.02 A VEP should not:

a) impair the functionality and characteristics of the Project, including, but not limited to, the service life, economy of operation, ease of maintenance, aesthetic considerations, preliminary engineering commitments, or design and safety standards.

b) be similar to a change in the Drawings or specifications under consideration by the Ministry for the Work at the time the VEP is submitted to the Ministry.

c) increase the anticipated life cycle costs of the Project.

125.02.03 To be eligible for a Value Engineering Incentive, a VEP must propose a change to the Work which meets the same constraints, assumptions and considerations as those which governed the original design of the Work, as it is defined in the Agreement. Where Changed Conditions, or other changes, have occurred and have already created the need for a Change To Work, a VEP which responds to this need will not normally be eligible for a Value Engineering Incentive, and in any case will be eligible only for a reduced incentive.

125.02.04 A VEP may involve:

a) a material or product substitution.

b) a change to the Work method.

c) a Work sequencing change, including changes to traffic routing or detour sequences, changes to structure or roadway construction sequences.

d) a change to the design or engineering of the Project which provides a marked departure from the product as defined in the Contract Document Package.

125.03 Value Engineering Proposal Submissions

125.03.01 Prior to presenting a VEP, the Contractor will prepare a Summary VEP and submit it to the Ministry for consideration.

125.03.02 The Ministry will evaluate the Summary VEP and will advise the Contractor whether or not the Ministry would be willing to consider, without obligation, the VEP described in the Summary VEP.

125.03.03 A VEP should contain the following information:

Page 50: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 125 VALUE ENGINEERING - PROPOSAL GUIDELINES

125 (2 of 2) 2006 BC - MOT

a) a statement that the proposal is submitted as a VEP.

b) a detailed description of the VEP and the manner in which the VEP should be implemented (by Supplemental Agreement or Work Order).

c) a detailed description of the Items and quantities, Drawings, specifications, designs, Completion Date, Milestone Dates or other elements under the Agreement which would be changed, altered, modified or replaced by the implementation of the VEP.

d) plans and working drawings needed to analyze the VEP and determine the impact of the VEP on the Project.

e) an itemized cost analysis of the Net Cost Savings.

f) the date, which must be not less than two weeks after the date of the VEP, by which the VEP must be implemented in order to maximize the cost reduction

during the remainder of the Agreement.

125.03.04 Any request by the Contractor for substitution of material or method will only be considered if submitted as a VEP.

125.04 Implementation of a VEP

125.04.01 To implement a VEP, the Ministry Representative will prepare a Supplemental Agreement or a Work Order which will set out the Net Cost Savings, the Change To Work required to realize the Net Cost Savings, and the adjustment to the Contract Price(s) and payment terms resulting from the VEP, in accordance with these guidelines.

125.04.02 The Ministry will retain the right to utilize a VEP, or part thereof that has been accepted for the Project, on any other or subsequent projects without any obligation to the Contractor, unless the Contractor has provided written notice in the Summary VEP and the VEP regarding patented materials or processes involved in the VEP.

Page 51: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 135 (1 of 10)

SECTION 135

CONSTRUCTION SITE SAFETY

135.01 Definitions - In this Section, except as otherwise expressly provided herein:

a) Base Safety Program means the occupational health and safety program that the Contractor will initiate and maintain, as described in this Section.

b) Designated Prime Contractor means the Contractor, or another contractor, designated by the Ministry pursuant to Subsection 135.04.01 to discharge the responsibilities of the Prime Contractor for the Specified Area.

c) Designated Qualified Coordinator means the person designated by the Designated Prime Contractor to discharge the responsibilities of the Qualified Coordinator for the Specified Area.

d) Designated Qualified Person means the person designated by the Designated Prime Contractor to discharge the responsibilities of the Qualified Person for the Specified Area.

e) Designated Supervisor means the person who is designated by an Employer at a Multiple-Employer Workplace to discharge the responsibilities of a supervisor as described in the Workers Compensation Act and the Regulation.

f) Employer means an employer as defined in the Workers Compensation Act, and includes the Contractor.

g) Joint Committee means the joint health and safety committee established and maintained by the Contractor in compliance with the Workers Compensation Act and the Regulation, and

Joint Committees means additional committees that may be established by the Contractor in compliance with the Workers Compensation Act and the Regulation.

h) Multiple Employer Workplace means a workplace where workers of 2 (two) or more employers are working at the same time, and includes the Site and the Specified Area.

i) Notice of Project means the notice of project described in the Regulation.

j) Notice of Unsafe or Harmful Condition or Act means the written notice that the Contractor will deliver to any Employer pursuant to Subsection 135.05, in the form set out in Appendix A of this Section.

k) Other Persons means any person or persons, other than Workers working on the Project, who, for whatever reason or purpose, are on the Site or the Specified Area.

l) Prime Contractor means a prime contractor as defined in the Workers Compensation Act.

m) Qualified Coordinator means the person, who meets the qualifications of a qualified coordinator described in the Regulation, and who is appointed by the Prime Contractor to discharge for the Site, the responsibilities of a qualified coordinator as described in the Workers Compensation Act and the Regulation.

n) Qualified Person means the person who meets the qualifications of a qualified person described in the Workers Compensation Act and the Regulation, and who is designated by the Prime Contractor to discharge for the Site the responsibilities of a qualified person as described in the Workers Compensation Act and the Regulation.

o) Regulation means the British Columbia Regulation 296/97 entitled Occupational Health and Safety Regulation prescribed under the Workers Compensation Act, as amended from time to time.

p) Safety Officer means the person so designated by the Ministry pursuant to this Contract.

q) Specified Area means that part or those parts of the Site and any lands adjoining or overlapping the Site that are designated as the Specified Area in the Special Provisions of the Contract Document Package or in a written notice that may be issued by the Ministry Representative from time to time pursuant to Subsection 135.04.01.

r) Workers means the employees, workers, servants, agents or invitees of Employers, including of the Contractor, at the Site or at the Specified Area.

s) Workers Compensation Act means the Workers Compensation Act, R.S.B.C. 1996, c.492 as amended from time to time.

t) Workers’ Compensation Board means the Workers’ Compensation Board constituted under the Workers Compensation Act and Regulation.

135.02 Base Safety Program

135.02.01 Notwithstanding the limitation relating to the requirement for initiating and maintaining an occupational

Page 52: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 135 CONSTRUCTION SITE SAFETY

135 (2 of 10) 2006 BC - MOT

health and safety program set out in the Regulation, the Contractor will initiate and at all times maintain at the Site, and if the Contractor has agreed to be the Designated Prime Contractor, at the Specified Area, the Base Safety Program which will be designed to prevent injuries and occupational diseases within the contemplation of the Workers Compensation Act and the Regulation and, without limiting the generality of the foregoing, will describe how the Contractor will ensure that:

a) (not used)

b) the requirements of an occupational health and safety program stipulated in the Regulation will be satisfied, including the establishment and maintenance of a Joint Committee.

c) the activities of all Employers, Workers and Other Persons at the Site and, if applicable, at the Specified Area, relating to occupational health and safety will be coordinated.

d) reasonably practicable measures are taken to establish and maintain a system or process to ensure compliance with the Workers Compensation Act and the Regulation in respect of the Site, and if applicable, the Specified Area.

e) all Workers, Employers, and Other Persons are made aware of all known or reasonably foreseeable health and safety hazards to which they may be exposed on the Site, and if applicable, the Specified Area, and are instructed in the terms of the Workers Compensation Act and the Regulation.

f) complete and accurate reports, records and documents relating to occupational health and safety activities at the Site and, if applicable, at the Specified Area, or related to the Work, will be established, maintained, reviewed and assessed on an ongoing basis.

g) safety equipment and apparel are properly used and worn by Workers and Other Persons, as required pursuant to the Regulation and the Base Safety Program.

h) a first aid program in compliance with the Regulation is established, implemented and maintained at all times on the Site and, if applicable, on the Specified Area.

135.02.02 The Contractor will determine and control the manner in which the Base Safety Program is established, initiated, and maintained and the manner in which the

instructions, directions, rules, policies and procedures contained therein are carried out.

135.03 Prime Contractor - The Site

135.03.01 The Contractor, by entering into the Contract, agrees to be the Prime Contractor in connection with the Site for the purposes of the Workers Compensation Act and the Regulation.

135.03.02 The Contractor will, prior to commencement of the Work, deliver to the Ministry Representative, in writing:

a) the name of each of the Qualified Coordinator and the Qualified Person in connection with the Site.

b) a copy of the Notice of Project.

c) confirmation that the Base Safety Program has been initiated and is readily available on the Site.

135.03.03 The Contractor will, in connection with the Work and the Site:

a) observe, abide by and comply with the Workers Compensation Act and the Regulation.

b) deliver the Notice of Project to the Workers’ Compensation Board in accordance with the Workers Compensation Act and the Regulation.

c) prominently post and at all times maintain on the Site the Notice of Project in accordance with the Workers Compensation Act and the Regulation.

d) ensure that the person or persons to be appointed as the Qualified Coordinator and Qualified Person meet the qualifications of a “qualified coordinator” and “qualified person” as described in the Workers Compensation Act and the Regulation.

e) appoint and at all times maintain a Qualified Coordinator to perform the functions of the “qualified coordinator” on the Site as described in the Workers Compensation Act and the Regulation, and as set out in this Section, and designate and at all times maintain not less than one Qualified Person to be responsible for health and safety activities of the Contractor in connection with the Work, including, without limiting the generality of the foregoing, administering the Base Safety Program.

f) deliver written notice to the Ministry Representative of any change in the appointed Qualified Coordinator

Page 53: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CONSTRUCTION SITE SAFETY SECTION 135

BC - MOT 2006 135 (3 of 10)

or the Qualified Person referenced in Subsection 135.03.03 (e).

g) establish and at all times maintain one or more Joint Committees.

h) where conditions or activities affect the Workers of more than one Employer, or where there are overlapping or adjoining work activities of 2 (two) or more Employers at the Site, ensure:

i) that the Qualified Coordinator coordinates the occupational health and safety activities at the Site.

ii) that:

• Employers, Workers, Suppliers and Subcontractors of the Contractor, and Other Persons.

• the work activities of Workers, Employers, Suppliers and Subcontractors of the Contractor and Other Persons.

• the conditions of the Site.

comply with the Workers Compensation Act and the Regulation;

i) make the Base Safety Program and a copy of the Workers Compensation Act and the Regulation readily available at the Site.

j) provide and maintain the Site in a manner that ensures the health and safety of persons at or near the Site.

k) ensure that every Employer at the Site is given the information known to the Contractor that is necessary to identify and eliminate or control hazards to the health or safety of Workers and Other Persons at the Site.

l) ensure that Workers, Employers and Other Persons are made aware of all known or reasonably forseeable health and safety hazards to which they are likely to be exposed by the Work on the Site.

m) do everything that is reasonably practicable to establish and maintain a system or process that will ensure compliance with the Workers Compensation Act and the Regulation with respect to the Site.

n) immediately notify Employers, Workers, Suppliers and Subcontractors of the Contractor, and Other Persons of any hazard created by virtue of overlapping or adjoining work activities of 2 (two) or more

Employers and ensure that the hazards are addressed throughout the duration of such activities.

o) at the sole cost of the Contractor, provide, post and maintain 2 (two) signs, in accordance with the specifications, which contain the informational messaging stipulated in Drawing SP135-01 of this Section, at locations satisfactory to the Ministry Representative.

p) immediately give written notice to the Ministry Representative of any event which is reportable or is subject to notification requirements under the Workers Compensation Act or the Regulation.

q) where the execution of the Work involves overlapping or adjoining work activities of 2 (two) or more Employers that create a hazard to Workers, cause the Qualified Coordinator to:

i) coordinate health and safety activities of all Employers at the Site in accordance with the Regulation.

ii) publish and post at the Site and otherwise make readily available on the Site, information relating to health and safety activities at the Site, including without limiting the generality of the foregoing:

• the name of the Qualified Coordinator. • a drawing of the Site showing the project

layout, first aid locations, emergency transportation provisions and the evacuation marshalling station.

• a set of construction procedures designed to protect the health and safety of Workers at the Site.

all in compliance with the requirements of the Workers Compensation Act and the Regulation.

135.04 Designated Prime Contractor - The Specified Area

135.04.01 The Ministry may, in its sole discretion, designate in writing the Specified Area, and

a) appoint in writing the Contractor to be the Designated Prime Contractor in connection with the Specified Area, and upon notification of such appointment the Contractor will deliver written confirmation to the Ministry of its agreement to be the Designated Prime Contractor, or

b) appoint in writing a contractor other than the Contractor as the Designated Prime Contractor in

Page 54: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 135 CONSTRUCTION SITE SAFETY

135 (4 of 10) 2006 BC - MOT

connection with the Specified Area, and will notify the Contractor in writing of the designation.

135.04.02 The Designated Prime Contractor, in connection with the Specified Area, will:

a) deliver written confirmation to the Workers’ Compensation Board, with a copy to the Ministry Representative, of its agreement to be the Designated Prime Contractor for the Specified Area.

b) appoint a Designated Qualified Coordinator to perform the functions of the “qualified coordinator” as described in the Workers Compensation Act and the Regulation, and as set out in this Section for the Specified Area.

c) where conditions or activities affect the Workers of more than one Employer, or where there are overlapping or adjoining work activities at the Specified Area, ensure that:

i) the Employers, Workers, Suppliers and Subcontractors of the Designated Prime Contractor, and Other Persons,

ii) the work activities of all Employers, Workers, Suppliers and Subcontractors of the Designated Prime Contractor and Other Persons,

iii) the conditions of the Specified Area,

comply with the Workers Compensation Act and the Regulation;

d) provide and maintain the Specified Area in a manner that ensures the health and safety of persons at or near the Specified Area.

e) ensure that every Employer at the Specified Area is given the information known to the Designated Prime Contractor that is necessary to identify and eliminate or control hazards to the health or safety of Workers and Other Persons at the Specified Area.

f) make a copy of the Workers Compensation Act and the Regulation readily available at the Specified Area.

g) cause the Designated Qualified Coordinator to:

i) coordinate health and safety activities of all Employers on the Specified Area in accordance with the Workers Compensation Act and the Regulation.

ii) publish and post on the Specified Area and otherwise make information relating to overlapping or adjacent health and safety activities on the Specified Area readily available, including without limiting the generality of the foregoing:

• the name of the Designated Qualified Coordinator,

• a drawing of the Specified Area showing the project layout, first aid locations, emergency transportation provisions and the evacuation marshalling station,

• a set of construction procedures designed to protect the health and safety of Workers in the case of overlapping or adjacent work activities on the Specified Area,

all in compliance with the requirements of the Workers Compensation Act and the Regulation.

135.05 Site and Specified Area Notice Process

135.05.01 If the Prime Contractor, in connection with the Site, or the Designated Prime Contractor, in connection with the Specified Area determines, in its reasonable discretion, that:

a) any Employer or its Workers has failed to comply with the Workers Compensation Act or the Regulation, or to act in accordance with the requirements of the Base Safety Program for coordinating health and safety activities,

b) the failure creates or may create an unsafe or harmful condition on the Site or Specified Area that poses a danger of injury or death to Workers,

the Prime Contractor, or the Designated Prime Contractor, as applicable, may issue a Notice of Unsafe or Harmful Condition or Act to the applicable Employer, stipulating in reasonable detail the basis for the issuance of the Notice of Unsafe or Harmful Condition or Act, and the Contractor, or the Designated Prime Contractor, as applicable, will deliver a copy of the Notice of Unsafe or Harmful Condition or Act to the Ministry Representative.

135.05.02 The terms “Employer” and “Workers” referenced in Subsection 135.05, do not include the Prime Contractor’s or the Designated Prime Contractor’s Subcontractors or Suppliers, or their respective employees, workers, servants, agents or invitees.

135.05.03 Upon receipt of the Notice of Unsafe or Harmful Condition or Act, the Ministry Representative will issue to the applicable Employer a Stop Work Order at the location on the Site, or on the Specified Area, as applicable, that is specified in the Notice of Unsafe or

Page 55: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CONSTRUCTION SITE SAFETY SECTION 135

BC - MOT 2006 135 (5 of 10)

Harmful Condition or Act.

135.05.04 The Ministry will be deemed to have relied on the terms of and reasons for the issuance of the Notice of Unsafe or Harmful Condition or Act, notwithstanding any subsequent investigation or inquiry of the matter by the Ministry, which the Ministry may but will not be obligated to undertake.

135.05.05 If the Prime Contractor, or the Designated Prime Contractor, as applicable, and the Employer referenced in Subsection 135.05.01 fail to agree on the reasons for the issuance of the Notice of Unsafe or Harmful Condition or Act, then within one day of the issuance of the Notice of Unsafe or Harmful Condition or Act, the directive of the Prime Contractor, or the Designated Prime Contractor, to rectify the failure to comply with the Regulation or to act in accordance with the Base Safety Program, as the case may be, will be immediately implemented.

135.05.06 When the failure to comply with the Workers Compensation Act or the Regulation in accordance with the Base Safety Program stipulated in the Notice of Unsafe or Harmful Condition or Act has been rectified by the Employer to whom it was given to the reasonable satisfaction of the Prime Contractor, or the Designated Prime Contractor, as applicable, the Prime Contractor, or the Designated Prime Contractor, as applicable, will immediately:

a) withdraw the Notice of Unsafe or Harmful Condition or Act by endorsing on a copy thereof confirmation that the failure to comply with the Workers Compensation Act or the Regulation in accordance with the Base Safety Program has been rectified.

b) deliver the endorsed copy of the Notice of Unsafe or Harmful Condition or Act confirming the cancellation thereof to the applicable Employer and to the Ministry Representative.

135.05.07 The Ministry Representative will issue an Resume Work Order on receipt of the endorsed copy cancelling the Notice of Unsafe or Harmful Condition or Act.

135.05.08 If the Prime Contractor or the Designated Prime Contractor, as applicable, is delayed in performing the Work as a result of being required to issue the Notice of Unsafe or Harmful Condition or Act and the Work is stopped pursuant to an Stop Work Order under this Article, then the Completion Date will be extended by the number of days equal to the delay, as determined in the sole discretion of the Ministry Representative, and the Prime

Contractor or the Designated Prime Contractor, as applicable, will not be entitled to any compensation, in damages or otherwise, including without limiting the generality of the foregoing, any claim for lost profits or other consequential loss, including business loss, as a result of or in connection with the issuance and operation of any Notice of Unsafe or Harmful Condition or Act or the issuance and operation of any Stop Work Order pursuant to this Section.

135.06 Contractor Obligations to Coordinate with the Designated Prime Contractor - The Specified Area

135.06.01 Notwithstanding the Contractor's agreement to be the Designated Prime Contractor for the Specified Area pursuant to Subsection 135.04.01, the Contractor will continue to undertake and perform the obligations of a Prime Contractor at the Site at all times in accordance with the Workers Compensation Act, the Regulation and this Section.

135.06.02 If another contractor is appointed as the Designated Prime Contractor in connection with the Specified Area pursuant to Subsection 135.04.01, the Contractor will:

a) continue to undertake and perform the obligations of a Prime Contractor at the Site at all times in accordance with the terms of the Workers Compensation Act, the Regulation and this Section.

b) schedule and perform the Work and, in good faith, co-operate with the Designated Prime Contractor so as to comply with any directives that may be issued by the Designated Prime Contractor to coordinate the health and safety activities on the Specified Area.

c) ensure that at all times all Employers, Workers, Subcontractors and Suppliers of the Contractor, and Other Persons comply with the Designated Prime Contractor’s directions on coordinating occupational health and safety activities on the Specified Area.

d) upon the request of the Designated Prime Contractor, deliver occupational health and safety records and documentation to the Designated Prime Contractor as necessary for the Designated Prime Contractor to meet its obligations under the Regulation and under this Section.

e) advise the Designated Prime Contractor in writing and in advance of any work activities to be undertaken in the Specified Area that are likely to create a hazard for Workers of another Employer, and of the work activities.

Page 56: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 135 CONSTRUCTION SITE SAFETY

135 (6 of 10) 2006 BC - MOT

f) on receipt of notification from the Designated Prime Contractor of any unsafe or harmful condition or act by its Workers, Subcontractors, or Suppliers, or the Workers of its Subcontractors or Suppliers, investigate the reported situation and take immediate action to correct the condition or act, and report back to the Designated Prime Contractor, as may be required by the Designated Prime Contractor.

g) upon receipt of a Notice of Unsafe or Harmful Condition or Act from the Designated Prime Contractor and of an Stop Work Order from the Ministry Representative, take all steps to rectify, or cause to be rectified, the failure to comply with the Workers Compensation Act and the Regulation or to act in accordance with the Base Safety Program to the satisfaction of the Designated Prime Contractor.

h) if the Contractor and the Designated Prime Contractor fail to agree on the reasons for the issuance of the Notice of Unsafe or Harmful Condition or Act within 1 (one) day of the issuance of the Notice of Unsafe or Harmful Condition or Act, immediately implement the directive of the Designated Prime Contractor to rectify the failure to comply with the Regulation or to act in accordance with the Base Safety Program, as the case may be.

i) advise the Designated Prime Contractor in writing of the name of the Qualified Person, and of any change in the Qualified Person, designated to be responsible for the Contractor’s health and safety activities on or in connection with the Site, including the Specified Area.

135.06.03 The Ministry will be deemed to have relied on the terms of and reasons for the issuance of the Notice of Unsafe or Harmful Condition or Act notwithstanding any subsequent investigation or inquiry of the matter by the Ministry, which the Ministry may but will not be obligated to undertake.

135.06.04 Notwithstanding any other term of this Section or of the Contract, the Ministry may withhold payment of any progress payment due to the Contractor under the Contract. If the Designated Prime Contractor has issued, in connection with the Site or the Specified Area, as applicable, a Notice of Unsafe or Harmful Condition or Act in accordance with this Section, and the Ministry may continue to withhold payment of such progress payment or payments, as the case may be, until such time as the Notice of Unsafe or Harmful Condition or Act has been cancelled and the Resume Work Order has been issued.

135.07 Contractor’s Health and Safety Records

135.07.01 The Contractor will:

a) establish and maintain at a location on the Site, or at a location off the Site that is satisfactory to the Ministry, accurate records, including supporting documents, relating to the implementation, operation, and maintenance of the Base Safety Program, and to any other occupational health and safety matters relating to the Work.

b) notify the Ministry of the location referred to in Subsection 135.07.01 (a) not later than 5 (five) days after the Commencement Date.

c) permit the Ministry, its servants, employees and agents, at any time or times during normal business hours, to copy or audit, or both, any or all of the records, including supporting documents, referred to Subsection 135.07.01 (a).

135.07.02 The records and documentation referred to in Subsection 135.07.01 (a) include, but are not limited to the following in relation to the Work, the Site and the Specified Area:

a) the Base Safety Program.

b) any and all notices, directives and inspection reports which have been delivered to the Workers’ Compensation Board by the Contractor or which the Contractor has received from the Workers’ Compensation Board.

c) any and all written summaries of the particulars of any and all remedial actions taken by the Contractor to prevent the development or continuance of any risks, unsafe or harmful conditions or acts or hazards and to prevent the recurrence of such events.

d) minutes of and other documentation prepared in connection with or relating to safety meetings held between the Contractor and its Workers demonstrating that all Workers have and are receiving ongoing and adequate direction and instruction in the performance of their duties and the Work is being performed safely and without undue risk, and demonstrating the performance of regular inspections in accordance with and for the purposes stipulated in the Workers Compensation Act and the Regulation.

135.07.03 The delivery of progress payments by the Ministry to the Contractor under the Contract is conditional on the prior submission to the Ministry Representative by the Contractor, on a monthly basis, of a written summary of the documents recorded and collected under Subsection 135.07.02 and, if the Contractor is designated to act as the Designated Prime Contractor, a written summary of the actions taken by the Contractor to

Page 57: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CONSTRUCTION SITE SAFETY SECTION 135

BC - MOT 2006 135 (7 of 10)

coordinate the occupational health and safety activities of the Employers, the Workers, and the Other Persons within the Specified Area.

135.07.04 The Contractor will cause the Qualified Coordinator to obtain and will ensure that the Qualified Coordinator:

a) obtains the records prepared with respect to the Joint Committee meetings held in connection with the Site.

b) distributes such records to the qualified persons, appointed in accordance with the Workers Compensation Act and the Regulation, of other Employers on the Site, and as may be otherwise required by the Workers Compensation Act and the Regulation.

135.07.05 At all times during the Term, the Contractor will deliver to the Ministry Representative a copy of any accident or incident reports prepared by the Contractor in compliance with the Workers Compensation Act and the Regulation, when such reports have been completed.

135.07.06 The Contractor will provide the Ministry Representative with a statistical summary of all health and

safety records applicable to the Site during the Term which summary entitled "Contractor's Accident Statistics Summary Report" attached as in Appendix B to this Section, will provide particulars of the following information:

a) the total number of hours worked by the Workers of the Contractor and the Workers of Subcontractors of the Contractor.

b) the total number of occurrences or events which occurred on the Site that were reportable to or subject to the notification requirements of the Workers Compensation Act or the Regulation.

c) the total number person-days lost due to accidents, injuries or incidents.

d) the total actual cost of damage to equipment and materials due to accidents, injuries, or incidents.

135.07.07 Receipt and retention by the Ministry of the information and documentation listed above in this Section in no way constitutes approval of or authorization of the form, content or adequacy of such information and documentation on the part of the Ministry.

Page 58: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 135 CONSTRUCTION SITE SAFETY

135 (8 of 10) 2006 BC - MOT

APPENDIX “A”

PRIME CONTRACTOR’S NOTICE OF UNSAFE OR HARMFUL CONDITION OR ACT (the “Notice”)

This Notice has been issued by the Prime Contractor to:

Name of Contractor: ______________________________________________________________________

Address: ______________________________________________________________________ The following unsafe or harmful condition or act was observed at the following location and time:

Description of unsafe or harmful condition or act: ________________________________________________

________________________________________________________________________________________

Location: ____________________________ Date: ______________________ Time: ____________ AM/PM The Contractor named in this Notice is required to correct the above referenced unsafe or harmful condition or act prior to performing any more work activity at the location identified above. Prime Contractor: ______________________________________________________________________ Signature: _______________________________ Date: _________________ Time: ___________ AM/PM Receipt acknowledged by the Contractor:

Signature: _______________________________ Date: _________________ Time:____________ AM/PM The Ministry Representative received a copy of this Notice on: Date: ___________ Time: _______ AM/PM On the basis of this Notice, the Ministry Representative will issue an “Stop Work Order” in connection with the unsafe or harmful condition or act as identified on this Notice. The Prime Contractor will, if satisfied that the unsafe or harmful condition or act has been rectified cancel and withdraw this Notice. Date of cancellation/withdrawal: _______________________ Time: _____________ AM/PM

Prime Contractor - Signature: _____________________________________________________________ The Ministry Representative will issue an “Resume Work Order” when in receipt from the Prime Contractor of this Notice endorsed to indicate that the unsafe or harmful condition or act has be rectified. DISTRIBUTION: Original: Contractor Copy: Ministry Representative File Copy: Prime Contractor

Page 59: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CONSTRUCTION SITE SAFETY SECTION 135

BC - MOT 2006 135 (9 of 10)

APPENDIX “B”

Page 60: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 61: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 145 (1 of 16)

SECTION 145

GENERAL REQUIREMENTS FOR HIGHWAY, BRIDGE AND MARINE CONSTRUCTION

145.01 General Requirements - This Section covers the general Work requirements for highway, bridge, and marine construction.

The standards and materials specifications contained in the Standard Specifications for Highway Construction govern the specific requirements for the Work. Special Provisions provide additional specific requirements for the Work and supersede the Standard Specifications where there is conflict.

Specifications, standards, regulations and codes of other authorities named in full or by acknowledged abbreviations in the Glossary of Terms of the Standard Specifications or the Contract Document Package shall be adopted by reference.

Such reference in whole or in part by the necessary alphanumerical designation from the latest edition or revision is intended to fully detail the requirements of the Work.

145.02 Reference Information - Reference information for the Work identified in the Contract is made available for the Contractor to use for its own purpose. The Contractor shall be solely responsible for any interpretation placed thereon and for all impacts resulting from such interpretation.

145.03 Value Engineering Proposals - The Ministry wishes to encourage the development of value engineering proposals (VEP's) during the Term of the Contract. The Ministry will provide a process, as outlined in Section 125 to encourage the introduction, consideration, and possible implementation of VEP's. The Contractor may submit any number of VEP's during the Term.

The Ministry will be the sole judge of the acceptability of a VEP and of the cost savings, which will be realized by the Ministry due to the implementation of the VEP. The decision of the Ministry will be final.

The Ministry will not be liable to the Contractor for the Ministry's failure to accept or implement a VEP submitted by the Contractor nor for any delays to the Work that may be attributable to the VEP. A VEP or Summary VEP cannot, under any circumstances, be the basis for a claim by the Contractor.

145.04 Scope of Work - The scope of Work is described in the Special Provisions. No warranty is given or implied that any or all of this Work will be required or supplied.

145.05 Quantities and Dimensions - Quantities, dimensions, lines and elevations as shown on the plans and

Drawings are designed neat lines. Approximate quantities entered in Schedule 7 - Approximate Quantities and Unit Prices are quantities approximated using the lines and dimensions shown in the Contract Document Package and other relevant factors, and may vary from quantities derived from the Drawings. Actual payment quantities will be measured, calculated, or otherwise determined in accordance with the Contract.

145.06 Unit Prices – Unit Prices in the Schedule of Approximate Quantities and Unit Prices shall be complete and contain all the elements of cost involved, provision of all things, superintendence and profits. The price shall stand independent of any other Unit Price Item on the Schedule of Approximate Quantities and Unit Prices.

145.07 Pre-construction Meeting - The Ministry Representative will determine the pre-construction meeting's location and time and notify the Contractor.

145.08 Mobilization - Mobilization consists of the necessary Work and operations including, but not limited to, the movement of personnel, equipment, supplies, and incidentals to the Site, the establishment of offices, camps, and other facilities necessary to undertake the Work and all other Work Items and operations which must be initiated and finished as part of completion of the Work.

145.08.01 Payment for Mobilization – Where the Contract includes a payment Item for mobilization, the Lump Sum Price for mobilization includes any or all of the related expenses incurred for mobilization, demobilization and any re-mobilization not covered under the Work Items which must be initiated and finished as part of the Work. The Lump Sum Price for mobilization will be paid in increments as the Work progresses.

If the Contract does not contain a payment Item for “Mobilization”, all costs associated with mobilization, demobilization and re-mobilization will be included in payment for Items having such costs.

Payment for mobilization, if applicable, will be made at the tendered Lump Sum Price as follows:

a) The Contractor will be paid any portion of the mobilization Lump Sum Price exceeding five percent (5%) of the Tender Price within sixty (60) days after the Actual Completion Date or on the final progress estimate (whichever occurs first).

b) That portion of the mobilization Lump Sum Price not exceeding five percent (5%) of the total Tender Price, will be paid to the Contractor according to the following

Page 62: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 145 GENERAL REQUIREMENTS FOR HIGHWAY, BRIDGE AND MARINE CONSTRUCTION

(2 of 16) 2000 BC - MOT

breakdown:

i) Seventy-five percent (75%) when the Contractor has submitted, in an acceptable form, to the Ministry Representative each of the following that is required under the Contract

• Construction Schedule, • Cash Flow Projection Schedule, • Traffic Management Plan, • Quality Control Plan, • Sediment and Drainage Management Plan,

and the value of the Work completed on bid Items other than mobilization exceeds two percent (2%) of the Tender Price.

ii) The remaining twenty-five percent (25%) of this portion of the mobilization Lump Sum Price will be paid prorated on a monthly basis for the percentage of Work completed as determined by the Ministry Representative when the Ministry Representative receives acceptable construction schedule updates, all quality control reports have been submitted by the Contractor as required by the Ministry, all equipment has been removed from the Site, and the Site has been cleaned up to the satisfaction of the Ministry Representative.

The payments from the Lump Sum Price, as set out above, will be full compensation for mobilization, demobilization and re-mobilization, regardless of the number of times the Contractor mobilizes.

145.09 Authority of the Ministry Representative - The Ministry Representative has the authority to accept or reject the Contractor’s Work in accordance with the conditions set out in the Contract. Until the Work meets the requirements of the Contract and has been accepted by the Ministry Representative, the Ministry is not obligated to make payment for Work done by the Contractor. The Ministry Representative shall take all necessary measurements and calculations to determine the final quantities for final payment.

145.10 Power, Telegraph, Telephone Lines and Other Utilities - Moving of existing power, telegraph and telephone lines, poles and other utilities from their current to their final design locations, unless specified as being part of the Work, shall be performed by third parties at the Ministry's expense.

If the Contractor's operations require the temporary removal or relocation of lines or poles, such removal or relocation shall be entirely the responsibility of the Contractor and costs of any interim utility relocations shall be to the

Contractor’s account. Utility owner(s) must be contacted prior to doing any utility work.

The Contractor shall be responsible for any damage to poles, lines or utilities caused by the Contractor's construction operations, and shall repair and make good the same or bear the expense of making good and repairing the same.

The Contractor shall take the necessary precautions to protect existing utility services during the performance of the Work and shall be responsible for any losses or damages caused by the Contractor.

Locations of the utilities shown on the Drawings are approximate and may not be complete. The Contractor shall be responsible to ensure the locations of the utilities are complete and shall notify the Ministry Representative of any discrepancies between the Drawings and the Contractor’s findings.

145.11 Permits - The Contractor shall give all requisite notices in connection with the Work to the proper authorities and shall procure at the Contractor's expense all permits, licences, etc., of every description necessary for the construction and completion of the Work.

The Contractor shall deliver or make available all original certificates to the Ministry Representative for all or any part of the Work for which such certificates may be required in connection with performing the Work.

145.12 Inspection of Work - All materials and each part or detail of the Work shall be subject to inspection by the Ministry Representative.

The Contractor shall be held strictly to the true intent of the Contract in regard to quality of materials, work practice and the diligent execution of the Contract.

The Ministry Representative shall be given access to all or any part of the Work, and to the preparation, fabrication or manufacture of the materials to be used. The Contractor shall furnish all information and assistance as is required to make a complete, true and detailed inspection.

The Ministry Representative may reject any part or parts of the Work which do not comply with the requirements of the Contract. The Ministry Representative's decision will be accepted as final.

Inspection may extend to all or any part of the Work and to the preparation, fabrication or manufacture of the materials to be used. The Ministry Representative may station others on the Site to report on the progress of the Work and the manner in which it is being performed.

Page 63: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GENERAL REQUIREMENTS FOR HIGHWAY, SECTION 145 BRIDGE, AND MARINE CONSTRUCTION

BC - MOT 2006 145 (3 of 16)

The Ministry Representative will report to the Contractor on materials furnished or Work performed that fails to fulfill the requirements of the Contract.

Inspection or its lack shall not relieve the Contractor from any obligations to furnish acceptable materials or to provide completed construction Work that complies with the Contract.

The Contractor shall furnish for the approval of the Ministry Representative, at proper times, all shop and installation drawings as requested by the Contract or which the Ministry Representative may deem necessary.

In accepting Drawings submitted by the Contractor, the Ministry Representative will assume no responsibility as to the correctness of such Drawings and the Ministry Representative's examination is only to ensure general compliance with the Contract.

145.13 “Ministry Representative's Instruction" and "Contractor's Declaration"

145.13.01 “Ministry Representative's Instruction" - "Ministry Representative's Instruction" form (H0202) will be issued by the Ministry Representative to the Contractor in order to:

a) describe a portion of the Work which may not be covered specifically in the Contract.

b) confirm instructions which may affect the method of carrying out the Work or payment.

c) confirm verbal agreements made with the Contractor's representative.

d) respond to the Contractor's representation on "Contractor's Declaration" form (H0203).

145.13.02 "Contractor's Declaration" - The Contractor is to issue the "Contractor's Declaration" form (H0203) to the Ministry Representative in order to:

a) make a declaration of acceptance or objection to contents of the "Ministry Representative's Instruction".

b) formally present the Contractor’s opinions, problems or requirements for clarification.

145.14 Protection and Restoration of the Work - The Contractor shall protect all Work and surrounding infrastructure from injury or damage until the issuance of the Completion Certificate.

If the Contractor fails to prevent any injury or damage to the Work, the Contractor shall rebuild, repair, and restore at its expense any portion of the Work so injured or damaged.

The Ministry may reimburse the Contractor for any injury or damage caused by an event not foreseen and not reasonably foreseeable by the Contractor and beyond the control and not resulting from any fault or negligence of the Contractor including but not restricted to acts of God, acts of a Public Enemy, acts of the Ministry, extraordinary action of the elements and unavoidable slides.

145.15 Materials Supplied by the Contractor - The Contractor shall provide all materials necessary for the orderly completion of the Work with the exception of the materials supplied by the Ministry as listed in the Special Provisions.

Material supplied by the Contractor shall not have been previously used and shall be in new condition.

All materials incorporated into the Work shall conform to the requirements of the Contract unless previously approved otherwise by the Ministry Representative.

Materials supplied by the Contractor must be approved prior to incorporation in the work.

145.15.01 Inspection of Materials - The Contractor must provide manufacturer certification or milling slips for the Ministry's use, and allow 2 weeks for the Ministry Representative to test the materials. Such certificates or mill slips must demonstrate the material properties of the specific batch of materials provided to the Project and must demonstrate that the material complies with the requirements of the Contract.

The Ministry may also perform random inspection of the materials.

The Contractor shall notify the Ministry Representative of the sources of materials supplied by the Contractor, and such notification shall be given sufficiently far in advance of delivery to enable the Ministry Representative to make inspection of the material at the source. Insufficient notice will be cause for the Ministry to reject the materials without compensation.

The Contractor will be charged for all travel time, board and lodging costs incurred by the Ministry or its designate, required to inspect materials components if the source of the material is outside the Province and incorporated into the Work.

The Ministry will offset any costs for inspecting the materials from any payments made to the Contractor.

Page 64: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 145 GENERAL REQUIREMENTS FOR HIGHWAY, BRIDGE AND MARINE CONSTRUCTION

(4 of 16) 2000 BC - MOT

145.15.02 Samples and Testing - The Contractor shall, as required, submit to the Ministry Representative, for approval, samples of the materials proposed for use in the work. The approval or acceptance of samples of material shall not preclude the rejection of any material upon discovery of defects or weaknesses previous to acceptance of the complete work.

Any testing done on samples of materials provided to the Ministry Representative will be performed at the Ministry's expense, except where such testing establishes that the material does not comply with the Contract. In such cases, the Ministry may offset the cost of testing from any payments due the Contractor.

145.15.03 Alternative Materials - Brands, species and manufacturer's names specified are approved for use in the performance of the Work. No alternative materials will be considered unless approved in advance by the Ministry Representative in writing.

Savings as a result of using alternate materials will be evaluated using Section 125 Value Engineering.

145.16 Materials Supplied by the Ministry - Ministry supplied materials will be arranged by purchase orders for delivery by the Purchasing Commission on instructions from the Contractor notifying the Ministry Representative.

Separate purchase orders will be issued for each class of material.

Materials ordered for a specific Site shall not be transferred to any other Site without the written consent of the Ministry Representative.

Ministry supplied and owned materials will be used only for Ministry Work. Further requirements for asphalt materials supplied by the Ministry are contained in Sections 501 and 951.

145.16.01 Delivery Points - Each purchase order will specify points of delivery. The Contractor shall be responsible for all costs that may arise such as unloading from truck or rail car, hauling to the Site, stockpiling, dunnage, and reloading.

The costs to transport all materials to the Site will be incurred by the Contractor at its own cost and will be considered incidental and no separate payment will be made for this portion of the Works.

Should the Contractor request delivery be made to an alternative point other than the nearest specified point of delivery or in any manner of delivery other than specified by

the Purchasing Commission, the additional cost for this delivery shall be charged to the Contractor's account.

145.16.02 Delivery of Materials – When the Ministry Representative advises the Contractor of the name of the supplier(s), the Contractor shall be responsible for:

a) determining requirements and ordering far enough in advance that work is not delayed.

b) acceptance of all materials; careful unloading and handling; hauling and delivery from delivery point to job site; storage and security; prompt turn around of tank or shipping cars, trucks or delivery containers.

c) prompt payment of all demurrage or rental charges on cars, (except as provided in Section 501) freight, handling, delivery, storage or any other charges arising after the initial receipt of material at the delivery point.

d) ensuring that proper accounting is kept of all materials received.

The Contractor will obtain approval from the Ministry Representative prior to removing any materials from a Ministry storage site.

The Contractor shall not during normal working hours unload or take delivery of any material unless the Ministry Representative is present.

Where the Contractor takes delivery of materials during non-working hours, the Contractor shall immediately notify the Ministry Representative at the beginning of the next shift and allow sufficient time for the Ministry Representative to check quantity and quality before any materials are used.

After taking delivery of any materials supplied to the Contractor by the Ministry under the Contract, the Contractor shall be solely responsible for same and shall make good at the Contractor’s expense any loss of or damage to such materials.

The Contractor will provide a secure yard or storage area for materials supplied by the Ministry. The Contractor will replace at its own cost any material, which cannot be accounted for in the storage yard inventory.

If asphalt materials are hauled directly from the delivery point for immediate application to the roadway, the material will be measured by mass or volumetrically by the Ministry Representative at the time of delivery. The Contractor shall ensure that an acceptable means of measurement is available.

Page 65: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GENERAL REQUIREMENTS FOR HIGHWAY, SECTION 145 BRIDGE, AND MARINE CONSTRUCTION

BC - MOT 2006 145 (5 of 16)

145.16.03 Distribution of Materials - To control distribution of Ministry supplied materials (except asphalt materials as provided in Sections 501 and 951) and to facilitate accounting:

a) the Contractor shall arrange for delivery of the materials only after applying for and receiving authority to do so on "Authority to Arrange for Delivery of Construction Materials" form (H0313). The requirements of the Contractor shall be indicated on Part "A" of the form. Approval from the Ministry Representative shall be indicated on Part "B" of the form. The Contractor may then arrange for delivery from the supplier. As delivery will be made only on receipt of the purchase order number and the serial number of the “Authority” form, the Contractor shall arrange with the Ministry Representative to immediately distribute appropriate copies of the "Authority" form.

Material suppliers will be required to notify both the Ministry Representative and the Contractor when materials are shipped, giving sufficient information to identify each and every shipment against an appropriate “Authority” form serial number and purchase order number.

b) The use of “Authority” form shall not in any way relieve the Contractor of any responsibility imposed under Subsection 145.16.02.

c) If the Ministry Representative refuses to authorize the delivery of materials to the job, the Ministry Representative will send the refusal, with reasons in writing, to the Contractor.

d) The Ministry may, at the completion of the Work, if materials are delivered in excess of job requirements through conditions beyond the control of the Contractor, take over the surplus material or grant the Contractor the option of purchasing the material on Site. The transaction will be completed only after the Contractor obtains for the Ministry Representative, a supplier's credit note for the total cost to the Ministry of the excess material purchased f.o.b. at the delivery point.

Upon completion of the Work, the Contractor will deliver all unused materials, which have been purchased by the Ministry, to a location as specified by the Ministry Representative. No payment will be made for this portion of the Work.

145.17 Operation of Pavement Brooms on Highway - No mechanical pavement broom shall be operated on any highway without a rotating amber flashing light in operation. The light shall be mounted on self-propelled brooms and

upon the towing vehicle of trailer type brooms.

Traffic Control is to be in accordance with the Traffic Control Manual for Work on Roadways. In addition, on extremely winding narrow roads an additional shadow vehicle shall be used ahead of the broom with a C-37 on the front of the vehicle and a flashing arrow in bar mode.

145.18 Supply and Maintain Facilities

145.18.01 Working Office - When required under Special Provisions, the Contractor shall provide a suitable working office with lock-up for the sole use of the Ministry. The office shall meet the requirements of Appendix A and be weatherproof, reasonably soundproof, and have ample window area and ventilation. Location of the office shall be determined by the Ministry Representative.

The Contractor shall regularly collect refuse and keep the office clean and properly maintained with heat and light. .

The office and contents shall be for the use of the Ministry for the duration of the Work and may if necessary be used concurrently with the other inspection agencies.

The Contractor shall supply a private telephone line for the sole use of the Ministry Representative. Ministry’s long distance calls will be paid for by the Ministry.

Payment for the Ministry’s Site Office (when requested) will be made at the Lump Sum price in the Contract.

Payment will include the provision of the office, furnishings, maintenance through out the Term, and removal in its entirety.

Payment of 50% of the Lump Sum will be made when the office is ready for occupancy and the remaining 50% after the office has been removed and the Site cleaned up to the satisfaction of the Ministry Representative.

145.18.02 Testing Facility – When required by the Special Provisions, the Contractor shall provide the Ministry with a material testing facility with a minimum of 12 m2 floor space either in the form of a small trailer or the portion of a large trailer. The testing facility shall include power, light, heat, ventilation, plus basic furniture to permit testing and preparation of test records. The facility shall be stable, reasonably quiet and lockable.

Payment for the Ministry’s Material Testing facility (when required) will be made at the Lump Sum price in the Contract.

Payment will include the provision of the facility,

Page 66: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 145 GENERAL REQUIREMENTS FOR HIGHWAY, BRIDGE AND MARINE CONSTRUCTION

(6 of 16) 2000 BC - MOT

furnishings, maintenance through out the Term, and removal in its entirety.

Payment of 50% of the Lump Sum will be made when the facility is ready for occupancy and the remaining 50% after it has been removed and the Site cleaned up to the satisfaction of the Ministry Representative.

145.18.03 Service for Ministry Facilities – Where the Ministry provides its own facilities on Site, the Contractor shall, for the duration of the Contract, provide light and heat and any other services requested by the Ministry Representative for same, and the Contractor will be compensated on a Force Account Basis.

145.18.04 Weigh Scale - The Contractor shall provide a truck weigh scale wherever measurement of materials by mass is required.

The weigh scale shall be an approved electronic weigh scale or platform type with remote balancing beam. The scale shall be of sufficient size and capacity to weigh, at a single pass, the largest, rigid-framed haulage vehicle to be used on the job and in any case shall be of not less than 13 t (tonne) capacity. The scale shall be capable of weighing all loads to within 20 kg of the true mass.

At the start of the Work, and as frequently as the Ministry Representative may deem necessary in order to ensure the accuracy, the scale shall be calibrated and checked at the Contractor's expense by an Inspector of Weights and Measures.

The remote balancing beam shall be enclosed in a sound, watertight, dust-free scale house, properly ventilated and insulated. Adequate heating must be provided when the shade temperature is below 16oC.

The scale house shall be provided with full length windows facing the scale platform, and windows shall also be provided at either end, so that both the Contractor's scaleperson and the Ministry Representative's scale checker can at all times see vehicles to be weighed, not only on the scale but also approaching and leaving.

The front window shall be sufficiently large and low that the whole scale platform is readily visible to the Ministry Representative's checker. Immediately behind the balancing beam, a bench or table of sufficient length shall be provided to permit both scaleperson and checker to sit abreast in a position in which they can both write on the table and view the electronic scale or weigh beam and scale platform. Drawing SP145-01 shows these requirements.

The Contractor shall supply and maintain, at no additional

expense to the Ministry, portable washroom facilities at the weigh scale site.

Payment for the weigh scale and ancillary facilities shall be incidental to the Unit Prices of the materials being weighed.

145.19 Weighing Materials - The Contractor shall supply, at no additional expense to the Ministry, a qualified scaleperson to carry out the necessary weighing which will be monitored by the Ministry Representative’s scaleperson.

A weighing certificate prepared in triplicate, certified by the Ministry Representative’s scaleperson, will be issued for each load. The required certificate will be supplied by the Ministry. The Contractor will be paid only for such material as has been acknowledged by the Ministry Representative’s checker as having been received at the point of delivery designated by the Ministry Representative.

The delivery receipts will bear the signature, initials or other approved marking of the issuing Ministry Representative’s scaleperson and receiving checker.

If the Contractor has an automated scale and the following conditions are being met, the Contractor shall not be required to supply a scaleperson:

a) All weighed material is being delivered to a single Ministry job site. If the Contractor is delivering to two or more Ministry job sites at the same time, the Contractor shall supply a scaleperson as detailed in the first paragraph.

b) Truck operators do not require instruction.

c) There are no overloads, tarp covering, spillage difficulties, or any safety problems.

d) The scale platform is maintained by the Contractor to be clean and free from loose material at all times.

Should any of the above four conditions not be met, the Contractor shall provide a qualified scaleperson upon the instruction of the Ministry Representative.

In the event the Ministry Representative determines a scaleperson is not required, all weighed vehicles must be tared by both the Ministry Representative and the Contractor together once a day. In the event that any of the above conditions are not being met, at any time during the Term, in the opinion of the Ministry Representative, then the Contractor shall supply a scaleperson as detailed in the first paragraph.

145.20 Weather - No work shall be undertaken by the

Page 67: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GENERAL REQUIREMENTS FOR HIGHWAY, SECTION 145 BRIDGE, AND MARINE CONSTRUCTION

BC - MOT 2006 145 (7 of 16)

Contractor when, in the opinion of the Ministry Representative, the weather is unsuitable or unfavourable for that particular class of work. The Contractor shall not be entitled to make any claim for damages due to such delay.

145.21 Layout of Work and Calculation of Quantities- A number of key reference points of control line (primary) for the establishment of the design control line will be provided by the Ministry to enable the Contractor to lay out the Work. The Contractor shall assume full responsibility for the alignment, dimensions and elevations of each and every part of the work and their mutual agreement.

145.21.01 Ministry Responsibilities - The Ministry will survey the original ground line, and any subsequent material horizons, for determination of appropriate pay item quantities.

Where the Ministry has a pre-existing survey of the Site, the Ministry may use that survey as the original ground. If the Ministry elects to use such a survey, the Ministry Representative will notify the Contractor of such intent and give the Contractor an opportunity to view the cross-sections, contours, or Digital Terrain Model. Any areas of the survey or model that do not adequately reflect the Site at the start of construction will be identified by the Contractor or the Ministry and will be resurveyed by the Ministry prior to the Contractor starting work in any affected area of the Site.

Unless otherwise specified in the Contract, calculation of quantities will be on a neat line basis, as calculated from the design lines shown on the Drawings, adjusted to incorporate design changes and field-fits authorized by the Ministry Representative. Any material placed or excavated beyond the design lines is considered Unauthorized Work.

For items such as Type D excavation where the upper boundary of a cut cannot be determined until the completion of stripping, the design line will be revised to reflect the actual bottom of stripping line as determined by the Ministry's survey.

Quantities calculated from digital terrain models will be done using average-end-areas based on cross-sections extracted from the model or, at the Ministry Representative’s option, by using prismoidal volumes between surfaces in the model.

Where agreeable with the Contractor, alternate methods of determining payment quantities may be employed.

The Contractor may be required to adjust its construction activities from time to time to allow the Ministry's measurement work to proceed unencumbered. The

Contractor shall not proceed with the next stage of any construction until the Ministry has completed measurements of the previous work.

Quality Assurance and checking of layout may be performed by the Ministry Representative.

145.21.02 Contractor's Responsibilities - The Contractor shall perform all layout of the work and all other survey work required to execute the Contract and construct the works in accordance with the Contract.

The Contractor shall be responsible for establishing all secondary control points and/or lines, all slope stakes, the establishment of line and grades for subgrade and the various granular aggregate layers, layout by line and grade of all structures, culverts, and underground utilities, and shall perform all other layout and measurement necessary for the proper execution of the Contract.

The staking of all works shall be of a sufficient accuracy and frequency for the Ministry to carry out its quantity measurements and quality assurance program.

On request of the Ministry Representative, the Contractor shall submit documentation to verify the accuracy of the layout work.

The Contractor shall be satisfied, before commencing any Work, as to the meaning, intent and accuracy of any control points, control lines and benchmarks established by the Ministry.

Should the Contractor discover or suspect any errors in any control points, control lines, benchmarks, and data provided by the Ministry, the Contractor shall at once discontinue the affected work until such errors are investigated by the Ministry Representative and, if necessary, rectified.

No separate payment will be made for layout work and the cost thereof will be considered incidental to the various items of work to be performed in the Contract.

The Work shall be so laid out and constructed that the location of substructure elements and anchor bolt groups shall not differ from the true positions by more than the following amounts:

a) Substructure elements - 12 mm

b) Anchor bolt groups - 6 mm.

c) The elevation of bridge seats shall not differ from true elevations by more than 3 mm.

Page 68: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 145 GENERAL REQUIREMENTS FOR HIGHWAY, BRIDGE AND MARINE CONSTRUCTION

(8 of 16) 2000 BC - MOT

Any deviation beyond the above mentioned tolerances shall be satisfactorily corrected by the Contractor at the Contractor's expense.

145.22 Access to Site - The Contractor shall provide access to the Site as may be necessary. No separate payment will be made for the provision of any access roads or incidental works in connection therewith.

The Contractor shall make arrangements with the property owners adjacent to and around the terminal site for the use of access and for the use of any storage areas the Contractor may require. The Contractor shall acquire such access and storage rights at the Contractor’s expense.

In the event of roads being temporarily closed to the travelling public, the Contractor shall, at the Contractor's expense, provide, erect and maintain all requisite barriers, fences or other proper protection and must provide, keep and maintain such patrollers, lights and danger signals as may be necessary, or as may be required by the Ministry Representative to ensure safety to the public and to the workers.

The Contractor, during the Contractor's operations, must also provide and maintain reasonable road access and egress to property fronting along or in the vicinity of the work under contract, unless other means of road access exists. The Ministry Representative will be the sole judge as to what may be deemed reasonable road access.

145.23 Accommodation of Traffic - The Contractor shall cause as little inconvenience as possible to the travelling public during the Contractor's operations and shall erect and maintain proper and adequate barricades, traffic signs, lights and other traffic control devices as may be considered necessary, in the opinion of the Ministry Representative, for the safety of both workers and public traffic.

All barricades, traffic signs, lights and other control devices shall be provided at the Contractor's expense, and shall be erected in accordance with, and otherwise conform to the standards as set out in the Ministry's "Traffic Control Manual for Work on Roadways", Special Provisions and Standard Specifications.

145.23.01 Maintenance of Traffic - The Contractor shall comply with the requirements of the Highways Act and amendments thereto and such other Acts, By-Laws or Regulations as are in force for the governing and regulating of traffic or use of any road upon or over which it is necessary to do work or transport materials. The Contractor must arrange to keep roads open to traffic at all times and must cause as little inconvenience as possible to the travelling public.

145.23.02 Road Closure Notification - Road closures shall not be permitted until the Contractor requests and receives written permission from the appropriate authority in the Ministry. This request shall be submitted in writing not less than seven days in advance of the closure.

Upon receiving written permission for closure, the Contractor shall notify the local police, fire, ambulance, municipality, school board, and public transit at least 72 hours in advance of the closure.

The Contractor shall notify the public by local radio and newspaper at least 24 hours in advance of the closure.

All costs related to the above shall be for the Contractor’s account.

145.24 Alterations to Drawings and Plans - It shall be understood that the Drawings and Plans represent the nature and general layout of the work to be executed and not necessarily the works exactly as they will be carried out. The Ministry Representative will, without invalidating the Contract, be at liberty to make any reasonable alteration or to furnish any additional or amended Drawings which do not radically change the type of construction.

Payment for any such altered Work will be at the rates set forth in the Schedule 7 Approximate Quantities and Unit Prices.

145.24.01 Adherence to Drawings - The various parts of the Work shall be built in strict accordance with the furnished Drawings and with any supplementary Drawings which may be furnished during the progress of the Work as occasion requires.

Special Provisions, special specifications, Standard Specifications and the Drawings/Plans are to be considered as explanatory of each other, but should anything appear in one that is not described in the other, or should any discrepancy appear, no advantage shall be taken of such omission or discrepancy and the decision of the Ministry Representative as to the true intent and meaning of the Special Provisions, special specifications, Standard Specifications and the Drawings in such instances shall be final and binding, it being clearly understood that the Contractor is to execute all the works requisite for the perfect completion of each and all of the several parts of the Work according to the true intent and meaning of the Contract.

On all Drawings, in case of any discrepancy between the figured dimensions and the scaled dimensions, the figured dimensions shall govern.

Page 69: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GENERAL REQUIREMENTS FOR HIGHWAY, SECTION 145 BRIDGE, AND MARINE CONSTRUCTION

BC - MOT 2006 145 (9 of 16)

145.25 Use of Explosives - In using explosives the Contractor shall exercise the utmost care so as not to endanger life or property and, whenever directed, the number and size of the charges shall be reduced. Before doing any blasting the Contractor shall ascertain if there are in the neighbourhood any railway, power or other lines, water or other pipes, etc., which are likely to be in danger of being damaged. The Contractor shall give to the owner of such lines, pipes or other works timely notice of the intention to blast.

Whenever possible electric batteries shall be employed for simultaneous blasting.

The storage of explosives shall be in accordance with the regulations of the Canada Explosives Act and with any requirements of the representative of the Explosives Regulatory Division within the Mineral Technology Branch of the Minerals and Metals Sector of the Federal Department of the Natural Resources Canada.

145.26 Work in Ministry Pits or Quarries - When operating in a Ministry pit or quarry where the Ministry retains the role of Pit Manager, the Contractor shall comply with all provisions of the Mines Act, the Health, Safety and Reclamation Code for Mines in British Columbia, and/or the WCB Occupational Health & Safety Regulation, as applicable to the work undertaken.

The Contractor shall appoint a properly qualified supervisor or shift boss in any Ministry pit or quarry where work is undertaken, in compliance with Section 26 of the Mines Act, and ensure that the supervisor or shift boss is duly qualified certified in accordance with Section 1.13 of the Health, Safety and Reclamation Code for Mines in British Columbia.

When the Contractor is operating in a Ministry pit or quarry, the Contractor shall utilize the pit or quarry in accordance with the Ministry Pit Development Plan or obtain written approval from the Ministry Project Manager prior to deviating from the plan.

When investigating private aggregate sources, the Contractor shall ensure that all permits are in place allowing the Contractor to purchase and remove the aggregate from the property of the Owner.

Availability and use of the listed reserves or any other private aggregate source must be arranged by the Contractor. Prior to the removal of any aggregate material from an aggregate source, the Contractor shall provide a written notice from the owner authorizing the Contractor to remove aggregate material for use in the work.

Ministry pits or quarries may be used without charge, provided they are utilized, worked and maintained in accordance with the Standard Specifications and the Ministry’s development plans. Prior to the removal of any aggregate material, the Contractor shall obtain written approval from the local District Manager Transportation. No warranty is given or implied that the source of aggregate material from the Ministry pits or quarries will meet requirements or requisite quantities.

The Contractor shall contact the Road and Bridge Maintenance Contractor a minimum of two (2) weeks before the date the Contractor anticipates the use of any Ministry pits or quarries.

The Contractor and the Road and Bridge Maintenance Contractor shall co-ordinate their activities and schedule usage of the pit among themselves and any other affected parties.

The following listed Variances to the Health, Safety and Reclamation code for Mines in British Columbia will apply only to pits and quarry operations which fall under Ministry ownership.

The Chief Inspector of Mines has provided the following clarifications to the Ministry in a letter dated August 9, 1999:

Application for Continuation of Variance to Mine Code Section 1.5.1 - Hours of Employment

“Pursuant to section 13 of the Mines Act, R.S.B.C. 1996. c293, the assigned Ministry of Transportation (MoT) Pit Manager may permit the employment of persons in a sand and gravel pit or quarry (Mine) for up to 12 hours in a 24 hour period.

This variance applies only to pits managed by the MoT (Ministry of Transportation).

The Pit Manager shall communicate this variance to all affected workers, whether employees of the Ministry of Transportation, its contractors or sub-contractors.

This variance is subject to review within five years as provided by section 13(4) of the Mines Act.

A copy of this variance is available to any MoT regional or district Occupational Health and Safety Committees which may be involved in sand and gravel pit or quarry operations.”

Section 4.9.1 – Health, Safety and Reclamation Code for Mines in British Columbia (Code)

“Due to the short period of time that some haul trucks

Page 70: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 145 GENERAL REQUIREMENTS FOR HIGHWAY, BRIDGE AND MARINE CONSTRUCTION

(10 of 16) 2000 BC - MOT

spend at your various pits and quarries, i.e. for loading purposes only, I am hereby enabling a Health and Safety Inspector of the Mines Branch to vary the requirement for automatic back-up alarms on transient haul trucks at the discretion of the Inspector. If, in the opinion of the Inspector, the time spent by the truck at the pit or quarry is of short duration, and the required routing of the truck for loading purposes is such that no hazards are created by such a routing, then an automatic back-up alarm need not be required and the use of any audio warning device will be accepted while in reverse.”

“You are reminded that the above refers only to transient haul trucks and not to trucks used for production purposes; neither does it apply to any other vehicle in excess of 7,000 kg gross vehicle weight.”

Section 4.9.5 - Health, Safety and Reclamation Code for Mines in British Columbia (Code)

As a haul truck driver’s visibility of the area surrounding the truck tends to improve as the size of the truck decreases, I am prepared to allow a variance to the above section of the Code as follows:

“Provided that any haul truck used for production purposes at a gravel pit or quarry does not exceed 45 tonnes gross vehicle weight, there will be no requirement for the attachment of a whip antenna fitted with a flag and lamp, or a flashing light mounted on the cab of non-production vehicles.”

145.26.01 Available Ministry Sources - The Contractor, by entering an available source, will be deemed to have accepted all obligations, risks and costs for the production of aggregate meeting the contract requirements, just as if the pit or quarry was private. No warranty is given that the source will meet the quality and quantity requirements. The Contractor, without any additional compensation, shall provide whatever selection, screening, crushing, mixing, blending or other processing of any kind may be required to produce aggregate meeting all requirements for its intended use, including but not limited to:

• specified aggregate gradation, • fracture count, • aggregate quality requirements such as but not limited

to those set out in Subsection 202.04 and Table 501-D of Section 501 as applicable, and

• the specified properties of any products into which the aggregate is to be incorporated.

The Contractor shall comply with the Ministry pit development plan and the Ministry Representative’s directions regarding the location of material extraction within the pit by the Contractor.

The Contractor’s use of Ministry pits is limited to the extraction of previously unexcavated material from the bank, for the supply of materials for use on this Contract.

The Ministry’s Road and Bridge Maintenance Contractor has certain rights and obligations with respect to some Ministry pits, and the Contractor shall coordinate its activities with those of that contractor, where applicable, and with any other users, to the satisfaction of the Ministry Representative and the Ministry’s District Manager, Transportation.

Except where specifically stated otherwise in the Special Provisions, no separate payment will be made for clearing, grubbing, disposal or relocation of stockpiles, debris or contaminated materials, or for any other costs of site preparation, pit development, or access, or for any delay or other cost arising from the use of Ministry pits by others, and all costs thereof shall be covered in the prices for the Items under which payment is provided for the applicable materials.

145.27 Highway Right-of-Way - The Contractor shall confine its operations to the highway right-of-way and Licences to Construct as shown on the Ministry’s Drawings. Any land, property or water lot outside these boundaries required for construction yards, access roads, disposal or storage areas, or other operations of the Contractor, shall be acquired by the Contractor at no additional expense to the Ministry. The Contractor shall make arrangements for the use and compensation of such land with the titled land owner.

Work within the Site shall be confined to that necessary to construct the Project to the lines and grades specified. Excavation outside the design lines and grades to extract aggregates or for other purposes is prohibited unless authorized in advance by the Ministry Representative.

145.27.02 Disposal Site Outside the Right-of-Way - Waste, or other materials specified or designated by the Ministry's Representative to be disposed of, such as, but not limited to clearing and grubbing materials, fences, old culverts, old concrete and asphalt, etc., shall be removed from the Site to a disposal site provided by the Contractor. All disposal sites shall be the responsibility of the Contractor.

The Contractor shall ensure that the disposal site complies with all Federal, Provincial, Municipal and Regional by-laws and regulations prior to disposing of the material. Any fees incurred shall be paid by the Contractor. The Contractor must provide documented proof to the Ministry Representative for the use of the selected disposal site.

In addition, the Contractor shall ensure that the disposal site

Page 71: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GENERAL REQUIREMENTS FOR HIGHWAY, SECTION 145 BRIDGE, AND MARINE CONSTRUCTION

BC - MOT 2006 145 (11 of 16)

complies with all municipal and regional government by-laws and regulations and, when relying upon any exemption permitted under section 2(d) of the Agricultural Land Reserve Permit Regulation, shall provide a written confirmation from the Regional District of their agreement that no permit is required.

145.27.03 Access Roads to Private and Public Lands - The Contractor shall not block or impede the use of any private access roads or driveways during the Work of this Contract without the consent of the Ministry Representative.

The Contractor shall schedule any anticipated closure of an access with the property owner to minimize impact on the owner.

145.27.04 Private Land Reserves - Excavated or construction material shall not be deposited on land outside the right-of-way. Borrow material shall not be obtained from land outside the right-of-way, without prior approval from the titled land owner. In addition, lands located within an Agriculture Land Reserve require the approval from the B.C. Agricultural Land Commission and issuance of a valid permit under the Soil Conservation Act.

145.28 Protection of Land Subdivision Monuments, Roads and Property

145.28.01 Protection of Subdivision Monuments - The Contractor shall protect, preserve, and keep uncovered all land subdivision monuments or property marks during its construction activities which may cause disturbance to them. At points where construction activities will cover or destroy any land subdivision monuments or property marks, the Contractor shall be responsible for their protection from disturbance until their positions have been referenced. The Contractor shall not remove them until so directed by the Ministry Representative.

145.28.02 Protection of Survey Monuments - The Contractor shall be responsible for the preservation during construction of all geodetic benchmarks, survey monuments and property markers on the right-of-way. The Contractor shall use, at no additional expense to the Ministry, a British Columbia Land Surveyor to replace any survey monuments destroyed or damaged as a result of the Contractor's negligence. At locations where construction work will cover or destroy such markers, the Contractor shall not move or remove them until written direction is received from the Ministry Representative.

145.28.03 Protection of Roads - The Contractor shall ensure all equipment working on or hauling material on to and from the Site does not damage or deposit material onto any part of an existing roadway. Materials spilled onto the

public roadways or driveways opened to public traffic shall be cleaned up immediately. The Contractor has the full responsibility to repair any damage to existing highways, local roads and driveways caused by its construction equipment and/or operations.

145.28.04 Protection of Railway Property - The Contractor shall be wholly responsible for any damage to railway trackage or property on the railway company's right-of-way resulting from highway construction operations. It shall be the Contractor's responsibility that all workers and persons employed by the Contractor or the Contractor's agents, or under the Contractor's control, shall use due care that no person or property is injured, and that no rights are infringed in performing the work. The Contractor shall compensate injured parties.

All costs for employment of traffic control persons or other personnel required for the protection of the railway trackage or property shall be the responsibility of the Contractor. Where it is found necessary to re-route any telegraph or telephone lines during the course of operations, or where it is found necessary to make repairs to such installations as a result of contract operations, such re-routing or repair work shall be the responsibility of the Contractor, and shall be for the Contractor's account.

Any costs borne directly by or billed directly to the Ministry which relate to the above responsibilities will be charged to the Contractor with a surcharge of 20%.

The Contractor shall restore and clean all slopes between the highway and the railway track together with any fences, ditches and drains disturbed by the work to the satisfaction of the Ministry Representative.

The Contractor shall give advance notice to the railway company prior to carrying out any work on the railway right-of-way and shall not proceed without specific coordination with the railway company and its schedule, and notice to the Ministry Representative.

145.28.05 Construction Stakes, Monuments, Bench Marks and Tide Gauge - The Contractor shall set, as the Ministry Representative may direct and as is necessary for the proper layout of the Work, monuments and bench marks of concrete or other material sufficiently permanent and rigid to remain intact during the duration of the Work. The Contractor shall particularly avoid destroying or disturbing such monuments or construction stakes and, should such destruction be unavoidable, shall notify the Ministry Representative in advance so that the points may be properly referenced and re-established.

145.28.06 Protection and Restoration of Property and

Page 72: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 145 GENERAL REQUIREMENTS FOR HIGHWAY, BRIDGE AND MARINE CONSTRUCTION

(12 of 16) 2000 BC - MOT

Environment - The Contractor shall not enter upon private property for any purpose without first obtaining permission of the owner of that property and shall be responsible for the preservation of public property along and adjacent to the Work, and shall use every reasonable precaution necessary to prevent damage or injury thereto.

The Contractor shall be liable for all damages caused by fire started by the Contractor and shall, under no circumstances start fires without first securing the required permits and approval of authorities having jurisdiction even though it may be ordered or required to do such burning.

The Contractor shall take special care when burning brush, stumps or rubbish not to damages any standing trees, shrubs or other property and to use when practicable smokeless burning methods.

145.29 Haul Routes and Overloads - The Contractor shall be responsible for ascertaining that the Contractor's haul routes are acceptable to the authority having jurisdiction for highway loading.

Overweight or oversize vehicles are not permitted to use existing highway as a haul road for the hauling of construction materials, notwithstanding Section 7.01 of the Commercial Transport Regulation 1980 Consolidation, as amended from time to time.

Off-highway equipment may be permitted to cross the existing highway only at specific locations as approved by the Ministry Representative.

Once the crushed granular base, surfacing or pavement work has commenced on any portion of the new, reconstructed or relocated highway, no overloads will be permitted on that portion unless written approval is given by the Ministry Representative.

145.30 Health and Safety

145.30.01 Occupational Health and Safety Program - The Contractor shall provide an Occupational Health and Safety Program at the time of the pre-construction meeting and have it in place prior to the commencement of any Work. The Contractor shall provide evidence that an Occupational Health and Safety Program is in place at the pre-construction meeting.

Any delays in commencement of the Work related to acceptance of the Contract and site specifics of the Contractor's Occupational Health and Safety Program or interruptions of the Work related to the implementation of the Occupational Health and Safety Program are not Reimbursable Delays unless otherwise agreed to in writing

by the Ministry Representative.

145.30.02 Worksite Hazards - The Contractor has the responsibility to identify worksite hazards and shall develop operational occupational safety policies and procedures and plans which are specific to the Work to ensure the safety of all persons at the Site and the travelling public passing through the Site.

When requested by the Ministry Representative, the Contractor shall provide copies of any safety policies, procedures or plans verifying steps have been taken to make all concerned fully aware of all hazards or unsafe conditions in accordance to Section 135 - Construction Site Safety.

The Contractor shall provide for the safety, protection and convenience of the general public and residents along the highway.

The Contractor shall erect and maintain signs, fences and barricades at the ends of the bridges before they are opened to traffic and at other dangerous areas of the Project, as necessary to prevent access of vehicles and pedestrians to the unfinished bridge and other dangerous areas.

145.30.03 Equipment - All trucks and other equipment used by the Contractor whether owned or rented for use on the Project shall meet manufacture's specifications for its purpose.

All trucks and other equipment rented by the Contractor for use on the Project shall when practicable be qualified local trucks obtained from local residents.

For the purposes of this Section, qualified local truck means a truck that meets all the following:

a) a truck that has Motor Carrier approval.

b) where the Contractor has a collective agreement with its employees the truck operator is a member of, or has the permission of the appropriate bargaining unit.

c) the truck fulfils, in the opinion of the Ministry Representative, the specialized needs of the Contractor.

d) a truck registered on the Ministry's Hired Equipment list for the geographic area encompassing the Site to in adjacent areas.

Hire of trucks and other equipment paid on a production rate basis constitutes a Subcontract.

145.30.04 Audible Back Up Warning Device - All haul vehicles shall be equipped with an automatic audible

Page 73: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GENERAL REQUIREMENTS FOR HIGHWAY, SECTION 145 BRIDGE, AND MARINE CONSTRUCTION

BC - MOT 2006 145 (13 of 16)

warning device which will activate whenever the vehicle is backing up. The warning device shall be clearly audible above the ambient noise level at a minimum distance of 6 m from the back of the vehicle

145.31 Faulty Work - If there is evidence of any fault, defect, or injury from any cause whatever, which may adversely affect the strength, durability, safety, maintenance, or appearance of any section of the work, the Contractor shall, at the Contractor's expense, satisfactorily correct such faults or, if required, shall replace as much of said section as the Ministry Representative may deem necessary, even to the extent of replacing the entire section. The fact that the inspector in charge may have previously overlooked such defective work shall not constitute an acceptance of any part of it.

Upon failure of the Contractor to comply promptly with any order of the Ministry Representative made under the provisions of this Section, the Ministry Representative will have authority to cause defective work to be remedied or removed and replaced and to deduct the costs thereof from any monies due or to become due to the Contractor.

145.32 Temporary Excavation - Where temporary excavations are undertaken in the course of the Work, the Contractor shall be responsible for maintaining the stability of adjacent ground and all structures and other works thereon, and for the cost of any temporary works which it provides for this purpose for which payment is not expressly provided in the Contract

145.33 General Sign Requirements

145.33.01 Contractor Identification Signs - The Contractor may supply and install contractor identification signs for the Term. The Contractor shall maintain and remove such signs and all costs of supply, installation, maintenance and removal shall be the responsibility of the Contractor.

The contractor identification sign shall display only the Contractor's company name and beneath it the word "Information" followed by a telephone number which directly connects any caller to the Contractor's personnel who are familiar with, and are currently active on the Project.

The sign will not be reflectorized, and the background colour will not be either red, yellow or orange. The sign dimensions will not exceed 2,400 mm horizontal and 1,200 mm vertical, and the text size (height) will not be less than 150 mm.

The contractor identification sign will be erected only in

conjunction with the C-35 project identification sign, and will not be in advance of or at the same location as the C-35 sign. Where there is no C-35 sign, no contractor identification sign will be permitted.

No contractor identification sign may be installed without prior approval of both the sign and the intended installation and location by the Ministry Representative who, in determining whether or not to grant such approval, will not necessarily be limited to the requirements set out above.

145.33.02 Prime Contractor Sign - When designated as the Prime Contractor, the Contractor shall provide “Prime Contractor” sign as specified in Section 135 Construction Site Safety.

145.33.03 Traffic Control Signs – The Contractor is required to use the appropriate encapsulating or prismatic lens sheeting on the following traffic control signs in the work zone:

a) encapsulating lens sheeting (identified by the “honeycomb” pattern) on:

• C-2 ................. Survey Crew/Speed Limit; • C-4 ................. Crew Working; • C-15 & C-16 .. Temporary Slow & Hazard Marker; • C-36 ............... Survey Crew; and

b) prismatic lens sheeting (identified by the diamond shaped pattern) on:

• C-27 ............... Stop/Slow Paddle.

All the above traffics control signs shall meet current Ministry specifications. The Ministry Specifications for Standard Highway Sign Materials, Fabrication and Supply are located on our Ministry web page at:

www.th.gov.bc.ca/publications/eng_publications/ geomet/geometsigns.htm

Page 74: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 145 GENERAL REQUIREMENTS FOR HIGHWAY, BRIDGE AND MARINE CONSTRUCTION

(14 of 16) 2000 BC - MOT

All costs to provide, replace and use the required control signs in the work zone will be included in related work items and no additional compensation will be made.

Page 75: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GENERAL REQUIREMENTS FOR HIGHWAY, SECTION 145 BRIDGE, AND MARINE CONSTRUCTION

BC - MOT 2006 145 (15 of 16)

APPENDIX A

Ministry Office Requirements

REQUIREMENTS FOR OFFICE TYPES

Office Type A B C

Lockable desk/chair 1 2 3

Typist desk/chair - - 1

Drafting table 1.2 m x 2.4 m /stool 1 1 1

Reference table 1.2 m2 - 1 3

Conference table 1.2 m x 2.4 m - - 1

Additional chairs 2 2 9

Plan case or drawing storage unit 1 1 2

Filing cabinet (# drawers) 1 - 2 drawers 1 - 4 drawers 3 - 4 drawers

Shelving bookcase m2 2 5 20

Fire Extinguisher for Class A, B and C fires 1 - 5 kg 1 - 5 kg 2 - 5 kg

Supply Activated Telephones and Lines One (1) One (1) Three (3) on two (2) lines with external bell and switch

Toilet On site On site In washroom, hot and cold running potable water and

wash basin

First Aid Kit On site #1 Unit Kit #1 Unit Kit

Floor Areas - m2

a) Entrance

b) Ministry Representative's office

c) Additional Staff office

d) Wash room

e) Store room

-

12

-

-

-

-

12

8

-

-

5

12

20

As required

5

Page 76: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 77: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 165 (1 of 20)

SECTION 165

PROTECTION OF THE ENVIRONMENT

165.01 General - This Section covers the general and specific provisions for the protection of the environment under the direction of the Ministry Representative, in cooperation with any Federal and/or Provincial Environment officers or an Environmental Monitor, as designated in the Special Provisions.

165.01.01 Intent of Specifications - These Specifications give the Ministry or its Agent the right to exercise control over environmental aspects of the work. The Contractor shall adhere to specific instructions if the work may result in an adverse impact on the environment.

The Ministry will determine the significance of environmental impacts in consultation with Environmental Agencies. The Ministry reserves the right of approval over the general methods employed by the Contractor in the performance of the work, but only insofar as they may affect relations with Environmental Agencies and the protection of aquatic and terrestrial resources, the health and safety of public, and protection of socio-community resources and features.

These specifications are for the protection of the environment, and shall be given such interpretation as will secure this intent.

165.01.02 Definitions - For the purposes of this Section, the following general terms are defined as follows:

“Compensation” refers to monetary payment or replacement in kind for environmental losses resulting from a development project, as well as the construction activities for the re-creation of lost or damaged habitat.

“Deleterious Substance or Material” is defined as a substance harmful to fish or fish habitat (Canada Fisheries Act, Section 34.1).

"Designated" shall mean designated in the Special Provisions or by the Ministry Representative.

“Environment” refers to the physical, biological, social, spiritual and cultural components that are interrelated and affect the growth and development of living organisms. The term “environment” in these specifications shall include socio-community issues and resources.

"Environmental Agencies" shall mean the appropriate regulating branches of the Federal and Provincial agencies responsible for the management and protection of the Environment and human resources. A partial listing of these agencies and their areas of concern is given in the joint publication "Land Development Guidelines for the

Protection of Aquatic Habitat", Fisheries and Oceans Canada and Ministry of Environment, Lands and Parks (1992), hereafter referred to as the "Land Development Guidelines".

The "Environmental Monitor" shall mean an agent hired by the Ministry to monitor the Contractor's compliance with the environmental protection aspects of Standard Specifications, Special Provisions, permits and approvals, and to advise the Contractor and Ministry Representative on environmental problems. An Environmental Monitor will be used when and where required, and will report to the Ministry Representative.

“Environmental Approval” is defined as the written authority issued to a person or company by a government agency that allows the person or company to do something that otherwise may not be permitted by law or which is not defined in law. An environmental approval is a broad, generic term referring to informal or formal authorization for actions that may have an adverse effect on the environment, such as (i) undertaking an activity (e.g., authorization from fishery agencies to proceed with work within the wetted perimeter of a fish-bearing stream); or (ii) discharging some form of material (e.g., approval under the British Columbia Waste Management Act to introduce waste into the environment or the storage of special waste for a period of 12 months or less). The term “approval” can include related forms of authorization such as permits and licenses.

“Environmentally Sensitive Areas” shall mean areas requiring special management and attention to protect resources, habitat or species (which includes and is not limited to water quality, identified sensitive areas, fish and fish habitat, vegetation, rare and endangered flora/fauna, landscaping and visual aesthetics, soil conservation (including dust control), air quality and archaeological, heritage and cultural resources).

“Environmental Timing Window” shall mean any period suitable for environmentally sensitive construction work as designated by an Environmental Agency or other federal, provincial, municipal or local agency. This window represents the period that the natural or human environment is likely less susceptible to adverse impacts. A common example of an Environmental Timing Window on highway construction projects is a Fishery Timing Window. Timing windows may also be imposed for the protection of breeding birds, retention of significant recreational activities, maintenance of critical traffic patterns, etc.

“Fishery Timing Window” refers to the time period(s) of reduced risk for important commercial, sport, and resident

Page 78: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 165 PROTECTION OF THE ENVIRONMENT

165 (2 of 20) 2006 BC - MOT

fish species, based on their life histories. The Fishery Timing Window is the time of year during which there are no fish eggs or alevins present in the substrates of local watercourses, and the period when fish migration (juvenile out-migration and adult spawning in-migration) is not occurring. This is generally the preferred period for (i) instream work or (ii) work adjacent to or over top of fish-bearing streams with the potential to create adverse impacts on fish or fish habitat.

"Habitats" are defined as those parts of the environment on which terrestrial and/or aquatic species depend, directly or indirectly, in order to carry out their life processes.

"Fisheries Sensitive Zone" is defined as the instream aquatic habitats, as well as out-of-stream supporting habitat features such as side channels, wetlands, and vegetated riparian areas adjacent to these features.

“Impact” is defined as an alteration, either positive or negative, to the environment brought about as a direct or indirect result of a highway project, including construction, operation and maintenance work (e.g., the consequence of a highway-related activity interacting with its surroundings).

“Mitigation” refers to a procedure or an action designed to avoid, reduce or control the severity, magnitude, duration and/or frequency of environmental impacts of a project through design alternatives, scheduling or other means.

“Permit” refers to a formal authorization, typically granted to proponents by an Environmental Agency, for discharging agreed upon quantities and types of regulated substances such as pollutants or waste. For example, under Section 8 of the British Columbia Waste Management Act, a permit may be issued to introduce waste into the environment or to store special waste subject to environmental protection requirements which are deemed advisable. The permit can specify the procedures or requirements respecting the handling, treatment, transportation, discharge or storage of waste that the holder of the permit must fulfill. The term “permit” can be defined by applicable legislation. The term “permit” is synonymous with the term “license”, and the two terms are often used interchangeably.

“Riparian Area” is defined as the land adjacent to the normal high water level in a stream, river, lake or pond and extending to the portion of land that is directly influenced by the presence of adjacent ponded or channeled water, or a groundwater zone fed by surface water bodies (e.g., zone in which rooted vegetation is influenced). Riparian areas typically contain important vegetation resources which provide several critical functions for the survival of fish (e.g., protection from predators, shade for temperature regulation of the watercourse, and sources of food).

“Sedimentation” is defined as the deposition of material carried in water, usually as a result of a reduction in water velocity below the point at which material can be transported.

"Watercourses" shall apply to all bodies of water including streams, rivers, canals, ditches, lakes, ponds, and wetlands.

“Wetted Perimeter” is defined by Station number and/or as highlighted on the plan drawings.

165.01.03 General Restraints for Watercourses and Groundwater - The following general restraints in regard to the protection of any watercourse shall apply:

a) The Contractor shall place and/or dispose of all organic material, refuse, ash, petroleum products and other deleterious materials so as not to directly or indirectly pollute any watercourse or groundwater. The placement and disposal of all such products and materials shall be done in an environmentally acceptable manner.

b) Except as required by the Contract Documents, all inorganic material shall be placed and/or disposed of in a manner that does not obstruct or unduly disturb any permanent or seasonal watercourse. Any such obstruction or disturbance shall be restored to the original drainage pattern as reasonably required by the Ministry Representative. Any removal of inorganic material from a watercourse shall be done in a manner that minimizes adverse impacts and shall be carried out as directed by the Ministry Representative.

c) All activities within the wetted perimeter of any watercourse shall be kept to an absolute minimum. Machinery and equipment shall not be operated within the wetted perimeter of any watercourse other than under the authority of the Ministry Representative. An Environmental Monitor shall be present at the direction of the Ministry Representative during any work within the wetted perimeter of any watercourse on the Project.

The preceding requirements, a) through c), are considered incidental to the price bid for work under Contract and no other compensation will be made.

165.01.04 Designated Streams and Designated Environmentally Sensitive Areas - Any watercourse or environmentally sensitive area designated in the Special Provisions or by the Ministry Representative is subject to all of the restraints of this Section.

165.02 Planning and Scheduling - The Contractor shall carefully plan and schedule construction activities in a

Page 79: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PROTECTION OF THE ENVIRONMENT SECTION 165

BC - MOT 2006 165 (3 of 20)

manner that ensures the avoidance or absolute minimization of environmental damage. The Contractor shall be familiar with and be able to identify those areas and times which present environmental problems and shall prepare schedules and work methods accordingly. The Contractor shall forward a copy of each of the schedules to the Ministry Representative at least one week in advance of commencement of each of these operations, unless otherwise specified in the contract.

The Contractor, as directed by the Ministry Representative, shall provide an Environmental Management Plan (EMP) which describes in detail the approach to be taken in addressing environmental issues associated with the Project and the correlation of the EMP to the project schedule. The EMP will be structured according to the following format and will include, but not be limited to, the following:

• demonstrate understanding of the specific environmental issues involved with the Project,

• indicate an understanding of Ministry/Contractor responsibilities,

• include a sediment and drainage management plan, • identify all the tasks required and clearly identify the

duration and sequence of each task leading to the receipt of agency approvals, and

• indicate its linkage to the project schedule.

The EMP will clearly indicate how the Project will be undertaken to avoid negative impacts pertaining to, but not limited to, the following resources:

• water quality (including all surface and sub-surface sources),

• identified sensitive areas, • fish and fish habitat, • wildlife, • vegetation (including riparian plant communities), • rare and endangered flora/fauna, • landscaping and visual aesthetics, • soil conservation (including site stability, dust

control), • air quality, and • archaeological, heritage, and cultural resources.

The Contractor, in consultation with the Ministry Representative, Environmental Monitor and the Environmental Agencies, shall be responsible for determining the conditions under which the work must be carried out in Environmentally Sensitive Areas, and for making all required on-site examinations and examinations of documents supplied and referenced by the Ministry in order to fully comprehend the environmental aspects of the work required.

165.02.01 Environmental Legislation and Regulatory

Requirements - The Contractor shall observe and comply with all federal, provincial, municipal and local laws and regulations which seek to ensure that construction work does not adversely affect the environment or social-community resources.

In the event of conflict between the requirements set out in these Specifications and quality control laws, statutes, regulations and ordinances of federal, provincial, municipal or local agencies, the more restrictive requirements or regulations shall apply. A violation of the environmental laws and regulations reported to the Ministry by the responsible agencies may result in the issuance of a non-conformance report. Should the situation warrant more stringent measures, it may also result in the issuance of a stop-work order until the violation is corrected? The Contractor shall have no recourse for reimbursement due to delays or alterations to construction activities arising from such violations or the correction of such violations.

165.02.02 Environmental Procedures - The Ministry may require one or more detailed sets of environmental procedures for any work in and around Environmentally Sensitive Areas, such as critical fish habitat. When a set of environmental procedures is required, the Contractor shall prepare and submit the procedures for approval by the Ministry Representative and the Environmental Agencies prior to undertaking work in these areas. These detailed procedures shall supplement the EMP. The Contractor shall forward a copy of the approved set of procedures to the Ministry, prior to undertaking the work. The environmental procedures shall contain the following items:

a) Existing environmental conditions. Identification of the environmental resources (e.g. fish species and habitat) in the area of the proposed work.

b) Description of work proposed in the Environmentally Sensitive Area. Summary of the proposed work, equipment to be used, schedule of activities, and location.

c) Environmental protection measures. Statement concerning the protective measures that will be used to protect environmental resources (e.g., species and habitat) from each anticipated adverse impact.

d) Contingency plan. Description of alternative or backup plan in the event of an environmental emergency or failure of any of the protective measures.

e) Environmental monitoring requirements. Indication of any specific or unique environmental monitoring requirements to ensure compliance with environmental specifications and proper implementation of the

Page 80: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 165 PROTECTION OF THE ENVIRONMENT

165 (4 of 20) 2006 BC - MOT

environmental procedures.

The Contractor shall contact the Environmental Monitor and, if necessary, Fisheries and Oceans Canada (F&OC) and the Ministry of Water, Land and Air Protection for specific recommendations about the preparation of the environmental procedures. The environmental procedures must be approved by the Ministry Representative and the Environmental Agencies prior to commencement of work in Environmentally Sensitive Areas.

165.02.03 Project Orientation - The Contractor shall arrange regular meetings with the Ministry Representative, and, if employed, the Environmental Monitor. Other interested parties may be asked to attend (e.g., Agency Representatives), whose representation is necessary because of the specific type or location of work being undertaken. The purpose of such regular meetings will be to outline the schedule of upcoming construction and proposed activities, and to review the activities of the previous week. Such regular meetings do not relieve the Contractor from attending or arranging other types of meetings as required due to the nature or extent of the work being done.

The Contractor shall arrange and conduct such regular meetings during construction, subject to the following conditions:

a) Meetings shall be held on a weekly basis when construction activities are to proceed during an Environmental Timing Window, during a period when work is to proceed in an Environmentally Sensitive Area, or during a period when the proposed construction activity elsewhere on a project is to proceed for a duration greater than two weeks and has the potential to cause adverse environmental impacts.

b) During periods other than that specified above, regular environmental meetings shall be held every two weeks, or as otherwise agreed to by the Ministry Representative.

c) In the event that the Environmental Monitor or the Ministry deem the Contractor’s compliance regarding environmental requirements to be inadequate at any time during the Project, the frequency of the weekly or biweekly regular meetings shall be increased accordingly until the Environmental Monitor and the Ministry are satisfied with the Contractor’s compliance rate.

d) The Contractor’s Environmental Representative will record highlights from the meetings (e.g., summary of major discussion items and key action items) and forward a copy to the Contractor, as well as include this material in the Project Environmental Progress Reports.

e) During the maintenance phase of the Project, the Contractor shall conduct regular environmental meetings with the Environmental Monitor on a quarterly basis, unless operations are to be conducted within Environmentally Sensitive Areas that pose potential environmental concerns. In the event that operations are to be conducted within such areas, the Contractor and Environmental Monitor shall conduct weekly environmental meetings for the duration of the maintenance work in such areas.

The Contractor is responsible for ensuring that the foreman, operators, and work crews (including any subcontractors) understand the specific environmental issues on the work site and their responsibilities under this Section. The Contractor’s Environmental Representative will give all construction personnel a brief environmental orientation prior to such personnel commencing work in any Environmentally Sensitive Area on the Project. The Contractor’s Environmental Representative will ensure that construction personnel are familiar with the environmental requirements and acceptable construction practices on the Project. The Contractor shall support the Contractor’s Environmental Representative’s role in this regard.

165.02.04 Activity Within Designated Watercourses and Environmentally Sensitive Areas - All activities that are conducted within the wetted perimeter of any designated watercourse or within other designated Environmentally Sensitive Areas must conform to the timing restrictions stated in the Special Provisions, and to the Environmental Timing Windows given in the approvals of the Environmental Agencies. Construction work must be scheduled so that all operations affecting the Fisheries Sensitive Zone or other designated Environmentally Sensitive Areas can be completed within these time periods. Prior to the commencement of any construction activities, all work in these areas must be approved by the Environmental Agencies and the Ministry Representative.

The Contractor must give at least 48 hours notice to the Ministry Representative in advance of any construction-related activity in designated areas. Construction activities within designated watercourses or other Environmentally Sensitive Areas shall not commence without the approval of the Environmental Monitor.

165.02.05 Inclement Weather - The Contractor shall cease operations, modify construction methods, or relocate to an alternative site within the project area during periods of inclement weather to avoid siltation of designated watercourses. If the Ministry Representative judges that the Contractor is not complying with the intent of this Section, the Ministry Representative may direct the Contractor as to measures required without additional compensation for

Page 81: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PROTECTION OF THE ENVIRONMENT SECTION 165

BC - MOT 2006 165 (5 of 20)

delays or alterations in the Contractor's work.

165.02.06 Work Stoppage - Prior to initiating work stoppages, the Contractor shall initiate and complete any mitigative and environmental protection measures required to safeguard the environment and the Project during work stoppages.

The Contractor shall give the Ministry Representative sufficient notice of impending shutdowns to enable the Ministry Representative, Contractor, and, if employed, the Environmental Monitor to examine the project. This notice shall be sufficient to permit the Contractor adequate time to install all necessary additional environmental mitigation measures as may be directed by the Ministry Representative.

The Contractor shall ensure the Environmental Monitor and construction personnel inspect Environmentally Sensitive Areas on the Project on a regular basis during any extended work stoppages (e.g., weekends, statutory holidays, Christmas vacation periods) to prevent environmental problems. If potential adverse environmental impacts are observed during work stoppage periods, the Contractor shall initiate and undertake any required environmental measures to avoid or minimize impacts.

165.03 Compliance, Enforcement and Payment

165.03.01 Temporary Pollution Control - The Contractor shall be responsible for implementation of any temporary environmental protection measures, such as pollution control measures. If the Contractor fails to respond to this requirement or to the instructions in this regard from the Ministry Representative or the Environmental Monitor within directed time span, the Ministry Representative may take whatever action is necessary to provide the proper corrective measures. In the event the Contractor fails to take reasonable action to implement temporary environmental control measures, the Ministry's Representative shall determine the need for additional corrective action. The Ministry's Representative may deduct incurred costs from any money due or to become due to the Contractor for any corrective action taken in this regard.

165.03.02 Responsibility for Damage to Environment - The Contractor shall bear sole responsibility for any direct or indirect damage to the environment which occurs as a result of failure to comply with these Specifications, the directions of the Ministry Representative or recommendations of the Environmental Monitor.

165.03.03 Stop Work Orders - In the event that the Ministry Representative determines that some aspect of the construction is creating or will result in a substantial adverse effect on environmental values or resources on or adjacent

to the project site, the Ministry Representative may issue a "stop work order" on behalf of the Ministry. The Contractor shall subsequently be responsible for advising the Ministry Representative of the intended remedial action. The Ministry Representative may direct the Contractor to cease construction work on an unaffected portion of the site so that any necessary equipment can be immediately diverted to address the environmental emergency. In such an event the Contractor will not be entitled to any claim for compensation from the Ministry.

In the event that an Environmental Monitor is employed, and the Ministry Representative cannot be contacted, the Environmental Monitor will assume the Ministry Representative's role regarding Stop Work Orders, as detailed above, until such time as the Ministry Representative can be contacted. The Environmental Monitor will fully document all such instances. In such an event, the Contractor will not be entitled to any legal recourse or claim for compensation from the Ministry.

The Contractor shall be required to modify or halt any aspect of construction or maintenance that the Environmental Agencies determine poses or will pose an environmental concern. The Environmental Agencies may verbally direct the Contractor to modify or halt any such activity or submit formal written instructions to that effect. In either case, the Contractor’s immediate compliance with their instructions will be mandatory. The Contractor shall document any such requests by the Environmental Agencies and forward a copy of this documentation to the Ministry within five working days of the initial notification by the Agencies.

165.03.04 Compliance with Specifications - The Contractor is responsible for ensuring that all subcontractors and employees are in compliance with these Specifications and all applicable environmental legislation and regulatory requirements at all times, and shall take immediate action to rectify problems in this regard. The Contractor shall initiate action to rectify environmental problems within the time period as specified by the Ministry Representative. The Contractor shall have available such additional safeguards, safety devices and protective equipment as are necessary to protect the environment. The Contractor shall be responsible for ensuring sufficient safety devices and protective equipment (e.g., pumps, silt fence, armoring, tarps, fuel spill cleanup kits, etc.) are readily available at all times during construction of the Project. The location and inventory of safety devices and protective equipment shall be documented and placed in a prominent location in the Contractor’s field office. A copy of this information shall be updated as necessary and provided to the Ministry Representative.

Page 82: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 165 PROTECTION OF THE ENVIRONMENT

165 (6 of 20) 2006 BC - MOT

The Ministry Representative, and/or Environmental Monitor when employed, will inspect and monitor conditions at, and in the vicinity of, the project to ensure acceptable levels of pollution and disturbance are not exceeded, and to ensure compliance with the environmental specifications contained herein and in the Special Provisions.

The frequency of such inspection and monitoring efforts shall correspond to the sensitivity and location of construction activities, as well as to the environmental conditions (e.g., increased monitoring and inspection will be conducted during periods of inclement weather). In the event that the Ministry Representative is not satisfied with the frequency and duration of such inspection and monitoring, the Contractor and/or the Environmental Monitor will be required to increase their efforts in this regard to a level satisfactory to the Ministry.

165.03.05 Payment - All the requirements for compliance with these environmental specifications shall be considered incidental to the price bid for the Project under contract and no other compensation shall be made to the Contractor. However, the Contractor may be eligible for reimbursement for the installation of any additional environmental works (e.g., enhancement measures) where directed and approved in writing by the Ministry Representative and not covered in this Section or elsewhere in the Special Provisions or Schedule of Quantities and Unit Prices. Any eligible reimbursement will be paid for by an Order for Extra Work. The Ministry Representative, in consultation with the Ministry’s Environmental Quality staff and the Environmental Agencies, will be responsible for determining the Contractor’s eligibility in this regard and for identifying what environmental work is beyond the scope of the Contract and these specifications.

165.04 Erosion, Sediment, and Drainage Control - All works shall be undertaken in a manner that avoids or absolutely minimizes erosion problems and the discharge of siltation or other deleterious substances into any watercourse. The Contractor shall not disturb designated watercourses, unless the express written consent of the Environmental Agencies is obtained prior to initiating construction activities in such areas. No obstruction or debris shall be placed in any watercourse during any operations, unless specified in the Special Provisions or by the Ministry Representative, or for designated watercourses approved by the Environmental Agencies. Should any material be inadvertently placed within the normal high water wetted perimeter of a watercourse, the Ministry Representative shall be notified immediately and the Contractor shall remove the material immediately, using environmentally acceptable construction procedures and under the direction of the Environmental Monitor.

165.04.01 Sediment and Erosion Control - The Contractor shall incorporate all permanent soil erosion control features into the project at the earliest practicable time, as outlined in the accepted work schedule, and shall be responsible for temporary erosion and sediment control measures, including daily inspection of the integrity of such measures during adverse weather conditions or when construction operations are proceeding in Environmentally Sensitive Areas. Control measures shall be capable of continuous operation during working and non-working hours, and are subject to approval by the Ministry Representative. Any deficiencies which are observed in erosion control measures shall be immediately corrected.

The Ministry Representative has the authority to define environmentally sensitive areas or conditions, such as areas of erodible soil, and to direct the Contractor to provide temporary erosion and sediment control measures. These measures may include, but may not be limited to:

• interceptor ditches or berms to direct runoff away from erodible areas;

• slope protection measures such as mulches, hydroseeding, erosion mats, geotextiles, filter fabric, polyethylene covers, or riprap;

• silt fences; • ditch blocks to reduce flow velocities, and; • sediment control measures, such as settling ponds.

The Contractor shall have sufficient materials, such as clean rock, granular material, and filter fabric available on-site for emergency protection measures when required.

The Contractor shall regularly maintain sediment and drainage control measures, such that they function as designed. Immediate action shall be taken by the Contractor to correct any deficiency observed in the operation of sediment and erosion control measures. In the event that a deficiency in any sediment or drainage control measures is directly or indirectly creating an adverse environmental impact, the Contractor shall initiate the necessary action to correct the problem within one hour of observing or being informed of the situation. In the event that a deficiency in any sediment or drainage control measures poses the potential to create an adverse environmental impact, the Contractor shall take action within two days of observing or being informed of the situation. In the event that environmental conditions or the status of the situation change in regards to a potential deficiency, the Contractor shall accelerate any proposed correction measure(s) by taking immediate action (i.e., within one hour). The judgment of the need and timing for corrective action in regard to sediment or drainage control measures shall be at the discretion of the Ministry Representative, Environmental Monitor, and the Environmental Agencies.

Page 83: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PROTECTION OF THE ENVIRONMENT SECTION 165

BC - MOT 2006 165 (7 of 20)

Sediment and debris accumulations which compromise the functioning of the erosion and sediment control measures shall be removed by the Contractor and disposed of in an environmentally acceptable location and manner. At a minimum, silt fence structures shall be cleaned when sediment accumulation heights exceed 30 cm along any portion of the structure.

In the absence of site-specific requirements from the Fisheries and Oceans Canada or the British Columbia Ministry of Water, Land and Air Protection, the Contractor shall comply with criteria for suspended solids in runoff water from the site as agreed upon prior to construction by the Ministry Representative and Environmental Agencies.

Sediment and drainage control methods are detailed in the "Land Development Guidelines" and the MoT publication "Control of Erosion and Shallow Slope Movement". Compliance with the spirit and intent of these guidelines is mandatory. The determination of the Contractor's compliance with these guidelines shall be at the discretion of the Ministry Representative, Environmental Monitor and Environmental Agencies.

165.04.02 Sediment and Drainage Management Plans - The Contractor, as directed by the Ministry Representative and in consultation with the Contractor’s Environmental Representative, shall be responsible for the preparation and implementation of any Sediment and Drainage Management Plan(s) required for the Project. Such plans will form an essential component of the Contractor’s environmental protection program, in terms of identifying environmentally acceptable construction practices for sediment and erosion controls at specific sites. The Sediment and Drainage Management Plan(s) will be subject to, but not limited to the following requirements:

• Prior to commencement of construction activities on the Project and thereafter when deemed necessary, the Contractor and the Environmental Monitor will identify areas and major construction activities for which the Contractor will be required to prepare one or more Sediment and Drainage Management Plans. Designation of these areas and activities will be done in consultation with the Environmental Agencies and the Ministry's Environmental Quality staff.

• In addition to activities within the Project area, a Sediment and Drainage Management Plan shall be submitted for activities related to the Contractor’s work in areas away from the project that have the potential to create adverse environmental impacts, which will be determined by the Contractor in consultation with the Environmental Monitor, the Environmental Agencies and the Ministry. These activities are not confined to the areas immediately adjacent to the right-of-way, but also in other

locations in which the work or associated activities will be conducted, including but not limited to haul or access roads, temporary structures, borrow and granular excavations, staging/laydown areas, material storage sites and disposal sites.

• The Contractor shall not commence work in any area so identified until a Sediment and Drainage Management Plan has been submitted and accepted by the Ministry and involved Environmental Agencies.

• The acceptance and approval of the Contractor’s Sediment and Drainage Management Plan or updated Plan shall be valid only so long as the conditions and anticipated conditions upon which the Plan and its acceptance were based continue to be applicable.

• The Contractor shall at all times be responsible for ensuring that work is carried out in accordance with a Sediment and Drainage Management Plan or updated Plan, which has been accepted by the Ministry and Environmental Agencies.

• The Ministry or the Environmental Agencies may request the Contractor to update and resubmit its plan(s) at any time, and may require the Contractor to cease work until the update(s) has been submitted and accepted. Whether or not the Ministry or the Environmental Agencies so request, the responsibility for carrying out the work in accordance with a validly accepted Plan lies entirely with the Contractor.

• The Ministry or the Environmental Agencies may order the Contractor to stop work or to take other precautionary or remedial measures whenever the Contractor is carrying out any work that is not in accordance with a Sediment and Drainage Management Plan or updated Plan which has been accepted by the Ministry or the Environmental Agencies, and for which that acceptance is still valid. All costs of any resulting delay shall be borne entirely by the Contractor.

At a minimum, a Sediment and Drainage Management Plan will include the following information and will be prepared in a format satisfactory to the Ministry Representative and the Ministry:

a) A schedule for the proposed activities, as they pertain to the Sediment and Drainage Management Plan and construction staging, including anticipated duration of construction.

b) A description of the construction procedures that will be used to limit the potential for erosion and sediment production, including estimates of work areas where applicable (e.g., volume of material in a proposed stockpile site), description of construction equipment to be used, and staging of operations.

Page 84: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 165 PROTECTION OF THE ENVIRONMENT

165 (8 of 20) 2006 BC - MOT

c) A detailed description of the site-specific measures for runoff and drainage management.

d) A detailed description of the site-specific mitigation measures and design information for erosion prevention and control (e.g., sizing of culverts, ditches or sediment/detention ponds, silt fence specifications, and description of ditching and berming).

e) A schedule that identifies the various sloped areas by station and the dates in which they will be protected using temporary and permanent revegetation measures, such as hydroseeding.

f) A detailed description of mitigative measures for ensuring acceptable water quality and quantity at points of discharge to watercourses, including sizes and specifications for any proposed water treatment facilities.

g) A key plan and drawings, in suitable scale and detail, of the site and proposed mitigative measures and applicable construction procedures.

h) A written commitment of on-site equipment (e.g., water pumps) and materials (e.g., silt fence, hay bales, rock armoring, and ditch breakers) for erosion, sediment and drainage control to deal with emergency situations that may arise.

i) A written commitment of on-site equipment and staff to handle any fish salvage and transfer operations, if required.

j) Contact names, positions and telephone numbers.

A description of the specific monitoring procedures prior to, during and after completion of construction activities at this site.

165.04.03 Sediment Control Ponds - The Contractor shall construct sediment control ponds where necessary to prevent the release of unavoidably entrained sediments in runoff from the construction site, and shall construct stormwater detention ponds for the temporary and/or permanent control and discharge of stormwater runoff. The Contractor shall provide designs for and construct sediment control ponds, as well as stormwater detention ponds, on a site-specific basis in a manner that conforms to the "Land Development Guidelines", other than for the following exception(s):

• Sediment control ponds and dry or wet stormwater detention ponds shall be designed and constructed to accommodate the 10-year return period storm under developed conditions with a minimum 0.60 metre freeboard to the top of the berm.

The Contractor is referred to Section 3 of the “Land Development Guidelines” for other pond design criteria and Section 8 of that publication, for sample calculations for water flows and pond sizes.

If during construction the settlement pond is filled to capacity and is still required for sediment control, accumulated settled sediments shall be removed from sediment control ponds and stormwater detention ponds. Such sediments shall be disposed of in an environmentally acceptable location and manner.

165.04.04 Maintenance of Drainage Patterns - Except where interceptor ditches or berms are required to divert sediment laden runoff from the site to a sediment control pond, original drainage patterns shall be maintained throughout construction operations. Interceptor ditches or berms shall be constructed to divert water entering the site away from erosion prone areas. The Contractor will not rely on drainage courses or conduits being shown on the Drawings, and will make whatever investigation is necessary. Where a natural watercourse traversing the construction site crosses this interceptor ditch or berm, an armoured or lined ditch or a culvert shall be installed in order to pass accumulated flows through or around the construction site in a manner that maintains the natural runoff pattern, unless otherwise directed by the Ministry Representative.

All ditches constructed for interception of clean water outside the work site(s) to divert it around the work site(s) and for collection of treated water from the work site(s) shall be designed and constructed to accommodate the 10-year return period storm with a 0.3 m freeboard under developed conditions. Temporary and/or permanent drainage ditches, including those constructed for sediment and erosion control shall be designed to prevent high water velocities and erosion by including measures such as check dams, drop structures or erosion-resistant liners or armoring.

165.04.05 Storm Drainage Systems - In order to minimize siltation, the Contractor may be required to block storm drain inlets, or to activate inlets by means of sandbags, berms or swales, as circumstances require, or at the direction of the Ministry Representative. Berms shall be constructed of clean, non-erodible granular material. The Contractor shall maintain, on a regular basis, any inlets activated during the course of construction. Any deficiencies noted in these works shall be corrected immediately in the event that the inlet is plugged and within the same day if the site is relatively dry.

The Contractor shall ensure adequate inspection and correction of any storm drainage system deficiencies for sites within the influence of the Project. During periods of

Page 85: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PROTECTION OF THE ENVIRONMENT SECTION 165

BC - MOT 2006 165 (9 of 20)

inclement weather, the Contractor shall ensure project staff inspect storm drainage systems throughout the day, and if necessary, make arrangements for inspection and maintenance during regular work stoppage periods, such as evenings or weekends. At a minimum, such inspections shall be carried out at the start of the regular workday, at mid-day in the workday, and one hour prior to end of the regular workday. Furthermore, in the event of flooding problems, the Contractor shall be responsible for any damages or compensation resulting from impacts on residences or businesses caused by a failure or deficiency in the Contractor’s design and maintenance of the storm drainage system.

During concrete curb and gutter construction, road surface runoff shall be directed by berms or swales away from concrete which has been poured within the previous 48 hours.

165.05 Clearing and Grubbing

165.05.01 Limits for Clearing and Grubbing - Clearing and/or grubbing shall extend only to the designated limits, as defined in the Contract Drawings and marked on site. Prior to clearing or grubbing, marked limits will be inspected by the Ministry Representative, who may amend them. The Contractor may be required to use close-cut, no grub practices (i.e., cutting trees at ground level and not removing root system) or undertake hand clearing at environmentally sensitive sites, as designated in the Special Provisions or by the Ministry Representative.

The Contractor shall prepare a detailed clearing and grubbing plan in consultation with the Environmental Monitor and the Ministry Representative. The Contractor will obtain approval for this plan from the Ministry Representative and any necessary tree removal permits from the Ministry of Forests and/or municipal agencies prior to initiating any clearing and grubbing operations within 50 m of any designated watercourse or Environmentally Sensitive Area.

The Contractor shall minimize ground disturbance in the vicinity of any watercourse or Environmentally Sensitive Area, and shall not proceed with clearing and grubbing closer than 50 m from a designated watercourse or Environmentally Sensitive Area prior to marking the limits of the Fisheries Sensitive Zone or Environmentally Sensitive Area. The width of these zones, if not specified in the Special Provisions, will be determined by the Ministry Representative in consultation with the Environmental Agencies. The Contractor shall mark the limits of any Fisheries Sensitive Zone or Environmentally Sensitive Area, such as orange flagging tape or orange snow fence, at a minimum height of 1.5 m.

All clearing and grubbing activities in this zone must be granted prior approval by the Environmental Agencies. The Contractor shall not conduct approved grubbing operations within this zone until ready to proceed with earthwork and stabilization.

In areas near designated watercourses or other Environmentally Sensitive Areas determined by the Ministry Representative to be of high erosion or siltation potential, the surface area of erodible soil exposed at one time may be limited by the Ministry Representative. This will supersede Subsection 200.03 and 200.04. The Ministry Representative may confine grubbing to an area where excavation and earthwork is to be actively conducted within approximately 30 days following the completion of grubbing operations. In the event that a highway project consists only of clearing and grubbing operations, the cleared ground shall be protected and able to withstand specified periods of inclement weather.

165.05.02 Protection of Vegetation - The Contractor shall protect all vegetation growing outside of the designated and marked areas for clearing and grubbing, as specified in Section 769 "Protection and Retention of Vegetation", with the exception of danger trees, which must be hand-felled and removed with minimum disturbance to retained vegetation.

165.05.03 Clearing Activities - Falling of timber into a watercourse is prohibited except in situations in which safety considerations dictate otherwise or unless approved by the Environmental Monitor. Any trees or large pieces of woody debris that accidentally fall into a watercourse and require removal shall be removed in a manner that minimizes the disturbance of the watercourse and adjacent banks, and is approved by the Ministry Representative. Skidding of logs across watercourses will not be permitted. The Environmental Monitor must be present during removal of any large woody debris or trees from watercourses.

165.05.04 Disposal of Combustible Materials - The Contractor shall comply with the Forest Act and the Open Burning Smoke Control Regulation under the British Columbia Waste Management Act. For additional information regarding the regulation, the Contractor should contact regional Environmental Protection staff in the British Columbia Ministry of Water, Land and Air Protection office and the Fire Control staff in the British Columbia Ministry of Forests.

The Contractor shall prevent heat or smoke damage to all vegetation that has been designated for preservation. The use of waste oil and/or tires as fire accelerators shall not be permitted. The Contractor may be required to use a forced air method of burning. Burning piles shall not be located within 50 m of any watercourse, wetland or other

Page 86: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 165 PROTECTION OF THE ENVIRONMENT

165 (10 of 20) 2006 BC - MOT

Environmentally Sensitive Area, or in areas where ditches are to be constructed without written approval of the Ministry Representative.

In situations in which the material generated as a result of clearing and/or grubbing may not be burned on site, the Contractor shall dispose of it in a manner approved by the Ministry Representative who may require approval of the British Columbia Ministry of Water, Land and Air Protection.

165.06 Stripping Operations

165.06.01 Exposure of Erodible Earth - In areas where erosion or siltation is anticipated, the duration of exposure of erodible earth material shall be minimized. In such cases the surface area of erodible earth material exposed at one time shall be determined and approved in writing by the Ministry Representative. (See Subsection 165.05.01 Limits for Clearing and Grubbing)

165.06.02 Placement of Stripped Material - The Contractor shall avoid placement of stripped materials in areas adjacent to watercourses or other Environmentally Sensitive Areas. Sediment and erosion control measures must be taken prior to and after placement of stockpiles of stripped material in areas where natural drainage or storm water could erode the stockpile and thereby transport pollutants to surface waters. The location of stockpiles and erosion control measures must be approved by the Ministry Representative prior to placement of stripped materials and may be specified in the Special Provisions. The Contractor shall ensure that all stockpiles are stable.

Polyethylene sheeting or other suitable tarp material shall be used to cover temporarily exposed steep surfaces or stockpiles of erodible materials, such as topsoil, sand, gravel or roadbase fill. The Contractor shall ensure such erodible materials are properly covered with sheeting or suitable tarp materials immediately after creation of any temporary stockpiles. Such sheeting or tarp materials shall be examined and maintained on a regular basis. The sheeting or tarp materials shall be sufficiently anchored to prevent displacement by winds.

165.06.03 Slope Protection - The Contractor shall employ suitable techniques to prevent the initiation of surface soil erosion and movement of sediments from slopes, particularly those exposed as a result of clearing, grubbing and stripping operations. Acceptable techniques and conditions of implementation of erosion and sediment control measures for slopes are outlined in Section 3 (i.e., entitled “Slope Protection and Surface Protection”) of the “Land Development Guidelines” and the MoT publication "Manual of Control of Erosion and Shallow Slope

Movement". Compliance with the requirements specified in this Section, as well as any Authority/MoT manual(s) developed specifically for the Project, will be mandatory.

165.07 Earthwork Operations (Subgrade Construction)

165.07.01 Excavation and Disposal of Waste or Surplus Material - The creation and use of any site on Crown or private lands for the placement and disposal of waste or surplus material requires prior approval from the Ministry Representative and may require the approval of representatives of British Columbia Forests and the Environmental Agencies. Unless another time period is specified in the Special Provisions or by the Ministry Representative, not less than fifteen days prior to disposing of any waste or surplus material, the Contractor shall submit to the Ministry Representative for approval, a proposal delineating the locations and extent of the areas in which the Contractor intends to dispose of such material. The proposal shall describe the nature of the material and the methods to be employed in material placement, stabilizing and site revegetation. If a disposal site is required off the right-of-way, the proposal shall also indicate the procedures for any required land clearing activity. The proposal will be reviewed by the Ministry Representative who may consult with the Environmental Monitor, if employed, and the Environmental Agencies. No waste or surplus material shall be disposed of until the proposal has been approved. All work shall be done in accordance with the approved proposal.

All waste disposal sites shall be selected such that spoil is prevented from entering any watercourse. The excavated material shall be properly drained, spread and trimmed to a stable slope not exceeding 1.5 to 1, in a manner which minimizes disturbance of watercourses and vegetated areas. All waste sites shall be revegetated immediately after creation of the waste disposal site, or else suitable temporary erosion control measures, such as tarps, shall be used until revegetation is undertaken. The Contractor is responsible for ensuring that revegetation is successfully accomplished unless otherwise specified in the Special Provisions.

165.07.02 Work in Areas of High Water Table - Work in areas of high water table shall be scheduled to proceed during dry weather periods unless otherwise specified in the Special Provisions. The Contractor shall adopt all necessary mitigation measures to avoid or minimize adverse impacts in such areas.

165.07.03 Drilling and Blasting - Blasting operations shall be conducted in a manner that minimizes the disturbance of residences, businesses and public infrastructure (e.g., schools and churches) and to aquatic and terrestrial habitats and organisms due to shock waves, noise and vibration.

Page 87: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PROTECTION OF THE ENVIRONMENT SECTION 165

BC - MOT 2006 165 (11 of 20)

The Contractor shall not conduct blasting within 400 m of fish habitat without the approval of the blasting plan by the Fisheries and Oceans Canada; British Columbia Ministry of Water, Land and Air Protection, Fish and Wildlife offices and the Ministry Representative. The Ministry Representative may require the Contractor to undertake mitigative measures such as scheduling of works in Timing Windows given by the Environmental Agencies, smaller staggered blasts or use of blasting mats to minimize impacts. Vibrations and shock waves in fisheries habitat resulting from blasts shall comply with the Fisheries and Oceans Canada "Guidelines for the Use of Explosives in or Near Canadian Fisheries Waters".

Blasting operations shall be controlled to minimize the entry of fly rock into watercourses or adjacent to the right-of-way, particularly in an urban setting. If required by the Environmental Agencies, the Contractor shall comply with the Agencies' directions in removal of fly rock from watercourses and Environmentally Sensitive Areas at no cost to the Ministry.

When blasting is to be conducted adjacent to or in a designated environmentally sensitive area, the Contractor shall provide at least 24 hours notice of each blast to the Ministry Representative. The Contractor shall provide at least 24 hours written notice to those individuals or groups potentially affected by shock waves, noise and vibration from blasting operations.

165.08 Borrow and Sand / Gravel Pits - All Borrow and Sand/Gravel pit locations, operations, reclamation and revegetation shall comply with the Ministry of Energy and Mines / MoT / Natural Resources Canada joint publication "Reclamation and Environmental Protection Guidelines for Sand, Gravel and Quarry Operations in British Columbia".

165.08.01 Control of Drainage - Prior to borrow excavations, or quarry, sand or gravel pit development, all surface water entering the site shall be controlled so that its entrance into the operating area is prevented. Drainage shall be controlled throughout borrow operations in order to prevent natural drainage and surface runoff from carrying sediment into adjacent watercourses. The Contractor shall prepare a Sediment and Drainage Management Plan (see Subsection 165.04.02) prior to the creation and/or operation of any borrow excavations or quarry, sand or gravel pit development sites. The Contractor shall also prepare a Reclamation Plan.

165.08.02 Location and Development of Borrow and Sand/Gravel Pits - Clearing for borrow and sand/gravel pits shall comply with Subsection 165.05 - Clearing and Grubbing. All topsoil shall be stockpiled for future reclamation.

Borrow excavations shall not be located in the wetted perimeter of a watercourse or on a stream floodplain at a location likely to create a new channel to the stream at a time of flooding, without the approval of the Environmental Agencies. Borrow sources located within 100 metres of the wetted perimeter of a watercourse or at distances less than 100 m from any water-impounding dyke or dam embankment will require the design of a Professional Engineer or Professional Geologist. Final floor elevations shall be sufficiently high that they will not be subject to fluctuations in the groundwater table.

In erosion-prone areas, overburden removal shall be restricted to an area that will be excavated within one year. The open face(s) of the borrow pit should be no larger than necessary for efficient pit operation. Material should be exhausted at one location in a pit prior to the opening of a new face to remove a similar type and grade of material.

The Contractor shall be responsible for maintaining the functionality of erosion, sediment and drainage control measures within and around borrow and sand/gravel pits throughout all phases of overburden and material removal, as well as during periods of work stoppages. Borrow and/or sand/gravel pits shall be rehabilitated and decommissioned in an environmentally acceptable manner and to the satisfaction of the Ministry and the Environmental Agencies.

To minimize the spread of noxious weed seeds between construction sites and gravel pits/quarries, all crushing equipment and mining vehicles must be cleaned with a power/high pressure washer (manually cleaned in freezing temperatures), before entering any MoT pit or quarry. If the pit contains noxious weeds the crushing equipment and mining vehicles must also be cleaned with a power/high pressure washer (manually cleaned in freezing temperatures) before leaving the pit/quarry. Prior to the production of aggregates the pit floor, crusher/plant location, equipment-parking area, stockpile site(s), pit face(s) and area to be mined will be inspected by the contractor for the presence of noxious weeds. If noxious weeds are present they must be removed mechanically by the contractor. Noxious weeds are defined as non-native plants species designated on the provincial or regional district lists as defined by the Weed Control Act.

165.08.03 Washing Operations - In locations where siltation of a fish-bearing watercourse may occur, approval shall be obtained from the Environmental Agencies prior to the establishment of aggregate washing operations, and all wash water shall be subject to Subsection 165.04. Where possible the Contractor may be directed by the Ministry Representative to use water from pit dewatering or clarified water from the sediment pond(s) in the wash plant.

Page 88: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 165 PROTECTION OF THE ENVIRONMENT

165 (12 of 20) 2006 BC - MOT

Waste or surplus material shall be disposed of at a waste disposal site approved by the Ministry Representative. The Contractor shall create and designate, with appropriate signing, suitable sites and facilities for disposal of waste or surplus material. In particular, the disposal of deleterious materials, such as surplus concrete or concrete wash water in sites other than those approved by the Environmental Monitor and the Environmental Agencies will be prohibited. The Contractor and the Contractor’s Environmental Representative shall be responsible for ensuring all construction personnel, including subcontractors, are made aware of this requirement. In the event that it is not feasible to install a suitable concrete waste disposal site immediately adjacent to the work site, such as during a concrete pour on a long bridge deck, then the Contractor shall take the necessary precautions to isolate the work site from any watercourse or other environmentally sensitive area and to temporarily collect the concrete waste or wash water and transport it to a nearby suitable disposal facility. The Contractor shall notify and seek approval from the Ministry and the Environmental Agencies for any changes in the location of waste disposal sites during construction operations.

165.09 Detour, Access and Haul Roads

165.09.01 Design, Construction and Operation of Access Roads - Any temporary access, detour and/or haul roads associated with the project shall be constructed to accommodate all required uses and maintained throughout the course of construction operations in a safe, environmentally sound manner.

The location, alignment, design and construction of all detour, access and haul roads shall be subject to the approval of the Ministry Representative, and the Ministry may have to obtain the approval of the appropriate Environmental Agencies. Clearing shall extend no further than safe operation requires, or to the edge of cut or toe of fill. Root systems of cleared vegetation shall not be removed except in the area of cuts or actual road surface.

The Contractor shall employ suitable measures to maintain air quality, visibility, and safe conditions in the use of access, detour and/or haul roads associated with the Project.

165.09.02 Drainage and Erosion Control - Drainage structures shall be incorporated into and maintained for the duration of the project along all detour, access and haul roads to minimize erosion and maintain drainage patterns.

165.09.03 Abandonment - The Contractor shall winterize haul and access roads at the end of the construction season and shall ensure proper drainage control measures are in place. Culvert inlets and outlets shall be flagged. During

periods of work stoppages, the Contractor shall ensure sufficient inspection and maintenance of the access, detour and/or haul roads such that adverse environmental impacts are avoided or minimized. In the event that potential or existing environmental problems are identified by the Contractor, its staff, the Ministry, the Environmental Agencies or the public, the Contractor will take immediate steps to rectify the problem and ensure corrective action is taken to prevent future recurrence of similar problems.

When no longer required by the Contractor or the Ministry, construction roads shall be properly decommissioned, including measures such as blocking such roads off from vehicular traffic, scarifying the compacted surfaces and generally revegetating the area. All drainage and crossing structures shall be removed, and sufficient cross ditches and ditch blocks constructed and stabilized to restore the original drainage patterns and prevent erosion. The Ministry Representative may require that windrows along the side of the road be removed, and the road surface sloped to drain in the direction of the surrounding contours. Fill may be required to be pulled back onto the road if it is judged to be unstable. Remaining cut slopes shall not exceed the natural angle of repose. Reclamation works required by the Ministry Representative may include, but may not be limited to decompaction of the road surface, revegetation of exposed soil surfaces, and reforestation.

165.10 Instream Works - In general the Contractor shall comply with the requirements specified in Section 5, "Guidelines for Construction Practices within the Fisheries Sensitive Zone", of the “Land Development Guidelines”, as well as those requirements noted below. The Contractor, in consultation with the Environmental Monitor, shall prepare a detailed set of environmental procedures for any work within a Fisheries Sensitive Zone, within the wetted perimeter of any fish-bearing watercourse (or any watercourse that flows directly into a fish-bearing stream), or for any work with the potential to cause major adverse impacts on a fish-bearing watercourse (e.g., concrete pour for a bridge deck over a fish-bearing watercourse, hydroblasting of bridge substructures over a fish-bearing watercourse, etc.).

No clearing or equipment operation shall take place in a Fisheries Sensitive Zone prior to Ministry and environmental agency approvals. Waste material generated during instream works shall not be stored or dumped within the floodplain unless otherwise approved by the Ministry Representative.

Drainage of waterbodies, such as wetlands, swamps or beaver ponds, shall be subject to the approval of the Ministry Representative who will consult the Environmental Agencies, unless drainage of these areas is specifically

Page 89: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PROTECTION OF THE ENVIRONMENT SECTION 165

BC - MOT 2006 165 (13 of 20)

required as part of the Contract and has been approved by Fisheries and Oceans Canada and British Columbia Water Management office.

165.10.01 Provision of Fish Passage - Unless the Contractor has written approval from the Ministry Representative and the Environmental Agencies, any instream works in fish bearing streams shall provide for fish passage. It is the Contractor's responsibility to contact the Environmental Agencies to determine fish passage requirements for the specific location.

The Contractor is required to give two week's notice to the Ministry Representative of any activities, which may result in stranding of fish, to allow for scheduling of fish retrieval and/or transfer operations.

165.10.02 Management of Water Discharges - During preparation of stream diversions, culvert installations and other operations involving dewatering where drainage could readily reach a designated watercourse, all effluent and silt-laden water shall be discharged to a sediment control pond or a vegetated area acceptable to the Ministry Representative and the Environmental Monitor for removal of silt prior to its release into that watercourse. This requirement also applies to the control of discharge resulting from curing areas of recent concrete pours for bridges or drainage structure headwalls. The direct discharge or discharge via seepage of untreated, silt-laden water or other deleterious substance into any watercourse is prohibited.

165.10.03 Encroachment of Fill into Watercourses - Embankments which encroach on fish-bearing watercourses shall either be isolated and dewatered, by means of a cofferdam, until surfaced with riprap, or constructed of clean granular material and riprap or shot rock which is free of fine-grained material or other potential contaminants. Riprap composition and placement may be further detailed in the Special Provisions. The method of placement of this material shall be such that disturbance and/or alteration of aquatic habitats is absolutely minimized. Fill material must be entirely contained within the proposed fill cross section.

165.10.04 Temporary Stream Crossings - Prior to construction, the Contractor shall provide the Ministry Representative with a plan for approval, describing the proposed locations and types of stream crossings, complete with construction procedures and timing of construction. The Contractor shall forward a copy of the approved plan to the Ministry. Temporary stream crossings shall be subject to the same environmental constraints as permanent crossings, and shall be built to pass, at least, the 10 year return period flood for the time of year during which the structure will be in place. Wherever possible, vegetative cover shall be maintained in order to minimize erosion.

Temporary stream crossings that have been constructed during periods of low precipitation (i.e. summer and late winter) shall be completely removed prior to periods of increased precipitation (i.e. fall and spring freshet), unless otherwise approved by the Ministry Representative.

165.10.05 Instream Equipment Operation or Crossings - The entering or crossing of any designated watercourse by construction equipment, when not specified in the Special Provisions, shall require and comply with the written approval of the Ministry Representative who will consult the Environmental Agencies. The Contractor shall notify the Ministry Representative 48 hours prior to allowing equipment to cross or enter designated streams. The Environmental Monitor shall be present while equipment enters into and exits from any designated watercourse.

Upon completion, the banks shall be restored, stabilized and revegetated to prevent erosion. This work shall be completed to the satisfaction of the Ministry Representative.

165.10.06 Culvert Installations - Unless otherwise approved by the Ministry Representative, culvert installation in designated watercourses shall involve an appropriate method of isolating the work site from the stream, such as the diversion of the stream around the culvert site, and the placement of the culvert in the "dry".

Installation of riprap and other protective works shall be carried out at the earliest possible time following culvert installation in order to prevent erosion and siltation.

165.10.07 Culvert Obstructions - Unless the watercourse is dry, an obstructed culvert shall be cleared by mechanical means. Any variance to using mechanical means to clear wet obstructed culverts must have the prior approval of the Workers' Compensation Board.

165.10.08 Channel Diversions - Channel diversions shall be performed in accordance with the Special Provisions. If not specified in the Special Provisions, methods shall be approved by the Ministry Representative, and shall comply with the "Land Development Guidelines".

165.10.09 Bridge Construction - Bridge Endfills shall be constructed implementing fully the applicable subsections of Section 165, and Section 769, Protection and Retention of Vegetation. The Fisheries Sensitive Zone shall not be disturbed until construction of the endfill or crossing structure is ready to proceed. The Contractor may be required to hand fall trees and leave the root systems in place.

165.10.10 Watercourse Clean-up - Final watercourse clean-up shall consist of, but not be restricted to, the

Page 90: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 165 PROTECTION OF THE ENVIRONMENT

165 (14 of 20) 2006 BC - MOT

removal of temporary haul roads and temporary crossings, the reshaping of the stream to its original configuration, width and depth, the protection of stream banks, revegetation, and the removal of all construction related material and debris, including any material and debris deposited upstream or downstream of the site as a result of operations, under the direction of the Ministry Representative. All abandoned temporary diversions shall be plugged and stabilized. In the event that erosion has occurred during the course of construction, the Contractor will be required to recontour, stabilize and revegetate the affected area.

165.11 Ditch Maintenance - To reduce the risk of damage to aquatic habitat and sensitive life stages of fish and other aquatic organisms, the Contractor shall ensure that the excavation and maintenance of ditches is conducted in an environmentally sound manner.

Excavation for ditch cleaning of any ditch that contains or directly drains into fish-bearing waters shall be performed only within Timing Windows as detailed in the "Guidelines for Land Development, Appendix III" or as specified in the Special Provisions.

The Contractor shall consult local Environmental Agencies for the locations of sensitive areas and local Timing Windows prior to commencement of ditch maintenance. Areas identified as Fisheries Sensitive Zones shall be revegetated by the Contractor prior to the close of the timing window.

165.12 Bridge Maintenance - In performing any bridge rehabilitation or maintenance, the Contractor shall follow the procedures specified in the document "Federal Fisheries Guidelines for the Protection of Fish and Fish Habitat during Bridge Maintenance Operations in British Columbia"

The Contractor shall take measures to ensure absolute minimal loss of paint and abrasive material into watercourses during bridge cleaning. Mitigation measures may include placement of ground covers, lined nets or tarpaulins to capture falling debris, blast enclosures to encase the section of the bridge to be abrasively blasted, use of vacuum-shrouded power tools, and use of floating booms and barges to trap floating debris. Similar measures shall also be employed to assist in mitigating paint spray drift.

165.13 Servicing and Operation of Equipment

165.13.01 Transport of Materials - The Contractor shall use equipment and containers that are capable of safely transporting petroleum products and/or hazardous materials in compliance with Section 7.33.1 of the Federal "Transport of Dangerous Goods Regulations" for bulk containers, and

Sections 7.21 and 7.23 of the same regulations for materials in packages or small containers. These regulations shall apply to both on-road and on-site transport. In addition to compliance with the Federal Transport of Dangerous Goods Regulations, the transportation of fuel trailers, fuel tanks on skids, and non-commercial fuel trucks shall comply with all the requirements of the Motor Vehicle Act and the British Columbia Fire Code.

The Contractor shall take the necessary precautions to prevent the loss of materials during transport on public highways, roads, access roads, and haul routes. Trucks carrying loose materials shall be covered and restraints shall be used to prevent materials from blowing or falling from vehicles. The Contractor shall be responsible for collection and removal of any and all litter deposited by vehicles or equipment along access routes during construction-related activities, including removal of dirt and mud deposited from truck tires on municipal roadways.

165.13.02 Location and Installation of Fuel Storage Facilities - The siting and installation of all fuel storage facilities shall be the responsibility of the Contractor. Fuel storage shall not be located within 30 m of a watercourse, within a watercourses flood plain, or where there is a potential for any spilled fuel to enter a watercourse or groundwater. Fuel storage facilities shall be located on flat or gently sloping ground and shall be dyked to contain at least 125% of the total capacity of the storage containers. Dykes shall be constructed of impermeable material or lined to ensure that petroleum products cannot escape.

All large fuel storage tanks must be locked and secured when not in use. Automatic shut-off nozzles shall be installed on all dispensing units over 250 l capacity. Fuel storage tanks must be drained within one week of completion of construction or within one month of a prolonged shutdown period.

All small fuel storage containers, such as 45 gallon (200 litre) drums, used as a fuel cache shall be installed on a stable storage rack, within an impermeable containment device capable of capturing at least 125% of the total capacity of the storage container(s). A cover, such as a tarp, must be placed over the top of the fuel cache to prevent accumulation of precipitation in the containment device. The small fuel storage container(s) shall contain a metal spigot with a padlock placed on the container when not in use.

In the transport, storage and/or dispensing of fuel and other petroleum-based products, the Contractor shall comply with the requirements outlined in the Ministry of Environment, Lands and Parks/Ministry of Forests publication: “Environmental Standards & Guidelines for Fuel Handling,

Page 91: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PROTECTION OF THE ENVIRONMENT SECTION 165

BC - MOT 2006 165 (15 of 20)

Transportation and Storage” (December, 1995).

The Contractor shall be responsible for all costs associated with clean-up and disposal of any escaped toxic and hazardous substances.

165.13.03 Servicing of Equipment - The fueling, servicing or washing of machines or equipment within the wetted perimeter or riparian zone of watercourses is prohibited. On-site fueling and lubrication of equipment shall also be conducted as far as possible from detention and sediment control facilities. The Ministry Representative may require that servicing be conducted at designated sites that are properly protected and approved by Fisheries and Oceans Canada and British Columbia Ministry of Water, Land and Air Protection.

Refuse generated during the servicing of equipment (e.g., air and oil filters, hydraulic fluids, petroleum products) shall be collected and disposed of in an environmentally acceptable location and manner. Where possible, the Contractor is encouraged to recycle lubricants and other waste materials generated during the servicing of equipment and machinery, or alternatively dispose of such materials and refuse at nearby recycling depots. The dumping of oil or other deleterious materials on the ground or in any watercourse is strictly prohibited. The Contractor shall provide a means of catching and retaining drained oil or other deleterious materials and shall properly dispose of these materials in a location approved by the Ministry Representative.

165.13.04 Equipment Operation in Environmentally Sensitive Areas - Construction equipment shall be operated only within the designated construction site and access roads. Equipment operators shall not be allowed to damage or destroy vegetation or streambanks outside of this area.

The operation of equipment and machinery in a Fisheries Sensitive Zone must be:

a) authorized by the Ministry Representative

b) kept to an absolute minimum, and

c) undertaken only during the period(s) specified in the Special Provisions.

When working in any designated watercourse, equipment shall use biodegradable hydraulic fluid and shall be steam cleaned of oil, grease and other contaminants deleterious to aquatic species, prior to commencing work. When working in or near any watercourse, the Contractor shall ensure that all hydraulic systems, fuel systems and lubricating systems are in good repair. Equipment with fuel or fluid leaks shall not be permitted to enter the wetted perimeter of any

watercourse. Equipment developing such leaks shall be removed immediately and repaired.

165.14 Waste Disposal and Toxic/Hazardous Materials

165.14.01 General - All non-toxic or non-hazardous wastes which are not designated as combustible waste to be burned on-site shall be either recycled or disposed of in an approved sanitary landfill or other specialized area as indicated in the Special Provisions or as directed by the Ministry Representative. Any waste material that is inadvertently dumped in or adjacent to watercourses or other designated environmentally sensitive areas shall be removed by the Contractor and disposed of in an approved manner at the Contractor's expense.

The Contractor shall be responsible for the regular collection and disposal of all waste material generated by employees and sub-contractors. The Contractor shall take the necessary precautions to prevent loss of these materials during transport on public highways and roads, and shall be responsible for cleanup of all of these materials and all litter deposited by employees and subcontractors along access routes during construction-related activities, at no expense to the Ministry. Construction debris shall not be allowed to accumulate on the construction site but shall be collected promptly and regularly removed from the site. The Contractor shall ensure that waste materials are placed and stored in suitable containers. Waste material shall be disposed of at an approved waste disposal site. The Contractor shall be responsible for providing and regularly servicing animal-proof refuse containers and for ensuring that all employees and subcontractors dispose of wastes to keep the Project clear of waste and garbage.

165.14.02 Spill Clean-up Plans for Toxic/Hazardous Materials - Contingency plans for the clean-up of toxic or hazardous spills shall be prepared prior to construction and submitted, together with a list of spill abatement equipment to be stored on the job site, to the Ministry Representative for review. The Ministry Representative may require the Contractor to have on site any additional equipment or materials deemed necessary to deal with a potential spill. For operations adjacent to a watercourse, the Ministry Representative may require a Ministry-approved spill kit to be present. The Contractor shall promptly replace any used spill abatement and clean-up materials and maintain a sufficient inventory of materials throughout construction operations. For operations being conducted adjacent to or within the wetted perimeter of a watercourse or other Environmentally Sensitive Area, the Contractor shall have an approved spill kit ready for use nearby.

The Contractor shall immediately report any spill of any toxic or hazardous material verbally to the Ministry

Page 92: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 165 PROTECTION OF THE ENVIRONMENT

165 (16 of 20) 2006 BC - MOT

Representative and the Provincial Emergency Program (24 hour phone line: 1-800-663-3456). Written notification of the spill must follow within two weeks of this verbal report. The Contractor shall immediately take the necessary steps to abate the discharge and provide the necessary labour, equipment, materials and absorbents to contain and remove the spill, clean up the affected area, dispose of waste materials at an approved disposal site, and restore the area to the satisfaction of the Environmental Regulatory Agencies, at the Contractor's expense. Any soil contaminated by spills shall be removed and replaced by comparable substitutes at the expense of the Contractor. Contaminated soil and vegetation removed shall be disposed of in an approved waste disposal site. If the Contractor fails to respond to the Ministry Representative's requirements for cleanup, the Ministry reserves the right to take whatever action is necessary to clean up the spill and deduct incurred costs from any money due or to become due to the Contractor.

The Environmental Monitor and/or the Contractor’s Environmental Representative shall document any spills observed in the vicinity of the Project that are not the result of Project-related activities, and notify the Environmental Agencies of such incidents.

165.14.03 Contaminated Sites - If an area within or adjacent to the project site has been identified as a possible source of contaminated or hazardous material and the defined contaminated or hazardous material has not been removed prior to the start of the project, the Contractor shall notify the Ministry Representative at least two weeks prior to the time work is scheduled in or adjacent to that area.

In the event that the Contractor locates material on the project site believed to be contaminated or hazardous, and which has not been previously identified, the Contractor shall immediately cease work in that area and notify the Ministry Representative. The Ministry Representative will seek investigation and disposal recommendations from regional staff of the British Columbia Ministry of Water, Land and Air Protection, Environmental Protection office. No work shall proceed in the identified or suspected area until such time as these materials have been removed to the satisfaction of the Ministry Representative, representatives of the British Columbia Ministry of Water, Land and Air Protection Environmental Protection office, and the British Columbia Workers' Compensation Board. Unless it is specified in the Special Provisions, or agreement is made with the Ministry Representative to carry out such work, the Contractor is not responsible for the removal of contaminated or hazardous materials, which are not the result of the Contractor's actions.

165.14.04 Concrete Wastes - The Contractor shall isolate fresh concrete or cement from any designated watercourse

for 48 hours after placement. Containers or trucks carrying cement or fresh concrete shall be washed at a site approved by the Ministry Representative. Concrete wastes, including wastewater from batching or cleaning, shall only be disposed of at approved and designated disposal sites (i.e., location designated with proper signing). All cement-contaminated wastewater from cleaning or mixing is to be considered toxic, and must be prevented from entering any designated watercourse for at least 48 hours to allow the water to reach neutral pH. Any cement or concrete-contaminated wastewater shall be tested prior to release into a designated watercourse. In the event that such wastewater pH levels are unacceptable in terms of water quality for fish and other aquatic species, the Contractor shall take the necessary measures to contain and treat such wastewater until acceptable pH levels are achieved (i.e., pH levels are the same as the receiving waters).

The Contractor shall securely store on-site and use suitable equipment and materials for the mitigation of concrete spills into or in areas adjacent to watercourses. For example, cylinders of gaseous carbon dioxide shall be kept on the Project site, which shall be used in the event of concrete or concrete leachate discharges into any watercourse. During any concrete pour within 15 m of, or in work areas above the wetted perimeter of any designated watercourse, the Contractor shall ensure that carbon dioxide cylinders and suitable application devices (e.g., weighted soaker hoses) are available on-site and ready for use in the carbonation of water columns to neutralize any concrete leachate that is inadvertently discharged into the watercourse. Where concrete leachate is allowed to enter settling ponds, such that pH levels become very high, bubbling with carbon dioxide may not be an effective buffering agent. In such cases, it may be necessary to use other methods, such as acid buffers. The Ministry Representative shall be responsible for assisting the Contractor in identifying appropriate mitigation options and monitoring effectiveness of procedures to mitigate unacceptable pH levels.

Aged, broken concrete shall only be used as riprap with the approval of the Ministry Representative and the Environmental Agencies. The Contractor shall remove broken concrete or concrete wastes that have been inadvertently placed in non-approved sites on the Project and dispose of them at an approved waste disposal site.

165.14.05 Petroleum Wastes - Refuse generated during the servicing of equipment shall be removed from the site and disposed of in a location and manner that has been approved by the Ministry Representative. The dumping of oil or other deleterious materials (such as diesel used to wash out dump boxes) on the ground is prohibited. Where facilities are located within a reasonable distance, the Contractor shall dispose of wastes at recycling depots.

Page 93: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PROTECTION OF THE ENVIRONMENT SECTION 165

BC - MOT 2006 165 (17 of 20)

Solids, sludges and other pollutants generated as a result of construction or removed during the course of treatment or control of wastewaters shall be disposed of in a manner that prevents their direct or indirect discharge to any watercourse or groundwaters. Effluent generated by the water scrubber of an asphalt mixing plant must be given retention time in suitably sized, impermeable settling ponds prior to release into an adjacent watercourse. The required retention time will be determined by the Ministry Representative in consultation with representatives from British Columbia Water, Land and Air Protection.

Asphalt pavement shall be stockpiled for recycling in a specified location, or disposed of in a location approved by the British Columbia Environmental Protection branch, as directed by the Ministry Representative.

165.15 Pesticides - The use of all pesticides is subject to pre-approval by the Ministry Representative. The use of herbicides for vegetation control, other than noxious weeds, is not permitted. The Contractor shall comply with all Federal, Provincial and local regulations relative to the storage, use, and proper disposal of pesticides. Relevant legislation includes the Federal Pest Control Products Act and the British Columbia Pesticide Control Act. All pesticide wastes, washwaters, solvents, and containers shall be disposed of in compliance with the British Columbia Waste Management Act, Special Waste Regulation.

165.16 Air and Noise Pollution

165.16.01 Noise and Emissions - All activities, equipment, processes and work operated or performed by the Contractor in accomplishing the specified construction shall be in strict accordance with Federal, Provincial and local regulations governing noise levels and air emission standards. The Ministry Representative may require the Contractor to have maintenance performed on equipment or alter practices which are judged to produce excessive noise or emissions.

165.16.02 Dust Control - Application and handling of the any dust palliative, with the exception of water, shall be in compliance with the Ministry standards as given in "Maintenance Guidelines for Dust Palliatives and Gravel Road Stabilization".

Dust control techniques may also be required by the Ministry Representative during other construction operations, including but not limited to demolition, drilling, sand blasting and concrete cutting.

165.17 Use of Water

165.17.01 Authorization for Use - For any source of water not specified in the Special Provisions, the Contractor is

required to contact British Columbia Ministry of Sustainable Resource Management / Ministry of Water, Land and Air Protection Water Management office before any water is diverted, impounded, pumped or used for any purpose, including dust control, compaction, or operation of a work camp. Authorization in the form of an approval for short term use of water may be required from that agency. The Contractor should be aware that, if required, a water application approval may take at least six weeks to process.

Downstream water flow must be maintained at all times during water takings in fish-bearing waters.

Prior to commencing any work which may affect potable water supplies downstream of the construction area, the Contractor shall ensure that all owners of licensed water intakes have been notified.

Water sources must be approved by the Ministry Representative. In order to reduce the impact on local water supplies and watercourses, the Contractor may be required to use uncontaminated wastewater, such as that pumped from the surface of sedimentation basins.

165.17.02 Screened Intake Requirements - The intakes of all pumps or diversions used to withdraw water from fish-bearing watercourses shall be screened in accordance with the Fisheries and Oceans Canada "Freshwater Intake End-of-Pipe Fish Screen Guideline".

The Contractor shall provide and maintain stable access routes to all water withdrawal sites. The location of all such routes shall be subject to the approval of the Ministry Representative and the Environmental Agencies.

165.18 Support Facilities

165.18.01 Location and Operation of Support Facilities - The preservation of trees, shrubs, ground cover, fish and wildlife must be considered in site selection and construction of all temporary support facilities. During site preparation, vegetation shall be removed using selective hand clearing in preference to blanket clearing with heavy machinery, retaining vegetative cover wherever possible. The Contractor shall locate temporary field offices, storage, plant and other facilities on pre-existing cleared portions of the job-site or on areas to be cleared during the course of routine construction unless otherwise authorized by the Ministry Representative.

Where possible, for aesthetic purposes, work camps and parking areas shall be located behind a vegetative screen buffer. The Ministry Representative may require that work vehicles and heavy equipment shall be parked in designated locations only.

Page 94: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 165 PROTECTION OF THE ENVIRONMENT

165 (18 of 20) 2006 BC - MOT

The Contractor shall abide by all pollution control practices, laws, ordinances and regulations applicable to the construction of work camps and support facilities. The Contractor shall obtain the approval of the British Columbia Ministry of Health, the British Columbia Water, Land and Air ProtectionEnvironmental Protection and Water Management offices, and any applicable local authority prior to the installation and/or operation of sewage disposal and potable water distribution systems.

Work camps, field office facilities and work sites shall be kept clear of litter and garbage. The Contractor shall be responsible for providing and regularly servicing animal-proof refuse containers and for instructing all employees to dispose of food wastes accordingly. Sanitary landfill operations shall be located well away from the main camp in order to minimize conflicts with wildlife.

Combustible solid wastes shall be incinerated on a regular basis, subject to all applicable emission guidelines. Solid waste containers shall be large enough to contain all of the wastes generated between collection periods. The containers shall be constructed such that spilled liquids are contained and access by insects and wildlife is prevented. Storage areas and containers shall be maintained in a sanitary condition and shall be covered to prevent spreading of wastes by water, wind or animals. Transportation of solid waste shall be performed in a manner which prevents littering during transit to the disposal site.

Sanitary landfill sites shall be located a minimum of 450 m from watercourses or campsites, and shall be situated such that contamination of any stream, lake or groundwater system is avoided. The location of all sanitary landfill sites must be approved by British Columbia Ministry of Water, Land and Air Protection, Municipal or local officials and the Ministry Representative. The bottom of the landfill site shall be located at least 2 m above the water table. Trees and other vegetation shall be removed progressively as the size of the landfill increases in order to minimize erosion by wind and water.

Sanitary wastes shall not be discharged into watercourses or on the soil surface. All temporary toilets shall be equipped with approved septic tanks having safe drainage or with closed holding tanks which are emptied only into approved treatment plants or sewage tanker trucks. All temporary toilets used on -site shall be placed in environmentally acceptable areas, and shall be secured to avoid or minimize damage from vandalism.

165.18.02 Abandonment of Sites - Upon completion of construction, all temporary support facilities and camp infrastructure, including buildings, equipment, lumber, refuse, surplus materials, fencing and other such items shall

be removed. The original drainage pattern shall be re-established, and all disturbed areas shall be revegetated.

The Contractor shall ensure that all project-related sites are left in an environmentally acceptable manner, subject to the approval of the Ministry Representative, the Ministry and the Environmental Agencies. Decommissioned construction areas, material sources and access roads shall be reclaimed by the Contractor such that as much of the original forest, wildlife, agricultural productivity, recreational use, etc. as possible is restored or enhanced.

165.19 Protection of Livestock and Wildlife

165.19.01 Protection of Livestock and Wildlife - Harassment of livestock or wildlife in and adjacent to the project site is prohibited. The presence of livestock or wildlife in or adjacent to the project site, field office trailers or construction camp shall not be encouraged by feeding. The Contractor is required to inform work crews of the location of wildlife and livestock crossing sites situated within the boundaries of the construction area.

If it is necessary to arrange the removal or transfer of beavers, bears or other wildlife from the work-site or camp the Contractor shall contact a British Columbia Ministry of Water, Land and Air Protection Fish and Wildlife representative prior to taking action, and follow the course of action recommended.

165.19.02 Disturbance of Fish and Wildlife - Rules regarding hunting, fishing and the discharge of firearms by the Contractor, employees and sub-contractors, within the project area during the period of construction, shall be made in consultation with the Ministry Representative and the local British Columbia Ministry of Water, Land and Air Protection Fish and Wildlife office. The Contractor shall be responsible for ensuring compliance with these rules.

165.20 Archaeological and Paleontological Discoveries - In the event that any item of particular archaeological, heritage, historical, cultural or scientific interest is found on the project site, such item(s) shall remain the property of the Province and the Contractor shall, on making or being advised of such a find, immediately cease operations in the affected area, minimize activities which create ground disturbance in and adjacent to the affected area, and notify the Ministry Representative of the discovery. The Ministry Representative will notify the Archaeology Branch of the British Columbia Ministry of Sustainable Resource Management. Work shall not resume within 30 m of the discovery site until an appropriate directive has been received from that agency.

To protect archaeological and paleontological sites that are

Page 95: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PROTECTION OF THE ENVIRONMENT SECTION 165

BC - MOT 2006 165 (19 of 20)

situated within or adjacent to a project site, the Contractor may be required to use a variety of mitigative measures, including but not limited to drainage or erosion control, slope stabilization measures, or erecting fences or other suitable barriers to protect archaeological or paleontological sites that are situated within or adjacent to a project site. These measures, with any negotiated extensions of time for completion of the contract they require, will be determined and adopted at the discretion of the Ministry Representative. The costs associated with such mitigative measures will be borne by the Ministry, unless otherwise specified in the Special Provisions.

A buffer zone, in which no land alteration or other activity is permitted, may be required to ensure adequate site protection. The width of this buffer zone shall be determined by the Ministry Representative in consultation

with a representative of the Archaeology Branch of the British Columbia Ministry of Sustainable Resource Management.

The Contractor shall be responsible for the actions of employees and sub-contractors with respect to site vandalism and the unlicensed collection of artifacts from designated archaeological sites in and around the construction area.

165.21 Resolution of Disputes - In the event that a dispute arises between the Contractor and the Ministry, or the Environmental Monitor and the Ministry regarding environmental matters related to the project, the Ministry, or where appropriate, the Environmental Agencies, will have the final decision.

Page 96: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 165 PROTECTION OF THE ENVIRONMENT

165 (20 of 20) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 97: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 194 (1 of 6)

SECTION 194

TRAFFIC MANAGEMENT FOR WORK ZONES

PART A – GENERAL

194.01 General - Traffic management requirements will be as specified herein and as specified in the Special Provisions or by the Ministry Representative.

The Contractor’s Traffic Management Plan, Construction Schedule and its provisions for traffic control and safety will be based on providing safe passage through the Work Zone for all road users (i.e. cyclists, pedestrians and motorists). The Contractor will at all times make provisions for traffic through the Site to a sufficiently high standard to ensure the safety of the workers on the Project, the safety and the convenience of the travelling public, driver expectancy, and the protection of the Work Area. The Contractor will supply and maintain all traffic control devices and personnel necessary to provide all traffic control.

The Contractor’s accommodation for pedestrian and vehicular traffic, and proposed traffic control procedures, for each work operation, will require approval by the Ministry Representative prior to the start of that operation.

Any one or more of the advance warning area, transition area, buffer zone and termination area of the traffic control (work) zone may be outside the Limits of Construction, but this will in no way diminish the Contractor’s responsibility to meet the requirements of the Traffic Management Plan.

194.02 Definitions - For purposes of this Section, the following general terms are defined in the Traffic Management Guidelines for Work on Roadways:

• Traffic Management Plan • Traffic Management Strategy • Traffic Control Plan • Incident Management Plan • Public Information Plan • Implementation Plan

In addition, the following terms are used in this Section and defined below:

“Work Area” refers to an area that contains the work activity and is closed to traffic and set aside for the exclusive occupation by workers, equipment and construction materials. Work areas may remain fixed in location or may move as work progresses.

“Work Zone” as defined in the Traffic Control Manual for Work on Roadways.

“Construction speed zone” as defined in the Traffic Control Manual for Work on Roadways.

194.03 Standard Documents – Traffic Management Plans shall be developed in accordance with standards defined in the latest version of the following documents:

• MoT Traffic Management Guidelines for Work on Roadways (TMG)

• MoT Traffic Control Manual for Work on Roadways (TCM)

• MoT Electrical and Traffic Engineering Manual and all current Technical Bulletins

• TAC Geometric Design Guide of Canadian Roads • MoT Supplement to TAC Geometric Guide • Workers’ Compensation Board (WCB) Regulation

All Ministry Publications listed above can be purchased from:

GOVERNMENT PUBLICATION SERVICES MINISTRY OF MANAGEMENT SERVICES PO BOX 9452 STN PROV GOVT VICTORIA BC V8W 9V7

www.publications.gov.bc.ca/queries/service.html

Email: [email protected]

PHONE: 1-800-663-6105 FAX: (250) 387-1120

194.04 Traffic Control Supervisor - The Contractor will designate a traffic control supervisor who has the Contractor's authority to respond to traffic control requirements and who will provide surveillance of traffic conditions through the Work Zone. This person or qualified designate will be available at all times, both when the Contractor is working and during weekends or other periods when the Contractor's forces are not active on the Project, to respond to calls from the police and from representatives of the Ministry concerning damage or deficiencies in the traffic control devices and the passage for traffic through the Work Zone.

The traffic control supervisor shall meet the requirements of the TMG and WCB Regulation and shall not be the Contractor’s site superintendent.

194.05 Compliance with Acts and Regulations - The Contractor shall comply with the requirements of any legislation, Regulations and by-laws as are in force for the regulation of traffic or use of any road upon or over which it is necessary to carry out work or to haul materials or things.

PART B – PLANNING AND SCHEDULING

194.11 Provide Traffic Management Plan - The Contractor shall prepare a Traffic Management Plan (TMP)

Page 98: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 194 TRAFFIC MANAGEMENT FOR WORK ZONES

194 (2 of 6) 2006 BC - MOT

in accordance with the Ministry definitions and guidelines specified in the Traffic Management Guidelines for Work on Roadways Manual.

The Special Provisions or the Ministry Representative will specify the Traffic Management Strategy and required documentation for the Traffic Management Plan.

The Traffic Management Plan will be fully integrated with the Contractor’s plan and schedule for carrying out the work, comply with the requirements of the TCM, the Traffic Management Guidelines for Work on Roadways, the Traffic Management Strategies listed below, and with the provisions of the Contract.

194.12 Traffic Management Plan Review – The Ministry Representative may review the Contractor’s Traffic Management Plan for general conformance with the requirements of the Special Provisions and the Contract for sufficiency of detail to provide a complete and unambiguous traffic control layout. No review or change requested by the Ministry Representative in any way relieves the Contractor of any if its responsibilities for ensuring safe and adequate traffic management. No work that effects traffic will be permitted until the Ministry Representative accepts the Traffic Management Plan.

Where the Traffic Control Manual shows a choice of traffic control layouts for a given specific situation, the Ministry Representative may request the Contractor to use an alternative layout which is acceptable.

The following time periods are required for plan review and acceptance unless otherwise specified in the Special Provisions or by the Ministry Representative:

• A Traffic Control Plan shall be submitted to the Ministry Representative for review at least fifteen (15) working days prior to the start of any Works effecting traffic flows. The following conditions shall apply:

Any plan modifications shall be submitted to the Ministry Representative for review at least ten (10) working days prior to any changes being made in the field.

A staged plan shall be submitted to the Ministry Representative for review at least ten (10) working days prior to implementation of a new stage.

• The Implementation Plan, if required, shall be submitted to the Ministry Representative for review at least fifteen (15) working days prior to the start of any Works effecting traffic flows.

• The Public Information Plan, if required, shall be submitted to the Ministry Representative for review at least fifteen (15) working days prior to the start of any Works effecting traffic flows.

• The Incident Management Plan, if required, shall be submitted to the Ministry Representative for review at

least fifteen (15) working days prior to the start of any Works effecting traffic flows.

PART C – TRAFFIC MANGEMENT OPERATIONAL DETAILS

194.21 Speed Zones - . Reduction in speed limits may take several forms as defined in the TCM 1.4.6. Construction speed zones within the Project will be determined at the discretion of the Road Authority or as specified in the Special Provisions.

The Contractor's work plan, Construction Schedule and its provisions for traffic control and safety will include references to the reduced posted speeds referred to in Subsection 194.21.

The location and length of posted speed reduction zones shall be adjusted daily, or more frequently as appropriate to the Work, to provide the shortest reduced speed zone practical. For example, on a resurfacing project, the reduced speed limit would usually be invoked around active operations such as milling, priming, paving, and, if necessary, at access points to pits and the plant, but will not generally be acceptable for areas of the Site used only for haul.

194.22 Use of Channelling Devices and Taper Rates - Traffic cones, temporary highway delineators, standard barricades or other marker devices such as wooden or metal saw horses, temporary marking tape, etc., shall be used in the following circumstances for channelling traffic:

a) from one lane to another or for merging traffic where a reduction in the number of lanes must be effected

b) around a hazard on the travelled way

c) through an area of unfinished construction where the intended traffic lanes are not self-evident

d) at any other location where, in the Ministry Representative's opinion, channelling will ensure the safe passage of public traffic.

Minimum taper rates and spacing between cones or delineators shall be as shown in TCM.

194.23 Equipment on the Travelled Way - When working on the travelled way equipment shall be placed in such a position as to present a minimum of interference and hazard to the travelling public. Equipment units shall be kept as close together as working conditions will permit and preferably on the same side of the travelled way. Equipment shall not be left overnight on the travelled way but shall be located so as to avoid the possibility of an accident.

Page 99: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TRAFFIC MANAGEMENT FOR WORK ZONES SECTION 194

BC - MOT 2006 194 (3 of 6)

194.24 Roadway Configuration - The Contractor shall arrange to keep interconnected lanes of the highway open to traffic at all times with the least amount of inconvenience to the travelling public unless otherwise authorized by the Ministry Representative.

194.25 Roadway Condition - The Contractor shall keep the travelled way well-graded, free of potholes and of sufficient width that the required number of lanes of traffic may pass. The subgrade shall be completed progressively in order that gravel surfacing may follow in an orderly manner. Prior to tearing up a portion of the existing travelled way the Contractor shall obtain Ministry Representative approval and shall also have available a sufficient supply of crushed gravel, or another approved product, to ensure a smooth riding surface during the work.

194.26 Closures – Road closures shall not be permitted until the Contractor requests and receives written permission from the appropriate authority in the Ministry of Transportation. This request shall be submitted in writing not less than fifteen (15) days in advance of the closure.

Upon receiving written permission for the closure, the Contractor must notify the local police, fire, ambulance, municipality, school board, and public transit at least seven (7) days in advance of the closure.

The public must be notified by local radio and newspaper at least (5) days in advance of the closure. The Contractor shall arrange any public announcement relating to the Contract and incorporating the Ministry logo through the Ministry Representative and Corporate Writing Services. Such advertisements will be made at the Ministry’s expense. Notices or other advertisements of the Contractor unrelated to the Contract or where the Ministry’s logo or name is not incorporated may be made by the Contractor at the Contractor’s expense.

All costs related to the above shall be borne by the Contractor.

194.27 Detours – Where detours are required for the execution of the work or deemed necessary by the Ministry Representative, the Contractor shall provide well graded, gravelled detours or temporary roads to facilitate the passage of traffic around the restricted construction area. The Contractor shall be responsible for signs, maintenance of same and maintenance of the detour or temporary road. The Contractor shall consider the condition of the pavement used for detours and its impact on the safety and function of the detour. Milled surfaces upon which traffic is to run shall be clean and allow adequate drainage.

The minimum design requirements for any detours will be

specified in the Special Provisions or by the Ministry Representative.

Where the anticipated detour extends beyond the existing road surface, the Contractor will submit an engineering design to the Ministry Representative for review, a minimum of fourteen (14) days in advance of building the detour. The engineering design will include the design speed, the horizontal and vertical geometry, plus evidence that the design vehicle is accommodated for all movements and that all the requirements of this Contract are satisfied.

Where the anticipated deviation is minor, the Contractor may apply to the Ministry Representative, in writing, for approval to proceed without a formal design. Such approval does not relieve the Contractor of any of its responsibilities for provision of a safe site.

194.28 Access to Property - During operations the Contractor shall provide and maintain reasonable road access and egress to property fronting along or in the vicinity of the work unless other reasonable means of road access exists. The Ministry Representative will be the sole judge of what may be deemed reasonable road access.

194.29 Winter Lay-Up – In the event that the Work is stopped due to winter conditions, the Site is to be left in a condition as specified in the Special Provisions or as deemed acceptable by the Ministry Representative.

194.30 Delays – All major and minor delays to the travelling public will be determined by the Ministry Representative.

The Contractor will monitor the queue lengths created by any delay to the flow of traffic. Traffic must be cleared prior to starting another delay unless authorized by the Ministry Representative. If the Ministry Representative determines that the traffic delays are excessive, the Contractor shall immediately cease construction activities and make all the travel lanes available to traffic as quickly as possible. Resumption of roadway operations shall be permitted as traffic levels dictate and upon approval by the Ministry Representative.

PART D – TRAFFIC CONTROL DEVICES

194.41 Traffic Signals - Short one-way sections, such as bridge and culvert construction detours, etc., may be controlled by traffic signals and it is acceptable where the restriction will be in effect for an extended period. The use of signals on long one-way zones is not recommended as delays to traffic may be of considerable length and might not be accepted by the motorist.

Where traffic signals are requested by the Contractor, the

Page 100: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 194 TRAFFIC MANAGEMENT FOR WORK ZONES

194 (4 of 6) 2006 BC - MOT

Contractor shall arrange to have a qualified Traffic Engineering consultant prepare a Traffic Engineering study for the signal. The study shall document the following:

• Site layout • Anticipated volumes • Requirements for advance warning signs • Actuation • Proposed traffic signal timing plans

The Contractor will submit the study to the Ministry Representative for review. The approval for the installation of the signals will be determined by the Ministry Representative.

If the proposed traffic signal installation is approved by the Ministry Representative, the Contractor shall:

• Prepare a traffic signal design, signed and sealed by an electrical engineer registered with the APEGBC

• Supply and install all traffic controller equipment • Supply power • Operate and maintain the signals

Changes to the signal timing plans shall only be prepared by a qualified professional traffic engineer experienced in traffic signal timings. Traffic controller technology used shall comply with industry standard practice and shall have a conflict monitoring mechanism that will ensure signal malfunctions/conflicts result in the signal going to a flashing red state. Signals shall be vehicle actuated unless otherwise approved by the Ministry Representative. Signal operations shall conform to TCM 2.2.8 and the Electrical & Traffic Engineering Manual.

Where the work activity impacts the operation of an existing signal, the Contractor must submit a written notification to the Ministry Representative a minimum of ten (10) days in advance of the disruption to the signal.

194.42 Pilot Cars – The use of pilot cars may be warranted where public traffic must use a particularly hazardous route, or where traffic is required to remain in one lane, or change periodically from one lane to another, or negotiate a section of construction at restricted speed. Pilot cars shall be operated in conjunction with flagpersons stationed at each end of the restricted section. When required, the Contractor shall provide sufficient pilot cars, as may be required from time to time, to keep a steady and controlled flow of traffic moving around or through the construction area.

Pilot cars shall be equipped with the following:

a) A sign or signs with minimum 200 mm letters, designating the vehicle as a pilot car, and showing the message in both directions. Signs shall be illuminated

during the hours when headlights must be used. Signs shall not be displayed when the vehicle is not being used for piloting.

b) Amber flashing lights mounted on the roof at either side so as to be clearly visible from both directions. The flashing lights shall be in use for both day and night piloting.

194.43 Use of Flagpersons – It is generally expected that flagpersons will be required in the following situations:

a) when public traffic is required to pass working vehicles or equipment which may block all or part of the travelled roadway.

b) when it is necessary to institute a one-way traffic system through a construction area or other blockage where traffic volumes are heavy, approach speeds are high, and a traffic signal system is not in use.

c) in high speed, high volume areas where temporary protection is required while other traffic control devices (barricades, cones, signs, etc.) are being erected or taken down.

d) for emergency protection when other traffic control devices are not readily available.

e) in all situations, where adequate protection for workers, working equipment and public traffic is not provided by other traffic control devices.

194.44 Traffic Signs – All standard signs, new and replacement, shall meet current Ministry specifications. The Ministry Specifications for Standard Highway Sign Materials, Fabrication and Supply are located on our Ministry web page at::

www.th.gov.bc.ca/publications/eng_publications/ geomet/geometsigns.htm

Prior to the commencement of work the Contractor shall supply all posts, hardware and equipment required for the proper installation and maintenance of the project (C-35) signs and the Contractor's own "Construction Ahead" (C-18) signs. The Contractor shall place the signs as indicated in the TCM or as directed by the Ministry Representative.

Upon completion of the project the Contractor shall remove the C-35 signs and the C-18 signs, posts and hardware when directed by the Ministry Representative. The removal of the signs shall also include the backfilling, compacting and dressing of the postholes to the satisfaction of the Ministry Representative.

Page 101: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TRAFFIC MANAGEMENT FOR WORK ZONES SECTION 194

BC - MOT 2006 194 (5 of 6)

The signs shall be erected in advance of all highway and bridge construction projects whether undertaken by contract or day labour. The signs may be omitted at the direction of the Ministry Representative if the project is not in public view.

The Contractor shall supply and maintain all necessary signs and traffic control devices required by this specification and the TCM or as ordered by the Ministry Representative. All signs and devices used must conform to the standards detailed in this manual.

194.45 Barricades, Lights, Delineators, Traffic Lines - The Contractor shall provide, erect and maintain all types of temporary marker devices including traffic line marking tape, barricades, fences, delineators, flare-pots, battery operated amber flashing lights and 110 volt steady burning or simultaneous flashing lights, in order to ensure safety to the workers and the general public. These devices shall be as required by the Special Provisions and the TCM, or as directed by the Ministry Representative.

Flashing amber lights, if deemed necessary by the Ministry Representative, are used for extra night time effectiveness and the batteries of the flashing lights shall be checked each day.

Battery operated flashing lights, if two-faced, and if used to mark the right hand edge of a travelled lane, must have one face covered so that the light is not visible to traffic travelling in the other direction. Flashing lights having two faces showing in opposite directions may be used only if it is necessary that the obstruction or lane edge being marked be seen from both directions of travel. They should not be used in a line of delineators through an area of incomplete construction except where traffic must be diverted and a specific hazard exists.

Temporary road construction lighting installations shall be positioned as shown in FIGURE 1: Positioning of Temporary Lighting Adjacent to a Highway to minimize glare and resulting impaired driver vision. Lights shall be aimed away from any approaching traffic and at an angle of less than 45 degrees above vertical. Where lights cannot be located as shown then temporary glare screens shall be used to shield the traffic from the light source. These glare

screens shall be metal or an opaque plastic material designed to shield the lighting from the eyes of the driver.

The Contractor shall be responsible for the application and removal of all temporary pavement marking and reflective devices. When traffic lanes have to be redefined for Long Duration Work, the Contractor shall eradicate all redundant temporary or pavement markings that are not required for the intended traffic patterns.

Class I and Class II standard barricades are illustrated in the TCM. Temporary delineator posts shall be as shown on Drawing SP194.02. In speed zones of 50 km/h or less, the minimum height of traffic cones shall be 450 mm. Where the maximum speed limit is over 50 km/h, the minimum height of cones shall be 700 mm.

194.46 Changeable Message Signs –The use of changeable message signs (CMS) may be specified in the Special Provisions or by the Ministry Representative. Each sign must be portable. When in operation, the CMS shall be a minimum of two (2) metres from the bottom of the sign display to the road surface, and shall be level and capable of pivoting for sighting purposes. The specifications of the sign are as follows:

Sign unit: Yellow/Orange LED display Sign display: 3 lines with 8 characters per line Character size: 450mm (18 inches) Character matrix: 5 x 7 Remote dial-up access: By cellular phone or equivalent

A full matrix sign may be used given that it has the display parameters noted above.

The Contractor is responsible for the CMS including but not limited to bringing the signs to the Project, moving and setting-up, providing storage as required including moving the signs into and out of storage, maintaining the signs in full operating condition, ensuring the correct message is being displayed, damage to or loss of the signs and returning the signs to the supplier. The Contractor shall provide to the Ministry Representative with a description of the messages displayed and the procedures of how the messages on the CMS will be changed when the Contractor is on and off site.

Page 102: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 194 TRAFFIC MANAGEMENT FOR WORK ZONES

194 (6 of 6) 2006 BC - MOT

270°

180°

90°

45°

135°

FIXTURES SHALL BE AIMED IN THE 45° TO 135° QUADRANTS ONLY

TEMPORARY LIGHTING UNIT

90°

HIG

HW

AY

ROADWAY

0°TO45°

VE

RTI

CA

L

MAXIMUM 45° FROM VERTICAL

ROAD GRADE

TEMPORARYLIGHTING SYSTEM

HORIZONTAL

FIGURE 1: Positioning of Temporary Lighting Adjacent to a Highway

PART E – GENERAL MAINTENANCE

194.51 Maintenance - The Contractor shall be responsible for the continuing maintenance of all traffic control devices in use as follows:

a) Signs, etc., not applying to existing conditions shall be removed or covered. If covered, such as after sundown or during periods when work is suspended, the covering shall be placed over the sign so as to totally obliterate the message thereon. Where operations are carried out in stages, only those devices or signs, which apply to the current stage, are to be left in place or uncovered.

b) Signs shall be checked daily for legibility, damage, suitability and location. Dirty, damaged, unsuitable or misplaced signs shall be cleaned, repaired or replaced. Signs and delineators with a reflective surface shall be cleaned as frequently as necessary to ensure full reflectivity. As considerable damage may be inflicted on signs and devices during a weekend, the Contractor shall conduct a check for replacement or repairs before the rush hour on Monday morning. Similarly, high traffic volume and recreational routes shall be checked during the weekend or at any other time that works is not in progress.

During hours when headlights are required, signs that have not been treated with a reflective coating shall be

illuminated. After sundown all signs shall be checked for visibility and those that cannot be seen clearly shall be adjusted or replaced.

PART F – PAYMENT

194.61 Payment – The cost of all Traffic Management requirements, including the provision of pilot cars, all flagging and traffic control equipment, and personnel covered in this Section and the Contract Documents, or as ordered by the Ministry Representative, will be considered to be included in the unit prices bid for the applicable work of the Contract unless otherwise specified in the Special Provisions.

However, where pilot cars and flagpersons are included as bid items in the Contract Documents, a record of the days and hours that each pilot car and/or flagperson was employed shall be submitted daily by the Contractor for verification and approval of the Ministry Representative. In such event the overtime “hours worked” by flagpersons in accordance with the current union shall be expressed in equivalent straight-time “hours earned” for payment at the rate bid. Pilot cars will be paid for at the all found rate bid in the Schedule for the actual number of hours operated as such.

Page 103: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CLEARING AND GRUBBING SECTION 200

BC - MOT 2006 200 (1 of 4)

SECTION 200

CLEARING AND GRUBBING

200.01 Clearing - Except for trees and shrubs to be preserved as indicated on the Drawings or designated by the Ministry Representative, "Clearing" shall mean the complete removal and disposal of all standing and fallen trees, stumps, logs, upturned roots, rotten wood and all other vegetation growth, and accumulations of rubbish of whatsoever nature, and any other objectionable material from the area shown on the Drawings, or as directed by the Ministry Representative. Protective measures for the protection and retention of vegetation are specified in Section 769.

It shall also include the removal of existing cribwork, guard rail, fences, siphon structures built of timber and/or metal, culvert pipes of all types and timber box culverts within the limits of the work; but shall not include the removal of concrete buildings or their foundations, concrete bridge piers or abutments and their footings, concrete siphon boxes or concrete box culverts. The above items, which are excluded from Clearing shall be classified as Solid Rock and will be paid for as such in accordance with the measurements established by the Ministry Representative, and at the unit price bid in the Schedule of Approximate Quantities, and Unit Prices for Solid Rock.

The area to be cleared shall include those areas required for the highway right-of-way, borrow pits, quarry sites, Ministry or Crown gravel pits and access roads thereto, if ordered by the Ministry Representative; off-take ditches or other drainage ditches and channels for stream diversions either within or without the right-of-way; clearing of debris in streams as indicated on the Drawings, or as directed by the Ministry Representative within the Site; foundations for structures and the right-of-way as shown on the Drawings, or as directed by the Ministry Representative, for intersecting public and private road approaches or diversions of same outside the main highway right-of-way. All such areas are hereinafter referred to as the "Area."

200.02 Disposal of Material - All material, slash and debris resulting from clearing operations shall be disposed of by burning unless there are specific provisions for otherwise disposing of same. Unmerchantable timber, stumps, etc., shall not be disposed of by pushing outside the clearing and grubbing right-of-way. All trees shall be felled within the Area but, in the event of any trees falling outside the Area, such trees shall be cut up and together with all debris and slash therefrom, brought back to the Area and there burned. The Ministry Representative may designate certain trees or shrubbery to be left standing, in which case the Contractor shall take every precaution not to damage or injure such trees or shrubbery in felling adjacent timber, burning or any other clearing operations as specified in Section 769.

Such trees or shrubbery are to be limbed or thinned to such height and extent as may be directed by the Ministry Representative. No deduction will be made in the total quantity of clearing for any trees or shrubbery ordered to be left standing; no additional payment will be made for any limbing or thinning of such trees or shrubbery as may be directed by the Ministry Representative.

Except as hereinafter provided, all slash and debris shall be piled and burned at points located centrally in the Area. The number of fires to be started at any one time shall be limited to the capacity of the Contractor's equipment and organization to provide adequate protection against the spreading of the fires to adjacent timber or property.

All burning shall be carried out subject to the Provisions of the Forest Act and regulations thereto. In the event of Forestry regulations prohibiting burning, the slash, debris, etc., may be piled along the sides of the Area until such time as the regulations are rescinded.

Clearing must be carried on and completed at least 1 km ahead of grading operations.

200.03 Grubbing - Grubbing means the entire removal and disposal by burning as described in Subsections 200.01 "Clearing" and 200.02 "Disposal of Material" of all stumps, roots and embedded logs to a depth of 0.6 m below the ground line.

Grubbing shall be carried out over the entire Area as defined in Subsection 200.01 "Clearing." Grubbing shall be

Page 104: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 200 CLEARING AND GRUBBING

200 (2 of 4) 2006 BC - MOT

fully completed at least 300 m in advance of grading operations.

200.04 Danger Trees - This item shall consist of removing, on written order of the Ministry Representative, any leaning or dangerous trees or snag outside the clearing Area.

Such trees shall be felled and disposed of as provided for in Subsection 200.01 "Clearing" and Subsection 200.02 "Disposal of Material."

The Contractor will not be required to grub the stumps of any danger trees.

200.05 Payment for Danger Trees - Danger trees will be measured in three sizes according to the diameter of the tree trunk measured at a point 1.25 m above the ground line at the base of the tree. These sizes shall be as follows:

a) Under 0.75 m in diameter b) Between 0.75 m and 1.5 m in diameter c) Over 1.5 m in diameter.

Compensation for removal of danger trees as provided herein shall be made at the following unit prices which shall be accepted as full payment for everything furnished and done to remove danger trees as specified:

a) Under 0.75 m in diameter - $25.00 per tree b) Between 0.75 m and 1.5 m in diameter - $60.00 per tree c) Over 1.5 m in diameter - $100.00 per tree.

200.06 Mail Boxes - Where it becomes necessary to remove or otherwise disturb existing mail boxes within the limits of any project, the Contractor will be required to install the boxes temporarily in such a position that their usefulness will not be impaired. After construction work has been completed, the boxes shall be re-installed at positions designated by the Ministry Representative. No new posts or materials will be required, except that any damage caused by the Contractor to either boxes or supports, due to the Contractor's negligence, shall be repaired by the Contractor at the Contractor's expense.

All costs in connection with the removal and replacement of the mail boxes, as specified above, shall be considered as incidental to the construction of any improvement and shall be included in the unit prices for the various pay items of work involved in the contract. No additional compensation will be made.

200.07 Removal of Existing Signs and Symbols - When construction operations are started, the Contractor shall remove all existing Signs and Symbols of the British Columbia Ministry of Transportation not needed for the safe and orderly direction of traffic, and any other authorized signs within the limits of the right-of-way, and shall deliver them to such point as directed by the Ministry Representative.

Payment for this work shall be included in the unit prices for the various pay items of work involved in the contract. No additional compensation will be paid.

200.08 Quantities and Payment - Clearing will be paid for at the unit price bid per hectare of clearing and will, unless otherwise specified, comprise the full length and breadth of the right-of-way as shown on the Drawings or as directed by the Ministry Representative. Grubbing will be paid for at the unit price bid per hectare of grubbing and will, unless otherwise specified, comprise the full length and breadth of the right-of-way as shown on the Drawings or as directed by the Ministry Representative.

Page 105: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CLEARING AND GRUBBING SECTION 200

BC - MOT 2006 200 (3 of 4)

These prices shall be accepted as full compensation for everything furnished and done in connection therewith, regardless of the nature or condition of the Area.

Page 106: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CLEARING AND GRUBBING SECTION 200

BC - MOT 2006 200 (4 of 4)

THIS PAGE IS LEFT INTENTIONALLY LEFT BLANK

Page 107: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 201 (1 of 8)

SECTION 201

ROADWAY AND DRAINAGE EXCAVATION

DESCRIPTION

201.01 General - Roadway and Drainage Excavation shall include all excavation and the construction of all embankments required for the formation of the roadbed, parking areas and look-outs; excavation for any drainage ditch, off-take ditch or channel for stream diversion within or outside the right-of-way; removal of surcharge material, topsoil and organic waste material from the roadway, and of topsoil and unsuitable overburden from any borrow pit or any Ministry or Crown gravel pit, and disposal of same, as may be directed by the Ministry Representative; excavation of materials below grade; excavation of borrow pits; the grading necessary to construct any frontage road, gravel pit access road, borrow pit access road or any other access road, public or private, either within or outside the right-of-way, as may be ordered by the Ministry Representative; the grading of connections to intersecting roads, public or private, either within or outside the right-of-way; the hauling and disposal of all excavated material, and the trimming and shaping of all excavations and embankments.

201.02 Extent of Work - The dimensions of the excavations and embankments shall be as shown on the Contract Drawing but the Ministry Representative may increase or decrease the width of the roadbed or the ratio of the slopes as conditions and circumstances may necessitate.

Construction Grade is defined as the grade upon which the Asphaltic Pavement is laid.

Subgrade is defined as the grade upon which the first layer of select granular sub-base or base material is laid.

MATERIALS

201.11 Description of Material Types - Excavation shall be classified, as approved by the Ministry Representative, under the following material types:

a) Type A b) Type B c) Type C d) Type D

The material encountered in any highway excavation shall be classified as one of the four types listed above.

In no case shall a material be classified using percentages of two or more types.

It is possible that material may change at some level in the excavation. Where such a change occurs, in order to obtain approval for a change in classification, the Contractor shall immediately notify the Ministry Representative. If a

classification change is approved, sufficient field measurements will be taken to establish the boundary between the two types of material.

201.11.01 Type A - Solid Rock - Type A shall include all forms of "solid rock in place" occurring in masses, ledges, seams or layers of sufficient hardness to require breaking by continuous drilling and blasting before excavation and removal.

It shall also include detached masses of rock or boulders individually containing a volume of 1.5 m3 or more.

201.11.02 Type B - Materials Containing More Than 50% Loose or Broken Rock - Type B Material shall mean loose or broken rock, boulder gravel, or any other material containing at least 50% boulders or broken rock, having a size greater than 0.03 m3 but less than 1.5 m3 and in a state not requiring loosening, or drilling and blasting for removal.

Any excavation or portion thereof, containing the 50% boulders or broken rock of the size described above, shall be classified as this type of material and will be paid in its entirety under this category.

Any excavation, not containing 50% boulders or broken rock of the size described above, shall be classified in its entirety as Type D Material, and in that event no allowance will be made for the smaller percentage of boulders or broken rock in the material.

201.11.03 Type C - Materials Requiring Ripping - Type C shall include those materials of such density or so firmly cemented together that a force of at least 360 kN per linear metre of ripper shank or ripping equipment embedded in the material is required to loosen the material. If the material can be loosened with a lesser force, then the material will be classified as Type D.

If a means other than ripping equipment is used to loosen materials, the force generated must be equivalent to that specified above.

Where deemed necessary by the Ministry Representative, a ripping test will be conducted using a bulldozer or other appropriate equipment, under suitable weather conditions, that will develop sufficient traction and effectively deliver a force of 360 kN per lineal metre of ripper shank embedded into the alleged Type C. The material will only be classified as Type C if it cannot be loosened under such an applied load.

The test will be conducted at the Contractor's expense unless the test indicates, to the satisfaction of the Ministry

Page 108: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 201 ROADWAY AND DRAINAGE EXCAVATION

201 (2 of 8) 2006 BC - MOT

Representative, that the material is Type C. In that case, the cost of the equipment (including mobilization if the equipment is brought in solely for the purpose of the test) and the operator will be paid as Extra Work.

201.11.04 Type D - All Other Materials - Type D shall include all other materials of a nature not included in the foregoing definitions of Type A, Type B, or Type C; regardless of the nature or condition of the material or the method used to excavate or remove.

Type D shall also include any unsuitable materials of an organic nature, unless such materials have been specifically set apart in the Special Provisions of the contract.

201.12 Unsuitable Material - Unless otherwise shown, specified or directed, all topsoil and organic material shall be stripped from the highway cut and fill areas, and placed in the area between the highway and the right-of-way boundary, or on any other area designated by the Ministry Representative.

Where additional material is found above or below subgrade in an excavation or in the foundation of an embankment, which in the opinion of the Ministry Representative is unsuitable, such material shall be removed and paid for as excavation, as classified by the Ministry Representative. Soft clays and peats are examples of normally unsuitable materials.

Backfilling, where required, shall be carried out with approved materials, as ordered by the Ministry Representative. Payment for such backfilling and haul will be made at the unit prices bid for "Roadway and Drainage Excavation" and "Overhaul" in the Schedule of Approximate Quantities and Unit Prices.

Material that is unsuitable for the construction of embankments shall be disposed of as ordered. Any such material subsequently placed in an embankment, without the approval of the Ministry Representative, shall be removed and disposed of, as directed by the Ministry Representative, and no payment will be made for the removal or haul of such unsuitable material from the embankment.

Upon completion of the road grade, all topsoil and organic material suitable for growth of ground cover shall be spread on the cleared right-of-way and up the fill slopes to generally blend in with the cross-section. Care shall be taken that proper drainage is maintained. This topsoil shall be trimmed to a neat appearance preparatory to seeding by others. No additional payment will be made for replacing and trimming topsoil except that haul in excess of 300 m will be paid in accordance with Subsections 201.45, 201.83 and 201.93.

CONSTRUCTION

201.31 Rock Cuts- See Section 204

201.32 Dangerous, Loose and Overhanging Rock - The Contractor shall be required to remove dangerous, loose and overhanging rock within or outside the limits of the highway right-of-way, when and where ordered by the Ministry Representative. Such work within the cut slopes will be paid for under the heading of "Roadway and Drainage Excavation." Such work beyond the cut slopes will be paid for at a negotiated rate or by Order for Extra Work.

201.33 Overbreak in Solid Rock - Overbreak in solid rock excavation encountered in this contract is that portion of any such material which is excavated, displaced or loosened outside and beyond the slopes or grades as staked or re-established (with the exception of slides as described in Subsection 201.42) regardless of whether any such overbreak is due to the inherent character of any formation encountered or to any other cause.

All overbreak, as so defined, shall be removed by the Contractor at the Contractor's expense, and shall be disposed of by the Contractor, in the same manner as provided for "Surplus Material", but at the Contractor's expense without any allowance for overhaul, except as hereinafter stated.

201.33.01 Allowable Overbreak - If, and only where directed by the Ministry Representative, use is made of the overbreak to replace material, which would otherwise have to be borrowed for the construction of the roadway, then such overbreak will be classed as allowable overbreak.

201.33.02 Contractor's Negligence - Overbreak resulting from fault or negligence of the Contractor shall be removed and disposed of, as directed by the Ministry Representative, at no cost to the Ministry.

Definition of negligence will be deemed to mean lack of cut-off drill holes on the back slope, excessive spacing of drill holes and overloading of same.

201.34 Surplus Material - All excavation shall, if required, be taken or hauled into the nearest embankment and out to the extreme distance required by the Ministry Representative. The surplus beyond what is necessary to form the nearest embankment shall be disposed of in widening this embankment uniformly along one or both sides of the same, or shall be hauled to form or widen any embankment on the road to be constructed, as the Ministry Representative may direct. No material shall be wasted and in no case shall material be deposited above the grade of the adjacent roadbed, unless directed in writing by the Ministry Representative.

Page 109: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ROADWAY AND DRAINAGE EXCAVATION SECTION 201

BC - MOT 2006 201 (3 of 8)

201.35 Enlargement of Excavation - In cases where the quantity of material taken from a regular excavation will not be sufficient to form the requisite embankment, the deficiency shall be supplied by taking material from excavation within or outside the right-of-way, at such places as the Ministry Representative may direct, or from enlargement of the regular excavations made uniformly on one or both sides. The sides of the excavation in all cases shall be dressed to such slopes as the Ministry Representative may require, provided that if the Contractor shall have sloped or scaled such excavation by direction of the Ministry Representative before widening the same, payment for sloping or scaling the second time will be made by Order for Extra Work.

201.36 Rock Embankments - This section applies to embankments constructed from material containing more than 15% by volume of rock larger than 150 mm.

Embankments shall be constructed in layers equal in thickness to the largest size of the material but not exceeding 0.7 m. Greater lift thicknesses will be permitted by the Ministry Representative under special conditions provided the Contractor can spread the larger material satisfactorily.

The material shall be deposited and spread so that the larger rocks are well distributed and the intervening spaces are filled with smaller sizes as may be available to form a stable embankment. The finer portion of excavated rock shall be retained for the top transition layer. Each layer shall be compacted by routing the loading construction equipment over the entire width.

When a rock embankment is overlain by an earth embankment or by sub-base or base course materials, the top 0.5 m of the rock fill shall be sealed with smaller rock particles and suitable soil materials, if necessary, to prevent the uppermost layers penetrating into voids in this rock embankment.

Where permitted by the Ministry Representative, and where the width is too narrow to accommodate equipment, material for the toe of the side hill rock fills may be placed by end dumping until sufficient width of the embankment has been formed to carry equipment, after which the remainder shall be placed in layers and compacted as specified. Any loose material left on the slopes by end dumping shall be incorporated in the fill and compacted.

When embankments are made on hillsides or where a new fill is to be applied upon an existing embankment, the slopes of the embankment or original ground (except rock) shall be terraced in a continuous series of steps a minimum of 1.5 m wide as the embankment rises.

The material from step excavation shall be spread and compacted into the adjoining embankment. No additional payment will be made for excavation or for placing step material in the adjoining fill.

201.37 Earth Embankments - This section applies to embankments constructed from material containing less than 15% by volume of rock larger than 150 mm. Embankments shall be constructed in such a manner that they shall be completely stable with reference to designated traffic loading.

The natural surface shall be excavated to remove organic soils or other unsuitable material, as directed by the Ministry Representative, and the removal of such material will be paid at the unit prices for the class of excavation involved.

The earth embankment shall then be constructed in successive horizontal layers not exceeding 200 mm in loose thickness except that the top 500 mm shall be constructed in layers not exceeding 100 mm in loose thickness. Each layer shall be compacted to minimum 95% of the laboratory density obtained by the current ASTM test method D 698, except in the top 300 mm of the embankment, which shall be compacted to minimum 100% of the laboratory density.

No organic soils shall be placed in the embankment. Soils that cannot be compacted to the required density because of a high moisture content shall not be employed without prior aeration and drying.

When embankments are made on hillsides or where a new fill is to be applied upon an existing embankment, the slopes of the embankment or original ground (except rock) shall be terraced in a continuous series of steps a minimum of 1.5 m wide as the embankment rises.

The material from step excavation shall be spread and compacted into the adjoining embankment. No additional payment will be made for excavation or for placing step material in the adjoining fill.

The Contractor shall be responsible for selecting equipment and methods of attaining the specified degree of compaction. In general the roller mass shall be sufficient to compress the soil vertically after each pass but not sufficient to unduly rut or shear the soil.

Water shall be added and incorporated into the soil using suitable equipment such as rotary mixers, cultivators, etc., to increase the natural moisture content to the optimum moisture percentage as determined by the current ASTM test method D 698. In the event that the natural moisture content is greater than the optimum, the soil shall be aerated and dried employing suitable mixing equipment.

Page 110: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 201 ROADWAY AND DRAINAGE EXCAVATION

201 (4 of 8) 2006 BC - MOT

201.38 Frozen Material - The use of frozen material in embankments will not be permitted; the only exception is broken rock containing less than 15% passing a 4.75 mm sieve. Frozen excavated material which will be suitable when dry shall be stored and allowed to thaw and dry, and then placed in the embankment, as directed by the Ministry Representative. No compensation will be allowed for the storing and rehandling of this material.

201.39 Snow Removal - Snow overlying the surface of a cut, or the site or surface of an embankment shall be removed and deposited beyond the slope stakes at the Contractor's own expense.

201.40 Bridge End Fill – Material for bridge end fill shall be in accordance with Subsections 202.04 and 202.05. Construction of bridge end fill shall be in accordance with Subsection 202.23.

201.41 Transition Sections - Subgrade, other than solid rock, shall be subcut 1 m deep at the line of transition from cut to embankment. The subcut shall taper to zero depth 8 m within the cut. The embankment construction shall be carried back over the subcut only after the embankment has reached the level of the bottom of the subcut, as measured by the Ministry Representative. Payment for the subcut will be made as "Roadway and Drainage Excavation."

201.42 Slopes and Slides - The slopes of all excavations and embankments shall be trimmed neatly and evenly to the line and slope indicated on the or as directed by the Ministry Representative.

No undercutting of slopes in excavation by power shovels or other excavation equipment will be permitted.

In case slopes, finished to the lines as shown on the Drawings, slide into the roadway or out of embankments before final acceptance of the work, such slide material shall be removed by the Contractor from the roadway or replaced by the Contractor in the embankment, as the case may be, at the unit price for the class of excavation involved. The classification of material in slips and slides shall be in accordance with its condition at the time of removal regardless of its prior condition. The slopes shall be refinished by the Contractor, as directed by the Ministry Representative. Such refinishing will be paid for by Order for Extra Work. Materials to replace embankment slides shall be obtained from sources designated by the Ministry Representative.

Slopes undercut at the base or destroyed in any manner by act of the Contractor shall be resloped by the Contractor at the Contractor's expense to the slope, as directed by the Ministry Representative. All materials resulting from such

resloping shall be removed and deposited, as directed by the Ministry Representative. No payment will be made to the Contractor for the removal of such material.

201.43 Ditches - Ditches which may be considered necessary for the proper drainage of the work shall be constructed at such points and to such cross-section, alignment and grade as the Ministry Representative may direct. This shall include inlets and outlets to culverts and ditching of all kinds. Ditching quantities will be considered as ordinary excavation quantities and will be measured, classified and paid for as such.

201.44 Borrow - Borrow shall consist of the excavation and disposal, as directed by the Ministry Representative, of suitable and satisfactory material obtained from borrow pits, approved and measured by the Ministry Representative, for the construction of embankments, subgrade or shoulders. The widening of roadway cuts and ditches will not be considered as borrow.

Borrow pits may only be opened at sites approved by the Ministry Representative. The Ministry will formally arrange for securing the sites and the right-of-way thereto and will pay the cost of compensation, royalties and fencing, where required, and all other expenses in connection therewith except the cost of maintenance of access roads. This, however, shall not be interpreted as relieving the Contractor of any responsibility for damage to person and property.

Borrow pits shall be so excavated that they will drain to the nearest natural outlet, or to an outlet designated by the Ministry Representative. Side slopes of borrow pits in all cases shall be dressed to such slopes as the Ministry Representative may direct.

201.45 Haul and Overhaul - Excavated material shall be hauled to any distance that the Ministry Representative may direct. Whenever the material is hauled to a distance greater than 300 m, the Contractor will receive additional compensation for overhaul as allowed for in Subsections 201.83 and 201.93.

201.46 Watering - Water for compacting embankments, constructing subgrades and surfacing, and for laying dust caused by grading operations and traffic, shall be applied in the amounts and at the places designated by the Ministry Representative. Water shall be applied by sprinkling with tank trucks equipped with spray bars and suitable control apparatus. When directed by the Ministry Representative, sprinkling shall be done at night or in the early morning hours when evaporation loss is at a minimum.

The Contractor shall make all necessary arrangements for obtaining water at the Contractor's expense.

Page 111: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ROADWAY AND DRAINAGE EXCAVATION SECTION 201

BC - MOT 2006 201 (5 of 8)

201.47 Finishing of Roadway - Before acceptance and final payment is made, the entire roadway, including the roadbed, shoulders and ditches shall be neatly finished and trimmed to the lines, grades and cross-sections shown on the Drawings, or as directed by the Ministry Representative, to reproduce smooth surfaces, slopes and a uniform cross-section. Subgrade shall be finished within a tolerance of ± 15 mm except for rock cut fills where the tolerance shall be ± 50 mm.

All drainage ditches, waterways and culverts shall be opened up and cleaned out to restore them to their full effectiveness.

All loose rock and boulders within the right-of-way resulting from grading and grubbing operations shall be gathered up and buried, or otherwise disposed of as the Ministry Representative may direct.

The Contractor shall grade all portions of the right-of-way outside the Excavation and Embankment areas to conform to the general ground line. This work will be considered as subsidiary work pertaining to the Item of "Roadway and Drainage Excavation," and no extra payment will be made.

201.48 Surcharge Pre-consolidation - Pre-consolidation by surcharging shall be carried out where indicated on drawings and/or Special Provisions, or as directed by the Ministry Representative. Embankments on these areas shall be placed directly on the natural ground without removal of the organic materials, unless otherwise directed by the Ministry Representative, and shall be constructed to a surcharged height above construction grade as shown or specified.

The Contractor shall be allowed to place the initial lift of embankment to a minimum depth required to carry the Contractor's hauling equipment. The remainder of the embankments shall be constructed in accordance with procedures set forth in this Section; except that compaction will not be required on the surcharge material above construction grade.

To avoid shear failures, the rate of construction shall be rigidly controlled by instrumentation installed by the Ministry.

The surcharge shall remain on the embankments a minimum of three months, or additional time as directed by the Ministry Representative, and as may be indicated by the instrumentation.

Should any of the instrumentation become damaged or rendered unusable by the construction operations, same will be replaced by the Ministry at the Contractor's expense.

201.49 Back Slope Stabilization - Drainholes, rock bolts, mesh and/or shotcrete may be required where rock is being excavated.

The backslope stabilization requirements will be assessed by the Ministry Representative during construction and the amount and location of the drainholes, rockbolts, mesh and shotcrete may be changed or deleted according to the condition of the rock encountered in the field.

No adjustments in prices for changes in quantities or compensation for eliminated items will be made.

MEASUREMENT

201.81 Borrow - Borrow pits will be contour surveyed before the Contractor begins work therein and no payment will be made to the Contractor for any material excavated from borrow pits prior to this being done.

201.82 Excavation - All "Roadway and Drainage Excavation" will be measured in excavation by cross-section from the ground line as it exists after Clearing and Grubbing operations have been completed, as specified in Subsections 200.01 through 200.03.

Pay quantities will be computed in CUBIC METRE to the neat lines staked. Computation of end areas under 20 m2 will be by calculation and end areas over 20 m2 will be determined by use of planimeter; or the electronic computer may be used to determine all volumes. In computing volumes, the method of average end areas will be used. Adjustments for curvature will be made in any cut where deemed equitable by the Ministry Representative.

201.83 Overhaul - Overhaul of excavations and embankments will be measured on the completion of the project by the 1000 STATION METRES where a station metre (Sta. m) is 1 m3 of excavated material hauled a distance of one station (100 m). No allowance will be made for shrinkage or swell.

After allowances have been made for specific hauls which have been designated by the Ministry Representative, this information will be used to prepare a final volume overhaul diagram which will form the basis for payment of all other overhaul on "Roadway and Drainage Excavation."

201.84 Watering - Water will be measured by the KILOLITRE in tanks or tank trucks of known capacity or by means of metres of a type approved by the Ministry Representative, which shall be furnished and installed by the Contractor at the Contractor's expense.

201.85 Compaction - Compaction will be measured by the

Page 112: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 201 ROADWAY AND DRAINAGE EXCAVATION

201 (6 of 8) 2006 BC - MOT

SQUARE METRE. In determining the area compacted, the width shall be the mean width of the top and bottom of each 300 mm layer so compacted.

PAYMENT

201.91 Borrow - Payment for BORROW materials will be at the Contract Unit Price per cubic metre of "Roadway and Drainage Excavation" classified as provided for in Subsection 201.11. All subsections in this specification relating to excavation shall apply to borrow.

201.92 Excavation - Payment for EXCAVATION will be at the Contract Unit Price per cubic metre for the various types of materials excavated. The Contract Unit Price for such excavation will include hauling the materials to any point within 300 m from the point of excavation and shall be accepted as full compensation for everything furnished and done in connection therewith.

Compensation for hauling excavation to distances greater than the free haul limit of 300 m will be paid as prescribed in Subsection 201.93.

201.93 Overhaul - Payment for OVERHAUL will be at the Contract Unit Price per 1000 station metres (Sta. m).

201.94 Watering - Payment for WATERING will be at the Contract Unit Price per kilolitre. The Contract Unit Price shall be full compensation for furnishing all labour, materials, tools, equipment and doing all work incidental to furnishing, hauling and applying water as specified in Subsection 201.46.

201.95 Allowable Overbreak - Allowable overbreak will be paid at 75% of the Contract Unit Price for TYPE A MATERIAL. The quantity at the Contract Unit Price for overbreak in any one cut shall not exceed 10% of the original theoretical cut, as shown on the Drawings or as directed by the Ministry Representative. Material in excess of the above 10%, if used in lieu of borrow and only on the advice of the Ministry Representative, will be paid at the Contract Unit Price for TYPE D MATERIAL.

201.96 Embankment - Except where otherwise distinctly provided herein, the work described under the heading of "Embankment" will not be paid for directly as a pay item, but shall be considered as incidental work pertaining to the placement of the several classes of Excavation or Borrow and, therefore, no additional compensation will be made for the construction of embankments.

201.97 Compaction - The top 300 mm below subgrade which is compacted to minimum 100% of the laboratory density, as described in Subsection 201.37 and any additional compaction to 100% density ordered by the Ministry Representative, will be paid for directly as a pay item at the Contract Unit Price for COMPACTION.

All other compaction described in Subsection 201.37 shall be considered as incidental work pertaining to the several classes of Excavation or Borrow and, therefore, no additional compensation will be made.

201.98 Surcharge Removal - Payment for surcharge removal will be at the Contract Unit Prices for EXCAVATION and OVERHAUL.

Page 113: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 114: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 201 ROADWAY AND DRAINAGE EXCAVATION

201 (8 of 8) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 115: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 202 (Page 1 of 18)

SECTION 202

GRANULAR SURFACING, BASE AND SUB-BASES

PART A - SCOPE OF SPECIFICATION

202.01 Preliminary and General - This specification describes the classification, the materials and the professional standards required for the production of granular aggregates and the construction of granular surfacing, granular base and select granular sub-base.

PART B - MATERIALS

202.02 Aggregate Classification

202.02.01 Crushed Surfacing Aggregates:

i) High Fines Granular Surfacing Aggregate (HFSA): HFSA is used for surfacing of gravel roads and when paving is not scheduled for a few years. Cohesion for this aggregate is achieved by plastic fines.

202.02.02 Crushed Base Course Aggregates: These are high strength, high load bearing, high quality, crushed granular base materials. As these materially are not well suited for long-term traffic, they are usually overlaid by surface course materials (HFSA or asphalt/concrete pavement).

i) Well Graded Base (WGB): WGB is the standard base course material used for pavement structures, well graded with moderate permeability.

ii) Intermediate Graded Base (IGB): IGB is intermediate in gradation and permeability between well graded aggregate and open graded aggregate.

iii) Open Graded Base (OGB): OGB is a highly permeable, gap graded aggregate.

202.02.03 Sub-Base Aggregates – A granular material placed between the sub-grade and the base course aggregates, providing strength to the pavement structure.

i) Select Granular Sub-Base (SGSB): SGSB is the standard aggregate, crushed or screened, placed directly above subgrade, with moderate permeability and a wide gradation.

ii) Intermediate Graded Sub-Base (IGSB): IGSB is a higher permeability, crushed sub-base aggregate.

iii) Open Graded Sub-Base (OGSB): OGSB is a highly permeable, crushed sub-base aggregate.

202.02.03 Bridge End Fill (BEF): BEF is quality granular fill placed behind and below a bridge abutment to provide good drainage, a smooth transition from the bridge approaches to the bridge structure, and a suitable material through which to drive piles.

202.03 General Description of Work - The aggregates for granular surfacing, base and sub-base may be supplied either by the Contractor or produced from a Ministry provided source. Production of granular surfacing and granular base requires crushing and placing in stockpile. Production of select granular sub-base may be by crushing, screening or direct excavation.

Granular aggregate shall be loaded from the stockpile, crushing and screening plant, or pit face, as may be applicable; hauled out to the highway, placed accurately without segregation and thoroughly compacted to established line and grade.

The Contractor shall maintain the prepared surface of the base course aggregate until it has been paved or until completion of the contract, whichever is applicable.

202.04 Aggregate Quality

202.04.01 General - Granular aggregate shall be composed of inert, clean, tough, durable particles of crushed rock, gravel, sand and fines capable of withstanding the deleterious effects of exposure to water, freeze-thaw,

Page 116: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 202 GRANULAR SURFACING, BASE AND SUB-BASES

202 (Page 2 of 18) 2006 BC – MOT

handling, spreading and compacting. The aggregate particles shall be uniform in quality and free from clay lumps, wood and free from an excess of flat or elongated pieces.

Aggregates for surfacing, base, sub-base and bridge end fill will be tested in accordance with the Table 202-A:

TABLE 202-A AGGREGATE QUALITY TESTS

BASED ON ASTM TITLE OF TEST

C 136 Sieve Analysis of Fine and Coarse

Aggregates

C 117 Wash Test of Aggregates

C 88 Soundness of Aggregate by Use of

Magnesium Sulphate.

D 2419 Standard Test Method for Sand Equivalent Value of Soils and Fine

Aggregate

D 6928 Abrasion Loss by Micro-Deval

D 4318 Plastic Limit Determination

SS 202 Appendix 1

Fracture Count on Coarse Aggregate

SS 202 Appendix 2

Petrographic Test

202.04.02 Primary Quality Tests - All aggregates for surfacing, base, sub-base, and bridge end fill shall meet the requirements of Table 202-B.

TABLE 202-B AGGREGATE PROPERTIES Test Result

TEST Surfacing Aggregates 25 mm Base Course Sub-Base Aggregates Bridge

End Fill HFSA WGB IGB OGB SGSB IGSB OGSB BEF

Sand Equivalent ≥ 20 ≥ 40 ≥ 40 ≥ 40 ≥ 20 ≥ 20 ≥ 20 ≥ 20

Micro-Deval loss

factor ≤ 25% ≤ 25% ≤ 25% ≤ 17% ≤ 30% ≤ 25% ≤ 25% ≤ 30%

Fractured Faces

Method “A” ≥ 50 ≥ 50 ≥ 50 ≥ 50 n/a ≥ 50 ≥ 50 n/a

Plasticity ≤ 6 n/a n/a n/a n/a n/a n/a n/a

Where the Ministry has pre-existing test results, the Ministry will make this information available to the Contractor and the Contractor will be able to rely on the data and not have to perform the corresponding tests on materials extracted from the investigated portions of the pit or quarry.

In circumstances where historic performance of material from a source has proven satisfactory, the Ministry may, by Special Provision, waive any or all of the testing required in SS 202.04.

Page 117: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GRANULAR SURFACING, BASE AND SUB-BASES SECTION 202

BC - MOT 2006 202 (Page 3 of 18)

202.04.03 Secondary Quality Tests - All aggregates for surfacing, base, sub-base, and bridge end fill failing any primary quality test indicated in SS 202.04.02 shall further be tested as follows to determine acceptability or, at the Contractor’s option, a new source shall be found.

i) If the Micro Deval test results shows that the material fails, then the soundness shall be reassessed by use of Magnesium Sulphate (ASTM C 88). The material will be considered acceptable if the loss after 5 cycles is less than:

• 20% for coarse aggregate (the material retained on or above the 4.75 mm sieve) • 25% for fine aggregate (the material passing the 4.75 mm sieve)

ii) If the aggregate fails any of the Sand Equivalent, Micro-Deval or Magnesium Sulphate tests, it shall be examined using the Ministry petrographic test (SS 202, Appendix 2) to determine the cause of failure. The Ministry Representative will review the test results and determine whether the material is acceptable or not.

202.05 Aggregate Gradation

Gradation shall be determined in accordance with ASTM C 136 (Dry Sieve) and, for the material passing the 0.075 mm sieve, ASTM C 117 (Wash Test).

202.05.01 Aggregate shall have a gradation that defines a curve (% passing versus log sieve size) with a slope between adjacent sieves, equal or intermediate to the corresponding slopes of the boundary curves defined by the specification. Gradations shall fall within the limits, for the specified classification, shown in Table 202-C.

TABLE 202-C AGGREGATE GRADATIONS Percent Passing (%) Sieve Size SIEVE

SIZE Surfacing Aggregates 25 mm Base Course Sub-Base Aggregates Bridge

End Fill (mm) HFSA WGB IGB OGB SGSB IGSB OGSB BEF

75 --- --- --- --- 100 100 100 100 50 --- --- --- --- --- 55 – 100 70 – 100 30 – 100

37.5 --- --- --- --- --- 40 – 80 50 – 85 --- 25 100 100 100 100 --- --- --- --- 19 85 – 100 80 – 100 65 – 100 75 – 100 15 – 100 17 – 40 15 – 55 20 – 100 9.5 60 – 85 50 – 85 --- 30 – 65 0 – 100 --- --- --- 6.3 --- --- --- --- --- --- 0 – 20 --- 4.75 40 – 70 35 - 70 30 - 70 --- --- --- --- 10 – 60 2.36 --- 25 - 50 15 - 40 5 - 30 --- 10 – 25 0 – 10 --- 1.18 20 – 50 15 - 35 10 - 30 0 – 10 --- --- --- 6 – 32

0.600 --- --- --- --- 0 - 100 --- --- --- 0.300 10 – 30 5 – 20 5 – 15 0 – 8 0 – 15 4 – 15 0 – 8 4 – 15 0.075 5 – 15 0 – 5 0 – 5 0 – 5 0 – 5 0 – 5 0 – 5 0 – 5

202.05.02 Rut Resistance – Any aggregate supplied must, in addition to meeting the gradation requirements specified above, not rut when proof rolled with a fully loaded tandem axle truck. Any aggregate which does rut shall be removed and replaced, or blended with suitable aggregates, to meet both the gradation requirement and the rut resistance requirement.

PART C - USE OF MINISTRY-PROVIDED PITS OR QUARRIES

202.06 General – Ministry-provided pits and quarries are those identified in the Special Provisions which the Ministry is offering to the Contractor as potential aggregate sources.

They may include pits and quarries:

a) owned by the Ministry

Page 118: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 202 GRANULAR SURFACING, BASE AND SUB-BASES

202 (Page 4 of 18) 2006 BC – MOT

b) leased by the Ministry, or

c) attained by the Ministry through special agreement with the landowner.

Use of such pits and quarries will be at the Contractor’s option unless the Special Provisions clearly state that the source must be used for specific purposes.

When a Ministry pit or quarry is provided for the Contractor’s optional use under the Contract, the Contractor, by entering the pit or quarry, will be deemed to have accepted all obligations, risks and costs for the production of aggregate meeting the requirements of Part B of this section. The Ministry gives no warranty that its pit or quarry will meet the quality and quantity requirements.

Where a pit or quarry is designated as a mandatory source, the Ministry waives the aggregate quality requirements of SS 202.04.02 for aggregates required by the Ministry to be produced from that source.

202.07 Source of Supply - The Contract documents may identify one or more pits or quarries, for use as aggregate sources at the Contractor’s discretion.

The Ministry will provide those gravel pits or quarries and the right-of-way to those pits or quarries and will pay the cost of royalties, access road construction and fencing. The cost of maintaining access roads shall be considered as part of the cost of producing the construction aggregates and shall be payable by the Contractor. The Ministry will exercise its best judgement in the selection of the pit or quarry sites; however, the failure of the pit or quarry to yield materials of uniform quality shall not constitute grounds for a claim by the Contractor against the Ministry.

The Contractor shall be satisfied as to the gradation and other characteristics of the raw material in the Ministry provided pit or quarry and as to the nature and amount of work required to produce materials which will meet all gradation requirements, and the Contractor shall, at the Contractor's expense, remove any objectionable materials from the aggregate.

202.08 Development of Pit or Quarry - Before any material for aggregate is excavated from the pit or quarry, the site shall be cleared and grubbed, and all debris disposed of as ordered by the Ministry Representative. If topsoil or undesirable overburden exist, these materials shall be stripped and placed in separate stockpiles as directed by the Ministry Representative for future use in pit or quarry reclamation.

Adequate precautions and actions shall be taken to prevent pollution of the air, watercourses and adjoining land by the stockpiled material. If erosion prevention is deemed necessary, the Ministry may arrange to have the stockpiles grass seeded.

Watercourses located within or immediately adjacent to the gravel pit or quarry operations are to be protected against pollution. Where it is necessary to divert watercourses, application must be made to Ministry of Water, Land and Air Protection, or the appropriate Federal agent, prior to such diversion being undertaken. Upon termination of operations, the watercourses shall be restored to as close to their original condition as is practicable.

The Contractor shall not operate the pit or quarry in a manner which will contaminate remaining granular material nor leave the pit or quarry in a condition which will limit its future use.

The Contractor shall follow the pit development plan, where provided. Stockpile sites in Ministry-provided sources shall be per the pit development plan.

202.09 Use of All Materials - Any Ministry provided pit or quarry, once entered and developed, shall be used to its full potential. Normally, the Contractor shall produce select granular sub-base by selection or screening, provided that oversize reject aggregate is removed and properly placed in a stockpile for later crushing and use. However, if excessive oversize occurs, the Ministry Representative may order that pit run aggregate be crushed to produce 75 mm crushed granular base for use in place of select granular sub-base.

Page 119: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GRANULAR SURFACING, BASE AND SUB-BASES SECTION 202

BC - MOT 2006 202 (Page 5 of 18)

For the production of crushed surfacing and base aggregates, as well as IGSB and OGSB, the Contractor shall provide crushing equipment such that all aggregate which will pass through 375 mm x 450 mm slotted openings shall be used for the production of crushed aggregate; rocks which will not pass through these openings shall be stockpiled or disposed of as and where directed by the Ministry Representative. Crushing and screening equipment shall be provided with adequate facilities and capacity to bleed off reject aggregate in usable condition, or otherwise remove any excess of fine aggregate, dust or objectionable aggregate coatings that may be present in or on the aggregate, so as to make it generally acceptable for use. No portion of the products of crushers or screening plants that can be used shall be wasted, but shall be stockpiled or used as directed by the Ministry Representative.

202.10 Unsuitable Materials - The rejection or addition of any particular size material necessary to produce gravel conforming to specification requirements shall be the responsibility of the Contractor, and no additional compensation will be paid therefore.

202.11 Change of Ministry Provided Pit or Quarry - No payment will be made to the Contractor for moving plant from one Ministry provided pit or quarry to another Ministry provided pit or quarry.

If, in the opinion of the Ministry Representative, a saving in haul can be accomplished, or Ministry provided pits or quarries are inadequate or unsuitable, additional sources of aggregate will be acquired and developed at the Ministry's expense.

If the Ministry Representative requires a move to a newly Ministry provided pit or quarry the Contractor will be given notice in writing. On completion of the move, the Contractor will be paid a lump sum of $7,500 for moving a crusher operation.) and its supporting trapping, stockpiling and power units, or other basic crushing set-up which includes an additional breaker or screening unit. The payment will be deemed to be full compensation for all costs and expenses of the move and set-up of the crusher. If the Contractor moves the crushing plant without first securing a written order to do so from the Ministry Representative it will be considered sufficient proof that the move was unnecessary, and no allowance or compensation will be made to cover such a move.

202.12 Pit Cleanup - When the Contractor discontinues operations in any pit or quarry, the Contractor shall trim the sides of pit excavations, waste piles and stockpiles to a 1.5H to 1V slope, or such other slope as the Ministry Representative may direct, open up such drains or ditches as may be required to prevent water standing therein, and leave the site in a neat condition, all to the satisfaction of the Ministry Representative. The trimming, sloping, ditching and draining of the pit or quarry, as well as maintenance of the access roads, shall be considered part of the cost of producing the granular aggregate and no additional payment will be allowed.

If a pit has been fully depleted and is to be abandoned, the Contractor may be requested to reshape the sides to a slope not steeper than 2H to 1V using the stockpiled overburden if necessary, and cover same with any topsoil previously removed and stockpiled, all as directed by the Ministry Representative. In such cases, the replacing of stockpiled overburden and topsoil will be paid for in accordance with SS 202.32.

202.13 Work in Ministry Pits or Quarries – All work in a Ministry pit or quarry will be in accordance with SS 145.26.

PART D - CONTRACTOR SUPPLIED AGGREGATES

202.14 Preliminary and General - Aggregates, when supplied from private pits or quarries, shall meet the requirements of SS 202, Part B.

202.15 Development and Clean Up of Private Pits or Quarries - Pit or quarry development and cleanup shall be in accordance with local and Provincial Regulations.

Page 120: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 202 GRANULAR SURFACING, BASE AND SUB-BASES

202 (Page 6 of 18) 2006 BC – MOT

202.16 Contractor to Pay All Costs – The Contractor shall bear and pay all costs including applicable royalties for provision of granular aggregates supplied from non-Ministry-provide sources. The Contractor shall also pay all costs for any move of the equipment that may be ordered or required because a pit or quarry of the Contractor’s choosing proves unsuitable for production of the contracted quantity of granular aggregates meeting the requirements of SS 202.

PART E - PRODUCTION OF CRUSHED AGGREGATE

202.17 Equipment and Plant - The Contractor shall provide and maintain in good operating condition, all plant and equipment necessary to comply with the requirements of this specification. Such plant and equipment shall be of a type and capacity to ensure proper construction and maintenance of access roads, development of the pit or quarry, maximum use of the pit or quarry, production of granular aggregates to the standard of uniformity required, and adherence to the construction schedule.

Adequate sampling facilities shall be installed by the Contractor at the discharge end of the production conveyor. The Contractor shall ensure that the plant and equipment meet the requirements of the current Pollution Control Act and Workers' Compensation Board Regulations.

202.18 Working of Pit - A pit shall be worked in such a manner as to ensure that granular material excavated and fed to the crushers, screening plants or loaders shall be as uniform as possible. This may require the use of equipment capable of deep excavating through horizontal gravel layers or carrying out selective digging or cross blending over a large area of the pit. Before commencing production, the Contractor’s quality control plan shall describe the proposed method of production for the Ministry Representative and obtain the Ministry Representative's general approval.

202.19 Crushing Operations - The Contractor shall adjust the crushers and/or screening plants and provide such screens as may be necessary to produce and maintain acceptable gradations of granular aggregates.

202.20 Crusher Gradation Control

202.20.01 Design Aggregate Gradation

For each aggregate gradation classification specified for production, field and/or laboratory tests will be performed by the Contractor to select a single gradation curve within the “banana” specification (Table 202-B), the “Design Aggregate Gradation” (DAG), which will be the target for crusher control. The Contractor shall declare the DAG, in writing to the Ministry Representative, within production of the first 10% of the Approximate Quantity of a given aggregate classification.

As part of its quality assurance program and for payment purposes, the Ministry may sample the stockpile to assess aggregate gradation compliance to contractual requirements.

Page 121: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GRANULAR SURFACING, BASE AND SUB-BASES SECTION 202

BC - MOT 2006 202 (Page 7 of 18)

202.20.02 Variation Limits

The running average of four (4) consecutive tests, on each applicable individual sieve size specified in Table 202-C, must be maintained at all times within the limits specified in that Table.

The maximum permissible variation from the DAG curve, on each applicable individual sieve size specified in Table 202-C, of the mean of any four (4) consecutive tests shall also be within the limits specified in Table 202-D.

TABLE 202-D AGGREGATE GRADATION VARIATION LIMITS

SIEVE SIZE VARIATION LIMITS (% PASSING)

4.75 mm and larger ± 5

1.18 mm to 2.36 mm ± 3.5

0.300 mm and 0.600 mm ± 2

0.075 mm ± 1

202.20.03 Field Adjustment of Design Aggregate Gradation

The Contractor may make a maximum of two (2) field adjustments to the Design Aggregate Gradation, to accommodate minor changes in pit characteristics or to enhance production efficiency.

A field adjustment to the Design Aggregate Gradation is defined as a change in declared target gradation of the various aggregate sizes within the specified limits shown in Table 202-C which does not require a supplementary formal review. The maximum adjustment for individual sieve sizes for each adjustment are as permitted in the Table 202-E.

TABLE 202-E – FIELD ADJUSTMENT OF DESIGN AGGREGATE GRADATION

Sieve Designation (mm)

Maximum Field Adjustment (% Passing)

19 and larger ± 3.0 9.5 ± 2.5

2.36 and 4.75 ± 2.0 0.600 and 1.18 ± 1.5

0.150 and 0.300 ± 1.5 0.075 ± 1.0

A proposed Design Aggregate Gradation field adjustment shall be submitted in writing with supporting documentation (showing original DAG, current stockpile average gradation, and proposed field adjustment and the new DAG) to the Ministry Representative. Upon receipt of the proposed field adjustments, the Ministry Representative will assess the adjustment for conformance with the contract requirements and notify the contractor whether or not it is acceptable in a timely fashion.

No field adjustment will be acceptable if it results in a change from the current Design Aggregate Gradation which fall outside the limits defined in Tables 202-C. The variation limits specified in SS 202.20.02 will apply to the adjusted DAG.

Page 122: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 202 GRANULAR SURFACING, BASE AND SUB-BASES

202 (Page 8 of 18) 2006 BC – MOT

The Contractor shall have the moisture/density relationship established per ASTM test method D 698 for each original DAG, and one after each field adjustment thereto.

202.20.04 Declaration of a New Design Aggregate Gradation

Should there be a substantial change in the character of aggregate exposed in the pit face as the work proceeds, the Ministry Representative may authorize a change in the declared Design Aggregate Gradation, which would then also be eligible for field adjustment in accordance with SS 202.20.

A maximum of one change to the declared DAG be permitted.

202.21 Stockpiling

202.21.01 Unless it is specified in the Special Provisions or ordered otherwise in writing by the Ministry Representative, all crushed aggregates shall be stockpiled prior to use on the Highway.

202.21.02 Stockpile sites shall be cleared of all vegetation, trees, brush, rocks or other debris and a uniform gravel surface prepared before the stockpile material is deposited on the stockpile site.

202.21.03 Stockpiles shall be constructed on the designated site and when completed shall be neat and regular in shape, occupying as small an area as is practicable. Spilling of material over the edges of the piles will not be permitted.

202.21.04 The Contractor shall ensure that stockpiles shall be built up in layers not to exceed 1 m in thickness.

202.21.05 The Contractor shall ensure that plank or protected runways shall be provided for operating trucks on stockpiles when the Ministry Representative deems them necessary to prevent dirt being tracked onto the crushed aggregate.

202.21.06 The Ministry Representative may, on receipt of a written request from the Contractor, permit the Contractor to build the final stockpile by bulldozing the aggregate from a feed pile at the end of a production belt provided that the following are maintained:

i) The bulldozer(s) to be used shall be equipped with U-shaped pushing blades.

ii) The aggregate does not become contaminated with oversize material, mud or other objectionable material picked up from the pit floor or general working areas.

iii) The crushed granular aggregate is distributed evenly over the final stockpile area in lifts not greater than 150 mm in depth.

iv) The cone of the feeder pile at the end of the production belt shall not, without express permission, be allowed to build up to a greater height than 2 m.

v) No appreciable segregation or degradation shall occur in the main stockpile as a result of using this method.

PART F - CONSTRUCTION METHOD

202.22 Weather and Job Conditions

202.22.01 No construction shall be undertaken during snow, heavy rain, freezing or other unsuitable conditions. Aggregate shall not be placed upon a frozen, wet, muddy or rutted sub-grade, sub-base, base or surface unless otherwise directed by the Ministry Representative.

202.22.02 When the sub-grade is soft due to excessive moisture, the placing of granular sub-base shall be stopped

Page 123: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GRANULAR SURFACING, BASE AND SUB-BASES SECTION 202

BC - MOT 2006 202 (Page 9 of 18)

until rutting or displacement of the lower layers can be prevented by reduced loading or by other means approved by the Ministry Representative.

202.23 Bridge End Fill - Construction of the bridge end fill shall not commence until the Ministry Representative has assessed the pertinent foundation conditions that may affect the future stability of both the bridge and embankments and has authorized continuation of construction. Unless the procedure for construction is stated in the Special Provisions, the Contractor's proposed method must be submitted to the Ministry Representative for approval before commencing work.

The bridge end fill shall be laid out by extending back from the bridge abutment station, as shown on the Drawings; a distance of 8.0 m along centreline (and transversely parallel to the abutment) at finished grade and thence to a 1.5:1 backslope. The front slope, as shown on the Drawings, shall start at the bridge abutment station.

The bridge end fill shall be constructed to the subgrade elevation.

The material shall consist of mineral soil with properties and gradation in accordance with Sections 202.04 and Section 202.05.

The bridge end fill shall be constructed in successive horizontal layers not exceeding 150 mm in loose thickness.

Each layer shall be compacted to a minimum 100% of the laboratory density obtained by the current ASTM test method D 698.

The determination of field density will follow a method approved by the Ministry Representative.

Payment for bridge end fill shall include supply, haul placement and compaction.

202.24 Thickness of Granular Courses - Crushed surfacing course, crushed base courses and sub-base courses shall be constructed to the specified thickness and dimensions as shown on the Contract Drawings or as described in the Special Provisions, unless otherwise directed by the Ministry Representative.

Normally, on new construction, crushed bases shall be constructed 300 mm thick (in individual lifts with compacted thickness of 150 mm) unless otherwise approved by the Ministry Representative. Additional base or sub-base granular materials will be of such thickness as may be considered necessary to provide supporting strength for the flexible pavement structure.

202.25 Construction of 75 mm Sub-Base 202.25.01 Aggregates for sub-base shall be delivered to the roadbed as uniform mixtures and shall be spread in layers without segregation, preferably through an approved aggregate spreader. Granular aggregate shall not be end dumped from trucks in piles on the grade. The Ministry Representative may permit spreading from the tailgate of trucks or from centre dump units, provided the Ministry Representative is satisfied that the work will be well controlled and segregation will not occur.

When the sub-grade below granular aggregate sub-bases consists of cohesionless sand, and written permission is granted by the Ministry Representative, a portion of the granular aggregate sub-base or base may be dumped in piles upon the sub-grade and spread ahead in sufficient quantity to stabilize the sub-grade. Segregation of aggregates shall be avoided and the material as spread shall be free from pockets or large or fine material. Segregated materials shall be remixed until uniform.

Where the required thickness is 150 mm or less, the granular base or sub-base may be spread and compacted in one layer. Where the required thickness is more than 150 mm, the aggregate shall be spread and compacted in two or more layers of approximately equal thickness; the maximum compacted thickness of any one layer shall not exceed 150 mm. Each layer shall be spread and compacted in a similar manner. At locations where the granular base or sub-base is to be placed over areas inaccessible to the spreading equipment, the granular sub-base or base may be spread by any means to obtain the specified results.

202.25.02 Immediately following spreading, the material shall be compacted to a minimum 100% of the laboratory

Page 124: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 202 GRANULAR SURFACING, BASE AND SUB-BASES

202 (Page 10 of 18) 2006 BC – MOT

density obtained by the current ASTM test method D 698.

If, because of the nature of the granular aggregate, the Ministry Representative considers that the results from the above test will be unreliable or the use of the test for density measurements is impractical, then the Ministry Representative may order that each lift or course of aggregate shall be continuously and thoroughly rolled until successive passes of a vibratory roller results in an increase in density of less than 10 kg/m3

The vibrating roller shall have a minimum steel drum diameter of 1.15 m, a minimum drum width of 1.5 m, and shall be capable of being loaded so as to have a gross mass of 20 kg per lineal centimetre of drum width.

However, so that development of new compaction equipment will not be inhibited, the Ministry Representative may give written permission for the substitution of new or alternative compaction equipment if the Ministry Representative is satisfied that such equipment will provide equal or superior compaction performance.

202.25.03 Subject to the concurrence of the Ministry Representative, the Contractor may water the sub-base aggregates as required to aid in attaining the specified density.

202.25.04 The completed surface of the Sub-base course shall conform to the required line, grade and cross section as shown on the Drawings to an accuracy ± 15 mm, neither uniformly high nor low.

202.26 Construction of 25 mm Crushed Base Course

202.26.01 Crushed 25 mm base course aggregate shall be placed on a properly prepared Sub-Base surface to such depth or at such rates as may be specified. If the Ministry Representative is of the opinion that the finished surface of the Sub-Base does not meet the requirements of SS 202.25.04 but has been thoroughly and densely compacted and should not be disturbed, the Ministry Representative may order that the surface of the Sub-Base be corrected to the true cross section, line and grade, and within the tolerances specified by use of a levelling course of crushed 25 mm base course aggregate. In such event, the crushed 25 mm base course aggregate so used will be paid for only at the rates bid for Sub-Base, provided the same Contractor is responsible for the construction of both the crushed base, and sub base.

The 25 mm crushed base course shall be constructed in such a manner that the aggregate is neither segregated, contaminated nor degraded. End dumping will not be permitted. The thickness of the 25 mm crushed base course shall be substantially uniform and the minimum thickness shall not be less than the nominal thickness shown on the drawings or ordered by the Ministry Representative. If the Contractor is unable to provide adequate manually operated equipment or workers of sufficient skill to lay the 25 mm crushed base course aggregate within the tolerances specified, the Ministry Representative may require that the Contractor lay the aggregate through an approved electronically controlled spreading machine

202.26.02 Compaction - Immediately following spreading, the 25 mm crushed base course aggregate shall be compacted to a minimum 100% of the laboratory density obtained by the current ASTM test method D 698.

The method of compaction to be employed may be selected by the Contractor, but shall be subject to approval by the Ministry Representative

202.26.03 Watering - If required, water shall be applied to attain the specified density.

202.26.04 The completed surface of the granular base course shall conform to the required line, grade and cross section as shown on the Drawings to an accuracy ± 10 mm, neither uniformly high nor low.

202.27 Equipment for Watering - Water shall be applied from a distributor of the pressure type, equipped with a spray bar mounting nozzles similar to those used on asphalt distributors and capable of applying the water accurately and uniformly. Splash plate type distributors or those equipped with spray bars that eject fine streams of water will not be permitted. The distributor must be provided with a satisfactory means for accurately measuring the quantity of water sprayed. If the Ministry Representative so requires, measuring equipment shall be calibrated under the Ministry Representative's inspection. The Contractor shall make all necessary arrangements for obtaining water at the Contractor's expense.

Page 125: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GRANULAR SURFACING, BASE AND SUB-BASES SECTION 202

BC - MOT 2006 202 (Page 11 of 18)

202.29 Proof Rolling and Stabilization- Before acceptance, each compacted course of base course aggregate shall receive one complete coverage by the tires of a truck having a 9 tonne single axle dual tire or 17 tonne tandem axle group with dual tires with a tire pressure of 600 kPa.

Any areas where rutting or displacement occurs shall be either excavated and replaced or stabilized by the addition of suitable blending material incorporated uniformly into the base as directed by the Ministry Representative.

The supply, load, haul, placing and mixing of such stabilizing aggregates as necessary to correct deficiencies in aggregate stability shall be incidental to the Work for Base aggregates. Blending may be performed at the pit or quarry or on the highway in whichever manner the Ministry Representative may direct.

202.30 Benkelman Beam Testing - At any time during the course of the work, when considered necessary by the Ministry Representative, Benkelman Beam testing may be undertaken.

PART G - MEASUREMENT AND PAYMENT

202.31 Water Applied to the Highway - Water for compaction or dust control shall be incidental to the bid price for the granular material.

202.32 Development and Cleanup of Ministry-Provided Pits and Quarries

202.32.01 Authorized clearing and grubbing of Ministry-provided pits and quarries, and construction of the access road will normally be paid for at the Unit Prices bid in the "Schedule of Approximate Quantities and Unit Prices." Payment for removal and stockpiling of overburden and topsoil in the development of the proposed work areas, and payment for spreading overburden to reshape the sides of a pit and spreading topsoil over a depleted pit or quarry will be at the Unit Prices bid for "Roadway and Drainage Excavation."

202.32.02 Pit and quarry development work, restoration work, and construction of access road will be paid for by Order for Extra Work where, in the opinion of the Ministry Representative:

i) There is no appropriate unit prices appear in the Schedule.

ii) The gravel pits or quarries are designated subsequent to tendering.

iii) Development and restoration work is substantially different from that bid at the time of tendering.

iv) Restoration work is required outside the current work area.

v) Where unit measurement is impracticable.

202.33 Stockpile Reject Aggregate

202.33.01 Aggregate from screening or crushing operations in a Ministry-provided pit or quarry, whether:

i) Oversize under SS 202.09, or

ii) Rejected at the crusher in order that the product meets the requirements of SS 202.05,

shall be stockpiled separately according to size in accordance with SS 202. Stockpiles of reject aggregate shall not be contaminated by organic or other deleterious materials.

202.33.02 No payment will be made for any reject aggregate.

202.34 Blending Materials for Stabilizing Aggregates on the Highway - Blending materials, supplied, loaded, hauled, placed and mixed into the granular aggregate on the highway to correct deficiencies in aggregate stability, will be paid for at the same rate as the granular aggregate which has to be stabilized.

Page 126: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 202 GRANULAR SURFACING, BASE AND SUB-BASES

202 (Page 12 of 18) 2006 BC – MOT

Normally, no additional payment will be made to cover the costs of work required to correct stability failure in the aggregate unless the Ministry Representative is satisfied that such instability is inherent in the type of aggregate available to the Contractor from a mandatory use Ministry-provided pit or quarry, and that the lack of stability has not risen because of unsatisfactory production methods or improper construction practices. In these circumstances, the Ministry Representative will issue an Order for Extra Work to the Contractor to cover the additional cost of mixing blending material into the granular aggregate to correct the stability deficiency.

202.35 Crushed Aggregate Supplied in Stockpile Only - Crushed aggregates, supplied in stockpile only, will be paid for at the unit price per CUBIC METRE, measured in stockpile and computed by surface to surface or, at the Ministry Representative’s option, average end areas.

Payment at the bid price shall be accepted as full compensation for everything furnished and done to supply (where applicable), produce and stockpile the crushed aggregate.

202.36 Aggregates Supplied in Place

202.36.01 Unit Price Payment - Crushed or screen aggregates (surfacing, base and sub-base) supplied and constructed in place will be paid on a neat line basis for at the applicable unit price bid per CUBIC METRE. Payment shall be full compensation for everything furnished and done, including without limitation costs for acquisition, development, and payment of royalties for private pits or quarries, purchase price of aggregate, access road maintenance, screening, crushing, stockpiling, loading, hauling, spreading, compaction and moisture adjustment (watering or drying) in place as specified.

202.36.02 Advance Payment - Crushed or Screened Aggregates Supplied in Place - An advanced payment of the greater of 70% of the demonstrated production costs or 30% of the extended amount for the Item will be made for crushed or screened aggregates (surfacing, base or sub-base) in stockpile. No advance payment will be made for pit run aggregates.

The quantities shall be determined in accordance with SS 202.37

Recovery of the advance payment will be made on each progress estimate as the respective aggregate is subsequently withdrawn from the stockpile, with an additional adjustment on the final progress estimate for any material remaining in stockpile such that the entire advance payment is recovered.

202.36.03 Surplus Aggregate

Where actual aggregate needs on the Contract fall below the Approximate Quantity indicated on Schedule 7, the Ministry will compensate the Contractor at the rates indicated in Table 202-F for a portion of surplus aggregates produced by the Contractor which meet all the applicable quality and gradation specifications of the contract.

For each classification of aggregate, the maximum quantity of surplus aggregate eligible for compensation shall be the Approximate Quantity of that aggregate on Schedule 7 minus the quantity of that aggregate paid on the final progress estimate.

There will be no compensation for surplus aggregate for pit run aggregates or for any portion of the production on other aggregates which are beyond the Approximate Quantity.

Where aggregates are purchased from a pre-existing commercial pit or quarry operation, there will be no compensation for any aggregate beyond that actually used in the Contract.

Surplus aggregates in stockpile on Ministry lands are the property of the Ministry. Surplus aggregate stockpiles on private lands, regardless of compensation by the Ministry, will be the property of the Contractor.

Page 127: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GRANULAR SURFACING, BASE AND SUB-BASES SECTION 202

BC - MOT 2006 202 (Page 13 of 18)

TABLE 202- F COMPENSATION FOR SURPLUS AGGREGATE

Compensation for Surplus Aggregates

($/m3) Stockpile Location

Crushed Screened Ministry land $6.00 $3.00 Private land $4.00 $2.00

202.37 Stockpile Volume Determination

The Ministry will determine the volume of aggregate by surveying the stockpile(s) using string-line techniques, determine volume using prismoidal volumes between surfaces, and deducting 10% for stockpile loss. Alternatively, the Ministry Representative may elect to survey using cross-section techniques and/or determine volumes using end-area volumes.

The base of the pile will be determined from a pre-stockpile survey or, where such a survey is not available, from a surface determined by the Ministry Representative as being a reasonable interpolation from the intersection of the pile sides with the adjacent ground level. Where there are two or more stockpiles of aggregate meeting the same gradation classification, the compensation will be based on the cumulative quantity of those stockpiles.

Page 128: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 202 GRANULAR SURFACING, BASE AND SUB-BASES

202 (Page 14 of 18) 2006 BC – MOT

Appendix 1

Fracture Count for Coarse Aggregate (BCH 1-13)

Purpose:

This test determines the amount of fractured material in the coarse part of an aggregate sample. Method "A" is used for crushed granular surfacing and base aggregates. Method "B" is used for paving aggregates.

Apparatus:

1. Drying oven, preferably forced draft, capable of maintaining a uniform temperature of 110 + 5 o C. 2. A nest of sieves of the following sizes:

Method "A": 37.5 mm, 25.0 mm, 19.0 mm, 12.5 mm, 9.5 mm, 4.75 mm Method "B": 19.0 mm, 13.2 mm, 9.5 mm

3. Balance with sufficient capacity and accurate within 0.1 percent of the mass of sample.

Test Sample: The sample of aggregate to be tested shall be representative, oven-dry, and reduced to an amount suitable for testing. The mass of the sample shall conform to the following:

Maximum Nominal Size

(mm) Minimum Dry Mass

(kg) 37.5 4.0 25.0 2.5 12.5 1.5 9.5 1.0

Procedure: Method "A" 1. Sieve the coarse aggregate to be tested on the 37.5 mm, 25.0 mm, 19.0 mm, 12.5 mm, 9.5 mm 4.75 mm

sieves. 2. Separate each sieve size into two groups, fractured and unfractured. Each rock in the fractured group shall

have at least one fractured face or shall be naturally angular with sharp edges. (See Discussion 1). 3. For each sieve size, count the number of fractured rocks and the total number of rocks (fractured and

unfractured). 4. Calculate and record the % fracture for each sieve size and report the total % fracture for the sample using

the following formulas:

FOR EACH SIEVE SIZE: (i.e. 19 mm) % Fracture (19 mm) = Number of Fractured Rocks (19 mm) x 100% Total No. of Rocks (19 mm) FOR THE TOTAL SAMPLE: Total % Fracture = Number of Fractured Rocks (All Sieve Sizes) x 100% Total No. of Rocks (All Sizes)

Page 129: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GRANULAR SURFACING, BASE AND SUB-BASES SECTION 202

BC - MOT 2006 202 (Page 15 of 18)

Procedure: Method "B"

1. Separate the coarse aggregate to be tested from the fine aggregate by sieving it over the 4.75 mm screen.

2. Separate the coarse aggregate for each sieve size into two groups, fractured and unfractured. Each rock in the fractured group shall have two or more fractured faces produced by a crusher or shall be naturally angular with sharp edges. Each rock in the unfractured group shall be unfractured or fractured only in one dimension.

3. Obtain the mass of the fractured group, also the mass of the total coarse aggregate (fractured + unfractured groups).

4. Calculate and report the total % fracture for the sample using the following formula:

% Fracture = Mass of Fractured Rock x 100 % Mass of Total Rocks

Discussion:

-Fractured face shall be defined as a fracture in any plane whose areas is 15% or more of the largest cross-section area in a parallel plane. -The required sample can be conveniently obtained from the separated fractions of the Dry or Wash Sieve Test.

Page 130: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 202 GRANULAR SURFACING, BASE AND SUB-BASES

202 (Page 16 of 18) 2006 BC – MOT

Appendix 2

Petrographic Analysis Test Purpose:

The purpose of the Petrographic Analysis Test is to identify the various rock types and rock characteristics in the aggregate fraction of material retained on the 9.5 mm sieve of a gravel deposit. The test is performed after a micro deval soundness test or a magnesium sulphate soundness test indicates that the granular materials are weak , non durable or suspect. The petrographic analysis test is to prove or determine the cause of the poor performance of the aggregate and to determine the extent or contributing factors of specific rock types or the extent of deleterious materials or clay particles. This information will be used to determine the possible use of the materials.

Scope:

The test should be performed by a geologist, geoscientist, professional engineer with experience in rock type identification, rock classification and gravel/aggregate sources and use. Recognized procedures for rock identification shall be used. The procedures involve simple physical and chemical tests, such as the hardness scratch test, hydrochloric acid reaction and visual surface examination assisted by magnifying lens. The predominance of easily distinguishable types in petrographic samples will permit reasonably accurate testing. Important accessories are a sample kit, the rock and mineral descriptions and a good text

Rock types are to be listed by percentage weight under the broad categories of origin (sedimentary-metamorphic-igneous) with condition descriptions (i.e. hardness, weathering and cementation). Note that the descriptions of quality regarding durability or soundness (good, fair, poor, deleterious) are vital to the test results.

Additional information on general condition including weathering, shape, porosity, coatings etc. should also be recorded.

Apparatus 1. Balance – 20,000 gram capacity, accuracy ± 0.1 gram. 2. Oven capable of maintaining 110 o C. 3. Sieves 19 mm (3/4 inch) and 9.5 mm (3/8 inch) and shaker. 4. Sample splitter with pans. 5. Hand-lens (10X magnification). 6. A ten percent solution of hydrochloric acid 7. Aluminum pans. 8. A stereoscopic microscope

Sample Preparation

A 1500 gram sample of representative aggregate passing 19 mm and retained on 9.5 mm screen is required.

1. For pit run materials, a minimum of 18 kg, or one full gravel bag of representative aggregate is required. 2. This material is oven-dried at 110°C ±5°C overnight, or for 16 hours. 3. After drying, the sample is quartered in the sample splitter. 4. A one-quarter sample is sieved to obtain passing 19 mm aggregate. Additional quarters are sieved if the

initial quarter provides less than 1500 gm of the required sizes. 5. The passing 19 mm retained on 9.5 mm aggregate is mixed and 1500 grams separated by splitter. 6. Fractured materials are separated from non-fractured materials and a fracture count test shall be

performed using method A (see above) 7. Following removal (by hand) of clay balls and very soft weak material, the non-fractured

rocks are washed to assist visual identification of mineral characteristics. The soft fractured

Page 131: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

GRANULAR SURFACING, BASE AND SUB-BASES SECTION 202

BC - MOT 2006 202 (Page 17 of 18)

rocks should be washed with great care as their degradation may prevent correct identification. The clay balls and lumps shall be weighed and the percent of sample noted.

Rock Type Classification

Assignment of each particle to rock type and character is required.

Identification of specific rock type may be preceded by general identification under the major rock categories of: igneous, sedimentary and metamorphic. Following simple physical, chemical and visual tests, each particle is then identified with a specific rock type and description.

Rock types are weighed to the nearest 0.1 gram. Weights are recorded on the test sheet and the percentage of each is calculated from the total sample weight.

Comments on each rock type include descriptions of physical and chemical qualities such as: • Hardness: hard, medium, soft. • Weathering: non weathered, slightly or intensely weathered. • Porosity: • Cementation: firmly cemented to friable. • Coatings

Quality Characterization (good. fair, poor, deleterious))

Basis of Quality System

The following quality distinctions are relative estimates of a rock's physical and chemical condition and of probable engineering quality.

• Good: Particles are hard, durable, free from fracture potential, little or no capillary absorption.

• Fair Particles are soft but sound and tough, medium hard, slightly to moderately weathered, have small to moderate capillary absorption, are relatively smooth and impermeable.

• Poor Particles are soft to very soft, friable, potential slaking when wetted and dried, highly fractured potential, capillary absorption moderate to high.

• Deleterious: Particles react chemically with alkali in Portland Cement causing expansion in concrete, although they may be suitable in base course.

Suitability and Remarks

A description of suitability should be stated by the individual performing the test.

Remarks should contain information in brief on general condition: weathering, shape, porosity, coatings, angularity.

A general executive summary of rock types and conditions shall be made at the beginning of the report.

(e.g. igneous granodiorite 90 % hard, non weathered. volcanics 10% hard and fresh, Some volcanics (30% of volcanics) slightly weathered, some volcanics (5% of volcanics) are vesicular and intensely weathered and soft. No clay lumps, some particles (less than 5% of sample) contained coatings of clay.

Page 132: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 202 GRANULAR SURFACING, BASE AND SUB-BASES

202 (Page 18 of 18) 2006 BC – MOT

THIS PAGE INTENTIONALLY LEFT BLANK

Page 133: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 204 (1 of 10)

SECTION 204

ROCK CUTS

DESCRIPTION

204.01 Scope - This Section describes the controlled blasting techniques required to produce rock cut slopes at the locations shown on the Drawings or as authorized by the Ministry Representative. Rock shall be excavated to subgrade elevation as shown on the Drawings. The work shall be conducted, whether by blasting or other methods, in a manner that minimizes blast damage to the excavation backslope and minimizes the requirement for stabilization. The responsibility for the results of every blast lies with the Contractor. Nothing within this specification shall be interpreted to mean the Ministry accepts responsibility for the results of any blast.

204.02 Definitions

204.02.01 Backline Holes - A line of holes detonated or intermittently detonated along the specified excavation backslope.

204.02.02 Bench – A near-horizontal or shallow slope surface at the top of a near-vertical rock face where blastholes are collared.

204.02.03 Bench Width – The horizontal distance on the bench between the excavation backslope and the crest of the existing rock face. Generally this dimension defines the width of the rock to be removed and is perpendicular to the highway alignment.

204.02.04 Blast Crater - A local depression in rock formed by blasting.

204.02.05 Buffer Holes - The line of production holes located closest to and parallel to the backline holes.

204.02.06 Burden - The distance between the blasthole and the nearest free face.

204.02.07 Charge - A specific quantity of explosive such as a cartridge.

204.02.08 Controlled Blasting - Controlled blasting is the controlled use of explosives and accessories in carefully spaced and aligned production and backline drill holes to produce the specified excavation backslope within the specified excavation limits. The purpose of controlled blasting is to minimize damage to the rock backslope, to help ensure long-term stability and to minimize flyrock.

204.02.09 Controlled Delay Sequence - The delay sequence required for controlled blasting.

204.02.10 Cushion Blasting - A blasting method whereby the production holes are detonated before the backline holes.

204.02.11 Delay - A blast initiator with a specific delay time period before detonation.

204.02.12 Excavation Backslope or Smooth Wall - This is the location of the free surface or shear plane in the rock produced by blasting along the backline holes.

204.02.13 Excavation Limits - This is the boundary within which rock is removed.

204.02.14 Explosive Decoupling - The separation of an explosive charge from the wall of the blast hole.

204.02.15 Flyrock - The throw of fragmented material during blasting.

204.02.16 Free Face - The rock face that provides relief for a blast.

204.02.17 Guide Holes - Those holes along the backline that are not loaded with explosive and are not stemmed.

204.02.18 Hole Deviation – Borehole misalignment distance measured in two directions, within and perpendicular to the excavation backslope. Within the plane of the excavation backslope, hole deviation is borehole misalignment as measured by the horizontal offset distance between any point in the design hole location and the point at a corresponding depth in the actual hole. Perpendicular to the plane of the excavation backslope, hole deviation is the horizontal offset distance between the plane of the design excavation backslope and the centreline of the borehole being measured.

204.02.19 Lift - The vertical distance between the top and bottom of an area to be blasted.

204.02.20 Overbreak in Rock - Overbreak in rock is any rock outside of the specified excavation limits (except slide material described in Subsection 201.42) that is excavated, displaced or loose due to the inherent character of any formation encountered or due to any other cause.

204.02.21 Overburden - This is Type B, C and/or D material (as described in Subsection 201.11) overlying rock.

204.02.22 Presplit (or Pre-Shear) Blasting - A blasting method whereby backline holes are detonated before production holes are detonated.

204.02.23 Production Blasting - Blasting of production

Page 134: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 204 ROCK CUTS

204 (2 of 10) 2006 BC - MOT

holes detonated in a controlled delay sequence.

204.02.24 Production Holes - All holes within the specified excavation limits that are not backline holes. Production holes are often more widely spaced than backline holes.

204.02.25 Rock Excavation - Rock excavation includes drilling holes, loading holes with explosives, detonation by controlled blasting, mucking to subgrade and ditch level, and removal of material to a designated area. Rock excavation also includes secondary breakage of oversize rock.

204.02.26 Rock - Rock is Type A material as defined in Subsection 201.11.01.

204.02.27 Scaling - The removal of all loose material using scaling bars, portable hydraulic jacks, other hand tools, wire rope cables, compressed air blow pipes, blasting without the need for drilled holes and other methods authorized by the Ministry Representative.

204.02.28 Setback Distance - The setback distance is the horizontal distance between the top of the excavation backslope and the toe of the overburden material. Setback is created by removing overburden.

204.02.29 Spacing - The distance between blastholes perpendicular to the burden.

204.02.30 Stemming - Material placed on top of the explosive to provide confinement of the explosive gases.

204.02.31 Subdrill - The distance drilled below subgrade level.

204.02.32 Trimming - The removal by drilling and controlled blasting of potentially unstable rock remaining at the exposed excavation backslope. Trimming may not require backline holes.

204.03 Quality Control

204.03.01 General - Quality control shall be conducted for all blasting operations.

204.03.02 Blasting Consultant - The Contractor shall retain a blasting consultant, acceptable to the Ministry Representative, to provide quality control. The consultant shall not be an employee of the Contractor, explosives manufacturer or explosives distributor.

204.03.03 Vibration Specialist - The Contractor shall retain a vibration specialist to provide blast vibration

monitoring if required. The specialist shall not be an employee of the Contractor, explosives manufacturer or explosives distributor.

204.03.04 Quality Control Activities For Blasting Operations - Quality control for blasting operations shall be performed for test sections, full scale blasting operations and trimming. The Contractor shall provide to the Ministry Representative a copy of the field report generated by the Consultant within one day of each site visit by the Consultant. Quality control for blasting includes, but is not limited to the following activities by the blasting consultant:

• Viewing the proposed blast area at least one (1) week before drilling operations commence.

• Preparing and submitting blast designs for production and backline holes.

• Intermittently viewing the site during drilling for each blast area.

• Intermittently observing the loading of holes with explosives and tying in to the delay system.

• Observing the blasts and reviewing the excavated areas.

• Attending on site to view the excavation backslope after each lift and reviewing excavation backslope for quality control purposes.

• Viewing the site while reviewing proposed changes to the blast design and preparing new designs.

• Attending on site at other times as are appropriate to assist the Contractor in the setting up, assessment and adjustment of the various procedures to be employed for blasting.

• Preparing a field report for each site visit, including details of the progress of blasting operations, a statement whether the blast design is being complied with, any changes to the blast design, any recommendations made to the Contractor and any problems encountered by the Contractor.

204.04 Submittals

204.04.01 General - Review of submittals by the Ministry shall not relieve responsibility from the Contractor for the accuracy and adequacy of the submittals. Submittals are for quality assurance and record keeping purposes. Inadequate or incorrect submittals will be returned for revisions prior to acceptance. The Contractor shall submit to the Ministry Representative the following documentation for review.

204.04.02 Qualifications and Experience of Contractor - Prior to the pre-construction meeting, the Contractor shall provide a statement of the qualifications, experience and work function of all personnel assigned to drilling and blasting duties. A statement of previous work experience on similar projects shall also be provided. This statement shall include the project name, location, volume of rock, year

Page 135: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ROCK CUTS SECTION 204

BC - MOT 2006 204 (3 of 10)

constructed and the owner/client contact name. The company, the driller and the blaster shall each have a minimum of 5 consecutive years demonstrated experience in drilling and controlled blasting work on at least 3 projects involving rock cuts over 8 m height along transportation corridors.

204.04.03 Qualifications and Experience of Proposed Blasting Consultant - By the pre-construction meeting, the Contractor shall provide the name of the consulting firm, and the name and qualifications of the blasting consultant’s on-site representative who will be providing the quality control for rock excavation. The blasting consultant shall have a minimum of 5 consecutive years demonstrated experience in preparing successful blast designs along transportation corridors for at least 3 projects. The following information shall be included in the qualifications submitted:

• Project name, location and experience. • Name and phone number of owner/client contact who

can verify the experience of the blasting consultant’s site representative.

204.04.04 Qualifications and Experience of Proposed Vibration Specialist - By the pre-construction meeting, the Contractor shall provide the name and qualifications of the vibration specialist who will be providing the quality control for rock excavation. The vibration specialist shall have a minimum of 5 consecutive years demonstrated experience in the field of vibration monitoring for at least 3 projects. The following information shall be included in the qualifications submitted:

• Project name, location and experience. • Name and phone number of owner/client contact who

can verify the experience of the vibration specialist.

204.04.05 Proposed General Construction Plan - By the pre-construction meeting, the Contractor shall submit a general construction plan showing proposed blasting sequence numbers defining the order of blasts for the contract. The plan shall also show the following information for each blast:

• Blast sequence number. • The location of the blast in relation to the remaining

rock on the site. • Approximate dimension of the rock to be removed. • Estimated volume of rock to be removed. • Location of the disposal site.

204.04.06 Sequence of Operations – The Contractor shall adopt a logical, systematic sequence of operations to ensure blasting is conducted safely and effectively. The following general sequence of blasting operations outlines minimum requirements of the Contractor to maximize the stability of

the excavation backslope and does not limit or supercede any other requirements in this specification:

• Retain a blasting consultant to perform quality control.

• Submit blast designs for review and authorization by the Ministry.

• Accurately survey locations of proposed blastholes. • Drill holes, load explosives, detonate blast and

remove muck pile. • Check the excavation backslope to determine hole

offsets, hole angles, hole alignment and compliance with allowable tolerances.

• Review blast results and make changes to blasting operations as necessary.

• Perform backslope stabilization to the satisfaction of the Ministry Representative before subsequent lifts are detonated.

204.04.07 Blast Design - The Contractor shall provide and follow a blast design, approved and signed by the blasting consultant, not less than one week prior to commencing drilling and blasting operations and a minimum of one day before the Contractor proposes to implement any changes to the previously utilized drilling or blasting methods. The design may be prepared by the blaster, but shall be reviewed by the Contractor and forwarded to the blasting consultant for signing. The design shall contain full details of the drilling and blasting patterns and controls that the Contractor proposes to use for controlled blasting. The blast design shall contain the following minimum information:

• Date the design was prepared and proposed date of blast.

• Station limits of proposed blast. • Plan and section views of proposed drill pattern

including free face, burden, blasthole spacing, blasthole diameters, blasthole angles, lift height, hole depth, and subdrill depth.

• The location of production (including buffer) and backline holes.

• Loading diagram showing type and amount of explosives, primers, initiators, and location and depth of stemming.

• Initiation sequence of blastholes including delay times and delay system.

• Manufacturer's data sheets for all explosives, primers, delays, and initiators to be used.

• Blasting consultant’s signature, printed name, and company name.

• Blaster’s signature, printed name, company name, and blaster’s certificate number.

204.04.08 Preblast Survey - The Contractor shall conduct a preblast survey a minimum of one day before blasting operations commence. The preblast survey shall include a

Page 136: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 204 ROCK CUTS

204 (4 of 10) 2006 BC - MOT

complete description of the existing condition of any nearby buildings, structures, wells and utilities that potentially may be damaged by blasting operations. The survey method used shall be acceptable to the Contractor's insurance company.

204.04.09 As-Built Blast Design - Within one day after each blast, the Contractor shall submit, unless otherwise authorized by the Ministry Representative, an as-built blast design showing all actual blast details in a format that permits direct comparison with the proposed blast design.

204.04.10 Blasting Consultant’s Field Report - The Contractor shall provide the blasting consultant’s field report within one day after each visit by the blasting consultant.

204.04.11 Vibration Control Records - As required, the Contractor shall provide all seismograph records of vibration monitoring and interpretation of results within one day after each blast.

204.04.12 Peak Overpressure Records - As required, the Contractor shall provide a permanent signed and dated record of the peak overpressure measurements within one day after each blast.

MATERIALS

204.11 Explosives and Related Products

204.11.01 Manufacturer - All products and materials used for any blasting operations shall be products of a company regularly engaged in the manufacture of explosives and related products.

204.11.02 Expired Explosives - Explosives with an expired shelf life shall not be used.

204.11.03 Water Resistance - Water resistant explosives may be required for the work.

CONSTRUCTION

204.31 Permits and Regulations - The Contractor shall obtain all necessary permits for and shall comply fully with the laws, rules and regulations of Municipal, Provincial and Federal agencies in connection with the use, transportation, storage and safe handling of all explosives, including those regulations contained in the Industrial Health and Safety Regulations (IHSR) published by the Worker’s Compensation Board (WCB) of British Columbia.

204.32 Supervision - The Contractor shall provide at least one person thoroughly trained and experienced in the use of

explosives who shall be present at all times during the execution of all blasting operations and who shall direct such work.

204.33 Personnel - The Contractor shall ensure that all persons conducting blasting operations have a valid blaster’s certificate issued by the WCB or is under the direct supervision of a certificate holder.

204.34 Safety - The Contractor shall meet all WCB regulations. All work shall be performed in a manner that prevents injury or harm to any personnel employed in the rock excavation area. Warning signs shall be posted and readily recognizable audible warning signals shall be used. The perimeter of the area affected by blasting operations shall be patrolled and controlled by direct voice communication. The Ministry Representative may stop work if the safety of the public is being jeopardized by the Contractor's blasting operations.

204.35 Flyrock Control - Before the detonation of any blast in areas where flying rock or other debris may result in personal injury or damage to property, the area within the excavation limits shall be covered with suitable blasting mats, soil or other equally serviceable material to prevent flyrock.

204.36 Other Damage - The Contractor shall be responsible for any damage resulting from blasting. Occupants of local buildings shall be notified by the Contractor, prior to the commencement of the blasting, as to the timing, size of blasts, types of warning and other signals.

204.37 Subgrade and Ditch Areas

204.37.01 General - The subgrade shall be constructed to ±50 mm of the specified line and grade before the placement of Select Granular Sub-Base Material. Any pinnacles of intact rock protruding above the design subgrade elevation shall be removed.

204.37.02 Supporting Rock - The Contractor shall exercise care and use appropriate methods to prevent breaking, loosening or otherwise damaging supporting rock below subgrade level and ditch bottom. The Contractor shall be responsible for the methods used and for any damage to the rock structure resulting from the operations.

204.37.03 Drainage - Unless otherwise authorized by the Ministry Representative, excavated rock areas shall be free draining. If craters formed in rock by blasting below subgrade elevation are not free draining, then the Contractor shall provide drainage by trenching to a free outlet. These blast craters and drainage trenches shall be backfilled to subgrade elevation.

Page 137: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ROCK CUTS SECTION 204

BC - MOT 2006 204 (5 of 10)

204.37.04 Shatter Zone for Drainage - Unless otherwise authorized by the Ministry Representative, drainage shall also be provided by shattering the upper portion of rock below subgrade and ditches within the entire excavation limits. The shatter zone shall be 300 mm thick. A shatter zone thickness of 900 mm may be required near cut to fill transition zones for 10 m beyond the transition, or as requested by the Ministry Representative.

204.37.05 Backfill Material - Backfill shall be free draining material such as clean broken rock or coarse clean granular material from a source authorized by the Ministry Representative. All backfill shall be placed and compacted as specified.

204.37.06 Ditches - The ditches shall be formed and cleaned before any base material is placed on the subgrade.

204.38 Blasting Test Section(s)

204.38.01 General - Unless otherwise authorized by the Ministry Representative, all requirements for full scale blasting shall also apply to test sections. Prior to commencing full-scale blasting operations, the Ministry Representative may require the Contractor to demonstrate the adequacy of the proposed blast design by drilling, blasting, and excavating short test sections, up to 30 m in length, to determine which combination of method, hole spacing, timing, and charge yields acceptable results. The length of the blast test section shall be as specified in the blast design.

204.38.02 Reduced Section Length - Where requested by the Ministry Representative, the Contractor shall use test section lengths of less than 30 m.

204.38.03 Backline Hole Spacing - The Contractor shall begin the tests by drilling backline holes 750 mm apart along the specified excavation backslope, then adjust if needed, until the Ministry Representative authorizes the spacing to be used for full-scale blasting operations.

204.38.04 Review of Test Section Results - The Contractor shall not drill beyond the test section until it has been excavated and the results reviewed by the blasting consultant and continuation is authorized by the Ministry Representative.

204.38.05 Revision of Methods - If either the blasting consultant or the Ministry Representative determines that the results of the test section are unsatisfactory, then notwithstanding the Ministry Representative's prior review of such methods, the Contractor shall adopt such revised methods as are necessary to achieve the required results.

204.38.06 Additional Test Sections - If at any time during the progress of the work the methods of drilling and blasting do not produce the required excavation backslope geometry within the tolerances specified for backline holes, then the Contractor will be required to drill, blast and excavate short sections, not exceeding 30 m in length, until a technique is achieved that will produce the desired results.

204.39 Overburden Removal and Setback - The setback distance shall be 3.0 m. Unless otherwise authorized by the Ministry Representative, the Contractor shall, before drilling the backline holes, remove all overburden within the excavation limits or 10 m beyond the limits of the production holes in a direction parallel to the backline. The overburden surface shall be sloped at 1.5:1 unless otherwise authorized by the Ministry Representative.

204.40 Backline and Production Holes

204.40.01 Stemming - The upper portion of all holes between the topmost charge and the hole collar shall be stemmed. Stemming materials shall be sand or other inert angular granular material with similar specific gravity passing a 9.5 mm sieve.

204.40.02 Hole Obstructions - Before placing charges, the Contractor shall determine that the hole is free of obstructions for its entire depth. All necessary precautions shall be exercised so that the placing of the charges will not cause spalling of material from the walls of the holes.

204.40.03 General Orientation - All holes shall be drilled downward unless otherwise specified in the blast design and authorized by the Ministry Representative. In general, slash holes (horizontal, near horizontal or fanned out holes) shall not be drilled along the excavation backslope or on pioneering routes excavated to provide access for backline hole drilling, unless authorized by the Ministry Representative.

204.40.04 Insertion of Explosive - Explosive materials shall not be inserted into the holes until the blast design has been reviewed by the Ministry Representative.

204.41 Backline Holes

204.41.01 General - The Contractor shall control the hole layout and drilling operations using proper equipment and techniques to ensure that backline holes are located and oriented correctly. The proposed location of each backline hole shall be accurately surveyed and staked.

204.41.02 Hole Location - For each blast, the line of backline holes shall extend 10 to 20 m beyond the limits of the production holes to be detonated or to the end of the

Page 138: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 204 ROCK CUTS

204 (6 of 10) 2006 BC - MOT

specified excavation backslope, as applicable.

204.41.03 Hole Location Tolerance - Backline holes shall be drilled within 75 mm of the staked collar location.

204.41.04 Hole Deviation - Backline holes shall not deviate from the plane of the specified excavation backslope by more than 150 mm as measured perpendicular to the slope. Backline holes shall not deviate more than 150 mm as measured within the plane of the excavation backslope

204.41.05 Hole Diameter - The backline holes shall be 50 to 75 mm in diameter, or as recommended by the blasting consultant and authorized by the Ministry Representative. Trim blast holes may be as small as 25 mm diameter.

204.41.06 Hole Length - The length of backline holes for any individual lift shall not exceed 8 m unless the Contractor can demonstrate to the Ministry Representative that the Contractor can stay within the tolerances and produce the required excavation backslope geometry.

204.41.07 Guide Holes - Guide Holes shall be of the same diameter and drilled in the same plane and to the same tolerance as the remaining backline holes.

204.41.08 Hole Length Increase - Upon satisfactory demonstration, the length of holes may be increased to a maximum of 12 m with written authorization of the Ministry Representative. If more than 5% of the backline holes are misaligned in any one lift, then the Contractor shall reduce the height of the lifts until the 150 mm alignment tolerance is met.

204.41.09 Control of Drilling Orientation - All drilling equipment used to drill the backline holes shall have mechanical devices attached to that equipment to accurately determine the orientation of the drill steel entering the rock. Backline hole drilling will not be permitted if these devices are either missing or inoperative.

204.41.10 Offset Between Lifts - When the cut height requires more than one lift, a maximum 0.5 m offset between lifts is permitted to allow for drill equipment clearances. The Contractor shall begin the backline hole drilling at a point on the top lift which will allow for necessary offsets and shall adjust at the start of lower lifts to compensate for any drift which may have occurred in the upper lifts.

204.41.11 Length for Toe Berm Removal - Drilling 0.5 m below ditch bottom is permitted to facilitate removal of the toe berm.

204.42 Presplit Blasting

204.42.01 General – As conditions permit, unless otherwise specified in the blast design and authorized by the Ministry Representative, presplit blasting shall be conducted for all blasting to the excavation backslope. In general, cushion blasting may proceed when the bench width is less than three times the lift height.

204.42.02 Explosive Type and Accessories - Drill hole conditions may vary from dry to filled with water. The Contractor shall use explosives and blasting accessories appropriate for the drill hole conditions encountered to accomplish the specified results. Only standard explosives manufactured for presplit blasting shall be used in backline holes, unless otherwise specified in the blast design and authorized by the Ministry Representative. Bulk ammonium nitrate and fuel oil (ANFO) shall not be loaded into the backline holes.

204.42.03 Explosive Decoupling - Explosives shall be evenly distributed and decoupled to the maximum extent possible.

204.42.04 Explosive Charges - The bottom charge of backline holes may be larger than the remaining charges but shall not be large enough to cause overbreak. The top charge of backline holes shall be placed far enough below the collar and be sufficiently small to avoid overbreak and heaving of rock beyond the excavation backslope.

204.42.05 Modified Blasting Sequence - The Contractor may detonate the backline holes before drilling production holes, provided satisfactory excavation backslopes are obtained.

204.42.06 Backline Hole Delays - If required to reduce ground vibrations or noise, backline holes may be delayed, provided the effective hole-to-hole delay time is not more than 25 ms.

204.42.07 Excavation Backslope Geometry - The excavation backslope shall not deviate more than 150 mm from a plane passing through adjacent drill holes except where the character of the rock is such that, as determined by the Ministry Representative, irregularities are unavoidable. The 150 mm tolerance shall be measured perpendicular to the plane of the slope. In no case shall any portion of the slope encroach on the ditch.

204.43 Cushion Blasting

204.43.01 General - Where the horizontal distance from the specified excavation backslope to the existing free face is less than 5 m, the Contractor may use cushion blasting instead of presplit blasting.

Page 139: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ROCK CUTS SECTION 204

BC - MOT 2006 204 (7 of 10)

204.43.02 Delay Time - The difference in delay time between the backline holes detonated after the buffer holes shall be between 25 and 75 ms. With the exception of these criteria, requirements for presplit blasting shall also apply to cushion blasting.

204.44 Production Blasting

204.44.01 Hole Diameter - Production holes shall not exceed 150 mm in diameter, unless otherwise specified in the blast design and authorized by the Ministry Representative.

204.44.02 Hole Location - Production blast holes (not including buffer holes) shall not be drilled closer than 2.0 m to the backline holes, unless otherwise specified in the blast design and authorized by the Ministry Representative. The bottom of the production holes (including buffer holes) shall not be lower than the bottom of the backline holes.

204.44.03 Delay Sequence - All sequences shall be delayed in such a manner that successive delays promote the movement of rock in the direction of a free face at all times.

204.44.04 Damage to Backslope - It is the Contractor's responsibility to take all necessary precautions during production blasting to minimize blast damage to the excavation backslope.

204.44.05 Buffer Holes - A line of buffer holes shall be drilled along a plane parallel to the backline holes. Buffer hole diameters shall be between 50 and 75 mm unless otherwise specified in the blast design. Unless otherwise specified in the blast design, the line of buffer holes shall be drilled approximately 1 m away from the backline holes and spaced 1.0 to 1.5 m centre to centre.

204.44.06 Buffer Hole Charge and Detonation - The explosive charge in buffer holes shall not exceed 50% of the full explosive load that could be placed in a 75 mm diameter production hole. Detonation of the buffer holes shall be on a delay sequence toward a free face. Ammonium nitrate and fuel oil shall not be used for buffer holes unless otherwise specified in the blast design and authorized by the Ministry Representative.

204.45 Vibration Control and Monitoring

204.45.01 Vibration Control - The Contractor shall use blasting methods designed to limit the intensity of ground vibrations originating within the excavation limits. When blasting near buildings, structures, wells, utilities or other works that may be subject to damage from blast induced ground vibrations, the ground vibrations shall be controlled using properly designed delay sequences and allowable

charge weights per delay.

204.45.02 Charge Weight Per Delay - Allowable charge weights per delay shall be based on vibration levels that will not cause damage. The Ministry Representative may monitor vibration levels at the blast site by requesting trial blasts to determine actual vibration levels reached during blasting.

204.45.03 Monitoring - Monitoring shall meet ISRM standards. Whenever vibration damage to adjacent structures is possible, the Contractor shall monitor each blast with approved seismograph(s) located between the blast area and the closest structure(s) subject to potential blast damage. The geophone shall be placed as close as possible to the structure(s) but not directly above the structure(s). The seismograph(s) shall be set to record particle velocity, accelerations, and frequency in the range generally found with controlled blasting. The peak particle velocity shall be calculated as the maximum vector sum of three mutually perpendicular components of vibration. All components and peak particle velocity shall be recorded.

204.45.03 Vibration Limits - Peak particle velocity, accelerations and frequency shall not be allowed to exceed the safe limits of the nearest structure subject to potential vibration damage. The Contractor shall employ a qualified vibration specialist to establish the safe vibration limits.

204.45.04 Interpretation - The vibration specialist shall interpret the seismograph records to ensure that the seismograph data is effectively used in the control of the blasting operations with respect to the existing structures.

204.46 Air Concussion and Noise Control

204.46.01 General - When requested by the Ministry Representative, an air concussion monitoring system shall be installed in a representative location between the blasting area and the nearest structure subject to potential blast damage or annoyance. The equipment used to make the air concussion measurements shall be the type specifically manufactured for that purpose.

204.46.02 Monitoring - The air concussion monitoring system shall be set to record air overpressure on the linear setting. When requested by the Ministry Representative, human annoyance (A weight setting) and human ear response (C weight setting) shall also be recorded.

204.46.03 Overpressure - Peak overpressure shall be controlled using appropriate blasthole patterns, detonation systems and stemming to prevent venting of blasts, and to minimize air concussion and noise levels produced by the blasting operations. The contractor shall use a qualified

Page 140: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 204 ROCK CUTS

204 (8 of 10) 2006 BC - MOT

vibration specialist to establish safe overpressure limits.

204.47 Excavation Backslope Stabilization

204.47.01 Stabilization - The excavation backslope shall be stabilized as recommended by the Ministry’s geotechnical engineer and to the Ministry Representative’s satisfaction, during or upon completion of the excavation of each lift. Unless otherwise authorized by the Ministry Representative, drilling of the next lift shall not proceed until stabilization has been completed. Drilling of the next lift shall not proceed until all concerns about stability raised by the Ministry’s geotechnical engineer and the Ministry Representative are addressed by the stabilization work, Stabilization shall be completed before any base material is placed upon the subgrade.

204.47.02 Stabilization Methods - Stabilization methods include scaling, trimming, the application of rock bolts, shotcrete, slope mesh, drains or other stabilization techniques recommended by the Ministry’s geotechnical engineer and authorized by the Ministry Representative.

204.48 Special Use of Excavated Rock - Excavated rock of suitable quality required for walls, riprap, paving, or other special use shall be sorted and deposited in stockpiles if so requested by the Ministry Representative.

MEASUREMENT

204.81 Type A Excavation - Type A excavation will be measured by the CUBIC METRE.

204.82 Excavation Backslope (Smooth Wall) – The excavation backslope will be measured by the SQUARE METRE where the height of the cut exceeds 2 m. Measurement will apply to the condition of the slope prior to scaling. Measurement for payment, including measurement of smooth wall surface area, hole deviation and slope deviation, will be conducted by the Ministry.

PAYMENT

204.91 Type A Excavation - Payment for TYPE A

EXCAVATION will be at the Contract Unit Price per cubic metre and will be authorized by the Ministry Representative after submittal of all documentation required in this Section. The Unit Price will be considered full compensation for the requirements of this Section.

Design slope lines including approved offsets, subgrade and ditch lines shall represent the pay lines of Type A excavation.

If so determined by the Ministry Representative, stabilization necessitated by improper blasting operations shall be at the Contractor’s expense.

Trimming will be paid at the Contract Unit Price per cubic metre for TYPE A EXCAVATION.

All costs associated with blasting test sections and any revised methods necessary to produce acceptable results shall be incidental to Type A excavation.

Additional drilling, blasting and excavation required to construct subgrade to the required tolerances and excavating, loading, hauling, placing and compacting backfill material for blast craters and drainage trenches to subgrade level shall be incidental to Type A excavation.

All costs associated with vibration control, air concussion and noise control, and all monitoring shall be considered incidental to Type A excavation.

204.92 Excavation Backslope (Smooth Wall) - Payment for EXCAVATION BACKSLOPE will be at the Contract Unit Price per square metre for only that part of the exposed cut face meeting the geometric tolerances for excavation backslope in this Section. Geometric tolerances to be met include hole location tolerance, hole deviation, offset between lifts and deviation of excavation backslope geometry.

Scaling of loose material disturbed by blasting including removal and disposal of overbreak shall be considered incidental to payment for excavation backslope.

Page 141: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ROCK CUTS SECTION 204

BC - MOT 2006 204 (9 of 10)

PROPOSED BLAST DESIGN File #: _____________________

PROJECT NO. ___________________

(TO BE SUBMITTED NOT LESS THAN 1 DAY BEFORE DRILLING)

GENERAL: DATE PREPARED__________________ CONTRACTOR'S NAME _____________________________________ PROPOSED BLAST DATE ___________ BLASTER'S NAME __________________________________________ BLAST # __________________________ BLASTER'S CERTIFICATE NUMBER __________________________

HIGHWAY#_________________ BLAST LOCATION AT: ____________________________________________________

UTILITY PROTECTION OR STANDBY REQUIRED: (CIRCLE) YES NO

SITE DETAILS:

HEIGHT ABOVE HWY ________ (m) SLOPE ANGLE ________ (°) SLOPE LENGTH ________________________ (m) ROCK TYPE ________________________________ DISTANCE TO NEAREST STRUCTURE (UTILITY)____________ (m)

ANTICIPATED DRILLING DETAILS:

PROPOSED NO. OF BACKLINE HOLES___________ PROPOSED APPROX. NO. OF HOLES ________ PROPOSED AVG. DEPTH __________ (m) HOLE DIA. ______ (mm) PROPOSED NO. OF ROWS ____________ APPROX. HOLE SPACING ___________ (m) BURDEN ____________ (m) PROPOSED MAXIMUM DEPTH ___________ (m) PROPOSED HOLE INCL.: (CIRCLE) VERTICAL HORIZ. VARIABLE PROPOSED TOTAL DEPTH ____________ (m)

PROPOSED BLAST DETAILS:

EXPLOSIVE TYPE _____________________________ EXPLOSIVE SIZE _________mm by ____________mm APPROX. NUMBER OF CARTRIDGES ___________ APPROX. TOTAL WEIGHT ________________________ (kg) PROPOSED NUMBER OF DELAYS ______________ DELAY TYPE AND LENGTH _________________ (ms)

INITIATION DEVICE: (CIRCLE) E.B. CAPS SAFETY FUSE OTHER (SPECIFY) _________________________________ BLASTING MACHINE: TYPE ______________ CAPACITY _______________

APPROX. VOLUME OF ROCK TO BE BLASTED ______________________ (m3)

PROPOSED BLAST SKETCH: SHOW THE FOLLOWING: PLAN VIEW: CROSS-SECTION VIEW: SCALE PLAN VIEW CROSS-SECTION ROCK GEOMETRY APPROX. HOLE LOCATIONS APPROX. HOLE DEPTH PROPOSED TIE-IN PATTERN ROW BY ROW DELAYS DETONATION DIRECTION HIGHWAY LOCATION UTILITY LOCATION NORTH ARROW

BLASTING CONSULTANT NAME ________________________ SIGNATURE_________________________ COMPANY_________________

BLASTER'S SIGNATURE _______________________________________________ COMPANY______________________________________

RECEIVED BY MINISTRY REPRESENTATIVE (SIGNATURE) ________________________________________________________________

(Use Additional Sheets if Necessary)

Page 142: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 204 ROCK CUTS

204 (10 of 10) 2006 BC - MOT

AS-BUILT BLASTING RECORD File #: _____________________

PROJECT NO. ___________________

(TO BE SUBMITTED NOT MORE THAN 1 DAY AFTER EACH BLAST)

GENERAL: DATE PREPARED__________________ CONTRACTOR'S NAME _____________________________________ ACTUAL BLAST DATE _____________ BLASTER'S NAME __________________________________________ BLAST # __________________________ BLASTER'S CERTIFICATE NUMBER __________________________

HIGHWAY#_________________ BLAST LOCATION AT: ____________________________________________________

UTILITY PROTECTION OR STANDBY USED: (CIRCLE) YES NO TYPE OF UTILITY PROTECTION _________________________

SITE DETAILS:

HEIGHT ABOVE HWY ________ (m) SLOPE ANGLE ________ (°) SLOPE LENGTH ________________________ (m) ROCK TYPE ________________________________ DISTANCE TO NEAREST STRUCTURE (UTILITY)____________ (m)

DRILLING DETAILS:

NUMBER OF BACKLINE HOLES___________ TOTAL NUMBER OF HOLES ________ AVERAGE DEPTH __________ (m) HOLE DIAMETER ______ (mm) NUMBER OF ROWS ____________ HOLE SPACING ___________ (m) BURDEN ____________ (m) MAXIMUM DEPTH ___________ (m) HOLE INCLINATION: (CIRCLE) VERTICAL HORIZ. VARIABLE TOTAL DEPTH ____________ (m)

BLAST DETAILS:

EXPLOSIVE TYPE _____________________________ EXPLOSIVE SIZE ___________mm by ______________mm TOTAL NUMBER OF CARTRIDGES ___________ TOTAL WEIGHT __________________________ (kg) TOTAL NUMBER OF DELAYS ______________ DELAY TYPE AND LENGTH __________________ (ms)

INITIATION DEVICE: (CIRCLE) E.B. CAPS SAFETY FUSE OTHER (SPECIFY) _________________________________ BLASTING MACHINE: TYPE ______________ CAPACITY _______________

VOLUME OF ROCK BLASTED ______________________ (m3)

BLAST SKETCH: SHOW THE FOLLOWING: PLAN VIEW: CROSS-SECTION VIEW: SCALE PLAN VIEW CROSS-SECTION ROCK GEOMETRY HOLE LOCATIONS HOLE DEPTH TIE-IN PATTERN ROW BY ROW DELAYS DETONATION DIRECTION HIGHWAY LOCATION UTILITY LOCATION NORTH ARROW

BLASTER'S SIGNATURE _______________________________________________ COMPANY______________________________________

RECEIVED BY MINISTRY REPRESENTATIVE (SIGNATURE) ________________________________________________________________

(Use Additional Sheets if Necessary)

Page 143: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 205

RIPRAP

205.01 General - This Section covers the protection by riprap of embankments and channels at the locations and of the type and class shown on the Drawings or required by the Ministry Representative.

Work within any watercourse shall generally be carried out in conformity with the environmental protection provisions to the satisfaction of the Ministry Representative.

205.02 Material - Rock shall be hard durable angular quarry rock of a quality that will not disintegrate on exposure to water or the atmosphere. The gradation of rock sizes (mass in kg) in each class of riprap, as specified or directed, shall conform to Table 205-A.

Rocks generally shall be evenly graded, approximately the stipulated sizes, and individual rocks shall have a thickness greater than one-third their length and none shall have a mass greater than five times that of the specified class mass.

For visual comprehension only, Table 205-B indicates the approximate average dimension of an angular rock for each specified rock class mass.

TABLE 205-A GRADATION OF ROCK SIZES IN EACH CLASS OF RIPRAP

CLASS OF

RIPRAP

*NOMINAL THICK-

NESS OF RIPRAP

ROCK GRADATION: PERCENTAGE LARGER THAN GIVEN

ROCK MASS (kg)

(kg) (mm) 85% 50% 15% 10 350 1 10 30

25 450 2.5 25 75

50 550 5 50 150

100 700 10 100 300

250 1000 25 250 750

500 1200 50 500 1500

1000 1500 100 1000 3000

2000 2000 200 2000 6000

4000 2500 400 4000 12000

* The thickness of riprap, measured at right angles to the slope, for the class specified, shall be the nominal thickness stated, unless otherwise shown on the Drawings or required by the Ministry Representative.

205.03 Preparation - Areas to receive riprap shall be trimmed to a uniform surface and to the slope(s) indicated on the Drawings or as directed by the Ministry Representative.

Before rock placement commences, loose material shall be removed and minor pot-holes and hollows filled with selected materials well tamped-in to the approval of the Ministry Representative.

205.04 Foundations - To provide a stable foundation and protection against any undercutting, the riprap shall be thickened at the toe, laid horizontally to form an apron and/or keyed into the bed of the watercourse, all as indicated on the Drawings or as directed by the Ministry Representative. 205.05 Filter Blankets - Filter blanket material and placement, where required, shall be as specified in the Special Provisions or as directed by the Ministry Representative.

205.06 Loose Riprap - The controlled placement of rock of the class specified shall produce a rock mass of the nominal or required thickness over the area indicated. The rock shall be manipulated as necessary to provide mass stability and a regular surface with a minimum of voids.

TABLE 205-B APPROXIMATE AVERAGE DIMENSION OF AN ANGULAR ROCK FOR EACH SPECIFIED ROCK CLASS MASS

kg 10 25 50 100 250 500 1000 2000 4000

mm 200 300 350 450 600 800 1000 1200 1500

BC - MOT 2006 205 (1 of 2)

Page 144: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 205 RIPRAP

205.07 Hand-Laid Riprap - Hand-laid riprap, normally Class 10 or 25, shall conform to the size, gradation and requirements set out in Subsection 205.02. Individual rocks too large to handle shall be manipulated for satisfactory setting and spacing.

At the toe of sloped riprap, a sufficient number of the larger rocks shall be placed to form a firm foundation approximately 50% thicker than the required nominal riprap thickness. The remaining larger rocks shall be regularly spaced, at least one to every 2.5 m², when placing the general rock mass to the nominal or required thickness over the area indicated. Smaller rocks or spalls shall be well hammered in to fill the interstices and to form a closely massed regular surface.

Where riprap is required in two layers, the rocks shall be laid up and generally lap jointed between the regularly spaced larger rocks placed as through headers.

205.08 Grouted Riprap - Where grouted riprap is shown or required, the surfaces of the rocks shall be cleaned and wetted and the interstices filled with cement mortar, well rodded and pounded in for a minimum mortar depth of 300 mm or as otherwise detailed or required by the Ministry Representative. The mortar shall consist of one part Portland cement to three parts well-graded clean fine aggregate mixed to a proper consistency.

205.09 Measurement and Payment - Measurement shall be made by multiplying the facial area by the average thickness dimensions as shown on the Drawings or as directed by the Ministry Representative. No allowance will be made for the quantity of rock placed in excess of these dimensions.

Payment shall be on the basis of the price bid per cubic metre for the type and class of riprap specified or required. The price bid shall be accepted as full compensation for everything completely furnished and done in connection therewith, but shall not include the excavation for foundation, which shall be paid for under "Foundation Excavation", nor for excavation of rock for riprap which shall be paid for under "Roadway and Drainage Excavation", nor for haul which shall be paid for under "Overhaul" in accordance with Subsection 201.93.

205 (2 of 2) 2006 BC - MOT

Page 145: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 206 (1 of 6)

SECTION 206

ROCK BOLTS

DESCRIPTION

206.01 Scope - This Section covers the installation, by appropriate rock bolting methods, of anchored steel bars tensioned and locked off against face plates in the areas designated by the Ministry Representative. Unless otherwise stated below, all rock bolts shall be installed and tensioned to the rock bolt manufacturer's specifications.

206.02 Codes And Standards

CAN/CSA G164 .............Hot Dip Galvanizing of Irregularly Shaped Articles. CAN/CSA G30.18 ..........Billet Steel Bars for Concrete Reinforcement CAN/CSA G40.21 ..........Structural Quality Steels CAN/CSA A23.2-9C......Compressive Strength of Cylindrical Concrete Specimens.

206.03 Quality Control - The Contractor shall provide quality control for rock bolt operations.

206.04 Submittals - The Contractor shall supply the following to the Ministry Representative:

206.04.01 Proposed Rock Bolt System - Provide documentation as follows for the proposed rock bolt system for review at least 5 working days before commencing rock bolt installation.

a) Rock Bolts - Type, dimensions and manufacturer of the bar, centralizers, face plate, washer (where applicable), and nut.

b) Resin - Published specifications showing name of material, manufacturer, graph of unconfined compressive strength development versus time, gel time, viscosity, shelf life, storage and handling requirements.

c) Grout - Published specifications showing name of material, manufacturer, 7 and 28 day unconfined compressive strength, composition, shelf life, storage and handling requirements.

d) Data Sheets - Upon request by the Ministry Representative, supply the manufacturer’s product data sheets.

e) Properties of Steel - Upon request by the Ministry Representative, supply the physical and chemical properties for each lot or heat number of the steel.

f) Test Results - Upon request by the Ministry

Representative, submit a certified statement from an independent testing laboratory of the physical dimensions and mechanical properties of the rock bolt bar proposed for use. This statement shall include:

• Minimum cross-sectional area of the threaded portion of the bar.

• Minimum cross-sectional area of the unthreaded portion of the bar.

• Yield strength of the bar. • Ultimate tensile strength of the bar. • Percent elongation of the bar at yield and ultimate

strength.

g) Quick Setting Mortar - Name of material, manufacturer, 7 and 28 day unconfined compressive strength, and composition.

h) Sealing - Proposed method of sealing fractures and voids in drill holes to prevent loss of grout.

206.04.02 Calibration Certificates - Provide tensioning jack calibration certificates 5 working days before commencing rock bolt installation. Calibration of jacks shall have been performed by an authorized testing agency not more than 30 days prior to rock bolt testing. The certificate shall show the relationship between gauge pressure and applied load. Pumps and jacks shall be paired for calibration.

206.04.03 Contractor's Rock Bolt Records - Provide daily rock bolt tensioning records within one day of each day’s rock bolt operations. Records shall include contractor name, date of tensioning, weather, temperature, test jack identification number, pump identification number, name of person who tested the rock bolt, rock bolt location, rock bolt number, rock bolt length, resin or grout details, test start time, test end time, gauge reading for each minute of the creep test, and lock off load. For resin systems, records shall also include the start and end times of spinning the bar through the resin in the hole.

MATERIALS

206.11 Materials - Steel materials shall be hot-dip galvanized to CSA G164. All resin, grout and steel materials shall be the products of established manufacturers regularly engaged in the manufacture of rock bolt materials for at least five years. Materials shall meet the following additional requirements:

a) Rock Bolt Bars

• Steel hot-rolled Grade 517 MPa meeting

Page 146: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 206 ROCK BOLTS

206 (2 of 6) 2006 BC - MOT

CAN/CSA G30.18. • Nominal bar diameter 22 mm unless otherwise

specified. • Threadlike surface deformations for full length of

bar and suitable for mechanical coupling. • Cut-thread reinforcing bar not permitted.

b) Miscellaneous Hardware

• Steel hardware to be compatible in size and strength with rock bolt bars.

• Face plates to be square in plan and dome shaped in cross-section.

• Face plate size to be matched to bar size. • Face plates to CAN/CSA G40.21 Grade 300W. • Face plate dimensions 10 mm by 150 mm by

150 mm unless otherwise specified. • Face plates date stamped after galvanizing on the

side visible when installed with the current year (in the format YYYY) in numbers 10 mm high.

• Face plates slotted for grout tube if grout is used.

c) Resin

• Fast-set and slow-set resin in cartridge form. • A minimum unconfined compressive strength

when fully mixed and cured of 90 MPa, tested in accordance with CAN/CSA A23.2-9C.

• Encased in a plastic film that provides optimum resistance to moisture, and is easily ruptured to enable complete mixing during installation.

• Suitable thixotropic and viscous properties to permit adequate mixing of the resin components by rotation of the rock bolt bar and to contain the resin within the drill hole.

• Easily identifiable gel time and as recommended by the resin manufacturer.

• Reach 80% of its ultimate strength within a time interval equal to five times the gel time.

• Non-shrink after the gel time. • Unaffected by mild acids or mild alkalis. • Cartridge boxes labelled with the resin expiry date.

d) Grout

• Pre-mixed, unsanded, non-metallic, and non-shrink cementitious grout containing silica fume.

• Can be mixed to a flowable consistency, typically with a water to cement ratio of 0.35 or as specified by the grout manufacturer to achieve or exceed the required strength.

• Minimum 7 day compressive strength of 30 MPa and a minimum 28 day compressive strength of 40 MPa, tested in accordance with CAN/CSA A23.2-9C.

• Admixtures to be used according to the manufacturer's specifications and as authorized by the Ministry Representative.

• Calcium chloride accelerator is not permitted.

e) Mortar Pads

• Portland cement based. • Quick setting.

CONSTRUCTION

206.31 Execution

206.31.01 General - The entire rock bolt system shall be stored under cover away from deleterious materials. All grease and other deleterious material shall be removed from the steel prior to rock bolt installation.

206.31.02 Site Preparation - Where rock bolts may be adversely impacted, rock removal above and around proposed rock bolt locations shall be completed before installation of rock bolts commences. Any minor rock scaling performed in conjunction with rock bolting shall be considered incidental to rock bolting.

206.31.03 Drill Holes

a) Location, Orientation and Depth - The location, direction, angle and depth of the holes will be dependent on field conditions encountered and will be detailed by the Ministry Representative.

b) Hole Diameter - The diameter of the holes shall be suitable for the rock bolt system chosen. Where grout is used, the hole size shall be according to the rock bolt manufacturer's recommendations. Where resin is used, the hole size shall be according to the resin manufacturer's recommendations.

206.31.04 Cleaning - All water, grease, oil, cuttings and other deleterious materials shall be removed from finished holes by a water and/or air jet as required.

206.31.05 Sealing The Contractor shall take measures to seal fractures and voids in drill holes where necessary to prevent anchor grout loss.

206.31.06 Installation

a) General - Rock bolts shall be inserted (or rotated) into the drill holes and fully encapsulated in resin or grout to the drill hole collar. When resin is used, the bolt shall be advanced and rotated at a rate recommended by the resin manufacturer.

Page 147: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ROCK BOLTS SECTION 206

BC - MOT 2006 206 (3 of 6)

b) Anchorage Length - The anchorage length or bond zone shall be the last 1000 mm of the inserted end of the bar, unless otherwise specified.

c) Centralizers - If grout is used, centralizers on 3.0 m centres shall centralize the rock bolt in the drill hole before grout is placed. Centralizers shall be suitable for holes in rock and shall be specifically manufactured for rock bolt application.

d) Resin - Resin cartridges shall be installed as follows or as specified by the resin manufacturer:

• Fast-Set Resin - A sufficient number of fast-setting cartridges shall be placed in the bond zone at the bottom of the hole for the anchorage.

• Slow -Set Resin - A sufficient number of slow-setting cartridges shall be placed in the free stressing length between the bond zone and the collar of the hole.

e) Grout - Grout shall be prepared and placed as follows unless otherwise specified by the grout manufacturer:

• Mixing - Grout shall be mixed in a colloidal or high shear grout mixer according to the grout manufacturer's published instructions. Mixing paddles shall be slotted and perforated. Mixing time shall be not less than two minutes.

• Batching - All ingredients for the grout mix shall be batched by mass. Water shall be added to the drum first and dry ingredients afterwards. Grout shall not be re-tempered after initial mixing. Grout shall be placed immediately after mixing.

• Grout Placement - Grout shall be pumped using a grout tube extending to the bottom of the hole. The inserted end of the tube shall remain below the level of the grout in the hole to effect a continuous air free column as the grout level rises. Grout shall be placed quickly and continuously to avoid overworking, segregation, bleeding and disturbance of initial set. Grout that has stiffened due to delay in placing shall not be used in the work and shall be disposed of at an authorized location.

f) Resin and Grout - At the Contractor's option, both resin and grout may be used to surround a rock bolt as follows. Resin cartridges may be placed in the bond zone, and grout may be used in the free-stressing length.

g) Rock Face Preparation - The bearing surface shall be prepared to allow the face plate to be oriented within the limits recommended by the anchor manufacturer. If necessary, rock shall be chipped from around the face plate contact area.

h) Mortar Pad Construction - Mortar pads shall be constructed as required to ensure the bar is within 20° of a line perpendicular to the face plate. Mortar pads shall be installed where face plates deform excessively under load. The pad shall not crack or deform when loaded. Sufficient time shall be provided to allow pads to achieve sufficient bearing capacity prior to test-tensioning.

i) End Hardware Installation

• Nuts shall bear uniformly against the faceplate. • The bolt extension beyond the nut shall be

100 mm ± 10 mm.

206.31.07 Tensioning - All rock bolts shall be test-tensioned and locked off following set-up (or curing) of the bond zone and before set-up of the free stressing length. Prior to testing, the bond zone grout and/or resin shall meet the strength specified by the anchor manufacturer. The following procedure applies to 22 mm diameter Grade 517 MPa steel bars. An alternative procedure may be specified for different bar sizes.

a) Equipment - Equipment required for tensioning shall be supplied by the Contractor and shall be of a size adequate to provide the required tension. A torque wrench shall not be used for tensioning.

b) Test-Tensioning and Creep Test - Rock bolts shall be test-tensioned to 186 kN (42,000 lb). The test load shall be held for 10 minutes for the creep test.

c) Lock-Off Tension - Rock bolts shall be locked-off to a design tension of 140 kN (31,500 lb)(25,000 lb) after testing.

d) Acceptance Criteria - During the creep test a load loss of greater than 10% of the load applied shall be indicative of anchorage failure. Creep movement at the anchor head shall not exceed 2 mm during the creep test. A replacement rock bolt shall be installed at the Contractor's expense where these criteria are not met.

206.31.08 Rock Bolt Evaluation - The Ministry Representative will implement a program of evaluation of rock bolts installed. After locking off the anchor, the load shall be re-applied to determine the lift-off load. The lift-off load shall be the tension level at which the anchor nut can be

Page 148: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 206 ROCK BOLTS

206 (4 of 6) 2006 BC - MOT

loosened by hand. Lift-off tests shall be performed on rock bolts chosen by the Ministry Representative to a minimum of 5% of the total number of rock bolts. One additional lift-off test on a different bolt shall be performed for each bolt whose lift-off load is not within 10% of the specified lock-off load. Following lift-off testing, all bolts shall be locked off as specified.

MEASUREMENT

206.81 Rock Bolts - Rock bolts will be measured by the METRE installed. The measurement length shall be the

length of bar in the rock.

PAYMENT

206.91 Rock Bolts - Payment for ROCK BOLTS will be at the Contract Unit Price per metre. Payment for rock bolts will be authorized after installation to the contract specifications and after submittal of the completed Contractor’s Daily Rock Bolt Testing and Tensioning Record. The Unit Price will be considered full compensation for all work and materials supplied according to the requirements of this Section.

Page 149: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ROCK BOLTS SECTION 206

BC - MOT 2006 206 (5 of 6)

Rec

ord

Gau

ge R

eadi

ng o

f Eac

h M

i nut

eT

est D

eta i

ls:

Page 150: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 206 ROCK BOLTS

206 (6 of 6) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 151: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 207 (1 of 8)

SECTION 207

SLOPE MESH FOR ROCK CUTS

DESCRIPTION

207.01 Scope - This Section applies to slope mesh structures which are installed to provide rockfall protection.

207.01.01 Rock slope scaling and tree removal, performed in conjunction with slope mesh installation, shall be considered incidental to slope meshing. Rock slope scaling and tree removal shall be completed before the mesh support system is installed unless otherwise authorized by the Ministry Representative. Trees to be removed will be detailed by the Ministry Representative.

207.01.02 Discarded mesh components, scaled rock, trees and debris generated by the slope meshing work shall be removed from the ditches and disposed of by the Contractor. Temporary storage of felled trees in ditches will not be permitted.

207.01.03 The contractor shall layout in the field all anchor and suspension cable locations for each section. Each section will be reviewed by the Ministry Representative prior to installation.

207.01.04 Field conditions may require final anchor, cable and mesh configurations to vary from the Ministry's Drawings. All variations must be authorized by the Ministry Representative.

207.01.05 The area to be provided with slope mesh protection shall be divided into sections with a maximum width of 24 m. Each section shall have a separate suspension cable, end main anchors and end anchors. End main anchors of adjacent sections shall be positioned 200 mm apart. The gap between sections shall be closed with mesh.

207.01.06 The maximum mesh length shall be 80 m.

207.01.07 The maximum rock impact energies shall be as follows:

• 3 kJ above cut crest • 30 kJ below cut crest

207.01.08 Overburden thickness may range from zero to over 1.5 m.

MATERIALS

207.11 Slope Meshing Materials - Unless otherwise specified, preparation and installation of materials shall be according to manufacturer's recommendations.

All components shall be hot-dip galvanized conforming to ASTM A 123 or ASTM A 153 or CSA G164 where appropriate. Damaged galvanizing shall be re-galvanized at the contractor's expense.

207.11.01 Mesh - Mesh shall be 11 gauge (2.95 mm dia.) hexagonal triple twist gabion type mesh. Mesh wire shall meet federal specification QQ-W-461g, possess soft tensile strength with a finish 5 class 3 zinc coating of not less than 260 g/m². The weight of zinc coating shall be determined by ASTM A 90. The coating shall withstand four one minute dips by the preece test, ASTM A 239. Mesh opening shall be hexagonal in shape and uniform in size measuring 80 mm by 100 mm.

207.11.02 Threadbar - Threadbar shall conform to CSA G30.18, grade 400 steel, manufactured by Dywidag Systems Int. (DSI) or authorized equivalent.

207.11.03 Eye nuts - Eye nuts shall be cast or manufactured eye nuts by DSI or authorized equivalent.

207.11.04 Cables - All cables shall be fibre core conforming to CSA G4. Cables shall be unspliced.

207.11.05 Thimbles - Thimbles shall meet FF-T-276B Type III (extra heavy G-414).

207.11.06 Clips - Clips shall meet FF-C-450 Type 1, Class 1 (G450 Crosby clip or authorized equivalent).

207.12 Grout

207.12.01 Grout for main anchors shall be Celtite Anchortite. Grout for auxiliary anchors shall be Celtite Lokset cartridges, cement grout or authorized equivalent.

207.12.02 Cement grout shall be Target 1118 or Ocean Microsil anchor grout or equivalent with W/C=0.35. Grout minimum 3 day and 28 day compressive strengths shall be 20 MPa and 40 MPa respectively, tested in accordance with CSA A23.2-1B.

207.13 Conformance Documents - Prior to installation the contractor shall supply documents of conformance to project specifications of all materials upon request.

CONSTRUCTION

207.31 Anchor Installation

207.31.01 Overburden shall be excavated to rock at anchor locations unless specified otherwise. The Contractor shall minimize disturbance of surrounding soil

Page 152: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 207 SLOPE MESH FOR ROCK CUTS

207 (2 of 8) 2006 BC - MOT

and rock when excavating. Cables shall not contact ground surface.

207.31.02 Anchor holes shall be a minimum of 1.5 times anchor diameter and in strong, competent rock. Anchors shall be centered in the hole and grouted. Anchors shall not be loaded within 3 days of grouting.

207.31.03 Main anchors shall be located at local high points where practicable to maximize clearance between suspension cable and ground surface. Main anchors shall be vertical and centered in the hole unless otherwise authorized by the Ministry Representative. Main anchor height above ground surface may be reduced where authorized by the Ministry Representative for field conditions.

207.31.04 Auxiliary anchors shall be located to minimize potential for main anchor bending.

207.31.05 Main anchors may be substituted, where authorized by the Ministry Representative, with a limited number of guy cables directly connected to the suspension cable where no suitable main anchor locations can be found. Guy cable anchors shall be located to maximize suspension cable elevation. See Section Y-Y, on Drawing SP207-02 and Detail B on Drawing SP207-03.

207.31.06 Auxiliary or guy anchor embedded length may require extension if weak rock conditions are encountered.

207.32 Soil Anchors - Soil anchors shall be used where required or as ordered by the Ministry Representative. For soil anchor details see Drawings SP207-04 and SP207-05.

Concrete requirements for soil anchors:

• minimum compressive strength at 28 days = 30 MPa • maximum nominal size of aggregate = 28 mm • air content = 5± 1% • slump = 55± 20 mm • maximum w/c ratio by mass = 0.45

Upon request by the Ministry Representative, the contractor shall load test one overburden soil anchor to 10 kN to verify capacity.

207.33 Cable and Mesh Installation - Suspension, auxiliary, end, and guy cables shall be installed to nominal tension to remove slack before and after installing mesh.

A maximum of two horizontal mesh seams (200 mm overlap) shall be permitted along the entire mesh height. The upper mesh portion shall be between the slope and lower mesh at the overlap. The horizontal seam connections shall be similar to the vertical seams.

The mesh shall terminate 1500 mm above the highway edge of pavement elevation. The bottom of the mesh shall

be evenly trimmed parallel with the highway elevation. The bottom of the mesh shall be bent to remove the curl.

MEASUREMENT

207.81 Slope Mesh - Slope mesh shall be measured by the SQUARE METRE of slope meshed area.

PAYMENT

207.91 Slope Mesh - Payment for SLOPE MESH will be at the Contract Unit Price per square metre. The Unit Price will be full compensation for all requirements in this specification. Partial payment may be authorized where all components have been installed in a portion of the designated slope meshing area. No separate payment will be made for mesh overlap

Page 153: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 154: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 155: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 156: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 157: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 158: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 207 SLOPE MESH FOR ROCK CUTS

207 (8 of 8) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 159: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 208

DRAINS FOR ROCK CUTS

DESCRIPTION

208.01 Scope - This Section covers the installation of lined drains in the designated areas to the specified depth. The exact locations of drain holes will be dependent on field conditions and will be detailed by the Ministry Representative.

MATERIALS

208.11 PVC Pipe Materials - Drain hole lining shall consist of Schedule 40 slotted PVC pipe. The outside diameter of the pipe shall not be less than 67% of the borehole diameter, and the internal diameter of the pipe shall be a minimum of 19 mm. The slots shall be along the entire length of the pipe in one row. Unless otherwise specified, the slots shall be 0.5 mm wide, spaced 6 mm apart and have a minimum length of 30% of the outside circumference of the pipe.

CONSTRUCTION

208.31 Drilling - Advancement of drilling for drain holes shall be in an upslope direction. The dip angle for drain holes shall be 5°, or as specified by the Ministry

Representative. Finished holes shall be flushed with air to remove deleterious materials.

208.32 PVC Pipe Installation: PVC pipes shall be installed into the finished holes immediately after flushing. Pipes shall be coupled according to the manufacturer's specifications. The pipe shall be installed along the entire length of the holes and shall protrude 0.30 m out of the rock face. The slots shall be on top when the pipe is installed. The pipe shall be secured in the hole, using plastic or wooden wedges driven into the hole collar if necessary, so that the pipe cannot be pulled out by hand.

MEASUREMENT

208.81 Lined Drains - Lined drains will be measured by the METRE of drain hole drilled.

PAYMENT

208.91 Lined Drains - Payment for LINED DRAINS will be at the Contract Unit Price per metre. Payment for lined drains will be authorized after installation to the contract specifications. The Unit Price will be considered full compensation for all work and materials necessary to complete the installation prescribed in this Section.

BC MOT 2006 208 (1 of 2)

Page 160: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 208 DRAINS FOR ROCK CUTS

THIS PAGE IS LEFT INTENTIONALLY BLANK

208 (2 of 2) 2006 BC MOT

Page 161: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 209

SHOTCRETE FOR ROCK CUTS

209.03 Submittals DESCRIPTION

209.03.01 The Contractor shall submit for review the following documentation by the pre-construction meeting:

209.01 General - Unless otherwise specified, the shotcrete standards of ACI 506.2 and the standards of good practice in ACI 506R shall apply. Section 211, Portland Cement Concrete, shall also apply for shotcrete, unless otherwise specified.

a) Qualifications and Experience of the Contractor - Provide a statement of the qualifications, experience and work function of all personnel assigned to shotcrete duties. A statement of previous work experience on similar projects shall also be provided. This statement shall include the project name, location, type of shotcrete, volume of shotcrete, year constructed and the owner contact name. The company, the nozzle operator and the predampener/pot operator shall each have a minimum of 5 years demonstrated experience on shotcrete work.

Shotcrete operations shall include, but not be limited to pre-construction and construction work including preparation of the mix design(s), quality control, surface preparation; installation of wick drains, weep holes and pipes; supply and installation of the shotcrete; preconstruction and construction testing, curing; the supply, transportation and testing of shotcrete panels; any core extraction of the in-place shotcrete, and any other testing to determine curing or protection requirements.

b) Qualifications and Experience of the Contractor’s Consultant - The qualifications shall include the name of the consulting firm, and the name and qualifications of the Consultant’s on-site representative who will be providing the quality control. The following information shall be included in the qualifications submitted:

209.02 Quality Control

209.02.01 General - The Contractor shall engage at its own expense, a specialist firm (the Contractor’s Consultant) to provide on-site quality control for shotcrete operations. The Contractor’s Consultant shall not be an employee of the Contractor.

• Project name, location and experience. • Name and phone number of the owner contact

who can verify the experience of the Contractor’s Consultant’s site representative. 209.02.02 Qualifications - The Contractor's Consultant

shall have designed shotcrete for 3 projects over the last 5 years. The Contractor's Consultant's representative conducting onsite shotcrete tests shall be an ACI or CSA certified concrete technician.

c) Proposed Laboratory Testing Agency - Provide a statement of the testing agency's experience in performing laboratory tests on shotcrete. The agency shall be an independent, qualified laboratory with a proven record of performing tests on shotcrete on at least 5 previous projects. The testing agency shall be certified to CSA A283.

209.02.03 Specific Requirements - For wet and dry process shotcrete, quality control shall include, but not be limited to the following:

• Observation of surface preparation before shotcrete application. d) Certification of the Concrete Technician - Provide

evidence of ACI or CSA Certification for the concrete technician who will be providing on site shotcrete tests.

• Observation and testing during shotcrete application. • Observation of curing operations.

209.03.02 The Contractor shall submit for review the following documentation at least 10 days prior to commencing shotcrete operations:

209.02.04 Other Requirements - The Contractor’s Consultant shall be present at other times as are appropriate to assist the Contractor in the preparation, assessment and adjustment of the various procedures to be used for shotcrete operations. a) Materials Records - Provide records showing source

and proof of conformance to project specifications of the following materials: 209.02.05 Field Report - The Contractor shall ensure that

the Contractor’s Consultant prepares a field report for each site visit, signed by the Contractor’s Consultant. The report shall include details of the progress of shotcrete operations, any recommendations made to the Contractor and any problems encountered by the Contractor.

• Portland Cement (provide mill certificates) • Silica Fume (provide mill certificates) • Mix Water • Aggregates • Admixtures (provide supplier data sheets) • Fibre Reinforcement (if specified), include

BC - MOT 2006 209 (1 of 14)

Page 162: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 209 SHOTCRETE FOR ROCK CUTS

load/deflection curves to ASTM C 1018 for the proposed mix design

• Temperature • Type of shotcrete (wet or dry process)

• Mesh Reinforcement (if specified, provide mill certificates)

• When is slump measured, before or after admixture and fibres

b) Previous Performance Data - Provide previous performance data for the proposed shotcrete mix design, if available.

Submit the following information for each batch of shotcrete:

• Batch number • Location of shotcrete c) Proposed Shotcrete Mix Design (Proportions) -

Provide documentation for the proposed shotcrete mix design. Include such back-up data as requested. The proposed mix design submittal shall include:

• Mix design number • Batch time at plant (wet process) • Batch arrival time on site • Truck departure time (wet process) • Placement start time • Mix design number. • Placement end time • Batch quantities in kg/m³ based on aggregates in

an SSD (Saturated Surface Dry) moisture state for wet process shotcrete and ready mix supplied dry process shotcrete. Batch quantities for dry bagged supply shall be based on mass of aggregates in a dry state.

• Quantity used • Water/cementitious materials ratio (wet process) • As-shot air content (wet process) • Slump (wet process) - indicate when measurement

is made (e.g.: after air entrainment is added, before superplasticizer is added and before fibre reinforcement is added)

• A total cementitious content of not less than 20% by mass of the total ingredients.

• Percent rebound (visual estimate) • Aggregate source, bulk density, absorption, combined gradation data and a grain size distribution graph scaled between 0.075 mm and 75 mm showing the percent passing curve for the combined aggregate.

• Average thickness of shotcrete • Test panel number • Shotcrete delivery tickets from batch plant (wet

process) • Comments on the quality of the shotcrete and any

problems that arise d) Proposed Shotcrete Imprint - Provide a drawing of the proposed shotcrete imprint including content, imprinting method and materials that will be used to produce the imprint.

• Proposed revised mix design

209.03.04 The Contractor shall submit the laboratory test results within 2 working days after testing. These test results shall compare the shotcrete performance with the requirements given in Table 209-A. Records shall include all reporting requirements outlined for construction testing. Records shall also include an original summary report of all test results, showing the sample number, sample origin, panel number, panel origin, date the panel was sprayed, panel shipping date, date panel received at the laboratory, photos of prepared test samples, test date, sample age at testing, test results for each sample, average test results of the three samples for each test at a given age, and acceptability of the results.

209.03.03 The Contractor shall submit for review the following documentation within 1 day following each day of shotcrete application:

a) Field Report - Provide original field reports signed by the Contractor’s Consultant.

b) Daily Records - Provide daily shotcrete records with the following information (certified by the Contractor's Consultant in the case of wet process shotcrete):

• Contractor Name • Nozzleman Name 209.04 Definitions - The following definitions refer to

words and terms used in this specification. For definitions not covered in this document, refer to ACI 506R and ACI 506.2.

• Helper Name • Contractor’s Consultant’s Name (for wet process

shotcrete) • Contractor’s Consultant’s Representatives Name

(for wet process shotcrete) 209.04.01 Blow pipe - Air / water jet operated by nozzle operator's helper during shotcrete placement to assist in keeping rebound and overspray out of the work.

• Date • Weather • Contractor’s start and end time • Shotcrete equipment type 209.04.02 Dry Process Shotcrete - A process where most

209 (2 of 14) 2006 BC - MOT

Page 163: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SHOTCRETE FOR ROCK CUTS SECTION 209

of the water added to the shotcrete mixture is added at the nozzle.

MATERIALS

209.11 Materials 209.04.03 Overspray - Shotcrete material deposited away from the intended receiving surface. 209.11.01 Cement - Cement shall be Type 10 or 30.

209.04.04 Pot (Sometimes called Gun) - Machine used to meter the shotcrete into the hose.

209.11.02 Silica Fume - Silica fume shall meet the requirements of CAN/CSA-A23.5-M, Supplementary Cementing Materials, Type U Silica Fume, with the following additional requirements: 209.04.05 Predampener - Device used to mix a portion of

the mixing water with the shotcrete. Can also be used to mix accelerator with shotcrete. • Minimum Si02 content - 90 percent by mass

• Maximum carbon content: 5 percent by mass

209.04.06 Saturated Surface Dry - The state of a material in which it will neither add nor subtract moisture from other material placed in contact with it.

209.11.03 Pozzolan - Pozzolan shall be Type F flyash.

209.11.04 Water - Surface or ground water may be used for cleaning the slope and curing provided it is free of deleterious substances. Verification that the water intended for use is acceptable is at the discretion of the Ministry Representative and at the expense of the Contractor.

209.04.07 Slake - A process of deterioration of freshly exposed rock due to exposure to the atmosphere and/or water.

209.04.08 Sloughing (also called sagging) - Subsidence of shotcrete, due generally to excessive water in the mix or placing too great a thickness of shotcrete in a single pass.

209.11.05 Aggregates - Aggregate shall be normal density. The combined aggregate gradation limits shall meet the limits shown in Table 209-B.

209.04.09 Weep Pipes - Plastic pipes inserted in water bearing fissures to relieve water pressure from behind the shotcrete.

209.11.06 Admixtures

a) General - Chemical admixtures shall include air-entraining, water reducing and set retarding admixtures where appropriate.

209.04.10 Wet Process Shotcrete - Shotcrete in which all of the ingredients are mixed before introduction into the delivery hose. Compressed air is introduced to the material flow at the nozzle. If an accelerator is used, it is normally added at the nozzle.

b) Superplasticizers - Superplasticizers shall meet the requirements of CAN3-A266.6-M.

c) Accelerating Admixtures in General - Accelerating

TABLE 209-A SHOTCRETE PERFORMANCE REQUIREMENTS

TEST DESCRIPTION TEST METHOD AGE

(DAYS) SPECIFIED

REQUIREMENT

*Maximum Water / Cementitious Materials Ratio - 0.45

*Air Content - As Shot, % CAN/CSA A23.2-4C - 4 ± 1½

*Slump at discharge into shotcrete pump, mm CAN/CSA A23.2-5C - 80 ± 30

Minimum Compressive Strength, MPa CAN/CSA A23.2-14C 7 28

30 40

Minimum Flexural Strength, MPa ASTM C 1018 7 4

Minimum Toughness Performance Level (TPL) ASTM C 1018 and this specification 7 III

Maximum Boiled Absorption, % Maximum Volume of Permeable Voids, % ASTM C 642 7

7 8

17

Notes: * Properties apply to wet process shotcrete only.

BC - MOT 2006 209 (3 of 14)

Page 164: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 209 SHOTCRETE FOR ROCK CUTS

admixtures shall only be used with the written consent of the Ministry Representative.

d) Accelerating Admixture Requirements - Accelerating admixtures:

i) shall be non-chloride based accelerating admixtures meeting the requirements of CAN/CSA A23.1M Clause 15.1.7.1;

ii) shall be compatible with the cement being used when tested in accordance with ASTM C 1117;

iii) shall have a demonstrated ability, when used at the required proportions, to produce accelerated shotcrete meeting the performance criteria specified in Table 209-A;

iv) for wet process shotcrete shall be liquid, dispensed at the nozzle in closely controlled quantities;

v) for dry process shotcrete shall be liquid, dispensed at the nozzle in closely controlled quantities; or be powdered and either:

• integrally mixed in the case of dry bagged material or;

• mechanically proportioned through the predampener in the case of ready mix supply; metering of accelerators directly into the pot will not be permitted.

209.11.07 Fibre Reinforcement - Unless otherwise specified, shotcrete reinforcement shall consist of steel or polyolefin fibres. The fibres shall be capable of meeting the performance criteria specified in Table 209-A and the

following requirements:

a) Steel Fibres - These fibres shall meet the requirements of ASTM C 1116 Type I.

b) Polyolefin Fibres - These fibres shall only be used in wet process shotcrete and shall meet the requirements of ASTM C 1116 Type III.

209.11.08 Mesh Reinforcement - Where specified instead of or in addition to fibre reinforcement, shotcrete shall be reinforced with mesh anchored to the surface before shotcrete application. For fibre reinforced shotcrete, additional reinforcement may be required by placing mesh panels up to 0.60 m by 0.60 m without anchors between successive shotcrete lifts where final shotcrete thicknesses are expected to exceed 300 mm in local areas.

a) Mesh Materials - Mesh shall consist of welded wire fabric 102 mm by 102 mm opening (4 by 4 inch) by MW13.3 / MW13.3 (8 gauge) wire meeting CSA G30.5 and hot dip galvanized meeting ASTM A 123.

b) Mesh Anchor Materials - Anchors shall consist of ASTM A 615 Grade 400 steel, minimum 19 mm nominal diameter. Anchorage may be resin or grout. Grout anchorage may be Ocean "Microsil Anchor Grout" or Target "Unsanded Silica Fume Grout”. Resin anchorage may be Celtite Lokset or Ground Control cartridges. Face plates shall be 150 mm by 150 mm by 6 mm. Face plates, nuts and washers shall be capable of developing full anchor pullout capacity.

c) Mesh Coverage and Overlap - Mesh shall be installed over the entire area to be shotcreted, unless otherwise specified. Mesh joints shall be lapped 1.5 mesh openings in each direction (horizontally and vertically) and tied at minimum 100 mm intervals with 16 gauge tie wire to achieve full contact between mesh layers.

TABLE 209-B COMBINED GRADATION LIMITS FOR SHOTCRETE AGGREGATE

U.S. STD SQUARE

MESH

METRIC SIEVE SIZE

TOTAL PASSING EACH SIEVE SIZE,

% BY MASS

3/4 1/2 3/8 #4 #8

#16 #30 #50 #100

20 mm 14 mm 10 mm 5 mm

2.5 mm 1.25 mm 0.630 mm 0.315 mm 0.160 mm

100

90-100 70-85 50-70 35-55 20-35 8-20 2-10

d) Mesh Anchor Spacing - Mesh shall be anchored on minimum 1.2 m centres in each direction or closer where required to form the mesh to within 50 mm of the slope surface. The mesh shall be in full contact with the surface where practicable. The mesh may also be anchored to any previously installed rock bolts provided the spacing is consistent with the spacing required for the above anchors.

e) Anchor Installation - Anchors shall be installed as recommended by the anchor manufacturer. The minimum anchor embedment length shall be 1.0 m. Resin or grout shall be applied to full anchor embedment.

209 (4 of 14) 2006 BC - MOT

Page 165: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SHOTCRETE FOR ROCK CUTS SECTION 209

f) Mesh Anchor Testing - A total of 5% of the anchors shall be load tested to 20 kN. This load shall be held for 10 minutes. A load loss of greater than 10% of the applied load shall be indicative of anchorage failure. Any failed anchors shall be replaced at the Contractor's expense.

209.11.09 Anchor Reinforcement - Where specified, additional anchor reinforcement shall be installed. Anchor materials, installation and testing shall meet the requirements for mesh anchors unless otherwise specified. Face plates for these anchors shall be “Spider Plates”. These anchors and plates shall be fully embedded in the shotcrete.

209.11.10 Materials Handling and Storage

a) General - All materials shall be stored and handled in a manner that will prevent damage, deterioration or contamination.

b) Hot Weather Storage - During hot weather prebagged material shall be stored in a manner that will allow maximum cooling of the material.

c) Cold Weather Storage - During cold weather prebagged material shall be stored in a manner that will provide maximum heat retention of the material.

209.12 Performance Requirements

209.12.01 General - Shotcrete shall meet the performance requirements in Table 209-A.

209.12.02 Air Content - The air content shall be determined on wet process shotcrete sprayed into a CAN/CSA-A23.2-4C air pressure meter base or freshly applied material removed from in-place and consolidated into the air meter base by rodding.

CONSTRUCTION

209.31 Batching, Mixing and Conveyance

209.31.01 General - Shotcrete shall be batched, mixed and supplied using (one of) the following system(s):

a) dry bagged pre mix supply to ASTM C 928 or:

b) ready mix supply

209.31.02 Mixing - Shotcrete supplied shall be uniformly mixed with no evidence of segregation or improper mixing.

209.31.03 Batching and Conveyance - Ready mix

supplied shotcrete shall be batched and conveyed at a rate that allows a consistent application of shotcrete. Irregularities of conveyance that result in delays or a surplus of aged material on site shall be avoided. Shotcrete that has stiffened excessively or is more than 90 minutes old from the time of batching will not be accepted.

209.32 Preconstruction Testing

209.32.01 General - The Contractor shall perform preconstruction shotcrete tests (prior to full-scale shotcrete operations), at a shotcrete test site chosen by the Ministry Representative, to demonstrate the competence of the crew, the adequacy of the equipment and the adequacy of the shotcrete mix design. The requirement for preconstruction testing may be waived by the Ministry Representative if sufficient documentation of previous satisfactory performance on similar work is provided.

209.32.02 Previous Performance - Documentation for previous satisfactory performance shall meet the following requirements:

a) Company - The company shall have applied more than 100 m³ of shotcrete on a minimum of 3 projects in the last 5 years.

b) Nozzle Operator - The nozzle operator shall have applied more than 100 m³ of shotcrete on a minimum of 3 projects in the last 5 years.

c) Predampener/Pot Operator - The predampener/pot operator shall have mixed more than 100 m³ of shotcrete on a minimum of 3 projects in the last 5 years.

d) Contacts - The contact name and number for each project above shall be supplied upon request.

209.32.03 Application - Shotcrete applied at the shotcrete test site shall be applied in accordance with the general shotcrete provisions in these specifications.

209.32.04 Test Panel - One test panel shall be gunned and tested for the preconstruction shotcrete testing as described for construction testing.

209.32.05 Test Results - The Contractor shall not apply shotcrete outside of the shotcrete test site area until the preconstruction shotcrete test results have been evaluated by the Ministry Representative and authorization is given to proceed with the work.

209.32.06 Revised Methods - If the results of the shotcrete tests are unsatisfactory in the opinion of the Ministry Representative, then, notwithstanding the Ministry

BC - MOT 2006 209 (5 of 14)

Page 166: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 209 SHOTCRETE FOR ROCK CUTS

Representative's prior review of the Contractor's preconstruction submittals, the Contractor shall adopt such revised methods as are necessary to achieve the required results.

209.32.07 Additional Tests - The Contractor shall perform, at any time during the progress of the work, additional shotcrete tests at designated test sites if the shotcrete applied in the areas specified in this Contract is unsatisfactory in the opinion of the Ministry Representative.

209.33 Weather Conditions

209.33.01 Heavy Rain or High Wind - During periods of heavy rain or high wind, the Contractor shall ensure that the quality of the finished shotcrete product is not compromised. Shotcrete shall not be applied during such weather unless protective measures can be practicably taken.

209.33.02 Hot Weather - During periods of hot weather, when ambient temperatures are expected to rise over 30°C, the following requirements shall be met:

a) Curing - The Contractor shall implement curing immediately after the shotcrete has been placed.

b) Temperature at Placement - The Contractor shall take any steps necessary to ensure that the temperature of the shotcrete supplied to the site is less than 25°C at the time of placement.

209.33.03 Cold Weather - During periods of cold weather, where the minimum ambient air temperature falls below 5°C, the following requirements shall be met:

a) Temperature at Placement - The Contractor shall take whatever steps are necessary to ensure that the in-place shotcrete temperature is between 10 and 25°C at the time of placement.

b) Initial Curing Temperature - The Contractor shall ensure that, during the initial curing period (4 days), the in-place shotcrete temperature will not fall below 5°C. Shotcrete shall not be placed unless measures can be practicably taken to ensure these requirements are met.

c) Temperature at the Pot - The Contractor shall not allow the temperature of the dampened dry process shotcrete at the pot to exceed 30°C.

d) Ice, Snow or Frozen Surfaces - Shotcrete shall not be applied to frozen surfaces, or surfaces covered with frost, ice or snow.

209.34 Surface Preparation - Surfaces to which shotcrete

is applied shall be cleaned of loose rock, dirt and debris which if left in place could impair the bond of shotcrete to rock, concrete or existing shotcrete. Water or air and water jets shall be used to clean rock surfaces. Compressed air only shall be used to clean rock surfaces that have a tendency to slake from contact with water.

209.35 Drainage - Unless otherwise controlled, water seepage from slopes shall be controlled by installing weep holes, weep pipes, and wick drains. Surface runoff shall be controlled using suitable water diversion systems.

209.35.01 Weep Holes - Weep holes (and weep pipes as required) shall be installed before shotcrete is applied. These weep holes shall be on 1 to 1.5 m centres in the areas to be shotcreted in joints, fractures and faults, or at a closer spacing where required by the Ministry Representative. Holes and pipes shall be inclined to permit free drainage.

209.35.02 Weep Pipes - To prevent blockage of weep holes due to entry of shotcrete or rebound materials, weep pipes shall be secured in weep holes and temporarily plugged at the outer end of the pipe. The plugs shall be removed when shotcreting is completed. Weep pipes shall consist of 25 mm minimum outside diameter Schedule 40 plastic pipe.

209.35.03 Active Seepage Areas - Where active seepage occurs, weep holes shall be drilled approximately 150 mm or more to intercept fractures or openings wherever practicable and weep pipes shall be installed prior to the application of shotcrete. Where drilling is not practicable, the weep pipes shall be secured in the fractures by other appropriate means.

209.35.04 No Active Seepage Areas - Where no active seepage occurs, weep holes shall be installed in joints, fractures and faults by one of the following methods:

a) by securing the weep pipes by appropriate means before shotcreting;

b) by marking locations using sticks or other appropriate means before or during shotcreting and drilling at the marked locations after shotcreting. Weep holes shall be 25 mm diameter and shall be drilled to intersect the joints, fractures and faults under the shotcrete at the marked locations. Weep pipes are not required for such holes.

209.35.05 Weep Pipe Removal or Cutting - Weep pipes shall be removed or cut level with the shotcrete surface after the shotcrete has reached initial set, within one day after application.

209.35.06 Additional Weep Holes - Additional weep

209 (6 of 14) 2006 BC - MOT

Page 167: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SHOTCRETE FOR ROCK CUTS SECTION 209

holes shall be drilled after shotcreting where there are visible signs of water pressure, such as seepage and damp spots in the hardened shotcrete.

209.35.07 Wick Drains - In areas of active seepage, wick drains shall be installed before shotcreting in addition to weep holes if requested by the Ministry Representative. Wick drains shall consist of a flexible polypropylene core drain wrapped with a proven durable geotextile filter fabric. Wick drains shall be 3 mm by 100 mm size (variable length), with #120 sieve filter, 0.17 mm/s filter permeability, and 0.8 kN core grab tensile strength. They shall be able to withstand all handling, abrasion and distortion that occur during installation. Wick drains shall be secured to the surface on maximum 0.5 m centres with pneumatically driven nails, or authorized substitute fasteners. Fastener spacing shall be reduced where required to ensure wick drains are in full contact with the surface. Wick drains shall be installed and covered with shotcrete in a manner that allows gravity drainage to the toe of the slope.

209.35.08 Surface Runoff - Where the bond of shotcrete to rock may be impaired by surface water runoff, this water shall be controlled and directed away from the area to be shotcreted.

209.36 Existing Rock Bolts - Within or near areas designated for shotcrete where rock bolts were installed (not for the sole purpose of securing mesh) prior to shotcrete application, the rock bolts shall be protected or extended through the shotcrete as follows:

209.36.01 Extension of Rock Bolts - Unless otherwise specified, where rock is fractured within 0.5 m of the existing rock bolts, the face plates and nuts shall be removed before shotcrete is applied. The bar shall be extended, where necessary, using a short piece of bar and a coupler. The shotcrete shall be applied up to and against the existing bar. The face plates and nuts shall then be reinstalled over the shotcrete after the shotcrete has cured. Each face plate shall be replaced to the same bar from which it was removed. The exposed bar length shall be 100 mm following reinstallation of the face plate. The bar shall be nominally tensioned (using a wrench to the nut).

209.36.02 Protection of Rock Bolts - All other rock bolts shall be protected from overspray. Where overspray was not anticipated, the affected rock bolts shall be cleaned off by appropriate means.

209.37 Application

209.37.01 General - Prior to application of any shotcrete, the Contractor shall obtain authorization to proceed after the areas prepared for shotcrete have been reviewed by the

Ministry Representative. Review by the Ministry Representative shall not relieve the Contractor from the responsibility for ensuring that the shotcrete operations are conducted in a satisfactory manner in accordance with these specifications.

209.37.02 Wetted Surface - Not more than one hour prior to application of shotcrete, all surfaces (except slaking ground) to be shotcreted shall be sprayed with water. Wetted surfaces shall be allowed to dry back to a saturated-surface-dry condition prior to application of shotcrete. If necessary, a blow-pipe shall be used to facilitate removal of surface water. Compressed air used in the blow pipe shall be oil-free.

209.37.03 Shotcrete Layers - Wherever possible, shotcrete shall be applied to the full thickness in a single layer, provided it does not slough or become delaminated. If multiple lifts are required, the previous shotcrete lifts shall be scraped or broomed prior to the time of set to remove any loose material, rebound, overspray, laitance or any other material that may impair bond of subsequent layers. Previous lifts shall be prevented from drying out by moist curing. Construction joints shall be to a 45° edge.

209.37.04 Rebound and Overspray - A blow pipe shall be used during the course of the work to remove accumulations of rebound and overspray from areas to be shotcreted. Rebound and overspray shall not be incorporated in the completed work.

209.37.05 Thickness and Area Covered - In general, an average thickness of 100 mm of shotcrete shall be applied over fractures, joints and faults in the areas designated for shotcrete, unless otherwise specified by the Ministry Representative. In general, shotcrete shall cover laterally to a maximum of 0.50 m beyond fractures, joints and faults over solid rock or concrete areas.

209.37.06 Access - Suitable devices shall be employed to allow access to the work for shotcreting. Access shall be such that fresh shotcrete is not damaged by hoses, equipment or personnel.

209.37.07 Surface Finish - The shotcrete surface shall be left in a natural gun state unless otherwise specified.

209.37.08 Embedments - A cover of 50 mm of shotcrete shall be applied over any reinforcing steel or other embedments. If greater total thicknesses of shotcrete are applied to encapsulate the embedments this work shall be performed at no cost to the Ministry.

209.37.09 Imprint - The plastic shotcrete surface shall be neatly imprinted with capitalized lettering 75 mm high with

BC - MOT 2006 209 (7 of 14)

Page 168: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 209 SHOTCRETE FOR ROCK CUTS

the following information:

• MoT • (the shotcrete completion date, in the format MMM,

YYYY) • (the name of the Contractor)

The imprint shall be located in a small area in the bottom right corner of each continuous shotcrete area, unless otherwise authorized by the Ministry Representative. Where practicable, the information shall be readable unaided from highway level following shotcrete curing. Imprints produced by scraping letters into the plastic shotcrete will not be acceptable.

209.38 Curing and Protection

209.38.01 Curing Compounds - Membrane curing compounds shall not be used unless specifically authorized in writing by the Ministry Representative.

209.38.02 Moist Curing - The surface of the shotcrete shall be maintained in a moist condition for a minimum period of 4 days following shotcrete application or until an in-place compressive strength of 20 MPa has been reached. Wet burlap and polyethylene sheet or water sprays shall be used to provide moist curing.

209.38.03 Protection from Freezing - The shotcrete shall be protected from freezing for a minimum period of 7 days after placing or until an in-place compressive strength of 20 MPa has been reached, whichever occurs first.

209.38.04 Sampling and Testing - If compressive strength samples are used to determine curing or protection requirements, the cost for obtaining the samples, shipping the samples and performing the tests shall be the responsibility of the Contractor. Extraction of cores shall be in accordance with CAN/CSA A23.2-14C. Compressive strength testing shall be performed according to requirements for construction testing.

209.39 Construction Testing

209.39.01 On-Site Tests - For wet process shotcrete, the following on-site tests shall be conducted for each truck:

• As-placed air content. • Slump at discharge into pump.

209.39.02 Thickness Monitoring - The Contractor shall monitor the thickness of shotcrete applied using depth gauges or probes. Thickness shall be measured on 1.0 m centres or closer as required to provide thickness control.

209.39.03 Test Panels in General - The Contractor shall

produce test panels in accordance with the requirements of ASTM C 1140, but panels shall have minimum base dimensions of 500 mm x 500 mm and a minimum depth of 125 mm. The form base shall be made from 19 mm thick sealed plywood, and side pieces shall be made from two by six timbers. The test panel molds shall have 45° sloped sides to permit escape of rebound.

209.39.04 Test Panel Frequency - One construction test panel shall be cast on each day of shotcrete placement or for every 50 m³ of shotcrete being placed, whichever results in more panels. The time of gunning the panels may be chosen by the Ministry Representative.

209.39.05 Test Panel Gunning and Marking - Test panels shall be gunned using the same nozzle and length of hose as the production shotcrete. The Ministry may request test panels to be gunned at the location of the in-situ shotcrete. Construction test panels shall contain no reinforcement or embedments (other than fibre reinforcement). For each test panel the Contractor shall provide a record of the test panel number, date cast, date shipped and date received by the laboratory.

209.39.06 Test Panel Curing and Transportation - Test panels shall be field cured, in the forms, in the same manner as the specified shotcrete work, for a minimum period of 48 hours, prior to transport to the test laboratory. Panels shall be covered with wet burlap and plastic sheet to prevent drying. In cold weather, panels shall be protected from temperatures below 5°C by covering with thermal insulation blankets or by placing panels in a suitably heated enclosure. Test panels shall be transported in their forms and kept moist, with care being taken not to crack or damage the shotcrete.

209.39.07 Test Panels in Laboratory - The test panels shall be placed in a moist room in the laboratory, maintained at a temperature of 23 ± 2°C and relative humidity of 98 ± 2%. After age 3 days the test panels shall be removed from the forms and returned to the moist room until the time of testing.

209.39.08 Test Specimen Extraction and Storing - At specified test ages, test specimens shall be extracted from the panels using either diamond sawing or coring. Test specimens shall be maintained in a moist state in the moist room in the laboratory or in a lime-saturated water bath maintained at 23 ± 2°C until the time of testing.

209.39.09 Compressive Strength Test Specimens - Compressive strength test specimens shall preferably be 75 mm diameter cores. Length/diameter ratios shall not exceed 2:1 and shall not be less than 1:1.

209 (8 of 14) 2006 BC - MOT

Page 169: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SHOTCRETE FOR ROCK CUTS SECTION 209

209.39.10 Compressive Strength Testing - For each panel, three specimens shall be tested for compressive strength at each specified age. Compressive strength tests shall be conducted in accordance with CSA/CAN-A23.2-14C. Measured compressive strengths shall be corrected to equivalent 2:1 length:diameter cores, using the core correction factors given in CSA/CAN-A23.2-14C (Table 1). Reporting of results shall be according to Section 5 (Reporting) in CSA/CAN-A23.2-14C.

209.39.11 Flexural Strength and Toughness Test Specimens - Flexural strength test specimens shall have dimensions of 100 mm x 100 mm x 350 mm. Reporting of results shall be according to "11. Report" in ASTM C 1018 and shall include all load - deflection graphs.

209.39.12 Flexural Strength and Toughness Testing - For each panel, three specimens shall be tested for flexural strength and toughness at the specified age. Flexural strength and toughness tests shall be conducted in accordance with ASTM C 1018 with the following additional requirements:

a) Measuring System - A "Japanese Yoke" or other measuring system that precludes any extraneous deflection measurements shall be used. An automatic data acquisition system or equivalent shall also be used during the tests.

b) Accuracy of Measurement - The accuracy of the first crack deflection shall be verified by comparing the measured value with the theoretically calculated value by using the formula:

( )

++×= 2

23

11512161

129623

LH

EIPL µδ

Where:

δ = mid-span deflection in mm P = load at first crack in kN L = load span in mm E = modulus of elasticity (for convenience usually based on an estimated compression modulus of elasticity) in GPa I = moment of inertia in mm4 H = height of specimen in mm µ = Poisson's Ratio (for convenience usually based on an assumed compression Poisson's Ratio of 0.2)

For a 100x100x350 mm beam tested on a 300 mm span the first crack deflection for typical fibre reinforced shotcrete will have first crack deflection in the range of about 0.03 to 0.05 mm. Extraneous deflections have been eliminated if first crack deflections are within this

range.

c) Recording of Deflections - An LVDT connected to an x-y plotter or digital recording shall be used to capture load vs. deflection response. Dial gauges shall not be used for recording deflections. Bending Load shall be plotted against Net Midspan Deflection.

d) Testing Machine - A deflection-control testing machine shall be used, but shall not be of the closed-loop or soft testing type.

e) Total Deflection - Deflection measurements shall continue until a total deflection of 2 mm is reached.

209.39.13 Toughness Performance Level Data Analysis - Toughness Performance Level of flexural strength specimens shall be obtained by the following analysis:

a) Template - A template shall be created using the percent of design flexural strength shown in Table 209-C, but expressed in load equivalent units. The following formula shall be used:

100012

×××

=LHBPd

σ

to determine load equivalent units, where:

Pd = design flexural load in kN σ = design flexural strength in MPa B = beam width in mm H = beam depth in mm L = load span in mm

b) Master Template - A master template shall be produced to the same scale as the load vs. deflection data recorded from the toughness test. The master template shall be superimposed over the actual load deflection curves and compared with the recorded data.

c) Acceptability Criterion - To conform to a given Toughness Performance Level the recorded data shall meet the specified flexural strength and fall above the line representing the given Toughness Performance

TABLE 209-C TOUGHNESS PERFORMANCE LEVEL

TOUGHNESS PERFORMANCE

RESIDUAL FLEXURAL STRENGTH BY % OF DESIGN FLEXURAL

STRENGTH LEVEL 1/600 Span

(0.5 mm) 1/150 Span (2.0 mm)

III 50% 30%

BC - MOT 2006 209 (9 of 14)

Page 170: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 209 SHOTCRETE FOR ROCK CUTS

Level at both the 0.5 mm and 2 mm net midspan deflection.

209.39.14 Boiled Absorption and Permeable Voids Test Specimens - Specimens for boiled absorption and permeable voids testing shall be 75 mm cubes cut from the broken ends of flexural test prisms, or extracted 75 mm diameter cores at least 100 mm long.

209.39.15 Boiled Absorption and Permeable Voids Testing - For each panel, three specimens shall be tested for boiled absorption and permeable voids at the specified age. Boiled absorption and permeable voids tests shall be conducted in accordance with ASTM C 642. The report of results shall include all information recorded for 6.1 Calculation in ASTM C 642.

209.39.16 Laboratory Test Results - For each type of test, test results shall be considered acceptable if the average of three (3) specimens tested at a given age meets or exceeds the criteria specified in Table 209-A. The test results for an individual specimen shall not be less than 80% of the criteria specified for compressive strength, and not more than 120% of the criteria specified for boiled absorption and permeable voids.

209.40 Shotcrete Deficiencies and Repair

209.40.01 General - The Contractor shall, whenever possible, correct deficiencies while the shotcrete is still plastic. For any proposed changes to the initial mix design, a solid volume calculation shall be performed and submitted upon request. The calculation shall include the mass, density and volume of each constituent material, the total yield, and a comparison between measured (ASTM C 138) and the calculated plastic density.

209.40.02 Deficiency Types - Shotcrete deficiencies other than failure to meet the performance requirements include, but are not limited to, the following:

a) Improper consolidation of the shotcrete because of incorrect spraying angles or improper distance of the nozzle from the receiving surface.

b) Improper control and removal of overspray and rebound material.

c) Excessive shotcrete or fibre rebound.

d) Any evidence of excessive plastic or drying

shrinkage cracking.

e) Segregation, incorporation of sand lenses, excessive voids, tears, sags, sloughs or delaminations in the work.

f) Inadequate thickness.

209.40.03 Shotcrete Repair - At the discretion of the Ministry, shotcrete with deficiencies as defined above shall be removed and replaced to these specifications.

209.41 Shotcrete Evaluation - The Ministry Representative will implement a program of evaluation of the in-place shotcrete.

209.41.01 Core Extraction - Cores shall be extracted from the in-place shotcrete in accordance with CAN/CSA A23.2-14C, at locations detailed by the Ministry Representative, and tested for compliance to the project specifications. Generally up to 6 cores shall be extracted from every 200 m² of shotcreted surface.

209.41.02 Non-Destructive Testing - The shotcrete will be checked for delaminations, voids or other deficiencies using appropriate non-destructive testing procedures.

MEASUREMENT

209.81 Shotcrete - Shotcrete will be measured by the CUBIC METRE supplied and installed in-place on the slope in the designated areas.

PAYMENT

209.91 Shotcrete - Payment for SHOTCRETE will be at the Contract Unit Price per cubic metre. Payment for up to 75% of the shotcrete installed will be authorized after the Ministry Representative has received 7 day test results for this shotcrete. Payment for the remaining 25% will be authorized after 28 day test results and complete documentation have been received. The Ministry may consider reduced payment for defective or deficient shotcrete based on test results on test panels and/or in-situ shotcrete. The Contract Unit Price for shotcrete shall be considered full compensation for all requirements in this specification.

209 (10 of 14) 2006 BC - MOT

Page 171: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SHOTCRETE FOR ROCK CUTS SECTION 209 DAILY SHOTCRETE RECORD

File #: _________________ PROJECT NAME______________________________

PROJECT NO._____________________

(TO BE SUBMITTED WITHIN 1 DAY AFTER EACH DAY'S OPERATION)

Contractor Name ____________________________________ Date _______________________________ Nozzleman Name ___________________________________ Weather ____________________________ Helper Name _______________________________________ Temperature________________________°C Contractor’s Consultant’s Name ________________________ Contractor's Start _______End ______Time Contractor’s Consultant’s Representative __________________ Shotcrete Equipment Type______________

Shotcrete Type: (circle) WET DRY Process

For wet process, when is slump measured (circle) BEFORE AFTER Air entrainment added BEFORE AFTER Superplasticizer added BEFORE AFTER Fibre Reinforcement added

On-Site Details and Tests for Shotcrete:

Batch #

Location

Mix

Design #

Batch Times:

From On

Site

Spray

Start Time

Spray End

Time

Quantity

Us edm3

Water/ Cement Ratio

Sample (As-Shot)

Air Content

Slump

(wet mix) (mm)

Re-bound

est. (%)

Average Thickness of

In-Place Shotcrete

Test

Panel No.

Zone Area Plant From To (mm)

Comments: ___________________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________

Certified Correct: ______________________________ ____________________________ (Contractor’s Consultant’s Representative) (Title)

(Use Additional Sheets if Necessary)

BC - MOT 2006 209 (11 of 14)

Page 172: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 173: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 174: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 209 SHOTCRETE FOR ROCK CUTS

THIS PAGE IS LEFT INTENTIONALLY BLANK

209 (14 of 14) 2006 BC - MOT

Page 175: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC MOT 2006 211 (1 of 32)

SECTION 211

PORTLAND CEMENT CONCRETE

211.01 General. This Section of the Province of British Columbia "Standard Specifications for Highway Construction" describes the requirements for Portland Cement Concrete. Requirements include quality control and quality assurance, constituent materials, mix design proportioning, sampling and testing of the materials and concrete, batching, mixing, transporting, placement, finishing and curing. The Contractor shall supply all necessary materials.

211.02 Applicable Standards. The standards listed in Table 211-A shall apply unless specified otherwise herein or in the Special Provisions. All referenced standards shall be to the current editions at time of tendering.

TABLE 211-A APPLICABLE STANDARDS

CAN/CSA-A23.1 Concrete materials and methods of concrete construction

CAN/CSA-A23.2 Methods of test and standard practices for concrete

CAN/CSA-A3000 Cementitious Materials Compendium

CAN/CSA-S269.3 Concrete Formwork

CAN/CSA-A283 Qualification Code for Concrete Testing Laboratories

211.03 Concrete Mix Designs and Submission Requirements.

211.03.01 General. The Contractor shall be responsible for quality control of all components of the concrete operation, including but not limited to, aggregate and component quality, proportioning, test batching, batching, mixing, transporting, placing, consolidating, finishing, curing, and all necessary quality control and verification testing of the components and the fresh and hardened concrete.

211.03.02 Proportioning. The Contractor shall be responsible for proportioning and designing all concrete in full compliance with the stated mix specifications. All mix designs shall use the “Absolute-Volume Method” for mix proportioning.

211.03.03 Alkali-Aggregate Reactivity (AAR) Preventative Requirements. Contrary to CSA A23.2 27A, the total alkali content (Na2O equivalent) contributed by the portland cement to the concrete mix shall not exceed 2.0 kg/m3. The Ministry reserves the right to alter this limit or to redefine the concrete mix design parameters based on the review of the mix design submittal.

211.03.04 Mix Design Submittals. The Contractor shall submit a report outlining the proposed mix design for each classification of concrete to the Ministry Representative for review and acceptance at least 2 weeks in advance of when concrete production is scheduled to commence. Acceptance of the mix design by the Ministry does not constitute acceptance of the concrete. Acceptance of the concrete will be based on the test results and the performance and quality of the concrete and concrete components placed on the project. No concrete shall be placed prior to receiving Ministry acceptance of the mix design. Each mix design submittal shall include all of the following:

Project Specifics

Name and location of the proposed supplier.

Distance and expected travel time from batch plant location to project site.

Page 176: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (2 of 32) 2006 BC MOT

Expected method of batching, transporting and placing concrete.

Specified mix parameter requirements.

Name and contact information of certified quality control testing laboratory and certified testing personnel. Certification shall be in accordance with the requirements of CSA A23.1.

Materials

All materials shall comply with the requirements as listed in Section 211.04 of this Standard Specification.

Cementitious Materials – Types and source of each material including mill test reports and manufacturer’s certificates of compliance.

Aggregates – Type and source of all individual aggregate products including individual gradations and all other aggregate quality testing as described in Table 211-D for each product and each aggregate source.

Admixtures – Type and source of all admixtures, including expected dosage rates, point of addition to the mix, compatibility documentation, and individual technical data sheets.

Water – The source of mixing water. (depending on the source, the MoT Representative may request additional test documentation).

Miscellaneous – Documentation for all other materials proposed for the mix, showing conformance with applicable Ministry requirements and manufacturer/industry guidelines and standards.

Proportioning

The concrete proportions expressed in terms of quantity of each component .

Fresh and hardened concrete properties.

The mass of materials in kilograms (kg) and the absolute volume in cubic metre (m3) contributed by each material in the mixture.

The quantity of each individual cementitious material added in a powder state shall be expressed as kilograms per cubic metre (kg/m3).

Pozzolans that are added in slurry shall have their respective solid and water contents expressed as kilograms per cubic metre (kg/m3).

The quantity of each separately batched size of coarse aggregate and fine aggregate shall be expressed as kilograms per cubic metre in a saturated-surface-dry (SSD) condition.

The quantity of water shall be the maximum amount allowed based on the maximum specified water-to-cementitious material ratio (W/Cm), corrected to account for any additional water that may be contributed by other materials used in the proposed mix.

The quantity of water shall be expressed as kilograms (or Litres) per cubic metre. If ice is used for temperature control, it shall be expressed in incremental units (sacks, bags, or pails, etc.) and kilograms per cubic metre and shall be included in the maximum allowable water quantity.

Admixtures dispensed as liquids shall be expressed as Litres per cubic metre and where applicable, expected dosage range stated.

The quantity of any pre-measured, pre-packaged additives, such as fibres, shall be expressed in incremental units (sacks, bags, or pails, etc.) and kilograms per cubic metre.

The absolute volume of each material, air content and the total sum of the absolute volumes of all materials shall be provided in cubic metres (m3).

Slump, unit weight, air content, strength characteristics, and any other specified characteristic shall be reported for each set of mixture proportions intended for use.

Page 177: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (3 of 32)

Incomplete submittals by the Contractor may result in rejection of the mix design submittal.

211.03.05 Trial Mixes. The Contractor shall produce test batches of 4.0 m3 volumes on all proposed bridge deck mix designs. The Contractor shall produce test batches of 4.0 m3 volumes on other mix designs where deemed necessary by the Ministry Representative. Point of discharge sampling and testing shall be carried out by the Contractor to verify the pertinent parameters of the proposed mix design. If placement is by pump, concrete shall be sampled and fully tested at both the truck chute discharge and at the pump discharge locations. Sampling and testing shall be in accordance with Section 211.09, Table 211-J and Table 211-K. Test parameters include all required properties of the fresh and hardened concrete, workability and finishability of the mix, strength gain characteristics, including 7 and 28-day compressive strengths, and any other additional testing of the hardened concrete that may be required by the Ministry Representative. Batching, haul times and conveyance procedures used for the test batch must emulate the procedures expected during the actual concrete placement. The Contractor shall be fully responsible for all costs associated with the test batches. Test batch trials that do not meet the specified requirements shall be repeated.

211.03.06 Adjustments to Mix Designs. If, during the progress of the work, the mix design is found to be unsatisfactory, the Contractor shall make the necessary adjustments. Adjustments shall be accepted by the Ministry Representative prior to subsequent concrete placement. Notwithstanding the Ministry Representative’s review and acceptance of the proposed mix design, it remains the Contractor’s responsibility that the concrete meets all the specified requirements.

211.04 Materials.

211.04.01 General. All material properties used in concrete production shall conform to CSA A23.1, unless otherwise specified in these specifications. Laboratory testing shall be carried out by a testing laboratory certified in accordance with the requirements of CSA Standard A283. Field test procedures shall be undertaken by personnel certified under an industry-recognized program.

211.04.02 Cementitious Material. The Contractor shall obtain, from the supplier, a mill test report and a manufacturer's certificate of compliance representing each type of cementitious material for each delivered shipment.

211.04.02.01 Portland Cement. Unless otherwise specified, the Contractor shall use Type GU (General Use) Portland Cement in all concrete. Cement shall conform to the requirements of CSA Standard A3001, Cementitious Materials for use in Concrete.

The total alkali content [Na2O equivalent, (Na2O + (0.658 x K2O))] of the Type GU Portland Cement shall not exceed 0.60% by mass.

211.04.02.02 Silica Fume. Dry condensed silica fume shall conform to CSA Standard A3001 Type SF, with a SiO2 content of at least 85%, a maximum of 10% ignition loss, and maximum SO3 content of 1.0%. Silica Fume application rates shall be 8% maximum by mass of Portland Cement.

211.04.02.03 Fly Ash. Fly ash shall conform to CSA Standard A3001, Type F or C1, with a maximum CaO content of 8%, a maximum SO3 content of 5%, a maximum 8.0% ignition loss for Type F and a maximum 6% ignition loss for Type C1. Fly ash application rates shall be limited to a maximum of 25% by mass of Portland Cement in substructure concrete. Fly ash shall not be used in bridge deck concrete without the acceptance of the Ministry Representative. Upon such acceptance the maximum application rate shall be 15% by mass of Portland Cement.

211.04.02.04 Blended Hydraulic Cement. Blended Hydraulic Cement shall not be used without the acceptance of the Ministry Representative.

Page 178: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (4 of 32) 2006 BC MOT

211.04.03 Water. Water to be used for mixing concrete or mortar and for curing shall conform to the requirements of CSA Standard A23.1 and shall be free from contamination by oil, acid, alkali, organic matter, sediment or other deleterious substances. The Contractor shall not use water from shallow, stagnant or marshy sources.

211.04.04 Admixtures. Admixtures shall not be incorporated into the mix design and/or added to the concrete without the acceptance of the Ministry Representative.

Unless otherwise specified, all concrete shall contain Air-Entraining Admixtures.

Air-Entraining Admixtures shall conform to ASTM C260.

Chemical admixtures shall conform to ASTM C494.

Type F High Range Water Reducer (superplasticizer) shall be used when concrete contains silica fume.

All accepted admixtures shall be compatible with all other admixtures and constituents used in the mix.

Type B, Retarding or Type D, Water-Reducing and Retarding (Hydration Stabilizing) Admixtures shall not be incorporated into the mix design and/or added to the concrete without the acceptance of the Ministry Representative. When accepted by the Ministry Representative, the guidelines given in Section 211.08.02 shall apply.

Calcium chloride or any admixture containing chloride ions shall not be used. If requested, a written statement from the manufacturer stating that the admixture contains no intentionally added calcium chloride shall be provided to the Ministry Representative.

211.04.05 Aggregates. All aggregates are to be natural, processed or manufactured granular material composed of hard, sound and durable particles, free of adherent coatings, shale, clay, organic materials and other soft or disintegrated pieces.

211.04.05.01 Coarse Aggregate. All coarse aggregate materials shall conform to the following requirements:

• Sampling shall be according to CSA Test Method A23.2-1A.

• Gradation shall be determined in accordance with CSA Test Method A23.2-2A and 5A. (All gradations shall be based on a washed sieve analysis, see Table 211-D footnotes).

• Gradation of the coarse aggregate shall be within the limits shown in Table 211-B for the particular size range or nominal maximum size of coarse aggregate specified.

NOTE: The gradation of coarse aggregates used shall be such that the percentage passing any one sieve does not vary more than 5% from the initially approved coarse aggregates used in the mix design. • The maximum Petrographic Number (PN) of coarse aggregate shall not exceed 125, and shall be determined in

accordance with CSA A23.2 15A.

• The amount of deleterious substances in coarse aggregate shall not exceed the limits prescribed in Table 211-E.

• Other specified physical properties measuring aggregate quality referenced in Table 211-D shall not exceed the limits prescribed in Table 211-E.

Page 179: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (5 of 32)

Table 211-B GRADATION REQUIRMENTS FOR COURSE AGGREGATES

Total Passing Each Sieve, Percentage by Mass NMSA (1)

mm

Product Size, mm 56

mm 40 mm

28 mm

20 mm

14 mm

10 mm

5 mm

2.5 mm

1.25 mm

40 40-5 (2) 100 95-100

__ 35-70 __ 10-30 0-5 __ __

28 28-5 (2) __ 100 95-100

63-83 30-65 __ 0-10 0-5 __

20 20-5 __ __ 100 90-100

50-90 25-60 0-10 0-5 __

14 14-5 __ __ __ 100 90-100

45-75 0-15 0-5 __

10 10-2.5 __ __ __ __ 100 85-100

10-30

0-10 0-5

(1) NMSA – nominal maximum size of course aggregate. Definition: The standard Sieve size opening immediately smaller than the smallest through which all of the

aggregate must pass.

(2) To prevent segregation, aggregates that make up the above gradings shall stockpiled and batched in two or more separate sizes as per CSA A23.1

211.04.05.02 Fine Aggregate. Fine aggregate shall conform to the following requirements:

• Sampling shall be according to CSA Test Method A23.2-1A.

• Grading shall be within the limits given in Table 211-C when tested in accordance with CSA Test Method A23.2-2A and 5A. (All gradations shall be based on a washed sieve analysis)

• Fineness modulus shall be between 2.3 and 3.1

• Fineness modulus tolerance shall be ±0.2 (except that the above sentence shall apply) from the fineness modulus of the initially approved fine aggregate used in the design mix.

• A maximum 45% shall be retained between any two consecutive sieves.

• The amount of deleterious substances in fine aggregate shall not exceed the limits prescribed in Table 211-E.

• Other specified physical properties measuring aggregate quality referenced in Table 211-D shall not exceed the limits prescribed in Table 211-E.

211.04.06 Steel Fibres. Steel fibres shall meet the requirements of ASTM Standard A820 Type 1 Cold Drawn High Tensile Deformed Steel Fibres. A mill certificate showing compliance with ASTM Standard A820 shall accompany each delivered lot. Steel Fibres shall be Xerox 1 or Novotex or an alternate acceptable to the Ministry Representative. Concrete where steel fibres are used shall contain 50 kg of 30 mm or 50 mm length fibres per cubic metre of concrete.

Page 180: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (6 of 32) 2006 BC MOT

TABLE 211-C GRADATION REQUIREMENTS FOR FINE AGGREGATES

SIEVE SIZE mm

TOTAL CUMULATIVE PASSING EACH SIEVE, PERCENTAGE BY MASS

SIEVE SIZE mm

TOTAL CUMULATIVE PASSING EACH SIEVE, PERCENTAGE BY MASS

10 100 0.630 25-65

5 95-100 0.315 10-35

2.5 80-100 0.160 2-10

1.25 50-90

TABLE 211-D REQUIRED AGGREGATE TESTING FOR NORMAL DENSITY COARSE AND FINE AGGREGATE (PER INDIVIDUAL PRODUCT & AGGREGATE SOURCE)

Test Method Test Description Test Data Validity(5)

CSA A23.2-2A(1)

CSA A23.2-5A(1)

Sieve Analysis of Fine and Coarse Aggregate

Amount of Material finer than 80 µm in Aggregate

Within 90 days(6)

Within 90 days(6)

CSA A23.2-3A Clay Lumps in Natural Aggregate Within 3 years

CSA A23.2-4A Low Density Granular Material in Aggregate Within 3 years

CSA A23.2-6A, 12A

Relative Density and Absorption of Fine and Coarse Aggregate Within 1 year

CSA A23.2-7A Test for Organic Impurities in Fine Aggregates for Concrete Within 2 years

CSA A23.2-8A(3) Measuring Mortar-Strength Properties of Fine Aggregate Within 2 years

CSA A23.2-9A(2) Soundness of Aggregate by Use of Magnesium Sulphate Within 4 years

CSA A23.2-14A Potential Expansivity of Aggregates (Procedure for Length Change Due to Alkali-Aggregate Reaction in Concrete Prisms)

Within 5 years

CSA A23.2-13A Flat and Elongated Particles in Coarse Aggregate - Procedure A (Length to Width Ratio 4:1)

Within 3 years(6)

CSA A23.2-16A(7) Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine

Within 4 years

CSA A23.2-23A(2) Test Method for the Resistance of Fine Aggregate to Degradation by Abrasion in the Micro-Deval Apparatus

Within 4 years

CSA A23.2-29A(2) Test Method for the Resistance of Coarse Aggregate to Degradation by Abrasion in the Micro-Deval Apparatus

Within 4 years

CSA A23.2-15A(4)

Petrographic Analysis of Coarse & Fine Aggregate specific for use as concrete aggregate; and Determination of the Petrographic Number

See Note 4

Page 181: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

BC MOT 2006 211(7 of 32)

(1) Each aggregate product that may be used as a component of the proposed mix must have a washed sieved analysis performed showing the cumulative percent passing for each of the following sieve sizes; 56, 40, 28, 20, 14, 10, 5, 2.5, 1.25, 0.630, 0.315, 0.160 and 0.080 mm. Sieve analysis reports are to include all relevant sampling information (date/sampled by/location/field sample size) and include the actual test specimen sample mass.

(2) Test Method A23.2-9A can be performed as an alternative to performing Test Method A23.2-23A and A23.2-29A. Refer to CSA A23.1, Section 4.2, Table 12 for further information.

(3) Test Method A23.2-8A is required only if the aggregate fails to meet the requirements of Test Method A23.2-7A as described in CSA A23.1 Section 4.2.3.3.3.2

(4) Petrographic Assessment of Aggregates

The Contractor shall submit the results of the Petrographic Analysis, certified by a qualified professional registered with the Association of Professional Engineers and Geoscientists of B.C. and indicating the aggregate’s suitability for its intended use.

The petrographic analysis shall not be used to forfeit the requirement of performing other necessary aggregate quality testing.

(5) Test data validity requirements are based on time periods prior to the expected initial date of concrete production. It is only applicable to aggregate sources proven to be materially consistent, based solely on historical test data. The Ministry Representative, based on submitted test data and/or visual observations, may reduce the above listed time periods.

(6) Quality control during aggregate production shall include the following test methods at the specified test frequencies: CSA A23.2-2A & A23.2-5A (1 per 500 tonnes), and A23.2-13A (1 per 1000 tonnes).

(7) Test Method CSA A23.2-16A can be waived if CSA A23.2-29A test results meet the specified criteria.

TABLE 211-E LIMITS FOR DELETERIOUS SUBSTANCES IN AND PHYSICAL PROPERTIES OF AGGREGATES

Test Method Substance or Property Maximum Percentage by Mass of

Total Sample

Coarse Aggregate

Fine Aggregate

CSA A23.2-3A Clay Lumps 0.25 1.0

CSA A23.2-4A Low-Density Granular Materials 0.5 0.5

CSA A23.2-5A Material Finer than 0.08 mm for Concrete Subject to Wear

1.0 3.0

Material Finer than 0.08 mm for Other Concrete

1.0 5.0

CSA A23.2-9A Magnesium Sulphate Soundness Loss 12 16

CSA A23.2-16A, Los Angeles Abrasion Loss for Concrete Subject to Wear

35 N/A

CSA A23.2-23A-29A

Micro-Deval Abrasion Loss 17 20

CSA A23.2-12A Absorption Percentage 2.0 N/A

CSA A23.2-7A Organic Impurities in Fine Aggregate N/A Standard colour or lighter (1)

CSA A23.2-13A Flat and Elongated Particles in Coarse Aggregate - Procedure A (Length to Width Ratio 4:1)

20 N/A

CSA A23.2-14A Alkali-Reactivity Expansion in Concrete Prisms

0.040 (2) 0.040 (2)

Page 182: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

BC MOT 2006 211(8 of 32)

(1) Standard Colour is defined as Organic Plate No. 3

(2) Expansion measured at 1 year

211.05 Storage and Handling of Materials - General. The storage and handling of all materials used in the production of concrete shall conform to CSA A23.1, unless otherwise specified herein. All materials shall be stored and handled in a manner that will prevent contamination or deterioration, otherwise they shall be rejected. Access shall be provided to the storage facilities to allow for inspection and sampling. Where applicable, materials shall be identified by MSD sheets.

211.05.01 Cementitious Material. All cementitious materials shall be stored in a suitable weather-tight structure capable of protecting the materials from dampness, hydration and contamination, otherwise they shall be rejected. Materials shall be free of lumps at all times during their use in the work and shall have a maximum temperature of 50oC.

211.05.02 Tanks. Tanks used for storing and/or hauling, concrete mixing and curing water shall be free from contamination by oil, acid, alkali, organic matter, sediment, rust or other deleterious substances.

211.05.03 Admixtures. All admixtures shall be stored in manufacturers’ original labelled containers with clearly legible labels and be kept above freezing at all times and in accordance with the manufacturers’ technical data sheets. Admixtures damaged by any cause shall be rejected.

211.05.04 Other Materials. Other materials, such as steel fibres, etc. shall be stored and handled in accordance with the manufacturer's recommendations and instructions.

211.05.05 Aggregates. Each nominal size of aggregate, including coarse and fine shall be separately stockpiled, stored and handled in a manner that will prevent contamination, intermixing and segregation. A minimum of 10 m³ of each aggregate size, in excess of the requirements of the daily concrete operations, shall be maintained in identifiable stockpiles at the batch site in order to ensure proper continuity of the work with approved aggregates.

NOTE: Stockpiled aggregate, which has segregated, contaminated or intermixed with foreign matter of any kind, shall be rejected. Separate batch plant storage bins shall be provided for each size of aggregate to be batched.

Precautions shall be taken when moving, handling and transferring aggregates to prevent contamination, segregation or degradation in accordance with the following recommendations:

• Aggregate blanket 150 mm thick should be left on the ground as stockpiles are depleted.

• Aggregate transfer over stockpiles or storage bins of other sized aggregates should be avoided.

• Storage bins should be filled only to 150 mm from the top unless a suitable extension rim is provided to prevent contamination.

• Front-end loader buckets should be filled by raising them vertically up the face of the stockpile, not by thrusting into the stockpile in one place.

• Depositing aggregates into the batch plant storage bins should be made directly over the bins' outlet.

• Storage bins should be kept as full as possible during batching to minimize segregation as the aggregates are withdrawn from the bins.

Acceptable and uniform aggregate moisture content shall be obtained and maintained by necessary means to include the following:

• Washed or wetted aggregates should remain in stockpiles for a minimum of 12 hours to permit a uniform moisture content throughout the stockpile to be reached before aggregate transfer to batch plant storage bins.

Page 183: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (9 of 32)

• After each day's concrete production during wet weather, fine aggregate bins should be either emptied or covered with a suitable waterproof covering.

211.06 Batching.

211.06.01 Batching Equipment.

i) General - Batching equipment, such as weighing mechanisms, gates, water lines and dispensing systems, shall be maintained in good working order. Batching bins shall be completely emptied of all material before the first and succeeding batches are measured.

Batching equipment shall have the following capabilities and facilities:

• bins or silos for storage of aggregates, silos for storage of cement and pozzolan

• free movement of each type or size of material to discharge openings without contamination

• design of storage and hauling facilities to prevent:

- loss or intermingling of different sizes and types of materials

- contamination by deleterious substances

- harmful segregation and breakage

• covers to stockpiles of fine aggregates to ensure constant moisture content

• all fulcrums, clevises and similar working parts maintained in clean condition

• provision made, in remote control plants and/or where batch cycles are timed, for the complete filling and discharge of the measuring unit for each batch.

ii) Batch Charging Mechanism - Batch Charging Mechanism requirements shall be as follows:

• material flow control within the specified tolerances

• hopper construction to eliminate material accumulation and to permit the complete discharge of every batch

• cement weighing hopper:

- self-cleaning and properly ventilated to allow air to escape

- accessible for inspection

- dust sealed between the charging mechanism and the hopper to maintain weighing accuracy.

iii) Scales and Dispensing Mechanism - Scales and Dispensing Mechanisms shall conform to the following requirements:

• beam type or springless dial type

• other methods of weighing (electric, hydraulic, load cells, etc.) are acceptable provided the specified weighing tolerances and accuracy requirements are met

• all accurate to ±0.4% of the total capacity of the scale when static load tested

• zero balance adjustment capability

• unaffected by binding or vibration due to vibrators or other appurtenances

• working range between 10% and 90% of the scale reading

• equipped with prominent markers with individual batch weight setting capabilities for dial scales

• calibration facilities including an adequate number of standard test masses

• beam type scales with provision for indicating to the operator that the required load in the hopper is being

Page 184: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (10 of 32) 2006 BC MOT

approached; the device shall indicate at least the last 100 kg of the load.

• all weighing and indicating devices shall be in full view of the operator while charging the hopper, and the operator shall have convenient access to all controls.

iv) Volumetric Devices for Water Measurement - Volumetric devices for water measurement shall be:

• fitted with such valves and connections as are necessary to divert the water measured for a batch to easily verify the accuracy of measurement

• arranged so that measurements will be unaffected by variable pressures in the water supply line

• calibrated to an accuracy of 2% of the batch volume.

v) Dispensing Systems for Liquid Admixtures - Dispensing systems for liquid admixtures, other than weigh systems, shall have the following capabilities:

• visual, volumetric measuring or readout units located as close as possible to eye level for easy reading by the operator

• positioned in such a manner that discharge into the batch is observed by the operator from a normal working position

• volumetric measuring unit for periodic check of dispenser accuracy where a positive displacement system is used

• visual measuring unit for an accurate visual check of increments of 30 mL of air entraining agent or of chemical required to treat a maximum of 25 kg of cement

vi) Certificate or Report of Inspection - A certificate or report of inspection, from a Weights and Measures approved, independent testing authority, and which is not more than one year old for the plant in its present position, shall be on display in the plant at all times. The certificate or report will be accepted as proof of accuracy of the scales or weighing devices. Where there is reasonable doubt concerning the accuracy of the scales or weighing devices the Ministry Representative may require their recalibration and recertification,at the Contractor's expense, during progress of the work. Plant relocation or major alterations shall require such recalibration and recertification.

211.06.02 Batching of Materials. Material may be weigh-batched separately or cumulatively.

Aggregates shall be batched by mass, cement and mineral admixtures in the powder form by mass or bag.

The mass of any ingredient to be batched shall not be less than 10% nor greater than 90% of the scale capacity.

When batched by 40 kg bags, only full and sealed bags of cement shall be used with no fractional bags permitted. Cement batched by mass shall be to an accuracy of ±1% for batch quantities between 30% and 90% of the scale capacity. When the mass of cement being batched is between 10% and 30% of the scale capacity, the mass of cement batched shall not be less than the required mass nor more than 4% in excess. Intermediate bulk cement shall be weighed to an accuracy of ±1%.

When aggregates are measured by mass, batch masses shall be based on the required mass of saturated surface dry aggregate corrected for the moisture conditions of the aggregate at the time of batching. Field determination of free moisture in the aggregates shall be made by any proven method such as CSA A23.2-11A or by the use of a device such as the "Speedy Moisture" gauge. Where doubt exists as to the accuracy of such methods, total moisture in the aggregate shall be determined in accordance with ASTM C566. The minimum test frequency shall be once per each day’s production. When individual aggregate weigh batchers are used, the scale reading for each material shall be within 2% of the specified mass. In a cumulative aggregate weigh batcher, the cumulative mass after each measurement shall be within 1% of the required cumulative amount when the scale is used in excess of 30% of its capacity. For cumulative measurement less than 30% of scale capacity, the allowable variation shall be ±0.3% of scale capacity or ±3.0% of the required cumulative mass, whichever is less.

Page 185: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (11 of 32)

Mixing water shall be measured by mass or volume to an accuracy of ±1%. Adjustments for free water contained in batched materials, such as free water in the aggregates, water contained in admixture solutions, shall be made to the quantity of water to be batched. The total amount of mixing water in the batch obtained from all sources shall be within ±3% of the specified quantity and shall not vary the designed water-to-cementitious material ratio of the mix by more than ±0.02. Mixers shall be completely emptied of all water prior to the loading of a concrete batch.

Admixtures shall be batched in liquid form by either mass or volume; in powdered form by mass or bag. Volumetric measurements of admixtures or air entraining agents shall be to an accuracy of ±3% of the required amount or 30 mL, whichever is greater. Measurement by mass shall be to an accuracy of ±3% of the required amount.

The addition of cement to a fully-batched load of aggregates will not be accepted.

211.07 Mixing.

211.07.01 General - Sufficient plant capacity and transporting equipment shall be provided by the Contractor to ensure continuous delivery of concrete at the rate required with the necessary intervals between batches, for the proper placing and finishing of the concrete without the formation of cold joints in the finished concrete.

211.07.02 Concrete Mixers.

i) General - Concrete mixers shall conform to the following requirements:

• manufacturer's rating plate carried in a prominent position, indicating rated mixing capacity, and recommended speed of mixing which must be in the range of not less than 4 nor more than 18 rpm

• demonstrated capability of operating satisfactorily at the recommended mixing speed

• number of revolutions of the drum or blades registered with a counter in working condition

• charge and discharge openings and chute free from appreciable accumulations of cement or concrete, and hopper and chute surfaces clean and smooth

• batch water measuring equipment in good operating condition.

ii) Volumetric Mobile Mixers. - Volumetric mobile mixers shall conform to the following requirements:

• Shall be auger type mixers

• The mobile mixers shall be calibrated with the actual cement and aggregate products used in the concrete mix. Calibration tables and curves shall be submitted to the Ministry Representative. The volume of the concrete produced shall be confirmed and shall be within 2%.

• Mobile mixers shall have separate flow controlled supply hoppers for each individual aggregate gradation and cementitious constituent material to be added volumetrically.

• May be used provided that the accuracy of batching and uniformity of concrete is as required by CSA A23.1.

• Cement flow rates shall be checked before (during if required) each placing operation.

• The scale being used to calibrate the mobiles shall have a minimum capacity of 50 kg.

• The water tank shall have a stand pipe showing the amount of water in the tank.

• The mobiles shall have individual flow meters and admixture tanks for each admixture to be used as part of an admixture injection system.

• The mobiles shall be able to advance backwards and forwards from controls located at the back of the mobile.

• The mixer auger shall be maintained at minimum of a 25° angle from horizontal when mixing and discharging, unless otherwise indicated by the manufacturer.

Page 186: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (12 of 32) 2006 BC MOT

211.07.03 Mixing Concrete. Mixing drums shall be clean and empty before being charged. The drum shall be rotated at the manufacturers' recommended mixing speed during charging and mixing. Concrete shall be mixed to the uniformity requirements of CSA A23.1, Section 5.2.3.5. When a satisfactory mixing time is established it shall be maintained for all batches of the same design, mixed with the same equipment.

211. 08 Delivery.

211.08.01 General - Off-site mixed concrete shall, after being mixed, be transported to the job site in either truck agitators or truck mixers operating at the speed designated by the manufacturer of the equipment as agitating speed.

When concrete is being mixed in mixer trucks while in transit, the speed of the mixing drum shall be reduced to agitating speed once the mixing time has elapsed. Delivery of mixed concrete in non-agitating equipment will not be permitted.

211.08. 02 Time of Placement

Time of placement guidelines for bridge decks including diaphragms, bridge parapets, bridge medians, bridge sidewalks and approach slabs are given in Standard Specification Section 413, Bridge Decks and Concrete Overlays.

All other concrete shall be fully discharged and placed within 90 minutes after water and cement have been combined. Under conditions contributing to rapid stiffening of concrete the Ministry Representative may require a time of less than those stated above.

Time of placement extensions will be considered on a case by case basis and may require the use of Hydration Stabilizing Admixtures (HSA’s) conforming to the requirements of ASTM C494 Type B, Retarding or Type D, Water-Reducing and Retarding Admixtures. If accepted by the Ministry Representative, guidelines for the use of HSA’s shall be as follows:

Concrete shall be fully discharged and placed within 3 hours after water and cement have been combined.

When HSA’s are used, these time extensions are subject to preconstruction trials being conducted by the Contractor to establish the appropriate HSA dosage to provide suitable extended slump life of concrete without increasing the water/cementitious ratio of the concrete above that which would be required if HSA’s were not used. The use of HSA’s shall in no instance modify the maximum concrete temperature required at time of placement. A one time only addition of HSA will be allowed, this will be during initial batching of the concrete or immediately at completion of batching as recommended by the admixture manufacturer. Addition of HSA at any other time will be cause for rejection of the concrete.

211.08.03 Temperature Control - Temperature control guidelines for bridge decks including diaphragms, bridge parapets, bridge medians, bridge sidewalks and approach slabs are given in Standard Specification Section 413, Bridge Decks and Concrete Overlays.

The temperature of all other concrete, from the time of batching to complete discharge shall remain between 10° C and 25° C. Any concrete containing silica fume shall not have a maximum temperature in excess of 17°C at time of placement. Concrete used in elements having a minimum section thickness greater than 1000 mm shall have temperature controls as per CSA A23.1 Clause 5.2.4.4. Methods used for maintaining temperature controls shall not diminish the quality of the concrete, and shall not alter nor exceed the specified maximum W/Cm ratio.

When the atmospheric temperature is 20°C or higher, Clause 211.18 – Hot Weather Concreting shall apply.

211.08.04 Addition of Water - No water shall be added after the initial introduction of the mixing water for the mix, except at the start of discharge within the initial 10% of the total load volume, and when:

• the specified water-to-cementitious materials ratio is not exceeded

Page 187: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (13 of 32)

• the measured slump is less than that specified

• no more than 60 minutes have elapsed after water and cement have been combined

• the concrete is in a mixer or truck mixer.

An amount not exceeding 16 L of water per cubic metre of concrete or 10% of the mix design water whichever is less may be added. After addition of water, the drum or blades shall be turned an additional 30 revolutions or more if necessary at mixing speed. The amount of water added shall be recorded on the delivery ticket. Water shall not be added to the batch at any later time. The Contractor assumes full responsibility for the on-site addition of water and its subsequent effect on the quality of the concrete.

211.08.05 Addition of Superplasticizer (HRWR) – When superplasticized concrete falls below the designated slump due to delay, it shall be re-tempered with superplasticizing admixtures only, not water, and shall only receive a maximum of one re-tempering. The amount of superplasticizer added shall be recorded on the delivery ticket. The Contractor assumes full responsibility for the on-site addition of superplasticizer and its subsequent effect on the quality of the concrete. The use of superplasticizers shall not be used for extending the time of placement requirements described in Section 211.08.02.

211.08.06 Control of Air Content on the Job Site – The air content of the concrete shall, if necessary, be brought up to the specified range by the addition of an air-entraining agent in the field. Mixing shall follow to ensure proper dispersion and upon completion of mixing, the air content shall be retested. The amount of admixture added shall be recorded on the delivery ticket. The Contractor assumes full responsibility for the on-site addition of the air entraining agent and its subsequent effect on the quality of the concrete.

211.08.07 Delivery Ticket - Concrete delivered to the job site shall be accompanied by a ticket providing the Contractor and Ministry Representative with legible information, as follows:

• serial number of ticket

• date, name and location of concrete supplier

• name of the Contractor

• specific job designation (name and location)

• specific designation of concrete mix design

• truck number and volume of concrete in cubic metres

• addition of any materials added at the job site, at the request of the Contractor including but not limited to water and all chemical admixtures.

• time concrete was batched, arrived at job site, and completely discharged.

• amount of water added during batching including free moisture in aggregate, the maximum allowable amount of water that can be added at the site to maintain the specified maximum W/Cm ratio.

211.09 Quality Control Inspection, Testing and Acceptance.

211.09.01 General. The Contractor shall be fully responsible for hiring, scheduling, overseeing, performing and documenting all quality control testing and inspection in full compliance with the Contract.

The Ministry may perform on-site sampling and testing as a function of the Ministry’s quality assurance and/or audit. Ministry quality testing shall not relieve the Contractor of responsibility for providing quality control.

211.09.02 Sampling and Testing. Laboratory testing shall be carried out by a testing laboratory certified in accordance with the requirements of CSA Standard A283. Field test procedures shall be undertaken by personnel certified under an industry-recognized program. Field inspectors shall have extensive experience in on-site quality control testing of concrete, with the applicable admixtures being used, and with on-site batch adjustments.

Page 188: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (14 of 32) 2006 BC MOT

Testing personnel shall be on-site and available to test concrete for the complete duration of any concrete placement operation. Sampling and testing shall be in accordance with the test methods and minimum frequency levels as listed in Table 211-J and Table 211-K. Any test outside the specified range shall be immediately reported to the Contractor and Ministry Representative. Copies of all test results shall be received by the Ministry Representative within 1 day of the test date.

211.09.03 Sampling - Point of Acceptance. Determination of concrete properties for acceptance will be made based on samples taken at the final discharge end of the placement system. The Ministry Representative may accept sampling at the truck discharge end provided that testing during the test batches confirm that the concrete mix parameters are within the stated specification requirements at the actual placement point. The Ministry Representative may require additional testing to be performed at the point of placement at a predetermined frequency throughout the placement period. Such additional testing, including all costs shall be deemed as part of the Contractor’s quality control program.

211.09.04 Strength Tests. Unless otherwise specified, a strength test shall be the average 28-day strength of three standard 100 mm x 200 mm test cylinders, sampled, cast, cured, transported, and tested in accordance with CSA A23.2- 3C and 9C. The cylinder size shall however, meet the aggregate size limitations specified in Clause 6.2 of CSA Test Method A23.2-3C. For each strength test, a fourth cylinder shall be cast for a 7-day strength determination. If one specimen in a strength test, in the opinion of the testing agency shows evidence of improper sampling, casting, or testing, including damage from improper handling and transporting (and if agreed to by the Ministry Representative), it shall be discarded and the remaining two specimen strengths averaged. Additional cylinders may be cast, at the discretion of the Ministry Representative or Contractor.

The strength of each classification of concrete shall be considered satisfactory if:

• the averages of all sets of three consecutive strength tests equal or exceed the specified strength

• no individual test shows strengths less than 90% of the specified strength

Each "classification of concrete" will be taken as all of the concrete in one pay item in the Schedule 7. Where fewer than three strength tests are taken, the results of one test or the average of two will be used.

TABLE 211-J STANDARD TEST METHODS FOR SAMPLING AND TESTING

Test Methodology Test Description Minimum Test Frequency

CSA A23.2-1C Sampling Plastic Concrete As stated below

CSA A23.2-3C

CSA A23.2-9C

Making and Curing Concrete Compression and Flexural Test Specimens

Compressive Strength of Cylindrical Concrete Specimens

One set for every 35 m3 or portion thereafter for each classification of concrete placed within an individual structural element or component, and placed on any one-calendar day from a single supplier. The Ministry Representative may request additional sets.

CSA A23.2-4C

CSA A23.2-5C

ASTM C1064

Air Content of Plastic Concrete by the Pressure Method

Slump and slump flow of Concrete

Temperature of Fresh Concrete

Every individual load unless approved otherwise by the Ministry Representative

Retests shall be performed following any load adjustments.

Page 189: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (15 of 32)

CSA A23.2-6C Density, Yield, and Cementing Materials Factor of Plastic Concrete

Density and Yield tests shall be performed with every air test and strength test.

TABLE 211-K ADDITIONAL TEST METHODS FOR CONCRETE CONTAINING HIGH RANGE WATER REDUCERS (SUPERPLASTICIZERS)

Test Methodology Test Description / Sample Requirements

Minimum Test Frequency

ASTM C457 * Microscopic Determination of Parameters of the Air-Void System in Hardened Concrete

One test per individual test batch for each classification of concrete.

Acceptance criteria shall be in accordance with CSAA23.1 Section 4.3.3.2 and 4.3.3.3.

Further testing, during scheduled concrete pours may be required, as directed by the Ministry Representative

ASTM C1202 Electrical Indication of Concrete’s Ability to Resist Chloride Ion Penetration (Test age at 56 days)

One test per individual test batch for each classification of concrete

Acceptance criteria shall be a coulomb rating not exceeding 1500 coulombs

Each test set includes two 100 mm x 200 mm [4" x 8"] cylinders, sampled at the final placement discharge point. Casting, transporting and curing shall be in accordance with Section 211.09.05 of this Section.

* for superplasticized concrete only

211.09.05 Test Cylinders. Making and curing concrete test cylinders shall be carried out in accordance with CSA A23.2-3C, except that the time for cylinders to reach the testing laboratory shall be between 20 and 48 hours from initial time of casting. The test cylinders shall be cast by the Contractor using standard CSA approved moulds. The Contractor shall provide properly designed temperature-controlled storage boxes for test cylinder storage, as specified in CSA A23.2-3C Clause 7.3.2.1, for a period of at least 20 hours, and further protection from adverse weather and mishandling before and during delivery to the testing laboratory for curing and testing. The Contractor shall provide a maximum-minimum thermometer for each storage box.

The Contractor shall deliver the test cylinders to a CSA certified testing laboratory. Handling and transporting of the cylinders shall be in accordance with CSA A23.2-3C. No extra laboratory curing time will be allowed for cylinders that are delivered late to the laboratory. A copy of the test results shall be forwarded to the Ministry Representative within 2 days of each individual strength test date. Test results shall include all information as described in CSA A23.2, Annex B, Form for Reporting Compressive Strength of Concrete Test Cylinders.

211.09.06 Field Cured Test Cylinders. The Ministry Representative may require field cured test cylinders be cast to check the adequacy of the Contractor’s curing or cold weather protection. The Contractor may also cast field cured test cylinders for determining interim strengths that may be required for further work progress approval such as opening to traffic, formwork removal and/or erection, etc.

Page 190: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (16 of 32) 2006 BC MOT

Casting, handling, transporting and testing shall be in accordance with CSA A23.2-3C and 9C.

Test cylinders shall be stored as near as possible to the point in the structure that the test cylinders represent, and shall be afforded the same temperature protection and moisture environment as the structure.

At the end of the curing period the test cylinders shall be left in place, exposed to the weather in the same manner as the structure.

All test cylinders shall be removed from the field storage and stored in lime water at 23 ± 2ºC for 24 ± 4h immediately before time of testing to ensure uniform moisture conditions from cylinder to cylinder.

Test results on field cured test cylinders shall not be used as a basis for acceptance or rejection of the concrete.

211.09.07 Failure to Meet Minimum Strength Specifications.

i) Low Average - where the average of the strength tests is low, but no test shows less than 90% of the specified strength, the concrete will be accepted at a reduced price (see Subsection 211.21.02).

ii) Understrength Concrete - where testing shows lower strengths, the Ministry Representative may order replacement or reinforcing, at the Contractor's expense, of portions of the structure. Alternatively, at the Ministry Representative's discretion, the understrength concrete may be accepted at a reduced price (see Subsection 211.21.02).

iii) Coring - the coring of concrete, to verify its strength, will be allowed only for concrete, which is otherwise to be replaced or reinforced. Coring will not be allowed for concrete for which reduced payment is to be made for understrength. When coring is allowed, cores shall be taken at locations directed by the Ministry Representative, who shall be present during the coring.

Where coring is allowed, it shall be carried out at the Contractor’s expense by an independent qualified testing firm. Three cores shall be obtained and tested in accordance with CSA A23.2-14C "Obtaining and Testing Drilled Cores for Compressive Strength Testing" at each test location. Concrete in the area represented by the core tests may be considered structurally adequate if:

• the average strength test result of each set of three cores from the portion of the structure in question is equal to at least 100% of the specified strength

• the strength test result of any single core is not less than 80% of the specified strength

Notwithstanding the final result, the Contractor will be responsible for all costs associated with the coring operation and testing, and shall not be reimbursed for inconvenience and other associated costs.

211.09.08 Failure to Meet Slump or Air Content Specifications. In the event that the slump and/or air content are outside the specified limits, the Ministry Representative may accept adjustments to correct the deficient condition as an alternative to rejection. In such cases, adjustments must be completed within the maximum time allowed as specified in Section 211.08.02 and additional testing shall be required to verify specification compliance. If compliance is not achieved, the concrete shall be rejected.

211.10 Placing of Concrete.

211.10.01 General - Equipment for conveying concrete at the job site, such as buggies, buckets, hoppers, chutes, belts and pumps, shall be of such design, size and condition to deposit a continuous and adequate supply of concrete of the specified mix and consistency without segregation at the required locations.

211.10.02 Buggies. Buggies shall have inflatable rubber tires. Inner surfaces of the bucket shall be smooth with filleted corners, mortar-tight and free of any excessive accumulation of hardened concrete, obstructions or deterioration interfering with the proper discharge of concrete. Grade and ramp-way surfaces shall be sufficiently smooth to prevent segregation of concrete being carried in buggies.

211.10.03 Bottom-dump Buckets and Hoppers. Bottom-dump buckets and hoppers shall have side slopes not

Page 191: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (17 of 32)

less than 60o from the horizontal and shall be equipped with wide free-working and tight-closing discharge gates. The discharge gates shall be constructed to regulate the concrete flow, spring loaded to ensure complete closure and be capable of immediate closure at any time during discharge. Buckets and hoppers shall be cleaned of any accumulation of partially hardened or hardened concrete before and during concrete placement. Gate control mechanisms shall be cleaned and lubricated before being used.

In the use of crane and bucket, segregation of concrete from jarring or shaking shall be prevented. Side-dump buckets shall be used whenever necessary to avoid conflict with extended reinforcing steel or formwork.

211.10.04 Chutes. Chutes shall be of rounded cross section to avoid the accumulation of concrete in corners; be capable of slope adjustment sufficiently steep to permit flow without requiring a slump greater than that specified or required for placement (slope normally required is 1 vertical to 2 or 2½ horizontal).

Baffles and changes in direction may be used to control flow, but not vibration, paddling or water spray.

Chutes or belts shall be rigidly supported but sufficiently mobile to permit discharge as close as possible to the placement location as it progresses. Any long line of chutes or belts shall be covered during hot, dry or windy weather to prevent drying of concrete and excessive slump loss.

211.10.05 Conveyor Operation Rate. Conveyor operation rate shall be dependent on the proper placement and consolidation of the concrete with the belt inclination such that no segregation occurs from any sliding or roll-back of the concrete.

211. 10. 06 Hoppers. Hoppers, set approximately level, shall be supported on specially framed bearers transmitting only vertical loads to the top of the formwork.

211. 10. 07 Pumps - Pumps shall be of sufficient capacity to supply un-segregated concrete, using the design mix proportions at the design slump, to meet the required placement volume at the forms. Satisfactory operation and performance of the proposed pumping equipment with the concrete materials and mixes otherwise suitable and appropriate for the job, along with the line layout and grate size opening, shall be demonstrated to the Ministry Representative's satisfaction and acceptance.

Any necessary priming of the concrete pump shall be done with a water/cement or water/cement/sand slurry. The prime slurry followed by approximately 0.25 cubic meters of concrete shall not be included in the concrete placement. No other pump aid type admixtures will be permitted.

211.11 Falsework and Formwork.

211.11.01 General. Formwork and falsework shall be designed, supplied, installed and removed in accordance with CAN/CSA-S269.3-M92, CAN/CSA-S269.1-1975 and the requirements for concrete formwork and falsework given in the British Columbia Workers Compensation Act, Occupational Health and Safety Regulations unless otherwise noted.

Formwork and falsework support accessories shall not be welded to the permanent structural steelwork.

Where required, formwork and associated temporary falsework design and drawings shall be prepared and sealed by a professional engineer registered with the Association of Professional Engineers and Geoscientists of British Columbia and experienced in the design and construction of falsework and formwork structures similar to those required to construct this project. No load shall be placed on the formwork or falsework until the professional engineer responsible for the design has inspected and certified, in writing, that the work has been carried out in accordance with the formwork drawings and specifications and a copy of the formwork design engineers’ certification has been received by the Ministry Representative.

Bridge deck formwork design shall include a check for the lateral stability of the girders during the placement of deck concrete. Stringers shall be temporarily braced, if necessary, to facilitate deck concreting operations.

Detailed falsework and formwork drawings shall be submitted to the Ministry Representative for review. The drawings shall be submitted a minimum of two weeks before the start of installation.

Page 192: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (18 of 32) 2006 BC MOT

211.11.02 Design. All forms shall be designed and built mortar-tight and of sufficient rigidity to prevent distortion due to the pressure of vibrated concrete and other loads incidental to the construction operation. The forms shall be substantial and unyielding, and shall be designed so that finished concrete will conform to the design dimensions and contours. The shape, strength, rigidity, water tightness and surface smoothness of re-used forms shall be maintained at all times. Forms which are unsatisfactory in any respect shall not be used.

All formwork and falsework shall be designed to be completely removable, no stay in place formwork will be permitted.

No dry ties shall be permitted; form tie rods shall remain embedded and terminate not less than 50 mm from the formed face of the concrete. Removable embedded fasteners on the ends of the rods shall be such as to leave holes of a regular shape for reaming and filling.

For narrow walls and columns, where the bottom of the form is inaccessible, removable panels shall be provided in the bottom form panel to enable cleaning out of extraneous material immediately before placing the concrete.

211.11.03 Forms for Exposed Surfaces. All forms for exposed surfaces shall be mortar-tight. All exposed edges shall be chamfered by use of a chamfer strip and return corners filleted. Metal bolts or anchorages within the forms shall be so constructed as to permit their removal to a depth of at least 50mm from the concrete surface. Break-back type form ties shall have all spacing washers removed and the tie shall be broken back a distance of at least 50 mm from the concrete surface. All fittings for metal ties shall be of such design that, upon their removal, the cavities which are left will be of the smallest possible size. Torch cutting of steel hangers and ties will not be permitted. Formwork hangers for exterior surfaces of decks and curbs shall be an acceptable break-back type with surface cone, or removable threaded type. Cavities shall be filled with cement mortar and the surface left sound, smooth, even and uniform in color. See Subsection 211.17 for details on finishes, mortar mixes and other relevant information.

211.11.04 Deck Formwork. Formwork for decks, curbs, sidewalks and parapets shall be fabricated so that the lines and grades shown on the drawings are achieved. For suspended slab bridge decks the formwork shall be designed to allow for an adjustable haunch to facilitate the casting of a constant depth deck slab as shown on the Drawings. Girders will be erected to normally accepted standards of tolerance; it shall be necessary to adjust the formwork to compensate for camber, variances in girder dimensions, positioning, and sweep.

Prior to commencing deck formwork and subsequent to the completion of the erection of girders, with the girders in a thermally neutral condition and with no dead load other than the dead load of the girders and necessary fall protection, the Contractor shall profile all the girders. Camber elevations are to be taken at 2000 mm centres maximum (or as indicated on the Drawings or Special Provisions), centrelines of all bearings and ends of girders. The camber elevation locations are to be laid out to an accuracy of 25 mm horizontally and camber elevations taken to the nearest 1mm vertically. Within 14 days of the Contractor supplying the camber elevation to the Ministry Representative, the Contractor will receive haunch heights for setting the deck slab soffit, and the design finished grade elevations for the deck, complete with anticipated dead load deflections at 1000 mm stations along the centreline of roadway.

In the event that actual girder camber values vary significantly from the design values, the Contractor will be required to modify the original design finished grade as directed by the Ministry Representative.

211.11.05 Removal of Falsework and Formwork. Where formwork and associated falsework have been engineered by a professional engineer, forms and their supports shall not be removed without the approval of the professional engineer responsible for the formwork and falsework design and without the acceptance of the Ministry Representative. In determining the time for the removal of falsework and formwork, consideration shall be given to the location and character of the structure, the weather and other conditions influencing the curing of the concrete, and the materials used in the mix.

Supports shall be removed in such a manner as to permit the concrete to uniformly and gradually take the stresses due to its own weight together with any construction loads likely to be imposed. All formwork must be removed from the completed structure.

Page 193: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (19 of 32)

211.12 Construction Joints.

211.12.01 General - Definition. Joints between adjacent or successive lifts of concrete where the previously cast concrete cannot be plasticized with a vibrator, or any joint required by the Contractor's method of construction. Construction joints generally shall be in accordance with the following requirements:

• kept to a minimum

• concealed by a natural break or line in the structure

• provided for by the formwork design and placing techniques.

Emergency construction joints shall conform as nearly as possible to planned joints. In any case, concrete must be levelled as well as possible and, if lifts are partial, a vertical bulkhead shall be installed. Permission from the Ministry Representative shall be required to complete the cast following any emergency joint installation.

211.12.02 Joint Edges. Joint edges shall be preformed whenever possible for a true line upon form removal. Pour-strip shall be positioned relative to form ties so as to minimize form bulge at the bottom of the subsequent cast, but concrete may be cast to the top of a form instead of the pour-strip. Concrete surfaces outside of the reinforcing steel shall be steel trowelled to a true line.

211.12.03 Surfaces Preparation. Joint surfaces of the hardened concrete shall be thoroughly cleaned of foreign matter and laitance to present clean, sound surfaces with the coarse aggregate partially exposed and achieved by:

• brushing immediately following initial set

• treatment with a surface set retardant, followed by green cutting

• sand blasting

• water blasting.

Where roughening of the hardened concrete is specified, the surface shall be roughened to a full amplitude of at least 5mm.

211.12.04 Bonding of Joints. Bonding of joints shall be achieved through the use of a water-cement slurry or, if specified, an epoxy-type bonding agent conforming with ASTM C 881M applied in strict accordance with the manufacturer's specifications. Slurry, when used, shall have a water-cement ratio equal to that of the concrete being placed and be brush applied to a 3 to 5 mm thickness for 100% coverage on to the cleaned existing concrete surface within five minutes of placing concrete.

211.13 Consolidation.

211.13.01 Vibrators – General. The number, type, design and operation of vibrators will be subject to the acceptance of the Ministry Representative.

Vibrators shall have the following capabilities and requirements:

• diameter and frequency of vibrators shall conform to Table 211-L

• vibration transmission to the concrete at frequencies not less than 130 Hz

• vibration intensity sufficient to be visually observed on concrete with not more than 25 mm slump over a radius of at least 450 mm

• sufficient number of vibrators available to properly compact each 8 m³ batch within 15 minutes after it is placed in forms, with at least two vibrators provided for each concrete placing unit

• stand-by vibrator and generator available on the job at all times in case of breakdown.

211.13.02 Mechanical Vibrators. Mechanical vibrators shall thoroughly consolidate concrete immediately after placing.

Page 194: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (20 of 32) 2006 BC MOT

Vibrator usage shall be as follows:

• not inserted between reinforcing steel and formwork nor directly on to the reinforcing steel

• inserted vertically at a rate of 75 mm per second and penetrating into the preceding layer at least 50 mm

• withdrawn at a rate of 150 mm per second

• grid pattern movement starting 100 mm from a formed surface and at a maximum spacing of 300 mm thereafter.

211.13.03 Form Vibrators. Form vibrators may be permitted at the discretion of the Ministry Representative where rebar configuration would prohibit the use of internal vibrators.

TABLE 211-L REQUIREMENTS FOR DIAMETER AND FREQUENCY OF VIBRATORS

DIAMETER (mm) FREQUENCY (Hz)

RATE OF PLACEMENT OF CONCRETE PER VIBRATOR

(m3/h)

APPLICATION

20-40 170-250 1-4 very thin members

30-60 150-225 2-8 walls and slabs 200 mm - 300 mm

50-90 130-200 5-15 larger members

211.14 Finishing.

211.14.01 Finishing Top Surfaces - Plastic concrete, struck off immediately following casting and before the accumulation of bleed water, shall be finished by hand or mechanical floating with the least possible disturbance. Water, cement or proprietary topping material shall not be added to the surface during finishing.

No steel floats or trowels shall be used on exposed surfaces.

211.14.02 Strike-off and Finishing Machines - Strike-off and finishing machines for surfacing concrete such as slabs on grade, pavements, etc. shall conform to the following:

• capable of accurately finishing concrete surfaces to the grade and elevation shown on drawings or as directed by the Ministry Representative

• surface finish production free of open texturing, plucked aggregates or projections

• maintained in good mechanical repair and free of hydraulic fluid leaks, oil leaks, excessive grease and other contaminants.

211.14.03 Trowel Finishing - Trowel finishing where required:

• by the drawings or specifications,

• for unformed surfaces exposed to view from a close distance,

• by close tolerance requirements (such as bearing surfaces),

shall be commenced after bleed waters have disappeared to reduce the texture of the concrete surface and produce a smooth blemish-free surface.

211.14.04 Other Textured Finishes - Other textured finishes shall be applied as and where specified.

Page 195: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (21 of 32)

211.14.05 Damage or Scaling - Any damage to or scaling of surfaces shall be repaired to the satisfaction of the Ministry Representative.

211.15 Curing.

211.15.01 General. Freshly deposited concrete shall be protected from freezing, abnormally high temperatures or temperature differentials, premature drying, excessive moisture, moisture loss, heavy shocks, excessive vibrations and high stresses, for the period of time necessary to develop the desired properties of the concrete.

The curing period will begin following the placement of the concrete in the section cast. It shall be the responsibility of the Contractor to ensure that the system of curing and protection is properly planned, constructed and maintained throughout the entire curing period.

211.15.02 Acceptable Methods and Procedures. Acceptable curing methods and procedures shall include the following:

• concrete surfaces shall be cured for a period of seven consecutive uninterrupted twenty-four hour periods, however, if the Ministry Representative has accepted the use of high-early strength cement(HE), this period may be reduced as permitted by the Ministry Representative.

• surface temperature maintained between 10oC and 35oC, unless high-temperature curing (i.e., by hot blankets or steam) is acceptable to the Ministry Representative.

• hot weather and cold weather special requirements are covered by Subsections 211.18 and 211.19. The determination and recording of air and concrete temperatures to verify compliance with the requirements for hot and cold weather concreting shall be the responsibility of the Contractor. The location and methodology for the determination and recording of temperatures shall be acceptable to the Ministry Representaive.

• formed concrete protection, with form-work left in place during the curing period (usually seven days), is generally not necessary except during extremes of hot or cold weather temperatures. Where formwork is removed before the end of the curing period, the concrete shall be protected in the manner specified below for unformed surfaces during the remainder of the curing period

• unformed surface protection using burlap and water or where permitted, other moisture-retaining methods considered adequate to promote curing, shall include the following common methods and requirements:

i) Burlap - Soaking wet burlap of acceptable quality shall be carefully laid on the surface of the concrete as soon as the concrete has set sufficiently to support the burlap without marring the surface. Strips shall be overlapped 150 mm, adequately held down and maintained in place in a thoroughly wet condition throughout the curing period (usually seven days). Wetness of burlap shall be maintained at all times.

ii) Vapour Barrier - Vapour barrier of acceptable quality of opaque white-pigmental 0.10 mm thick ("4 mil") polyethylene sheet, white upper surfaced paper or other permitted material shall be of such size and placement to minimize the number of laps. The material shall be laid, lapped and held down around the edges and at the laps:

• to prevent displacement

• to provide and maintain an effective vapour barrier

• prevent any flow of air between the vapour barrier material and the concrete

• kept in place throughout the curing period (usually seven days).

However, the barrier material shall not be pulled tight against the fresh concrete surface so as to smooth the required surface texture.

211.15.03 Removal of Protective Materials. Protective materials shall be removed entirely from all concrete surfaces at the end of the curing period and the surfaces left clean.

211.16 Dimensional Tolerances. Dimensional tolerances shall be as shown in Table 211-M.

Page 196: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (22 of 32) 2006 BC MOT

NOTE: The tolerances listed in Table 211-M are acceptable only in so far as they do not prevent the proper fit of structural members.

Table 211-M DIMENSIONAL TOLERANCES

Trueness of bearing surfaces such that there is no gap over 1 mm under a 1 m straight edge

Trueness of bridge deck surfaces such that there is no gap over 3 mm under a 3 m straight edge

Trueness of slope pavement surfaces such that there is no gap over 12 mm under a 3 m straight edge

Trueness of other surfaces exposed to view such that there is no gap over 12 mm under a 3 m straight edge

Curbs and parapets such that there is no gap over 3 mm under a 3 m straight edge

Horizontal distance to concrete surfaces ±50 mm

Elevations of concrete surfaces except bearings and decks

±25 mm

Elevations of bridge deck surfaces ±15 mm

Elevations of bearing surfaces ±5 mm

Variation from plumb 1:400, but not more than 30 mm

Dimensions of members over 10 m ±25 mm

Dimensions of members under 10 m -6 mm, +15 mm

Location of anchor bolts ± 6 mm

Projections of anchor bolts, other embedments ±13 mm

211.17 Finishing Formed Surfaces.

211.17.01 Class 1 Finish. Class 1 Finish is the basic finish to be produced on all formed surfaces not exposed to view unless a better finish is specified or required by the Drawings or Special Provisions.

In order to produce a Class 1 finish, the formwork shall be mortar tight. Panel marks and texture are of no importance.

All ties, bolts, nails and other metal specifically required for construction purposes shall be removed or cut back to a depth of 50 mm from the surfaces of the concrete and the resulting holes filled.

No dry ties shall be permitted; form tie rods shall remain embedded and terminate not less than 50 mm from the formed face of the concrete. Removable embedded fasteners on the ends of the rods shall be such as to leave holes of a regular shape for reaming and filling.

Page 197: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (23 of 32)

Honeycombs and voids over 500 mm² in area shall be filled. Honeycombs and voids shall not be repaired until inspected by the Ministry Representative as special methods of repair may be required where occurring in structural elements. Otherwise, concrete surfaces shall be repaired as follows:

• remove all porous concrete by cutting 20 mm into sound concrete

• thoroughly clean reinforcing steel without damaging same

• cut edges of cavities as nearly perpendicular to the concrete surface as possible and deep enough to hold the patching mortar

• keep surrounding concrete saturated for 30minutes before patching

• after the sheet of free water has disappeared from the concrete surfaces, apply a latex bonding agent, in strict accordance with the manufacturer's instructions,

• patch with mortar, proportioned as specified in Subsection 211.17.05 and mixed with the minimum amount of water necessary to make a workable paste: for voids deeper than 10 mm, multiple layers of mortar each with a maximum thickness of 10 mm shall be used with 30 minute intervals allowed between layers

• trowel the surface of the patch flush with the surface of the surrounding concrete.

211.17.02 Class 2 Finish. Class 2 Finish is to be produced on all formed surfaces exposed to view from a moderate distance, such as surfaces of abutments and piers, and to any surfaces for which a Class 2 finish is specified or required by the Drawings or the Special Provisions. A Class 2 finish shall provide surfaces of uniform colour and texture as viewed from 25 m.

In order to produce a Class 2 finish, formwork shall be mortar tight and shall render a true surface. Fins 3 mm wide (maximum) shall be allowed at the panel joints; however, sheathing joints must be mortar tight. Irregularities of 3 mm in height with areas of 50 mm x 75 mm shall be allowed to a maximum of four such areas per 3 m² of formwork. Patches of dissimilar material will not be permitted. Horizontal and vertical joints shall be aligned.

All ties, bolts, nails and other metal specifically required for construction purposes shall be removed or cut back to a depth of 50 mm from the surfaces of the concrete and the resulting holes filled.

No dry ties shall be permitted; form tie rods shall remain embedded and terminate not less than 50 mm from the formed face of the concrete. Removable embedded fasteners on the ends of the rods shall be such as to leave holes of a regular shape for reaming and filling.

Honeycombs and voids over 25 mm diameter shall be filled, and all bugholes over 5 mm diameter shall be pointed. All fins and projections shall be removed with a hand stone or power grinder. The use of a power grinder shall be kept to a minimum and confined to the areas required.

When a rubbed finish is not called for, patches shall be textured with a mortar float or lightly brushed after trowelling smooth.

Where more than 50 voids or bugholes over 5 mm diameter occur per square metre, or if the surfaces are not acceptably uniform in colour or texture, the entire area affected shall be given a rubbed finish, as follows:

• allow patches to attain an initial set

• keep surfaces saturated with water for 60 minutes before applying mortar

• remove free water from surfaces

• apply mortar, proportioned as specified in Subsection 211.17.05 and mixed at least 60 minutes before application, to the concrete surfaces with a sponge, float or a hand carborundum stone, and work mortar well into the surfaces

• allow mortar to dry 30 - 60 minutes

Page 198: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (24 of 32) 2006 BC MOT

• remove residues from the surfaces by rubbing with clean dry burlap but with no addition of neat cement to the surface during the "sacking" operation and finally cure the surfaces as specified in Subsection 211.15.

211.17.03 Class 3 Finish. Class 3 Finish is to be produced on all formed surfaces exposed to view from close distances, such as surfaces of curbs and parapets, and to any surfaces for which a Class 3 finish is specified or required by the Drawings or Special Provisions. A Class 3 finish shall provide surfaces of uniform colour and texture when viewed from less than 15 m.

In order to produce a Class 3 finish, the formwork shall render a true smooth surface, free from fins and projections. New plywood or steel is necessary to produce the required finish. Re-use of plywood forms will be permitted only if in an "as new" condition. Repairs to the forms shall be with full panels of sheathing only.

All ties, bolts, nails and other metal specifically required for construction purposes shall be removed or cut back to a depth of 50 mm from the surfaces of the concrete and the resulting holes filled.

No dry ties shall be permitted; form tie rods shall remain embedded and terminate not less than 50 mm from the formed face of the concrete. Removable embedded fasteners on the ends of the rods shall be such as to leave holes of a regular shape for reaming and filling.

Patching shall be:

• patch installation projecting slightly from the surrounding concrete surface

• after 24 hours, saturated and carefully finished to render the surfaces of the patch true to the surrounding concrete, but any grinding using a hand carborundum stone kept to a minimum

When a rubbed finish is required, the applied mortar shall be carefully worked into the surface area being finished and, using a hand carborundum stone manipulated in a circular motion, the entire surface rendered true and smooth with all excess mortar removed.

211.17.04 Class 3 Finish Alternative Procedures. Class 3 Finish alternative procedures when, in the opinion of the Ministry Representative, the formwork may safely be removed at an early age and the concrete finished while still partly plastic, shall include the following:

• careful removal of the formwork when the concrete has sufficiently hardened so as to hold its shape

• finishing the surfaces immediately (within 4 to 8 hours of casting, depending upon weather)

• careful rubbing of the concrete surfaces with a carborundum stone, occasionally wetting same to produce a paste from the surface of the concrete

• rubbing continued, adding necessary sand-cement mortar in small quantities to fill voids, until all voids and form marks are removed

• surface curing as specified.

Modifications to the surface texture shall be achieved by grinding or other means.

211.17.05 Patching Mortar. Patching mortar where specified above shall be constituted as follows:

Cement: 60% Normal Portland

40% White Normal Portland

Liquid: 70% Water

30% Latex Bonding Agent

Sand: Passing a 1.25 mm sieve

NOTE: Cement blend above may be adjusted to provide close match to the concrete colour.

211. 18 Hot Weather Concreting.

Page 199: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (25 of 32)

When ambient air temperature is 25oC or higher or there is a probability of it rising to 25oC during the placing period (as forecast by the nearest official meteorological office), hot weather concreting procedures as outlined below, shall be used, for all concrete other than deck concrete. Additional requirements for hot weather concreting for bridge decks including diaphragms, bridge parapets, bridge medians, bridge sidewalks and approach slabs are given in Standard Specification Section 413, Bridge Decks and Concrete Overlays.

Prior to the placement of concrete, the Contractor shall submit to the Ministry Representative for acceptance, the proposed placing operations complying with the requirements for hot weather concreting.

Curing shall be accomplished by water spray or by using saturated absorptive material, such as burlap.

Formwork, reinforcement and concreting equipment shall be protected from the direct rays of the sun or cooled by fogging and evaporation.

Concrete for piers, abutments and footings of bridges shall not have a temperature greater than 25oC at any time prior to placement and curing.

The initial temperature of concrete prior to placement may be estimated from the temperatures of its ingredients by using the following equation:

T = 0.22(TaMa+TcMc)+TwMw+TwaMwa

0.22(Ma+Mc)+Mw+Mwa

where Ta, Tc, Tw and Twa

= temperature in oC of aggregates, cementing materials, added mixing water, and free water on aggregates, respectively

where Ma, Mc, Mw and Mwa

= mass in kilograms of aggregates, cementing materials, added mixing water, and free water on aggregates, respectively

If deemed necessary, the Contractor shall employ the following hot weather concreting procedures to reduce the concrete temperature:

a) Mixing Water

• Shading of storage tanks and water supply lines;

• Refrigeration of mixing water; and/or

• Adding cubed, shaved or chipped ice directly to the concrete mixer drum, and ensuring ice is of a particle size to be completely melted before the concrete is discharged from the mixer drum for placement.

b) Aggregate

• Shading of coarse and fine aggregate stockpiles; and/or

• Wetting of coarse aggregate and allowing time for drainage of free water.

• Note that wetting down of stockpiles of fine aggregate is not permitted.

c) Mixing: Mixing time should be kept to a minimum, allowing adequate time for complete mixing of the concrete. The external surface of the mixing drum should be frequently wetted down.

d) Placing: Production of concrete during hot weather shall be scheduled for a continuous supply of concrete at the job site.

Adequate manpower, equipment and standby provisions shall be provided in order to place and consolidate the delivered concrete within 45 minutes after initial mixing. Further, the time interval between placing batches shall

Page 200: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (26 of 32) 2006 BC MOT

not exceed 30 minutes.

Time of placement extensions during hot weather concreting may be considered by the Ministry Representative and may require the use of Hydration Stabilizing Admixtures (HSA’s) conforming to the requirements of ASTM C494 Type B, Retarding or Type D, Water-Reducing and Retarding Admixtures. Use of HSA’s shall be in accordance with SS211.08.02.

For large unformed surfaces, the quantity and rate of placing of concrete shall be dependent upon the rate of finishing and climatic condition.

When the rate of evaporation from unformed surfaces as estimated from Drawing SP211-01 "Surface Evaporation Rate" exceeds 1.0 kg/m²/hr, either concrete operations shall cease or, upon acceptance of the Ministry Representative, necessary precautions taken to prevent plastic shrinkage as detailed in CSA A23.1 Section 7.4.2.2.

e) Curing during hot weather shall be commenced as soon as possible.

Forms shall be kept moist and loosened as soon as this can be done without structural damage, with a flow of water introduced and allowed to run down inside.

Newly exposed concrete surfaces shall be protected from premature drying by the application of pre-wetted curing materials or a continuous water spray as the forms are removed.

Large exposures of concrete require special precautions as follows:

• burlap application commenced as soon as the surface will support the mass without excessive deformation, with this surface kept continuously wet by fog spraying until a waterproof barrier is securely in place

• concrete under the curing blanket is not allowed to dry out for a minimum of seven days from the time of initial covering, necessitating frequent checking and soaking by the addition of water under the top evaporation barrier

• wet curing followed by the removal of the evaporation barrier only under such conditions that the wetted burlap is permitted to dry slowly before removal and the surface is exposed to prevent excessive thermal shock.

211.19 Cold Weather Concreting. Cold weather concreting procedures shall be used when the ambient temperature is, or is forecast to be, below 4oC during placement, and/or is forecast to fall below 4oC during the first seven days after placing. The Contractor shall be fully responsible for the protection of concrete during cold and adverse weather conditions and shall maintain a minimum concrete temperature of 10oC for a minimum of seven continuous days. Prior to the placement of concrete, the Contractor shall submit to the Ministry Representative for acceptance, the proposed placing operations complying with the requirements for cold weather concreting. The following provisions for cold weather concreting shall apply:

a) All aggregate and mixing water shall be heated to a temperature of at least 20oC but not more 65oC. However, the temperature of the combined water and aggregates shall not exceed 40oC when combined with the cement. The temperature of the concrete shall be between 10oC and 25oC at the time of placement.

b) Aggregates shall be heated to eliminate frozen lumps, ice and snow without overheating or excessive drying. Aggregates shall not be heated above 65oC, and all lumps of frozen aggregate shall be excluded from the mix.

c) Formwork, Reinforcing Steel: Before any concrete is placed, all ice, snow or frost shall be completely removed from the forms and the temperature of contact surfaces raised to a minimum of 5oC, with such minimum established and maintained for at least one hour prior to placement.

Heat shall be applied uniformly and at a rate which will not induce excessive thermal stresses in the section being heated. Ambient air temperatures shall not exceed concrete temperatures by more than 13oC and shall be raised at a maximum rate of 2oC/hr.

Projecting reinforcing steel shall be insulated when temperatures are between 0oC and -10oC for a minimum of

Page 201: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (27 of 32)

300 mm away from the fresh concrete and for a minimum of 600 mm when temperatures are below -10oC.

d) Other Contact Surfaces: Concrete shall not be placed on frozen surfaces except in pile founded footings where a minimum layer of 25 mm rigid insulation shall be installed. Rock surfaces shall be heated by forced air. Heating shall continue until all standing frost crystals are dissolved. Frozen embankment shall be thawed and recompacted prior to placing concrete thereon. The temperature of existing concrete work shall be raised to a minimum of 5oC and maintained at this temperature for a time sufficient to raise the entire mass of concrete to this temperature.

e) Curing and Protection necessary to maintain a minimum concrete temperature (10oC) shall be provided throughout the curing period.

Heated enclosures shall be kept at 95% minimum relative humidity. Concrete surfaces shall be protected by formwork or impermeable membranes from direct exposure to the combustion gases of heating. The use of salamanders, coke stoves, oil or gas burners and similar spot heaters which have an open flame and intense local heat is prohibited without the Ministry Representative’s acceptance. The enclosed air temperature shall not be less than 10oC nor more than 26oC.

Where practical, insulated forms, capable of maintaining the surface of the concrete at not less than 10 oC for a period of seven days, may be used instead of enclosures and heating. If forms are insulated, exposed horizontal surfaces shall be protected with a similar layer of the insulating material securely fastened in place. If the insulated forms do not maintain the proper temperature at the concrete surface, auxiliary protection shall be used to provide additional heat as described above.

The determination and recording of air and concrete temperatures to verify compliance with the requirements for cold weather concreting shall be the responsibility of the Contractor.

The Contractor is responsible for furnishing and using a 24-hour minimum/maximum or continuous temperature recording thermometer to record the air temperature within the enclosure and/or insulated forms. Daily records shall be submitted to the Ministry Representative upon request.

At the end of the curing period, heating and protection shall be withdrawn in such a manner so as not to induce thermal shock stresses in the concrete. The temperature of the concrete shall be gradually reduced at a rate not exceeding 10oC per day to that of the surrounding air. To achieve this, in a heated housing, the heat shall be slowly reduced and then shut off, and the whole housing allowed to cool to air temperature before the housing itself is removed. However, the protection shall not be removed until the temperature of the concrete has fallen to within 10oC of the temperature of the outside air.

211.20 Underwater Concreting. Underwater concreting procedures shall be used when structures, or parts of structures, are to be constructed under water. The concrete, methods of placement either by pumping or tremie pipes, and equipment shall be in accordance with the following, or as otherwise directed by the Ministry Representative:

a) Proposals outlining procedures shall be submitted for review to the Ministry Representative 3 weeks prior to placement of concrete. Placement shall comply with the provisions of the proposal.

b) Materials shall conform to the requirements of Subsection 211.04, except that coarse aggregates shall contain not more than 25% angular particles by mass.

c) Mix proportions shall be as specified in Subsection 211.03, except:

• cement content not less than 400 kg/m³

• water-cement ratio no greater than 0.40

• slump of 150 mm ±20 mm

• admixtures used to achieve plastic, cohesive and flowable concrete if acceptable to the Ministry Representative

• retarding type admixture if accepted by the Ministry Representative shall be used to prevent the formation of

Page 202: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (28 of 32) 2006 BC MOT

cold joints with the lift method of placement or where the concrete surface area is large.

d) Heating of water or aggregates or both, to obtain a suitable placing temperature, shall be done in accordance with Subsection 211.19. Concrete, when mixed, shall have a temperature of between 15oC and 25oC and shall not be placed in water having a temperature less than 2oC.

e) Cofferdams or forms into which concrete is to be placed shall be sufficiently tight to prevent the loss of mortar and, if in running water, reduce the velocity of flow within the cofferdam or forms to not more than 3 m per minute. Dewatering will not be permitted until at least 24 hours after concreting has been completed.

f) Pumping and tremie pipe requirements shall be as follows:

• length sufficient to reach the lowest point of deposit but held 150 mm to 250 mm above the bottom of the placement

• submerged into the placed concrete and held in a near vertical position at all times

• supported in such a manner to allow vertical movement

• discharge at locations not farther apart than 7 m

• discharge end fitted with a 3 m section of steel pipe

• fed by either chutes or pumps with a continuous flow of concrete.

g) Priming of tremie pipes shall be by inserting a plug of burlap, 25 mm less in diameter than the tremie pipe, in the top of the pipe and carefully controlling concrete flow as the plug passes through the pipe. Where priming is lost, the priming procedure shall be repeated.

h) Concrete flow, once begun, shall be continuous through the pipe, at a minimum of 15 m³ of concrete supplied to each tremie or pump per hour, but controlled so as not to overflow the feed hopper. The flow of concrete shall be continuous to the end of the batch and the pipe lowered in the placed concrete to maintain its prime.

i) Placement of concrete underwater shall be either to the full depth of placement or in lifts and shall conform to the following requirements:

• seals shall be placed by beginning at one end and continuing until final grade is achieved

• point of placement shall be relocated by approximately 3 m, either laterally or longitudinally and placement continued to grade

• above procedures repeated to the completion of the seal or when the lift method of placement is used

• flow of concrete shall be regulated to produce approximately horizontal surfaces

• each lift placed before the preceding lift has taken initial set

• depth and area of each lift dependent upon the rate of placement.

Concrete in its plastic state shall not be disturbed either directly or indirectly by puddling or vibration.

Should interrupted placement be sufficient for the concrete to take initial set, the laitance shall be removed from the concrete surface before concreting is resumed, but with the resumption of concreting delayed indefinitely, laitance shall be removed not later than 36 hours after the interruption.

211.21 Measurement and Payment.

211.21.01 Formwork. Payment for formwork will be made at the Unit Prices bid per square metre. Payment shall be for the supply, construction and removal (if required) of formwork, and for the finishing, as required, of formed surfaces. Areas shall be measured of the faces of forms in contact with the concrete.

Payment will be made for forming one face of vertical construction joints which are shown on the Drawings or ordered by the Ministry Representative. No payment will be made for forming construction joints not so required.

Page 203: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PORTLAND CEMENT CONCRETE SECTION 211

BC MOT 2006 211 (29 of 32)

Payment will be made for forming both faces of joints formed by casting in sheets of styrofoam or other material, where such joints are required by the Contract Documents.

Payment will not be made for forming surfaces which are cast against permanent embedded items which are paid for separately.

Upper surfaces which form an angle of 45o or less with the horizontal, will not usually be considered to be formed surfaces.

The undersides of members which are shown on the Drawings to rest on ground or fill will not be considered formed surfaces. The undersides of members which are not shown on the Drawings to rest on ground or fill will be considered formed surfaces.

Where sides of footings or faces of walls are cast against ground or fill (if permitted by the Ministry Representative) the surfaces so formed will be considered formed surfaces. Only the areas of the surfaces shown on the Drawings will be paid for.

Progress payments will be made according to Table 211-N.

TABLE 211-N PROGRESS PAYMENTS

Progress Payments

Application

60% for formwork in place

20% For Formwork removed

20% For surface finishing completed

211.21.02 Concrete. Payment for concrete will be made at the Unit Prices bid per cubic metre (or at a reduced price for understrength concrete-see third paragraph of this subsection) prorated at 90% for the supply, transportation, placing, and finishing (except the finishing of formed surfaces) of concrete, and for everything supplied and done in connection therewith, except formwork and reinforcing steel. Payment for curing, prorated at 10% will be made pending satisfactory completion of the specified curing process. No payment will be made for partial curing. Failure to comply strictly with the specified curing process will result in forfeiture of payment for curing. The Ministry Representative shall take measures as required to provide the specified curing. Should the cost of these measures exceed the monies recovered from the forfeiture of curing payment, the balance will be deducted from the remaining payment for concrete. Payment for concrete shall include cement.

Payment shall also include all costs associated with quality control.

Measurement of volume will be made to the surfaces shown on the drawings or ordered by the Ministry Representative. Deductions will be made of the volumes of embedded ducts, timbers, etc., but not of the volume of reinforcing steel. No payment will be made for concrete placed outside the surfaces shown or ordered, as to fill spaces left by over excavation or irregularities in excavation. The reduced price to be paid for understrength concrete shall be calculated by the following formula:

P x SS = P U

SP

AVR

where PR = reduced price

Page 204: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

211 (30 of 32) 2006 BC MOT

PU = bid price

SSP = specified strength

SAV = the lowest average of three consecutive strength tests for one classification of concrete within the same structural element. Where less than three strength tests are taken, the results shall be the average of all the actual strength tests taken.

See Subsection 211.09.07 for circumstances under which a reduced price will be paid. Where a reduced price is paid, it will be applied to all of the concrete in the applicable pay item.

Page 205: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 206: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 211 PORTLAND CEMENT CONCRETE

BC MOT 2006 211(32 of 32)

THIS PAGE LEFT INTENTIONALLY BLANK

Page 207: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 213

TIMBER BRIDGES - CONSTRUCTION

213.01 Materials - All materials shall be of the quality, grade and finish as shown on the bills and drawings and shall conform to the requirements of the Sections 903, 904, 905 and 908 that are relevant.

213.02 Logs for Cribs and Log Stringers - Logs for cribs shall be cut from live trees and shall be peeled before use.

Stringers shall be cut from live trees not less than 30 days before use and shall be seasoned with the bark on. Immediately before use in the work, all bark shall be peeled and the log trimmed smooth of all knots and projections.

213.03 Work Practice - The standard of work shall be first-class throughout and in accordance with the best modern practice.

213.04 Handling and Storing Materials - All materials shall be handled with reasonable care. Timber shall not be bashed, cut or punctured or otherwise damaged.

Dogs, hooks, peavies or other equipment shall not be used on the side surfaces of treated timber. All handling of treated timber with pointed tools shall be confined to end grain and shall be such as to avoid damage of the original pressure-treated surface.

Subject to the approval of the Ministry Representative, the Contractor shall make good any superficial damage of treated timber by the methods outlined in the current edition of C.S.A. 080 Specification for Wood Preservation. Timber which, in the opinion of the Ministry Representative, cannot be made good by such methods will be rejected.

Minor damage to untreated timber shall be repaired and severely damaged pieces will be rejected.

When unloading at the site of the work, the various pieces shall be sorted and stacked in such a manner as to require a minimum of rehandling before being placed in the structure.

Level ground cleared of snow, brush and weeds shall be provided for stacking the timber. The timber shall be placed on blocking to raise it above the ground.

The Contractor shall make good, at the Contractor's expense, any damage to materials supplied by the Ministry after having taken delivery of same.

213.05 Framing - Framing shall be first class in every respect and performed by skilled workers only. No open joints, blocking or shimming of joints will be allowed. Daps, gains and dove-tails in trestles, culverts, cribs, etc. may be finished with an adze, but all joints shall go together without pounding or excessive cramping up and have full bearing in contact.

Holes shall be bored with an auger to the sizes shown in Table 213-A.

Spikes that are likely to crack or unnecessarily damage the timber shall have holes bored 1/16" small.

213.06 Field Treatment - Unless so specified, treated timber shall not be cut or dapped except for cutting to length. Cut ends and specified cuts and daps of treated timber (except piles) shall be given three coats of the same preservative used in the treatment; creosote, if used, shall be hot.

The heads of all treated piles, after cut-off, shall be covered with alternate layers of hot roofing pitch and loosely

BC - MOT 2006 213 (1 of 4)

Page 208: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 213 TIMBER BRIDGES - CONSTRUCTION

woven fabric using four applications of pitch and three layers of fabric.

The fabric shall measure at least six inches more in dimension than the diameter of the pile and shall be neatly folded down and secured by large-headed galvanized roofing nails or by binding with not less than seven complete turns of galvanized wire securely held in place by large-headed galvanized roofing nails or staples. The edges of the fabric projecting below the fastening shall be neatly trimmed.

The heads of all untreated piles, after cut-off, shall be thoroughly swabbed with three coats of hot creosote oil and if they are to be capped, they shall also be coated with hot roofing pitch.

All bolt holes drilled in the field in treated timber shall be treated with hot creosote oil applied with an approved pressure bolt hole treater.

All surfaces in contact and all bolt holes in untreated timber shall be swabbed with a water-borne preservative.

TABLE 213-A HOLE SIZES

FIR AND HARD-WOODS CEDAR AND SOFT-WOODS

BOLTS 1/16" Large Same size as bolt

DRIFT BOLTS Same size as bolt 1/16" Small

DOWELS 1/16" Large for ends of posts, but in sills make same size as dowel

1/16" Large for ends of posts, but in sills make same size as dowel

213.07 Preparation of Laminated Decks for Wearing Surface

213.07.01 For Asphalt Plank - Depressions in laminated decks shall be levelled by placing and compacting a fine sand levelling course.

The levelling course shall consist of a mixture of fine durable sand conforming to the gradation shown in Table 213-B.

The sand shall be thoroughly mixed with asphalt emulsion, Type SS-1 which shall conform to the requirements of Subsection 951.17. The asphalt emulsion content shall be such that an air void content of 5% to 8% in the compacted mixture is obtained. This will normally require an asphalt emulsion of 15% to 25% by weight of the total mixture.

TABLE 213-B CONSISTENCY OF THE LEVELLING COURSE

U.S. STANDARD AND ASTM SIEVE SIZES

PERCENTAGE PASSING BY WEIGHT (%)

#8 100

#16 100 - 60

#30 80 - 46

#50 62 - 35

#100 46 - 25

#200 35 - 18

Before laying and nailing asphalt plank, laminated decks shall be swabbed with oxidized mopping asphalt Type 2 conforming to the requirements of Table 213-C.

213.07.02 For Asphalt - Prior to placing asphalt wearing surface, creosote-treated laminated decks shall be lime-scrubbed where creosote oil has "bled" to the surface.

To prevent "bleeding" of the creosote oil, the mix temperature of hot-mix asphalt placed on these decks shall be as low as is practicable.

213 (2 of 4) 2006 BC - MOT

Page 209: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TIMBER BRIDGES - CONSTRUCTION SECTION 213

213.08 Basis of Payment - Payment will be made at the unit prices bid, for the various items in the Schedule of Approximate Quantities and Unit Prices, for material remaining in and forming a part of the finished structure. Such payment shall be accepted as full compensation for all labour, equipment, tools, materials, including hardware and furnishing and placing all other items required to complete the work.

TABLE 213-C REQUIREMENTS FOR OXIDIZED MOPPING ASPHALT TYPE 2

TEST DESCRIPTION ASTM TEST

TYPE 2

METHOD MINIMUM MAXIMUM

Softening Point (R & B), oF D36 165 175

Flash Point, C.O.C., oF D96 450 ---

Penetration @ 32oF D5 12 20

Penetration @ 77oF D5 20 35

Penetration @ 115oF D5 --- 70

A.P.I. Gravity @ 60oF D71 4.6 5.8

Ductility @ 77oF, 5 cm minimum D113 3 ---

Loss on Heating to 325oF, 5 hr., % D6 --- 0.3

Penetration of Residue, % of original D5 80 0

Total Bitumen (soluble in CS2) %: Mineral Stabilized Asphalt D4 80 ---

Total Bitumen (soluble in CS2) %: Asphalt Without Mineral Stabilizer D4 99 ---

Proportion of Bitumen Soluble in CCl4 99.5 ---

BC - MOT 2006 213 (3 of 4)

Page 210: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 213 TIMBER BRIDGES - CONSTRUCTION

213 (4 of 4) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 211: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 214

TIMBER PILING CONSTRUCTION

214.01 Materials - All piling shall conform to requirements of Section 906, Round Timber Piles, and where specified to Section 908, Preservative Treatment.

214.02 Pile Lengths - When supplied by the Contractor, piles shall have minimum lengths in accordance with those listed on the Ministry's drawings or bills of materials. At the Contractor's expense, allowances will be made for such additional lengths of pile as may be required to provide fresh heading and to suit the method of operation.

Pile lengths determined by the Ministry, whether for its or the Contractor's supply, are those expected to remain in the completed structure plus 600 mm for cut-off, except for end bearing piles where the allowance for cut-off and bearing depth irregularity is 3.5 m.

214.03 Handling of Piles - The use of dogs, hooks, peavies or any other equipment which may damage the round surface of a treated pile will not be permitted.

Pointed tools used in the handling of treated piles shall be confined to end grain.

During lifting, long piles shall be supported at a sufficient number of points, properly located, to prevent damage due to excessive bending.

Subject to the approval of the Ministry Representative, the Contractor shall make good any superficial damage of treated piles by the methods outlined in the current edition of CSA 080 Specifications for Wood Preservation. Piles damaged by the Contractor, which, in the opinion of the Ministry Representative, cannot be made good by such methods, will be rejected and shall be replaced at the Contractor's expense.

214.04 Hammer - Piles may be driven with a drop hammer or a mechanical hammer. Drop hammers shall weigh not less than 1,400 kg for piles less than 15 m long and not less than 1,600 kg for piles 15 m and over in length, and in no case shall the weight of the hammer be less than the combined weight of driving head and pile. Mechanical hammers shall develop a total energy not less than 3,900 kg per blow.

214.05 Leads - Pile drivers with fixed leads or with hanging or swinging leads that can be held in a fixed position during driving shall be used to drive all piles.

Batter piles shall be driven using leads adaptable to their driving.

When driving treated timber piles, the use of spuds and chocks in the leads shall be kept to a minimum in order that the protective treatment will not become bruised or broken.

214.06 Preparation for Driving

214.06.01 Driving Caps and Bands - The heads of timber piles, when driving is such as to unduly damage them, shall be protected by driving caps of approved design, preferably having a rope or other suitable cushion next to the pile head and fitting into a casting which in turn supports a timber shock block. Alternatively, the pile head may be banded with a pile ring and covered with a steel wire mat. When driving treated piles, a driving cap shall be used.

214.06.02 Pointing - Where soil conditions, in the opinion of the Ministry Representative, require the pointing of piles, the Contractor shall fit the piles with steel points.

Steel points fabricated in accordance with Drawing SP214-01 shall be supplied by the Contractor.

214.06.03 Excavation - Footing excavation and seal excavation, where applicable, shall be completed with any

BC - MOT 2006 214 (1 of 6)

Page 212: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 214 TIMBER PILING CONSTRUCTION

necessary allowance made for upheaval before the driving of footing piles. Should too great an allowance be made, backfilling with gravel will, in general, be permitted to raise the bottom of the excavation to the correct elevation. Any material forced up between the piles to above the footing level shall be removed to the correct elevation. No extra payment will be made for the supply and placing of gravel or any additional excavation to obtain the correct elevation.

214.07 Driving - Unless otherwise specified, all piles shall be driven with the small end downward. The fall of a drop hammer shall be regulated to avoid damage to the piles and under no circumstances shall exceed 3 m.

Each pile shall be square-headed, properly pointed, and set fair in the leads; if it becomes split or broomed on the top it shall be fresh headed.

Piles shall be driven to the minimum depth indicated on the drawings or the supplemental specifications and unless otherwise ordered by the Ministry Representative, to practical refusal, which shall be to the depth at which the piles have a load carrying capacity of 20 tonnes and an average penetration per blow determined by the following formulae:

For drop hammers: For mechanical hammers:

Where: s = average penetration per blow in metres under last 10 blows w = weight of moving part of hammer in newtons h = effective fall of hammer in metres p = allowable load capacity of pile in newtons

Where it is required by the Ministry Representative to penetrate a thin stratum (which may show practical refusal in driving) to obtain greater depth in a less resistant formation, driving shall be continued through the stratum regardless of the definition laid down for practical refusal.

Any pile which, in the opinion of the Ministry Representative, is so damaged in driving as to be unfit for the use for which it is intended, or is so far out of position, or off vertical or designated batter, as to require excessive force or manipulation to restore it to its proper position, shall be withdrawn and replaced by a new pile. If this is not possible, a new pile shall be driven adjacent to the defective pile. The damaged, out-of-position or misaligned piles shall be for the Contractor's account.

Where boulders or other large obstructions make it impossible to drive piles in the location shown on the drawings, the Ministry Representative may direct the Contractor to drive an additional pile, or piles, for which the Contractor will be paid in accordance with the various items of Subsection 214.12 - Payment.

214.08 Additional Equipment - Where, in the opinion of the Ministry Representative, the bounce of the hammer is excessive or where the required depth or resistance is not obtained by the use of a hammer complying with the above minimum requirements the Contractor shall provide a heavier hammer at the Contractor's expense.

214.09 Accuracy of Driving - All piles shall be driven in such manner that any variation from the vertical, or batter as shown on the drawings, shall not exceed 20 mm/m. Piles in trestle bents shall be so driven that the cap may be placed in its proper location without including excessive stresses in the piles. Cutting, springing, dapping or facing-off for placing bracings and planking on piles will not be permitted.

After driving, footing piles shall not be more than 75 mm out of the position shown on the drawings.

s whp= −6 0 03.

s wh

p= −6 0 003.

214 (2 of 6) 2006 BC - MOT

Page 213: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TIMBER PILING CONSTRUCTION SECTION 214

214.10 Pile Heads - The tops of all piling shall be cut off to a true plane as shown on the drawings or as established by the Ministry Representative. Piles shall show a solid head at the plane of cutoff.

Pile heads not encased in concrete shall be protected as follows:

214.10.01 Treated Piles - After cut-off, the pile heads shall be covered with alternate layers of hot roofing asphalt and loosely woven glass fabric, using four applications of asphalt and three layers of fabric.

The fabric shall measure at least 150 mm more in dimension than the diameter of the pile and shall be neatly folded down and secured by large headed galvanized roofing nails or by binding with not less than seven complete turns of galvanized wire securely held in place by large-headed galvanized roofing nails or staples. The edges of the fabric projecting below the fastening shall be neatly trimmed.

214.10.02 Untreated Piles - After cut-off, the pile head shall be thoroughly swabbed with three coats of hot creosote oil and if they are to be capped, they shall also be coated with hot roofing asphalt.

214.11 Surplus Treated Piling - When treated piling is supplied by the Ministry, surplus piling and pile cut-offs designated by the Ministry Representative shall be loaded on to Ministry trucks at the conclusion of the pile driving operation.

Payment for taking delivery, transporting and handling of surplus piling will be made under extra work.

214.12 Payment - When piling is supplied free to the Contractor by the Ministry, payment will be made under items (a), (b), and (d) as follows, and item (c), if applicable.

a) Setting up b) Handling c) Pointing

i) Supply ii) Install

d) Driving

Payment under item (a) will be made at the lump sum bid for providing, setting up and removing the plant and equipment for driving the piles, and shall be accepted as full compensation for everything furnished and done in connection therewith.

Payment under items (b) and (c) will be made at the unit price bid per pile or pile point for the total number of piles or pile points remaining in and forming part of the completed structure, except that only piles and pile points called for on the drawings or ordered by the Ministry Representative will be paid for. Payment shall be accepted as full compensation for all cost in connection with taking delivery, transporting, handling, including loading of salvageable cut-offs and cutting off of piles or with supplying, handling and installing pile points. If pile points are not a bid item and are required, payment for (c) will be for extra work order.

Payment for item (d) will be made at the unit price bid per metre for the total number of metres of piling remaining in the structure for those piles paid for under item (b).

Payment shall be accepted as full compensation for everything furnished and done in connection with the driving of piles.

When piles are supplied by the Contractor, payment will be made for under an additional item, Supply and Delivery. When this item is included, item (b) shall not include payment for taking delivery of the piles.

BC - MOT 2006 214 (3 of 6)

Page 214: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 214 TIMBER PILING CONSTRUCTION

Payment for the item Supply and Delivery will be made at the unit price bid per metre for the total number of metres of piling as shown on the Ministry's drawings or bills of material. Such payment shall be accepted as full compensation for everything furnished and done in connection with the supply and delivery of the piles.

214 (4 of 6) 2006 BC - MOT

Page 215: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 216: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 214 TIMBER PILING CONSTRUCTION

THIS PAGE IS LEFT INTENTIONALLY BLANK

214 (6 of 6) 2006 BC - MOT

Page 217: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 215

BRIDGES

215.01 General - Bridges shall be designed in accordance with the current design codes for highway bridges. Fabrication and erection shall be in accordance with the specifications prepared for the particular structure.

BC - MOT 2006 215 (1 of 2)

Page 218: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 215 BRIDGES

THIS PAGE IS LEFT INTENTIONALLY BLANK

215 (2 of 2) 2006 BC - MOT

Page 219: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 216(1 of 20)

SECTION 216

COATING OF STEELWORK

216.1 Scope -This Section of the Province of British Columbia "Standard Specifications for Highway Construction" covers the operations required for shop, field and/or maintenance coating of structural and miscellaneous steel surfaces. The coating process includes pre-cleaning, surface preparation, coating, and curing of coatings. 216.2 Definitions 216.2.1 Good Painting Practice - The application of generally accepted methods and equipment to clean, contain and coat industrial structures in a safe, practical, environmentally sensitive manner resulting in a long lasting quality protective coating system. These principals are laid out in this Section. Many of the points are drawn from the SSPC (Society for Protective Coatings) publication Steel Structures Painting Manual Volume 1, Good Painting Practice. References are to the current edition unless otherwise stated. These practices are based on experience in the United States and where they conflict with Canadian or British Columbia laws, regulations or guidelines the local regulations shall prevail. 216.2.2 Shop, Field and Maintenance Coating - The series of operations that include the surface preparation, pre-treatment (if required) and application of coatings to structural steel surfaces either in the shop or in field. It also includes the supplying of all labour, equipment and materials. In addition, it encompasses the protection of newly coated surfaces during curing, transport and erection as well as the protection of traffic, property and the environment. Additionally, it also includes the disposal of waste material in accordance with all applicable environmental, fisheries and local regulations and bylaws. 216.2.3 Painting / Coating - The terms painting and coating are considered synonymous for the purposes of this document. Techniques such as metallizing or galvanizing while not typically thought of as painting, are considered here to be painting or coating since they form part or all of a protective system. 216.2.4 Shop Coating - The coating of steel or other components in a shop or plant before shipment to the site of erection. This may include part of a coating system or the whole system including the topcoat. 216.2.5 Field Coating - The coating of steel or components at the place of erection. 216.2.6 Maintenance Coating – The coating of structures in service that have previously been partially or completely coated. The maintenance coating may be one of four general types: 216.2.6.1 Touchup – The cleaning and coating of small selected areas on a structure. Typically, this is used to repair damaged or failed areas of coating. For repairs, sufficient coats are added to bring the new coating up to the level of the existing coating surrounding the repairs. It may also be used as an interim maintenance strategy to extend the lifetime of a coating system overall. 216.2.6.2 Zone Coating – The coating process where specific whole parts of a structure are coated and others are deliberately left. This deals with larger portions of a structure than touchup coating. For example an above deck arch portion of a bridge would be zone coated, but the edges of the flanges would be touched up. Zone coating may use touchup, overcoat, or recoat strategies to meet its objectives. Zone coating also includes coating new steel added to old structures for example steel added for seismic upgrades. 216.2.6.3 Overcoating – The coating of portions of a structure where the structure is touched up, then coated with a topcoat overall. It may include top coating part or all of the structure.

Page 220: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 216 COATING OF STEELWORK

216(2 of 20) 2006 BC – MOT

216.2.6.4 Recoating – The coating process where larger portions of old coating on a structure are removed to bare metal and a completely new coating system is applied over the entire area. 216.2.7 Surface Profile - The surface profile is a measure of the roughness of the prepared surface. The profile is normally measured from surface peak to surface valley and expressed as a range (for example 50 to 75 µm or 2 to 3 mils). Besides the depth, the surface profile is dependant on the grit type used to create it. Mineral abrasives such as sand, slag, garnet, etc. produce a ‘sharp’ profile. Steel shot produces a rounded profile unless mixed with 15% steel grit. Normally the surface profile is specified as both a depth and a sharpness. 216.2.8 Containment / Hoarding - The process of encapsulating the work site so that hazardous or nuisance materials cannot escape to the surrounding environment. SSPC Guide 6 Guide for Containing Debris Generated During Paint Removal Operations specifies types and levels of containment necessary for various cleaning operations. 216.2.9 Ambient Conditions - Ambient conditions refer to such things as wind, relative humidity, dew point, air temperature, substrate temperature etc. that affect the cleaning, application, and curing of coatings. They are very important in obtaining a properly adhered, long lived coating. All coating works shall be within the specified parameters as given in 216.8.4, 216.8.5 and 216.8.9. Where ambient environmental conditions do not fall within these conditions, coating work may continue if the conditions are being met within the containment. This may mean extra hoarding, dehumidification, ventilation and/or temperature control for the duration of cleaning, application and curing of the coating system. It is worthy of note that some coatings are designed to apply in conditions outside those mentioned above. These coatings and their conditions of use will be individually considered for use. 216.3 Reference Standards - It is recognized that standards are changed or amended from time to time. All specifications mentioned shall be the current editions at the date and time of contract signing unless a specific edition of a reference or standard is stated here or in the Contract Special Provisions. 216.3.1 British Columbia Ministry of Transportation 216.3.1.1 Recognized Products List (RPL) - The Ministry publishes a Recognized Products List of products. This is available on the Ministry website at: http://www.th.gov.bc.ca/publications/eng_publications/geotech/Recognized_Products_Book.pdf Only those coating systems listed in SS308 and under the heading of “Coating Systems” in the RPL or as otherwise specified in the Special Provisions or on the Drawings shall be used on Ministry Projects. The Ministry may, at its sole discretion, designate alternative materials to fit a unique situation. 216.3.2 SSPC - Society for Protective Coatings - The SSPC publishes two volumes: SSPC Painting Manual Volume 1, Good Painting Practice and SSPC Painting Manual Volume 2, Systems and Specifications, which lay out the basics for painting steel structures. The following SSPC standards and guidelines shall apply unless noted otherwise. 216.3.2.1 Surface Preparation Standards 216.3.2.1.1 General - SSPC-SP COM Surface Preparation Commentary for Steel and Concrete Substrates. 216.3.2.1.2 Visual Standards: Guide to SSPC-VIS 1, Visual Standard for Abrasive Blast Cleaned Steel

Page 221: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING OF STEELWORK SECTION 216

BC - MOT 2006 216 (3 of 20)

Guide to SSPC-VIS 2 Standard Method of Evaluating Degree of Rusting on Painted Steel Surfaces Guide to SSPC-VIS 3 Visual Standard for Power and Hand Tool Cleaned Steel Guide to SSPC-VIS 4/NACE No. 7 Guide and Visual Reference Photographs for Steel Cleaned by Water Jetting SSPC-VIS 5/NACE VIS 9 Guide and Reference Photographs for Steel Surfaces Prepared by Wet Abrasive Blast Cleaning 216.3.2.1.3 Surface Cleaning Standards: SSPC-SP 1 Solvent Cleaning SSPC-SP 2 Hand Tool Cleaning SSPC-SP 3 Power Tool Cleaning SSPC-SP 5/NACE No. 1 White Metal Blast Cleaning SSPC-SP 6/NACE No. 3 Commercial Blast Cleaning SSPC-SP 7/NACE No. 4 Brush-off Blast Cleaning SSPC-SP 10/NACE No. 2 Near-White Blast Cleaning SSPC-SP 11 Power Tool Cleaning to Bare Metal SSCP SP 12/NACE No. 5 Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultrahigh-Pressure Water Jetting Prior to Recoating SSPC-SP 13/NACE No. 6 Surface Preparation of Concrete SSPC-SP 14/ NACE No. 8 Industrial Blast Cleaning SSPC-SP 15 Commercial Grade Power Tool Cleaning 216.3.2.2 Abrasive Specifications: SSPC-AB 1 Mineral and Slag Abrasives SSPC-AB 2 Cleanliness of Recycled Ferrous Metallic Abrasives SSPC-AB 3 Newly Manufactured or Remanufactured Steel Abrasives 216.3.2.3 Paint Application Standards, Guides and Specifications: SSPC-PA COM Commentary on Paint Application SSPC-PA 1 Shop, Field and Maintenance Painting of Steel SSPC-TU 3 Overcoating SSPC-PA 2 Measurement of Dry Film Coating Thickness with Magnetic Gauges 216.3.2.4 Guides: SSPC - Guide 6 Guide for Containing Debris Generated During Paint Removal Operations SSPC – Guide 12 Guide for Illumination of Industrial Painting Projects 216.3.2.5 Technical Updates: SSPC-TU 4 Field Methods for Retrieval and Analysis of Soluble Salts on Substrates SSPC-TU 6 Chemical Stripping of Organic Coatings from Steel Surfaces SSPC-TU 7 Conducting Ambient Air, Soil, and Water Sampling During Surface Preparation and Paint Disturbance Activities

216.3.2.6 Qualification Procedures - These requirements will be laid out specifically in the Contract for each project and will depend primarily on the work to be done. Contractors may require current certification in one or more of the following levels to perform ministry work as called for in the particular tender. SSPC-QP COM Commentary on Qualification Procedures SSPC-QP 1 Standard Procedure for Evaluating Painting Contractors SSPC-QP 2 Standard Procedure for Evaluation Painting Contractors to Remove Hazardous Paint SSPC-QP 3 Standard Procedure for Evaluating the Qualifications of Shop Painting Contractors NACE Coating Inspection Program Level 2 with Peer Review

Page 222: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 216 COATING OF STEELWORK

216(4 of 20) 2006 BC – MOT

2.16.3.3 Hot Dip Galvanizing CAN/CSA-G164, Hot Dip Galvanizing of Irregularly Shaped Articles 216.3.4 Metallizing CAN/CSA-G189 Sprayed Metal Coatings for Atmospheric Corrosion Protection 216.3.5 Colour Standards - Refer to US Federal Specification 595B Colors. Topcoat colours shall be in accordance with the Special Provisions and/or the Drawings or as determined by the Ministry Representative. 216.4 Environmental Considerations 216.4.1 General - All coating works including preparation shall comply with SS 165, Protection of the Environment. 216.4.2 Environmental Agencies Affected - Depending on the Work, some or all of the following Environmental Agencies and other affected parties have interests and may need to be contacted for their input to the Work. The list below is not exhaustive. 216.4.2.1 Federal: Fisheries and Oceans Canada Environment Canada Port Authorities 216.4.2.2 British Columbia: Ministry of Water Land and Air Protection (WLAP) Provincial, Municipal or Private Utilities if Affected Railways if Affected Aboriginal Bands if Affected Water User Groups if Affected Other Affected Parties, as necessary

The various parties’ interests vary from legislated involvement to public or private interest in the portion of the environment potentially affected by the coating project. It is the Contractor’s responsibility to liaise with all the affected parties and to meet the requirements of the relevant authorities. 216.5 Containment of Coating Operations 216.5.1 General - Full containment shall be provided to prevent contamination of the environment. This enables work to be accomplished by physically limiting the spread of debris and facilitates cleanup. Current containment technology is able to contain virtually all debris generated by washing, water jetting, hand, power tool, or abrasive blasting, and coating operations. 216.5.2 SSPC - Guide 6 - Containment shall be provided in accordance with SSPC - Guide 6, Guide for Containing Debris Generated During Paint Removal Operations. In general, the Ministry wishes to minimize the environmental impact of all Ministry coating work. To this end, all coating works shall be fully enclosed to prevent contamination of the environment. The coating specification will contain specific language to exactly determine the desired containment end performance requirements. Containment shall be approved by the pertinent WCB, Environment and Fisheries Authorities. 216.5.3 Containment of Debris and Disposal of Debris - All debris from cleaning and coating operations must be contained in such a way as not to contaminate the environment. All debris shall be contained, tested and

Page 223: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING OF STEELWORK SECTION 216

BC - MOT 2006 216 (5 of 20)

disposed of in accordance with current environmental, fisheries and local regulations. The Contractor shall provide written proof of disposal of all materials including way-bills and transport logs. 216.6 Construction Site Safety 216.6.1 General - General site safety is governed primarily by SS 135 Construction Site Safety. Contractor shall also meet all WCB regulation requirements for work undertaken. 216.6.2 Specific Safety Issues Relating to Bridges and Coating Work 216.6.2.1 Working at Height - All work occurring at height shall conform to all WCB regulation requirements. 216.6.2.2 Lead Paint - Many of the Ministry structures are painted with paint containing lead. While the Ministry will attempt to indicate the presence of paint containing lead, it is the responsibility of the Contractor to ascertain the presence and extent of lead containing paint if any; and to conform to all regulations for work undertaken. This includes but is not necessarily limited to WCB and WLAP regulation requirements for working with, storing, transporting, disposing of and documenting any work process involving lead paint. 216.6.2.3 Enclosed Spaces - Many of the Ministry structures contain enclosed spaces or spaces that the WCB defines as enclosed spaces. In some instances the hoarding or containment is considered an enclosed space. It is the responsibility of the Contractor to ascertain whether or not a space is defined as an enclosed space and to adjust their work procedures to meet all regulation requirements. 216.7 Surface Preparation 216.7.1 General - The useful lifetime of a coating is extended by appropriate surface preparation prior to coating. The Ministry will in its coating Contracts define the quality of surface preparation for a given area to be coated. Where this surface preparation differs from the coating manufacturer’s recommended surface preparation, the Ministry Contract specifications shall be considered correct, but in the case where the coating manufacturer’s specification requires more stringent surface preparation, the Ministry Representative shall make the final decision. Where surface preparation is not defined in the Contract, the manufacturer’s specifications shall be used. 216.7.2 Washing 216.7.2.1 General - Washing is a procedure for removing surface contaminants including oil, grease, drawing and cutting compounds, soil, salts, etc. from either steel or coated surfaces. Removal of the contaminants shall be accomplished by the use of any one or a combination of the following: potable water, alkaline cleaners, solvents, emulsion cleaners, steam cleaning (with detergents), high pressure water, scrubbing (with detergent) or other approved method. Alkaline cleaners, detergents, solvents, etc. shall not be used over streams, lakes, rivers, etc. or agricultural land without first obtaining approval from the Ministry of Water, Land and Air Protection (WLAP) as well as Fisheries and Oceans Canada. The washing procedure shall be conducted so that any part of the structure which has already been cleaned, or newly coated, shall not be contaminated with the cleaning chemicals or solvents. Immediately after treatment with cleaning chemicals, the surfaces shall be thoroughly washed with clean water to remove detrimental residues. 216.7.2.2 Residual Ion Levels - One main reason for washing is to remove residual anions such as chloride and sulphate as well as the ferrous cation and other non-visible contaminants. Currently, low risk levels for most of the

Page 224: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 216 COATING OF STEELWORK

216(6 of 20) 2006 BC – MOT

ions are not well defined, however chloride levels are. Generally levels shall be at or below the SSPC-SP12 NV-2 level, less than 7 µg/cm2 chloride ion, 10 µg/cm2 soluble ferrous ion, and 17 µg/cm2 sulfate, immediately prior to application of coatings when tested by SSPC-TU 4 swabbing extraction method. Chloride levels shall be measured using one of the methods in SSPC-TU 4, and calculated using the formula in Appendix C of that specification. Verification of NV-2 level shall be done prior to surface preparation operations and prior to primer application. 216.7.3 Water Cleaning/Jetting - Water jetting encompasses low pressure water cleaning (LP WC), high pressure water cleaning (HP WC), high pressure water jetting (HP WJ), and ultrahigh pressure water jetting (UHP WJ). SSPC-SP12/NACE No. 5, Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultrahigh- Pressure Water Jetting Prior to Recoating defines specifications for visual and non-visual surface preparation by water jetting. Water jetting is inherently dangerous and safety precautions as listed in SSPC-SP 12 and in SSPC Steel Structures Painting Manual, Volume 1, Good Painting Practice, shall be followed. Where current WCB regulations conflict with SSPC-SP12/NACE No. 5, the WCB regulations shall prevail.Water used in water jetting units shall be clean and free of contaminants that may leave deposits on the surface being cleaned or affect the adhesion of subsequent coatings applied.Water supply to the water jetting units must meet regulations for water taken from streams if on-site water from streams is used. All waste water and coating debris shall be contained and disposed of in accordance with Environmental and Fisheries Agencies or other applicable regulations. Wastewater must meet regulations for disposal on-site if it is to be disposed of on-site. These regulations are typically those of Fisheries and Oceans and WLAP, but may not be limited to those governmental agencies. As well, SS 165 Protection of the Environment, lays out the Contractor Responsibilities. 216.7.4 Manual and Power Tool Cleaning - Manual cleaning is a procedure for removing loose mill scale, loose rust, loose coating and other detrimental foreign matter by chipping, scraping, grinding, and wire brushing, etc. The tools used for this method of cleaning may be either hand or power tools; they shall be of high quality, and maintained in good repair. The standard of cleaning obtained by this method shall be SSPC-SP 2, SP 3, SP 11or SP 15 as specified in the Contract. Where surface preparation is not defined in the Contract, the manufacturer’s specifications shall be used. In specific circumstances the methods available may be limited by the Contract. In all four preparation methods listed above, the surface shall be cleaned of dirt, grease and soluble salts prior to treatment. Heavier layers of rust shall be removed by chipping, before any of the other cleaning tools are used. Finally, all traces of dust shall be removed prior to coating. 216.7.5 Abrasive Blast Cleaning - Abrasive blast cleaning is a procedure for removing mill scale, rust, rust scale, paint or other foreign matter by use of abrasives propelled through nozzles or by centrifugal wheels. It is also used to roughen the surface of the substrate to enhance adhesion. If compressed air blasting is employed, proper line filters and dryers, which remove all oil and water from the air, shall be used. Compressed air shall be periodically tested for presence of these contaminants. The standard of cleaning obtained by this method shall be SSPC SP 5, SP 6, SP 7, SP 10, or SP 14

Page 225: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING OF STEELWORK SECTION 216

BC - MOT 2006 216 (7 of 20)

In all preparation standards, it is assumed that prior to treatment the surface has been cleaned of dirt, oil, grease and soluble salts etc. If necessary, heavier layers of rust shall be removed by chipping before the blast cleaning operation commences. A cleaned and blasted surface shall be coated within a maximum of 8 hours of cleaning and before the surface shows evidence of rust blooming. If either of these criteria is not met, then the surface shall be re-prepared to specification. If a prepared surface is contaminated before coating, it shall be re-cleaned and/or re-blasted to Contract Specifications before coating is applied. Finally, all traces of dust and sand, etc. shall be removed prior to coating. 216.7.6 Abrasive Materials - Abrasive materials, unless specified, must be accepted by the Ministry Representative. 216.7.7 Recycled Steel Abrasive - Recycled steel abrasives are permitted, however the working material must meet SSPC-AB 2 requirements and must contain a minimum 15% steel grit to produce an angular/sharp profile. 216.7.8 Containment of Debris and Disposal of Debris - All debris from cleaning and coating operations must be contained in such a way as not to contaminate the environment. All debris shall be contained, tested and disposed of in accordance with current environmental, fisheries and local regulations. The Contractor shall provide written proof of disposal of all materials including way-bills and transport logs. 216.8 Application of Coating Materials 216.8.1 Pretreatment - Newly cleaned surfaces may require pretreatment other than washing or abrasive blasting prior to the application of the prime coat of paint. The application of the pretreatment shall be strictly in accordance with the manufacturer's directions. When pretreatments are used, particular care shall be taken to prevent contamination of adjacent surfaces. 216.8.2 General - In general, Contractors shall follow SSPC-PA 1 Shop, Field, and Maintenance Painting of Steel when applying coatings. Where SS 216 and SSPC-PA 1 disagree, SS216 shall be taken as applicable. 216.8.3 Materials Storage and Handling - Materials handling and use shall be as per SSPC-PA 1, 5.1. Coatings shall be stored in a secure building on-site, but not on the structure itself. Coatings taken onto the structure in cans, pails or totes shall be contained so that should they spill, no coating will escape to contaminate the adjacent area or environment. 216.8.4 Temperature - Coatings shall only be applied when the ambient, surface or coating temperature is within the range indicated by the Manufacturer’s written instructions. Coating shall not be applied when the substrate temperature is less than 3°C above the Dew point. Winter or quick dry catalysts or coating formulations shall not be used. Some coatings are designed for use in marginal conditions. Their use is at the sole discretion of the Ministry Representative. In unique situations where coatings must be used outside these limits, they shall only be used at the sole discretion of the Ministry Representative. Lack of permission may necessitate removal, re-cleaning and reapplication at the Contractor’s expense. 216.8.5 Humidity - Coatings shall not be applied in wet weather, fog, mist, rain, snow and/or relative humidity in excess of 85%. Coatings shall not be applied to wet or damp or icy surfaces and care shall be taken to ensure that any overnight dew has completely evaporated before coating commences in the morning. Some coatings are designed to cure in higher humidity environments and may be specified on individual Ministry Projects.

Page 226: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 216 COATING OF STEELWORK

216(8 of 20) 2006 BC – MOT

216.8.6 Mixing and Thinning - All ingredients in any container of paint shall be thoroughly mixed before use and shall be agitated often enough during application to keep the paint in uniform condition. In all cases of heavily pigmented paints (e.g. "Zinc Rich" paints) the material shall be continuously agitated during application. Mixing shall be done in accordance with the manufacturer’s instructions and in accordance with good painting practice as outlined in SSPC Steel Structures Painting Manual, Volume 1, Good Painting Practice and SSPC-PA 1. Thinner shall only be added with the written consent of the Manufacturer and only after it is shown that satisfactory application cannot be obtained with proper adjustment of the spray equipment and air pressures. In no case shall more than 12.5% of thinner by volume be added to a paint. Only thinner specified and supplied by the Manufacturer for that product shall be added to a product. Thinners used for cleanup shall not be recycled as thinning agents. Paint shall be mixed by mechanical methods. Paint shall be mixed in a manner that will ensure breaking up of all lumps, complete dispersion of settled pigment and a uniform composition. After mixing, all paint shall be strained to remove skins and other undesirable matter; the strainer shall not be so fine as to remove any pigment. Thinner, when approved, shall be added after initial mixing is completed. The quantity of thinner added shall be measured in and thoroughly mixed until the paint is again of uniform consistency. 216.8.7 Induction Time - Manufacturers’ induction times shall be strictly observed before the coating is applied. Since induction times are a function of temperature, temperatures outside the normal range may necessitate changing the induction period. Revised times if necessary shall be provided by the Coating Manufacturer in writing and accepted by the Ministry Representative. 216.8.8 Pot Life - Manufacturer’s estimates of pot life shall be adhered to and no coating shall be used after the recommended pot life has expired. Since pot life is a function of temperature, in hot or cold conditions the pot life may have to be modified reflect that temperature. Revised pot life times if necessary shall be provided by the Coating Manufacturer in writing and accepted by the Ministry Representative. 216.8.9 Wind - Paint shall not be sprayed when the wind speed is over 15 km per hour. This includes gusts. Wind speed shall be measured where the work is taking place, for example within the containment. 216.8.10 Curing Conditions - Coating lifetime may be affected by curing conditions. Coatings shall be protected from rain during their curing. Coatings shall be cured under the Coating Manufacturer’s stated conditions. This may require heating, cooling, humidity or ventilation adjustments to bring the ambient conditions into line with the Coating Manufacturer’s recommended conditions for curing. In enclosed spaces, ventilation must be provided to remove evaporating vehicle from the coating. Failure to achieve proper curing or curing conditions may necessitate removal, re-cleaning, reapplication or repair of the coating at the Contractor’s expense. 216.9 Inspection 216.9.1 General - The Contractor shall provide the quality control functions on the Contract work. Quality assurance will be done by the Ministry. The Contractor shall produce a quality plan for all work to be done and submit this plan for the Ministry’s acceptance. The Ministry will audit the quality process via the Ministry Representative.

Page 227: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING OF STEELWORK SECTION 216

BC - MOT 2006 216 (9 of 20)

216.9.2 Quality Control Inspection - Quality Control inspectors shall be qualified NACE Level 2 plus peer review, i.e. NACE Certified Coating Inspectors. Inspection records produced shall be quickly forwarded to the Ministry Representative. The records shall be electronic files, preferably Microsoft Excel files, and shall be forwarded to the Ministry Representative in that format to speed dissemination and aid any data manipulation required for the quality audit. Where this is not possible due to lack of communication technology, the records may be hard copy or hand delivered electronic files. The Quality Control inspector(s) shall follow the quality plan as accepted by the Ministry. All washing and cleaning work shall be inspected by the Contractor before any coating is applied. Each coat of paint shall be inspected by the Contractor and passed before the succeeding coat is applied. Coated surfaces rejected shall be made to comply with all requirements of this specification at the sole expense of the Contractor. 216.9.2.1 Hold points for inspection shall include, but may not be limited to: Installation of scaffolding and other accesses Installation of containment Surface after washing Surface after cleaning prior to coating application Surface after Prime coat Surface after Penetrating Sealer if any Surface after Stripe Coat Surface after each midcoat Surface after caulking Surface after topcoat Removal of containment Removal of scaffolding and other accesses 216.9.2.2 Accessibility for Inspection - The Contractor shall provide the Ministry Representative safe access to the specific areas of the jobsite under inspection. In order to limit the work disruption, the Contractor shall notify the Ministry Representative of upcoming hold points at least 24 hours prior to the hold point. The Ministry may perform quality assurance and /or quality audit inspections in conjunction with or subsequent to the Contractor’s quality control inspections. The Ministry Representative will attempt to limit delays to the Contractor as much as possible, but retains the right to obtain as much information from the quality assurance/audit inspections as needed to justify acceptance or rejection of the work. The Contractor shall maintain a minimum 200 foot-candles illumination at all areas of the work to be inspected. This may include adding lighting to augment natural light. Lighting if added shall be according to SSPC Guide 12, Guide for Illumination of Industrial Painting Projects. 216.9.3 Thickness Measurement - Large areas amenable to the application of SSPC-PA 2 Measurement of Dry Paint Thickness with Magnetic Gauges shall be measured by this method. The use of PA 2 is not considered to limit the number of measurements should additional readings be needed for any reason. The Contractor shall set aside a suitable area of steel on the structure to be coated and dry abrasive blast clean the area with the Contractor's equipment and blast abrasive to the standard required by the coating specification. This area shall be protected from moisture and shall be used as a standard for acceptable surface cleanliness and anchor profile. A portion of the area shall also be used as an area to verify the calibration of dry film thickness (DFT) gauges. It is recognized that the magnetic plane on the blast cleaned surface is above the bottom of the profile. The Contractor shall fill that difference with coating. If requested by the Ministry Representative, the Contractor shall produce and calibrate a secondary, portable calibration standard for dry film thickness gauges.The dry film thickness of small and/or more complex areas shall be measured as agreed upon by the Contractor’s Inspector and

Page 228: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 216 COATING OF STEELWORK

216(10 of 20) 2006 BC – MOT

the Ministry Representative. Gauges are to be calibrated according to SSPC-PA 2 at the beginning and end of each work shift. 216.9.4 Tinting Multilayer Systems - Each separate coat, penetrant, stripe, midcoat(s) and topcoat shall be coloured or tinted to differentiate it visually from the coats above and below. This is an aid to application and inspection and also serves as an indicator of wear for the life of the coating. 216.9.5 Coating Systems - Ministry of Transportation SS 308 lists coating systems used or identified by the Ministry and suggests situations where the systems are best applied. Coating systems meeting SS 308 requirements are listed in the Recognized Products List. Only specified coating systems from the Recognized Products List shall be used. Occasionally, special requirements mandate the use of coating materials not already listed in SS308. These requirements will normally be specified in the Contract’s Special Provisions section or will be shown on the Contract Drawings. 216.9.6 Coatings from Different Manufacturers - The Contractor shall not mix or interchange coatings or solvents from different manufacturers. 216.9.7 Coating Flaws - A coat of paint will only be accepted if none of the following faults are apparent:

• Coatings showing sags, runs, holidays, pinholes, orange peel, dry spray, shadowing or other application defects.

• Poor coverage at rivet heads, bolts, threads, plate edges, crevices, pockets, corners or re-entrant angles. • Surfaces damaged mechanically by moving scaffolding, equipment, etc. or damage by rain, flying dust, etc.

or damage from any other cause. Sags and runs may be repaired or treated as per SSPC-PA 1, Section 7.4.5 Coatings shall be applied as per SSPC-PA 1, except where directed otherwise by this specification. 216.9.8 Rejection - Areas not meeting specification shall be repaired at the sole expense of the Contractor. At the sole discretion of the Ministry Representative, small areas may be spot repaired. Larger areas shall be re-cleaned to specification and the coating built up again to specification. 216.10 Application Methods (Excluding metallizing and Hot Dip Galvanizing) 216.10.1 General - Coatings are designed to be applied by specific application techniques. These techniques are specified by the Manufacturer to ensure that the risk of failure is minimized. Manufacturer’s product application sheets shall be followed when applying coatings. Where an application method is not possible due to circumstances at a particular structure, the Contractor shall obtain written instructions from the Manufacturer for a new application method. The Ministry Representative must accept such methods before they are used. 216.10.2 Brush or Roller Application - Brushes or rollers shall be of high quality and of a style and material that will enable proper coating application.The paint shall be brushed or rolled so that there are no runs or sags, minimum brush marks and a uniform thickness. Achieving the specified thickness for a coating may require more than one coat with brush or roller. The Contractor is responsible for achieving the specified thickness.

Page 229: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING OF STEELWORK SECTION 216

BC - MOT 2006 216 (11 of 20)

216.10.3 Air Spray Application - The equipment shall be capable of properly atomizing the paint to be applied. The equipment shall be kept clean and maintained in excellent condition. Equipment that has dirty or malfunctioning parts shall not be used until the parts are cleaned, repaired or replaced as necessary. Paint shall be applied in a uniform layer, with overlapping at the edge of the spray pattern. The spray pattern shall be adjusted so that the paint is deposited uniformly. During application, the gun shall be held perpendicular to the surface and at a distance that will ensure that a wet layer of paint is deposited on the surface. The trigger of the gun shall be released at the end of each stroke. All runs and sags shall be brushed out immediately, or the paint shall be removed and the surface repainted. Areas inaccessible by spray such as cracks and crevices and the blind sides of rivets and bolts shall be painted by brush. Stripe coat material may be applied by spray to speed up the transfer of material to the surface, but all stripe coating must be brushed in to ensure complete wetting and coverage. The air caps, nozzles and needles shall be those recommended by the manufacturers of both the material being sprayed and the equipment being used. Proper air line filters and dryers shall be provided to remove oil and condensed water from the air. The air from the spray gun impinging against the surface shall show no condensed water or oils. The pressure on the material in the pot and of the atomizing air shall be adjusted for optimum spraying effectiveness. Both material and atomization pressures shall be controlled by suitable pressure regulators with gauges. The atomizing air pressure shall be high enough to properly atomize the paint, but not so high as to cause excessive fogging of paint, excessive evaporation of solvent or loss by overspray. The air compressor used shall be of sufficient size to maintain the regulated air pressures constant at all times, irrespective of the amount of equipment that is being operated from the compressor. 216.10.4 Airless Spray Application - The equipment shall be capable of properly atomizing the paint to be applied. The equipment shall be kept clean and maintained in excellent condition. Equipment that has dirty or malfunctioning parts shall not be used until the parts are cleaned, repaired or replaced as necessary. Paint shall be applied in a uniform layer, with overlapping at the edge of the spray pattern. The spray pattern shall be adjusted so that the paint is deposited uniformly. During application, the gun shall be held perpendicular to the surface and at a distance that will ensure that a wet layer of paint is deposited on the surface. The trigger of the gun shall be released at the end of each stroke. All runs and sags shall be brushed out immediately, or the paint shall be removed and the surface repainted. Areas inaccessible by spray such as cracks and crevices and the blind sides of rivets and bolts shall be painted by brush. Stripe coat material may be applied by spray, to speed up the transfer of material to the surface, but all stripe coating must be brushed in to ensure complete coverage. Fluid tips shall be of proper orifice size and fan angle, and fluid control gun of proper construction as recommended by the manufacturers of both the material being sprayed and the equipment being used. The air pressure to the paint pump shall be adjusted so that the paint pressure to the gun is proper for optimum spraying effectiveness. The pump pressure shall be controlled by a suitable regulator with working gauges. Pressures higher than that necessary to properly atomize the paint shall not be used. The air compressor used shall be of sufficient size to maintain the regulated air pressure to the pump constant at all times irrespective of the amount of equipment being operated from the compressor.

Page 230: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 216 COATING OF STEELWORK

216(12 of 20) 2006 BC – MOT

Proper filters shall be provided in the high pressure line so that dirt, dry paint or other foreign materials are not deposited on the paint film. The trigger of the gun shall be pulled fully open and held fully open during all spraying to ensure proper application of paint. The trigger shall be released at the end of each stroke. 216.10.5 Mitt and Dauber Application - Mitt and Dauber application shall be limited to situations where other coating application methods are poorly suited. Their use shall be at the sole discretion of the Ministry Representative. Coating thickness shall be uniform over the entire surface of the object coated. Coating shall be free of pinholes or other holidays, sags, etc. 216.10.6 Powder Coatings - Powder coatings are finely ground coatings that are electrostatically sprayed onto the substrate, then melted into a consolidated layer by heat. Coatings may be thermoplastic or thermosetting. Cleaning is typically in a series of chemical baths. Substrates contaminated with soluble salts shall be washed to remove those salts before being cleaned to meet specification. Acceptable levels of soluble salts shall be at the NV 2 level as stated in SSPC-SP 12. The substrate to be coated shall be cleaned to the coating manufacturer’s specifications. The water test shall show a clean surface. If required for adhesion, a conversion coating shall be applied to the substrate before powder coating. Fresh and reclaimed powder shall be dry, free flowing, and free of lumps and contaminants. Soaking oven temperatures and residence times shall be sufficient to completely melt the powder, but not enough to oxidize or discolour the coating. Coating thickness and gloss shall be uniform over the entire surface of the object coated. Coating shall be free of pinholes or other holidays. 216.11 Application Methods (Metallizing and Hot Dip Galvanizing) 216.11.1 Metallizing - Metallizing shall be applied in accordance with CSA-G189 Metallizing includes the thermal spraying of zinc or Zn:Al/85:15 alloy onto a properly prepared metal substrate. The method of heating the spray metal is either by flame or by plasma arc. Spray metal may be in wire or powder form to fit the apparatus used to spray the metal. The application method shall ensure that a uniform, clean, well adhered, film of metal is applied to the steel surface. Surface preparation shall be SSPC SP5 white metal blast. Profile shall be sharp, 50 to 75 µm. Metallizing shall be applied by qualified personnel with documented field experience metallizing steel structures such as bridges. Metallizing shall be applied in a uniform layer at a thickness of 150 to 200 µm thickness. For special applications, the thickness may be specified outside this range. When the metallizing is to be overcoated to form a duplex system, the newly metallized surface shall be protected from contamination until coated. If the metallized surface becomes contaminated, the steel substrate shall be re-cleaned to SSPC SP5/NACE No. 1 as above and re-metallized.

Page 231: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING OF STEELWORK SECTION 216

BC - MOT 2006 216 (13 of 20)

Metallizing is porous, and application of a coating over the surface may require a mist coat or other special procedures to avoid bubbling and subsequent problems caused by the interaction of the porous coat with the coating being applied. This cost if any, shall be borne by the Contractor. Metallizing may be applied over a much wider range of ambient conditions than normal paint. When application conditions may deviate outside normal coating conditions, the Contractor shall consult the Ministry Representative for acceptance before proceeding. 216.11.2 Hot Dip Galvanizing - Hot dip galvanizing shall be applied per CAN/ CSA-G164. 216.12 Application of Coatings 216.12.1 General - Application of coatings on steelwork specified to be painted as part of a Contract shall meet the following requirements. 216.12.1.1 Welding Requirements - Areas to be field welded shall have no paint applied for a distance of at least 100 mm back from the weld area. If inorganic zinc primer is used, the set-back shall be a minimum 25 mm. All welds shall be cleaned of weld residue including weld spatter and roughness on the welds. Sharp edges shall be rounded to a minimum radius of 1 mm. All welds shall receive a stripe coat of midcoat material over the primer prior to the midcoat. Welding done on existing coated surfaces shall have the coating removed, past the heat affected zone or 100 mm from the weld whichever is more, down to bare metal. Surface profile of the cleaned area shall be at least 25 µm (1mil). 216.12.1.2 Faying Surfaces - Unless specified otherwise, the faying surfaces of weathering steel shall be blast cleaned but not coated. When faying surfaces are specified to be coated, faying or friction connections shall be coated with only a prime coat of a Class B certified coating. A copy of the Class B test certificate shall be supplied to the Ministry Representative for each coating used on a faying surface. The class of coating is as defined in CSA/CAN S6-00. Coating and curing conditions shall strictly follow all application parameters listed on the Class B Certificate. Failure to do so will require re-cleaning and recoating according to the Class B parameters for that coating. 216.12.1.3. Surfaces Inaccessible After Erection - Surfaces inaccessible after erection shall receive the field coats of paint in the shop, before shipment to the erection site. Prior to erection, handling damage shall be repaired to the satisfaction of the Ministry Representative. 216.12.1.4 Application and Curing of Successive Coats of Paint - Each coat of paint shall be in a proper state of cure or dryness before the application of the succeeding coat. Unless otherwise specified a minimum of overnight drying shall be required. Under poor drying and curing conditions, this period will be extended. Curing conditions shall be those given by the Coating Manufacturer in the product application instructions. Curing time will vary according to temperature and in some cases humidity. The required curing time is estimated at the ambient conditions during curing. This will normally be done from data supplied by the Coating Manufacturer.

Page 232: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 216 COATING OF STEELWORK

216(14 of 20) 2006 BC – MOT

Coatings that have a maximum overcoating window shall not be overcoated after that time without appropriate surface preparation as provided in writing by the Coating Manufacturer. The overcoat window will be calculated from data supplied by the Coating Manufacturer using the ambient conditions at the site. 216.12.1.5 Primer - Primer shall not be applied until the cleaned steel surface meets specification requirements. Once specification requirements are met for a substrate, the primer must be applied within 8 hours. The substrate if protected will be assumed to continue to meet the specification for 8 hours unless obvious contamination has occurred. This will be at the sole discretion of the Ministry Representative. Primer shall be applied to specification requirements. Should the specification requirements be different than the Coating Manufacturer’s application instructions then the decision as to which is followed will be made at the sole discretion of the Ministry Representative. 216.12.1.6 Penetrating Sealers - Penetrating sealers or low viscosity products designed to wick into seams and seal them shall be applied according to the Coating Manufacturer’s product data sheets unless the Contract calls for specific application parameters. Should that be the case, the sealer shall be applied to Contract specification requirements. Current industry thinking has these products applied on top of a single primer coat and under stripe and midcoats. Under certain circumstances it may be necessary to use a penetrating sealer as a primer or as a first coat. This will be at the sole discretion of the Ministry Representative. 216.12.1.7 Stripe Coat - All areas such as crevices, corners, rivets, bolts, nuts, welds, edges and other protrusions shall be given a stripe coat to ensure that there is sufficient coating dry film thickness. Unless it is specifically excluded, it is the intent of the Ministry that all such areas shall receive a stripe coat. Coating may be applied by spray, but it shall be brushed into all areas to be striped. The stripe coat is a separate coat and shall be applied at the thicknesses given for the midcoat coating. The stripe coat shall be applied to the area and at least 25 mm out from the area to be striped. The stripe coat shall be a contrasting colour to the coats above and below it. The stripe coat shall be cured before being overcoated. 216.12.1.8 Midcoat - Midcoat shall be applied as a full coat onto clean, cured, primer, sealer, and stripe coats. The stripe coat and or sealer shall be cured before being coated. 216.12.1.9 Caulking - Caulking shall be applied after the midcoat and prior to the topcoat. Caulking shall be compatible with the coating system used. Silicone Caulking shall not be used. Suitable caulking materials are listed in SS 308 under the sub heading System PCM Paint Caulking Materials. Caulking shall be applied as specified in the Contract. Caulking shall not be topcoated until it cures according to the Manufacturer’s product data sheets. Lower temperatures may increase this time.

Page 233: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING OF STEELWORK SECTION 216

BC - MOT 2006 216 (15 of 20)

If there is a time window for top coating, the caulking shall be topcoated before the window expires. 216.12.1.10 Topcoat - Once the undercoat and caulking if any have cured, the topcoat shall be applied. 216.12.1.11 Lapping Existing Coatings - Primer if applied shall not overlap existing coatings by more than 10-20 mm. Ministry preference is that it just contacts the existing feathered coating or overlaps very slightly to seal the join. Midcoat shall overlap existing coatings by a minimum 50 mm. Topcoat shall overlap existing coatings by a minimum 50 mm and shall hide all newly added midcoat material. 216.12.2 Shop Coating 216.12.2.1 General - Unless otherwise specified the following procedure shall apply to all new steel prior to shipment to the site of erection: Before blast cleaning, the steel shall be checked for contamination of non-visible salts and the surface shall meet SSPC-SP12/NACE No. 5, NV-2. Before coating, the steel shall be blast cleaned to SSPC-SP 10/NACE No.2 Near white. Abrasive blast cleaning will be permitted prior to fabrication provided that any contamination incurred during fabrication is removed prior to coating, leaving an SSPC-SP 10/NACE No.2 surface. Small areas of contamination occurring during fabrication shall be cleaned by manual cleaning to SSPC-SP 3 Power tool cleaning and/or SSPC SP-12/NACE No. 5 LPWC as necessary to remove contamination. Large areas of contamination occurring during fabrication shall be dry abrasive blast cleaned again to SSPC-SP 10/NACE No.2 Near-white blast. Surface profile for primers shall be 50 to 75 µm and sharp. Prior to dry abrasive blasting, all welding slag, spatter and alkaline deposits in the vicinity of the welds shall be removed. Surfaces shall then be blast cleaned to SSPC-SP 10/NACE No.2 Near-white blast. When fabrication is completed and the surfaces cleaned as required, they shall be inspected prior to the application of paint. After passing inspection and before any contamination has occurred, prime all steel surfaces with one coat of the selected shop coat primer from SS 308. Primer shall be applied to specification requirements. Should the specification requirements be different than the Coating Manufacturer’s application instructions then the decision as to which is followed will be made at the sole discretion of the Ministry Representative. A dry abrasive blast cleaned surface shall be coated within 8 hours of cleaning and before rust blooming becomes apparent. If either condition is exceeded then the area must be re-blasted to specification. Clean or partially coated steel shall be protected from contamination including, but not limited to dirt, oil, grease, soluble salts and overspray, while in the shop. Contaminated surfaces shall be re-cleaned at the Contractor’s expense. Surfaces that will be in contact with concrete shall be coated with the full system prior to erection. Coatings with known incompatibilities with high pH shall not be used in contact with the concrete.

Page 234: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 216 COATING OF STEELWORK

216(16 of 20) 2006 BC – MOT

Surfaces inaccessible after erection shall receive the field coats of paint in the shop, before shipment to the erection site. If more than one coat is to be shop applied, manufacturer’s recommended recoat times for the ambient temperatures shall be followed. Generally, a minimum of 16 hours drying/curing time shall be required between the application of any paint in the shop and the moving or handling of any piece so painted. This period may be increased in cases where poor drying conditions exist, such as shop areas open to the weather in winter months. Since curing times vary with different coating products, variations from this time may occur with specific products. Quick Dry/Cure products or products with “winter” catalysts shall not to be substituted for SS 308 products unless accepted by the Ministry Representative. 216.12.3 Transport of Coated Items - Transport of coated items shall be done in a manner that imparts minimum damage to the coating system. The coatings shall be cured before handling and shipment. Canvas or Fabric slings shall be used to move the items. Chains or other methods that are known to damage coatings shall not be used. Coated items to be transported shall have sufficient dunnage to prevent coating damage. Transport tie-downs shall be padded to protect the coated surfaces and edges. Transport damage shall be repaired at the Contractor’s expense. 216.12.4 Field Repair of Damaged Shop Coating and Field Weld Areas - After the complete erection of shop coated steel members the following procedure shall apply: Before coating, field weld areas shall be ground off to remove all welding slag, spatter and alkaline deposits in the vicinity of the welds. Washing will be required when the shop coat or steel has been contaminated with air borne dirt, dust, salt, chemicals, etc., unless the steel shows no visible contamination, and meets the SSPC SP-12/NACE No. 5, NV2 levels for non-visible contaminants. Surfaces shall then be cleaned to SSPC-SP 11 Power Tool Cleaning to Bare Metal. The existing coating shall be feathered back 25 mm from damaged areas into good coating. Feathering shall continue until the existing coating is well adhered. This may be considerably more than the 25 mm feather back. Care shall be taken not to damage surrounding areas. Note: This cleaning shall include the 100 mm welding set back. All areas of the shop applied coating system which have been damaged during handling, shipping and erection and all field connections shall be cleaned to SSPC-SP 3 Power tool clean or SSPC SP11 Power tool cleaning to bare metal at the discretion of the Ministry Representative. Low pressure water cleaning shall be used as necessary to remove dirt, salts and other deleterious contamination. All areas that have been cleaned to bare metal as required shall be coated with an organic zinc field primer, applied by brush to ensure full coverage. If the area is too large to coat practically with a brush, then spray may be used, providing overspray does not contaminate the surrounding finished coating. Lapping of new and existing coatings shall be as Section 216.12.1.11 above.

Page 235: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING OF STEELWORK SECTION 216

BC - MOT 2006 216 (17 of 20)

If a partial system was applied in the shop then the primed areas shall be coated with successive coats to the level of the surrounding coating then the entire structure shall be topcoated. This treatment shall include a brushed-in stripe coat. If a coating system was completely applied in the shop and on erection some damage has occurred or there are still uncoated areas, then these areas shall be cleaned per this section above and successively coated with each coat of the system up to the topcoat including a brushed-in stripe coat. Manufacturer’s recoat times for the ambient temperatures shall be followed.

216.12.5 Field Topcoat - Remaining coats shall be applied as per Section 216.13 below. 216.12.5 Field Coating 216.13.1 Touch-up coating This section deals with the repair of small areas of coating by the Ministry representative or their Contractors. The definition of small areas, will vary depending on the situation, but in general, will apply to areas that can be economically treated using the touch-up technique. The coating used for touch up and repair shall be one of the SS 308 Field Overcoat (FO) systems. The area to be repaired and coated shall be washed to SSPC SP-12/NACE No. 5, WJ-4, with a surface cleanliness of NV-2 before attempting further cleaning. Areas of the coating that have failed or rusted shall be cleaned to SSPC-SP 3 or SSPC-SP 11 using the appropriate tools. The old coating shall be feathered back 25 mm from damaged areas into good coating. Feathering shall continue until the coating is well adhered. This may be considerably more than the 25 mm feather back. Pack rusted crevices will require more thorough cleaning. The degree of cleaning required will be detailed in the Contract Documents for each specific structure. After cleaning, they shall be coated with the prime coat, then a brush coat of penetrating sealer shall be applied to the crevice and allowed to soak in. Repeated applications of the penetrating primer may be necessary until the inside of the crevice is saturated. Where the coating system used does not include a specific primer coat, the penetrating sealer shall be applied as a first coat. In general, coating used for touch up and repair shall be of the same type as those used initially. For example if the coating system to be touched up is an alkyd system, then alkyds are the coatings of choice. The coating to be used shall be accepted by the Ministry Representative or as specified in the Contract. The selected primer shall be applied in the damaged areas. The primer shall be cured for the time recommended by the manufacturer prior to additional coating being applied After the primer is cured, the midcoat(s) shall be applied to bring the surface of the coating to the same level as the surrounding sound coating. The midcoat shall be applied within the manufacturer’s suggested range of thickness. The midcoat(s) shall be cured for the time(s) recommended by the manufacturer. After the midcoat material is cured, the area shall be given a topcoat. Where practical, the topcoat shall be extended to a logical edge such as the edge of the beam or plate, to present a less patchy appearance. Lapping of new and existing coatings shall be as Section 216.12.1.11. 216.13.2 Overcoating - The object is to clean the surface, repair spot or area damage with coatings and to overcoat the entire area with a topcoat.

Page 236: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 216 COATING OF STEELWORK

216(18 of 20) 2006 BC – MOT

The coating used for touch up and repair shall be one of the SS 308 Field Overcoat (FO) systems. The area to be repaired and coated shall be washed to SSPC SP-12/NACE No. 5, WJ-4, with a surface cleanliness of NV-2 before attempting further cleaning. Areas of the coating that have failed or rusted shall be cleaned to SSPC-SP-3 or SSPC-SP-11. Larger failed areas shall be cleaned to SSPC-SP 6/NACE No.3 Commercial blast clean. In this case, surface profile should be 50-75 µm and sharp. Debris contaminating the rest of the structure or the immediate environment due to cleaning operations shall be removed by the Contractor. The old coating shall be feathered back 25 mm from damaged areas into tightly adhered coating. If the coating cannot be removed with a dull putty knife, it is considered tightly adhered. Pack rusted crevices shall be cleaned as per Section 216.13.1 above. Once all the existing damaged areas are built up to the level of the existing coating, the topcoat is applied over the entire area to seal the existing coating and all the repairs. In general, coating used for overcoating shall be of the same type as those used initially. For example if the coating system to be touched up is an alkyd system, then alkyds are the coatings of choice. Use of an over wintered test patch is recommended to test compatibility. The coating to be used shall be approved by the Ministry Representative or as specified in the Contract.

216.13.3 Recoating - The area to be recoated shall be washed to SSPC SP-12/NACE No. 5, WJ-4, with a surface cleanliness of NV-2 before attempting further cleaning. The entire area shall be blast cleaned to SSPCSP 6 Commercial blast clean. Note that some specialty coatings or coatings in some difficult applications such as immersion may require SSPC-SP 10/NACE No. 2 Near-white blast or even SSPC-SP 5/NACE No. 1 White metal blast. Surface profile should be 50 - 75 µm and sharp. The Contractor shall provide full containment of debris generated by the cleaning, coating and curing operations. Debris contaminating the rest of the structure or the immediate environment due to cleaning operations shall be removed by the Contractor at his cost. Sharp edges shall be radiused to 1mm. 216.13.4 Zone Coating - Zone coating may use any one of or a combination of touch-up, overcoating or recoating on limited areas of a structure. 216.13.5 Field Curing of Coatings - Each coating application shall be cured before it is coated over or exposed to weather or traffic. Coatings inside enclosed spaces shall continue to be ventilated until dry or cured to ensure that they cure correctly. Uncured coating shall be protected against damage from dust or other detrimental foreign matter. If necessary, coating shall be delayed until the cause of the dust, etc. has abated. Uncured coating shall be protected from the weather until cured. In some cases, this may include hoarding, heating, ventilation or dehumidification. Coating contaminated or damaged by any of the above conditions shall be repaired at the Contractor’s expense.

Page 237: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING OF STEELWORK SECTION 216

BC - MOT 2006 216 (19 of 20)

216.14 Damage to Adjacent Property - It is the intention of the Ministry of Transportation that the coating work shall have no adverse effect on adjacent property. Repair of damage to adjacent property, vehicles, pedestrians and other portions of the structure due to the Contractor’s coating operations is the sole responsibility of the Contractor. 216.15 Cleanup - All construction and painting debris must be removed from the site and the site environs. The site and surroundings shall be left in the same condition as prior to work being commenced unless the specification directs otherwise. 216.16 Measurement and Payment - Measurement and Payment shall be as set out in the Contract Documents.

Page 238: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 216 COATING OF STEELWORK

216(20 of 20) 2006 BC – MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 239: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 218 (1 of 4)

SECTION 218

CONCRETE FOR MINOR WORKS

218.01 General - The whole work shall be carried out in accordance with the best modern practice of cement concrete manufacture.

The Ministry Representative shall be the sole judge as to the suitability of the materials, their quantity, quality and condition; of the Contractor's plant, equipment and personnel; of the time and manner of carrying out the work and of every operation and matters incidental thereto.

218.02 Cement - Portland cement shall conform to CSA Standard A5 - Portland Cement

218.03 Aggregates - The aggregates shall be the best procurable and shall comprise inert, inorganic mineral matter only. They shall be satisfactorily clean, durable, hard, sound, strong and tough and be practically free from alkali, clay, dust, loam, mica, shale, silt or any material deemed objectionable in nature or amount by the Ministry Representative. None of the particles comprising the aggregates shall be coated nor be unreasonably flat or elongated. No aggregate may be used while frozen.

218.04 Grading of Aggregates - The grading of all aggregates shall be such as will produce an economic, plastic, practical, smooth, workable mix which when placed, set and cured, will produce a concrete of the best character possible.

To secure such grading, the Ministry Representative may require the Contractor to modify the aggregate by the addition or subtraction of proportions of specific sizes of material. The cost of making such modifications, by screening or otherwise, shall be included in the price bid by the Contractor.

218.05 Classes of Concrete - The classes of concrete are A, B, C, X and Y. Each class of concrete shall be used in that part of the structure in which it is called for on the Drawings, or where directed by the Ministry Representative. Unless otherwise specified, Class "A" Concrete shall be used. The following requirements shall govern unless otherwise shown on the Drawings:

Class "A" concrete shall be used for all superstructures, except as noted below, and for reinforced substructures except where the sections are massive and lightly reinforced. The more important items of work included are slabs, beams, girders, columns, arch ribs, box culverts, reinforced abutments and retaining walls, and reinforced footings. Class "A" concrete shall be used for precast piles and cribbing. Class "A" concrete shall also be used for work exposed to salt water.

Concrete deposited in water shall be Class "A" with 10% additional cement.

Class "B" concrete shall be used for mass footings, pedestals, massive pier shafts and gravity walls with none or only a small amount of reinforcing.

Class "C" concrete shall be used for very massive unreinforced sections.

Class "X" concrete shall be used for massive sections lightly reinforced where a higher grade than Class "B" is desired.

Class "Y" concrete shall be used in thin reinforced sections, for handrails, except as specified, for precast railing under "Railings," and for filler in steel grid floors.

218.06 Classification and Proportioning of Concrete Mixtures - The materials shall be proportioned so that the amount of cement contained in 1 m3 of concrete in place shall be approximately as shown in Table 218-A.

Page 240: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 218 CONCRETE FOR MINOR WORKS

218 (2 of 4) 2006 BC - MOT

The proportions of water, cement, coarse and fine aggregate to be used shall be determined by the Ministry Representative on the ground from time to time. Measurement shall be made by mass, and the accuracy must be satisfactory to the Ministry Representative; all such allowances for contained water, bulking or otherwise must be made as found necessary to allow for the proportions ordered by the Ministry Representative, being accurately provided in each batch.

218.07 Machine Mixing - The mixing of concrete, unless otherwise authorized by the Ministry Representative, shall be done in a batch mixer of type approved by the Ministry Representative. The mixer shall be equipped with a suitable charging hopper, water storage and water measuring device. It shall be cleaned at frequent intervals when in use and maintained in such a condition that the mixing action will be unimpaired.

218.08 Duration of Mixing - The mixing of each batch shall continue not less than 90 seconds after all the materials are in the mixer, during which time the mixer shall rotate at a speed of from 14 to 20 revolutions per minute unless otherwise rated by the manufacturer.

218.09 Hand Mixing - When hand mixing is authorized by the Ministry Representative, it shall be done on a watertight platform. The fine aggregate shall be spread on the platform and the cement spread evenly over the fine aggregate. The material shall then be shovelled into a cone shaped pile by casting centrally on the pile. This pile shall then be divided by casting into two or more cone shaped piles and the operation of dividing and reuniting continued until the batch is uniform in colour. Only sufficient water to produce the desired consistency shall then be added by sprinkling as the batch is turned. The coarse aggregate previously moistened shall then be mixed with the mortar in the manner specified for mixing fine aggregate and cement.

218.10 Retempering - The retempering of concrete or mortar which has partially hardened, that is, remixing with or without additional cement, aggregate or water, will not be permitted.

218.11 Forms - Forms shall be so constructed that the finished concrete will conform to the shapes, lines, grades and dimensions indicated on the Drawings.

Lumber used in forms shall be free from warp. For exposed surfaces, it shall be dressed to a uniform width and thickness and be free from loose knots, decay or other defects. For unexposed surfaces and rough work, undressed lumber may be used if means are taken to prevent leakage of mortar.

Lumber once used in forms shall have nails withdrawn and surfaces to be in contact with concrete thoroughly cleaned and smoothed before being used again.

TABLE 218-A CLASSIFICATION AND PROPORTIONING OF CONCRETE MIXTURES

CLASS OF CONCRETE

REQUIRED STRENGTH AT 28

DAYS MPa

SIZE OF COARSE AGGREGATE (mm)

CEMENT (40 kg) SACKS PER CUBIC

METRE

MAXIMUM WATER CONTENT PER SACK

OF CEMENT (l)

A 20 25.0 to 5.0 9.1 21.0

B 15 50.0 to 5.0 7.0 24.5

C 10 63.0 to 5.0 5.6 30.0

X 17.5 50.0 to 5.0 9.2 24.0

Y 20 20.0 to 5.0 9.8 21.0

Page 241: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CONCRETE FOR MINOR WORKS SECTION 218

BC - MOT 2006 218 (3 of 4)

Unless otherwise specified, suitable moulding or bevels shall be placed at the angles of forms to round or bevel the edges and re-entrant angles of the concrete.

For internal ties, bolts and rods shall preferably be used. They shall be so arranged that when the forms are removed no metal shall be within 25 mm of any exposed surface. Wire ties may be permitted only on light work; they shall not be used through surfaces where discolouration will be objectionable.

The inside of forms shall be coated with non-staining mineral oil, or other approved liquid or thoroughly wetted, (except in freezing weather). Where oil is used it shall be applied before the reinforcement is placed.

Care shall be taken to ensure that forms do not become dried and warped before concrete is deposited. Before concrete is placed, forms and reinforcement shall be checked and approved by the Ministry Representative.

Forms shall not be disturbed until the concrete has adequately hardened. The proper time for removal of forms shall be determined by the Ministry Representative.

Care shall be taken when removing forms to avoid roughening or injuring corners and to keep edges sharp.

Whenever forms are removed from showing faces before the concrete has become hard and dry, the surface of the concrete shall be immediately wetted and kept wet for at least three days. Defects in showing faces shall be rectified to the satisfaction of the Ministry Representative.

218.12 Depositing Concrete - Concrete shall be deposited in forms in approximately uniform horizontal layers as near as practicable in its final position to avoid re-handling. Depositing shall be continuous until the unit of operation, as approved by the Ministry Representative, is complete and as rapid as practicable to ensure bonding of the successive layers.

Concrete shall be thoroughly worked around reinforcement and embedded fixtures and into all parts of the forms. Coarser particles shall be worked back from the face of the forms.

218.13 Basis of Payment - Payment shall be made at the prices bid per cubic metre of concrete and per pound of steel in place in and forming part of the finished structure; and in accordance with the various classes of concrete as defined in the specifications and as set out in the "Schedule of Approximate Quantities and Unit Prices"; and shall be accepted as full compensation for everything furnished and done in connection therewith.

Page 242: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 243: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 232

METAL BIN-WALL

232.01 Scope - This Section covers the construction of metal bin type retaining walls in accordance with the general layout and details indicated on Drawings 1-SP232 through 3-SP232.

232.02 Provision of Metal Bin-Wall - Bin-wall of the design (depth to height ratio) called for shall be constructed at the locations and as shown on the Drawings with the materials, accessories, and necessary ancillary work all in accordance with the details indicated on the Drawings, Specifications, Special Provisions, the standard Drawings or as directed by the Ministry Representative.

232.03 Materials - Bin-wall material will be supplied by the Ministry in accordance with Subsection 145.16 f.o.b. the Contractor's job site yard or Ministry's yard, as noted, except where required by the Drawings, Specifications or Special Provisions for supply in whole or in part by the Contractor.

Structure backfill shall be well-graded granular material with a maximum size of 75 mm and not more than 8% passing a 0.075 mm (#200) sieve.

232.04 Construction

232.04.01 Construction - Construction shall be carried out with all labour, tools, equipment and incidentals necessary to complete all bin-walling in accordance with good work practice.

232.04.02 Foundation - Foundation excavation shall be carried down to the depths shown on the drawings or to such greater depths as the Ministry Representative may direct. In the case where rock, hardpan or other unyielding material is encountered, it shall be removed to a depth 300 mm below the design grade and backfilled in accordance with Subsection 232.04.04.

232.04.03 Erection - The units shall be assembled as shown on the drawings. Components shall be handled carefully and any which are damaged shall be removed and replaced with new components at the Contractor's expense.

Before the assembly bolts are tightened, columns shall be checked for line and batter or plumbness, where applicable.

232.04.04 Backfill - Structure backfill material shall be placed as wall foundation, backfill inside the bins, and for 0.6 m behind the wall. The material shall be spread in layers not exceeding 150 mm in thickness and shall be compacted to a minimum 95% of the laboratory density obtained by the current ASTM test method D 698.

Backfill inside each bin shall progress simultaneously but not in advance of that behind the wall.

Note: Bin wall may be backfilled as it is erected provided that the columns are held in correct position while the backfill is being placed.

232.05 Measurement and Payment - Metal bin-type retaining walls shall be paid for at the price bid per square metre of facial area of wall which shall be full compensation for taking delivery, hauling to the site and erection.

Excavation for foundation shall be paid for at the rate bid for "Foundation Excavation".

Backfill in and around the bins shall be paid for at the rate bid for "Structure Backfill" which shall be full compensation for supplying, hauling to the site, placing and compaction.

BC - MOT 2006 232 (1 of 4)

Page 244: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 232 METAL BIN-WALL

232 (2 of 4) 2006 BC – MOT

Page 245: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

METAL BIN-WALL SECTION 232

BC – MOT 2006 232 (3 of 4)

Page 246: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 232 METAL BIN-WALL

232 (4 of 4) 2006 BC – MOT

Page 247: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 303 (1 of 6)

SECTION 303

CULVERTS

DESCRIPTION

303.01 Scope - This Section covers the construction of pipe culverts where shown on drawings or as directed by the Ministry Representative, and in accordance with the drawings and Special Provisions covering the various types. The trench and other preparatory work shall be approved by the Ministry Representative before actual placing starts.

Culvert materials are normally durable under most conditions. Factors which affect the service life of culvert material are corrosion from acidic and alkaline conditions in the soil, abrasion from bedload carried by the stream and freeze/thaw cycles. Plastic culverts shall not be exposed to direct sunlight (ultra violet rays) or installed in areas where there is a potential fire hazard.

Filtration control devices, such as filter cloth, must not be attached to the end of culverts.

Obstructed culverts shall be cleared as outlined in Subsection 165.10.07.

All culvert pipe, unless otherwise specified, will be supplied by the Contractor to the requirements of the Contract, generally in accordance with Subsection 145.15.

MATERIALS

303.11 Concrete Pipe - Reinforced concrete pipe supplied will have joints of the tongue and groove type all in accordance with the current specification ASTM C 76 Series, and plain concrete pipe in accordance with the current specification ASTM C 14 series.

303.12 Corrugated Steel Pipe - Corrugated steel pipe supplied will conform to the requirements of Section 320.

303.13 Polyethylene Pipe – The materials for pipe and fitting shall be high-density polyethylene meeting ASTM D 3350 Cell Classification 335420C.

303.14 PVC Pipe – See Subsection 318.03

303.15 Structural Plate Corrugated Steel Pipe/Pipe-Arch (Field Assembled) Culverts - Special care shall be taken in the installation of all structural plate corrugated steel culverts.

CONSTRUCTION

303.31 Concrete, Corrugated Steel and Plastic Pipes – This Subsection does not cover Structural Plate Corrugated Steel Pipe/Pipe Arch installations.

303.31.01 Trenching - A trench shall be excavated to the depth and grade as given by the Ministry Representative. A full trench condition shall be provided wherever possible, but in no case shall the trench be of lesser depth than 50% of the diameter of the pipe. If, in the opinion of the Ministry Representative, the material in the bottom of the excavation is of such a character as to cause unequal settlement along the length of the culvert, the trench shall be dug below the grade to such depth as ordered, backfilled with gravel or other suitable material, and thoroughly tamped or otherwise compacted to ensure a firm and uniform foundation.

Where rock, in either ledge or boulder formation, occurs in the bottom of the trench, the rock shall be excavated below grade and backfilled with sand or fine gravel so that there will be at least a 150 mm cushion between the rock and all portions of the pipe.

The bottom of the trench upon which the pipe is to be laid shall be shaped so that at least 25% of the circumference of the pipe is in contact with the prepared foundation for the whole of its length.

303.31.02 Placing - Concrete pipe shall be laid beginning at the lower end with the groove and pointing up-grade. Pipe with elliptical reinforcement shall be laid with the minor axis of the reinforcement as marked by the manufacturer in a vertical position.

When jointing concrete pipes the trench shall be in a dry condition and the joints shall be cleaned and wetted before sealing with mortar. The mortar shall consist of one part Portland Cement to two parts fine sand, mixed to the proper consistency. Sealing shall be neatly and thoroughly done, and the interior of the pipe cleaned of all surplus mortar. Joints shall be kept damp with burlap or earth for at least three days after sealing.

Corrugated steel pipe shall be laid beginning at the lower end with the outside laps pointing up-grade and the longitudinal joint on the side. The separate section shall be firmly jointed together and any steel in joints, which is not thoroughly protected by galvanizing, shall be coated with a suitable asphaltum paint.

303.31.03 Backfilling - Backfill and Bedding Material shall consist of mineral aggregate and shall meet the gradation specified in Table 303-A.

For metal structures with corrugation depths greater than 63 mm, the backfill maximum particle size may be as high as one-half the corrugation depth or 75 mm whichever is smaller.

Page 248: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 303 CULVERTS

303 (2 of 6) 2006 BC - MOT

Minimum bedding thickness is 150 mm or twice the corrugation depth whichever is greater.

For embankment installation, bedding and backfill will extend two-thirds of the span or 0.9 m beyond the culvert span on either side, whichever is greater. For trench installation, bedding and backfill will extend a minimum of 0.3 m on either side. Backfill will extend to the base of the pavement structure (to the surface in the case of high fines gravel surface) or to a depth of cover of two-thirds of the span (diameter) whichever is less. Bedding and backfill shall be placed in layers not exceeding 150 mm in depth. Backfill shall be placed symmetrically. The differential backfill height on either side of the culvert shall not exceed 0.3 m. Bedding and backfill shall be compacted to a minimum 95% of the laboratory density by following the current ASTM D 698, except the 0.3 m layer immediately

above the pipe which shall be placed with no compaction.

303.31.04 End Walls - End walls shall be built around the ends of pipe culverts as shown on the Contract Drawings or as directed by the Ministry Representative. The construction of these end walls shall meet the requirements governing the construction of Class "A" concrete (See Subsection 218.05).

303.31.05 Inlet and Outlet Ditches - Inlet and outlet ditches to culverts shall be constructed to the lines and levels as given by the Ministry Representative, on the ground. The excavation shall be classified as "Roadway and Drainage Excavation," not "Foundation Excavation."

303.32 Structural Plate Corrugated Steel Pipe/Pipe-Arch Culverts

303.32.01 Foundation Excavation - If a coarse boulder material or solid rock is encountered when preparing the bed of the pipe, the material shall be excavated a minimum depth

of 300 mm below the pipe and backfilled with granular material having a maximum size of 75 mm.

303.32.02 Backfilling - All backfill materials for a minimum width of 3 m on either side of the pipe and to a depth of 1 m above the pipe, if grade allows, shall be granular material approved by the Ministry Representative.

End dumped or loose pushed material shall not be piled closer than 3 m from the pipe. Spreading in layers not exceeding 150 mm and compaction shall be carried out by equipment operating parallel to the pipe. The area close to the pipe shall be compacted by small mechanical tampers. No boulders in the backfill material of a size greater than 75 mm shall be closer than 1.2 m to the pipe surface.

Extreme care must be taken to ensure the backfilling operation is carried out equally on both sides of the pipe. Hauling equipment shall not be operated over the pipe until backfill operations have completed a minimum cover of 600 mm over the pipe.

MEASUREMENT

303.81 Concrete, Corrugated Steel and Plastic Pipe Culverts – Culvert pipes will be measured by the METRE along its centre line as installed.

303.82 Structural Plate Corrugated Steel Pipe/Pipe-Arch Culverts – The culverts will be measured by the METRE along its centre line as installed.

PAYMENT

303.91 Concrete, Corrugated Steel and Plastic Pipe Culverts - Payment for CULVERT PIPE will be at the Contract Unit Price per metre. The Contract Unit Price shall be accepted as full compensation for everything furnished and everything done in connection therewith, but shall not include payment for excavation, riprap, paving, concrete cradles and end walls; these shall be paid for at their respective prices in the schedule.

303.92 Structural Plate Corrugated Steel Pipe/Pipe-Arch Culverts - Payment for STRUCTURAL PLATE CULVERT PIPE will be at the Contract Unit Price per metre. The Contract Unit Price shall be full compensation for supply and placing all materials, including equipment, and incidentals necessary to complete the work as shown on the drawings. Foundation excavation shall be paid for under the item "Foundation Excavation." All materials excavated for inlet and outlet ditches, for channel work and for backfilling shall be paid for under the item "Roadway and Drainage Excavation."

TABLE 303-A GRADATION REQUIREMENTS FOR CULVERT BACKFILL AND BEDDING MATERIAL

SIEVE SIZE mm PERCENTAGE PASSING

31.5 100

25 60-100

19 15-100

2.36 10-100

0.075 0-5

Page 249: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CULVERTS SECTION 303

BC – MOT 2006 303 (3 of 6)

Page 250: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 303 CULVERTS

303 (4 of 6) 2006 BC – MOT

Page 251: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 252: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 303 CULVERTS

303 (6 of 6) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 253: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 308 (1 of 16)

SECTION 308

COATING SYSTEMS

308.01 Scope - This Section defines the coating systems required for shop and field coating of structural steel or wood/concrete surfaces which may be exposed to exterior corrosive conditions.

308.03 Standards and Specifications

a)Specifying Bodies: SSPC The Society for Protective Coatings, has a large number of coating and cleaning specifications. ASTM The American Society for Testing and Materials, produced test procedures for a wide range of products and processes. NACE, The National Association of Corrosion Engineers, also produces specifications and test procedures for coatings and corrosion engineering. All have a web presence available by searching the name above.

b)Colour Specifications using a five digit number refer to the US Federal Specification 595b colour numbers.

c)Measuring Units

The metric unit (µm) or imperial unit (mil) can be used interchangeably, at the conversion factor of:

1 mil = 25 µm (1 mil = 1 thousandth of an inch)

308.04 System Selection Table - This table summarizes the coating systems currently in use. The table lists application areas where specified coating systems may be used. It is intended to assist in the choice of a coating system for specific applications. Some systems may find use in more than one specific application or in applications not mentioned. Where a system is specified in a contract, only those approved coating systems listed for that system may be used. The generic coating systems below mirror the same categories in the Recognized Products List, which lists approved coatings in each of the categories below.

COATING SYSTEM SELECTION TABLE (PART 1)

System

Code

Application

Area

Structure

Environment

Coating System

Primer - Midcoat - Topcoat

STRUCTURAL STEEL

SS1 Steel, Shop Standard New Steel Coating for Moderate to Severe Service

Inorganic zinc, epoxy, polyurethane

SSWP Steel, Shop Weldable Primer Under Development

SF1 Steel, Field Severe Field Application Metallizing, epoxy, polyurethane

SF2 Steel, Field Standard Field Recoat for Moderate to Severe Service

Organic zinc, epoxy, polyurethane

SF3 Steel, Field Severe Where Adjacent buildings/traffic etc require a Dry Fall Material

Metallizing, vinyl, vinyl

SF4 Steel, Field Moderate to Severe Where Adjacent buildings/traffic etc require a Dry Fall Material

Organic zinc, vinyl, vinyl

SF5 Steel, Field Moderate Alkyd on steel

Page 254: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 308 COATING SYSTEMS

SF6 Steel Field Moderate to Severe Field Application Multi-Component Urethane Systems

SFIM1 Steel Field, Immersion Moderate to Severe Field Application Coal Tar Epoxy or Equivalent

SFO1 Steel, Field Overcoat Moderate conditions Water-based Acrylics and Vinyls

SFO2 Steel, Field Overcoat Under Development Water Based Acrylic Epoxy

SFO3 Steel, Field Overcoat Moderate conditions Solvent Based Single Component

SFO4 Steel, Field Overcoat Moderate to Severe Solvent Based Surface Tolerant Epoxy

SFO5 Steel, Field Overcoat Moderate Alkyd on steel CAN/CGSB-1.59M alkyds

SFAG Steel, Field Antigraffiti Coatings Under Development Varies with system

COATING SYSTEM SELECTION TABLE (PART 2)

System

Code

Application

Area

Structure

Environment

Coating System

Primer - Midcoat - Topcoat

SFTB Steel, Field Touchup Brushable Small Damaged Areas, or as a Holding Primer

Rust Inhibitive Primer / Topcoat

SFTA Steel, Field Touchup Aerosol Small Damaged Areas, or as a Holding Primer

Rust Inhibitive Primer / Topcoat

UNIQUE SITUATIONS

U1 Steel, Unique Products Moderate Rust Inhibitive Sealer / Topcoat

U2 Steel, Unique Products Low Temperature, high humidity Organic Zinc / Midcoat / Topcoat

PENETRATING SEALERS

SPS Steel, Penetrating Sealers Penetrating Sealers for Joints, Bolts, Rivets etc.

Various Unique Systems, Designed To Be Used With Coating Materials From The Same Manufacturer

CAULKING MATERIALS

PCM Paint Caulking Materials For Non-immersion Service Assorted

WEATHERING STEEL

SW * Steel, Weathering Field Coatings

Under Development Two or three coat systems

CONCRETE

CF1 Concrete, Field Under Development Cementatious

CF2 Concrete, Field Under Development Non-Cementatious

CFAG Concrete, Field Antigraffiti Under Development Concrete Antigraffiti

HOT DIPPED GALVANIZING

308 (2 of 16) 2006 BC - MOT

Page 255: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING SYSTEMS SECTION 308

GO Hot Dip Galvanizing, Overcoat Under Development

STEEL RAILINGS

SRG Steel, Hot Dip Galvanizing Preferred Treatment for Removable Railings

Hot Dip Galvanizing

SRM Steel, Metallizing Primarily for non-removable posts Zinc - Zinc Aluminum Powder or Wire

WOOD

WFR Wood, Railings and Rubrails Moderate to Severe Primer, Midcoat, Topcoat CAN/CGSB-1.59M alkyds

WF1 Wood, Fencing Under Development Oil based sealer 1-GP-145M

WF2 Wood, Fencing Under Development Latex Based Sealer 1-GP-204M

WFT Wood, Field Touchup Moderate to Severe Primer, Midcoat, Topcoat CAN/CGSB-1.59M alkyds

INLAND FERRIES

InFer Steel Inland Ferries Under Development

308.05 Not Used

308.06 System Selection Criteria - The selection of a coating system is dictated by the location and environment of the structure to be coated. The coating system may be applied in a shop or in the field. The field location may necessitate a specific maintenance regimen, for example, a complete recoat or a single overcoat. The environment may be moderately or severely corrosive. In addition, there may be concerns with limiting overspray.

The following general comments apply to all coatings supplied.

• Coatings shall not be mixed and matched between suppliers, or within a supplier's product line.

• All coatings shall bear the manufacturer's name and address, batch number, paint type, date of manufacture, DOH or US Federal Specification 595b color code, and mixing and application instructions. All labels shall contain the requisite WHMIS label information and be accompanied by a valid MSDS. All coatings are subject to inspection and testing before acceptance or at the time of application.

308.07 Coating Systems - The Ministry Recognized Products List (RPL) lists coating products that have been reviewed and accepted for use on Ministry projects. The RPL can be reviewed at the following Ministry web site:

http://www.th.gov.bc.ca/publications/eng_publications/geotech/Recognized_Products_Book.pdf

Products not on the Ministry Recognized Products List shall not be used without the prior acceptance of the Ministry representative. Unless noted otherwise in this Section, products on the RPL shall be used in accordance with the introduction/definitions, descriptions, notes qualifiers and all other information given in the RPL. The use of the products from the RPL by the Contractor shall in no way relieve the Contractor from its contractual obligations.

The following pages list requirements for systems appearing in Subsection 308.04 - Coating System Selection Table.

BC - MOT 2006 308 (3 of 16)

Page 256: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 308 COATING SYSTEMS

STEEL, SHOP - SYSTEM SS1: Inorganic Zinc primer, Epoxy midcoat, Polyurethane topcoat

MoT Usage: This system is designed for use in a shop coating environment where the new steel is protected from the weather during coating and curing. The system will provide good service in a moderate to severe field environment.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

Inorganic Zinc None Epoxy Midcoat Material

Epoxy Midcoat Material

None Aliphatic Polyurethane

SSPC-SP 10/NACE No. 2, "Near-White Metal", Sharp Profile: 50 - 75 µm (2 - 3 mils)

Notes for use:

• Dry film thicknesses shall be as per the manufacturer’s application instructions. Where a specification calls for a different thickness, the specification shall be taken to be correct unless corrected by a Ministry Representative.

• Depending on the system chosen, the inorganic zinc primer may require a mist coat to prevent bubbling in the mid-coat material.

• Inorganic zinc shall be dry and cured before additional coatings are applied. • Stripe coating shall be applied on top of the primer and brushed to a minimum stripe width of 50

mm (2 inches). • While most of the above systems require SSPC-SP 10 surface preparation, SSPC-SP 5 "White

Metal" blasting will typically give a longer service life.

STEEL, FIELD - SYSTEM SF1: Metallizing primer, Epoxy midcoat, Polyurethane topcoat MoT Usage: This system is designed for use in a field coating environment where extreme exposure such

as splash zones on through trusses, fence posts (panels should be hot dip galvanized), bearings, expansion joints and any steel exposed to de-icing chemical solutions dripping from above; structures adjacent to pulp mills or smelters are present.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT TOPCOAT

Zinc wire or powder

150-200 µm (6 - 8 mils)

15% thinned epoxy

Midcoat Material

None Epoxy Midcoat Material

None Aliphatic Polyurethane

SSPC-SP5/NACE No. 1, "White Metal", Sharp Profile: 50 - 75 µm (2 - 3 mils)

Notes for use:

• Dry film thicknesses shall be as per the manufacturer’s application instructions. Where a specification calls for a different thickness, the specification shall be taken to be correct unless corrected by a Ministry Representative. The metallizing is normally 6 to 8 mils, but may in extremely severe environments be made thicker to enhance the lifetime.

308 (4 of 16) 2006 BC - MOT

Page 257: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING SYSTEMS SECTION 308

• The sealcoat is applied to partially fill the voids in the metallizing and reduce bubbling in the subsequent coat.

• Previously galvanized railings, fence posts, and panels shall be "Brush-off" cleaned and top-coated with a different colour than the structure, after a wash primer is applied.

• Metallizing can be either zinc or zinc:aluminum (85:15) alloy wire thermal spray, flame process, plasma arc process or spray and fuse powder process.

• If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE No. 5, LP WC water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level.

STEEL, FIELD - SYSTEM SF2: Organic Zinc primer, Epoxy midcoat, Polyurethane topcoat

MoT Usage: This system is designed for use in a field coating environment that is moderate to severe. This is the most often used field coating system.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

Organic Zinc Primer

May use a Penetrating

Sealer

Epoxy Midcoat Material

Epoxy Midcoat Material

None Aliphatic Polyurethane

SSPC-SP6/NACE NO. 3, "Commercial Blast", Sharp Profile: 50 - 75 µm (2 - 3 mils)

Notes for use:

• Dry film thicknesses shall be as per the manufacturer’s application instructions. Where a specification calls for a different thickness, the specification shall be taken to be correct unless corrected by a Ministry Representative.

• If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE No. 5, LP WC water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level..

• Stripe coating shall be applied on top of the primer and brushed to a minimum stripe width of 50 mm (2 inches).

STEEL, FIELD - SYSTEM SF3: Metallizing primer, Vinyl midcoat, Vinyl topcoat

MoT Usage: This system is designed for use in a field coating environment where extreme exposure areas such as splash zones on through trusses, fence posts (panels should be galvanized), bearings, expansion joints and any steel exposed to de-icing chemical solutions dripping from above and no adjacent pulp mills or smelters are present. This system shall be used only when epoxies cannot be used due to adjacent buildings, traffic, etc. This system is high VOC and should only be used where other coating systems such as SF1 cannot be used.

BC - MOT 2006 308 (5 of 16)

Page 258: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 308 COATING SYSTEMS

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

Zinc wire or powder

15 - 200 µm (6 - 8 mils)

May use a thin coat of Vinyl

Midcoat Material

None Vinyl Midcoat Material

None Vinyl Topcoat Material

SSPC-SP 5 "White Metal", Sharp Profile: 50 - 75 µm (2 - 3 mils)

Notes for use:

• Dry film thicknesses shall be as per the manufacturer’s application instructions. Where a specification calls for a different thickness, the specification shall be taken to be correct unless corrected by a Ministry Representative. The metallizing is normally 6 to 8 mils, but may in extremely severe environments be made thicker to enhance the lifetime.

• The sealcoat is applied to partially fill the voids in the metallizing and reduce bubbling in the subsequent coat.

• Previously galvanized railings, fence posts, and panels shall be "Brush-off" cleaned and top-coated with a different colour than the structure, after a wash primer is applied.

• Metallizing can be either zinc or zinc:aluminum (85:15) alloy wire thermal spray, flame process, plasma arc process or spray and fuse powder process.

• If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE No. 5, LP WC water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level.

STEEL, FIELD - SYSTEM SF4: Organic Zinc primer, Vinyl midcoat, Vinyl topcoat

MoT Usage: This system is designed for use in a field coating environment that is moderate to severe. This system shall be used only when epoxies cannot be used due to adjacent buildings, traffic, etc. (e.g., pedestrian overpasses).

This system is high VOC and should only be used where other coating systems such as SF2 cannot

be used.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

Organic Zinc Primer

None Vinyl Midcoat Material

Vinyl Midcoat Material

None Vinyl Topcoat Material

SSPC-SP6/NACE NO. 3, "Commercial Blast", Sharp Profile: 50 - 75 µm (2 - 3 mils)

Notes for use:

• Stripe coating shall be applied on top of the primer and brushed to a minimum stripe width of 50 mm (2 inches).

308 (6 of 16) 2006 BC - MOT

Page 259: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING SYSTEMS SECTION 308

• If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE No. 5, LP WC water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level.

STEEL, FIELD - SYSTEM SF5: Alkyd System on Steel MoT Usage: This system is designed for use in a field coating situation where more moderate conditions are

expected. It may also be used in areas where surface preparation is less than ideal.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

Alkyd Primer CAN/CGSB

1.40-89

None Alkyd Midcoat Material

Alkyd Midcoat

CAN/CGSB 1.59-89M

None Alkyd Topcoat

CAN/CGSB 1.59-89M

SSPC-SP 2 "Hand Tool Cleaning" or SSPC-SP 3 "Power Tool Cleaning"

Notes for use:

• While this system will work on the cleaning regimen listed above it will perform better on SSPC- SP 6 “Commercial blast”.

• Stripe coating shall be applied on top of the primer and brushed to a minimum stripe width of 50 mm (2 inches).

• If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE No. 5, LP WC water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level.

STEEL, FIELD - SYSTEM SF6: Multi-Component Urethane Systems

MoT Usage: This system is designed for use in a field coating environment in moderate to severe exposure areas.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

Zinc Primer Material

Midcoat Material Midcoat Material

Topcoat Material

High Pressure Water Wash then SSPC- SP 2 "Hand Tool Cleaning" or SP 3 "Power Tool Cleaning"

Notes for use:

• While this system will work on the cleaning regimen listed above it will perform better on SSPC- SP 6 Commercial blast.

BC - MOT 2006 308 (7 of 16)

Page 260: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 308 COATING SYSTEMS

• Stripe coating shall be applied on top of the primer and brushed to a minimum stripe width of 50 mm (2 inches).

• If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE No. 5, LP WC water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level.

STEEL, FIELD IMMERSION - SYSTEM SFIM1: Coal Tar Epoxy or Equivalent MoT Usage: This system is designed for use in a field coating environment in immersion situations

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

None Typically Topcoat Material Per

Manufacturers Instructions

Topcoat Material Per

Manufacturers Instructions

Topcoat Material

Per Manufacturers

Instructions

Water Wash as below then per the Manufacturer’s Instructions Typically SSPC-SP 5 blast

Total Thickness: Per Manufacturer’s Instructions or Specification

Notes for use:

Some coal tar filled products are carcinogenic. Read the MSDS for detailed information • • If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE No. 5, LP WC

water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level.

STEEL, FIELD OVERCOAT - SYSTEM SFO1: Water-based Acrylic or Vinyl System

MoT Usage: This system is designed for use in a field over coating situation where the original alkyd system is intact or where loose rust/paint can be removed by hand/power tools before repair and topcoating.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

Primer Material

As Per Manufacturer’s

Instructions

As Per Manufacturer’s

Instructions

As Per Manufacturer’s

Instructions

As Per Manufacturer’s

Instructions

High Pressure Water Wash then SSPC- SP 2 "Hand Tool Cleaning" or SP 3 "Power Tool Cleaning"

Notes for use:

These products are designed primarily for overcoating and encapsulating existing coatings. • • A test patch, and subsequent adhesion measurements and observation of compatibility are

recommended prior to specifying this type of coating. This reduces the risk of overcoating.

308 (8 of 16) 2006 BC - MOT

Page 261: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING SYSTEMS SECTION 308

• Manufacturer’s instructions are used here because there are a wide range of possibilities that require specific details of cleaning, coating and curing to address each individual circumstance. Areas of old coating that are feathered back should be built up to the topcoat level, before overcoating. •

• If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE No. 5, LP WC water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level.

STEEL, FIELD OVERCOAT - SYSTEM SFO3: Solvent-based System Single Component

MoT Usage: This system is designed for use in a field over coating situation where the original alkyd system is intact or where loose rust/paint can be removed by hand/power tools before repair and topcoating. It may be used in moderate to severe exposures.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

As per Manufacturer’s instructions

As per Manufacturer’s

instructions

As per Manufacturer’s

instructions

As per Manufacturer’s instructions

None As per manufacturer's

instructions

Rusted areas and Delaminated areas: High pressure water wash then SSPC- SP 11 “Powertool Cleaning to Bare Metal”. Undamaged areas high pressure water wash

Notes for use:

• The coatings listed under SF03 are too different to list a common application thickness. • This system is designed as a two coat system. • A test patch, and subsequent adhesion measurements and observation of compatibility are

recommend prior to specifying this type of coating. This reduces the risk of overcoating. • If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE No. 5,

LP WC water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level.

BC - MOT 2006 308 (9 of 16)

Page 262: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 308 COATING SYSTEMS

STEEL, FIELD OVERCOAT - SYSTEM SFO4: Solvent-based Surface Tolerant Epoxy MoT Usage: This system is designed for use in a field over coating situation where the original alkyd system is

intact or where loose rust/paint can be removed by hand/power tools. It may also be used in damp or condensing areas on structures. It may be used in moderate to severe exposures.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

As per Manufacturer’s

instructions

None As per Manufacturer’s

instructions

None None As per Manufacturer’s instructions

Rusted areas and Delaminated areas: Water wash as below then SSPC- SP 11 “Powertool Cleaning to Bare Metal”. Undamaged areas water wash as below.

Notes for use:

• This system is designed as a two coat system. • This material shall not be applied to damp or condensing surfaces. • Edges shall be feathered and where possible, bare areas shall be built up to the level of the previous

topcoat before overcoating. • If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE No. 5, LP

WC water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level.

STEEL, FIELD OVERCOAT - SYSTEM SFO5: Alkyd System on Steel Structures

MoT Usage: This system is designed for use in a field over coating situation where the original alkyd system is intact or where loose rust/paint can be removed by hand/power tools. It may be used for moderate exposures.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

Alkyd Primer CAN/CGSB

1.40-89

None Midcoat over prime

Alkyd Midcoat CAN/CGSB 1.59-89M

None Alkyd Topcoat CAN/CGSB 1.59-89M

SSPC-SP 2 "Hand Tool Cleaning" or SSPC-SP 3 "Power Tool Cleaning"

Notes for use:

• While this system will work on the cleaning regimen listed above it will perform better on SSPC-SP 6/ NACE No. 3 “Commercial blast”.

• Edges shall be feathered and where possible, bare areas shall be built up to the level of the previous topcoat before overcoating.

• If field steel has been exposed to weather, deicing salts or dirt, an SSPC-SP 12/NACE No. 5, LP WC water wash shall be done before blasting to remove salts to an SSPC-SP 12/NACE No. 5, NV-2 level.

308 (10 of 16) 2006 BC - MOT

Page 263: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING SYSTEMS SECTION 308

STEEL, PAINT CAULKING MATERIALS - SYSTEM PCM: MoT Usage: These materials are designed to be used immediately under the topcoat material. They are

compatible with most paint systems, but a test is recommended to ensure compatibility. They are used primarily to seal joints in steel structures to prevent the ingress of water in laps, splices etc. Manufacturer’s instructions are followed for use.

Notes for use:

• These materials are applied on the midcoat, then coated with the final topcoat. • Typically the top and sides of a plate are sealed and the bottom is not caulked to enable water

to exit the crack if any gets in. • If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE

No. 5, LP WC water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level.

STEEL, FIELD TOUCH-UP COATING SYSTEM - SYSTEM SFTA: Aerosol Products

MoT Usage: This system is designed for quick touch-up use in a field overcoating situation where the original alkyd system is intact or where loose rust/paint can be removed by hand/power tools. It is designed as a stopgap measure until proper maintenance coating can be scheduled.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

Zinc Rich or Inhibitive

alkyd None None None None As needed

SSPC- SP 2 "Hand Tool Cleaning" or SP 3 "Power Tool Cleaning"

Notes for use:

• All coatings will work better on a properly prepared surface (i.e., high pressure water washed and sandblasted).

• These products shall not be used on faying surfaces.

BC - MOT 2006 308 (11 of 16)

Page 264: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 308 COATING SYSTEMS

STEEL, FIELD TOUCH-UP COATING, BRUSHABLE PRODUCTS - SYSTEM SFTB: Brushable Products

MoT Usage: This system is designed for brush application in a field touchup situation where the original alkyd system is intact and where loose rust/paint can be removed by hand/power tools.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

Alkyd Primer CAN/CGSB

1.40-89

Zinc Rich alkyd

None Midcoat over prime

Alkyd Midcoat CAN/CGSB 1.59-89M

None Alkyd Topcoat CAN/CGSB 1.59-89M

SSPC- SP 2 "Hand Tool Cleaning" or SP 3 "Power Tool Cleaning" or SP 11 Industrial

Notes for use:

• These products require different surface preparation and application thickness, refer to manufacturer’s literature.

• All coatings will work better on a properly prepared surface (i.e., high pressure water washed and sandblasted).

• These products shall not be used on faying surfaces. • If field steel has been exposed to weather, deicing salts or dirt, an SSPC- SP 12/NACE No. 5, LP

WC water wash shall be done before blasting to remove salts to an SSPC- SP 12/NACE No. 5, NV-2 level.

STEEL, PENETRATING SEALERS - SYSTEM SPS.

MoT Usage: These products are designed for use in the field to help seal joints, pack rusted areas, riveted and bolted areas, and generally any area where a product that will wick into any small cracks and crevices to help seal them. These products must be topcoated as most are epoxy based and will not provide good service in exterior sunlight.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

If Used As per Manufacturer’s

Instructions

As per Manufacturer’s

Instructions

If Used As per Manufacturer’s

Instructions

If Used As per Manufacturer’s

Instructions

As per Manufacturer’s

Instructions

Notes for use:

• It is important to apply these products exactly as the Manufacturer states since they do not tolerate over thickness well.

• These products shall be used only with compatible products from the same manufacturer

308 (12 of 16) 2006 BC - MOT

Page 265: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING SYSTEMS SECTION 308

• When used as part of a coating system, these products shall be applied after the primer coat, before the stripe and midcoats. This is to take greatest advantage of the sacrificial primer which must be in electrical contact with the steel to be most effective.

PRODUCTS FOR UNIQUE SITUATIONS: ENCLOSED SPACES AND PROTECTED AREAS - SYSTEM U1: Products for Enclosed Spaces and Protected Areas

MoT Usage: This system is designed to use in situations where corrosion protection is desired and where high gloss is not as important. It is not for use in abrasive areas or where dirt retention is a problem.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

Penetrating Sealer

Topcoat material if needed

Topcoat material if needed

None As Per Manufacturer’s

Instructions

Notes for use:

• The penetrating sealer shall be used to penetrate and seal rusted areas and lap joints that cannot be properly cleaned. This is a unique application and Manufacturer’s instructions shall be followed.

• The topcoat is a relatively soft, inhibitive coating that is surface tolerant and application tolerant. It does not harden enough to place in areas that are abrasive, traveled, or accessible to the public.

• The sealer may be used before the primer or any of the successive coats. Typically the sealer is used and then coated with a mid or topcoat

PRODUCTS FOR UNIQUE SITUATIONS: LOW TEMPERATURE / HIGH HUMIDITY - SYSTEM U2: Products for low temperature / high humidity use

MoT Usage: This system is designed to use in situations where low temperature and/or high humidity preclude the use of other coating systems.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT TOPCOAT

As Per Manufacturer’s

Instructions

As Per Manufacturer’s

Instructions

As Per Manufacturer’s

Instructions

As Per Manufacturer’s

Instructions

None As Per Manufacturer’s

Instructions

Notes for use:

• These coatings are moisture cured, therefore the entire can shall be used at once to prevent reaction of the coating in the can resulting from contact with atmospheric moisture.

• These coatings may also be used at normal coating temperatures and humidities. Since it is cured by reaction with atmospheric moisture, it should not be used in low humidity cure situations.

BC - MOT 2006 308 (13 of 16)

Page 266: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 308 COATING SYSTEMS

• If field steel has been exposed to weather, deicing salts or dirt, an SSPC-SP 12/NACE No. 5, LP WC water wash shall be done before blasting to remove salts to an SSPC-SP 12/NACE No. 5, NV-2 level.

STEEL, RAILINGS, HOT DIP GALVANIZING - SYSTEM SRG: Hot Dip Galvanizing Coating of Removable Rails

MoT Usage: This system is designed for use where small parts such as railing can be removed and sent to the galvanizing plant.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

None None None None None Zinc

Surface preparation is done at the galvanizing plant.

Notes for use:

• This is the preferred treatment for rails as it provides a very long life combined with low maintenance.

• The colour is grey. A colour coat is not recommended due to the increased capital costs and maintenance.

• Sections with closed tubes shall not be done without relieving the tubes by drilling holes to let the hot gases escape. This shall be designed into the item.

• Both the inside and outside of sections are coated with zinc. • Defects include inclusions, dross, runs and mottling.

STEEL, RAILINGS AND POSTS, METALLIZING - SYSTEM SRM: Metallizing For Steel Railings And Posts

MoT Usage: This system is used primarily to coat steel fence posts that cannot be easily removed from a structure. It can however be used to coat any structural element in place. For elements which can be removed, hot dip galvanizing is the preferred treatment.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT

TOPCOAT

None None None None None Zinc

SSPC-SP 5 /NACE No. 1 White metal, Sharp Profile: 50 - 75 µm (2 - 3 mils)

Notes for use:

• Substrate shall be very clean. • Zinc or zinc:aluminum (85:15) wire or powder shall be used. • If field steel has been exposed to weather, deicing salts or dirt, an SSPC-SP 12/NACE No. 5,

LP WC water wash shall be done before blasting to remove salts to an SSPC-SP 12/NACE No. 5, NV-2 level.

308 (14 of 16) 2006 BC - MOT

Page 267: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

COATING SYSTEMS SECTION 308

• This coating may be overcoated to increase lifetime, although it is not necessary

WOOD, FIELD, RAILINGS AND RUBRAILS - SYSTEM WFR: Alkyd System Wood Railings and Rubrails

MoT Usage: This system is designed for use in a field over coating situation for wooden railings and rubrails, where the original alkyd system is intact or where loose paint can be removed by hand/power tools.

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT TOPCOAT

Can/CGSB 1-GP-189M

None If Used, Midcoat Material

White/ Grey

CAN/CGSB 1.59M89

None White latex

CAN/CGSB 1.138-93

White alkyd

CAN/CGSB 1.59M89

For guardrails:

Yellow/White alkyd CAN/CGSB 1.28M89

For sign/posts: Green alkyd

Yellow alkyd

White alkyd

CAN/CGSB 1.59M89

SSPC- SP 2 "Hand Tool Cleaning" or SP 3 "Power Tool Cleaning"

Notes for use: None

WOOD, FIELD TOUCHUP - SYSTEM WFT: Alkyd System for Touchup on Wood Structures

MoT Usage: This system is designed for use in a field over coating situation where the original alkyd system is intact or where loose rust/paint can be removed by hand/power tools.

BC - MOT 2006 308 (15 of 16)

Page 268: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 308 COATING SYSTEMS

308 (16 of 16) 2006 BC - MOT

PRIMER SEALCOAT STRIPECOAT MIDCOAT 2nd MIDCOAT TOPCOAT

DOH A-3 CGSB 1-GP-18

9M

None If Used Midcoat Material

White/ Grey CAN/CGSB 1.5

9M89

None White latex

CAN/CGSB 1.138-93

White alkyd

CAN/CGSB 1.59M89

For guardrails:

Yellow/White alkyd

CAN/CGSB 1.28M89

For sign/posts:

Green alkyd

Yellow alkyd

White alkyd

CAN/CGSB 1.59M89

SSPC- SP 2 "Hand Tool Cleaning" or SP 3 "Power Tool Cleaning"

Notes for use: None

Page 269: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 312 (1 of 12)

SECTION 312

STEEL TRAFFIC BARRIERS AND WOOD POSTS

312.01 Scope - This Section covers the quality and manufacture of steel beam guardrails, wood posts and accessory material for use as traffic barriers.

The layout and installation of materials specified in this Section are generally indicated on the Drawings of the SP312 series.

Section 604 covers the installation of the material of this Section together with the construction of ancillary work

312.02 Standards of Reference - Standards of various authorities are referred to herein generally in sufficient detail for the purpose of this Section. For detailed testing and other requirements reference to the Standards may be necessary from actual copies obtainable as follows:

CSA Canadian Standards Association: Standards Sales, 178 Rexdale Blvd, Rexdale, ON M9W 1R3 ASTM: American Society for Testing and Materials, 1916 Race Street, Philadelphia, Pennsylvania 19103 ARTBA: American Road and Transportation Builders Association, 525 School Street SW, Washington DC 20024 AASHTO: American Association of State Highway and Transportation Officials, 444 North Capitol Street N.W., Suite 225, Washington, DC 20001.

312.03 General - Steel traffic barriers shall consist of rail sections fabricated for installation to develop a continuous beam strength with the necessary safety end feature components.

All rail sections and other components shall match the design profiles and dimensions of the AASHTO/ARTBA requirements cited below for full interchangeability of similar components regardless of the source of manufacture.

The name and/or trademark of the manufacturer and the metal thickness shall be clearly and permanently marked on each component clear of the splicing overlap and on the opposite face to the traffic side.

312.04 Steel Beam Guardrail - Guardrail shall be manufactured from open hearth, electrical furnace or basic oxygen semi-spring steel sheet galvanized before forming (or afterwards as may be specified or ordered for authorized special installations) all in general accordance with the AASHTO Standard Designation M-180 “Corrugated Sheet Steel Beams for Highway Guardrail” and shall conform to the following detail requirements.

Note: Design and part numbers are taken from the ARTBA Technical Bulletin #268-B, current edition (unless stated to be BCH Part numbers) and are reproduced on Drawings 6-SP312 through 10-SP312.

312.04.01 Beam Classification (According to the AASHTO Standard) - The shape, class and type together with the ARTBA design and part numbers shall be as specified on the Purchase Order, Work Order or Special Provisions in accordance with any applicable Contract Drawings and/or Drawings of the SP312 series, as selected from the following, the standard Drawings or as may be otherwise required or approved.

i) Shape - W-Beam are for ARTBA Design G4 and MB4 installations and Thrie-Beam for Design G9 and MB9 installation and both shall be accurately formed to profile, dimensions and tolerances of the AASHTO Standard with overall cross sections of 311 mm x 85 mm and 508 mm x 85 mm respectively (ARTA Designation RE-3 and RE-63).

ii) Class and Type - Unless otherwise specified or ordered, beams shall be Class A, Type 1. Authorized special installations for corrosive conditions and environment of industrial and marine areas may necessitate a Class A, Type 2 requirement.

Note: Type 4 shop primed beams will not normally be specified.

iii) Length - Normally 3.81 m (12’ 6”) nominal length beams (4.19 m, +0, -75 mm overall) will be required.

Note: 1.9 m (6’ 3”) and other lengths if specified or ordered may be considered a special order.

iv) Punchings - In addition to joining bolt holes, punchings may be designed as 7.82 m, 3.81 m or 1.9 m (25’ 0”, 12’ 6”, 6’ 3” respectively), see Drawings, 1-SP312 and 2-SP312 for requirements.

Note: Punchings at 0.95 m, 1.27 m (3’ 1 1/2” and 4’ 2”) and other centres if specified or ordered may be considered a special order.

v) Curved Rails - For curved rail data see Drawing SP312-11.

312.04.02 Metal

i) Properties - Properties of the base metal for beams and any transition section shall conform to the following requirements:

Page 270: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 312 STEEL TRAFFIC BARRIERS AND WOOD POSTS

312 (2 of 12) 2006 BC - MOT

• Yield point minimum: 345 MPa • Tensile strength minimum: 483 MPa • Elongation minimum in 50 mm: 12%

Note: End and buffer sections shall have minimum yield point of 227 MPa and minimum tensile strength of 310 MPa.

ii) Sheet Thickness - Class A base metal thickness shall be 2.8 mm nominal (2.67 mm minimum) and for special authorized installations Class B 3.5 mm nominal (3.43 mm minimum).

iii) Sheet Widths - Sheet Widths shall be minimum 483 mm for W-Beams and 749 mm for Thrie-Beams both with a permissible tolerance of minus 3.2 mm.

312.04.03 Zinc Coating - Zinc for coating beams and ancillary sections shall be at least equal to “Prime Western” conforming to CSA Standard HZ2 or AASHTO Standard M120 (ASTM B 6) “Slab Zinc”.

The coating shall be firmly bonded to the base metal whether fabrication is from galvanized sheet or galvanizing is specified after fabrication.

The average mass of zinc coating Type 1 (AASHTO M180) shall be 610 g/m² for three specimens but minimum 550 g/m² for any individual specimen being the total amount on both sides of the sheet or beam. When Type 2 is specified or ordered (see Subsection 312.04.01 (ii)) the coating shall have average 1220 g/m² and 1100 g/m² individual minimums.

312.04.04 Quality of Work - Beams shall be punched for splice and post bolts in strict conformity with the AASHTO Standard to the designated number of and centre to centre spacing of posts.

Upon delivery the beams shall be ready for assembly and installation.

Note: No punching, cutting or welding will be permitted on site except for special details in unforeseen and exceptional cases and to the prior approval of the Ministry Representative.

Warped or otherwise deformed beams will be rejected as will those with injurious defects or excessive roughness of the zinc coating.

Beams for concave and/or convex curved installations with a radius of 45 m or less shall be accurately and smoothly bent in the shop with minimum deformity. The radius of curvature shall be clearly stencilled on the back of each

curved rail section.

312.04.05 Inspection - No material shall be shipped prior to inspection or until a release for shipment has been issued by the Ministry Representative.

All materials may be inspected before shipment to the construction site, or at the construction site, or both. The supplier or manufacturer shall provide the necessary facilities to enable the Ministry Representative to expeditiously examine selected pieces or take specimen samples for testing from the material lot(s) clearly identified for intended supply to the Ministry. Identification shall be such that after inspection and testing the lot may be subsequently identified for acceptance or rejection.

Inspection of material before shipment shall not exclude its subsequent rejection at the construction site if found to fail any requirements of this specification.

312.04.06 Examination - Examination may include the following:

i) Dimension measurements for size and thickness all of which shall be within the tolerance measurements specified by Subsection 312.04.01 (i) and Table 312-A.

ii) Coating generally shall be smooth, free of beading or sharp projections at edges. Coating adherence shall prevent the peeling of any portion of the zinc coating so as to expose the base metal by cutting or prying with a stout knife under considerable pressure.

312.04.07 Testing - When required by the Ministry Representative, testing shall be carried out according to ASTM A 90 - “Weight of Coating in Zinc Coated . . . . . Articles” (also AASHTO T65) to determine the mass of galvanizing in conformity with the requirements of

TABLE 312-A

GALVANIZED BEAM THICKNESS

FINISH

Base Metal

Type 1 Type 2 Tolerance

Class A (2.8 mm nominal)

2.74 mm 2.82 mm minus 0.23 mm

Class B (3.5 mm nominal)

3.51 mm 3.58 mm minus 0.25 mm

Note: Tolerance given is for under specified thickness; there is no limit for over thickness.

Page 271: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STEEL TRAFFIC BARRIERS AND WOOD POSTS SECTION 312

BC - MOT 2006 312 (3 of 12)

Subsection 312.04.03. Alternatively magnetic gauge determination in accordance with ASTM E 376 may be permitted.

The testing of the mechanical properties of the base metal may be carried out by the Ministry Representative for compliance with the requirements of Subsection 312.04.02.

312.04.08 Rejection and Retests - Should the beam tested fail to meet the testing requirements specified above, two additional beams as selected by the Ministry Representative shall both meet the test requirements in every respect, otherwise the complete lot represented by the samples will be subject to rejection.

In the event of complete lot rejection and prior to any further testing by the Ministry, the intended replacement lot shall be satisfactorily tested by a mutually acceptable independent testing agency at no expense to the Ministry. When the time delay for retesting is unacceptable to the Ministry the order or part thereof will be subject to cancellation.

Rejected material shall be replaced at the Supplier’s or Contractor’s expense, including shipping charges and removal of rejected material at the construction site, if applicable.

312.05 Guardrail Accessories

312.05.01 Transition Section - Transition section for W-Beam to Thrie-Beam shall be of matching metal thickness and finish and fabricated to the ARTBA design profile (RE-69) to provide a smooth and uniform transition of beam widths and corrugations.

312.05.02 End Sections - End sections shall be of the type specified or ordered as indicated on standard Drawing 2-SP312. Double face buffer (ARTBA Designation RE-7) sections for breakaway cable terminal (BCT) assemblies shall be of the stipulated radius and the metal thickness and finish to match the beams. Terminal connectors (RE-8), as return sections of the BCT buffer ends and as normal beam connections (RE-8 or RE-67) to bridge parapets, abutments and the like, the metal thickness shall be Class B with matching finish.

312.05.03 Back-up Plates - Back-up Plates required where steel beams between splices are to be installed to any square or channel section steel posts (standard 305 mm lengths) shall be fabricated of the stipulated lengths from the standard beam section (as or similar to RE-4 or RE-64 ARTBA Designation).

312.05.04 Bolts, Nuts and Washers - Button-head bolts for joining beam sections in the length or to end sections and

for fixing beams to posts (ARTBA Designation F-3) and hexagonal-head bolts elsewhere shall be of the stipulated diameter, thread length and/or bolt length.

Bolts generally shall conform to the requirements of ASTM A 307, nuts to ASTM A 563 Grade A and plain washers to ANSI B27.2 Type A requirements, and unless otherwise specified, all galvanized according to ASTM A 153.

Plate washers where required (as ARTBA Designations F-12, F-36 and F-38) shall be of the size and thickness stipulated to ASTM A 36 and galvanized to ASTM A 153 requirements.

312.05.05 Post Sleeve - Post Sleeve for BCT breakaway cable fixing through the wood post shall be a 150 mm length of 60 mm outside diameter galvanized pipe conforming to ASTM A 120 for “standard weight” pipe (ARTBA F-34).

312.05. 06 Cable Assembly - Cable Assembly for BCT installation shall consist of a swaged fitting, 25 mm diameter threaded stud, locking pin, nut and washer at each end of a cable of 19 mm nominal diameter, 6 x 19 wire strand core independent wire rope core, galvanized, right regular lay wire rope with a minimum breaking strength of 200 000 N (45,000 #) and conforming to AASHTO M-30 with the overall assembly length of 1980 mm developing a similar breaking strength (ARTBA F-37, F-35 and complete with plate washers, F-36 one end and F-38 the other).

312.05.07 Anchor Plate - Anchor Plate for the breakaway cable attachment to the steel beam for BCT assemblies shall be fabricated to the ARTBA design profile (RE-71) from steel plate conforming to ASTM A 36 and galvanized according to ASTM A 123 after forming and drilling for and including eight 16 mm diameter hexagonal-head bolts 38 mm long each with nut and 3.5 mm thick plain washer 44 mm outside diameter (ARTBA F-8 and F-13) complying with Subsection 312.05.04.

312.05.08 Anchor Inserts - Anchor Inserts for fixing terminal connector end sections to existing concrete shall be heavy duty hexagonal bolt type expansion anchor “Hilti” size HSL M16/25, or other pre-approved alternative with hardened plain washer minimum 4 mm thick and 57 mm outside diameter with all metal surfaces galvanized.

Anchors of alternative manufacture may be approved by the Ministry Representative provided equivalence of design and effect can be demonstrated.

312.05.09 Steel posts - Where required for installation on concrete, steel posts shall be fabricated from standard structural steel H-beam or bent steel plate to channel or “C” shape and with similar section short length offset “blocks”

Page 272: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 312 STEEL TRAFFIC BARRIERS AND WOOD POSTS

312 (4 of 12) 2006 BC - MOT

and heavy base plates and all shall conform to CSA Standard G40.21M type 300 W or ASTM A 570, Grade 45 and/or ASTM A 36.

All welding shall conform to the requirements of the American Welding Society Code AWS D1.1. All welding shall be carried out by qualified operators of a contractor approved by the Canadian Welding Bureau or the American Welding Society to the requirements of CSA Standard W47.1 Division 3 or the AWS Code.

Galvanizing, according to CSA Standard G164 or ASTM A 123, shall be carried out after all punching, drilling, cutting and welding.

Post type, size and length similar to ARTBA Designation P-42 or P-53, complete with connecting bolts (F-8), expansion anchors similar to Subsection 312.05.08 or through bolts and backing plates or other fixing devices shall be as stipulated and/or detailed.

Alternative shape, type and size of post members and fixing devices to those detailed or ordered may be permitted by the Ministry Representative provided equivalence of design and effect can be demonstrated.

312.06 Wood Posts

312.06.01 Square Posts - Square posts and offset blocks shall be Douglas Fir/Hemlock “No. 1, Structural Posts and Timber”, graded in conformity with the requirements of NGLA “Standard Grading Rules for Canadian Lumber”.

Wanes on any face shall not exceed the following width:

• Above grade (including blocks): 25 mm • Below grade: 60 mm

being the minimum permissible post width less the portion entirely free of wane.

Posts and blocks shall be supplied in the exact lengths ordered or specified and unless otherwise required on the Purchase Order, Work Order, drawing or specification the scantling shall be nominal 200 mm x 200 mm, and pair of 200 mm x 150 mm for each BCT installation, with dressed on four sides minimum dimension of 189 mm x 189 mm and 189 mm x 138 mm respectively and a tolerance of plus 3 mm.

312.06.02 Preservation Treatment - All posts and blocks shall be pressure treated in accordance with CSA Standard 080-M “Wood Preservation”.

Unless otherwise specified or stipulated on the Purchase Order, Work Order, specifications, or drawings, the preservatives and retention of preservatives shall conform to the recommendation of CSA Standard 080.14-M Table I “Minimum Retention of Preservatives in Pressure Treated Wood for Highway Construction” under the heading of “Posts-Guardrail...” for square posts and blocks.

Prior to treatment all material shall be air seasoned in accordance with AWPA Standard M1 Paragraph 1.31 to a moisture content of 15% to 22% before pressure treatment. In exceptional circumstances the Ministry Representative may permit conditioning by steaming for a total of not more than 6 hours at a temperature not in excess of 115°C.

312.06.03 Inspection - All processing of the material shall be open for inspection by the Ministry Representative with free entry to the treating plant while the work is being performed.

No material shall be shipped prior to inspection or the written release for shipment by the Ministry Representative.

Material inspected before shipment shall not bar its subsequent rejection after delivery if found to fail any requirements of this specification. Rejected material shall be replaced at the Supplier’s expense including shipping charges and removal of rejected materials if applicable.

Note: Inspection of material already in bundles ready for shipment shall be considered as “incomplete”, and the material will be subject to final inspection by the Contractor only when the bundles are opened immediately prior to use.

The Supplier shall advise the Ministry Representative at least two full working days before the material is ready for inspection prior to shipment. A Supplier in a distant location or outside B.C. shall advise the Ministry Representative at least one full week before the material is ready for inspection prior to shipment. After inspection the Ministry reserves the right to conduct whatever tests are deemed necessary to confirm that the material complies with the requirements of this specification before a release for shipment is issued.

Page 273: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STEEL TRAFFIC BARRIERS AND WOOD POSTS SECTION 312

BC – MOT 2006 312 (5 of 12)

Page 274: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 312 STEEL TRAFFIC BARRIERS AND WOOD POSTS

312 (6 of 12) 2006 BC – MOT

Page 275: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STEEL TRAFFIC BARRIERS AND WOOD POSTS SECTION 312

BC – MOT 2006 312 (7 of 12)

Page 276: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 312 STEEL TRAFFIC BARRIERS AND WOOD POSTS

312 (8 of 12) 2006 BC – MOT

Page 277: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STEEL TRAFFIC BARRIERS AND WOOD POSTS SECTION 312

BC – MOT 2006 312 (9 of 12)

Page 278: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 312 STEEL TRAFFIC BARRIERS AND WOOD POSTS

312 (10 of 12) 2006 BC – MOT

Page 279: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STEEL TRAFFIC BARRIERS AND WOOD POSTS SECTION 312

BC – MOT 2006 312 (11 of 12)

Page 280: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 281: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 316 (1 of 10)

SECTION 316

STEEL AND WIRE FENCE MATERIALS

316.01 Scope - This Section covers the quality and manufacture of wire fencing material, steel posts, gates and hardware, and various accessory material.

Treated wood fence posts are specified by Section 909.

For convenience, chain link fabric necessary for protection on rock slopes is included in this Section.

The uses of materials specified in this Section are generally indicated on Drawings of the SP741 series for construction of fences and Section 207 for rock protection.

The types of Standard Wire fencing and Chain Link fabric for fencing and protection on rock slopes covered by this Section are designated as follows:

• Type A - Special Wire Fabric Fence for use only on railway rights-of-way

• Type B - Standard Wire Fabric Fence

• Type C - Standard Barbed Wire Fence

• Type D - Chain Link Fence.

Chain link fence protection on rock slopes and tentative requirements for High-tensile Smooth-wire Fences are also included.

316.02 Applicable Documents - See Table 316-A.

Note: Standards referred to in this Section are obtainable from:

CGSB: Canadian Government Publishing Centre Supply and Services Canada Ottawa, ON K1A 0S9

ASTM: American Society for Testing and Materials 1916 Race Street Philadelphia, PA 19103

316.03 Type A & B Fence Fabrics - Fence fabric for railway and highway rights-of-way shall be manufactured from good commercial quality galvanized steel wire in general accordance with ASTM A 116, but shall conform to the requirements following and those listed in Table 316-B.

316.03.01 Styles - See Table 316-B. Length of fabric rolls shall be 101 m unless otherwise ordered.

Note: Other standard and specialty fabrics when specified shall meet the following general specifications.

316.03.02 Wire Size and Strength - All wire used in the fabric shall have a minimum galvanized coated nominal diameter of 2.50 mm (12 1/2 ga.). The variation permitted from the measured nominal diameter shall be ± 0.1 mm. The minimum breaking force shall be 4250 N.

316.03.03 Zinc Coating - The zinc used for coating shall be any grade of zinc conforming to ASTM B 6. All wire shall have a uniform coating of zinc which shall adhere firmly to the base metal. The average mass of zinc coating shall be 90 g/m2 of uncoated wire surface for three specimens but minimum 80 g/m2 for any individual specimen.

316.03.04 Quality of Work - Splicing of individual line wires by means of a wrap joint, electric butt weld or galvanized sleeve is permitted.

The maximum number of line wire joints shall not exceed half of the number of line wires in any roll of fencing.

All joints shall be made in accordance with good work practice.

All stay wires shall be properly spaced and substantially perpendicular to the line wires.

The locks or fastenings at the intersections of the longitudinal and vertical wires of the woven wire fencing shall be of such construction as will prevent them from slipping, either longitudinally or vertically. All locks and fastenings shall be effectively galvanized.

Horizontal wires of all woven wire fencing shall be provided with tension curves to accommodate temperature changes after erection.

316.03.05 Testing

i) Samples: Sufficient length of fabric to include at least three vertical stay wires shall be cut from each roll to be tested as required by Subsection 316.15 from which line wire and stay wire specimens shall be taken for testing.

ii) Diameter of coated wire: The average of two readings taken at right angles to each other at random on uniformly coated areas shall all be within the tolerance measurements specified in Subsection 316.03.02.

iii) Strength: The tensile strength of three line wire specimens shall be tested in accordance with ASTM A 370 on a machine calibrated to ASTM E 4 standards. The tensile strengths shall meet the requirements of

Page 282: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 316 STEEL AND WIRE FENCE MATERIALS

316 (2 of 10) 2006 BC - MOT

Subsection 316.03.02.

iv) Coating adhesion: Three line wire specimens shall be wrapped in a close helix at least twice around a cylindrical mandrel having a diameter four times the nominal diameter of the wire: wrapping speed shall not exceed four seconds per turn. The coating shall adhere to the wire without flaking or being removed by rubbing with bare fingers.

v) Coating mass: Three line wire specimens (from each roll), each more than 400 mm in length, and three stay wire specimens of short lengths between knots, etc., but each specimen totalling more than 400 mm shall be tested in accordance with ASTM A 90 for conformity with the requirements of Subsection 316.03.03.

vi) Rejection and Retest: Refer to Subsection 316.16.

316.04 Type D Fence Chain Link Fabric - Chain link fence fabric shall be manufactured from good commercial quality galvanized steel wire (or other specified finish) in general accordance with CAN/CGSB-138.1M and shall conform to the requirements listed in Subsections 316.04.01 through 316.04.04.

316.04.01 Fabric Classification (according to CGSB Standard) - The type, class, style and grade of chain link fence fabric shall be as specified on the Purchase Order, Work Order or Special Provisions in accordance with the Drawings and/or Drawings SP741-05.01 and SP741-05.02, selected from the following or as may be otherwise specified or approved.

i) Type/Class 1A - Zinc coated (galvanized) steel wire fabric normally will be specified for all heights of chain link fences as indicated on Drawing SP741-05.01, unless Type/Class 1B Vinyl coated steel is required for authorized special installations.

ii) Style - nominal diameter of zinc coated wire:

• Heavy, for highway protection fence from rolling rock • Medium, for Standard and Security height fences • Light, for Residential height fences (see Drawing

SP741-05.01) • See Table 316-C and 316-D (when permitted).

iii) Grade - mass of zinc coating per unit area of uncoated wire: Grade 1, average 490 g/m2 for three specimens, minimum 440 g/m2 for any individual specimen. The zinc used for coating shall be any grade of zinc conforming to ASTM B 6. All wire shall have a uniform coating of zinc which shall adhere firmly to the base material.

Note: When specified, Grade 2 heavy coating (average 610 g/m2, individual 550 g/m2 minimums) for corrosive environments and the zinc coating (average 90 g/m2, individual 80 g/m2 minimums) for vinyl coated wire and the vinyl coating requirements shall be in accordance with CAN/CGSB-138.1M.

316.04.02 Fabric Height, Length and Mesh - Wire shall be woven throughout to a uniform diamond mesh 50 mm ± 3.0 mm clear between parallel mesh wires: fabric height as specified ± 25 mm with both selvage edges twisted and/or knuckled:

• fabric 1.5 m high and under: knuckled both edges • fabric 1.8 m high and over: knuckled one edge, and

twisted the other • Residential height fence light style fabric 1.0 m and

1.2 m high: knuckled both edges.

Length of rolls with slack removed by nominal tensioning shall be 100 m unless otherwise ordered.

Note: Typical (normal) ordering designation from above: Type 1, Class A, Grade 1, Medium Style with roll width (height), length, mesh size and quantity.

316.04.03 Quality of Work - Fabric shall be of uniform quality and condition, free from all defects and imperfections affecting serviceability and appearance.

316.04.04 Testing

i) Samples: Three full height pickets shall be provided from each roll as required by Subsection 316.15.

ii) Diameter of coated wire: The average of two readings taken at right angles to each other at random on uniformly coated portions of each pair of pickets between bends shall be within the tolerance measurement specified in Subsection 316.04.01 (ii).

iii) Strength: The tensile strength of three line wire specimens shall be tested in accordance to ASTM A 370 on a machine calibrated to ASTM E 4 standards. The tension applied to the undeformed portion between two adjacent bends shall meet the requirements of Subsection 316.04.01 (ii).

iv) Coating adhesion: Three specimens of undeformed portions between two adjacent bends shall be wrapped in a close helix once around a cylindrical mandrel having a diameter four times the nominal diameter of the wire: wrapping speed shall not exceed four seconds per turn The coating shall adhere to the wire without flaking or being removed by rubbing with bare fingers.

Page 283: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STEEL AND WIRE FENCE MATERIAL SECTION 316

BC - MOT 2006 316 (3 of 10)

v) Coating mass: Three specimens (from each roll) each more than 400 mm long excluding knuckled or twisted ends shall be tested in accordance with ASTM

A 90 for conformity with the requirements of Subsection 316.04.01 (iii).

TABLE 316-A DOCUMENTS APPLICABLE FOR REFERENCE

CAN/CGSB-138.1-M and 1-GP-181M

Fence, Chain Link, Fabric Coating, Zinc-Rich, Organic, Ready Mixed

ASTM A 53 Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and Seamless

ASTM A 90 Test Method for Weight of Coating on Zinc-Coated (Galvanized) Iron or Steel Articles

ASTM A 116 Specification for Zinc-Coated (Galvanized) Steel Woven Wire Fence Fabric

ASTM A 121 Specification for Zinc-Coated (Galvanized) Steel Barbed Wire

ASTM A 123 Specification for Zinc (Hot-Galvanized) Coatings on Products Fabricated from Rolled, Pressed, and Forged Steel

ASTM A 153 Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A 641 Specification for Zinc-Coated (Galvanized) Carbon Steel Wire

ASTM B 6 Specification for Zinc (Slab Zinc)

ASTM B 211M Specification for Aluminum-Alloy Bar, Rod, and Wire [Metric]

TABLE 316-D VINYL COATED ZINC-COATED WIRE (when permitted)

Type 1B Style Vinyl Coated Zinc-Coated Wire Nominal Diameter

Breaking Force Minimum N

Heavy 5.0 mm ± 0.1 mm 6 000

Medium 3.5 mm ± 0.1 mm 3 000

Light 3.0 mm ± 0.1 mm 2 600

TABLE 316-C ZINC COATED WIRE

Type 1A Style Nominal Diameter of Zinc Coated Wire Breaking Force Minimum N

Heavy 5.0 mm ± 0.1 mm 10 000

Medium 3.5 mm ± 0.1 mm 5 000

Light 3.0 mm ± 0.1 mm 3 600

TABLE 316-B STYLES OF FENCES

Fence Types Fabric Style No.

Number of Horizontal Wires

Fabric Height (mm)

Stay Wire Spacing (mm)

Wire Diameter (mm)

A 1047-6 10 1195 150 2.50 MIN

B 939-6 9 990 150 2.50 MIN

Page 284: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 316 STEEL AND WIRE FENCE MATERIALS

316 (4 of 10) 2006 BC - MOT

vi) Rejection and Retest: refer to Subsection 316.16.

316.05 Chain Link Fabric and Accessories on Rock Slopes - Chain link fabric for protection on rock slopes shall be manufactured and tested in general conformity with Subsection 316.04 and to the following requirements:

• Fabric shall be to CAN/CGSB-138.1M designation of wire woven to 75 mm diamond mesh in rolls 3.0 m wide, knuckled on both selvage edges, and 15 m long. See Table 316-E.

Note: For corrosive conditions and environment Grade 2 - heavy galvanizing may be specified as a special order with possible extended lead time required for delivery.

316.06 Barbed Wire - Barbed wire for Type B & C fences and for security height Type D fences shall be manufactured from good quality galvanized steel wire in general accordance with ASTM A 121 but shall conform to the following detail requirements:

a) Wire Size and Strength: The wire shall be continuously twisted double strand of 2.5 mm nominal diameter (12 1/2 ga.) and to have a minimum breaking force of 4000 N.

b) Barbs: Four point barbs shall be of not less than 2.0 mm nominal diameter (14 ga.) and regular 150 mm maximum spacings.

c) Zinc Coating Class (according to ASTM A 121): The zinc used for coating shall be any grade of zinc conforming to ASTM B 6. All wire, including barbs, shall have a uniform coating of zinc which shall adhere firmly to the base metal.

The average mass of zinc coating per unit area of uncoated wire for three specimens and the minimum for any individual specimens shall be in accordance with the class of coating as follows:

i) Class 1 for use in the construction of Type C fences and for the top strand of Type B fences (see Drawings SP741-01.01 and SP741-02.01), the coating shall be average 90 g/m2 and 80 g/m2 individual minimums.

ii) Class 3 for use with Security height Type D Chain Link fences (see Drawing SP741-05.01), coating shall be average 240 g/m2 and 215 g/m2 individual minimums.

d) Length: Spools shall be 400 m unless otherwise ordered.

e) Quality of Work: Splicing of individual strand wires by means of a wrap joint or an electric butt weld is permitted. Not more than three splices or joints shall exist in any 400 m spool of barbed wire. Such splices or joints shall be made in accordance with good work practice.

The twist in the double strand barbed wire shall be uniform and continuous in one direction to lock the barbs in place. The barbs shall be sharp and well formed.

Wire strands showing nicks or indentures likely to cause the wire to break under flexure are not acceptable.

f) Testing

i) Samples: Sufficient length of barbed wire shall be cut from each spool to be tested as required by Subsection 316.15.

ii) Strength: The tensile strength of three line wire specimens shall be tested in accordance to ASTM A 370 on a machine calibrated to ASTM E 4 standards. The tensile strength shall meet the requirements of Subsection 316.06 (a).

iii) Coating Mass: Three single wire specimens (from each spool), each aggregating more than 400 mm in length shall be tested in accordance with ASTM A 90 for conformity with the requirements of Subsection 316.06 (c).

iv) Rejection and Retest: Refer to Subsection 316.16.

Note: Smooth (barbless) galvanized wire, not specified to be "high-tensile," shall be double strand meeting all the above requirements except those for barbs.

TABLE 316-E FABRIC DESIGNATION

Type 1 Class A Grade 1 Light Style OR Nominal Medium Style

i.e. Steel zinc coated (galvanized)

3.0 mm Diameter 3.5 mm

Page 285: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STEEL AND WIRE FENCE MATERIAL SECTION 316

BC - MOT 2006 316 (5 of 10)

316.07 High-tensile Wire - Requirements for galvanized wire for high-tensile smooth-wire (no barbs) fencing are shown in Table 316-F.

316.08 Brace, Tension and Tie Wire

316.08.01 Brace Wires - Brace wire shall be manufactured of good commercial quality soft temper steel wire 3.5 mm nominal diameter gauge and zinc coated (galvanized) normally minimum 80 g/m2 (Class 1 according to ASTM A 641) or as otherwise specified or approved.

Brace wire for high-tensile smooth-wire fencing may be fence wire specified in Subsection 316.07.

316.08.02 Tension Wire - Tension wire to secure bottom of chain link fencing and at top where specified shall be manufactured of good commercial quality coil spring crimped steel wire 5.0 mm nominal diameter gauge and zinc-coated (galvanized) normally 400 g/m2 (Class B according to ASTM A 641) for Standard and Security height fences, or as otherwise specified or approved. Residential height fences tension wire shall be 3.5 mm nominal diameter.

316.08.03 Tie Wire and Wire Hog Ring Clips - Tie wire and wire hog ring clips shall be of steel of the nominal diameter gauge specified and zinc coated equivalent to that specified for the relevant fencing fabric: aluminum tie wire shall be of specified gauge and according to ASTM B 211M.

316.09 Steel Fence Posts on Rock (Excluding Chain Link Fence) - Steel fence posts and braces for Type A, B and C fences where specified or required on exposed rock or rock with minimum over-burden shall be of good commercial quality steel conforming to either Category A or Category B as specified in Subsection 316.10 with the following exceptions:

• Line post mass shall be not less than 1.9 kg/m and angles 4.75 kg/m minimum, both drilled for attaching barbed wire or a substantial number of fence fabric line wires with wire ties or clips.

• Channel braces shall be 1.5 kg/m minimum.

316.10 Steel Pipe Posts, Rails and Braces - Chain Link Fencing

316.10.01 Category and Sizes - All posts, rails and braces shall be of Category 1 or Category 2 at the discretion of the supplier and shall be supplied in the nominal outside diameter as specified on the Purchase Order, Work Order or Special Provisions in accordance with the Drawings and/or Drawing SP741-05.02 and selected from Tables 316-G or 316-H or as may be otherwise specified or approved.

Note: Specifications or Purchase Order may permit thin wall tubing and consequent lower zinc coating for proprietary galvanized and vinyl coated residential fence posts and gates.

Bolts and nuts for fastening braces to posts shall be galvanized Class D (305 g/m2 individual pipe posts, rails and braces for chain link Type D fences shall be manufactured in general accordance with ASTM A 53.

a) Category A - Category A posts, braces and rails shall be steel butt weld pipe, Schedule 40, as specified by ASTM A 53, except that the hydrostatic testing requirement is waived, and the minimum weight shall be no less than 95% of the nominal weight. Pipe shall be zinc-coated in accordance with ASTM A 53. This ASTM Standard requires, among other things, an average zinc coating of 550 g/m2 and a minimum zinc coating of 490 g/m2.

b) Category B - Category B posts, braces and rails shall be made from steel pipes. The pipe shall be formed from steel strip conforming to ASTM A 569. The steel in the formed pipe shall have a minimum yield strength of 350 MPa (50,000 psi). The product of the yield strength and section modulus of the pipe shall be not less than that of pipe meeting the requirements for Category A posts and rails.

The outer surface of Category B posts, braces and rails

TABLE 316-F REQUIREMENTS FOR GALVANIZED WIRE FOR HIGH TENSILE SMOOTH-WIRE (NO BARBS) FENCING

Diameter: 2.5 mm nominal diameter (12 1/2 ga.)

Tensile Strength: between 1170 MPa and 1590 MPa (170,000 to 230,000 psi)

Breaking Force: in excess of 5800 N (1300 lbf)

Zinc Coating (Class 3): minimum 240 g/m2

Coil Length: in excess of 1200 m (approx. 100 lb.)

Page 286: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 316 STEEL AND WIRE FENCE MATERIALS

316 (6 of 10) 2006 BC - MOT

shall have all of the following protective coatings, applied in the following order:

i) Hot dip zinc coating, conforming to ASTM B 6, High Grade or Special High Grade, applied at an average weight of 305 g/m2 (1.0 oz/ft2) and at a minimum weight of 275 g/m2 (0.9 oz/ft2), as determined by the test method in ASTM A 90.

ii) Chromate conversion coating, with a weight of 30 micrograms/sq. in. ± 15 micrograms/sq.in., as determined by a strip and weight method for the zinc and chromate and by determining the percentage of each by atomic absorption spectrophotometer.

iii) Clear acrylic polyurethane coating with a thickness of 0.100 mm ± 0.025 mm (0.4 ± 0.1 mils). The combined outer coating shall have an ability to resist:

• 1000 hours of exposure to salt fog with a maximum of 5% red rust when tested in accordance with ASTM B 117.

• 500 hours of exposure to 100% relative humidity without blistering and peeling when tested in accordance with ASTM D 2247; and

• 500 hours of exposure in a weatherometer without

film cracking of the clear coat when tested in accordance with ASTM G 23, Type E or EH carbon arc, or ASTM G 26, Type B or BH xenon arc.

The inner surface of Category B, posts, braces and rails shall have either a zinc coating as per ASTM F 1234, Type B, applied at an average rate of 305 g/m2 and a minimum rate of 275 g/m2; or an ASTM F 1234, Type D zinc coating with a minimum zinc powder loading of 91% by weight and a minimum thickness of 0.075 mm (0.3 mils). The inner coating shall have an ability to resist 650 hours of exposure to salt fog with a maximum 5% red rust when tested in accordance with ASTM B 117.

316.10.02 Quality of Work - The finished pipes shall be reasonably free from injurious defects. All burrs at ends of pipes shall be removed.

The zinc or zinc/chromate/acrylic coating shall be free from injurious defects and excessive roughness.

316.10.03 Testing

a) Samples: A 100 mm specimen shall be cut from each end of one pipe in every lot of 500 or fraction

TABLE 316-H REQUIREMENTS FOR PIPE COMPONENTS FOR CHAIN LINK FENCING - CATEGORY A

Actual Outside Post Diameter (mm) 26.7 33.4 42.1 48.3 60.3 73.0 88.9

Wall Thickness (mm) 2.87 3.38 3.56 3.68 3.91 5.16 5.49

Mass (kg/m) 1.7 2.5 3.4 4.0 5.4 8.6 11.3

Tolerances: Diameter ± 1% Mass ± 5%

TABLE 316-G REQUIREMENTS FOR PIPE COMPONENTS FOR CHAIN LINK FENCING - CATEGORY A

Pipe Sizes Nominal Outside Diameter (mm)

Residential Standard Security

Line Posts 42 48 60

End, Corner & Straining Posts 48 60 73

Gate Posts, gates 2.5 m and less 48 60 73

Gate Posts, gates over 2.5 m 48 73 89

Top Rails 33 33 42

Brace Rails -- 33 42

Page 287: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STEEL AND WIRE FENCE MATERIAL SECTION 316

BC - MOT 2006 316 (7 of 10)

thereof.

Note: Specimens may be taken from the extreme ends of pipe that has been cut to length after galvanizing; otherwise, specimens shall be taken at least 200 mm clear of each galvanized end build-up.

b) Dimensions: Specimens shall be measured for diameter and wall thickness/mass and all shall be within the tolerance measurements specified by Subsection 316.10.01.

c) Mass Coating: Specimens shall be tested for the mass of zinc or composite coating in accordance with Subsection 316.10.01 and ASTM A 90.

d) Rejection and Retest: Refer to Subsection 316.16.

316.11 Gates and Hardware - Gates shall be supplied with hardware ready for installation as specified by the Purchase Order, Work Order or Special Provisions in accordance with the Drawings and/or Drawings SP741-04.04, SP741-04.05, SP741-05.03 and SP741-05.04 or as may be otherwise specified or ordered.

Gates may be specified by the types as follows:

• Type I Pressed sheet steel frame, in-fill and brace members

• Type II Pipe frame and horizontal pipe in-fill members

• Type III Pipe frame, bracing and wire fabric in-fill • Type IV Pipe frame, bracing and chain link fabric

in-fill • Type V Slip wire range gates barbed wire and

wood droppers

with the general requirements of material, finish, hardware and quality of work specified in Subsections 316.11.01 through 316.11.06.

316.11.01 General - Gate sizes shall be the fence height or as otherwise stipulated and the nominal width designated by the clear opening width between gate posts with allowance made for hinges and latches, etc.

Gates shall be fabricated of galvanized pipe, tubing or formed sheet metal sections properly joined, braced and with in-fill all as specified by type below.

All pipe joints shall be cut to fit closely together and fully welded, vertical stiles neatly capped or mitred to horizontals with drilled holes to vent and drain closed end pipe members. Bends where permitted at corners shall be made without deforming tube or pipe section.

All welds, conforming to the best commercial practice, shall be smooth, and with adjoining and other marred galvanized pipe surfaces, shall be painted with two heavy coats of zinc rich paint manufactured in accordance with Standard 1-GP-181M.

All hardware and required fittings and fasteners shall be of suitable aluminum alloy or of steel or malleable or ductile cast iron, galvanized in accordance with ASTM A 153. Hinges generally shall be so designed as to permit the gate to swing back against the fence and to prevent the easy removal of gate and hinges. Hinges and other fittings shall all be of adequate strength for fastening securely without distortion and shall be sound and free of defects. Chain and/or latching gate catch for padlocking together with keepers to hold the gate open and centre drop bolt and sleeve for double swing gates shall be provided as and where specified or ordered.

All galvanizing and other finished surfaces shall be smooth and free of sharp dangerous protrusions.

316.11.02 Type I Gate (sheet metal members) - Formed heavy duty galvanized sheet metal sections with rolled edges as horizontal rails and vertical stiles, braced vertically and/or diagonally with similar members as necessary shall be rigidly riveted together to form a rugged non-sagging prefabricated gate.

Nominal sizes: 1220, 2440, 3050, 3660, 4270 and 4880 mm wide and 1220 mm high.

Gates to be supplied completely assembled with required hardware for wood (or metal) gate posts all as specified or ordered.

316.11.03 Type II Gates (all pipe) - Galvanized pipe 42 mm OD, 3.4 kg/m mass with zinc coating minimum 490 g/m2 (see Subsections 316.10.01 and 316.10.03) shall be welded together as gate frame and horizontal pipe in-fill members at 305 mm on centres. Vertical centre bracing of 5 mm x 19 mm flat bar on both sides of all horizontals is not required for gates 3050 mm and 3660 mm nominal widths. Gussets shall be welded to opposite corners of the gate as shown on Drawing SP741-04.05.

Nominal sizes: 3050, 3660, 4270 and 4880 mm wide and 1220 mm high.

Gates shall be supplied completely assembled with required hardware for wood (or metal) gate posts all as specified or ordered.

316.11.04 Type III Gates (pipe and fabric) - Galvanized pipe 33 mm OD, 2.5 kg/m mass with zinc coating minimum

Page 288: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 316 STEEL AND WIRE FENCE MATERIALS

316 (8 of 10) 2006 BC - MOT

490 g/m2 (see Subsections 316.10.01 and 316.10.03) shall be formed with even radius bent corners or neatly welded corners and vertical bracing at 1/3 points in the width of 27 mm OD, 1.7 kg/m pipe. Cleats or gussets shall be welded to opposite corners of gate frame/panel(s) as indicated on Drawing SP741-04.05, holed for securing under tension a diagonal brace consisting of 5.0 mm nominal diameter galvanized coil spring wire (see Subsection 316.08) with or without forged turn-buckle as and when specified or ordered.

In-fill shall be wire fabric all of 3.5 mm galvanized diameter wire with seven or more horizontal line wires, and stay wires not more than 600 mm apart. Fabric shall be securely fixed taut without sag to gate frame all round and to vertical brace in an approved manner.

Nominal sizes: 3050, 3660, 4270, 4880 and 5490 mm wide and 1070 and 1220 mm high.

Gates shall be supplied completely assembled with required hardware for wood (or metal) gate posts all as specified or ordered.

316.11.05 Type IV Gates (pipe and chain link) - Gate frame and required vertical bracing and/or diagonal bracing to cleats all welded as generally indicated on Drawing SP741-05.04 for hinged swing gates shall be fabricated to the designated size(s) complete with chain link in-fill and hardware for fixing to metal posts all as detailed, specified or ordered.

Pipe shall be in accordance with Subsection 316.10 and welding with Subsection 316.11.01. In-fill of chain link fabric as specified for fencing (see Subsection 316.04), shall be attached to gate frame stiles with tension bars and bands (see Subsection 316.12), and to horizontal members and vertical bracing with tie wire (see Subsection 316.08.03), all taut and sag free.

Sliding gates may be specified for gate openings over 4.0 m and shall be fabricated as generally indicated for swing gates but with diagonal tension rod bracing to support centre from both ends. The rolling hardware shall hold the gate vertical and parallel to the gate posts and adjoining fence at all times to allow free operation from any position while not retained by latches or keepers.

Roller assembly sheaves and wheels with bearings, grease fittings, necessary clamps, supports and fasteners, and chain and/or latching gate catch for padlocking, all of approved design, shall be provided as and when specified or ordered.

316.11.06 Type V Gates (range slip wire) - Barbed wire continued across standard width gate opening (for possible

future farm gate) with 50 mm diameter full fence height treated wood droppers securely figure of eight wire tied and stapled to each line wire shall be provided with a galvanized steel strap loop at bottom and either similar loop at top with an intermediate chain (for padlocking) or, when specified, a Princeton or other approved cinch-up lockable latch device all for securely attaching to fence or gate posts to hold open-end dropper.

316.12 Accessory Material - All required fittings, fasteners, hardware and accessories shall be of suitable aluminum alloy or steel, malleable or ductile cast iron, and galvanized in accordance with ASTM A 153, or as may be otherwise specified and/or ordered.

a) Staples for securing wire and fabric to treated wood fence posts shall be nominal 3.5 mm diameter steel wire with a driving length of at least 45 mm heavy galvanized finish.

b) Hog ring clips for securing wire fabric and/or barbed wire of Type A, B and C Fences to steel posts and to tension wire of Type D Fences see Subsection 316.08.03.

c) Dowel, Spikes, Bolts and Nuts shall be of good commercial quality, galvanized where specified or ordered.

d) Metal Droppers for high-tensile fencing will be prefabricated "Waratah" or other acceptable galvanized formed sheet metal droppers, 1070 mm for 5-wire and 1170 mm long for 6-wire fences, with preformed wire clips: such metal droppers or other acceptable manufacture may be specified or permitted as an alternative to the wood droppers specified by Subsection 909.08 for barbed wire (Type C) fences.

Note: Galvanized twisted double wire fence stays are permitted only for the extension of normal fence heights to deer height and the like.

e) All terminal and tensioning posts, for Type D chain link fences, shall be provided with aluminum or galvanized weather tight caps to fit and fasten securely and with extended arms for engaging barbed wire of security fences.

f) Caps for line posts for Type D chain link fences, shall carry top rail. Rail and brace end caps shall be provided for securing to rails and bolting with steel bands to posts.

g) Tension Bars for securing chain link fencing to terminal and tensioning posts and to vertical stiles of gates of Type D Fences shall be merchant quality mild

Page 289: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STEEL AND WIRE FENCE MATERIAL SECTION 316

BC - MOT 2006 316 (9 of 10)

steel strip 5 mm x 19 mm in minimum lengths of 50 mm less than full height of the chain link fabric, hot dip galvanized.

h) Tension and Brace Bands for securing brace and top rail caps and tension bars to posts shall be formed of minimum 2.5 mm x 19 mm mild steel strip, hot dip galvanized complete with bolt and nut.

i) Tensioning Devices for individual in-line high-tensile wire will be "Hayes" or other acceptable manufacture and operation.

j) Mechanical Splices and Fasteners shall be of "Nicopress FW2-3" or other acceptable manufacture applicable to the respective diameter and tensile strengths of wires.

316.13 Packaging and Marking - Each roll of fencing fabric or chain link mesh and spool of wire shall be tightly rolled and firmly tied to prevent loosening during shipment and handling.

Posts shall be securely fastened in bundles or sets, and accessories packaged in cartons or other suitable containers, to prevent loss or damage during shipment and handling.

Each product, roll, bundle or container etc., shall be clearly marked with the name, brand and/or trade mark of the manufacturer; the heat or lot number and other information sufficient to identify the style, type, class, grade, finish, height and/or length, nominal or outside diameter, gauge and the applicable Standard to which the product conforms.

316.14 Inspection - No material shall be shipped prior to inspection or until a release for shipment has been issued by the Ministry Representative.

All material may be inspected before shipment to the construction site or at the construction site, or both. The Supplier or manufacturer shall provide the necessary facilities to enable the Ministry Representative to expeditiously examine selected pieces from the material lot(s) clearly identified for intended supply to the Ministry. Identification shall be such that after inspection and testing

the lot(s) may be subsequently identified for acceptance or rejection.

Inspection of material before shipment shall not exclude its subsequent rejection at the construction site if found to fail any requirements of this specification.

316.15 Sampling - One roll of fabric or spool of wire, in every lot of 50 or fraction thereof, in the shipment may be selected at random for testing but in no case will less than two samples be tested.

Specimens for testing will be required from the outside ends of the selected sample roll or spool material and both ends of one post in every 500 or fraction thereof.

Sufficient length of each roll, spool or pipe shall be taken to provide the number of specimens for each of the testing requirements specified.

Wire used for knots, knuckling, twisting and wraps and wire containing welds shall be excluded from tests.

See respective material tests for pertinent sample lengths.

316.16 Rejection and Retests - If any tested specimen fails to meet the testing requirements specified above, the roll, spool or pipe represented by the specimens shall be replaced with two additional rolls, spools or pipes selected by the Ministry Representative and both shall meet the test requirements in every respect, otherwise the complete lot represented by the samples will be subject to rejection.

In the event of complete lot rejection and prior to any further testing by the Ministry, the intended replacement lot(s) shall be satisfactorily tested by a mutually acceptable independent testing agency at no expense to the Ministry: where the time delay for retesting is unacceptable to the Ministry the order or part thereof will be subject to cancellation.

Rejected material shall be replaced at the Supplier's or Contractor's expense including shipping charges and removal of rejected material at the construction site, if applicable.

Page 290: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 316 STEEL AND WIRE FENCE MATERIALS

316 (10 of 10) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 291: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 317

P.E. PLASTIC DRAINAGE PIPE

317.01 Scope - This Section covers the requirements and methods of testing corrugated polyethylene (P.E.) drainage pipe. The inside wall may be corrugated or smooth. It covers nominal pipe diameters 200 mm, 250 mm, 300 mm, 400 mm, 450 mm and 600 mm.

317.02 Applicable Documents

ASTM D 883: Definition of Terms Relating to Plastics

ASTM D 2122: Standard Method of Determining Dimensions of Thermoplastic Pipe and Fittings

ASTM D 2412: Test for External Loading Properties of Plastic Pipe by Parallel Plate Loading

ASTM D 2444: Standard Test Method for Impact Resistance of Thermoplastic Pipe and Fittings by means of a Tup (Falling Weight)

ASTM F 405: Standard Specification for Corrugated Polyethylene Tubing and Fittings

ASTM F 412: Definition of Terms Relating to Plastic Piping Systems

ASTM F 667: Standard Specification for 8", 10", 12", 15", 18" and 24" Corrugated Polyethylene Tubing

Note: ASTM Standards are obtainable from: American Society for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103.

317.03 Materials - The pipe, fittings and couplers shall be manufactured from virgin polyethylene plastic of Type III or IV, Class C, Category 5 and Grade P33 as defined in ASTM D 1248.

317.04 Joining Systems - The assembly of joints shall be in accordance with the pipe manufacturer's recommendations. Manufacturers wishing to supply joint systems other than those listed below shall submit details to the Ministry Representative for approval prior to the awarding of the Contract.

Approved joint systems are as follows:

a) Integral Bell Gasketed Joint

i) The joint shall be designed so that when assembled, the gasket will be compressed radially on the pipe spigot or in the bell to form a watertight seal.

ii) The joint shall be designed to avoid displacement of the gasket when assembled in accordance with the manufacturer's recommendation.

b) Corrugated Screw-On Coupler (Nominal Pipe Diameters 250 and Larger)

i) Coupler shall be manufactured of polyethylene plastic as specified in Subsection 317.03.

ii) Coupler length shall be a minimum of 1.1 times the nominal pipe diameter or 270 mm, whichever is greatest (a minimum of 0.4 times the length of the coupler shall be engaged on both pipes to be joined).

iii) Average coupler wall thickness shall be a minimum 2.6 mm for nominal pipe diameters of 250 mm and 300 mm and 3.2 mm for all other diameters up to and including 600 mm.

BC - MOT 2006 317 (1 of 4)

Page 292: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 317 P.E. PLASTIC DRAINAGE PIPE

317.05 Requirements

317.05.01 Quality of Work - The pipe shall be homogenous throughout and free from visible cracks, flaws, foreign inclusions or other injurious defects. The pipe shall be uniform in colour, opacity and other physical properties.

317.05.02 Pipe Diameter

i) Nominal Diameter - The nominal diameter shall be the average inside diameter rounded to the nearest whole number (mm).

ii) Inside Diameter - The permissible inside diameter tolerances shall be +3% and -1.5%. Measurement shall be taken in accordance with ASTM D 2122.

317.05.03 Length - Laying length shall be 4 m or 6 m for all diameters otherwise specified on the Purchase Order, Work Order or Drawings. A tolerance of ± 25 mm on the nominal laying length will be permitted.

317.05.04 Physical Properties

i) Impact Strength - The minimum drop weight impact strength shall be 36.8 Joules when tested in accordance with Subsection 317.07.01.

ii) Pipe Stiffness - The minimum pipe stiffness shall be 210 kPa when tested in accordance with Subsection 317.07.02.

iii) Pipe Flattening - There shall be no evidence of splitting, cracking or breaking when tested in accordance with Subsection 317.07.03.

317.05.05 Joint Separation Resistance - Joint systems when installed in accordance with the manufacturer's instructions shall not separate when tested in accordance with Subsection 317.07.04.

317.06 Marking - All pipe shall be clearly marked at intervals of no more than 1.5 m with 5 mm or larger letters with the following information:

• Manufacturer's name or trademark • Nominal diameter • Materials designation and cell class: PEGR33 • The words "Drainage" or similar • The class: PS210 • The applicable Specification designation (ASTM F 405 or F 667) • Date of manufacture and plant designation.

317.07 Test Methods

317.07.01 Impact Resistance - Five specimens, each at least as long as the nominal pipe diameter, shall be tested in accordance with ASTM D 2444, using a 2.5 kg Tup "B" and the flat plate holder "B". The height of the drop shall be 1.5 m (total drop energy = 36.75 Joules). The test shall be performed at 0oC (± 0.5o) allowing no more than 15 seconds to complete the test after removing the sample from the conditioning medium. Any cracking or other signs of material fatigue evident after the test shall constitute a failure. All five specimens must pass. If one specimen fails, five more specimens shall be tested. Nine out of ten specimens passing will be acceptable.

317 (2 of 4) 2006 BC - MOT

Page 293: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

P.E. PLASTIC DRAINAGE PIPE SECTION 317

317.07.02 Pipe Stiffness - The pipe stiffness shall be determined at 5% deflection of the initial inside diameter in accordance with ASTM D 2412. Three specimens, each at least as long as the nominal pipe diameter, shall be tested. The exact specimen length shall be an integer multiple of the corrugation pitch. All test specimens shall meet the required stiffness.

317.07.03 Pipe Flattening - The three specimens tested in Subsection 317.07.02 shall be flattened between parallel plates in a suitable press until the distance between the plates is 40% of the original inside diameter. The loading rate shall be uniform and such that the compression is completed within two to five minutes. Remove the load and examine the specimen. All three specimens shall meet the requirements.

317.07.04 Joint Separation - A test specimen shall be constructed using the manufacturer's joining system centred on two pieces of pipe each 0.75 m in length. The specimen shall be hung vertically and a dead weight test force applied to the bottom end of the pipe. The vertical test force shall be 0.87 N/mm of nominal pipe diameter. Any separation of the joint shall be considered a failure.

317.08 Inspection

a) The Ministry shall have access to the fabrication plant for inspection and every facility shall be extended for this purpose.

b) Inspection may include checks on physical dimensions and general quality of work.

c) For the purpose of sampling for Subsections 317.05 and 317.07, one pipe from each lot of 50 pipes or fraction thereof in a shipment shall be selected for sampling. All test specimens shall be cut from the selected pipe(s).

d) If the test sample fails to meet the requirements of Subsection 317.05 when tested in accordance with Subsection 317.07, that batch will be rejected and shall be replaced by the Supplier with a new batch that conforms to this Specification at no additional cost to the Ministry.

317.09 Quality Assurance

a) The Supplier shall develop and maintain an effective quality control system to ensure that adequate inspection coverage is maintained throughout the manufacturing process. Evidence of such inspection shall be available to the authorized inspector of the Ministry prior to shipment from the place of manufacture or the Supplier's storage facility.

b) The Ministry reserves the right to maintain surveillance over the Supplier's quality control system to ensure conformance with this Specification.

BC - MOT 2006 317 (3 of 4)

Page 294: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 317 P.E. PLASTIC DRAINAGE PIPE

THIS PAGE IS LEFT INTENTIONALLY BLANK

317 (4 of 4) 2006 BC - MOT

Page 295: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 318

PVC PLASTIC DRAINAGE PIPE

318.01 Scope - This Section covers the requirements and methods for testing for:

• Type PSM* Poly Vinyl Chloride Drainage Pipe • Ribbed Poly Vinyl Chloride Drainage Pipe

and the perforation requirements of type PSM pipe up to a nominal diameter of 375 mm.

Note: The term PSM* is not an abbreviation but rather an arbitrary designation for a product having certain outside dimensions.

318.02 Applicable Documents

CSA B182.2: Large-diameter, Type PSM PVC Sewer Pipe and Fittings

CSA B182.4: Large-diameter, Ribbed PVC Sewer Pipe and Fittings

ASTM D 883: Definition of Terms Relating to Plastics

ASTM D 1784: Standard Specification for PVC and CPVC Compounds

ASTM D 2122: Standard Method of Determining Dimensions of Thermoplastic Pipe and Fittings

ASTM D 2152: Standard Test Method for Quality of Extruded PVC and CPVC Compounds

ASTM D 2412: Test for External Loading Properties of Plastic Pipe by Parallel-Plate Loading

ASTM D 2444: Standard Test Method for Impact Resistance of Thermo-plastic Pipe and Fittings by Means of a Tup (Falling Weight)

ASTM D 3034: Standard Specification for Type PSM PVC Sewer Pipe and Fittings

ASTM D 3212: Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals

ASTM F 412: Definition of Terms Relating to Plastic Piping Systems

ASTM F 477: Standard Specification for Elastomeric Seals for Joining Plastic Pipe

ASTM F 794: Standard Specification for PVC Large-diameter Ribbed Gravity Sewer Pipe and Fittings Based on Controlled Inside Diameter.

318.03 Materials - The pipe shall be made of virgin PVC plastic having a cell classification of 12454-B, 12454-C, or 13364-C, as defined in ASTM D 1784.

The fittings shall be made of virgin PVC plastic and shall have a cell classification of 12454-B, 12454-C, or 13343-C, as defined in ASTM D 1784.

Elastomeric gaskets shall comply with the requirements of ASTM F 477.

318.04 Quality of Work - The pipe shall be homogenous throughout and free from visible cracks, flaws, foreign inclusion, or other injurious defects. The pipe shall be uniform in colour, opacity and other physical properties.

BC - MOT 2006 318 (1 of 6)

Page 296: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 318 PVC PLASTIC DRAINAGE PIPE

318.05 Joining System - All sizes of pipe shall be supplied with Elastomeric Gasket Joints providing a watertight seal in accordance with ASTM D 3034.

a) Integral Bell Gasketted Joints shall be designed so that when assembled, the gasket shall be compressed radially on the pipe spigot or in the bell to form a watertight seal.

b) The joint shall be designed to avoid displacement of the gasket, when assembled in accordance with the manufacturer's recommendation.

c) Joint assembly shall be in accordance with the pipe manufacturer's recommendations.

Note: Manufacturers wishing to supply pipe joining systems other than those listed under this specification shall submit details to the Ministry Representative for approval prior to the awarding of the contract.

318.06 Requirements

318.06.01 Length - Laying length shall be 4 m or 6 m for all diameters unless otherwise specified by the Purchase Order, Work Order or Drawings. A tolerance of ± 25 mm on the nominal laying length will be permitted.

318.06.02 Type PSM, PVC Drainage Pipe Dimensions - The average outside diameter and the minimum wall thickness of Type PSM PVC drainage pipe shall be as specified in Table 318-A when measured in accordance with ASTM D 2122.

TABLE 318-A PIPE DIMENSIONS - TYPE PSM

OUTSIDE DIAMETER (mm)

NOMINAL DIAMETER

(mm) AVERAGE TOLERANCE MINIMUM MAXIMUM

MINIMUM WALL

THICKNESS

100 107.06 ± 0.22 106.84 107.28 3.06

150 159.38 ± 0.28 159.10 159.66 4.58

200 213.36 ± 0.30 213.06 213.66 6.10

250 266.70 ± 0.38 266.32 267.08 7.62

300 317.50 ± 0.46 317.04 317.96 9.07

375 388.62 ± 0.58 388.04 389.20 11.10

450 475.00 ± 0.70 474.30 475.70 13.57

525 560.00 ± 0.85 559.15 560.85 16.00

600 630.00 ± 0.95 629.05 630.95 18.00

680 710.00 ± 1.05 708.95 711.05 20.29

318.06.03 Ribbed, PVC Drainage Pipe Dimensions - The average inside diameter and minimum wall thickness of Ribbed PVC drainage pipe shall be as specified in Table 318-B when measured in accordance with ASTM D 2122.

318 (2 of 6) 2006 BC - MOT

Page 297: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PVC PLASTIC DRAINAGE PIPE SECTION 318

TABLE 318-B PIPE DIMENSIONS RIBBED

INSIDE DIAMETER (mm)

NOMINAL DIAMETER AVERAGE TOLERANCE MINIMUM MAXIMUM

MINIMUM WATERWAY

WALL THICKNESS

450 448.31 ± 1.41 446.90 449.72 3.30

525 527.05 ± 1.50 525.55 528.55 4.06

600 596.90 ± 1.78 595.12 598.68 4.58

680 673.10 ± 2.00 671.10 675.10 5.20

760 749.30 ± 2.30 747.00 751.60 5.96

900 901.70 ± 2.70 899.00 904.40 7.36

1000 1003.30 ± 3.00 1000.30 1006.30 8.26

1200 1206.50 ± 3.55 1202.95 1210.95 10.16

318.06.04 Perforations - Perforated pipe up to the nominal diameter of 37.5 mm shall be type PSM and perforated in accordance with Figure I and Table 318-C. The perforations shall be 8 to 10 mm in diameter, circular, and cleanly cut. The gasketted bell and spigot end of the pipe shall be unperforated for a length equal to the depth of the socket and/or shoulder.

FIGURE I

BC - MOT 2006 318 (3 of 6)

Page 298: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 318 PVC PLASTIC DRAINAGE PIPE

TABLE 318-C PERFORATION REQUIREMENTS

NOMINAL DIAMETER (mm)

MINIMUM ROWS OF PERFORATIONS

HORIZONTAL HOLE SPACING (mm)

H (mm) * L (mm) **

100 2 80 + 5 30 65

150 4 80 + 5 70 73

200 4 80 + 5 93 130

250 4 100 115 163

300 6 150 140 195

375 6 150 175 240

*H: maximum height of the centreline of the uppermost perforations above the Invert.

**L: minimum length of the unperforated inner surface at the bottom of the pipe.

318.07 Physical Properties

318.07.01 Impact Strength - The minimum drop weight impact strength for pipe shall meet the requirements of Table 318-D when tested in accordance with Subsection 318.09.01.

318.07.02 Pipe Stiffness - The minimum pipe stiffness when tested in accordance with Subsection 318.09.02 and ASTM D 2412 shall be 320 kPa.

318.07.03 Pipe Flattening - There shall be no evidence of splitting, cracking or breaking when the pipe is tested in accordance with Subsection 318.09.03.

318.07.04 Extrusion Quality - The pipe shall not flake or disintegrate when tested in accordance with ASTM D 2152.

TABLE 318-D IMPACT STRENGTH AT 0ºC

NOMINAL DIAMETER (mm) joules ft. / lb.

100 93 69

150 147 108

200 175 129

250 190 140

300 205 151

375 230 170

450 and larger 250 184

318.08 Marking - All pipe shall be clearly marked at intervals of no more than 1.5 m with 5 mm or larger letters with the following information:

• Manufacturer's name or trademark • Nominal diameter • Material designation and cell class: PVC-12454-B

318 (4 of 6) 2006 BC - MOT

Page 299: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PVC PLASTIC DRAINAGE PIPE SECTION 318

• The word "Drainage" or similar • The class: SDR35 or PS320 • The applicable specification designation (ASTM D 3034 or F 794) • Date of manufacture and plant designation

The marking on perforated pipe shall be 180º from a point equidistant between the bottom row of holes as shown in Figure I and Table 318-C.

318.09 Test Methods

318.09.01 Impact Resistance - Five specimens, each nominally 150 mm long for the PSM pipe and 300 mm long for the ribbed pipe, shall be tested in accordance with ASTM D 2444, using a 15 kg Tup "A" and the flat plate holder "B". The height of the drop shall not be less than 600 m or more than 3 m. The test shall be performed at 0ºC (± 0.5ºC), allowing no more than 15 seconds to complete the test after removing the sample from the conditioning medium. Perforated samples shall be positioned as shown in Figure I. Any cracking or other signs of material fatigue evident after the test shall constitute a failure. All five specimens must pass. If one specimen fails, five more specimens shall be tested. Nine out of ten specimens passing will be acceptable.

318.09.02 Pipe Stiffness - The pipe stiffness shall be determined at 5% deflection of the initial inside diameter in accordance with ASTM D 2412. Three specimens, each with a length equal to one pipe diameter shall be tested; all shall meet the required stiffness. Perforated samples shall be positioned as shown in Figure I.

318.09.03 Pipe Flattening - Three specimens, each nominally 150 mm long, shall be flattened between parallel plates in a suitable press until the distance between the plates is 40% of the original nominal diameter of the pipe. The loading rate shall be uniform and such that the compression is completed within two to five minutes. Remove the load and examine the specimen. All three specimens shall meet the requirements.

318.09.04 Pipe Dimensions - Measurements shall be taken in accordance with ASTM D 2122.

318.10 Inspection

a) The Ministry shall have access to the fabrication plant for inspection and every facility shall be extended for this purpose.

b) Inspection may include checks on physical dimensions and the quality of work.

c) For the purpose of sampling for Subsections 318.07 and 318.09, one pipe from each lot of 50 pipes or fraction thereof in a shipment shall be selected for sampling. All test specimens shall be cut from the selected pipe(s).

d) If a test sample fails to meet the requirements of Subsection 318.07 when tested according to Subsection 318.09, that batch will be rejected and shall be replaced by the Supplier with a new batch that conforms to this specification at no additional cost to the Ministry.

318.11 Quality Assurance

a) The Supplier shall develop and maintain an effective quality control system to ensure that adequate inspection coverage is maintained throughout the manufacturing process. Evidence of such inspection shall be available to the authorized inspector of the Ministry prior to shipment from the place of manufacture or from the Supplier’s storage facility.

b) The Ministry reserves the right to maintain surveillance over the Supplier's quality control system to ensure

BC - MOT 2006 318 (5 of 6)

Page 300: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 318 PVC PLASTIC DRAINAGE PIPE

318 (6 of 6) 2006 BC - MOT

conformance with this specification.

Page 301: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 320 (1 of 26)

SECTION 320

CORRUGATED STEEL PIPE

320.01 Scope - The Section covers the material and fabrication requirements for corrugated steel pipe and structural plate corrugated steel pipe.

Abbreviations:

CSP - Corrugated Steel Pipe: Galvanized sheet steel formed to finished shape by the fabricator.

SPCSP - Structural Plate Corrugated Steel Pipe: Hot rolled sheets or plates, corrugated, hot-dip galvanized, curved to radius, assembled and bolted together to form large pipes, pipe-arches, and other shapes.

320.02 Materials

320.02.01 Galvanized Steel Sheet - All culverts supplied under this specification shall be fabricated from steel sheets meeting all requirements of ASTM A 444 "Standard Specification for Zinc Coated (Galvanized) Iron or Steel Sheets for Culverts and Underdrains," with the following exceptions and additions:

320.02.01.01 - Steel shall conform to the chemical composition as specified in Table 320-A

TABLE 320-A CHEMICAL COMPOSITION

ELEMENT HEAT ANALYSIS (MAXIMUM) %

Carbon 0.15 (except SPCSP)

Manganese 0.60 (except SPCSP)

Phosphorous 0.04

Sulphur 0.05

320.02.01.02 - Each sheet, or each 600 to 1500 mm of coil or strip shall be identified by showing the following:

i) Brand or name of sheet manufacturer (mill).

ii) "CSP Sheet/Tole TTAO"

iii) Nominal overall zinc coated sheet thickness in mm.

iv) Heat and Coil numbers.

v) Zinc coating designation.

vi) "ASTM A 444" or "CSPI-501-M" of "CSA G401-M."

Exceptions and additions to ASTM A 444 requirements:-

320.02.01.03 The requirement for the sheet manufacturer to run tensile tests on samples from each cast or heat (See ASTM A 444 Paragraph 5.2) will be waived if the sheet or plate is authorized to be stamped "CSPI-501-M."

320.02.01.04. - In addition to the Coating Adherence requirements of ASTM A 444 Paragraph 6, the Finish and Adherence of casting requirements of ASTM A 123, Paragraph 9 shall also apply.

Page 302: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 320 CORRUGATED STEEL PIPE

320 (2 of 26) 2006 BC - MOT

320.02.01.05. - The mass of zinc coatings, total both sides shall be not less than Z610 (610 g/m²) when tested by the Triple Spot Test or not less than 550 g/m² by the Single Spot Test.

320.02.01.06. - Thickness and Tolerances shall conform to the requirements of Table 320-B.

TABLE 320-B CSP SHEET THICKNESS AND TOLERANCES

CSP SHEET - THICKNESS AND TOLERANCES (mm)

Nominal Overall Thickness * (including Zinc)

Tolerance on Nominal Overall Thickness (over or under) Design Base Metal Thickness **

1.0 0.13 0.82

1.3 0.15 1.12

1.6 0.18 1.40

2.0 0.18 1.82

2.8 0.20 2.64

3.5 0.23 3.35

4.2 0.23 4.08

* Thickness shall be measured at a point on the sheet not less than 10 mm from an edge. Field measurement shall be made on a corrugation tangent.

** Minimum Base Metal Thickness shall be not less than 95% of the Design Base Metal Thickness. Minimum Base Metal is equal to the nominal Overall Thickness minus the Tolerance on Overall Nominal Thickness minus an allowance for zinc of 0.09 mm.

Nominal Overall Thickness is Order Thickness.

320.02.01.07 - Flatness tolerances shall apply to cut lengths only.

For specified thickness of 2.0 mm and thicker, the tolerance, or maximum deviation from a horizontal flat surface, shall not exceed 13 mm for specified width up to 1500 mm.

For thickness less than 2.0 mm the tolerance shall not exceed 20 mm for 900 to 1500 mm width, and 13 mm for less than 900 mm width.

320.02.01.08 - Permissible variations in width, length, and camber of flat sheet shall be in accordance with CSA G163.2.

320.02.02 Structural Plate Corrugated Steel Sheet and Plate - SPCSP sheet and plate shall conform to the relevant requirements of Subsection 320.02.01 except:

i) The maximum carbon shall be 0.10% and maximum manganese of 0.50%.

ii) Each lift shall be identified by the mill name or brand, test number, nominal mass, mill order number and dimensions either by marking the top plate of the lift or by a durable tag attached to the lift.

iii) Thickness and Tolerances shall conform to the requirements of Table 320-C.

Page 303: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CORRUGATED STEEL PIPE SECTION 320

BC - MOT 2006 320 (3 of 26)

TABLE 320-C SPCSP SHEET AND PLATE BASE METAL THICKNESS AND TOLERANCE

Nominal Base Metal

Thickness * (mm)

3.0

3.5

4.0

5.0

6.0

7.0

Design Base Metal

Thickness ** (mm)

2.84

3.37

3.89

4.95

6.0

7.0

Width of Blank (mm) SHEET TOLERANCES *** (mm) PLATE TOLERANCES *** (mm)

1340 ± 0.20 - ± 0.20 +0.40/-.030 +0.40/-0.30 +0.50/-0.30

1585 ± 0.28 - ± 0.28 +0.50/-0.30 +0.50/-0.30 +0.50/-0.30

2315 ± 0.30 - ± 0.30 +0.60/-0.30 +0.60/-0.30 +0.70/-0.30

* Nominal Base Metal Thickness is the specified Order Thickness. For field thickness check, add 0.09 mm to the Base Metal Thickness to account for galvanizing. Thickness shall be measured at a point on the sheet not less than 20 mm from a longitudinal edge. Field measurement shall be made on the corrugation tangent.

** Minimum Base Metal Thickness shall be not less than 95% of the Design Base Metal Thickness.

*** Mill terminology.

320.02.03 Hardware - Hardware shall conform to the following requirements:

320.02.03.01 Rivets - Rivets shall conform to ASTM A 31, Grade A copper bearing, and shall be galvanized in accordance with ASTM A 153 Class D or ASTM A 164 Type RS.

320.02.03.02 Bolts and Nuts - Bolts shall be M20 x 2.5 nominal diameter and thread pitch as shown in Figure I. Bolts shall meet the chemical and mechanical properties of ASTM A 449. Nuts shall be as shown in Figure I and shall meet the requirements of ASTM A 563 Grade C. Bolts and nuts shall be galvanized to CSA G164 Class 5.

320.02.03.03 Coupler Band Hardware - Nuts and bolts on coupler bands shall conform to ASTM A 307, Grade A and shall be galvanized according to ASTM A 153 Class C or ASTM A 164 Type RS.

Other hardware on coupler bands such as lugs and flanges shall be of material approved at the time the design of the coupler band is approved and they shall be galvanized in accordance with CSA G-164 Class 4.

If lugs or flanges are welded in place the weld shall be thoroughly wire brushed followed immediately by the application of a dry thickness of 50 µm of zinc rich coating in accordance with CGSB 1-GP-181M Coating, Zinc Rich, Organic, Ready Mixed.

320.03 Fabrication From Culvert Sheet

320.03.01 Corrugation Profile - CSP shall have corrugations which form smooth continuous curves in either helical or annular rings about the pipe axis with nominal inside diameters and profile dimensions as specified in Table 320-D. The profile radius of curvature (R) shall not be less than 50% of the depth of the corrugation as shown in Figure II.

Page 304: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 320 CORRUGATED STEEL PIPE

320 (4 of 26) 2006 BC - MOT

TABLE 320-D CSP DIAMETER RANGE - CORRUGATION PROFILE (mm)

NOMINAL INSIDE RANGE (mm)

CORRUGATION PROFILE DIMENSIONS Pitch * x Depth **

(mm) 100, 150, 200 and 250 38 x 6.5

200 to 2400 *** 68 x 13

1200 to 3600 76 x 25

1200 to 3600 125 x 26

* Pitch shall be measured perpendicular to the direction of corrugations. Average pitch tolerance ± 3.0 mm.

** Depth shall be measured from outside crests to outside valley, with a straight edge laid across crests perpendicular to the direction of corrugation. Depth tolerance minus 5%.

*** Flexibility Factor of concern for diameters greater than 2000 mm.

320.03.02 Standard Sizes and Tolerances

320.03.02.01 Riveted CSP - Minimum outside circumferences for riveted CSP shall be as shown in Table 320-E

TABLE 320-E RIVETED CSP - MINIMUM OUTSIDE CIRCUMFERENCE

NOMINAL INSIDE MINIMUM OUTSIDE CIRCUMFERENCE NOMINAL INSIDE DIAMETER (mm) 13 mm 13 mm 25 mm or 26 mm DIAMETER (mm)

200 680 3830 3900 1200

250 840 4460 4520 1400

300 1000 5080 5150 1600

400 1310 5700 5770 1800

500 1630 6330 6390 2000

600 1940 6950 * 7020 2200

700 2260 7570 * 7640 2400

800 2570 8580 2700

900 2880 9510 3000

1000 3200 10450 3300

11380 3600

* Flexibility Factor of concern for diameters greater than 2000 mm.

a) Measurement of minimum outside circumference may be made with a band which covers adjacent corrugation crests.

Page 305: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CORRUGATED STEEL PIPE SECTION 320

BC - MOT 2006 320 (5 of 26)

b) Dimensional Tolerances:

• Diameter - The average nominal inside diameter tolerance shall be ± 13 mm or ± 1%, whichever is greater, measured between inside crests of the corrugations perpendicular to pipe axis.

• Length - The specified individual pipe length shall be measured from the inside crest of the last corrugation at one end to the inside crest of the last corrugation at the other end. The overall length is greater than the specified length by approximately 50% of the corrugation pitch.

320.03.02.02 Helical CSP - Minimum outside circumferences for Helical CSP shall be as shown in Table 320-F.

TABLE 320-F HELICAL CSP - MINIMUM OUTSIDE CIRCUMFERENCE

MINIMUM OUTSIDE CIRCUMFERENCE (mm)

Nominal Inside CORRUGATION DEPTH (mm) Nominal Inside Diameter (mm) 6.5 11 13 11 13 25 & 26 Diameter (mm)

100 350 2900 2910 2970 900

150 500 3210 3220 3290 1000

200 660 3840 3850 3920 1200

250 820 4480 4550 1400

300 1000 1010 5110 5170 1600

400 1320 1330 5730 5800 1800

500 1630 1650 6360 6430 2000

600 1950 1960 6980 7050 2200

700 2260 2280 7610 7680 2400

800 2580 2590 8620 2700

9560 3000

10500 3300

11440 3600

Note: Dimensional Tolerances:

Diameter - Average nominal inside diameter tolerance shall be ± 6.0 mm or ± 0.5% whichever is greater, measured between inside crests of the corrugations perpendicular to pipe axis.

Length - The length tolerance shall be ± 25 mm of the specified length. For CSP with recorrugated ends, the length tolerance for individual pipes shall be plus 50 mm minus 25 mm.

320.03.02.03 Pipe Arch - Helical or Riveted - Standard pipe-arch dimensions measured from the inside crests of corrugations shall be as shown in Table 320-G.

320.03.03 Riveted Construction

320.03.03.01 All rivets shall be according to the requirements of Subsection 320.02.03.01. All rivet diameters and lengths shall be not less than those shown in Table 320-H.

320.03.03.02 Fabrication Requirements

a) Hole centres shall not be closer than twice the hole diameter from any sheet edge, and shall be in reasonable

Page 306: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 320 CORRUGATED STEEL PIPE

320 (6 of 26) 2006 BC - MOT

alignment.

b) Rivets shall be driven cold without bending. Sheet edges shall be drawn tightly together throughout an entire lap length with rivet holes in reasonable alignment.

c) Rivets shall have full heads and shall completely fill the holes.

d) Longitudinal seams shall have at least one rivet for each corrugation, in the valley.

e) Double-riveting, or two rows of rivets along a longitudinal seam, shall be as in Table 320-I. The distance between centrelines of rows of rivets shall nominally be three times the hole diameter.

f) Circumferential seams shall have a maximum rivet spacing of 150 mm measured on centres, except that six rivets will be sufficient on 300 mm diameter or smaller.

g) Longitudinal seam lap shall equal or exceed minimums shown in Table 320-I. Circumferential seam lap shall be 30 mm minimum.

TABLE 320-G STANDARD PIPE-ARCH DIMENSIONS (mm)

SPAN RISE EQUIVALENT DIAMETER

MINIMUM CORNER RADIUS

450 340 400 75

560 420 500 75

680 500 600 75

800 580 700 85

910 660 800 100

1030 740 900 110

1150 820 1000 125

1390 970 1200 150

1630 1120 1400 175

1880 1260 1600 200

2130 1400 1800 225

Note: Span and Rise dimensional tolerance is ± 25 mm or 2% of equivalent round diameter, whichever is greater.

320.03.04 Helical Construction

320.03.04.01 Fabrication Requirements

a) The edges of the sheets forming the pipe shall be jointed with a continuous lock seam formed by folding over the edges of adjacent sheets so that they interlock with each other to form a tight joint. See Figure III.

b) The sheets shall be continuous throughout the length of the pipe, the joining of sheets by butt welding shall only be permitted provided the weld meets the following requirements:

• The butt joint shall be made by shielded electric arc process with a continuous deposit of material throughout the length of the joint. Penetration shall be to the full depth of the material and no undercut,

Page 307: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CORRUGATED STEEL PIPE SECTION 320

BC - MOT 2006 320 (7 of 26)

splatter or scale shall be permitted. If deemed necessary, sample of the joint shall pass a 90° bend test.

• The weld and adjacent area of damaged zinc shall be thoroughly wire brushed followed immediately by the application of a dry thickness of 50 µm of zinc rich coating conforming to CGSB 1-GP-181M Coating, Zinc Rich, Organic, Ready Mixed.

c) Ends of Helical CSP shall be finished with a straight cut perpendicular to the longitudinal centreline and any saw cut mismatch shall not exceed 15 mm. The ends shall be finished without significant burr. Cutting of previously manufactured stock to a shorter length with a hand held cutting torch is not permitted.

d) Standard fabricated lengths shall be in full metre lengths, as ordered. The length tolerance shall be ± 25 mm of ordered length. For CSP with recorrugated ends, length tolerance for individual pipes shall be plus 50 mm minus 25 mm.

TABLE 320-H RIVET DIAMETERS AND LENGTH (mm)

NOMINAL OVERALL CSP NOMINAL RIVET DIAMETER (mm) MINIMUM SHEET THICKNESS CORRUGATION DEPTH RIVET LENGTH

(mm) 13 mm 25 mm or 26 mm (mm)

1.0 8 16

1.3 8 16

1.6 8 10 16

2.0 8 10 16

2.8 10 12 20

3.6 10 12 25

4.2 10 12 25

TABLE 320-I RIVETED CSP - LONGITUDINAL SEAM LAP AND ROWS OF RIVETS

DIAMETER RANGE (mm)

CORRUGATION DEPTH (mm) ROWS OF RIVETS

MINIMUM LONGITUDINAL SEAM

LAP (mm)

200 to 500 13 Single 40

600 to 1000 13 Single 50

900, 1000 25 Double 75

1200 and larger 13 or 25 Double 75

320.03.04.02 Visual Inspection - by reference to Figure III the quality of the lock seam shall be judged by visual inspection. The pipe shall be cut so as to show the cross-section normal to the seam. The cut shall be of sufficient length to show the complete lock seam profile including offset.

a) The minimum seam lap dimensions shall be as shown in Table 320-J.

b) There shall be no roller indentations on either side of the 180º fold or beyond the lapped area.

c) The retaining offset as shown in Figure III shall be that portion of the sheet profile adjacent to the lock seam, and in tight contact with the 180º fold. The total retaining offset of both sides shall be a minimum of 1 t where t

Page 308: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 320 CORRUGATED STEEL PIPE

320 (8 of 26) 2006 BC - MOT

is equal to the nominal overall thickness of the sheet of which the pipe is constructed. The retaining offset on any one side shall be a minimum of 0.3 t. Figure III shows retaining offset of 1 t on both sides, for a total retaining offset of 2 t.

d) The 180º fold of metal at the lock seam shall have a smooth curvature both inside and outside with no angularity of the interior of the fold.

e) The gaps opposite the interior fold shall be equal on both sides of the seam, and each gap individually shall not exceed 1.0 t where t is equal to the nominal overall thickness of the sheet of which the pipe is constructed.

f) The helix angle (see Figure IV) shall be not more than 30° for helical CSP 600 mm diameter and greater.

TABLE 320-J HELICAL CSP - MINIMUM SEAM LAP DIMENSIONS

CORRUGATION PROFILE (mm x mm) 38 x 6.5 51 x 11 68 x 13 76 x 25 125 x 25

LAP (mm) 4.0 6.5 6.5 8.0 8.0

320.03.04.03 Shear Strength of the Lock Seam - If the visual inspection required by Subsection 320.03.04.02 indicates that the joint is not tight for any reason, such as the lapping surfaces apparently not in intimate or complete contact, then the shear strength of the seam shall be tested by the test method defined in Appendix I. The minimum shear strength of the lock seam shall be 80 N/mm. If this test is performed, it shall be in addition to, not in lieu of, the visual inspection requirements in Subsection 320.03.04.02 and all requirements must be met.

320.03.04.04 Recorrugated Ends - Helical pipe ends may be recorrugated to provide two or four annular corrugations on each end of pipe for coupling purposes.

The visual checks and/or pull tests required by Subsection 320.09.04 Quality Control - Helical CSP shall (where possible) be carried out prior to recorrugation. Additional quality control pull tests will be required in the reformed end and the minimum lateral seam strength of the lock seam as per Table 320-K shall be not less than 60% of that required for the remainder of the pipe. There shall be no visible cracks in the base metal in the reformed end.

TABLE 320-K HELICAL CORRUGATED LOCK SEAM PIPE MINIMUM LATERAL SEAM STRENGTH

NOMINAL OVERALL THICKNESS (mm) MINIMUM LATERAL SEAM STRENGTH (N/mm)

1.0 36

1.3 51

2.0 65

2.8 88

3.5 136

4.2 182

Greater than 4.2 234

The Ministry reserves the right to obtain a sample of the lock seam from the undamaged portion of a recorrugated pipe by means of a 38 mm hole saw. (See Appendix IV).

Note: If recorrugated ends are specifically requested, then annular corrugated couplers (see Subsection 320.04.02) shall be provided.

320.04 Coupler Systems

Page 309: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CORRUGATED STEEL PIPE SECTION 320

BC - MOT 2006 320 (9 of 26)

320.04.01 Purpose - Coupler systems for corrugated pipe shall resist water leakage, preserve pipe alignment, resist separation of adjoining pipe sections and resist root penetration or infiltration of normal backfill materials.

Note: When culverts are to be installed on steep grades, extra wide annular corrugated couplers are recommended for diameters greater than 600 mm.

320.04.02 Fabrication Requirements

320.04.02.01 Coupler bands shall be compatible with the conduit shape and corrugation profile, and designed so that it can be installed to lap equal portions of the pipes being connected.

320.04.02.02 Coupler bands shall be either corrugated or have circumferential rows of projections (i.e., dimpled). Both systems shall be designed to substantially mesh with the pipe corrugations and meet the requirements of Subsection 320.04.01.

320.04.02.03 Coupler standard dimensions shall be as shown in Table 320-L.

TABLE 320-L MINIMUM COUPLER DIMENSIONS

NOMINAL DIMPLES

COUPLER TYPE

PIPE DIAMETER

(mm)

OVERALL THICKNESS

(mm)

MINIMUM WIDTH (mm)

NO. OF BOLTS

MINIMUM NO. OF CIRCUMFERENTIAL

ROWS

MINIMUM NO. PER ROW *

Flat 100-600 1.30 140 2

Corrugated 300-600 1.30 180 2

700-1600 1.60 300 2

over 1600 1.60 300 or 600 ** 3

Universal 300-600 1.30 300 2 4 6

Dimple 700-1200 1.60 300 2 4 7

Over 1200 1.60 600 3 4 8

* Minimum number of dimples per row is 6 for 76 mm x 25 mm corrugation profile. ** Width dependent on application.

320.04.02.04 Coupler ends shall be drawn together about the pipe by bolts, wedges or other means of fastening to meet the requirements of Subsection 320.04.01.

320.04.02.05 Coupler flanges shall consist of rolled or formed angles or lugs (meeting the requirements of Subsection 320.02.03.03) of at least 3.2 mm effective thickness riveted or welded to the coupler.

320.04.02.06 - The minimum number of 12 mm diameter bolts (meeting the requirements of Subsection 320.02.03.02) per connection shall be two for the 180 and 300 mm coupler, three for the 600 mm coupler and four for the 900 mm coupler. Bolt length shall be not less than 150 mm.

320.04.02.07 Riveted & Weld Fasteners - Where flanges are riveted, the rivets shall have a minimum diameter of 10 mm (and shall meet the requirements of Subsection 320.02.03.01). The minimum number of rivets per angle shall be two for the 180 mm coupler, three for the 300 mm coupler, five for the 600 mm coupler and seven for the 900 mm coupler.

Where flanges or lugs are welded in place the weld area shall be thoroughly wire brushed followed immediately by two coats of zinc-rich coating conforming to CGSB 1-GP-181M.

Page 310: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 320 CORRUGATED STEEL PIPE

320 (10 of 26) 2006 BC - MOT

320.04.02.08 Wedge Fastening - Coupler flanges shall be integrally formed in a manner to utilize fully the available areas of contact with the wedge. Lips of both coupler and wedge shall be formed to a contained angle of approximately 45º and shall be nominally 10 mm wide. Wedge shall be at least 16 mm high at the wide end suitable for hammering into position over the coupler and shall be at least 75 mm longer than the width of the couplers. Lips of wedges with engage lips of couplers shall be 13 mm minimum width. Wedges shall be no less than 2.0 mm thickness.

320.04.02.09 Where gasketed joints are required for watertightness, they shall meet ASTM D 1056, ASTM C 361M, or requirements as stated in Special Provisions of the Contract.

320.05 Pipe Arch Corrugated Steel Pipe Construction

320.05.01 Pipe arch CSP is a multi radii shape having integral top, bottom and corners. The pipe arch shall conform to the dimensions shown in Table 320-G.

320.05.02 For riveted CSP pipe arch the staggered lapped longitudinal seam or seams shall be placed in the top arch section and not located in an area of change of radius or minimum radius.

320.05.03 - In the case of helical CSP pipe arch the minimum corner radii (see Table 320-G) apply also to the lock seams located at the corners; no transverse creasing of the seams will be permitted.

320.05.04 The longitudinal axis of the pipe centreline must be preserved straight, it shall not bend appreciably either vertically or horizontally. In the case of dispute the pipe arch shall be placed on a flat surface; the invert shall be in uniform contact with the flat surface throughout the length of the pipe and the inside of the pipe shall appear straight when viewed from either end.

Note: The requirements of Subsections 320.05.03 and 320.05.04 are unlikely to be met consistently without the use of properly designed interior mandrels. Only if a manufacturer can demonstrate that he can consistently produce CSP Pipe Arch meeting these requirements without such equipment will the use of alternative methods or equipment be accepted.

320.06 Perforated Corrugated Steel Pipe

320.06.01 Helical and riveted perforated CSP shall meet all requirements of this specification for helical and riveted CSP before perforation.

320.06.02 The perforations shall be approximately circular and cleanly cut; they shall have a nominal diameter of 10 mm and shall be not less than 8.0 mm. The perforations shall be arranged in rows parallel to the axis of the pipe and shall be located in the outside valleys or along tangents of corrugations. Perforations are not required within 150 mm of each end of each length of pipe. The rows of perforations shall be arranged in two equal groups placed symmetrically on either side of a lower unperforated segment, corresponding to the flow line of the pipe. The spacing of the rows shall be uniform. The distance between the centrelines of rows shall be not less than 25 mm.

320.06.03 The minimum number of longitudinal rows of perforations, the maximum heights of the centrelines of the uppermost rows above the bottom of the inverts and the inside surface of chord lengths of the unperforated segments illustrated in Figure V shall be as specified in Table 320-M.

Page 311: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CORRUGATED STEEL PIPE SECTION 320

BC - MOT 2006 320 (11 of 26)

TABLE 320-M CSP INVERT PERFORATIONS

DIAMETER OF PIPE (mm) MINIMUM ROWS OF PERFORATIONS H * (mm) L ** (mm)

100 2 46 85

150 4 70 120

200 4 92 160

250 4 115 195

300 6 138 240

400 6 184 315

500 6 230 370

600 6 276 465

* Maximum Heights "H" of the Centreline of the Uppermost Rows above the bottom of the invert.

** Minimum Lengths of Inner Chord "L" of unperforated segments (See Figure V).

320.06.04 Flat band couplers shall be supplied with perforated pipe unless corrugated or dimpled couplers are specified. Couplers shall comply with all requirements of Subsection 320.04.

320.07 Structural Plate Corrugated Steel Pipe Construction

320.07.01 This Subsection covers the fabrication of SPCSP products, using sheet and/or plate as specified in Subsection 320.02. Shapes in addition to round include vertical and horizontal ellipse, pipe-arch, arch, vehicular, pedestrian, or animal underpasses, and others. Nominal inside diameters are given in Table 320-N.

TABLE 320-N SPCSP - NOMINAL INSIDE DIAMETERS (mm)

1500 2590 4610

1660 2740 4920

1810 3050 5230

1970 3360 5540

2120 3670 5850

2280 3990

2430 4300

320.07.02 SPCSP shall have annular corrugations. Crests and valleys shall form circumferential rings about a pipe axis. Profile (pitch x depth) shall be: 152 mm x 51 mm. Tolerances are given in Figure VI.

320.07.03 Standard Round - Nominal inside diameter for round pipe shall be as given in Table 320-M.

320.07.03.01 Structural plates shall be fabricated to standard dimensions shown in Table 320-O and Figure VII. Nominal corrugated plate lengths shall be 3050 and 3660 mm. Overall structure lengths shall be any combination of these two lengths, plus 100 mm.

Page 312: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 320 CORRUGATED STEEL PIPE

320 (12 of 26) 2006 BC - MOT

TABLE 320-O SPCSP - FLAT PLATE WIDTH DIMENSIONS

WIDTH DESIGNATION NUMBER OF HOLE

SPACES

NET ARC WIDTH (mm)

OVERALL OR BLANK WIDTH (mm)

NUMBER OF CIRCUMFERENTIAL

BOLT HOLES

5N 1220 1340 6

6N 1465 1585 7

9N 2195 2315 10

Note: Number of circumferential bolt holes spaces (N) at 244 mm along plate net (arc) width. See Figure VII.

320.07.03.02 Plates shall be punched along the edges with holes to form longitudinal and circumferential lap seams when assembled by bolting. Hole diameter shall not exceed bolt diameter by more than 6.0 mm.

320.07.03.03 The longitudinal hole pattern shall be a minimum of two holes per corrugation. Dependent on the seam strength requirements, three or four holes per corrugation may be specified (See Figure VII).

320.07.03.04 Plate arrangements in structures are normally designed with seams staggered such that not more than three plates come together at any one bolt hole.

320.07.03.05 Plate arc width equals the number of circumferential bolt hole spaces (N) at 244 mm centres along the plate, in accordance with Table 320-O and Figure VII.

320.07.04 Plate Curvature

320.07.04.01 Plates shall be curved to a radius along the inner crest dimension (plate net arc width) to form the circular arcs as required for the shape specified.

320.07.04.02 Tolerance on calculated rise shall be ± 13 mm (See Figure VIII). Length of straight-edge shall be not less than 75% of chord length.

Note: Structural plate fabricators shall make available on request the standard rise dimensions for plates of varying curvature, using varying straight-edge inspection lengths.

320.07.05 Bolts and nuts shall be in accordance with Subsection 320.02.03.02

320.07.05.01 Bolt lengths shall be sufficient to provide full thread engagement in the nut when the assembled plates are tightened in place.

320.07.05.02 The number of bolts of each length furnished shall be plus 2% in excess of the theoretical number to field erect the structure.

320.07.05.03 Bolts and bolt containers shall be identified by length of bolt using colour codes given in Table 320-P.

Page 313: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CORRUGATED STEEL PIPE SECTION 320

BC - MOT 2006 320 (13 of 26)

TABLE 320-P SPCSP BOLT AND CONTAINER COLOUR CODE

BOLT LENGTH

(mm)

COLOUR BOLT

COLOUR CONTAINER

MARK

BOLT LENGTH

(mm)

COLOUR BOLT

COLOUR CONTAINER

MARK

30 None White 50 Black Black

40 Green Green 80 None Yellow

45 Red Red Nuts * None Blue

* Nuts may be shipped in Bolt containers

320.07.06 Drawings and Plate Identification

320.07.06.01 SPCSP plates shall be adequately identified by fabricator for field erection. Marking shall be clear and distinct for each job or order number. Identification may include thickness, radius, and drawing or code numbering.

320.07.06.02 For each structure order the fabricator shall provide a bill of material. Erection drawing(s) shall be provided where required showing plate arrangements together with assembly instructions.

320.07.06.03 Cut plates for bevelled or skewed ends shall be legibly identified to designate positions in a finished structure, and referenced on erection drawings.

320.08 Asphalt Coated Pipe - This Subsection covers asphalt coatings applied to CSP products; it does not cover pipe manufactured of asbestos bonded sheet.

Coating Designations:

AC - Asphalt coated ACPI - Asphalt coated Paved Invert

320.08.01 AC - Asphalt Coated - The completed CSP manufactured in accordance with this specification shall be uniformly coated by a hot dip process with asphalt inside and outside to a minimum thickness of 1.3 mm each side measured on a corrugation crest. A minimum of two dips shall be required for each length of pipe. The first dip shall be prolonged sufficiently to ensure that the metal in the pipe is substantially at the same temperature as the asphalt, to ensure proper adhesion. The second dip shall be prolonged only sufficiently to build to the required thickness. No pin holing, bubbles or breaks in the asphalt coating shall be apparent after the second dip. During the cooling period after each dip the asphalt shall be protected from rain or snow and shall not be rolled or handled in any way to damage the coating.

320.08.02 ACPI - Asphalt Coated Paved Invert - In addition to the requirements of Subsection 320.08.01 asphalt shall be applied to provide a smooth surface in the invert filling the corrugations for at least 25% of the circumference of a round pipe and 40% of the periphery of a pipe arch. Pavement shall have a minimum thickness of 3.0 mm above the crests of the inside corrugations, except where pavement edges feather into corrugations.

320.08.03 Coupler Bands - Unless otherwise specified, the coupler bands ordered with AC or ACPI pipe shall be coated as required by Subsection 320.08.01. Coupler band hardware shall not be coated.

320.08.04 AC Perforated Pipe - Shall be uniformly coated inside and out to a minimum of 0.8 mm per side. Not more than 15% of the specified perforations shall be covered with a film of asphalt. The diameter of the clear perforations shall be not less than 7.0 mm.

Page 314: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 320 CORRUGATED STEEL PIPE

320 (14 of 26) 2006 BC - MOT

320.08.05 Coatings Generally - Surface of the asphalt coating immediately after solidification (and prior to any treatment with anti-stick material) shall have a smooth and shiny appearance free of pinholes and bubbles.

Asphalt coating shall not spall under normal handling within the range of maximum summer and minimum winter temperatures.

Asphalt coating sampled from the finished pipe shall be capable of meeting the Shock, Flow, and Imperviousness Tests as defined in Appendix II.

320.08.06 Handling - To prevent bruising, scaling, or scuffling of asphalt coated CSP, proper and careful handling shall be observed. Asphalt coated pipe shall not be dragged or pushed along the ground, or otherwise roughly handled.

The fabricator may use an anti-stick material such as soapstone, chalk, or sand to spray or dust on the finished pipe coating after cooling.

320.08.07 Storage - Prolonged storage in open sunlight of asphalt coated CSP is not recommended. Long exposure to sunlight may evaporate asphaltic volatiles, resulting in drying with alligator cracking. Asphalt coated CSP shall be installed and backfilled within a reasonable period after coating to ensure maximum protective benefits against hydraulic, abrasive, and corrosive conditions.

320.08.08 Repair - Spots where the asphalt coating has been damaged shall be repaired. The fabricator shall be responsible for the repair of any damage to the asphalt coating preceding shipment. Repair may be made with cold asphalt mastic, provided the area is small. Redipping will be required for large areas.

320.09 Inspection, Quality of Work, and Quality Control

320.09.01 Inspection

320.09.01.01 The Purchaser shall have access to the fabricating plant for inspection, and every facility shall be extended to the Purchaser for this process.

320.09.01.02 Inspection may include checks on gauge thickness, weight of zinc coating, corrugation profile, outside circumference, quality of riveting or lock seam, and such other features as deemed necessary by the Ministry to meet this specification.

320.09.01.03 Sampling of the base metal for chemical analysis shall be made in accordance with ASTM A 444.

320.09.02 Quality of Work

320.09.02.01 In addition to compliance with the details of construction, the complete pipe shall show careful, proper quality of work in all particulars.

320.09.02.02 Among others, the following defects constitute poor quality of work, and the presence of any of them in a corrugated steel pipe may be cause for rejection: uneven laps, undue deviation from true shape, lack of rigidity, excessive variation from a reasonably straight centreline, ragged or diagonally sheared edges, loose, unevenly aligned or spaced rivets or bolts, poorly formed rivet heads of lock seams, or damaged lock seam metal, bruised, scaled or broken zinc coating, corroded or improperly cleaned and painted welds, illegible brand, significant dents or bends in the steel itself, and ragged or unfinished ends.

320.09.03 Repair of Damaged Zinc Coating

320.09.03.01 Small localized areas, scratches or burns in which the zinc coating has been damaged by welding or other fabrication procedures shall be repaired by careful wire brushing followed immediately by the application of a

Page 315: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CORRUGATED STEEL PIPE SECTION 320

BC - MOT 2006 320 (15 of 26)

dry film thickness of 50 µm of zinc rich coating conforming to CGSB Standard 1-GP-181M Coating, Zinc Rich, Organic, Ready Mixed.

320.09.03.02 Gross uncoated areas shall be repaired by re-galvanizing by hot-dip process in accordance with Subsection 320.02.01 or by metallizing process which shall meet the requirements of CSA Standard G-189.

320.09.04 Quality Control Helical CSP - The supplier shall develop and maintain an effective quality control system to ensure that adequate inspection coverage is maintained throughout the manufacturing process. Evidence of such inspection shall be available to the authorized inspector of the Ministry prior to shipment from the place of manufacture or from the supplier's storage facility.

The Ministry reserves the right to maintain surveillance over the supplier's quality control systems to ensure conformity with this specification.

The supplier shall furnish the Ministry Representative with an outline of the supplier’s quality control procedures. The outline shall include the intended method of identification of production runs, frequency of visual checks and pull tests, method of reporting and recording, and/or retention of samples.

320.09.04.01 Production run shall be considered to include all pipes of the same metal thickness and diameter produced continuously, with only minor adjustments to the machinery being required. A new production run shall be considered to start with a change in metal thickness or a change in pipe diameter.

320.09.04.02 Visual checks shall at least include observations or measurement, as applicable, of metal thickness, corrugation depth, diameter, length, square end cut and zinc coating. They shall also at least include observation or measurement, as applicable, of the lock seam as follows: lap, gap, retaining offset, loss of seam contact, interior angularity, and roller indentation.

320.09.04.03 Pull tests shall be conducted in accordance with Appendix III. The lateral seam strength shall meet the minimum requirements of Table 320-K.

If any sample fails this requirement, all pipe already produced in that production run or all pipe produced since the last pull test was conducted shall be subject to rejection. The manufacturer may however conduct additional pull tests on the previously produced pipe and thereby ascertain which, if any, can be considered acceptable.

320.09.04.04 The Ministry reserves the right not to accept bids from manufacturers whose Quality Control procedures are below the norm set by the industry as a whole in British Columbia.

To be considered acceptable a lock seam must meet all visual criteria as well as the minimum lateral seam strength requirement.

Page 316: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 317: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 318: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 319: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CORRUGATED STEEL PIPE SECTION 320

BC - MOT 2006 320 (19 of 26)

SECTION 320

CORRUGATED STEEL PIPE

APPENDIX I

Test Method for Shear Strength of the Lock Seam of Helical Pipe (Referred to in Subsection 320.03.04.03)

A1.1 Apparatus

a) Testing Machine - Any standard testing machine capable of maintaining the specified rate of strain and of measuring the tensile load with an error not to exceed ± 50 N.

b) Grips - The grips for holding the test specimen in the testing machine shall be of the self-aligning type.

A1.2 Test Specimens

a) Sample - A sample shall be taken from the end of a completed pipe. The sample shall be cut out with a metal cutting saw, the cuts being made at least 12 mm on either side of the seam. The length of the sample measured along the shorter side of the seam shall be at least 255 mm. The end cut shall be made at right angles to the direction of the seam.

b) Specimen - Three separate specimens, each 75 mm long, shall be cut from the sample commencing at the end of the sample opposite the end of the pipe. See Figure 1. The remaining piece of seam at the end of the pipe shall be discarded. Each specimen shall then be prepared as shown in Figure 2. Extreme care shall be exercised in preparing the specimen to ensure that the seam is not loosened. If prepared in a vise it shall be held and cut such than no forces are applied which will tend to warp, twist or flatten the specimen.

A1.3 Procedure

a) The gauge length of each specimen shall be measured with calipers to an accuracy of ± 0.2 mm.

b) Each test specimen shall be carefully placed in the grips of the testing machine in such manner as to ensure that the axis of the test specimen coincides with the direction of the applied pull.

FIGURE 1 - DIAGRAM FOR CUTTING SEAM SAMPLE FROM END OF HELICAL PIPE

Page 320: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 320 CORRUGATED STEEL PIPE

320 (20 of 26) 2006 BC - MOT

c) The load shall be applied at the rate stated in Appendix A1.4 until the test specimen has slipped 6.0 mm. The maximum load in Newtons shall be recorded.

A1.4 Speed of Testing

The load shall be applied continuously throughout the test at a uniform rate of motion of the moveable cross head of 2.5 mm per minute.

A1.5 Calculation

The shear strength of the lock seam of each specimen shall be calculated by the following formula:-

S = P/L

Where: S = Shear strength of lock seam, Newtons per lineal millimetre. P = Maximum load obtained within first 6.0 mm of slippage, Newtons L = Gauge length, millimetres.

A1.6 Report

The shear strength of the three specimens shall be reported and the average shall be the shear strength of the sample.

A1.7 Acceptance

A test sample shall be considered to meet the test requirements provided that the above average shear strength exceeds the requirements of 80 N/mm required by Subsection 320.03.04.03 and provided that at least two of the specimens also exceed that requirement. Should any test sample fail to meet the test requirements, the manufacturer shall be allowed a retest on two additional samples for each sample that failed. Both retest samples are required to meet the test requirements before the pipe can be considered acceptable.

FIGURE 2 - DETAIL OF SPECIMEN FOR SHEAR STRENGTH TEST OF LOCK SEAL

Page 321: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CORRUGATED STEEL PIPE SECTION 320

BC - MOT 2006 320 (21 of 26)

SECTION 320 CORRUGATED STEEL PIPE

APPENDIX II

ASPHALT COATING (Referred to in Subsection 320.08)

A2.1 Coating

The asphalt used for the AC and ACPI pipe shall have the following properties:-

Limit % Test Method

Asphalt soluble in trichloroethylene, not less than 99.5 ASTM D 2042

Loss on heating to 163°C, not more than 1 ASTM D 6

Penetration of residue after heating compared with penetration of same sample before testing for loss on heating, not less than

85 ASTM D 5 & D 6

A2.2 Sampling

All tests on the asphalt coating shall be made on samples obtained from the pipe on or about to be delivered to the project.

A 150 g sample of asphalt coating shall be obtained by gathering strippings from the inside top of one or more lengths of pipe. (Care should be taken in sampling to avoid contamination from sand or soapstone that may have been applied after dipping).

A2.2 Shock Test

The ability of coated pipe to withstand handling in cold weather is indicated by successfully passing the following shock tests:

a) Apparatus: The apparatus for the shock test shall consist essentially of a rigid metal anvil or base plate not less than 12 mm thick and resting on a solid foundation, and a hammer weighing 2 kg arranged to fall freely in suitable guides against a plunger weighing 1 kg and sliding freely in a vertical sleeve. The lower end of the plunger shall be hemispherically shaped, with a radius of 12 mm. The hammer shall be held in its guide by a trip mechanism at a distance of 130 mm above the plunger. Split molds for preparing the specimens shall be made of brass with the surfaces amalgamated to prevent sticking and held together by slip rings pressed on the slightly tapered outside surfaces.

b) Procedure: Four test specimens shall be prepared in the form of discs 9.5 mm thick and 45 mm diameter. Approximately 115 g of the material sample shall be heated over a low flame until it becomes fluid, then poured into a mold or molds. The sample shall be melted at the lowest possible temperature. The sample shall be stirred thoroughly until it is homogeneous and free from air bubbles when poured into the molds. The material may be poured in a 45 mm diameter cylinder of such length that the four test specimens may be cut from it, using a wire cutter. Two of the samples used in the shock test may be used later to prepare samples for the flow test.

Page 322: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 320 CORRUGATED STEEL PIPE

320 (22 of 26) 2006 BC - MOT

The four specimens shall be cooled in a brine of ice and salt at a temperature of -1°C for a period of at least one hour. The samples shall then be removed one at a time and quickly placed on the anvil of the test apparatus and centered under the plunger. The hammer shall then be tripped from a height of 130 mm. Not more than eight seconds shall elapse from the time each specimen is removed from the brine until the hammer strikes the plunger.

For material to be acceptable, not more than one of the four test specimens shall show a crack. If it is difficult to determine visually whether a specimen has cracked, it may be removed from the test apparatus and bent slightly.

A2.4 Flow Test

The ability of the coating on the pipe to remain in place and not flow or sag at summer temperatures is indicated by successfully meeting the following flow tests:

a) Apparatus: The apparatus for the flow test shall consist of a corrugated brass plate 0.8 mm thick, 200 mm long and 100 mm wide, with corrugations running the long way of the plate and a metal support to hold the plate on a 45 angle with the horizontal. The corrugations shall have a crest-to crest dimension of 16 mm and depth of 4.8 mm. A line shall be scribed 150 mm from the lower edge. Split molds shall be similar to those specified above for the shock test.

b) Procedure: Two test specimens in the form of cylinders, each 9.5 mm in diameter and 19.0 mm in length, shall be obtained by pouring the excess molten from the shock test into the amalgamated brass molds. Each specimen shall be placed in a corrugation of the corrugated slide (slide to be on the 45° slope) so that the lower end of each specimen will rest exactly along a line scribed 150 mm from the bottom edge of the slide. The test apparatus, with the specimens in place, shall then be placed in an oven maintained at 64°C (± 1°). After 4 hours it shall be removed and allowed to cool to room temperature. The distance from the bottom of the corrugated plate to the lower edge of each test specimen subtracted from 150 mm, determines the amount of sag or flow. To be acceptable, the flow must not exceed 7.0 mm for either of the two specimens.

A2.5 Imperviousness Test

The imperviousness of the coating shall be determined by placing 25 to 50 millilitres each of a 25% solution of sulphuric acid, a 25% solution of sodium hydroxide, and a saturated salt solution, in three adjacent corrugations of the coated pipe or in three corrugations of a section approximately 100 mm wide cut from the pipe. The three solutions shall remain in corrugations for a period of 48 hours during which time no loosening or separation of the coating from the galvanizing shall have taken place.

Page 323: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CORRUGATED STEEL PIPE SECTION 320

BC - MOT 2006 320 (23 of 26)

SECTION 320 CORRUGATED STEEL PIPE

APPENDIX III

Test Method for Lateral Seam Strength of Helical CSP Lock Seam

(Referred to in Subsection 320.09.04.03)

A3.1 Apparatus

a) Testing Machine - Any standard testing machine capable of maintaining the specified rate of strain and of measuring tensile load with an error not to exceed ± 50 N.

b) Grips - The grips for holding the test coupon shall be of the self-aligning type.

A3.2 Preparation of Sample

a) Torch or saw cut a piece approximately 100 mm x 200 mm from the end of the pipe (See Figure 1).

b) Saw cut a 25 mm by 150 mm coupon with parallel sides perpendicular to the lock seam (See Figure 1).

FIGURE 1 - LOCATION OF LOCKSEAM SAMPLE

c) Flatten ends of the coupon for gripping in the testing machine. Do this in a vise one end at a time, insert strip in vise to 12 mm from the lock seam. As vise flattens corrugation, strip will rotate. Realign lock seam with flattened ends by use of crescent wrench or vise grips tightened over the lock seam to prevent distortion of the seam itself while bending the strip back into line.

A3.3 Procedure

The gauge length of the test coupon shall be measured in the direction of the seam with calipers to an accuracy of ± 0.2 mm.

The coupon shall be carefully placed in the grips of the testing machine in such manner as to ensure that the axis of the test coupon coincides with the direction of the applied pull.

The load shall be applied at a uniform rate of motion of the movable cross head of 2.5 mm per minute. The maximum load in Newtons shall be recorded.

Page 324: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 320 CORRUGATED STEEL PIPE

320 (24 of 26) 2006 BC - MOT

A3.4 Calculation

The lateral seam strength shall be calculated by the following formula:

S = P/L

where: S = Lateral Seam Strength in N/mm P = Maximum Load N L = Gauge length of test coupon in the direction of the seam in mm

Page 325: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CORRUGATED STEEL PIPE SECTION 320

BC - MOT 2006 320 (25 of 26)

SECTION 320 CORRUGATED STEEL PIPE

APPENDIX IV

Method of Obtaining Lock Seam Sample from Pipe With Recorrugated Ends

(Referred to in Subsection 320.03.04.04)

A4.1 Tools

The following tools are required:

• Heavy duty 12.5 mm variable speed drill complete with a 38 mm and a 64 mm hole saw. • Hammer • Centre punch • Crescent wrench (200 mm) • Screwdriver.

A4.2 Procedure

Drill a 38 mm diameter sample with the hole saw. Centre the drill on the centre of the lock seam about 600 mm from the end of the pipe clear of the recorrugated portion.

The sample of the lock seam shall be ground flat across the seam and shall be examined for all the visual inspection requirements contained in Subsection 320.03.04.02.

A4.3 Repair

Repair the pipe by bolting 64 mm zinc coated washers on either side of pipe. See Figure 1. Washers may be obtained by use of the 64 mm hole saw on the tangent of a piece of corrugated sheet.

FIGURE 1

Page 326: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 320 CORRUGATED STEEL PIPE

320 (26 of 26) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 327: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 321

TRAFFIC PAINT

321.01 Scope - This Section applies to paint suitable for spray application at a temperature of 50ºC ± 5ºC to asphalt or concrete pavements for marking of traffic lines. It will be used with overlay glass reflectorized beads, and will be supplied in white or yellow without any "pre-mix" beads.

321.02 Not Used

321.03 General Requirements - The composition of the paint will be at the discretion of the manufacturer but shall be a product pre-qualified by the specified procedure. (See Subsection 321.11 for tendering prerequisites).

321.04 Detail Requirements - Paint to this specification shall comply with the following:

a) Consistency: 85 ± 5 Kreb units. Test method ASTM D 562.

b) Drying Time: Maximum 30 minutes at 21ºC at 50-60% relative humidity. Test method ASTM D 711.

c) Bleeding: The paint shall have a degree of resistance to bleeding of seven or greater. Test methods ASTM D 969 and D 868.

d) Road Service Life: The paint shall obtain satisfactory ratings for general appearance, durability and night visibility during seven to eight months of service (June to December approximately) under heavy traffic on bituminous pavement in the vicinity of Victoria or Vancouver, British Columbia. Satisfactory ratings are defined as being equal to or better than those obtained by paints currently “Qualified” by the Ministry.

Test Method: British Columbia Ministry of Transportation Standard Method of conducting and rating Road Service Tests on Traffic Paint (See Subsection 321.11).

e) Handling Qualities:

i) The degree of settling after five months storage shall be such that the paint can be readily re-mixed to a uniform consistency and there shall be no skinning. The paint shall not have marked thixotropic properties.

ii) The paint shall be capable of being sufficiently atomized to produce a uniformly applied line 100 mm in width with absence of side splatter, overspray, or cobwebbing within the limits imposed by the application equipment used on the Ministry’s line striping machines.

iii) The paint shall be capable of being successfully applied to at least 2 km of dash line without the necessity of making adjustments to any machine settings and without showing any evidence of distortion of the spray pattern or appreciable build up of paint in the spray gun tips.

Test Method: British Columbia Ministry of Transportation Standard Method of conducting Handling Quality Tests on Traffic Paint (See Subsection 321.11).

f) Colour:

i) White paint shall comply with US Federal Specification 595b White 17886.

ii) Yellow paint shall match British Columbia Ministry of Transportation Standard Yellow Traffic Paint colour chip.

BC - MOT 2006 321 (1 of 4)

Page 328: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 321 TRAFFIC PAINT

g) Quality Control: Paint supplied under contract shall be identical with the sample submitted for qualification (See Subsection 321.03). Paint shall be considered identical if it has been manufactured within the following tolerances:

i) Mass per litre: ± 25 g of the value on the Traffic Paint Data Form.

ii) Drying time: Maximum 30 minutes and within ± 5 minutes of the value shown on the Traffic Paint Data Form.

iii) Composition of Paint: Within the tolerances indicated by the manufacturer on the Traffic Paint Data Form.

The Ministry reserves the right to conduct whatever other tests are deemed necessary to identify the paint supplied with the paint submitted for qualification.

321.05 Packaging - Paint required to be supplied in 204.6 l (45 Imperial gallon) drums shall be shipped in heavy duty, leakproof, clean, open head steel drums. Special precautions are necessary to ensure that lids are sufficiently secure to withstand offloading by rolling or dropping from a truck deck.

Drums must be sealed vapour proof.

The drums may be chargeable but must be returnable for credit or cash equal to the charge.

321.06 Delivery - Delivery at 36 000 l (8,000 Imperial gallons) a week shall commence within 3 weeks of date of the award of the contract. This rate shall be maintained until advised in writing by the Ministry that a slower rate is required. In the event that the delivery rate is to be increased after having been decreased or temporarily stopped, the manufacturer shall increase production within one week of notification. The delivery rates and notification times apply to paint released for shipment and the manufacturer shall allow 24 hours for such release to be authorized (See Subsection 321.07). If a batch is rejected for non-compliance with these Specifications, the resulting deficit in delivery rate shall be made good within one week.

A manufacturer unable to meet this requirement may obtain qualification and may supply paint to the Ministry, provided that the manufacturer states clearly the rate at which the paint can be delivered at the time of applying for qualification and on any quotation submitted after qualifications has been obtained. If awarded part of the contract this requirement will apply as modified by the lower rate quoted.

321.07 Release for Shipment

a) The manufacturer shall run quality control tests for each batch of material and shall report the results on the prescribed form.

b) The manufacturer shall notify the Ministry of times at which each batch is to be filled into drums. Samples shall be taken by the Ministry Representative at that time.

c) The batch will be released for shipment by the Ministry after sufficient tests have been run to identify the batch with the sample originally qualified and after receipt of the manufacturer’s quality control test results. Such release shall not be a bar to subsequent rejection of the material if it is found to have unsatisfactory handling qualities in the field (See Subsection 321.04 (e)) or if its properties of consistency and drying time fail the requirements within one month of the date of manufacture.

321.08 Labelling - Each container shall be clearly marked with Batch Number, Date of Manufacture, Name of

321 (2 of 4) 2006 BC - MOT

Page 329: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

TRAFFIC PAINT SECTION 321

Manufacturer and Manufacturer’s Code Number on both drums and lids. These markings shall be affixed so that they will not be affected by weather or handling.

321.09 Rejection - Paint rejected for non-compliance with these specifications shall be replaced with paint that does so comply, at the manufacturer’s expense, including handling and transportation charges.

321.10 Non Delivery Penalty - Failure of a manufacturer to deliver paint at the specified rate (See Subsection 321.06) necessitating the Ministry obtaining a proportion of the order from an alternative supplier will result in cancellation of that proportion of the contract and payment of a penalty based on that proportion. The penalty will be negotiated by the Chairman of the Purchasing Commission at the time of default.

321.11 Qualification Procedures and Ministry Test Methods - Details regarding procedures for qualification and Ministry Test Methods may be obtained from the Manager, Centreline Operations, (phone (604)576-2907).

Note: Samples for qualification must be received not later than April 1st of each year to obtain qualification for the following year’s supply.

BC - MOT 2006 321 (3 of 4)

Page 330: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 321 TRAFFIC PAINT

321 (4 of 4) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 331: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 407

FOUNDATION EXCAVATION

407.01 Scope - This Section covers foundation excavation (i.e., excavation for abutments, piers, culverts, walls, manholes, paving, riprap, etc., not requiring cofferdams), as specified herein, and shall apply generally to all structures other than those in deep water, and where it is distinctly stated that the prices bid are inclusive of excavation.

407.02 Extent of Work - Foundations shall be excavated to the lines, levels and grades established by the Ministry Representative. All organic and soft materials shall be entirely removed to a firm formation and piled well back from the work. The use of explosives shall be limited strictly to the necessities of the job. As nearly as practicable, the foundation provided shall be of uniform bearing capacity.

407.03 Description of Material Types - Foundation excavation classified under the following material types:

Type A, Type B, Type C and Type D material shall be as defined in Subsection 201.11.

No distinction shall be drawn between wet and dry excavation, the prices being the same for both.

407.04 Method of Measurement - This excavation shall be measured by the cubic metre in its original position for the actual volume moved, with the following limitations:

a) No allowance shall be made for the excavation for Catch Basins.

b) No allowance shall be made for slides, cave-ins, siltings or filling in of excavations due to the carelessness of the Contractor.

c) No allowance shall be made for any overbreak.

d) On structural footings, foundations and box culverts, no payment shall be made for material removed outside of an area which is bounded by vertical planes 600 mm outside and parallel to the neat lines of the footings or floor.

e) Excavation for pipe culverts, other pipes and underdrains shall be limited to the width of trench actually constructed, but not to exceed a width of trench greater than 600 mm plus the outside diameter of the pipe.

f) Excavation for manholes shall be limited to the dimensions actually constructed, but shall not exceed the width, breadth or diameter of the outside dimensions of the manhole by 1.2 m.

g) No payment will be made for any material removed from below the elevations shown on the plans or established by the Ministry Representative for the bottom of the excavations. Any such material excavated below the established elevations shall be replaced at the Contractor's expense. Replacement shall be made with concrete or other material acceptable to the Ministry Representative.

407.05 Quantities and Payment - Payment shall be at the unit price bid for each class and shall be accepted as full compensation for everything furnished and done in connection therewith.

BC - MOT 2006 407 (1 of 2)

Page 332: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 407 FOUNDATION EXCAVATION

THIS PAGE IS LEFT INTENTIONALLY BLANK

407 (2 of 2) 2006 BC - MOT

Page 333: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 412 (1 of 6)

SECTION 412

REINFORCING STEEL

DESCRIPTION

412.01 Scope - This Section describes the supply, fabrication and installation of reinforcing steel for concrete structures.

The requirements of CAN/CSA-S6-00, “Canadian Highway Bridge Design Code” shall apply unless specified otherwise herein or in the Contract Documents.

For items not covered by CAN/CSA-S6-00, “Canadian Highway Bridge Design Code” or the Contract Documents, CAN/CSA A23.1 shall apply.

References to standards shall be to the current editions at time of tendering.

MATERIALS

412.11 General - All reinforcing bars shall be deformed except for spirals and ties where plain bars may be used.

The type and grade required shall be as specified on the Purchase Order, Work Order, Drawings or Special Provisions.

Wire ties for reinforcing steel, conforming to CSA G30.3, shall be minimum 1.6 mm diameter, cold drawn, annealed steel wire.

Two copies of mill certificates giving chemical and physical properties of the reinforcing steel shall be furnished to the Ministry Representative.

The identification of reinforcing bars shall be maintained throughout the fabrication, coating (if required) and shipping processes to the installation on the job.

The Contractor shall as part of his quality control program have random samples (selected by the Ministry Representative) of reinforcing steel, both coated and uncoated, tested for bending and tension. Two samples shall be taken of each size and grade of bar used on the project. Testing shall be in accordance with CAN/CSA-G30.18-M92 unless otherwise specified. Testing shall be performed by an approved testing agency.

412.11.01 Uncoated Reinforcing Steel - Concrete reinforcement shall conform to the requirements of the CSA Standards shown in Table 412-A, as applicable.

412.11.02 Epoxy-Coated Reinforcing Steel - Epoxy-coated reinforcing steel bars shall conform to the requirements of ASTM A-775M and D-3963M. Application plants shall be certified under the Concrete Reinforcing Steel Institute (CRSI) Voluntary Certification Program for Fusion-Bonded Epoxy-Coating Applicator Plants, and proof of certification shall be submitted to the Ministry Representative. Pre-treatment of the near white blast cleaned surfaces with chromate or equivalent is mandatory prior to the application of a minimum of 180 µm of cured thickness of protective epoxy-coating by an electrostatic spray method. All epoxy-coated bars shall be clearly labelled with the name of the manufacturer, the primer and the coating system used and the date of production. The method of labelling shall be determined by the applicator plants and test certificates of performance of coated bars shall be submitted to the Ministry Representative.

Further to paragraph 9.2 of ASTM D-3963, the identification marks on all coated reinforcing bars shall be maintained from the point of delivery until they are incorporated into the structure.

The Ministry Representative may require samples of epoxy resin and epoxy patching material for acceptance testing as called for in ASTM A-775M. The Ministry Representative may require tests of coated bars as called for in ASTM A-775M.

412.11.03 Galvanized Reinforcing Steel – Galvanized reinforcing bars shall be used only where shown on the Drawings. Substitution of galvanized reinforcing bars in place of epoxy-coated reinforcing bars will not be permitted. Substitution of epoxy-coated reinforcing bars in place of galvanized reinforcing bars will not be permitted. Hot dipped galvanized Reinforcing bars shall conform to the requirements of ASTM A-767M – Class 1 coating.

TABLE 412-A REQUIREMENTS FOR UNCOATED REINFORCING STEEL

G30.3 Cold-Drawn Steel Wire for Concrete Reinforcement

G30.5 Welded Steel Wire Fabric for Concrete Reinforcement

G30.14 Deformed Steel Wire for Concrete Reinforcement

G30.15 Welded Deformed Steel Wire Fabric for Concrete Reinforcement

G30.18 Billet Steel Bars for Concrete Reinforcement

Page 334: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 412 REINFORCING STEEL

412 (2 of 6) 2006 BC - MOT

Only Grade W bars shall be galvanized

Galvanized reinforcing bars shall not be placed in contact with uncoated reinforcing bars.

412.11.04 Fibre Reinforced Polymer (FRP) - FRP components and FRP reinforcing bar shall conform to CSA Specification S806. FRP reinforcing bars shall be used only where shown on the Drawings.

412.11.05 Order Lists and Bending Diagrams - All order lists and bending diagrams shall be submitted to the Ministry Representative for review before material is ordered.

The review of order lists and bending diagrams by the Ministry Representative shall not relieve the Contractor or Suppliers, as applicable, of responsibility for the correctness thereof.

CONSTRUCTION

412. 31 Bending - Reinforcement bars shall be cut and bent to the shapes shown on the Drawings. Bending shall be sufficiently accurate that the placing tolerances (Subsection 412.33.01) can be met. All bars shall be bent cold, unless otherwise permitted. Bars partially embedded in concrete shall not be field bent except as shown on the Drawings or specifically permitted.

412.31.01 Hooks and Bend Dimensions - Where hooks are shown on the Drawings, they shall have the following dimensions, unless shown otherwise:

• 180° bend plus extension of at least 4 bar diameters, but not less than 60 mm.

• 90° bend plus extension of at least 12 bar diameters. • for stirrups and ties only, either a 90° or a 135° bend

plus extension of at least 6 bar diameters.at the free end of the bar.

• Minimum inside diameters of bends shall be as shown in Table 412-B.

Exceptions:

• Minimum inside diameters of bends and 90º and 135º hooks for stirrups and ties shall be 4 bar diameters for uncoated bars and 8 bar diameters for epoxy-coated bars.

• Minimum inside diameters of bends in welded wire fabric, plain or deformed, for stirrups and ties shall not be less than 4 wire diameters for deformed wire larger than 7 mm and two wire diameters for all other wires, except that bends with an inside diameter of less than 8 wire diameters shall be not less than 4 wire diameters from the nearest welded intersection.

• Note: Reinforcing bars shall be pre-bent before galvanizing unless acceptable to the Ministry Representative. Minimum bend diameters if pre-bent and galvanized will be as for uncoated bars.

Bars partially embedded in concrete shall not be field bent except as permitted by the Ministry Representative.

412.32 Handling and Storage - Reinforcing bars shall be stored on platforms, skids or other suitable supports clear of the ground and shall be protected as practicable from mechanical injury and surface deterioration caused by exposure to conditions producing rust. When placed in the work, reinforcement shall be free from dirt, loose rust or scale, mortar, paint, grease, oil, or other materials that would reduce bond.

412.32.01 Epoxy-Coated Reinforcing Steel - Epoxy-coated reinforcing bars shall be handled and stored so as to minimize damage to the coating. Equipment for handling the bars shall have protected contact areas. Nylon slings or padded wire rope slings shall be used. Suitable bundling bands shall be used to prevent damage. Bundles of coated bars shall be lifted at multiple pick-up points to prevent bar-to-bar abrasion from sags in the bundles of bars. The bars or bundles shall not be dropped or dragged.

Coated steel reinforcing bars shall be stored off the ground on protective cribbing, and timbers placed between bundles when stacking is necessary. Supports shall be placed sufficiently close to prevent sags in the bundles. Long term storage of epoxy-coated bars shall be minimized If circumstances require storing coated steel reinforcement

TABLE 412-B MINIMUM INSIDE DIAMETERS OF BENDS*

BAR DESIG-

UNCOATED BARS (mm)

EPOXY COATED

NATION 300R 400R or

500R 400W or

500W BARS (mm)

10M 60 70 60 80

15M 90 100 90 120

20M - 120 100 160

25M - 150 150 200

30M - 250 200 240

35M - 300 250 350

45M - 450 400 450

55M - 600 550 550

Page 335: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

REINFORCING STEEL SECTION 412

BC - MOT 2006 412 (3 of 6)

outdoors for more than two months, protective storage measures shall be implemented to protect the material from sunlight, salt spray and weather exposure. Coated steel reinforcing bars stored in corrosive environments will require protection sooner. Coated steel reinforcing bars or bundles shall be covered with opaque polyethylene sheeting or other suitable opaque protective material.

Coated bars shall not be cut or bent on the job without the permission of the Ministry Representative. In any case, the flame-cutting of coated bars will not be permitted.

When placing coated steel reinforcing bars, all wire bar supports, spacers, and tying wire shall be coated with non-conductive material, for example, an epoxy-coated or plastic coated material compatible with concrete. When immersion-type vibrators are used to consolidate concrete around epoxy-coated steel reinforcing bars, the vibrators shall be equipped with rubber or non-metallic vibrator heads Any bar with coating damage exceeding 2 % of the surface area of the coated steel reinforcing bar in any 300 mm length, the coated bar shall be rejected. When the extent of the damage does not exceed 2 % of the surface area in any 300 mm length, all damaged coating shall be repaired with patching material in accordance with ASTM A 775M, Section 12. Patching material shall be applied in strict accordance with the manufacturer’s written instructions. Prior to application of the patching material, rust shall be removed from the damaged areas. The patching material shall be allowed to cure before placing concrete over the coated steel reinforcing bars. The “Guidelines for Jobsite Practices”, contained as an Appendix of ASTM A 775M shall be mandatory.

Where on-site inspection or testing by the Ministry Representative does not confirm the coating thickness or integrity, for any shipment of bars, such bars may be rejected, and in any case shall not be placed in the structure until the Ministry Representative is satisfied as to their acceptability.

The Contractor shall make available to the Ministry Representative, for inspection and acceptance, all repairs performed to protective coatings on any reinforcing steel. Repairs of epoxy coatings shall not be performed when the coated bar or ambient air temperature is 5oC or less, or when moisture is present on the bar. Patching material shall not be applied if precipitation is expected within four hours of the procedure. If precipitation does occur within four hours, the Ministry Representative shall determine as to whether the material as applied is acceptable or must be replaced. If the placed coated bars have been exposed to salt spray or

road salts, the bars shall be rinsed with fresh water to remove any chloride contamination prior to placing concrete.

412.33 Placing and Fastening - Before any concrete is placed, the placing and securing of reinforcing steel including dowels, within the area of concrete placement shall be complete, Tying in place of all dowels projecting from the area of concrete placement shall be acceptable to the Ministry Representative before any concrete is placed. The reinforcing steel shall be free from dirt, detrimental rust, loose scale, paint, oil or other foreign material.

Reinforcement shall be placed in the positions shown on the Drawings, within the tolerances specified below, adequately supported and secured against displacement. All splices of adjacent bars shall be securely tied together. Tying 100% of the bar intersections is required where the bar spacing centres are 300 mm or greater. Tying of 50% of the bar intersections is required when the bar spacing centres are less than 300 mm.

The locations of the top reinforcing steel in bridge decks shall be checked by running a full deck-width template along the longitudinal screeds. The lower edge of the template shall be set at the nominal cover dimension (see Drawings) below the level of the deck surface. No steel shall touch the template nor be more than 6 mm distant from it.

The location of reinforcing steel near deck joint anchors shall be adjusted so that there will be no interference with the deck joint anchors.

Tack welding of reinforcement for cage assembly or securing of reinforcement will be permitted only with the written acceptance of the Ministry Representative. In no cases shall stirrups be welded to tensile reinforcement.

412.33.01 Tolerances - Tolerances for placing reinforcement shall, unless otherwise specified, be as shown in Table 412-C.

412.33.02 Bar Supports and Spacers - Bar supports and spacers shall be adequate to ensure concrete cover and bar spacings are maintained within the specified tolerances.

Bar supports and spacers shall be sufficient in number and strength to support the reinforcement and prevent displacement by workers or equipment before and during concreting and shall be adequately spaced to ensure that any sagging between supports does not intrude on the specified concrete cover.

Bar supports and spacers shall be of a type and material that will not cause rust spots, blemishes or spalling of concrete

Page 336: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 412 REINFORCING STEEL

412 (4 of 6) 2006 BC - MOT

surfaces.

Bar supports and spacers shall be precast concrete, plastic, steel wire, stainless steel or steel bar, except that, supports or spacers over 200 mm in height shall be precast concrete or steel bar.

Bright wire and uncoated steel supports and spacers may only be used where they are not in contact with soil surfaces, finished concrete surfaces or epoxy coated reinforcement.

Where concrete surfaces are to be exposed to sandblasting, sea water, or de-icing chemicals the bar supports and spacers shall be either stainless steel, hot dipped galvanized steel,

epoxy coated reinforcing steel, plastic or precast concrete.

Precast concrete supports shall have a compressive strength and quality not less than that of the concrete in which they are embedded. For finished surfaces, the face of the support in contact with the forms shall not exceed 50 mm in any dimension and shall have a colour and texture to match that

of the finished concrete surface.

Bar supports and spacers for approach slabs and formed horizontal slabs such as bridge decks, bridge sidewalks, and top slabs of culverts shall meet the following additional requirements:

a) Supports or spacers up to 200 mm in height shall be either precast concrete or plastic.

b) Supports and spacers over 200 mm in height shall be either:

i) precast concrete,

ii) bent or welded steel bar that has been hot-dipped galvanized after fabrication,

iii) stainless steel bar, or

iv) epoxy coated reinforcing steel bar

c) Plastic supports or spacers shall have an individual minimum breaking strength of 4.5 kN (1000 lbs) and shall be capable of maintaining strength and dimensional properties for the range of temperatures encountered on site.

d) Maximum spacing between supports, for each mat of bars, shall be 1200 mm, except that the maximum spacing between plastic supports, for each mat of bars, shall be 1000 mm.

e) Each support shall carry the load from not more than one mat of reinforcing steel, except as provided below:

i) Where a support is used that is specifically designed by the manufacturer to carry two mats at two separate positions, or

ii) If the top mat of reinforcing steel is more than 200 mm above the slab soffit, then the top mat may be supported by epoxy coated reinforcing steel spreader bars secured between the top and bottom reinforcing mats, provided that, the bottom reinforcing mat is supported on precast concrete chairs which are sufficient in number and adequately spaced to carry the additional weight of the top mat of reinforcing steel.

412.33.03 Concrete Cover - Concrete cover for reinforcing steel shall be as listed in Table 412-D, unless shown otherwise on the Drawings.

TABLE 412-C TOLERANCES FOR PLACING REINFORCEMENT

Concrete cover to top reinforcing steel in bridge decks

+ 6 mm - 0 mm

Concrete cover to reinforcement, other than top reinforcing steel in bridge decks ± 8 mm

Bar location, except cover, when depth of a flexural member, thickness of a wall or smallest dimension of a column is 200 mm or less

± 8 mm

Bar location, except cover, when depth of a flexural member, thickness of a wall or smallest dimension of a column is larger than 200 mm but less than 600 mm

± 12 mm

Bar location, except cover, when depth of a flexural member, thickness of a wall or smallest dimension of a column is 600 mm or larger

± 20 mm

Longitudinal location, except cover, of bends and ends of bars ± 50 mm

Longitudinal location, except cover, of bends and ends of bars at discontinuous ends of members

± 20 mm

Page 337: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

REINFORCING STEEL SECTION 412

BC - MOT 2006 412 (5 of 6)

412.33.04 Spirals - Spirals shall be held in place and to line by vertical spacers.

For spiral rods less than 15M spacing shall be as follows:

• two spacers per loop for spirals less than 500 mm in diameter.

• three spacers per loop for spirals 500 mm to 800 mm in diameter.

• four spacers per loop for spirals over 800 mm in diameter.

For spiral rods 15M and larger spacing shall be as follows:

• three spacers per loop for spirals up to 600 mm in diameter.

• four spacers per loop for spirals over 600 mm in diameter.

If vertical reinforcements are to serve as spacers, spirals shall be securely tied to vertical reinforcement at the spacing required for spacers.

412.34 Splicing of Bars - Special requirements for splicing, such as particular locations for splices, use of overlength bars or special lap lengths, shall be as shown on the Drawings.

Splices in bars larger than 35M shall be mechanical coupler splices or welded. The detail of such splices shall be subject to acceptance by the Ministry Representative.

412.34.01 Lapped Splices

a) Horizontal bars shall not be spliced unless greater than standard mill lengths - 12 m for 10M bars and 18 m for larger bars - would otherwise be required.

b) Splices to be staggered so that no more than one third of the reinforcing steel in a member shall be spliced in any transverse section that is within the required lap length.

c) If not shown on the Drawings, the length of lapped splices shall be in accordance with CAN/CSA-S6-00,

“Canadian Highway Bridge Design Code”, Clause 8.15.9.

d) Adjacent reinforcing bars shall not be spliced at the same locations unless shown on the Drawings or authorized by the Ministry Representative.

Column spirals shall be lapped 48 rod diameters at splices.

412.34.02 Welded Splices - Welded splices shall be used only if detailed on the Drawings or acceptable to the Ministry Representative in writing. Welding shall conform to the requirements of CSA Standard W186, Welding of Reinforcing Bars in Reinforced Concrete Construction and shall be performed by a company certified by the Canadian Welding Bureau to the requirements of CSA Standard W186. Welded splices shall not be used on epoxy coated bars.

412.34.03 Mechanical Coupler Splices - Mechanical couplers shall be used for splices only if pre-approved or detailed on the Drawings or authorized in writing by the Ministry Representative. Such couplers shall develop in tension or compression, as required, at least 120% of the specific yield strength of the bars, but not less than 110% of the mean yield strength, representative of the bars to be used, in the test of the mechanical connection.

Wedge couplers shall not be used in bars greater than 15 mm diameter.

When mechanical couplers are used the Contractor shall ensure that the minimum concrete cover as specified is maintained.

The total slip of the reinforcing bars within the splice sleeve of the connector after loading in tension to 0.5fy and relaxing it to 0.05fy shall not exceed the following measured displacements between gauge points straddling the splice sleeve:

Up to and including 45M bars 0.25 mm 55M bars 0.75 mm

MEASUREMENT

412.81 General - When required, reinforcing steel will be measured by KILOGRAMS for the total mass in each part of the structure(s) as computed using Table 412-E.

The mass of clips, separators, tie wires, chairs and other fastening devices, and epoxy or other coating shall not be added into the calculations of mass of reinforcing steel.

TABLE 412-D CONCRETE COVER FOR REINFORCING STEEL

Concrete cast against ground 75 mm

Tops of deck slabs 70 mm

Undersides of deck slabs 40 mm

Other surfaces 60 mm

Page 338: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 412 REINFORCING STEEL

412 (6 of 6) 2006 BC - MOT

PAYMENT

412.91 General - Payment for REINFORCING STEEL will be made at the Contract Lump Sum Prices for reinforcing steel in each part of the structure(s), for the supply, cutting, bending, coating (if required), shipping, placing and securing of reinforcing steel. Payment shall also include all costs associated with quality control.

Payment for increases or reductions in quantities of uncoated and coated reinforcing steel ordered by the Ministry Representative will be made at the following Unit Prices per kilogram.

...Uncoated reinforcing steel ............ $2.00

...Epoxy-coated reinforcing steel ..... $2.50

...Galvanized reinforcing steel ......... $2. 50

TABLE 412-E NOMINAL LINEAR MASS

BAR DESIGNATION 10M 15M 20M 25M 30M 35M 45M 55M

MASS kg/m 0.785 1.570 2.355 3.925 5.495 7.850 11.775 19.625

Page 339: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 413 (1 of 10)

SECTION 413

BRIDGE DECKS AND CONCRETE OVERLAYS

DESCRIPTION

413.01 General - This Section describes requirements for the construction of Bridge Decks, and for the construction of Concrete Overlays on previously constructed (old) bridge decks and on newly constructed (new) bridge decks. The requirements of Section 211 shall apply except as otherwise specified in this Section. Unless otherwise specified in this Section, bridge deck concrete shall include diaphragms, deck slabs, bridge parapets and medians, bridge sidewalks, approach slabs and overlay concrete.

413.31 Bridge Decks

413.31.01 General - Deck slab construction shall be full-width and continuous between the joints shown on the Drawings, and shall be placed in the sequence as shown on the Drawings. Any variation from this requirement shall be to the acceptance of the Ministry Representative.

413.31.01.01 Camber Survey - Prior to commencing deck construction and subsequent to the completion of the erection of girders, with the girders in a thermally neutral condition and with no dead load other than the dead load of the girders and necessary fall protection, the Contractor shall profile all the girders. Camber elevations are to be taken at 2000 mm centres maximum (or as indicated on the Drawings or Special Provisions), centrelines of all bearings and ends of girders. The camber elevation locations are to be laid out to an accuracy of 25 mm horizontally and camber elevations taken to the nearest 1 mm vertically. Within 14 days of the Contractor supplying the camber elevations to the Ministry Representative, the Contractor will receive haunch heights for setting the deck slab soffit, (for suspended slab type structures only) and the design finished grade elevations for the deck, complete with anticipated dead load deflections at 1000 mm stations along the centreline of roadway, to be used by the Contractor in establishing the required screed rail settings.

In the event that actual girder camber values vary significantly from the design values, the Contractor will be required to modify the original design finished grade as directed by the Ministry Representative.

413.31.01.02 Method, Equipment & Personnel - The Contractor shall submit to the Ministry Representative for review, four weeks prior to the scheduled start of deck slab concrete placement, a complete description of the method, equipment and personnel, including previous deck placement experience of the personnel to be employed. This shall include the equipment for mixing, transporting, placing, vibrating and curing the concrete and shall also

include details of the finishing equipment and support rails. All equipment shall be subject to inspection and acceptance by the Ministry Representative. Equipment may be rejected during operation if it is unsatisfactory.

Two weeks prior to the scheduled start of deck slab concrete placement, the Contractor shall meet with the concrete supplier and the Ministry Representative to review deck concrete operations with respect to concrete mix design and performance, concrete delivery, placing, finishing and curing equipment and methods.

413.31.01.03 Haunch Setting, Screed Rails & Reinforcing Cover – The Contractor shall set the deck slab soffit formwork to within 2 mm of the haunch dimension as determined in accordance with SS 413.31.01.01.

After installation of the deck slab reinforcing, the Contractor shall set the screed rails for the deck finishing machine. Screed rails shall be installed to an accuracy of ± 2 mm and have a maximum deflection between supports of 1 mm. Allowance for dead load deflection of the structure shall be made in the screed rail setting as well as any anticipated deflection due to the loading of any formwork that may be supporting the screed rail system. The screed rails shall be adequately supported outside the area to be concreted and shall be completely installed before concrete is placed, unless otherwise accepted by the Ministry Representative.

Prior to the placement of deck slab concrete and subsequent to the installation of deck slab reinforcing and screed rails, the locations of the top reinforcing steel in bridge decks shall be checked by running a full deck-width template along the longitudinal screeds. The lower edge of the template shall be set at the nominal cover dimension (as per the Drawings) plus any anticipated deflection of the screed rail support system below the level of the deck surface. No steel shall touch the template nor be more than 6 mm distant from it. Any discrepancies outside of these limits shall be corrected by the Contractor to the satisfaction of the Ministry Representative.

413.31.02 Concrete Placement

413.31.02 .01 Concrete Temperature at Placement - Concrete designed for bridge decks including any bridge deck concrete containing silica fume shall not have a temperature in excess of 17°C at time of placement. Concrete used in elements having a minimum section thickness greater than 1000 mm shall have temperature controls as per CSA A23.1 Clause 5.2.4.4. Methods used for maintaining temperature controls shall not diminish the

Page 340: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 413 BRIDGE DECKS AND CONCRETE OVERLAYS

413 (2 of 10) 2006 BC - MOT

quality of the concrete, and shall not exceed the specified W/Cm ratio.

When the atmospheric temperature is 15°C or higher, Clause 211.18 – Hot Weather Concreting, shall apply except as modified herein.

Concrete for bridge decks and overlays shall not have a temperature greater than 17oC when placed. Prior to the placement of bridge deck and overlay concrete, when the ambient air temperature is at or above 15 oC, or when there is a probability of its rising to 20oC or above during the placement period (as forecast by the nearest official meteorological office), the Contractor shall submit to the Ministry Representative for acceptance, the proposed placing operations complying with the requirements for hot weather concreting.

When the ambient air temperature is at or above 15 oC , or when there is a probability of its rising to 20 oC or above during the placement period (as forecast by the nearest official meteorological office), bridge decks and overlays shall be cast when daily air temperatures are forecast to be a minimum (normally between 12:00 midnight and 9:00 AM).

413.31.02 .02 Time of Placement – All bridge deck and overlay concrete shall be fully discharged and placed in its final location within 45 minutes after the water and cement have been combined. Under conditions contributing to rapid stiffening of concrete, the Ministry Representative may require a time of less than stated above.

Time of placement extensions will be considered on a case by case basis and may require the use of Hydration Stabilizing Admixtures (HSA’s) conforming to the requirements of ASTM C494 Type B, Retarding or Type D, Water-Reducing and Retarding Admixtures. If accepted by the Ministry Representative, guidelines for the use of HSA’s shall be as follows:

HSA modified concrete for bridge decks shall be fully discharged and placed within 90 minutes after water and cement have been combined.

When HSA’s are used, these time extensions are subject to preconstruction trials being conducted by the Contractor, to establish the appropriate HSA dosage to provide suitable extended slump life of concrete, without increasing the water/cementitious ratio of the concrete above that which would be required if HSA’s were not used. The use of HSA’s shall in no instance modify the maximum concrete temperature required at time of placement. A one time only addition of HSA will be allowed. This will be during initial batching of the concrete or immediately at completion of batching as

recommended by the admixture manufacturer. Addition of HSA at any other time will be cause for rejection of the concrete.

413.31.02 .03 Concrete Placement-Diaphragms - Unless otherwise specified, diaphragms shall be placed either:

a) about two hours before the deck concrete. In this case, diaphragm concrete shall have a slump less than 40 mm and shall be retarded so that it sets at the same time as the deck concrete, or

b) a sufficient length of time ahead of the deck concrete, so that the diaphragm concrete attains a compressive strength of 15 MPa before the deck slab is cast.

Sequence for the placing of concrete for diaphragms at ends of girders on continuous and integral type spans shall be as shown on Drawings.

413.31.02 .04 Concrete Placement-Deck Slab - The top surfaces of concrete stringers shall be prepared in accordance with Clause 211.12.03 and the surfaces shall be in a saturated surface dry condition immediately before the deck is cast.

Concrete shall be placed at a rate of not less than 6 m/hr. The concrete front and finishing operation shall be kept parallel to the substructure. Placing shall be started at such time as to permit finishing during daylight hours, except if ambient temperatures are as outlined in Clause 413.31.02.01, then adequate lighting is to be provided in accordance with Workers Compensation Act, Occupational Health and Safety Regulations, BC, to allow for concrete operations under reduced light conditions.

In the event of unexpected rain, concrete placing shall cease and the surface shall be protected immediately. Surface concrete which has been rained on shall immediately be removed to the top of reinforcing steel.

413.31.02 .05 Finishing - The deck surface shall be finished by a drum-type deck finisher on support rails. Two work bridges shall be provided. No inserts will be permitted in the finished roadway surface.

The surface behind the finisher shall be floated transversely to eliminate ridges and open texture. Areas which cannot be machine-finished shall be hand screeded and floated to conform to the machine-finished deck.

Prior to final surface texturing, the deck surfaces shall be repeatedly checked for accuracy of deck slab thickness and

Page 341: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BRIDGE DECKS AND CONCRETE OVERLAYS SECTION 413

BC - MOT 2006 413 (3 of 10)

alignment. The Contractor shall measure and record the deck slab thickness at a frequency of at least one measurement per interior bay and overhang bay, at a maximum of 3000 mm centers longitudinally. Adjustments as acceptable to the Ministry Representative shall be made to the deck finishing machine to maintain the minimum deck slab thickness and the required concrete cover on the deck reinforcing. The deck slab thickness readings shall be supplied to the Ministry Representative at the conclusion of each placement section.

Bridge deck slab final surface texturing shall be by tining. The tining shall create transverse grooves 3 mm wide by 1.5 mm to 3 mm deep at 20 mm centre to centre spacing.

413.31.03 Repairs - Areas of the deck not meeting the required accuracy of alignment as given in Subsection 211.16 Table 211-M, shall be corrected as follows:

a) where the required alignment can be obtained with a maximum cut of 6 mm, the bumps shall be cut with a bump cutter which will provide an acceptable longitudinal grooved texture;

b) where the required alignment cannot be obtained with a maximum cut of 6 mm, the concrete shall be broken out with vertical edges to a minimum depth of 40 mm and shall be replaced with new concrete of the required quality.

Any physical damage to the deck surface shall be cut out and replaced. Any areas of open texture or plucked aggregates shall be repaired to the satisfaction of the Ministry Representative.

413.31.04 Interim Strength Requirements - Deck concrete shall attain a strength of 15 MPa before parapets are placed and 25 MPa before heavy loads, such as concrete trucks are allowed on the bridge.

413.31.05 Curing

413.31.05.01 General - Freshly deposited concrete shall be protected from freezing, abnormally high temperatures or temperature differentials, premature drying, excessive moisture, moisture loss, heavy shocks, excessive vibrations and high stresses, for the period of time necessary to develop the required concrete properties.

The Contractor shall submit a detailed plan for curing deck and overlay concrete. The plan shall contain details such as water source, the distribution system, the collection and run-off control system, person(s) responsible for quality control, and staff to maintain the system. The curing

system shall be capable of maintaining free film of water, on the areas of concrete requiring curing, for a minimum of 8 unattended hours and this capability shall be demonstrated prior to concrete placement. It shall be the responsibility of the Contractor to ensure that the system of curing and protection is properly planned, constructed and maintained throughout the entire curing period.

Burlap shall be pre-soaked by immersing it in water for a period of at least 24 hours immediately prior to placing. A layer of burlap shall be applied to the surface of the concrete. Strips must overlap 150 mm and must be held in place without marring the surface of the concrete.

The burlap shall be applied immediately after finishing of the concrete surface within 2 to 4 meters of the final surface texturing operation (no more than 20 minutes) and shall be maintained in a saturated condition in a manner which does not damage the finished concrete surface. The burlap shall be maintained in a continuously wet condition throughout the curing period and a continuous film of free water on the surfaces of the areas noted herein shall be maintained by means of soaker hoses, sprinklers, etc.

Concrete for diaphragms, monolithic decks, concrete overlays, approach slabs, parapets, and sidewalks shall be cured for a minimum of seven consecutive uninterrupted twenty-four hour periods at a minimum temperature of 10°C and for the time necessary to attain 80% of the specified compressive strength of the concrete. The compressive strength tests for verifying completion of the curing period shall be determined using field cured test cylinders cured in accordance with Clause 7.3.4 of CSA A23.2-3C. The curing period will begin following the completed placement of the concrete in the section cast.

The temperature of the concrete being cured must be monitored to ensure maximum and minimum temperature requirements in accordance with Subsection 211.15.02 are met.

Regardless of ambient temperature, moist curing with burlap and water must be provided at all times. During cold weather, burlap must be prevented from freezing.

At completion of the curing period, the curing shall be discontinued in a manner so as not to subject the concrete to undue stresses due to rapid moisture loss in the concrete.

When the air temperature is at or below 5°C or when there is a probability of it falling below 5°C within the next 5 days after the curing period, then the following shall apply:

• At completion of the curing period, the addition of free water is to be discontinued and followed by an additional 5 consecutive uninterrupted twenty-four hour periods of drying with the

Page 342: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 413 BRIDGE DECKS AND CONCRETE OVERLAYS

413 (4 of 10) 2006 BC - MOT

concrete temperature maintained at a minimum temperature of 5°C.

413.31.05.02 Additional Curing Requirements for Concrete Containing Silica Fume or Fly Ash, With or Without Fibres. - A fog mist shall be applied continuously from the time of screeding until the concrete is covered with burlap, in such a way as to maintain high relative humidity above the concrete and prevent drying of the concrete surface. Water must not be allowed to drip, flow, or puddle on the concrete surface during fog misting, when placing the burlap, or at any time before the concrete has achieved final set.

Fogging equipment will consist of pressure washers (minimum output pressure of 28 MPa (4000 psi)) with suitable tips for producing a fine water mist or fog. A minimum of two pressure washers shall be used for this process and the adequacy of the range and coverage shall be demonstrated prior to placing any concrete.

When the air temperature is at or below 5°C or when there is a probability of it falling below 5°C within the next 10 days after the curing period, then the following shall apply:

• At completion of the curing period, the addition of free water is to be discontinued and followed by additional 10 consecutive uninterrupted twenty-four hour periods of drying with the concrete temperature maintained at a minimum temperature of 10°C.

Modifications to the curing process my be required if it is anticipated that the deck may be subjected to the application of de-icing chemicals within the first month after the curing period.

413.31.06 Payment - for bridge deck FORMWORKand CONCRETE will be made as outlined in Clause 211.21 01 and Clause 211.21.02 respectively and payment for bridge deck REINFORCING STEEL will be made as outlined in Clause 412.91 unless otherwise provided for in Section 413.

CONCRETE OVERLAYS

413.32.01 General - This Section describes requirements for repair and resurfacing of existing bridge decks (old) and newly constructed bridge decks (new) with a concrete overlay, describing the construction practices, materials and equipment required to place acceptable concrete overlay. This work is usually carried out on one half of the deck at a time, while traffic is maintained on the other half. The requirements of Subsection 413.31 shall apply except as otherwise specified in this section.

413.32.02 Gradeline - The Contractor shall survey and reference profiles of the existing bridge deck and approaches prior to scarification as follows:

• Longitudinally the profiles shall be taken at 2

to 3 metre stations for the entire length of the structure, including 21 meters on each end, with additional shots taken at the back of ballast walls and all existing or proposed new joint locations.

• Transversely the number of profiles required will be determined by:

- A maximum spacing between elevation points of 3 meters.

- Profiles are required 500 mm from each curb or parapet face.

- Profiles are required 300 mm (inside area to be concreted) from longitudinal overlay construction joint lines requiring adjustable screed rails. In general longitudinal overlay construction joints shall be located at the center of a lane or between lanes. The final location of the longitudinal construction joints is subject to the acceptance of the Ministry Representative.

- A Profile is required at hinge point of crown.

• Elevation points are to be laid out in cross section ninety degrees to centerline of roadway on straight structures and radial to centerline of roadway on curved or spiraled structures.

• Profile elevation points shall be laid out to an accuracy of ± 20 mm horizontally and elevations taken to an accuracy of ± 3 mm vertically and be referenced such that they can be re-established within ± 25 mm from their original location.

The Contractor shall provide the Ministry Representative with the gradeline profiles plotted at a scale of 1:10 vertical and 1:50 horizontal and a spreadsheet showing actual original elevations for all points surveyed. In the case of old decks, subsequent to scarifying and cleaning of the deck surface, the Contractor shall re-establish the original elevation points, take new elevations for the points to the nearest millimeter and submit these elevations along with plotted profiles to the Ministry Representative. The Ministry will provide the Contractor with design finished grade profiles and elevations for the survey points

Page 343: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BRIDGE DECKS AND CONCRETE OVERLAYS SECTION 413

BC - MOT 2006 413 (5 of 10)

as originally laid out by the Contractor. These profiles and elevations shall be used by the Contractor to set the screed rails for the deck finishing machine, checking of overlay thickness during the dry run of the deck machine and for calculating the volume of overlay concrete required. The Contractor is responsible for properly setting the screed rails to match the design gradeline provided by the Ministry Representative. Depressions creating ponded water, or localized high spots in the concrete surface, resulting from deficient finishing procedures shall be repaired at the Contractor’s expense. At completion of the deck overlay the Contractor shall re-establish the original elevation points and take as built elevations for the points to the nearest millimetre and submit these elevations along with plotted profiles to the Ministry Representative. No specific payment shall be made for this work as all costs associated with the production of the gradelines and profiles are deemed incidental.

413.32.03 Removal of Existing Concrete Deck Surface The existing concrete surface shall be removed by use of scarification ( roto-milling), hydro-demolition or alternate methods acceptable to the Ministry Representative over the full length and width of the bridge deck. If methods other than scarification are proposed by the Contractor, the Contractor shall submit all required details of the proposed work to the Ministry Representative and shall obtain the acceptance of the Ministry Representative at least two weeks prior to starting the work. Alternate methods shall meet the requirements as specified for scarification.

413.32.03.01 Scarification - If scarified, equipment shall be capable of removal to an accuracy of ± 5 mm. The scarifying equipment shall produce a surface that does not exceed 10 mm in amplitude for roughness. The maximum cut will be to within 10 mm of the reinforcing steel. Depth of scarification will be specified by the Ministry. The Contractor shall monitor the total depth of concrete cover to the top mat of reinforcing steel using a pachometer or alternate methods acceptable to the Ministry Representative. Readings shall be taken at regular intervals ahead of the scarification. The Contractor shall adjust the rate and depth of concrete removal to ensure that the reinforcing steel is not damaged and the desired scarified profile is achieved. All reinforcing steel damaged by the Contractor’s operations will be replaced at the Contractor’s expense. Care must be taken not to damage the existing deck drains. The Contractor will be required to repair or replace any

damaged drains at the Contractor’s expense. Drains are to be plugged to insure containment of debris.

All areas inaccessible to the scarification equipment shall be prepared by hydro-demolition, grinders or by jackhammers that are limited to a maximum 18 kg. Preparation shall minimize damage to the sound substrate concrete. Larger jackhammers may be used if accepted by the Ministry Representative and if performance acceptable to the Ministry Representative can be demonstrated. In the case of previously overlaid decks, concrete shall be removed to below the old bond line. Where the bond line is within 10 mm of the reinforcing steel, the remaining concrete and the old bonding material shall be removed by hydro-demolition or pneumatic tools. Upon completion of scarification of the deck, prior to opening the scarified deck lane to traffic and at the direction of the Ministry Representative, the Contractor shall place temporary asphalt tapers (minimum 40:1) using asphalt patch material (cold mix) with tar paper underneath at all deck joints and bridge ends as required to maintain adequate traffic movement. The asphalt tapers shall be maintained until traffic is no longer using that lane or the final paving is complete. The temporary tapers shall be as per Standard Specifications, Section 501. 413.32.03.02 Payment - Payment for removal of the existing concrete deck surface and asphalt roadway approaches will be made at the Lump Sum price bid. Payment for removal shall include all work for the removal of the concrete and asphalt roadway approaches including but not limited to sweeping, washing and /or blowing of debris, power hand tool removal of all concrete inaccessible to the scarification process, containment and the removal and disposal of all debris from the site. Payment shall also include all labour, material and equipment for the supply, installation and maintenance of temporary let downs, and disposal of all asphalt material from the site.

413.32.04 Removal of Concrete for Partial and Full Depth Repairs The Contractor, in the presence of the Ministry Representative, shall carry out a detailed visual inspection of the deck surface for patch concrete. A chain drag method shall be used to examine the entire deck surface for evidence of additional delaminated and deteriorated concrete. These areas of unsound concrete and patch concrete shall be removed to sound concrete or removed full depth when considered necessary by the Ministry Representative.

Page 344: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 413 BRIDGE DECKS AND CONCRETE OVERLAYS

413 (6 of 10) 2006 BC - MOT

Removal and repair of a specific area will not be completed until the Contractor and the Ministry Representative have inspected the affected areas requiring repair, and have agreed on the extent of repair required.

The Contractor shall supply the necessary labour and supplies to mark out the repair areas. Concrete for repair for partial and full depth repairs shall proceed as follows:

• The Contractor shall keep repair boundaries

square or rectangular and avoid abrupt changes in width of a given repair area. The edge of the repair area shall be maintained vertical. No debris shall be permitted to fall from the bridge. Saw cut the perimeter of the repair areas to a minimum depth of 25 mm to prevent feather edges. Do not cut the existing reinforcing steel.

• Remove deteriorated, delaminated and patch

concrete to sound concrete. Maximum jackhammer shall be 18 kg. Care shall be taken to avoid damage to the reinforcement and remaining concrete. Jackhammers are to be operated at angles less than 45º as measured from the surface of the deck to the hand tool. The Contractor shall use wedge type chisel bits. Moyles and round point chisels are not permitted. Adhering concrete shall be removed from the reinforcement using hammers no larger than 7 kg.

• Remove all concrete to allow a 25 mm space

around all exposed reinforcing bar within partial depth repairs. Expose all corroded reinforcement at edges of partial and full depth repair area

• Full depth repairs will only apply when the

soffit concrete is removed. For full depth repair areas, the Contractor shall install all necessary formwork prior to cleaning of reinforcing and concrete surfaces. The finished soffit repair concrete shall be flush with the surrounding soffit concrete. Areas for full depth repair exceeding 1 m2 shall be patched prior to placement of the overlay. Before placement of the concrete patch, the surface of the adjoining concrete should be saturated with water for a period of no less than 30 minutes and coated with a bonding

agent immediately ahead of the fresh concrete.

• Mildly corroded reinforcement shall be blast

cleaned to commercial blast finish SSPC-SP6. Severely corroded and damaged reinforcement shall be replaced. Mechanical couplers acceptable to the Ministry Representative or laps meeting the CSA S6-00 Code requirements shall be used to attach new bars to the existing bars. Mechanical couplers shall develop at least 125% of the specified yield strength of the bar.

• Prior to the placement of the partial and full

depth repair area infill concrete the surfaces of the sub deck within the repair area shall be abrasive blast (minimum 35 MPa/5000 psi) or high-pressure water blast (minimum 35 MPa/5000 psi) cleaned to remove all bruised and fractured concrete and foreign materials such as dirt, dust, laitance, sand, grease, oil, concrete slurry etc. to the satisfaction of the Ministry Representative.

• The Contractor shall collect and remove all

dirt, dust, and blasting sand from the repair areas of the sub deck, by vacuum or similar method, and dispose of the materials off the bridge site. Disposal shall be in accordance with all applicable environmental regulations.

Payment for removal of Concrete for Partial Depth Concrete Repair of the sub deck will be made at the Unit Price per square metre bid. Payment shall be for all labour, materials and equipment to break out the concrete, including; inspections, sounding, cleaning of mildly corroded reinforcing, abrasive blast cleaning of the existing concrete surfaces within the repair areas, saw cutting, and containment and disposal of all debris.

Payment for Removal of Concrete for Full Depth Concrete Repair of the sub deck will be made at the Unit Price per square metre bid. Payment shall be for all labour, materials and equipment to break out the concrete, including inspections, sounding, cleaning of mildly corroded reinforcing, abrasive blast cleaning of the existing concrete surfaces within the repair areas, saw cutting, and containment and disposal of all debris. Payment shall also include the supply, installation and removal of all required formwork.

413.32.05 Reinforcing Steel

Page 345: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BRIDGE DECKS AND CONCRETE OVERLAYS SECTION 413

BC - MOT 2006 413 (7 of 10)

Reinforcing steel shall be supplied and installed in accordance with Standard Specifications, Section 412. Welding of reinforcing bars will not be permitted. Severely corroded reinforcing steel, more than 25% section loss as determined by the Ministry Representative, in the existing deck shall be removed and a replacement bar spliced using mechanical couplers acceptable to the Ministry or lapped with existing reinforcing steel. Mechanical couplers and lap length shall be in accordance with CAN/CSA S6-00 Reinforcing steel damaged by the Contractor’s operations shall be replaced at the Contractor’s expense.

Payment for replacement of severely corroded reinforcing steel will be made at the unit price per kilogram shown for increases and reductions in clause 412.91 of the Standard Specifications and will be paid out of the Provisional Sum Item for Site Modifications. Payment shall be for quality control, supply, cutting, bending, shipping, placing and securing of reinforcing steel.

Payment for mechanical couplers will be made on a force account basis under the Provisional Sum Item for Site Modifications.

413.32.06 Removal and Replacement of Existing Deck Joints 413.32.06.01 Expansion joint system - The Contractor is responsible for the demolition and removal of the existing concrete and expansion Joints. The steel portions of the deck joint shall be supplied and fabricated in accordance with Standard Specifications; Section 422. The steel portions of the deck joint shall be galvanized and the joint armoring shall be installed 5 mm below the finished concrete nosing surface. Galvanized surfaces damaged by welding shall be touched up with two coats of an approved zinc rich coating. Each joint seal shall be supplied in a single length, without splices. Before the joint seal is installed, the joint shall be thoroughly cleaned with a wire brush and all moisture removed from the joint. The seal shall be installed in accordance with the Manufacturer’s recommendations. Payment for Deck joints will be made at the Price bid for each joint. Payment shall be for all Work as shown on the Drawings and Special Provisions. Payment shall include but not be limited to demolition and removal of the

existing deck and curb concrete, removal of the existing joints seal, preparation of shop drawings; the supply, fabrication, galvanizing, and installation of the steelworks, anchors, forming, reinforcing and supply and installation of joint seal. Payment shall also include the removal of the joint curb seal section and replacement with a joint sealant within the curbs section.

413.32.06.02 Preparation of Filled Joints - The Contractor shall cut a transverse line, directly above the filled joint location, during casting of the deck overlay concrete using an edge cutter attached to a bull float. The line shall be neat and straight.

The Contractor shall further saw cut the filled joint along the transverse line within 48 hours of casting the deck. The saw cut will be achieved using a 4mm wide diamond blade to a depth of 30 mm below the top of the deck.

The Contractor shall fill the saw-cut with Sikaflex 1C SL, a one-component, self-leveling, polyurethane sealant or an alternate permanent filler, impervious to water and resistant to ultra violet radiation, acceptable to the Ministry Representative. Sealants shall be installed in accordance with the manufacturers’ recommendations. The saw cut shall be clean and dry before placing the sealer. Payment for Preparation of Filled Joints will be made at the price bid for each joint. Payment shall be for all labour, materials and equipment required to produce the filled joints

413.32.07 Preparation of the Sub Deck The Contractor shall high pressure (minimum 110 MPa/15000 psi @ 68 liters/minute using a rotating head) water blast the surface of the entire concrete subdeck including both parapet or curb faces 50 mm up from original deck elevation and abutment ballast walls, no earlier than 2 days before placing the overlay concrete. The water blasting equipment shall effectively remove laitance, loose materials, bruised concrete, dust, slurry, oil, or other contaminants (as applicable) that are detrimental to the concrete overlay bond and shall leave behind a sound concrete surface, thoroughly cleaned and roughened to partially expose the coarse aggregate. The Contractor shall provide full containment and disposal of all debris, contaminants, etc., and shall comply with all applicable environmental and Workers Compensation Act, Occupational Health and Safety Regulation BC, requirements. The Contractor shall provide adequate guards to contain over spray and flying debris during the

Page 346: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 413 BRIDGE DECKS AND CONCRETE OVERLAYS

413 (8 of 10) 2006 BC - MOT

scarification, water blasting, deck washing and chipping process. The Contractor shall take all means necessary to reduce and contain the amount of dust produced throughout the entire project.

For the period between water blasting and placement of overlay concrete the sub-deck shall be protected from contaminants.

Water blasting equipment shall always travel downhill, keeping all waste material ahead of the equipment and preventing the waste material from rehydrating on the previously cleaned surface. Payment for high pressure water blasting the entire deck surface, including both parapet faces and abutment ballast walls, to clean and roughen the sound concrete surface, will be made at the Lump Sum price bid.

Payment shall be for all labour, materials and equipment required to produce the specified surface roughness. Payment shall also be for the containment and treatment of the contaminated water and the removal and disposal of any debris from the site.

413.32.08 Concrete Overlay Placement All concrete works will be governed by the requirements of SS 211 ”Portland Cement Concrete” , SS 933 “Admixtures for Portland Cement Concrete” and Subsection 413.31 except as otherwise specified in this Section. The Contractor shall be responsible for the design of all concrete mixes. The Contractor shall be responsible for quality control of each component of the concreting operation, including aggregate and component quality, batching, mixing, transporting, placing, consolidating, finishing, curing and testing. The Contractor shall submit a detailed plan of equipment and manpower to be used for placement and curing of the concrete overlay a minimum of 14 days prior to the scheduled placement dates for the acceptance of the Ministry Representative. The plan shall also contain details such as: water source, the distribution system, the collection and run-off control system, person(s) responsible for quality control, and staff to maintain the system The Contractor will undertake a test placement of the proposed deck mix design as indicated by the requirements of SS 211.03.05.

Payment for placement of the concrete overlay, partial and

full depth repairs will be made at the Unit Price per cubic meter bid. Payment shall be for all labour, materials and equipment for the final preparation and cleaning of the existing prepared concrete sub deck, supply and application of the cementitious bonding agent and the epoxy bonding agent, the supply of cement, silica fume, superplasticizer, all other constituent concrete materials and the supply and placing and curing of the concrete and containment and disposal of all debris. 413.32.08.01 Materials & Equipment - Acceptable types of overlay are High Density concrete and Silica fume modified concrete. For High Density concrete overlays, acceptable finishing machines are Bidwell model OF400, Bidwell model OF500 or alternate (low slump pan-type overlay finishers), acceptable to the Ministry Representative. Concrete shall be produced on site using volumetric concrete mobile mixers. All equipment shall be provided in good working condition. For structures over 50 m long and structures over 20 m long with a grade greater than 3%, two finishing machines shall be used in tandem. The speed of the trailing machine shall be such that its motion is continuous. Any open texture remaining after two finishing machine passes shall be repaired by hand.

For Silica fume modified concrete overlays, acceptable finishing machines are Bidwell model 4800, Gomaco model CA450 or alternate acceptable to the Ministry Representative. Concrete shall be produced by either a qualified concrete batch plant or at the bridge site using pre-bagging concrete mix and mixer trucks. All equipment shall be provided in good working condition. Finishing machines shall be capable of forward and reverse motion under positive control and with provision for raising screeds to clear previously screeded surfaces while traveling in reverse.

The Contractor shall provide steel rail mounted mechanical deck concrete finishing equipment of adequate size and design to permit the complete placement and finishing of a single lane section from abutment to abutment with the prescribed surface finish, without forming any cold joints.

The Contractor is responsible for properly setting the screed rails to ensure longitudinal and transverse drainage from the deck without ponded areas or “bird baths”. Sufficient screed guide rails will be set out for the full length of the anticipated section to be cast plus 6 m length at each end for run in and run out of the deck machine, adjusted for height and accepted by the Ministry

Page 347: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BRIDGE DECKS AND CONCRETE OVERLAYS SECTION 413

BC - MOT 2006 413 (9 of 10)

Representative prior to the pour as follows:

i) Screed guide rails, upon which the finished machine will be placed outside the area to be concreted, will be horizontally and vertically stable. Rails shall be installed with fully adjustable supports at 350 mm maximum spacing

ii) The finishing machine and guide rails will be

adjusted so that the height of the screed above the existing subdeck at each point meets the Ministry Representative’s requirements. To confirm the adjustment of the machine and guide rails, the screed will be “dry-run” and clearance measurements taken at 3 m intervals and provided to the Ministry Representative for acceptance. The minimum overlay thickness shall be 50 mm. Resetting of the machine and/or guide rails will be done as necessary to obtain an acceptable “dry-run”. Adjustments to the machine or the rails will not be permitted after an acceptable “dry-run” is complete.

Work bridges shall be provided to facilitate bull floating, edge finishing with hand tools, correction of defects in machine finished concrete and tining and fog curing.

Rigid forms made of wood or steel shall be installed at longitudinal bulkheads in a manner that will maintain the desired shape during concrete placement, consolidation and finishing. The longitudinal bulkhead will be installed at the centerline or lane lines of the bridge deck. The top of the longitudinal bulkhead will be set at the finished deck elevation. Any honey combing or poorly consolidated concrete after stripping the longitudinal bulkhead will be cut back into the new overlay a minimum of 150 mm.

The overlay shall be placed in strips with longitudinal joints near lane markings. Each strip shall be placed continuously between joints; adjacent strips shall not be cast for 24 hours.

413.32.08.02 Bonding Agent - The Contractor shall apply a pre-approved cementitious bonding slurry to the prepared sub-deck and repair concrete.The prepared concrete sub deck shall be in a saturated surface dry (SSD) state prior to slurry placement. The Contractor shall supply the necessary equipment such as water hoses and vacuum or oil free compressed air. The cementitious bonding slurry is to consist of type GU portland cement mixed with a water/cement ratio not exceeding 0.38 by mass. The slurry must not exceed 3 mm in depth and be scrubbed into the substrate surface with

coarse brooms; in particular no pooling will be permitted. The bonding slurry is to be applied immediately ahead of the overlay concrete placement and in a timely fashion so as not allow drying or setting up of the slurry prior to the placement of overlay concrete. Any areas to which the slurry has been applied, that in the opinion of the Ministry Representative exhibit drying or setting shall be cleaned of the bonding slurry and re-coated prior to the placement of deck overlay concrete.

The vertical faces at the edge of the scarified sub-deck surface; at construction joints; and at concrete/deck-joint interfaces for old bridge decks and the vertical faces at sub-deck and curb or parapet interface for new decks shall be coated with an epoxy bonding agent conforming to ASTM C881, Type V, Grade 2. The Class of bonding agent shall be appropriate for the temperature at the time of application. The bonding agent shall be applied in accordance with the manufacturer’s instructions. 413.32.08.03 Interim Partial Strength - Overlay shall attain a minimum strength of at least 30 MPa before removal of the burlap and opening to traffic. All other requirements of seven day curing shall be adhered to. The interim strength tests shall be determined using field cured test cylinders cured in accordance with Clause 7.3.4 of CSA A23.2-3C.

Page 348: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 413 BRIDGE DECKS AND CONCRETE OVERLAYS

413 (10 of 10) 2006 BC - MOT

THIS PAGE LEFT INTENTIONALLY BLANK

Page 349: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC – MOT 2006 415 (1 of 14)

SECTION 415

MANUFACTURE AND ERECTION OF PRECAST AND PRESTRESSED CONCRETE MEMBERS

DESCRIPTION

415.01 Scope – This Section covers the manufacture and erection of precast and prestressed concrete members

415.02 General

415.02.01 The manufacture and erection of precast and prestressed concrete members shall conform to the requirements of these specifications and details as shown on the drawings.

415.02.02 Precast concrete elements shall be manufactured in plants certified to the current CSA-A23.4 in the appropriate category by a certification organization accredited by the Standards Council of Canada in the subject area of building products and structures. Certification shall be in effect prior to the beginning of Work, and maintained throughout the period of manufacture.

415.02.03 Materials and construction shall conform to the current CSA- A23.4 and the current PCI “Manual for Quality Control for Plants and Production of Precast and Prestressed Concrete Products 1999".

415.03 Prefabrication Meeting – The Ministry will at it’s discretion, convene a prefabrication meeting with the Contractor to review procedures on quality control, plant certification, concrete source and mix designs, use of Hydration Stabilization Admixtures (if applicable), mill certificates, alternate details and procedures, updated schedule for prefabrication and to confirm the Ministry’s requirements.

415.04 Working Drawings - Working drawings shall consist of the following:

• Shop drawings, • Transportation details, and • Erection drawings

Transportation details and erection drawings shall be prepared and sealed by a professional engineer registered with (APEGBC).

Shop drawings shall be prepared and sealed by a professional engineer registered with the Association of Professional Engineers and Geoscientists of British Columbia (APEGBC) when the Contractor is responsible for the design of items that are detailed on the shop drawings.

Working drawings shall be in the same system of units as the design drawings.

Working drawings shall be on D size sheets approximately 560 mm (22") by 865 mm (34"), (one drawing per sheet). Lettering for notes and dimensions shall be at least 2.5 mm and 4 mm for headings. Drawings shall be legible when half-sized or microfilmed.

415.04.01 Shop Drawings –Shop drawings shall show all information and details needed for the fabrication of the members including, but not limited to, such items as member shapes and dimensions, mark numbers and general arrangement of member locations, mass, prestressed and non-prestressed reinforcement, embedments, openings, block outs, chamfers, recesses, finishes, concrete mix design, stressing details, special tolerances, special handling instructions, lifting details and lifting locations.

415.04.02 Transportation Details – Transportation details shall include such items as:

• Description of hauling and handling equipment, • Weight of members, • Length and height of loads, • Location and method of member support, and

engineering calculations where members are to be supported during transportation further from their ends than outlined in Subsection 415.48,

• Details for handling, storing, and loading of members.

415.04.03 Erection Drawings

Erection drawings shall show in detail the method of erection including, but not limited to, the following:

• Erection procedures • Procedures for off loading of members upon delivery • Details for temporary storage and support of

members on site prior to erection • Equipment to be used • Layout or general arrangement drawing showing the

layout of the members, equipment positioning, and access roads

• Crane make, model, and capacity charts, boom length(s) , crane placement, and access for transporting of members to crane(s)

• Radii and loads for crane lifts • Rigging details • Mass of members , rigging and special installation

equipment • Details for installation and removal of all falsework,

temporary supports, temporary bearings, bracing, guys, dead-men, and lifting devices

• Attachments to the bridge members and bridge structure for temporary support and special launching

Page 350: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 415 MANUFACTURE AND ERECTION OF PRECAST AND PRESTRESSED CONCRETE MEMBERS

415 (2 of 14) 2006 BC – MOT

equipment • Detailed description of sequence of operations • Details for special installation equipment such as a

launching truss, launching nose, head frames, spreader beams and rollers

• Details for installation of members onto the permanent bearings

• Traffic control plan for roadway and rail traffic • Details for protection of existing utilities affected by

the erection procedures • Layout and detail of fall protection and their sequence

of installation.

The Contractor shall be responsible for the lateral stability of members and shall design and provide bracing as necessary until completion of the Work.

The erection drawings shall be complete in detail for all anticipated phases and conditions during erection and during the temporary support of members. The Contractor shall submit calculations upon request, to the Ministry Representative that demonstrate that allowable stresses are not exceeded in members, falsework, temporary bracing and temporary supports and that member capacities and final geometry will be correct. The calculations shall be sealed by the professional engineer that sealed the erection drawings.

Falsework, temporary supports and temporary bracing shall meet the requirements of CSA Standard S269.1 –1975, “Falsework for Construction Purposes” and shall also meet all the requirements for falsework given in the applicable Clauses of the Workers Compensation Act, Occupational Health and Safety Regulations BC.

A professional engineer registered with (APEGBC) shall be responsible for any field designs and any changes made to the erection procedures. Field designs and changes to the erection procedures must be documented and sealed by the responsible professional engineer and must be available at the Site prior to the affected erection work being carried out.

Immediately before placement of loading on falsework, the Contractor must ensure that the falsework is inspected and a sealed engineering certificate is issued by a professional engineer registered with APEGBC which:

• Indicates the specific areas inspected, and • Certifies that the falsework has been erected in

accordance with the latest approved erection drawings and supplementary instructions.

Prestressed concrete stringers shall not be set on their bearings, nor shall the bridge deck be cast, until 30 days after the casting of the stringers. If it is necessary to erect the stringers earlier, they shall be placed on temporary

supports. Prestressed concrete twin cell box stringers up to a maximum length of 20 metres may be shipped and erected after 10 days if the specified 28 day compressive strength has been attained.

415.04.04 Submittals - The Contractor shall submit to the Ministry Representative three sets of all working drawings. These drawings shall be submitted at least fourteen days prior to the fabrication of the work. The Ministry Representative will review the drawings for general compliance with the contract requirements.

If modifications to the drawings are required, the Ministry Representative will return one set of drawings, marked up, to the Contractor. The Contractor shall re-submit three sets of revised drawings to the Ministry Representative.

If no exceptions are taken to the drawings, the Ministry Representative will return one set of reviewed drawings to the Contractor. The Contractor shall forward an additional two sets of the reviewed drawings to the Ministry Representative.

Shop drawings will not be reviewed without the transportation and erection drawings applicable to the members in question.

Any work done on materials ordered prior to the review of working drawings shall be at the Contractor's risk. Erection will not be allowed to proceed without the Ministry Representative’s review of the method proposed.

Review of working drawings shall not relieve the Contractor of any responsibility for dimensions or detail or for carrying out the work in full accordance with the drawings and specifications.

415.05 Alternative Details - All details shall, in general, conform to those shown on the Drawings. Subject to the Ministry Representative’s consent, alternative details may be substituted to facilitate the Contractor's work methods. Such alternative details shall comply in all respects with this specification.

415.06 Quality Control - The Contractor shall implement a quality control program to meet the Contract requirements.

415.07 Quality Assurance - The Ministry will implement a quality assurance program by auditing the Contractor's quality control program and by inspection at its discretion.

The Contractor shall notify the Ministry Representative at least 14 days before fabrication is to commence. The Contractor shall allow the Ministry's representatives access to all parts of work, and shall supply such information and

Page 351: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

MANUFACTURE AND ERECTION OF PRECAST SECTION 415 AND PRESTRESSED CONCRETE MEMBERS

BC – MOT 2006 415 (3 of 14)

assistance as is required. When the Ministry requests, the Contractor shall provide samples of any materials. Inspection by the Ministry Representative shall not relieve the Contractor from obligation to perform the work in accordance with the contract.

Concrete tests shall be in accordance with the current CSA A23.2. The Contractor shall make available at the plant a sheltered, heated space for the casting and storage of test cylinders, with curing tanks and a concrete cylinder testing machine.

The Ministry may reject any items which, in its opinion, do not comply with the requirements of this specification.

Each unit shall be certified as acceptable by a Ministry Inspector before it is shipped from the shop. This certification shall not relieve the Contractor of responsibility for subsequent damage or for defects which become apparent before the work is finally accepted by the Ministry.

MATERIALS

415.11 Materials Supplied by the Contractor

415.11.01 Cement - Portland cement shall conform to the requirements of CAN/CSA-A3001, Cementitious material for use in concrete.

415.11.02 Aggregates - Fine and Coarse Aggregates shall conform to the current CSA A23.1. Coarse aggregates shall not exceed 20 mm nominal size.

415.11.03 Water - Water shall conform to the current CSA A23.1. The mortars and tests shall be made in accordance with the current CSA A23.2.

415.11.04 Reinforcing Steel - Reinforcing steel shall be in accordance with the current CAN/CSA G30.18, G30.3 and G30.5.

All reinforcing shall be of the lengths called for on the Drawings and all bends shall be made in accordance with Section 412.

All bending schedules shall be furnished by the Contractor for the Ministry's review and any material ordered before such review shall be at the Contractor's risk. The review of bending diagrams by the Ministry shall in no way relieve the Contractor of responsibility for the correctness thereof.

415.11.04 Epoxy-Coated Reinforcing Steel - All reinforcing steel labelled "E" on the drawings shall be epoxy-coated to the requirements of ASTM A 775 M and D 3963M.

415.11.05 Prestressing Steel – Pre-tensioning steel shall consist of seven-wire, uncoated, low relaxation strands as called for on the drawings and complying with the requirements of the current ASTM A 416M.

All strands for each project shall be obtained from one mill, and preferably strands from one heat shall be used for one project. Each reel of strand shall be identified by a secure tag showing the size of strand, CSA or ASTM Designation number, heat number, and name or mark of the manufacturer.

The Contractor shall supply to the Ministry Representative, for each heat number, one set of the standard mill test reports. Strands shall be protected at all times to prevent corrosion and shall be dry and clean (free from scale, rust, oil, soap, grease, and other deletrious materials) immediately before the concrete is placed. No strand which has previously been tensioned or gripped by strand chucks shall be incorporated into the members.

415.11.06 Admixtures – Chemical admixtures shall conform to the current ASTM C-494. Air-entraining admixtures shall conform to the current ASTM C-260.

Water reducing admixtures shall be of a lignosulfonic acid or salt, or hydroxylated carboxylic acid or salt.

Type B, Retarding or Type D, Water-Reducing and Retarding (Hydration Stabilizing) Admixtures conforming to to the requirements of ASTM C494 shall not be incorporated into the mix design and/or added to the concrete without the acceptance of the Ministry Representative. When accepted by the Ministry Representative, the guidelines given in Sections 415.37, 415.40.01 and 415.42.01 shall apply.

415.12 Storage of Materials - All materials shall be stored in accordance with the requirements of the current CSA A23.1. Cement shipments shall be used in the order in which they are received.

415.13 Premixed Aggregates - Pre-mixed aggregates in which the fine and coarse aggregates are combined in definite proportions will be permitted provided that the aggregates are delivered in batches directly to the hopper of the concrete mixer. Pre-mixed aggregates shall be transported and delivered in batches, each containing the correct quantity for one batch of concrete. At no time after the fine and coarse aggregates are combined shall any batch come in contact with or intermingle with any other batch.

415.14 Forms - All exterior forms shall be of steel and shall be mortar-tight and of sufficient rigidity to prevent

Page 352: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 415 MANUFACTURE AND ERECTION OF PRECAST AND PRESTRESSED CONCRETE MEMBERS

415 (4 of 14) 2006 BC – MOT

distortion due to incidental loadings during construction. Forms for skewed ends may be of rigid steel-reinforced plywood.

Forms shall produce 20 mm chamfers and fillets as shown on the Drawings.

415.15 Ministry's Office - Except for "on site" precasting work, where an office is already provided under the general contract, the Contractor shall provide at the point of manufacture a suitable lock-up office for the sole use of the Ministry.

The office shall be weatherproof and reasonably soundproof and provided with ample window area and ventilation. Location of the office shall be acceptable to the Ministry. The office shall measure not less than 3 m x 4 m. In the event that the office is to be used concurrently with other inspection agencies, the minimum area required for Ministry's use shall be 3 m x 4 m. The Contractor shall install satisfactory heat and lights and provide a telephone and a draughting table 1 m x 2.5 m in size with a plywood top, desk 0.75 m x 1 m, two chairs, drafting stool and one square metre of shelves.

Long distance calls made by Ministry personnel will be to the Ministry's account.

The Contractor shall, during the life of the work, regularly clean and properly maintain, heat and light to the office.

The office and contents shall be for the use of the Ministry for the duration of the work and may, if necessary, be used concurrently with other inspection agencies.

CONSTRUCTION

415.31 Reinforcing Steel - All reinforcing bars shall be accurately placed in the positions shown on the drawings and firmly held during placing and setting of the concrete. Tolerances shall be as specified by the current CSA A23.4.

When placed in the work the reinforcing steel shall be free from dirt, rust, loose scale, paint, oil, or other foreign materials. Bars shall be tied at all intersections except that where spacing is less than 300 mm, alternate intersections shall be tied. Form clearance shall be maintained by stays, ties, hangers or other approved supports. Before placing concrete, the placing and securing of reinforcing in the forms shall be inspected by the Ministry Representative.

All reinforcing shall be placed in the full lengths called for on the Drawings. Splicing of bars will not be permitted unless acceptable to the Ministry Representative. Splices shall be staggered. Unless otherwise shown or called for on

the drawings, splices shall be made by lapping in accordance with the requirements of Section 412. The bars shall be placed so as to maintain the minimum specified clearances between bars and the concrete surface. Welding of reinforcing steel shall be done only if called for on the Drawings or accepted by the Ministry Representative.

Tack welding of reinforcing steel, if permitted, shall be in accordance with the current CSA W186-M.

415.32 Stressing - The dials of gauges shall be at least 200 mm in diameter. Gauges shall be calibrated with the hoses and jacks with which they are to be used, by an approved testing agency. The calibration must have been performed within the previous 6 months of use or 12 months maximum. Before stressing commences, certified calibration curves shall be furnished to the Ministry Representative.

If during the work any gauges give erratic results, the tension system or tension device shall be recalibrated.

The Contractor shall schedule the work so that placement of concrete follows tensioning of strands within 24 hours. In cases of unavoidable delay, a maximum period of 80 hours will be allowed, provided that the strands do not show unacceptable corrosion (see current PCI “Manual for Quality Control for Plants and Production of Precast and Prestressed Concrete Products”).

Before tensioning, an initial force shall be applied to each strand to equalize stresses and eliminate slack. This force shall not exceed 22 kN. After the initial tension forces have been applied, each strand shall be marked at the outer end of each chuck as a reference line from which the elongation of the strand can be measured.

The method of tensioning shall be such that the specified tension is maintained in the strands until the forces in the strands are transferred to the concrete member(s). The maximum jacking load in each strand shall be 80% of the ultimate strength of the strand.

A tensioning force shall be determined both by reading the jacking load on the calibrated gauge and by measuring the elongation of the strand. When the difference between the two methods is greater than 5%, the cause of the discrepancy shall be ascertained and corrected.

Elongations of strands shall be calculated and shown on the working drawings. Calculations for elongations shall include appropriate allowances for possible slippage or relaxation of the anchorages, friction at hold down points, temperature difference, and strand relaxation.

415.33 Forms - The design of the forms shall take into

Page 353: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

MANUFACTURE AND ERECTION OF PRECAST SECTION 415 AND PRESTRESSED CONCRETE MEMBERS

BC – MOT 2006 415 (5 of 14)

account the effect of vibration of concrete as it is placed.

All exterior forms shall be set and maintained true to the designated lines until the concrete has hardened. When forms are unsatisfactory in any way, either before or during the placing of concrete, the Ministry Representative may order the work stopped until the defects have been corrected.

The shape, strength, rigidity, mortar-tightness and surface smoothness of re-used forms shall be maintained at all times. Any warped or bulged formwork must be realigned before being re-used. Forms which are unsatisfactory in any respect shall not be reused.

Void forms shall be of an approved product and shall be anchored firmly by a method acceptable to the Ministry Representative, to prevent displacement during the placing of the concrete. Any member with a void out of position in excess of the specified tolerance will be rejected.

Exterior forms shall be treated in moderation with form oil before placing the concrete. Any material which will adhere to or discolour the concrete shall not be used.

Side forms and any attachments which would obstruct strain of the members shall be removed before transfer of stress.

415.34 Admixtures - The Contractor shall add sufficient air-entraining agent to entrain 5% ±1% air as determined by an air-meter used in accordance with the current CSA A23.2.

The use of other admixtures, such as water-reducing agents or superplasticizer, shall be subject to the acceptance of the Ministry Representative.

Type B, Retarding or Type D, Water-Reducing and Retarding (Hydration Stabilizing) Admixtures shall not be incorporated into the mix design and/or added to the concrete without the acceptance of the Ministry Representative. When accepted by the Ministry Representative, the guidelines given in Sections 415.37, 415.40.01 and 415.42.01 shall apply.

415.35 Measurement of Materials - Measurement of materials shall conform to the current CSA A23.1. The Contractor shall produce a certificate or report of inspection from a weights and measures approved, independent testing authority, and which is not more than 6 months old. The certificate or report will be accepted as proof of accuracy for the batching equipment. Cement in standard packages need not be weighed.

The surface moisture shall be determined in accordance with the current CSA A23.2 and the batch weights of aggregates and water adjusted accordingly.

415.36 Mix Requirements - Minimum compressive strength at time of transfer of stress to the concrete and at 28 days as determined by the current CSA A23.2 shall be as called for on the Drawings. In any case, the force in the prestressing tendons shall not be transferred to the concrete until the compressive strength of the concrete is at least 25 MPa for pretensioned components and 20 MPa for post-tensioned components.

Slump measurement shall be determined by the current CSA A23.2. The mix design shall specify the slump and the tolerances in the measured slump shall be ±20 mm for superplasticized concrete. Slump shall not exceed 200 mm for superplasticized concrete and shall be measured within 5 minutes after discharge from the mixer.

In order to minimize shrinkage and creep the cement/aggregate ratio shall be kept as low as is consistent with strength requirements.

415.37 Batching and Mixing - The batching plant and mixing of concrete shall conform to the current CSA A23.1.

Mixing shall begin within 15 minutes after the cement has been added either to the water or aggregate.

Within 30 minutes after the introduction of the mixing water to the cement and aggregate, or the cement to the aggregate, the concrete shall be placed in its final position in the forms. In hot weather or under other conditions contributing to quick stiffening of the concrete, the maximum allowable time may be reduced by the Ministry Representative.

Time of placement extensions will be considered on a case by case basis and may require the use of Hydration Stabilizing Admixtures (HSA’s) conforming to the requirements of ASTM C494 Type B, Retarding or Type D, Water-Reducing and Retarding Admixtures. If accepted by the Ministry Representative, guidelines for the use of HSA’s shall be as follows:

HSA modified concrete when used shall be fully discharged and placed in it’s final position within 90 minutes after the introduction of water to the cement and aggregate.

All concrete in a given precast element shall be placed in it’s final position before 90 minutes.

When HSA’s are used, these time extensions are subject to preconstruction trials being conducted by the Contractor, to establish the appropriate HSA dosage to provide suitable

Page 354: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 415 MANUFACTURE AND ERECTION OF PRECAST AND PRESTRESSED CONCRETE MEMBERS

415 (6 of 14) 2006 BC – MOT

extended slump life of concrete, without increasing the water/cementitious ratio of the concrete above that which would be required if HSA’s were not used. The use of HSA’s shall in no instance modify the maximum concrete temperature required at time of placement. A one time only addition of HSA will be allowed. This will be during initial batching of the concrete or immediately at completion of batching as recommended by the admixture manufacturer. Addition of HSA at any other time will be cause for rejection of the concrete.

Concrete mixing and transporting equipment shall be capable of placing concrete in the forms at the rate of 20 cubic metres per hour. Batch delivery shall be uniform and at a maximum interval of 10 minutes.

The maximum size of each batch shall not exceed the maximum rated capacity of the mixer as stated by the manufacturer of the mixer.

Concrete when placed in the form shall have a temperature not less than 10°C nor greater than 25°C.

415.38 Handling and Placing Concrete - In preparation for the placing of concrete, all construction debris and extraneous matter shall be removed from the interior of forms. Struts, stays and braces inside the forms shall be kept to a minimum and entirely removed when the concrete placing has reached an elevation rendering their service unnecessary.

Concrete shall be handled and placed in accordance with the requirements of the current CSA A23.1 and shall be placed in the shortest possible time after mixing is completed. When rectangular void forms are used, concrete under voids shall be placed and compacted before void forms are in position.

Concrete may be deposited a maximum of 2 m without the use of pipes, provided, when required, suitable measures are taken to prevent segregation and premature coating of upper reinforcing steel. When pipes are used they shall, as far as practicable, be kept full of concrete during placing and their lower ends shall be kept buried in the newly placed concrete.

After initial set of the concrete, the forms shall not be jarred and no stress shall be placed on reinforcing bars which project.

415.39 Vibration - Concrete, during and immediately after depositing, shall be thoroughly compacted. The compaction shall be accomplished by mechanical vibration subject to the following provisions:

a) Vibration shall be internal for all accessible parts and shall be external for inaccessible parts.

b) Vibrators shall be of a type and design acceptable to the Ministry. They shall be capable of transmitting vibration to the concrete at frequencies recommended in the current CSA A23.1.

c) The intensity of vibration shall be such as to visibly affect a mass of concrete of 50 mm slump over a radius of at least 500 mm.

d) The Contractor shall provide a sufficient number of vibrators to properly compact each batch immediately after it is placed in the forms.

e) Vibrators shall be manipulated so as to thoroughly work the concrete around the reinforcing and embedded fixtures and into the corners and angles of the forms.

Vibration shall be applied at the point of deposit and in the area of freshly deposited concrete. The vibrators shall be inserted into and withdrawn from the concrete slowly. The vibration shall be of sufficient duration and intensity to thoroughly compact the concrete, but shall not be continued so as to cause segregation. Vibration shall not be continued at any one point to the extent that localized areas of grout are formed.

Application of vibrators shall be at points uniformly spaced and not farther apart than twice the radius over which the vibration is visibly effective.

f) Vibration shall not be applied directly or through the reinforcement to sections or layers of concrete which have hardened to the degree that the concrete ceases to be plastic under vibration. It shall not be used to make concrete flow in the forms over distances so great as to cause segregation, and vibrators shall not be used to transport concrete in the forms.

g) Vibration shall be supplemented by such spading as is necessary to ensure a smooth surface and dense concrete along form surfaces and in corners and locations impossible to reach with the vibrators.

h) Vibrator heads shall be smaller than the minimum clear distance between prestressing strands.

415.40 Test Cylinders - The Contractor shall make available, as may be required by the Ministry Representative, samples of the concrete to be used in casting the members.

Further, the Contractor shall take samples and make test cylinders in the presence of the Ministry Representative and in accordance with the current CSA A23.2-1C, -3C and -9C.

Page 355: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

MANUFACTURE AND ERECTION OF PRECAST SECTION 415 AND PRESTRESSED CONCRETE MEMBERS

BC – MOT 2006 415 (7 of 14)

At least 8 cylinders per casting bed shall be made for testing.

415.40.01 Release Strength - Two cylinders from each end of the casting bed shall be cured in the same manner as the members and tested by the Contractor under the discretionary observation of the Ministry Representative (QM or MR) at the Contractor's plant to assess the strength of the concrete at the time of transfer of force to the concrete. Only one cylinder from each end need be tested if the average strength of the two cylinders is equal to or greater than the required release strength at transfer and no test cylinder is more than 1.4 MPa below the release strength. No transfer of force shall occur without the acceptance of the Ministry Representative.

If all release cylinders are tested and the release strength has not been attained, further testing with an impact hammer shall be allowed, provided a written procedure acceptable to the Ministry Representative is provided by the Contractor. The procedure shall correlate readings from areas of a prestressed girder where the release strength has been determined by concrete test cylinders with similar areas on the girder in question. If this situation occurs, extra pairs of release cylinders shall be made on future casts until confidence in determining the release strength is re-established.

When HSA’s are incorporated into the mix design, pre-construction tests shall be conducted to determine the rate of early strength development for the selected concrete mix design. Tests shall be repeated when there is a change in the HSA dosage rate.

415.40.02 28 Day Strength - Two cylinders from each end of the casting bed shall be identified as "acceptance cylinders" and shall be cured in the Contractor's curing tanks. These cylinders shall be tested by the Contractor under the discretionary observation of the Ministry Representative to determine the twenty-eight day strengths. The strength of the concrete in the member shall be taken as the average of the compressive strength of the "acceptance cylinders", however, no individual cylinder shall be more than 3.5 MPa below the specified strength and the average strength shall equal or exceed the 28 day strength.

415.40.03 Additional Cylinders - For special cases, extra cylinders shall be made and tested if required by the Ministry Representative. In the case of ready mix, and plant mixed concrete with no established records, extra cylinders, in addition to the release strength or 28 day strength cylinders, shall be made from each load.

415.41 Surface Finish - Throughout the work, special precautions shall be employed in formwork and concrete placing to produce a smooth and dense concrete. Exposed

surfaces shall be as free as possible from form marks, fins, honey-combing and pock marking. Only a minimum amount of pointing will be allowed. Poor surface finish upon the removal of the forms shall be sufficient cause for the rejection of any member. All exposed edges shall be chamfered unless otherwise noted on the Drawings.

Roadway and surfaces to be bonded to shall be rough screeded by wood floating following initial strike off. Surfaces to be bonded to shall be sandblasted or exposed with chemical retarder and water blasted to remove all laitance and foreign matter and to roughen the surface. The amplitude of the surface roughness shall be equal to one third of the nominal size of the concrete coarse aggregate or 6 mm, whichever is less. Loose sand and debris shall be washed or blown off. Water, cement or proprietary topping material shall not be added to the surface during finishing.

Walkway surfaces shall be given a coarse transverse broomed finish following initial screeding and floating. Roadway surfaces not requiring any wearing surface shall be given a tined surface in accordance with Subsection 413.31.02. Roadways receiving a membrane shall be finished in accordance with Subsection 419.33.

The outer surfaces of the outside stringers and any other surfaces indicated on the drawings shall be given a Class 2 finish in accordance with Subsection 211.17.

415.42 Curing - Members may be cured by steam or heat as outlined herein.

415.42.01 Steam Curing: The concrete shall be allowed to attain its initial set before application of steam (generally 2 to 4 hours after the final placement of concrete or as justified by previous experience and acceptable to the Ministry Representative.

If HSA’s are used in the mix design, time to attain initial set after concrete has been placed may exceed that required for conventional concrete. The concrete shall have attained initial set before the application of steam.

After the placement of concrete, sufficient steam shall be applied during initial curing to hold the air surrounding the member at a temperature not less than 13°C.

Steam curing shall be done within a suitable enclosure to contain the steam and minimize moisture and heat losses. The enclosure shall allow free circulation of steam around the sides and tops of members and shall not be in contact with the member.

Steam at the outlets shall be at 100% relative humidity and low pressure. Application of the steam shall not be directly

Page 356: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 415 MANUFACTURE AND ERECTION OF PRECAST AND PRESTRESSED CONCRETE MEMBERS

415 (8 of 14) 2006 BC – MOT

on the concrete or test cylinders and shall be from outlets distributed uniformly along the whole length of the member.

During application of the steam the ambient air temperature shall increase at a rate not to exceed 22°C per hour until an optimum temperature of 55°C is reached. In no case shall the ambient curing temperature exceed 80°C. The maximum temperature shall be held until the concrete has reached the transfer strength. In discontinuing the steam, the ambient air temperature shall not decrease at a rate greater than 33°C per hour until a temperature has been reached about 11°C above the temperature of the air to which the concrete will be exposed. The forms shall not be stripped until the completion of this cooling off period.

Provision shall be made for checking the ambient air temperature either by placing minimum-maximum thermometers under the enclosure or periodically checking with hand thermometers.

415.42.02 Curing With Radiant Heat and Moisture - Curing with radiant heat and moisture shall be done by heating the casting area in combination with the continuous application of moisture.

Heat shall be applied by means of pipes circulating steam, hot oil or hot water or by electric heating elements. Pipes shall not be in contact with concrete, form surfaces or test cylinders.

Moisture shall be applied by a continuous sprinkling to a cover of burlap or cotton matting or any other approved method for keeping the members continuously moist.

An auxiliary cover in addition to the moisture retaining cover shall be used above the entire bed to retain the heat. This cover shall be supported at a sufficient distance above the member to allow circulation of the heat.

The cycle of application of heat, temperature limitations, reduction of temperatures and use of recording thermometers shall be similar to the cycle specified for steam curing.

415.43 Draped Strands - Where called for on the Drawings strands shall be draped in accordance with the current CSA A23.4.

415.44 Transfer of Force to Concrete Members - The transfer of the forces in the strands to the concrete member(s) shall be in accordance with the current CSA A23.4 (section on Detensioning).

415.45 Protective Coating for Ends of Strands - After completion of concrete curing the ends of tensile strands

shall be ground flush with the concrete surface. Where the ends of the members are to be embedded in concrete, the ends of the strands shall be painted with two coats of an organic zinc rich paint acceptable to the Ministry. Where the ends of the members are not to be embedded in concrete, the ends of the members shall be covered with thixotropic epoxy to provide at least 3 mm cover for a band width of 50 mm on each side of all strands. This material is to be applied in accordance with the manufacturer's recommendations.

415.46 Tolerances - For bridge stringers, the tolerances specified in the PCI “Manual for Quality Control for Plants and Production of Precast and Prestressed Concrete Products 1999". shall be modified so that the length of each member, measured parallel to the longitudinal axis, to extreme corners, at 20°C, does not exceed the specified length by more than 10 mm / 10 m (25 mm maximum).

The Contractor shall employ an adequate method of checking tolerances both before and after placement of concrete. Review of the method of checking tolerances by the Ministry Representative will not limit the Contractor's responsibility for the accuracy of the members.

415.47 Repairs to Members - Defective areas should be repaired immediately following removal of forms and before detensioning of strands. Holes, honeycomb spots, etc., shall be treated as for Class 2 finish in accordance with Subsection 211.17. The method of repair for cracks, broken corners and edges, bulges and other defects shall be submitted to the Ministry Representative for review.

415.48 Handling, Storing and Loading of Members - Stringers shall at all times be kept in their normal upright position during handling, storage and transportation. They shall be picked up by means of vertical forces or forces inclined towards the opposite ends of the members by no more than 30º from the vertical, applied to lifting devices near the ends of the stringers. I-beams shall be adequately stiffened during lifting and transportation.

Stored stringers shall rest on unyielding level supports near the ends of the stringers.

When loaded for transportation, members shall be supported so that they will not be overstressed. In general, beams with straight strands may be supported up to one-tenth of their lengths from each end, whereas beams with draped strands should be supported at their bearings. If the Contractor believes that it is possible to safely support members further from their ends, the Contractor shall submit to the Ministry Representative, sketch(es), sealed by a registered professional engineer, showing the proposed support arrangement. Adequacy of support shall be based on the

Page 357: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

MANUFACTURE AND ERECTION OF PRECAST SECTION 415 AND PRESTRESSED CONCRETE MEMBERS

BC – MOT 2006 415 (9 of 14)

following assumptions:

• l00% impact on cantilevering ends, when checking stresses at supports,

• 50% negative impact on the whole member, when checking stress near midspan,

• 50% of prestress losses at time of shipping (unless circumstances dictate otherwise),

• allowable tensile stress = 0.5√fc • allowable compressive stress = 0.6fc • where fc = estimated strength of concrete at time of

shipping.

Such sketch(es) shall be submitted at the time of submittal of the working drawings (see Subsection 415.04). Members transported on supports further from their ends than outlined above, without the submittal of sketch(es) acceptable to the Ministry, will be rejected.

Piles shall be lifted in the horizontal position at the pick-up positions shown on the drawings and at no other points. When stacking for storage or for delivery, piles shall be supported at the pick up points. They shall be handled carefully, avoiding dropping and jarring and avoiding surface abrasions or other damage.

Any member damaged so as to be, in the opinion of the Ministry Representative, unfit for the use for which it is intended shall be replaced at the Contractor's own expense.

415.49 Placement of Concrete in Keyways - Keyways between box stringers shall be clean and shall be saturated surface dry surfaces, before being filled with concrete.

Concrete in keyways shall attain a strength of at least 15 MPa before light traffic such as one-tonne trucks are allowed on the bridge, and at least 25 MPa before heavy loads such as concrete trucks are allowed on the bridge.

415.50 Post-Tensioning - All post-tensioning shall be done in accordance with the Section 416 - "Manufacture and Installation of Post-Tensioned Concrete Members".

QUALITY CONTROL PROGRAM

415.61 Quality Control Program – These Subsections describe the general Quality Control Program required by the Ministry of Transportation for any Fabricator undertaking the fabrication of permanent precast concrete bridge components.

The term "Quality Control" defines those activities that the Fabricator performs to conform to the contract.

The term "Quality Assurance" defines those activities that

the Ministry performs to ensure conformance to the contract.

These Subsections contain statements of the Quality Objectives and Policies that the Ministry considers essential for successful and economical quality management. They also outline the Procedures and Documentation to implement and confirm that the Objectives are met.

The provisions of the Quality Control Program set forth in these Subsections shall apply to all precast concrete bridge components contracted by or for the Ministry.

These Subsections require the establishment of a Quality Organization with the responsibility for the successful and timely implementation of all necessary Quality Control activities. Some positions shown in the Suggested Organization Chart (see Figure 1) may be held by the same individual. For example, the General Manager may also be the Contract Administrative Manager and the Purchasing Manager. The Plant Superintendent may also be the Receiver and the Structural Supervisor.

415.62 Quality Objectives and Policies

415.62.01 Quality Objectives - The Quality Objectives of the Ministry of Transportation cover all precast concrete bridge components produced under contract to the Ministry, as follows:

a) Completed products shall conform fully to the governing Codes and Specifications stipulated in the contract document.

b) The Quality Control Program shall be fully integrated into the ongoing manufacturing activities of the Fabricator.

c) The operations of the Quality Control Program shall protect the interests of the Ministry with respect to scheduled delivery date and contracted price.

415.62.02 Quality Policy - It is Ministry policy that the interests of the Fabricator and the Ministry coincide when a product meets the Quality requirements of the contract, is delivered on time, and is produced in a cost-effective manner.

The Quality Control Program is an essential part of this policy. It is based on the fact that the best way to do any job is to do it right the first time. This applies to all stages of the design, drafting, procurement, manufacturing and testing of the product.

The Quality Control Program involves all Ministry and Fabricator personnel. Their activities must be consistent

Page 358: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 415 MANUFACTURE AND ERECTION OF PRECAST AND PRESTRESSED CONCRETE MEMBERS

415 (10 of 14) 2006 BC – MOT

with the Quality Objectives of the Ministry.

A Quality Control Manager shall be appointed with defined responsibilities in resolving quality matters and shall report to a senior management level. At each hold point, the Quality Control Manager shall:

• Document the successful completion of each stage as it progresses through fabrication and erection.

• Identify and report nonconforming components. • Initiate or recommend disposition of nonconforming

components. • Verify corrections.

Any persons assigned to perform quality control inspections shall be other than those performing or directly supervising the work and they shall not report directly to immediate supervisors responsible for producing the work.

The Quality Control Program is not subordinate to any design, drafting, procurement, manufacturing and testing activities, it is an essential part of them.

415.63 Scope of the Quality Control Programs - This Quality Control Program governs the fabrication of precast concrete bridge components for the Ministry of Transportation. The Suggested Organization Chart is shown in Figure 1

The General Manager shall be responsible for:

• adhering to this Quality Control Program in all respects.

• ensuring that completed bridge components shall conform fully to the applicable design and fabrication codes stipulated in the Contract.

• ensuring that all required documentation is produced according to this Quality Control Program.

415.64 Range of Capability - Within the Company, there shall be the necessary knowledge, skill (in-house or on a contract basis) and equipment to do the following work on precast concrete bridge components:

• Design of lifting and erection devices not shown on drawings

• Preparation of shop fabrication drawings • Preparation of bills of material • Preparation of material requisitions and purchase

orders • Receiving, checking and storing materials for bridges • Layout, form set-up, reinforcing steel, prestressing

and post-tensioning • Mix designs, batching, mixing, placing and curing of

concrete • Sampling, testing, making and breaking of concrete

test cylinders

• Dimensional checking and verification • Resolution of non-conformances • Documentation of all stages of work with capability

of tracing all major components • Finishing, patching, storing and shipping • Erection of bridge components

415.65 Drawings and Specifications – The Chief Design Engineer shall be responsible for:

• the design and location of lifthooks and the preparation of stressing sheets for prestressing or post-tensioning; and for the design of the erection procedures and any special erection equipment needed.

The Chief Draftsperson shall be responsible for:

• obtaining the latest revision of the design Drawings and Specifications for the work.

• submitting shop drawings and erection drawings to the Ministry for acceptance before commencement of the work.

• preparing material requisitions containing a full description of the material sizes, material specifications, and certifications required for conformance to the contract.

• delivering the material requisitions to the Purchasing Manager in ample time to permit ordering, delivery and documentation and not delay the progress of the work.

• issuing requisitions for all sub-contracted drafting work and shall ensure that all conditions of the Contract are part of such sub-contracts.

415.66 Material Control - All materials for bridge components shall be ordered by the Purchasing Manager in full conformance with the material requisitions provided by the Chief Draftsperson.

The Purchase Orders shall contain all information necessary to ensure that materials purchased will comply fully with the terms of the Contract. Where mill certificates and test reports are required, it shall be so stated on the Purchase Order. Instructions shall state when the certificates and reports are to be delivered to the Fabricator.

If a supplier proposes a substitute for any material, the Purchasing Manager shall refer the proposed substitution to the Chief Design Engineer for review. If the substitute is acceptable to the Ministry, the Chief Draftsperson shall amend all drawings and requisitions, withdraw old issues and issue the new versions.

The Receiver shall:

• inspect all materials on arrival for conformance with

Page 359: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

MANUFACTURE AND ERECTION OF PRECAST SECTION 415 AND PRESTRESSED CONCRETE MEMBERS

BC – MOT 2006 415 (11 of 14)

the Purchase Orders. • confirm that mill certificates and test reports are

provided and that they correctly identify the materials delivered.

• arrange with the Plant Superintendent to store all materials for the Contract in segregated areas.

• ensure all materials are clearly identified with the Contract.

• issue a non-conformance report covering overage, shortage or damage to the materials. Copies of the report shall be provided to the Purchasing Manager and the Quality Control Manager.

The Purchasing Manager shall deliver all documentation to the Quality Control Manager for inclusion in the Quality Control file for the Contract.

415.67 Pre-Pour Inspection and Reporting - The Quality Control Manager shall ensure only documented materials are used for the contract.

Forms used in the casting of members shall be inspected prior to use and shall meet all the requirements of the current CSA-A23.4 and the special provisions of the contract Specifications.

Reinforcement shall be fabricated and placed to satisfy the current CSA-A23.4 and the detailed shop drawings for quantity and spacing. Any reinforcement used to anchor cast in hardware by being welded to it will require the Fabricator to be certified to CSA W186-M.

All cast in hardware shall be fabricated and placed according to the current CSA-A23.4. Any hardware requiring welding, including stud welding, will require the fabricator to be certified under CSA W47.1 Division 3 and have approved procedures for each weld.

All pre-tensioning operations shall be done according to the current CSA-A23.4. Care shall be taken to properly execute, supervise and record the operations in a clear and legible manner.

The Quality Control Manager shall file a written report of verification with the General Manager and report any non-conformance that may exist on any of the above items in Subsection 415.67.

415.68 Concrete Control - All materials used in concrete mixes such as cement, fine and coarse aggregates, and admixtures, shall have representative certificates that can verify the quality of them.

Production of concrete shall be done according to the specifications. Records shall be kept of the mix type and

quantity used in each pour.

Handling, placing and vibration of freshly mixed concrete shall be done as per specifications. Any variations and interruptions in the process shall be recorded.

The sampling and testing of freshly mixed concrete shall be in accordance with the specifications and procedures laid out in the current CSA-A23.2. Concrete test cylinders shall be made, cured and tested in accordance with the Specifications.

Reports for all concrete testing shall be kept on file and all non-conformities reported.

415.69 Post Pour Inspection and Reporting - Dimensions of all members shall be verified to ensure tolerances are being maintained as per the specifications.

Verification shall be made of finishes, blockouts, keyways, projecting rebar, sole plates and protection of the cut off strands.

Camber shall be monitored at release and 28 days.

Members shall be stored according to the fabricator's documented procedures.

Members shall only be allowed to be shipped out for erection after they have been approved by both Quality Control and Quality Assurance.

Records shall be kept on file for all items in this section.

415.70 Correction of Non-Conformities - When a non-conformance is encountered, the Quality Control Manager shall determine a recommended disposition and submit such disposition to the the Ministry Representative for acceptance as quickly as possible.

If there is non-conformance to the material specification stipulated in the Purchase Order, the Purchasing Manager shall immediately find out the reasons for the delivery of non-conforming materials. If the material is of a grade superior to that ordered, the Quality Control Manager and the Chief Engineer shall be notified. They shall verify that the material is an acceptable alternative in all respects. This verification shall include consultation with the Ministry. If the material is of a grade inferior to that ordered, it shall be rejected and the correct material or a superior material shall be obtained.

If there is non-conformance of material delivery that will delay production, the Contract Administrative Manager and Plant Superintendent shall be notified immediately. They

Page 360: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 415 MANUFACTURE AND ERECTION OF PRECAST AND PRESTRESSED CONCRETE MEMBERS

415 (12 of 14) 2006 BC – MOT

shall be given revised delivery dates for the adjustment of production scheduling. The General Manager shall determine the alternatives available and shall notify the Ministry.

If there are pre-pour non-conformities in form set-up, prestressing, rebar placement, hardware and blockout size and location, the Quality Control Manager and Structural Supervisor shall immediately review the non-conformance and notify the Chief Design Engineer who may require further investigation prior to submitting corrective action to the Ministry for acceptance. If the necessary corrective action will result in delay to production, the General Manager shall be notified for adjustment to the production schedule. The Plant Superintendent shall inform the Quality Control Manager when the corrective actions are being done so that conformance can be verified and the non-conformance report cancelled.

If there are post-pour non-conformities such as honeycombs or large voids after form removal, before de-tensioning the Quality Control Manager shall notify the Chief Design Engineer who will investigate and submit corrective action to the Ministry for acceptance. Other non-conformities such as low concrete strength, dimensional errors due to faulty forms, variations in camber from design and missing hardware shall all be reported by the Quality Control Manager.

415.71 Welding - All welding on structural components shall conform to the Welding Standards of the Contractor as Approved by the Canadian Welding Bureau.

All welding consumables shall conform to the Approved Welding Standards and shall be received, stored and conditioned according to the applicable Welding Standards.

All welders and welding operators on the contract shall be qualified under the requirements of the current CSA W47.1 division 3 or better.

All welding of reinforcing steel, when acceptable to the Ministry, shall be done by fabricators certified under CSA W186.

415.72 Calibration of Measurement and Test Equipment - All measurement and testing equipment owned by the Fabricator and used in the Quality Control Program shall be calibrated and re-calibrated at the intervals and in the manner stipulated in the current CSA-A23.4.

When the concrete testing services are contracted to a Qualified testing firm according to the latest edition of CSA A283, they shall confirm in writing to the Ministry that all their measurement and test equipment used in the testing is

properly calibrated. If requested, they shall furnish copies of the calibration test data for inclusion in the contract documentation.

415.73 Records Retention - The Fabricator's Record File for each Contract shall contain the pertinent drawings, purchase orders, bills of material, material mill certificates, test reports, Quality Control documents, and certificates of compliance.

The Fabricator's Record File shall be made available to the Ministry's Inspectors upon request.

Items in the Fabricator's Record File shall be retained as per company policy.

The Quality Control Manager shall ensure that each file is complete in all respects before it is placed in the Company archives.

415.74 Hold Points - In planning the work flow, it is essential to coordinate with the Ministry Inspector to decide "hold" points for inspection. A list of hold points shall be drawn up by the Fabricator and the Ministry at a prefabrication meeting. The Ministry should be continuously informed of progress so that delays are minimized.

The "hold" points will typically include, but not be limited to, the following:

• verification of form size, quality and layout • after stressing, rebar and hardware placement • prior to form close up • sampling and testing of concrete • release cylinders • after patching and finishing • 28 day cylinder results • shipping arrangements.

It must be understood that work will not proceed past a "hold" point until it has been signed off by Quality Control and Quality Assurance. Reports must be completed promptly.

(Refer to the the current edition of the PCI Manual - Publication MNL-116 for "Sample Record Forms")

MEASUREMENT

415.81 Precast Concrete Members – Precast Concrete members will be measured by EACH of the type specified.

Page 361: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

MANUFACTURE AND ERECTION OF PRECAST SECTION 415 AND PRESTRESSED CONCRETE MEMBERS

BC – MOT 2006 415 (13 of 14)

PAYMENT

415.91 Supply and Fabrication –Payment for supply and fabrication of PRECAST CONCRETE MEMBERS will be made at the lump sum price bid. Payment shall be for quality control, shop drawings, supply and placing of concrete, formwork, reinforcing steel, prestressing strands and any required inserts. Payment shall also cover tensioning, curing, release, stripping of forms, patching as necessary and storage of members.

415.92 Shipping and Erection – Payment for shipping and erection of PRECAST CONCRETE MEMBERS will be made at the lump sum price bid. Payment shall be for quality control, erection drawings, transportation drawings, loading, shipping and unloading of members. Payment shall also cover falsework and erection of members. For box stringers, payment shall also cover the supply and placement of sealing strips between stringers.

Page 362: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 415 MANUFACTURE AND ERECTION OF PRECAST AND PRESTRESSED CONCRETE MEMBERS

415 (14 of 14) 2006 BC – MOT

F i g u r e 1

Page 363: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC – MOT 2006 416 (1 of 4)

SECTION 416

MANUFACTURE AND INSTALLATION OF POST-TENSIONED CONCRETE MEMBERS

DESCRIPTION

416.01 Scope – This Section covers the manufacture and installation of post-tensioned concrete members.

416.02 General Requirements

416.02.01 The requirements of CAN/CSA-S6-00 and Standard Specification Section 415 shall apply unless specified otherwise herein or in the Contract Documents.

For items not covered in CAN/CSA-S6-00, Standard Specification Section 415 or the Contract Documents, CSA A23.1, Subsection 6.8, shall apply.

416.02.02 Three weeks before post-tensioning, the Contractor shall submit to the Ministry Representative for review, complete details of the proposed procedure, including jacking sequence and loads, procedure for testing grout cubes, and a list of equipment. This procedure shall be prepared and sealed by a professional engineer registered with the APEGBC.

MATERIALS

416.11 Anchorages - Anchorages tested in an unbonded state shall develop at least 95% of the minimum specified ultimate strength of the prestressing tendons, without exceeding anticipated set and without slippage. Test results or certificates meeting these requirements shall be supplied by the Contractor.

Anchorages shall be able to sustain the loads applied to them without slippage, distortion or other changes that will permit loss of prestress.

The anchorages shall be of such a nature that they will not kink, neck down or otherwise damage the prestressing steel.

416.12 Ducts - The ducts shall be provided with vents at all high points and at the anchorages, so as to facilitate grouting. Drains may be provided at low points. In any case, in cold weather, care shall be taken to prevent water from collecting and freezing in the ducts. The locations of the vents and drains shall be as shown on the drawings.

Cored and external ducts shall be watertight when tested under an internal water pressure of 0.35 MPa.

The vents and drains shall be 13 mm minimum diameter flexible tubes. The connections to the ducts shall be made with metallic structural fasteners.

416.12.01 Internal Tendons - The sheaths for post-tensioning ducts shall be made of galvanized steel or plastic. Galvanizing shall meet the requirements of CAN/CSA G164-M. Plastic sheaths shall meet the requirements of Section 416.12.02. The sheaths shall be

corrugated, and chemically non-reactive with concrete, tendons, or grout. The inside cross-sectional area of the sheaths shall be at least two times the area of the prestressing steel.

Rigid steel sheaths shall have a wall thickness of at least 0.60 mm and shall be capable of bending to an inside radius of 9 m without distress. Semi-rigid steel sheaths shall have a wall thickness of at least 0.25 mm and shall be capable of bending to an inside radius of 3.50 m without distress.

The ducts shall be spliced with telescopic sleeves. The joint lines between the ducts and the sleeves shall be wrapped with tape or heat-shrink material to make the connections mortar-tight.

416.12.02 External Tendons - Unless otherwise specified, sheaths for external post-tensioning shall be made of plastic. Plastic sheaths, including their splices shall be made of high density polyethylene conforming to ASTM Standard D 3350, cell classification 334420C. The polyethylene sheath shall be manufactured in accordance with ASTM Standard D 2239.

Plastic sheaths shall not be used when the radius of curvature of the tendon is less than 10 m. Sheaths and their splices for external postensioning shall be smooth, seamless and capable of withstanding a grouting pressure of at least 1 MPa.

416.13 Condition - Tendons, ducts, anchor assemblies and other accessories shall be free of grease, oil and other foreign matter. A light coat of rust will be permissible provided any loose rust is removed and the surface of the steel is not pitted.

416.14 Epoxy - Epoxy applied to match-cast segment ends shall be as specified by AASHTO Standard Specifications for Highway Bridges (2002), Division II, Section 8.13.7.

416.15 Grout –Cement, water and admixtures for grout shall conform to the requirements of CSA Standard A23.1, Clause 4.2. Unless otherwise specified, grout for post-tensioning shall have a compressive strength of at least 20 MPa at 7 days and 35 MPa at 28 days. The Contractor shall propose a design mix for the grout and submit it for review by the Ministry Representative before grouting may begin.

The Contractor shall supply all materials for the grout.

The grout shall have a maximum water/cement ratio of 0.45. The grout shall consist of a mixture of Type GU (general use) cement, water and an approved admixture to control expansion and pumpability. The admixture shall be an aluminum powder base premixed material. Type HE (high early strength) cement may be substituted for Type GU during low temperature periods. The Contractor shall

Page 364: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 416 MANUFACTURE AND INSTALLATION OF POST-TENSIONED CONCRETE MEMBERS

416 (2 of 4) 2006 BC – MOT

determine the dosage of the admixture by using volume change and bleeding tests conducted before grouting commences. The Contractor shall make test grout cubes and deliver them to a testing agency acceptable to the Ministry.

EQUIPMENT

416.21 Stressing Equipment

416.21.01 Supervision - The Contractor shall provide a supervisor skilled in the use of the system of post-tensioning to be used.

416.21.02 Gauges and Calibration - The tensioning system shall be equipped with gauges that have been calibrated for the specific jacks and controls by an approved testing agency within the last 6 months. The dials of the gauges shall be at least 150 mm in diameter. Before stressing commences, certified calibration curves shall be furnished by the Contractor.

The tensioning system or tensioning devices shall be recalibrated if during the work any gauges give erratic results.

416.22 Grout - The grout shall be mixed in a shear type mixer with sufficient capacity to guarantee a continuous supply of grout to the pump. The accessory equipment to batch all materials shall accurately measure all materials.

The pump shall be a positive-displacement type and shall produce an outlet pressure of at least 1 MPa. The pump shall have seals to prevent introduction of oil, air or other foreign substance into the grout and to prevent loss of grout.

The grouting equipment shall utilize gravity feed to the pump inlet from a hopper attached to and directly over it. The hopper must be kept partially full of grout to prevent air from being drawn into the ducts.

The grouting equipment shall contain a screen having clear openings of 2.5 mm maximum to screen the grout prior to its introduction into the grout pump. A screen opening of 5 mm is satisfactory if a grout with a thixotropic additive is used. This screen shall be readily accessible for inspection and cleaning.

The Contractor shall have on site a pressure gauge with a full-scale of no greater than 2 MPa. The Ministry Representative may request the Contractor to install the gauge in the grout line between the pump outlet and the duct inlets to confirm pumping pressures.

The grouting equipment shall be capable of continuously grouting the largest tendon on the project in 20 minutes.

CONSTRUCTION

416.31 Anchorages - The spacing between anchorages shall be sufficient to allow the operation of the stressing jacks to be unimpeded by the adjacent tendons.

The axis of the tendons shall be in line with the anchorages for a minimum of 400 mm.

The load from the anchoring devices shall be effectively distributed to the concrete.

Anchorages shall be rigidly held in position when the concrete in the section is placed. Anchorages shall hold the tensioned tendons without slip of more than 6 mm; otherwise detensioning will be required.

416.32 Ducts - Vents and drains in the ducts shall be mortar-tight, taped as necessary and shall provide means for injection of grout and for sealing. The ends of vents and drains shall be removed 25 mm below the concrete surfaces after grouting has been completed. If drains are used, they shall be vented downward and shall remain open until grouting commences to permit the removal of any water that may be present in the duct.

416.33 Placement and Protection of the Tendons and Other Accessories - The plan and profile location of the ducts shall be as shown on the Drawings. Ducts shall be securely held at intervals of 1000 mm or less to prevent displacement or flotation during the placement of concrete. They shall be placed with a tolerance of ±6 mm in both the vertical and the horizontal directions. The location of the ducts shall permit the post-tensioning steel to follow the prescribed profiles.

The anchorage assemblies shall be placed so that the bearing surfaces are concentric with and perpendicular to the tendons within ±1°.

Immediately before concrete is placed, the post-tensioning steel profile and alignment shall be checked and corrected where necessary. The ducts, grout fittings, vents and drains shall be inspected and damage shall be repaired to prevent concrete from leaking into the ducts.

The grout fittings and the ducts shall be adequately protected from collapse and other damage. Grout openings, vents and drains must be securely anchored to prevent displacement during concrete placing operations.

The ends of the ducts shall be covered to prevent the entry of water or debris after the installation in the forms.

The ducts shall be blown out with compressed, oil-free air immediately after the completion of the concrete pour. The compressed air shall be used to the extent necessary to break up and remove any mortar in the ducts before it hardens. The ducts shall be blown out clear of any water or debris again prior to the placing of the tendons.

Duct ends at match-cast segment ends shall be fitted with gaskets or other sealing devices to prevent infiltration of epoxy during assembly. A uniform pressure of approximately 0.3 MPa shall be applied to the joint during the epoxy curing period. The pressure may be supplied by

Page 365: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

MANUFACTURE AND INSTALLATION OF SECTION 416 POST-TENSIONED CONCRETE MEMBERS

BC – MOT 2006 416 (3 of 4)

stressing a cable to a predetermined level, or by other means.

Segmental section joints of 10 mm to 70 mm wide shall be filled with a sand-cement mortar. Joints over 70 mm wide shall be filled with concrete. The strength of the mortar or concrete used in joints shall be at least equal to the parent concrete. The Contractor shall colour the mortar or concrete to match the parent concrete. The Contractor shall submit a trial mix with a proportion of white Portland cement, if necessary, to the Ministry for its review.

All post-tensioning steel shall be installed in the ducts prior to the concreting of the cast-in-place elements.

The concrete shall be vibrated with particular care at each cast-in-place end block (push-through diaphragm) and post-tensioning anchorage location. This will ensure adequate consolidation in the anchorage zones.

The prestressing steel in each tendon shall be pulled immediately after concreting, to ensure that it is free to move and is not bonded by concrete or grout leakage.

416.34 Stressing - The structure shall be stressed only after the concrete has reached its transfer strength as shown on the Drawings. No tendons shall be stressed until authorized by the Ministry Representative.

Tendons shall be stressed from the end as shown on the Drawings.

The supports under the segmental sections shall be able to accommodate horizontal movements caused by the stressing.

The multiple strands composing a tendon in a common duct shall be tensioned simultaneously. Tendons shall be tensioned in sequence as specified in the reviewed procedure. The tendon force at lock-off shall be as shown in the procedure.

Before commencing the stressing operation an initial tensioning force shall be applied to each tendon to equalize stresses and to eliminate slack. This force shall not exceed 10% of maximum jacking force.

After the initial tension forces have been applied, reference points shall be established for each tendon from which elongation by final tensioning forces will be measured.

The specified tensioning force shall be maintained steady in the strands until they are anchored. The sequence of tensioning shall be such that no undue tension stresses occur in the concrete near the ends of the members.

The tensioning force shall be determined by the calibrated gauge and by the elongation of the strands. When there is a difference of over 5% between the two means of calculation, the cause of the discrepancy shall be ascertained and corrected.

Tendons shall not be subjected to jacking forces in excess of

85% of their specified ultimate tensile strength. Any tendon subjected to such forces will be rejected.

The required tendon elongation and jacking force shall be computed, based on the required prestressing force and the estimated prestress losses.

The safety of the stressing procedure shall be in accordance with Workers Compensation Act, Occupational Health and Safety Regulations, BC.

Stressing records shall be kept. Stressing records shall clearly identify the tendons that were stressed, the sequence, the final jacking loads, the tendon elongations, the times, the temperatures and the dates. Stressing records shall be signed by the person supervising the stressing and submitted to the Ministry Representative.

416.35 Grouting - The temperature of grout shall be controlled by water temperature. Grout shall not be warmer than 30oC or colder than 5oC at the pump. The grout shall be mixed for a minimum of 2 minutes. The materials shall be charged in this order: water, cement and admixture. The admixture shall be added in accordance with the manufacturer's instructions.

The grout shall be mixed to a uniform consistency of thick cream without lumps or undispersed cement. The grout shall be agitated continuously and shall be recirculated when not injecting from the line.

Water shall not be added to the grout to increase the flowability that was decreased by delayed use of the grout. The grout shall be discarded when flowability has so decreased it cannot be pumped satisfactorily.

The time between the tensioning and grouting of a tendon shall not exceed 4 days.

Cored ducts with concrete walls shall be flushed with clean water to ensure that concrete is thoroughly wetted prior to grout injection. The ducts for external tendons shall be checked for leakage and blockage by flushing with clean water under pressure followed by oil-free compressed air immediately prior to grouting. Metal sheaths for internal ducts shall be flushed to clean out foreign materials, or oil free compressed air shall be used to check for blockages.

All grout and high point vent openings shall be open when grouting starts. Grout shall be allowed to flow from the first vent until any residual flushing water or entrapped air has been removed. The vent shall be capped or otherwise closed at that time. The remaining vents shall be closed in sequence in the same manner.

The pumping pressure at the tendon inlets shall be at least 0.7 MPa and shall not exceed 1.5 MPa.

If the pumping pressure exceeds the maximum allowable, grout may be injected at any grouted vent, as long as a one-way flow of grout is maintained. If this procedure is

Page 366: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 416 MANUFACTURE AND INSTALLATION OF POST-TENSIONED CONCRETE MEMBERS

416 (4 of 4) 2006 BC – MOT

used the vents that are to be used for injection shall be fitted with positive shutoffs.

The grout shall be pumped through the ducts and continuously wasted at the outlet pipes until no visible slugs of water or air are ejected. The efflux rate of the ejected grout shall not be less than the influx rate of the injected grout.

To ensure that the tendons remain filled with grout, the outlets shall be closed and the pressure held for 10 seconds. The grouting ends shall then be plugged. Plugs, caps or valves shall not be removed or opened until the grout has set. Alternatively, the outlets and inlets shall be kept under a 1000 mm head of hydrostatic pressure. The 1000 mm grout head shall be maintained until the grout has hardened.

The grout shall be immediately flushed out of the ducts with water when one-way flow of grout cannot be maintained. Standby water flushing equipment, with its own source of power, shall be available in addition to the grouting equipment. It shall be capable of developing a pressure of 2 MPa, and sufficient capacity to flush out any partially grouted enclosures. After flushing, the ducts shall be blown out with oil-free compressed air and then checked for blockages. The grouting procedure shall be repeated if there are no blockages.

The ducts shall be completely filled with grout. The presence of ungrouted lengths of duct shall be cause for nonacceptance of the members. Members with partially ungrouted duct(s) shall be replaced or repaired to the satisfaction of the Ministry at the contractor's expense.

Great care shall be taken to prevent blockages of the ducts due to grouting of nearby ducts or other causes.

All costs for investigations and for remedial measures due to blockages shall be at the Contractor's expense.

The grouting shall not be done when air temperatures are above 32°C or below 5°C, nor when freezing temperatures are predicted within the next 24 hours.

The temperature of the concrete shall be 2°C or higher from the time of grouting until site-cured cubes of grout reach a compressive strength of 6 MPa.

The grouted ducts may be subject to gamma ray radiography inspection. The cost of the inspection will be borne by the Ministry if the inspection indicates that ducts are completely filled with grout. Otherwise, the costs of inspection and the cost of reinspection shall borne by the Contractor.

416.36 Cropping - The cropping of post-tensioning strand shall be by a cold-cutting procedure. It shall not take place until authorized by the Ministry. Under no circumstances shall heat be applied to post-tensioning strand from cropping or other operations. The cropped strand shall be provided

with a minimum concrete cover of 25 mm.

416.37 Anchorage Recesses - The anchorage recesses shall be cleaned and sandblasted after completion of post-tensioning and grouting. The surfaces shall be coated with an epoxy bonding agent conforming to ASTM C 881,Type V, Grade 2. The Class of bonding agent shall be appropriate for the temperature at time of application. The bonding agent shall be applied in accordance with the manufacturer's applications. Wire mesh shall be placed before concreting in recesses larger than 300 mm square.

The Contractor shall fill the recesses flush with adjoining surfaces. All parts of anchorages shall have a minimum cover of 25 mm. All recesses exposed to view shall be filled with concrete coloured to match the parent concrete. If requested, the Contractor shall submit a trial mix with a proportion of white Portland cement to the Ministry Representative for review.

Page 367: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 418

CONCRETE BRIDGE DECK SEALANTS

SILANE SURFACE TREATMENT OF NEW PORTLAND CEMENT CONCRETE

418.01 Scope - This Section describes the treatment of new concrete bridge surfaces with a silane protective solution. The Specification describes surface preparation and application.

418.02 Silane Solution - The silane solution shall be a minimum 40% solution of alkyl trialkoxy silane (isobutyl trimethoxy silane or n-octyl triethoxy silane) dissolved in a maximum of 60% anhydrous alcohol.

418.02.01 Delivery and Storage of Silane Solution - The silane solution shall be delivered to the job site in unopened, sealed containers with original seals intact, also with a manufacturer's label identifying the product (including a batch number). The containers holding silane solution shall be stored in dry, enclosed structures to protect the contents from misuse, weather and excessive heat.

418.02.02 Quality Assurance - Only silane solution from an approved list prepared by the Ministry shall be permitted for use on the job.

Certification shall be required for each batch shipment of silane solution, prior to its use.

418.03 Contractor's Qualification - The applicator shall have a minimum of three years of successful and documented experience in application of liquid water repellents to concrete or masonry substrates, or else the applicator must provide documentation certifying that training approved by the manufacturer and the Ministry for applying silane solution was received.

418.04 Job Site Conditions

418.04.01 Substrate Condition - Prior to silane treatment:

• New concrete shall be cured for a minimum of 28 days.

• All concrete surfaces shall be fully dry.

418.04.02 Weather Limitations - Application of silane solution shall be undertaken only during periods when rain or snow has not occurred during the previous two days and no rain or snow is forecast by the weather office for the next two days.

Application of silane solution shall proceed only when the concrete surface temperature is above 4oC and below 32oC, and windspeed is less than 24 km/hr.

418.05 Surface Preparation - All concrete surfaces

prepared for treatment shall be thoroughly cleaned prior to application of the silane solution. The method of cleaning shall be capable of removing loose concrete, curing compounds, laitance, dirt, dust, salt, oil, asphalt or other foreign materials. The cleaning process shall expose concrete pores and capillaries to readily accommodate silane penetration.

The cleaning process shall not damage the concrete surface, remove or alter the existing surface finish, or expose the coarse aggregate of the concrete. The method of cleaning shall be performed in such a manner as to provide a uniform appearing surface colour.

418.05.01 Pre-Surface Cleaning - If necessary, pre-surface cleaning preparations may include the use of solvent and hand tools to remove materials detrimental to the silane treatment of the concrete surface.

418.05.02 Surface Cleaning - Suitable methods to clean the concrete surface are:

• Sand blasting • Steel shotblasting • Hydro blasting • Steam cleaning • Water pressure washing using a minimum of 3.5 MPa

(500 psi) nozzle pressure.

The cleaning method used shall be capable of cleaning concrete surfaces, as specified.

418.06 Silane Application - Silane application shall proceed only if the condition of the cleaned concrete surface is approved by the Ministry Representative.

418.06.01 Surface Condition - All concrete surfaces shall be fully dry prior to silane solution application. Concrete surfaces previously steam cleaned or water washed must be allowed to dry prior to application of silane solution for:

• Minimum one day during windy or sunny days when air temperatures are over 20oC.

• Minimum two days during calm or cold days when air temperatures are between 4oC to 20oC.

418.06.02 Silane Solution - The silane solution shall be used as supplied by the manufacturer. It shall not be diluted or altered in any way. Water shall not be allowed to contaminate the silane solution.

418.06.03 Application Equipment - The silane solution shall be sprayed on the concrete surface by using low

BC - MOT 2006 418 (1 of 2)

Page 368: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 418 CONCRETE BRIDGE DECK SEALANTS

pressure 0.1 MPa - 0.2 MPa (15 - 30 psi) positive displacement airless spray equipment. Suitable equipment is a pressurized garden sprayer or drum mounted pump. Large deck areas over 400 m2 shall be sprayed using a spraybar type unit.

All spray equipment shall be fitted with fan spray nozzles and the spray adjusted to a "wet spray" condition (i.e., minimum atomization of silane solution).

i) Cleaning of Application Equipment - All application equipment must be clean and dry prior to use. If equipment is wet, it shall be rinsed with a small amount of methyl hydrate (methanol) prior to commencement of the actual application.

418.06.04 Rate of Application

i) Surfaces Subject to Traffic Wear - Bridge decks and other surfaces subject to traffic wear shall be treated with silane solution at a rate of 0.40 l/m2.

ii) Surfaces not Subject to Traffic Wear - Surfaces not subject to traffic wear (parapets, pier caps, sidewalks, etc.) shall be treated with silane solution at a rate of 0.23 l/m2.

418.06.05 Method of Application - Silane solution shall be applied at a coverage rate according to this Specification. Horizontal surfaces shall be uniformly sprayed to saturate/flood the surface. Vertical surfaces should be treated from the bottom up and uniformly sprayed to saturate the surface.

If it is not possible to complete the silane treatment in one application, the boundary between the treated and untreated areas shall be clearly marked.

418.06.06 Curing - Following the application, the surface of silane treated concrete shall be cured by mist spraying with water after:

• 4-6 hrs, during days with temperatures between 25oC - 32oC

• 6-12 hrs, during days with temperatures between 15oC - 25oC

• 12-24 hrs, during days with temperatures between 4oC - 15oC

The traffic may be allowed on silane treated concrete one hour after the water wetting operation.

418.07 Safety and Health Hazards - Personnel exposed to silane solution and methyl hydrate shall wear personal protective equipment such as coveralls, goggles, rubber gloves and proper respirators.

No smoking, open flames, sources of heat or ignition shall be permitted during the construction operation.

Special precautions must be taken during the construction operation to prevent any over spray or spillage of materials on plants and vegetation or into fish-habitat water bodies, (Section 165, Protection of the Environment).

Manufacturer's material safety data and handling instructions shall be followed.

418.08 Measurement and Payment - Payment for the concrete deck sealant will be made at the unit price bid per square metre for the preparation of the concrete surfaces and the supply, application and curing of the deck sealant.

418 (2 of 2) 2006 BC - MOT

Page 369: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 419 (1 of 12)

SECTION 419

CONCRETE BRIDGE DECK WATERPROOFING SYSTEM

PREFABRICATED MEMBRANE

DESCRIPTION

419.01 Scope - This Section describes the protection of concrete bridge decks with rubberized asphalt prefabricated membrane overlaid with hot mix asphalt pavement. The Section describes materials, surface preparation and application.

NOTE: This Section is not applicable to existing concrete with high levels of chloride contamination. Membrane and pavement overlay shall not be installed on concrete bridge decks contaminated with acid-soluble chloride ion (Cl-) in excess of 0.10% by mass of cement.

MATERIALS

419.11 General - The membrane and accessory materials shall be supplied as a package containing:

a) full-width membrane, self-adhering internally reinforced sheet of rubberized asphalt. Membrane shall have a minimum thickness of 1.6 mm (65 mils) and shall be supplied in rolls in width between 900 mm and 1500 mm (3' to 5').

b) detailing strip of membrane, self adhering internally reinforced sheet of rubberized asphalt. Membrane shall have thickness between 1.50 and 1.75 mm (60 to 70 mils) and shall be supplied in rolls in width between 200 and 305 mm (8" to 12").

c) primer, rubberized asphalt dispersed in organic solvent with minimum solids of 45% (by mass), and maximum drying time of one hour.

d) mastic, single component material, consisting of rubberized asphalt, organic solvent and fillers, supplied in caulking tubes.

419.12 Delivery and Storage - Membrane and accessory materials shall be delivered to the job site in unopened packages and containers with manufacturer's label identifying the product and a batch number.

The packages and containers shall be stored in a dry secured place protected from weather and excessive heat. Specific manufacturer's instructions for storage shall be followed.

419.13 Quality Assurance - Only membranes and materials accessories (supplied as a package) from the Recognized Products list prepared by the Ministry will be permitted for use on the job.

Certification shall be provided for each batch (package) shipment, prior to its use.

CONSTRUCTION

419.31 Applicator's Qualification - The applicator must have a minimum of three years of successful and documented experience in application of solid membranes to concrete substrates, or else the applicator must provide documentation certifying that training approved by the manufacturer or the Ministry for applying solid membranes has been received.

419.32 Job Site Conditions

419.32.01 Substrate Conditions - Prior to application of membrane, new concrete shall be cured for a minimum of 28 days.

419.32.02 Weather Limitations - Application of primer and installation of membrane and pavement overlay shall be undertaken only during stable weather when precipitation has not occurred during the previous 24 hours and is not imminent, and when the minimum ambient and concrete surface temperature is 5oC and rising.

419.33 Surface Preparation - All concrete surfaces shall be sound, smooth, clean and free from any contamination.

a) All defects in concrete surfaces, cracks, delamination and spalled areas shall be repaired with a suitable patching material. All patching shall be completely cured.

b) All protrusions and sharp edges shall be removed by using hand tools or power tools.

c) New concrete overlays on bridge decks and concrete-filled shear keys between prestressed concrete box stringers shall have smooth finish. Broom finishes are not acceptable.

d) All loose aggregates, laitance dust, soil, oil and other debris and contaminations shall be removed from the concrete surface by one or a combination of the following methods:

i) high pressure clean dry air sweeping

ii) sand blasting

Page 370: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 419 CONCRETE BRIDGE DECK WATERPROOFING SYSTEM

419 (2 of 12) 2006 BC - MOT

iii) steel shotblasting

iv) hydro blasting using a minimum of 3.5 MPa (500 psi) nozzle pressure

v) steam cleaning.

The method used shall be capable of cleaning concrete surfaces as specified.

419.34 Priming - All concrete deck surfaces that are to receive membrane must be primed.

419.34.01 Concrete Surfaces - All concrete surfaces shall be fully dry prior to application of primer. Concrete surfaces previously steam cleaned or water washed must be allowed to dry prior to application of primer for:

• minimum 24 hours during windy or sunny days when air temperatures are over 20oC.

• minimum 48 hours during calm or cold days when air temperatures are between 5o to 20oC.

419.34.02 Primer Material - Primer shall be used as supplied by the manufacturer. It shall not be diluted or altered in any way.

419.34.03 Primer Application - Primer application shall proceed only if the condition of cleaned and repaired concrete surfaces is approved by the Ministry Representative.

All concrete surfaces to be covered with membrane shall be uniformly treated with primer at the rate of 0.15 to 0.25 l/m² depending on the porosity of the substrate surface.

The primer shall be uniformly applied on substrate surface by roller or brush.

419.34.04 Primer Curing - Only as much surface as will be covered by membrane in the workday shall be primed. Primed concrete surfaces not covered by membrane within the workday must be reprimed immediately prior to membrane installation.

All primed areas must be tack free prior to application of the membrane.

419.35 Membrane Application

419.35.01 Detail Work - Extra attention must be given to all detail work. Detail work shall be performed first, prior to installation of the full-width membrane. The membrane shall be installed as called for on Drawings SP419-01 through SP419-08 and as follows:

i) curb or parapet - inside corners at curbs or parapets shall be covered using a detailing strip of membrane. The uppermost edge of the detailing strip of membrane shall be placed and extended up the face of curb or parapet to 6 mm (1/4") below the finished height of the asphalt pavement overlay. The detailing strip of membrane shall be installed in such a manner to ensure it is smooth and that it adheres strongly to the face of curb or parapet, and bridge deck without any visible defects ("tenting", "fish mouth" or "bubbles"). The first sheet of the full width of membrane shall then be applied as close as possible to the curb or parapet.

ii) bridge deck edge - on bridge decks without curbs or parapets, the full width membrane or detailing strip of membrane shall terminate 6 mm (1/4") from the outer edges of the deck. The membrane shall be heated at the edge of the deck with light flame from a torch or with a hot air gun, followed by pressing the membrane down with a roller.

iii) drains - areas around drains, basins and any other protrusions shall be double covered with membrane. First, flashing pieces of detailing strip of membrane are applied, followed by the application of the full width membrane. The membrane shall be installed in such a way as not to obstruct openings of drains and basins.

iv) weep holes - do not require detailing strip. The membrane around weep holes shall be heated with light flame from a torch or hot air gun, and pressed down to expose the opening of the hole.

v) joints and cracks - all filled cracks wider than 3 mm (1/8"), and all joints with a gap less than 6 mm (1/4"), shall be covered with a detailing strip of membrane prior to application of a full width membrane. Joints wider than 6 mm (1/4"), shall be treated as a standard expansion joint and membrane shall be terminated at expansion joint assembly.

vi) bridge ends - detailing strip of membrane shall be installed over the joint between the existing pavement and the bridge deck. At each end of the bridge deck, a full-width membrane shall extend at least 900 mm (3') over the paved bridge approaches. In the case of new construction, when the existing structure has gravel approaches, the detailing strip of membrane shall be folded over the deck edge and covered with a full width membrane.

419.35.02 Membrane Installation - The full width membrane shall be applied in a longitudinal direction from the low point to the high point so that laps shed water. The area along the lower edge of the deck shall be covered first.

Page 371: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CONCRETE BRIDGE DECK WATERPROOFING SYSTEM SECTION 419

BC - MOT 2006 419 (3 of 12)

The full width membrane shall be laid flat, avoiding wrinkles and entrapped air. Each succeeding sheet of membrane shall be applied overlapping the side laps a minimum 65 mm (2 1/2") and the end laps a minimum 150 mm (6"). The entire surface of the membrane, especially laps, and all terminations shall then be rolled with sufficient pressure to affect a bond between the membrane and the concrete surface.

419.35.03 Mastic Application - All membrane terminations shall be sealed with a trowelled application of mastic 12 to 25 mm (1/2" to 1") wide and 1.5 to 3.0 mm (1/16" to 1/8") thick. Mastic shall be applied along the edge of the membrane at the face of the curb or parapet, along both sides of the deck joints, around drains and at termination of the membrane on both ends of bridge approaches.

At the end of each working day, or when application is interrupted by a change in construction scheduling, all membrane terminations shall be sealed with the mastic.

419.35.04 Inspection and Repairs - Prior to paving over the membrane, any defective areas of the membrane shall be repaired to the satisfaction of the Ministry Representative, including:

• tears, damaged areas and inadequately lapped seams shall be patched;

• fish mouth shall be slit and repaired; • large blisters shall be punctured and repaired; and • if water migrates underneath the installed membrane,

then the membrane covering the affected area shall be removed and replaced.

419.35.05 Traffic On Membrane - Traffic shall not be permitted on the membrane prior to installation of asphalt overlay with the exception of vehicles and equipment engaged in installing the asphalt overlay. Only vehicles or equipment provided with pneumatic tires or with flat tracks with rubber bonded pads, shall be permitted on the membrane. Any turning or sudden braking on the membrane shall be avoided. Any damage to the membrane resulting from the movement of vehicles or equipment shall be repaired at the Contractor's expense.

419.36 Paving - Asphalt overlay construction shall proceed only when the final condition of the installed waterproofing membrane is accepted by the Ministry Representative.

Prior to commencing asphalt pavement construction, the weight of equipment, including loaded trucks, paver and rollers, and their maximum combined weight must be accepted by the Ministry's responsible Bridge Engineer. Only this accepted equipment and equipment combination shall be permitted on the bridge structure at the time of

construction. Asphalt materials, mix design, mix production and hot mix asphalt pavement construction shall meet the requirements of Sections 501 and 951.

419.36.01 Asphalt Mix and Pavement Design - Asphalt mix shall meet the requirements of Subsections 501.14 and 501.15 for Pavement Class I, Medium Mix and appropriate asphalt binder. The asphalt pavement thickness constructed over the membrane shall be not less than 50 mm and shall be constructed as indicated in Subsection 501.35.

419.36.02 Placing The Asphalt Mix - In addition to standard paving practice:

i) no paving shall proceed over wet membrane;

ii) no primer shall contaminate membrane surface;

iii) paving operation shall commence as soon as possible after the waterproofing membrane is installed;

iv) paving shall proceed in the direction of the end laps in the membrane (i.e., from overlap to underlap);

v) the Contractor shall take due precautions to avoid damage to the waterproofing membrane during the paving operations by the paver and hauling trucks;

vi) the paver shall move at a constant speed avoiding any unnecessary stopping;

vii) hauling trucks shall maintain a steady supply of asphalt mix to the paver;

viii) excessive accumulation of asphalt mix in the paver hopper and auger shall be avoided;

ix) unloading of the asphalt mix from the hauling trucks onto the membrane surface will not be permitted;

x) paver screed burners shall be set in such a way as to avoid any damage to the membrane from excessive heat;

xi) the path in front of the screed side end plate must be kept continuously free from spilled asphalt mix. The bottom of the side end plate shall slide freely, otherwise the entrapped asphalt mix could damage the underlying membrane;

xii) screed adjustments during paving shall be made in such a way as to achieve a uniform thickness of mat, surface texture, smoothness and designed pavement geometrics;

xiii) the bridge deck joints, drains and other openings

Page 372: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 419 CONCRETE BRIDGE DECK WATERPROOFING SYSTEM

419 (4 of 12) 2006 BC - MOT

(except weep holes) shall be protected to avoid intrusion of asphalt during the paving operation; and

xiv) during a "one lane at a time" construction method, as on bridges partially open to traffic, the constructed pavement mat shall terminate not less than 100 mm (4") from the edge of installed membrane in order to provide a sufficient area for lapping of the next sheet of membrane.

419.36.03 Compaction - In addition to standard compacting practice:

i) drum vibration mode must not be used during compaction.

ii) steel drum shall run as close as possible to the curb or parapet.

iii) compaction along the expansion joints or concrete dams shall be performed transversely.

iv) sudden stops or sharp turns by rollers shall be avoided.

419.36.04 Hand Work - Placing of asphalt mix in areas inaccessible to paving equipment shall be done in accordance with Subsection 501.35.10 and 501.36.08.

419.37 Protection Of The Environment - The Contractor shall comply with Section 165, appropriate environmental requirements of Fisheries and Oceans Canada, the Ministry of Environment, Lands and Parks and any related municipal regulations.

Special precautions shall be taken during the construction operation to prevent spillage of materials into water bodies.

419.38 Safety and Health Hazards - Materials used in the construction of membrane and asphalt pavement overlay are flammable, toxic and hot. Personnel exposed to these materials and operations shall wear all appropriate personal protective equipment such as boots, coveralls, goggles, rubber gloves and proper respirators as specified by Workers’ Compensation Board. Manufacturer's material, data and handling instructions shall be followed.

MEASUREMENT

419.81 General - Rubberized asphalt membrane will be measured in SQUARE METRES installed.

Hot mix asphalt pavement will be measured in TONNES.

PAYMENT

419.91 General - Payment for the MEMBRANE installation will be made at the contract unit price bid per square metre. The unit price shall include everything done and furnished for the full completion of the waterproofing membrane installation.

Payment for the HOT MIX ASPHALT PAVEMENT OVERLAY will be made at the contract unit price bid per tonne.

Page 373: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 374: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 375: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 376: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 377: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 378: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 379: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 380: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 381: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 421 (1 of 20)

SECTION 421

STRUCTURAL STEELWORK

DESCRIPTION

421.01 Scope - This Section covers the supply, fabrication, erection and quality control program of all major structural steel elements.

In general, all shop connections shall be welded, and all field connections high-strength bolted.

Except as otherwise specified herein, steelwork shall be fabricated and erected in accordance with the AASHTO Standard Specifications for Highway Bridges (17th Edition - 2002 including all subsequent interim revisions and updates), Division II, Section 11. Welding and associated work shall be in accordance with the current edition of CSA W59-M - Welded Steel Construction. Fracture control requirements, welding requirements for fracture critical members and welding requirements for primary tension members shall be in accordance with CAN/CSA-S6-00.

421.02 Prefabrication Meeting - The Ministry will convene a prefabrication meeting with the Contractor to review procedures on quality control, welding procedures, procedures for non-destructive testing, mill certificates and heat numbers, splices, coatings, updated schedule for fabrication, and to confirm the Ministry's requirements.

421.03 Alternative Details - All details shall, in general, conform to those shown on the Drawings. Any proposed variation shall be submitted to the Ministry Representative in writing, with the reason for the variation, and any cost saving or extra cost. The Ministry may require the submission of Drawings prepared and sealed by a professional engineer registered with the Association of Professional Engineers and Geoscientists of British Columbia APEGBC).

If, in the opinion of the Ministry, the variation represents a clear improvement, it may be accepted without any price adjustment.

If the variation results in a product of equivalent quality, it may be accepted at the discretion of the Ministry. In this case any saving in cost to the Contractor (as determined by the Ministry) shall be passed on as a credit to the Ministry.

421.04 Working Drawings - Working drawings shall consist of the following:

• Shop drawings

• Transportation details and

• Erection drawings

Transportation details and erection drawings shall be prepared and sealed by a professional engineer registered with the Association of Professional Engineers and Geoscientists of British Columbia (APEGBC).

When the Contractor is responsible for the design of items that are detailed on the shop drawings, the shop drawings shall be prepared and sealed by a professional engineer registered with the Association of Professional Engineers and Geoscientists of British Columbia (APEGBC).

Working drawings shall be in the same system of units as the design drawings.

Working drawings shall be on D size sheets approximately 560 mm (22") by 865 mm (34"), (one drawing per sheet). Lettering for notes and dimensions shall be at least 2.5 mm and 4 mm for headings. Drawings shall be legible when half-sized or microfilmed.

421.04.01 Shop Drawings – Shop drawings shall show all information and details needed for the fabrication of the members including, but not limited to, such items as member shapes and dimensions, connection details, material and product standards, mark numbers and general arrangement of member locations, details of attachments, fastener details, weld details, mass of members, special tolerances, special handling instructions, coating details, lifting details and lifting locations.

421.04.02 Transportation Details – Transportation details shall include such items as:

• Description of hauling and handling equipment

• Weight of members

• Length and height of loads

• Location and method of member support

• Details for handling, storing, and loading of members.

421.04.03 Erection Drawings - Erection drawings shall show in detail the method of erection including, but not limited to, the following:

• Erection procedures

• Procedures for off loading of members upon delivery

• Details for temporary storage and support of members on site prior to erection

• Equipment to be used

• Layout or general arrangement drawing showing the layout of the members, equipment positioning, and access roads

• Crane make, model, and capacity charts, boom length(s) , crane placement, and access for transporting of members to crane(s)

• Radii and loads for crane lifts

• Rigging details

Page 382: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 421 STRUCTURAL STEELWORK

421 (2 of 20) 2006 BC - MOT

• Mass of members , rigging and special installation equipment

• Details for installation and removal of all falsework, temporary supports, temporary bearings, bracing, guys, dead-men, and lifting devices

• Attachments to the bridge members and bridge structure for temporary support and special launching equipment

• Detailed description of sequence of operations

• Details for special installation equipment such as a launching truss, launching nose, head frames, spreader beams and rollers

• Details for installation of members onto the permanent bearings

• Traffic control plan for roadway and rail traffic

• Details for protection of existing utilities affected by the erection procedures

• Layout and details of fall protection and their sequence of installation.

The Contractor shall be responsible for the lateral stability of members and shall design and provide bracing as necessary until completion of the Work.

The erection drawings shall be complete in detail for all anticipated phases and conditions during erection and during the temporary support of members. The Contractor shall submit calculations , upon request, to the Ministry Representative that demonstrate that specified factored demand/capacity ratios or allowable stresses are not exceeded in members, falsework, temporary bracing and temporary supports and that member capacities and final geometry will be correct. The calculations shall be sealed by the professional engineer that sealed the erection drawings.

Falsework, temporary supports and temporary bracing shall meet the requirements of CSA Standard S269.1 –1975, “Falsework for Construction Purposes”. and shall also meet all the requirements for falsework given in Clauses 20.17 to 20.26 inclusive of the WCB Occupational Health and Safety Regulations.

A professional engineer registered with APEGBC shall be responsible for any field designs and any changes made to the erection procedures. Field designs and changes to the erection procedures must be documented and sealed by the responsible professional engineer and must be available at the Site prior to the affected erection work being carried out.

Immediately before placement of loading on falsework, the Contractor must ensure that the falsework is inspected

and a sealed engineering certificate is issued by a professional engineer registered with APEGBC which:

• Indicates the specific areas inspected and

• Certifies that the falsework has been erected in accordance with the latest approved erection drawings and supplementary instructions.

421.04.04 Submittals - The Contractor shall submit to the Ministry Representative three sets of all working drawings. These drawings shall be submitted at least fourteen days prior to the fabrication of the work. Any work done or materials ordered prior to the review of the working drawings shall be at the Contractor's risk. The Ministry will review the drawings for general compliance with the contract requirements.

If modifications to the drawings are required, the Ministry Representative will return one set of drawings, marked up, to the Contractor. The Contractor shall re-submit three sets of the revised drawings to the Ministry Representative.

If no exceptions are taken to the drawings, the Ministry Representative will return one set of reviewed drawings to the Contractor. The Contractor shall forward an additional four sets of the reviewed drawings to the Ministry Representative.

Shop drawings will not be reviewed without the transportation details and erection drawings applicable to the members in question.

Erection will not be allowed to proceed without the Ministry Representative’s review of the method proposed.

Review of working drawings shall not relieve the Contractor of responsibility for carrying out the work in accordance with the contract documents.

421.05 Quality Control - The Contractor shall implement a quality control program to meet the Contract requirements.

421.06 Quality Assurance - The Ministry will implement a quality assurance program by auditing the Contractor's quality control program and by inspection at its discretion.

The Contractor shall notify the Ministry Representative at least 14 days before fabrication has commenced. The Contractor shall allow the Ministry's representatives access to all parts of the work, and shall supply such information and assistance as is required. The Contractor shall provide samples of any materials requested by the Ministry. Inspection by the Ministry shall not relieve the Contractor from obligation to perform the work in accordance with the contract.

At its discretion and expense, the Ministry will test any weld by non-destructive testing methods, in accordance

Page 383: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STRUCTURAL STEELWORK SECTION 421

BC - MOT 2006 421 (3 of 20)

with CSA W59-M. Generally, fillet welds will be tested by the dry powder magnetic particle method and butt welds by radiography, or by any other method of testing the Ministry deems necessary.

The Ministry will attempt to schedule non-destructive testing operations so as not to interfere with the progress of the work.

The extent of non-destructive testing will usually be as follows:

• Butt Welds 100%

• Flange/web fillet welds 100%

• Flange/stiffener fillet welds 100%

• Web/stiffener fillet welds 25%

• Bracing/stiffener fillet welds 25%

The inspection of welds shall be carried out as soon as possible after the completion of welding.

The Contractor shall be prepared to move and support the pieces being inspected. In general, inspection shall be done on the flat and a minimum of 1.25 m of headroom shall be available.

The Contractor shall bear the cost of reinspection of welds after defects are repaired.

The Ministry will inspect bolted connections in accordance with the AASHTO Specifications for Highway Bridges (17th Edition - 2002 including all subsequent interim revisions and updates), Division II, Section 11.

The Ministry shall be notified of any defects found in the work. No repair shall be made until agreed to by the Ministry. In the case of minor or routine corrections, approval to proceed may be given verbally by the Ministry's inspector. In such cases as repair of major cracks or a revised design to compensate for deficiencies, the means of correction shall be prepared and sealed by a professional engineer registered with the Association of Professional Engineers and Geoscientists of BC (APEGBC). It shall be submitted in writing, with adequate sketches, to the Ministry for review.

Each main member shall be audited by a Ministry quality assurance representative before it is shipped from the shop. This audit shall not relieve the Contractor of responsibility for subsequent damage or for defects which become apparent before the work is finally accepted by the Ministry.

421.07 Quality and Details of Welds - The quality and details of welds shall be in accordance with CSA W59-M.

421.08 Design Specifications - CAN/CSA-S6 shall be used in the design of alternative details and calculating the

effect of stresses incurred in fabrication and erection.

No increase in allowable stresses due to vertical loads shall be used for erection conditions.

MATERIALS

421.11 Materials

421.11.01 Structural Steel - Steel shall conform to the requirements of CAN/CSA-G40.20/G40.21-M, and shall be of the grades called for on the Drawings. Plates provided from coils shall not be used. Prior to fabrication, the Contractor shall supply to the Ministry the manufacturer's mill certificates giving details of all chemical and physical properties of steel to be used in the work.

Chemical composition of steel to be galvanized shall be in accordance with Subsection 421.42.

Steel shall be supplied free of surface defects and internal discontinuities, with due regard for the end use of the steel in the work.

Edges of all plates will be subject to inspection by the Ministry. Any discontinuities will be examined and may be accepted.

The Ministry shall be supplied with a record of all observed discontinuities and repair methods.

Repairs to defective plates shall not proceed until review of the proposed repair method by the Ministry.

421.11.02 Welding Consumables - All electrodes shall match the base metal specified in accordance with CSA W59-M, Table 12.1. The deposited weld metal shall provide strength, ductility, impact toughness and corrosion resistance equivalent to the base metal.

Welding consumables for all processes shall be certified by the Canadian Welding Bureau (CWB) as complying with the requirements of CSA W48.01.

421.11.03 High-Strength Bolts - Unless otherwise specified on the drawings, high-strength bolts, nuts and washers shall conform to the requirements of ASTM A325, and as follows:

a) for painted steelwork, Type 1, hot-dip galvanized to the requirements of CAN/CSA-G164-M.

b) or unpainted weathering steel, Type 3.

c) for painted weathering steel, Type 3 bolts will be acceptable provided that they are painted after installation in accordance with the field painting specifications.

421.11.04 Shear Connector Studs - Shear connector studs shall conform to the requirements of ASTM A108, Grades 1015, 1018 or 1020.

Page 384: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 421 STRUCTURAL STEELWORK

421 (4 of 20) 2006 BC - MOT

421.12 Material Storage and Care

421.12.01 Steel - Structural material, either plain or fabricated, shall be stored above the ground in an upright and shored position upon platforms, skids, or other supports. It shall be kept free from dirt and other foreign matter, and shall be protected as far as practical from corrosion. Long members shall be supported on skids placed near enough together to prevent overstress from deflection.

Prior to fabrication, all steel shall be marked for identification by heat number and specification by a marking system approved by the Ministry.

421.12.02 Welding Consumables - Electrodes and fluxes shall be stored and kept in condition as required by CSA W59, Section 5.2.

Gas for welding shall be stored in marked steel bottles and shall not be subjected to temperatures in excess of 50oC or temperatures of less than 0oC.

421.13 Fabrication - Prior to fabrication, the welders and welding operator’s qualifications, shop drawings, welding procedures, mill certificates and welding consumable certificates shall be submitted for the Ministry's review.

No fabrication, welding or coating of steelwork shall commence until permission to do so has been received from the Ministry.

421.14 Ministry's Plant Office - The Contractor shall provide in the fabrication plant or nearby a suitable lock-up office for the sole use of the Ministry throughout the period of fabrication.

The office shall be at least 2.5 m x 3 m and shall be weathertight and reasonably soundproof, provided with ample window area and ventilation, furnished with a 0.75 m x 1.2 m desk, a 1 m x 2 m drafting table, a two-drawer filing cabinet, two chairs, a drafting stool and 3 m of shelves, and equipped with a telephone, which shall be operational throughout the period of fabrication. All long distance telephone calls will be paid for by the Ministry.

The Contractor shall clean, heat and light the office throughout the period of fabrication.

EQUIPMENT

421.21 Qualifications and Equipment

421.21.01 Contractor - The Contractor shall produce evidence that the plant is currently fully approved by the CWB to the requirements of CSA W47.1, Division 1 or Division 2 prior to beginning work.

The Contractor shall also produce evidence of satisfactory experience in the fabrication of heavy structural steelwork.

The Contractor shall employ or retain a registered professional engineer experienced in steel bridge fabrication, to provide guidance throughout the work.

A qualified welding supervisor shall be employed on each shift where welding is done on the work.

Prior to fabrication, the Contractor shall submit to the Ministry the names of the welding engineer, the engineer experienced in steel bridge fabrication, and the welding supervisors who are to be employed on the work.

421.21.02 Welders and Welding Operators - The Contractor shall produce evidence that all welders and welding operators to be employed on the work are currently qualified by the CWB at the time of fabrication in the processes in which they are to be employed on the work.

The Contractor shall also produce evidence relative to each welder and welding operator, that they have been executing satisfactory welding in the required processes within the six-month period previous to the award of this contract.

421.21.03 Welding Equipment - All equipment to be used in the work shall be in good working order and shall be subject to the inspection of the Ministry.

For any arrangement of automatic welding, the Ministry may require that a preliminary test run of the equipment be made, without welding, over the length of the joint, to prove that the disposition of the equipment and the method and accuracy of travel are satisfactory.

421.22 Welding Procedures - The Fabricator shall submit copies of the proposed welding procedures for review by the Ministry. Gas metal arc welding shall not be used. Where the submerged arc or flux cored arc process is to be used, the Ministry may order that each welder and welding operator make a weld specimen not less than 1 m in length for fillet welds and 150 mm in length for butt welds. Steel of the same specifications and thickness as that to be used in the work shall be used in the specimen welds.

No welding shall be done on the work until the welders’ and welding operators’ qualifications are established to the satisfaction of the Ministry.

Welding procedures shall be accompanied by documentary proof that they have been qualified previously by the CWB at the plant where the work is to be carried out.

The procedures shall include the following information: joint type, welding process, welding position, base metal specification, welding consumable specification and size, preheat requirements, amperage and voltage requirements, speed, polarity, and welding equipment, including a description of travel for automatic welding.

Page 385: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STRUCTURAL STEELWORK SECTION 421

BC - MOT 2006 421 (5 of 20)

421.23 Butt Joints - Except as called for on the Drawings, butt joints will not be permitted.

The Fabricator may submit an alternative butt joint design provided that such design has been approved by the CWB.

421.24 Assembly and Welding Sequences - If requested by the Ministry, the Contractor shall supply full details of the proposed assembly and welding sequence of any particular weldment.

CONSTRUCTION

421.31 Preparation of Material

421.31.01 Straightening Material - Prior to being used in fabrication, all structural steel shall be straight and free from kinks or bends. The flatness tolerance of plate in excess of 900 mm wide shall be in accordance with the tolerances of the finished product as specified in CSA W59-M. If straightening is necessary, it shall be done by methods that will not injure the metal. The steel shall not be heated unless permission is given by the Ministry.

In no case shall the temperature of the steel exceed 620oC. After straightening, the surfaces of the metal shall be carefully inspected for evidence of fracture and if necessary, the material shall be replaced or repaired to the satisfaction of the Ministry. Sharp kinks and bends will be cause for rejection of the steel.

421.31.02 Camber - Girders shall be cambered as shown on the drawings.

421.31.03 Edge Preparation - Steel may be cut to size by sawing, shearing or flame cutting. All steel before cutting shall be marked by a method agreed to by the Ministry so that its specification may be immediately identified.

All cut edges shall be smooth and regular, free from fins, cracks, tears and notches. Freehand cutting shall be done only where approved by the Ministry. Roughness of cut surfaces shall not exceed the U. S. Standards Institute B46.1 value of 1000. Roughness exceeding this value shall be removed by machining or grinding. Occasional gouges will be tolerated only at the discretion of the Ministry Representative and shall be repaired as instructed.

Sheared edges of plates more than 16 mm in thickness shall be planed to a depth of 6 mm.

Re-entrant flame cuts shall be filleted to a radius of not less than 20 mm.

All exposed sharp corners of members, which are to be painted, shall be ground to a minimum radius of 1.6 mm.

All corners of oxygen-cut edges of main stress-carrying members, except unpainted bearing stiffeners and girder webs, shall be ground to a minimum radius of 1.6 mm.

Special attention shall be given to the cutting of flange plates. All flange plates prepared by flame cutting shall be preheated in accordance with Subsection 421.34.

The Ministry will carry out Brinell hardness testing of the edges of flange plates on fracture critical members. The Brinell hardness of the edges of flange plates on fracture critical members shall not exceed 220. If greater hardness is measured, the edges shall be ground by the Fabricator to remove the hard layer, or annealed by the Fabricator by means of a preheating torch. The Contractor shall bear all costs for reinspection and retesting.

Surfaces to be welded shall be free from loose scale, slag, rust, grease, moisture or other material that will prevent proper welding. Mill scale that withstands vigorous wire brushing, a light film of drying oil or a thin rust inhibitive coating may remain except that all mill scale shall be removed from the surfaces on which flange-to-web welds are to be made. Surfaces within 55 mm of any weld location shall be free from any paint or other material that would prevent proper welding or produce objectionable fumes while welding.

Edges of material thicker than specified in the following list shall be trimmed if and as required to produce a satisfactory welding edge wherever a weld along the edge is to carry calculated stress:

a) Sheared edges of material thicker than 12 mm;

b) Rolled edges of plates (other than Universal Mill Plates) thicker than 10 mm;

c) Toes of angles or rolled shapes (other than wide flange sections) thicker than 16 mm;

d) Universal Mill Plates or edges of flanges of wide flange section thicker than 25 mm.

421.31.04 Direction of Rolling - Steel plates for main members and splice plates for flanges and main tension members shall be cut and fabricated so that the direction of rolling is parallel to the direction of the primary stresses.

421.31.05 Bolt Holes - Standard holes for high tensile bolts shall be either punched, sub-punched and reamed, or drilled, and shall be of a nominal diameter not more than 2 mm in excess of the nominal bolt diameter, except that the following bolt/hole combinations will be permitted:

a) either 3/4 inch or M20 bolts in 22 mm holes;

b) either 7/8 inch or M22 bolts in 24 mm holes;

c) either 1 inch or M24 bolts in 27 mm holes.

Oversize or slotted bolt holes will be allowed only in special circumstances.

Punched holes shall be clean cut, without torn or ragged edges. The diameter of the die shall not exceed the

Page 386: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 421 STRUCTURAL STEELWORK

421 (6 of 20) 2006 BC - MOT

diameter of the punch by more than 2 mm. If a punched hole must be enlarged to admit a high tensile bolt, it shall be reamed.

Reamed holes shall be cylindrical and perpendicular to the member. Where practicable, reamers shall be directed by mechanical means. Reaming shall be done with twist drills or reamers.

Drilling shall be done with twist drills or core drills. Burrs on the outside surfaces shall be removed.

Poor matching of holes will be cause for rejection.

421.31.06 Faying Surfaces - All faying surfaces of steelwork shall be cleaned by sand blasting in the shop. Faying surfaces of steelwork to be painted shall be painted only with one coat of inorganic zinc primer. Primer coatings shall meet the Class B coating requirements as specified in CAN/CSA-S6-00. The class of coating shall be determined based on testing in accordance with the “Specifications for Structural Joints Using ASTM A 325 or A 490 Bolts” issued by the Research Council on Structural Connections. Primers shall be supplied with a Class B certificate and be applied and cured at the conditions on the certificate. Over thickness will not be accepted. If over thickness occurs then the surface will be cleaned and recoated at the Contractor’s expense.

421.32 Marking - Prior to fabrication, all steel shall be marked for identification by heat number and specification by a marking system approved by the Ministry. Steel, which is unidentified, shall not be used in the work.

421.33 Assembly of Weldments - The shop assembly of the various components of the weldments shall be executed in accordance with CSA W59-M.

Tack welding shall be done by qualified welders, using the smallest size weld required to hold the components of the assembly together. Tack welds shall be incorporated in the final weld.

421.34 Preheat and Interpass Temperatures - No welding shall be done when the temperature of the base metal is lower than -18oC. At temperatures below 0oC, the steel shall be preheated to a temperature of at least 10oC in excess of that stated in CSA W59-M, Table 5.3.

Preheat shall be applied to all steel to be welded so that the steel within 75 mm of the weld is heated to the temperature shown in CSA W59-M, Table 5.3.

Preheat shall be applied in such a manner that moisture from the heating equipment does not penetrate the joint.

Preheat temperatures above the minimum shown in CSA W59-M, Table 5.3 may be required for highly restrained joints if designated by the Ministry.

Preheat temperature shall in no case exceed 200oC.

Preheat requirements for tack welds shall be as in the above table except that where single pass tack welds are used and are to be incorporated and consumed in a weld made by the submerged arc process, preheat is unnecessary.

421.35 Welding - Welding shall be done by the manual, shielded metal arc, flux-cored arc or submerged arc processes in accordance with the reviewed procedures and CSA W59-M, Section 5.

Any weld between the web and flange of a bending member shall be made by an automatic process, which provides a continuous weld throughout the length of the member.

All welding shall be done under cover and, in the case of flux-cored arc welding, shall be done in an area free from wind or draft.

Where the submerged arc process is to be used, the Contractor shall:

a) Carry out a preliminary test run of the procedure over the length of the joint to prove that the disposition of the equipment, the handling of hoses, and the method and accuracy of travel are satisfactory.

b) Have each operator make a weld specimen not less than 1200 mm in length for fillet welds and 150 mm in length for butt welds. Steel of the same specification and thickness as that to be used in the work shall be used in the specimen welds. No welding shall be done on the work until such a specimen is satisfactory to the Ministry.

Butt welds shall be extended beyond the edges of the parts to be joined by means of start and run-off tabs providing sufficient thickness to avoid the weld burning through and with a joint preparation similar to that on the main material. For manual shielded metal arc welding the width of the tabs shall be not less than the thickness of the thicker part being joined or 75 mm, whichever is greater. For submerged arc, welding the width of the tabs shall be not less than 75 mm. Each weld pass shall be carried far enough beyond the edge of the parts being joined to ensure sound welds in the joint. Tabs shall be removed upon completion, and the weld cooled without damage to the parent plate. The end of the weld shall be made smooth and flush with the edges of the abutting parts.

In flux-cored arc welding the equipment shall be capable of sustaining a gas flow rate of from 0.85 to 1.25 m3/h.

421.36 Shear Connector Studs - Shear connector studs shall be welded in the locations shown on the drawings, to the requirements of CSA W59-M, Section 5.5.6. Shear connectors will be inspected and shall be repaired if necessary in accordance with the same standard.

421.37 High-Strength Bolts - Installation of

Page 387: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STRUCTURAL STEELWORK SECTION 421

BC - MOT 2006 421 (7 of 20)

high-strength bolts shall be in accordance with the AASHTO Specifications for Highway Bridges (17th Edition - 2002 including all subsequent interim revisions and updates), Division II, Section 11.5.6.

Galvanized bolts shall be lubricated with beeswax or other approved lubricant before installation.

Heads of bolts shall be placed on the outsides of girders and box members, and generally on the more conspicuous side, if any, of any connection.

421.38 Bent Plates - When bending plates, the plates shall be so taken from the stock plates that the bend line will be at right angles to the direction of rolling. The radius of the bend measured inside shall be not less than the thickness of the plate. Before bending, the corners of the plate shall be rounded to a radius of 2 mm throughout that portion of the plate at which bending is to occur.

421.39 Shop Assembly of Bolted Connections - Holes in girder and truss field splices shall be drilled while assembled in the shop or yard, or sub-punched or sub-drilled and reamed while assembled. Unless otherwise specified, the structure shall be progressively assembled in accordance with AASHTO Standard Specifications for Highway Bridges (17th Edition - 2002 including all subsequent interim revisions and updates), Division II, Section 11.5.3.1. The assembly, including camber, alignment and accuracy of holes shall be inspected by the Ministry before drilling or reaming is commenced.

Connecting parts assembled in the shop or yard for the purpose of reaming or drilling holes shall be match-marked by a method agreed to by the Ministry to indicate the location and orientation of all pieces.

Alternatively, the Contractor may drill holes full-size using automatic drilling equipment, as described in AASHTO Standard Specifications for Highway Bridges (17th Edition - 2002 including all subsequent interim revisions and updates), Division II, Section 11.4.8.3. In this case a check assembly will be required for the first of each major structural type, as described in AASHTO Standard Specifications for Highway Bridges (17th Edition - 2002 including all subsequent interim revisions and updates), Division II, Section 11.5.3.3. Reaming of holes shall be as specified in Subsection 421.47, if the bolt holes do not line up during field assembly.

421.40 Dimensional Tolerances - The dimensions of completed members shall comply with the appropriate dimensional tolerances as specified in CSA W59-M.

The maximum deviation from specified length shall be ± L/1000 but not over 20 mm.

Warpage of box members shall be determined by taking measurements at any two cross-sections in a member, at

opposite edges of one face of the member. Warpage is defined as the distance by which any point deviates from a plane defined by the other three points. This warpage shall not exceed 1/200 of the width of the member, or 3 mm, whichever is greater.

421.41 Machined Surfaces - Machine-finished surfaces, as designated on the Drawings, shall be coated with an approved protective compound.

421.42 Galvanizing or Metallizing (if required) - All steelwork to be galvanized shall be galvanized after complete fabrication to the requirements of CAN/CSA-G164-M. The galvanizer shall safeguard against embrittlement as required in CAN/CSA-G164-M, Appendix A. Galvanized members shall be subject, at the discretion of the Ministry, to the tests for embrittlement outlined in CAN/CSA-G164-M, Section 5.5.

The chemical composition of steel being galvanized shall be as follows:

• Carbon less than 0.25%

• Phosphorus less than 0.05%

• Manganese less than 1.35%

• Silicon less than 0.03% or between 0.15% and 0.25%

For steel not meeting these chemical composition requirements, special galvanizing techniques shall be developed by the galvanizer to ensure that the specified coating thickness and adherence is achieved. A detailed description of the special techniques shall be submitted to the Ministry Representative for review 2 weeks prior to galvanizing.

All steelwork to be metallized shall, after complete fabrication, be treated in accordance with the current CSA G189. The zinc coating shall not be less than 0.3 mm in thickness.

421.43 Shop Painting - The Drawings or Special Provisions shall specify whether the structure is to be painted, or what parts of a structure are to be painted. This subsection applies to those parts of the steelwork which are to be painted.

For weathering steel bridges, unless specified otherwise, all structural steel shall be painted for the larger of the following two distances from deck joint locations:

• 3000 mm; or

• 1.5 times the superstructure depth (including girder, haunch and slab thickness).

Coating work shall be in accordance with SS 216 unless noted otherwise in SS 421.

All steelwork, which is to be painted, shall be given three

Page 388: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 421 STRUCTURAL STEELWORK

421 (8 of 20) 2006 BC - MOT

shop coats of paint - primer, stripe coat and midcoat. Paint shall be chosen from SS308 System SS1. Paint shall be supplied by the Contractor.

The topcoat may be applied in the shop or in the field. The topcoat coat shall be chosen from either SS308 System SS1 or SF2. If the topcoat is to be applied in the shop, then the Quality Control Program shall specifically address the integrity of the topcoat through to project completion.

Surfaces surrounding bolt holes at connection locations shall receive the prime coat only and shall be masked off so that no stripe coat, midcoat or topcoat paint will be under the bolt heads, washers or nuts. These masked off areas shall have the stripe coat, midcoat and topcoat paint applied in the field after installation of the bolts.

Faying surfaces shall receive the prime coat only, as per SS 421.31.06. Faying surfaces shall not be coated with the stripe coat, midcoat or topcoat paint.

Paint shall be applied in a covered area in accordance with the manufacturer's specifications and SS 216.

All edges, corners, crevices, bolts, nuts, protrusions and welds (unless ground flush) shall be stripe painted by brush for a width of 50 mm with the midcoat paint before the midcoat coat is applied. Stripe coating paint shall be applied as per SSPC-PA1 and may be applied by spray, but shall be brushed in. Stripe painting shall be allowed to cure before the midcoat coat is applied.

Unless a different coating is called for on the Drawings, the exposed steel surfaces of bearings shall be cleaned and painted as structural steelwork.

Surfaces shall be cleaned to "near-white" per SSPC-SP10 / NACE No. 2 and 50 µm to 75 µm (2 to 3 mils) sharp/angular profile.

The midcoat shall be applied to all surfaces including tops and sides of the top flanges, except faying surfaces and surfaces surrounding bolt holes. The midcoat shall not be applied until the primer and stripe coat are accepted by the Ministry Representative to be sufficiently cured.

Any surfaces inaccessible after erection, except faying surfaces and tops and sides of top flanges, shall be given in addition to the three shop coats, one coat of the topcoat paint appropriate for the paint system being used.

If the topcoat is to be applied in the shop, then the topcoat shall be applied after the midcoat is accepted by the Ministry Representative to be sufficiently cured.

The colour of the topcoat will be selected by the Ministry. For weathering steel, unless noted otherwise, the topcoat colour shall match the expected colour of the oxidized surfaces. The proposed colour shall be subject to the acceptance of the Ministry Representative.

421.44 Marking and Shipping - Each member shall be marked by a method agreed to by the Ministry with an erection mark, corresponding to the mark shown on the erection diagram. Each member with a mass of over one tonne shall also be marked with the mass.

Members shall be loaded on trucks or cars in such a manner that they can be transported to and unloaded at their destination without being damaged.

After steelwork has been delivered to Site it shall be inspected by the Contractor’s quality control inspector. The Contractor shall clean the steelwork after it has arrived at Site of any dirt, road salts, slush or other contaminants accumulated during transport and shall carry out any other surface preparation work necessary to meet the specified surface preparation requirements.

421.45 Field Assembly - The parts shall be accurately assembled as shown on the drawings and any matchmarks shall be followed. Hammering which will injure or distort the members shall not be done. Bearing surfaces and surfaces to be in permanent contact shall be cleaned before the members are assembled. Field connections shall have one half of the holes filled with bolts and cylindrical erection pins (half bolts and half pins) before final bolting. Fitting-up bolts shall be the same nominal diameter as the high tensile bolts, and cylindrical erection pins shall be 1 mm larger.

421.46 Straightening Bent Material after Fabrication - The straightening of plates and angles or other shapes shall be done by methods that will not produce fracture or other injury. The metal shall not be heated unless permitted by the Ministry, in which case the heating shall not be to a higher temperature than that producing a "dark cherry red" colour. After heating, the metal shall be cooled as slowly as possible.

Following the straightening of a bend or buckle, the surface of the metal shall be carefully inspected for evidence of fracture, and if necessary, replaced or repaired to the satisfaction of the Ministry.

421.47 Misfits - For all primary connections, and secondary connections having eight or more bolts, 85% of the holes shall accept bolts without reaming. The remaining 15% may be reamed to accept the designed diameter bolts. The diameter of the reamer shall be the same as the drilled hole.

Holes in plates showing more than 5 mm of offset shall be cause for rejection of that plate. New plates, if necessary, shall be field drilled using the hole pattern in the senior member as a template.

421.48 Erection Tolerances - Unless otherwise specified, the misalignment of members after erection shall be within the dimensional tolerances specified in CSA W59-M, but

Page 389: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STRUCTURAL STEELWORK SECTION 421

BC - MOT 2006 421 (9 of 20)

not over 50 mm.

Misalignment shall be measured from vertical lines in the case of columns or towers, and from lines joining the ends of any test length of a member.

Joints, which are required on the drawings to be milled to bear, shall have at least 75% of the entire contact area in full bearing. The separations of any remaining portions shall not exceed 0.25 mm except locally at toes of flanges where a separation of 0.60 mm is permissible.

Where joints are not milled, the opening shall not exceed 13 mm.

421.49 Field Painting - This section applies to those parts of the steelwork which are to be painted. Coating work shall be in accordance with SS 216 unless noted otherwise in SS 421. After the completion of all deck and overhead concrete work, steelwork shall be thoroughly cleaned of all rust, dirt, dust, oil and other foreign materials. Non-visible salts shall meet the SSPC-SP12 / NACE No. 5 NV-2 levels. The shop coats of paint shall be touched up as necessary.

421.49.01 Field Touch-up - Bare, rusty or damaged areas shall be cleaned to SSPC-SP11, Power Tool Cleaning to Bare Metal. Feather edges into the existing coating and build the coating as per SS216. Build the coating using coatings from the specified SS308 System. Coating system shall be from the same manufacturer as the shop coating system on the steel.

After installation, Type 3 bolts, nuts and washers in the areas to be painted shall be cleaned to SSPC-SP11, Power Tool Cleaning to Bare Metal. These bolts, nuts and washers shall then receive the prime coat, stripe coat, midcoat and topcoat paint.

The masked off surfaces surrounding the bolt holes at connection locations shall be cleaned and shall receive the stripe coat, midcoat and topcoat paint.

421.49.02 Topcoat - The topcoat coat shall be chosen from either SS308 System SS1 or SF2.

If the topcoat has not been applied in the shop, then the steelwork shall be given one topcoat coat of paint applied in accordance with the manufacturer's specifications and SS216.

The colour of the finish coat will be selected by the Ministry. For weathering steel, unless noted otherwise, the topcoat colour shall match the expected colour of the oxidized surfaces. The proposed colour shall be subject to the acceptance of the Ministry Representative.

At the completion of the contract, all steelwork, painted or unpainted, shall be cleaned of concrete spatter, mud, oil and other foreign materials.

421.50 Unpainted Weathering Steel - In the case of unpainted weathering steel, the outer faces of the girders and stringers and any other surfaces mentioned in the Special Provisions shall present a uniform surface free of mill scale and, if necessary, shall be power washed and/or sandblasted prior to installation. Concrete splatter adhering to the steel surfaces after the construction of the deck shall be removed and the steel surfaces cleaned.

421.51 Touch-up of Galvanizing and Metallizing - All field welds and other damage in galvanized and metallized coatings shall be touched up as follows:

If the drawings or Special Provisions call for touch-up by metallizing, the damaged areas shall be locally sandblasted to "near white" per SSPC-SP10 / NACE No. 2. All dry abrasive blast cleaned areas shall be metallized in accordance with CSA G189, to provide a zinc coating not less than 0.3 mm in thickness.

Otherwise, the damaged areas shall be thoroughly cleaned and painted with two coats of Ministry-approved organic zinc-rich paint.

QUALITY CONTROL PROGRAM

421.61 Quality Control Program - These Subsections describe the general Quality Control Program required by the Ministry for any Fabricator undertaking the fabrication of permanent steel bridges and steel bridge components.

The term "Quality Control" defines those activities that the Fabricator performs to conform to the contract.

The term "Quality Assurance" defines those activities that the Ministry performs to audit the Contractor's quality control program.

These Subsections contain statements of the Quality Objectives and Policies that the Ministry considers essential for successful and economical quality management. They also outline the Procedures and Documentation to implement and confirm that objectives are met.

The provisions of the Quality Control Program set forth in these Subsections shall apply to all steel bridges and bridge components contracted by or for the Ministry.

These Subsections require the establishment of a Quality Organization with the responsibility for the successful and timely implementation of all necessary Quality Control activities. Some positions shown in the Suggested Organization Chart may be held by the same individual. For example, the General Manager may also be the Contract Administrative Manager and the Purchasing Manager. The Plant Superintendent may also be the Receiver and the Welding Supervisor.

421.62 Quality Objectives and Policies

Page 390: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 421 STRUCTURAL STEELWORK

421 (10 of 20) 2006 BC - MOT

421.62.01 Quality Objectives - The Quality Objectives of the Ministry cover all steel bridges and steel bridge components produced under contract to the Ministry, as follows:

a) Completed products shall conform fully to the governing Codes and Specifications stipulated in the contract document.

b) The Quality Control Program shall be fully integrated into the ongoing manufacturing activities of the Fabricator.

c) The operations of the Quality Control Program shall protect the interests of the Ministry with respect to scheduled delivery date and contracted price.

421.62.02 Quality Policy - The Quality Policy ensures that the product meets the Quality requirements of the contract, is delivered on time, and is produced in a cost-effective manner.

The Quality Control Program applies to all stages of the design, drafting, procurement, manufacturing and testing of the product.

A Quality Control Manager shall be appointed with defined responsibilities in resolving quality matters and shall report to a senior management level. At each hold point, the Quality Control Manager shall:

• Document the successful completion of each stage as it progresses through fabrication and erection;

• Identify and report nonconforming components;

• Initiate or recommend disposition of nonconforming components;

• Verify corrections.

Any persons assigned to perform quality control inspections shall be other than those performing or directly supervising the work and they shall not report directly to immediate supervisors responsible for producing the work.

The Quality Control Program is not subordinate to any design, drafting, procurement, manufacturing or testing activities.

421.63 Scope of the Quality Control Program - The Quality Control Program governs the fabrication of steel bridges and bridge components for the Ministry of Transportation.

The General Manager shall be responsible for:

• adhering to the Quality Control Program in all respects.

• ensuring that completed bridges or bridge components shall conform fully to the applicable design, fabrication and welding codes stipulated in

the Contract.

• ensuring that all required documentation is produced according to the Quality Control Program.

421.64 Range of Capability - The Fabricator shall provide the necessary knowledge, skill (in-house or on a contract basis) and equipment to perform the following work on steel bridges and bridge components:

• Design of connections and joints not shown on Drawings (if applicable);

• Preparation of shop fabrication drawings (if applicable);

• Preparation of bills of material;

• Preparation of material requisitions and purchase orders;

• Receiving, checking and storing materials for bridges;

• Layout, cutting, forming and fitting of parts;

• Assembly, tacking and welding;

• Dimensional checking and verification;

• Resolution of non-conformances;

• Documentation of all stages of work with capability of tracking all major components;

• Cleaning, painting, storing and shipping;

• Erection of bridges and bridge components (if applicable).

421.65 Drawings and Specifications - The Chief Draftsperson shall:

• obtain the latest revision of the design drawings and Specifications for the work;

• submit shop drawings and erection drawings to the Ministry for acceptance before commencement of the work;

• prepare material requisitions containing a full description of the material sizes, material specifications, and certifications required for conformance to the contract;

• deliver the material requisitions to the Purchasing Manager in ample time to permit ordering, delivery and documentation without delaying the work;

• issue requisitions for all sub-contracted drafting work and shall ensure that all conditions of the Contract are part of such sub-contracts.

The Chief Design Engineer shall be responsible for the design of any connections or joints not shown on the design Drawings; and for the design of the erection

Page 391: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STRUCTURAL STEELWORK SECTION 421

BC - MOT 2006 421 (11 of 20)

procedures and any special erection equipment needed.

421.66 Material Control - All materials for bridges and bridge components shall be ordered by the Purchasing Manager in full conformance with the material requisitions provided by the Chief Draftsperson.

The Purchase Orders shall contain all information necessary to ensure that materials purchased will comply fully with the terms of the Contract. Where mill certificates and test reports are required, it shall be so stated on the Purchase Order. Instructions shall state when the certificates and reports are to be delivered to the Fabricator.

If a supplier proposes a substitute for any material, the Purchasing Manager shall refer the proposed substitution to the Chief Design Engineer for review. If the substitute is acceptable to the Ministry the Chief Draftsperson shall amend all drawings and requisitions, withdraw old issues, and issue the new versions.

The Receiver shall:

• inspect all materials on arrival for conformance with the Purchase Orders;

• confirm that mill certificates and test reports are provided and that they correctly identify the materials delivered;

• arrange with the Plant Superintendent to store all materials for the Contract in segregated areas. Clear identification with the Contract shall be provided;

• issue a non-conformance report covering overage, shortage or damage to the materials, and copies of the report shall be provided to the Purchasing Manager and the Quality Control Manager.

The Purchasing Manager shall deliver all documentation to the Quality Control Manager for inclusion in the Quality Control file for the Contract.

421.67 In-Progress Inspection and Reporting - The Quality Control Manager shall ensure that only documented materials are used for the Contract.

All materials intended for incorporation into bridges, girders or complex parts shall be examined after cutting to size, forming and rolling. The Chief Inspector shall ensure conformance with the detailed shop drawings, shall report any non-conformance to the Quality Control Manager and shall order all work affected by the non-conformance to stop, pending approval of remedial action.

Before assembling any plate girders or complex parts, the surfaces of all materials shall be examined for imperfections revealed during previous fabrication operations. The joint edge preparation for all groove welds shall be verified as conforming to the Fabricator's

CWB-approved welding standards and shall be within the acceptable tolerances.

After assembly of any plate girders or complex parts, and before commencing the strength welding, the assembly shall be checked for dimensional conformance. The Welding Supervisor shall ensure that the fit-up of all welded joints conforms to the approved welding standards.

The Quality Control Manager shall file a written report of verification with the General Manager and report any non-conformance.

421.68 Correction of Non-conformance When a non-conformance is encountered, the Quality Control Manager shall determine a recommended disposition and obtain the Ministry's approval as quickly as possible.

If there is non-conformance to the material specification stipulated in the Purchase Order, the Purchasing Manager shall immediately find out the reasons for the delivery of non-conforming material. If the material is of a grade superior to that ordered, the Quality Control Manager and the Chief Engineer shall be notified. They shall verify that the material is an acceptable alternative in all respects, and this verification shall include consultation with the Ministry. If the material is of a grade inferior to that ordered, it shall be rejected and the correct material or a superior material shall be obtained.

If there is non-conformance of material delivery that will delay production, the Contract Administration Manager and Plant Superintendent shall be notified immediately. They shall be given revised delivery dates for the adjustment of production scheduling. The General Manager shall determine the alternatives available and shall notify the Ministry.

If there are non-conformities in material preparation, assembly, joint edge preparation and fit-up before strength welding, the Quality Control Manager and Welding Supervisor shall immediately review the non-conformance and notify the Chief Design Engineer who may require further investigation prior to submitting corrective action to the Ministry for approval. If the necessary corrective action will result in delay to production, the General Manager shall be notified for adjustment to the production schedule. The Plant Superintendent shall inform the Quality Control Manager when the corrective actions are being done so that conformance can be verified and the non-conformance report cancelled.

421.69 Welding - All welding on structural and mechanical components shall be done by the company certified to CSA W47.1 (Division 1 or 2), W47.2-M ( Division 2.1 or better) and W186-M as applicable, and shall be done in accordance with the Fabricator's CWB-approved welding standards.

Page 392: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 421 STRUCTURAL STEELWORK

421 (12 of 20) 2006 BC - MOT

The edge preparations for all groove welds shall conform to the dimensions established in the approved welding standards.

If the joint is to be welded from one side only without back-gouging, the root gap and root face shall be checked to ensure conformance with the required geometry so that the root pass can be successfully completed.

The strength level and chemical composition of all filler materials used in structural and mechanical assemblies shall conform to the approved shop drawings.

All welding consumables shall conform to the approved welding standards and shall be received, stored and conditioned according to the applicable welding standards.

Any preheat required before welding shall be according to the approved welding standards.

The welding procedure followed in welding any joint in a structural or mechanical component shall conform to the applicable Data Sheet in the approved welding standards.

All welders and welding operators welding on structural or mechanical contracts shall be qualified under the requirements of the CSA Standard governing certification.

421.70 Heat Treatment - This covers any post-weld heat treatment necessary to conform to the approved welding standards.

The Chief Design Engineer shall:

• whether any structural or mechanical components shall receive post-weld heat treatment to conform to the contract conditions or to the applicable Codes and Standards.

• inform the Chief Draftsperson of any such requirements so that they may be incorporated on to the approved shop drawings.

Any heat treatment stipulated on the approved shop drawings or contained in the approved welding standards shall be carried out at the appropriate time and according to the approved documents.

The Plant Superintendent shall ensure that any heat treatment stipulated is done according to the established procedures, shall obtain all documentation and reports, and shall deliver them to the Quality Control Manager.

421.71 Non-destructive Testing - The Ministry will test any weld by non-destructive testing methods, as described in Subsection 421.06.

The Plant Superintendent shall schedule the manufacturing operation to facilitate non-destructive testing.

If non-destructive testing of welded joints reveals imperfections that are marginally more than the acceptance standards, the Quality Control Manager shall consult with

the Ministry regarding the location and nature of the imperfections. The effects of leaving minor defects in place shall be assessed in relationship to the loads carried by the joint and the possible adverse effects of making an unnecessary repair.

Weld repairs shall conform to the approved welding standards.

421.72 Calibration of Measurement and Test Equipment - All measurement and testing equipment owned by the Fabricator and used in the Quality Control Program shall be calibrated and re-calibrated at the intervals and in the manner stipulated in the Manufacturer's Instruction Manuals. Any adjusting devices shall be sealed or otherwise protected from unauthorized adjustment or tampering.

421.73 Records Retention - The Fabricator's record file for each Contract shall contain the pertinent drawings, purchase orders, bills of material, material mill certificates, test reports, Quality Control documents, NDT reports and certificates of compliance.

The Fabricator's record file shall be made available to the Ministry's Inspectors upon request.

Items in the Fabricator's record file shall be retained as per company policy.

The Quality Control Manager shall ensure that each file is complete in all respects before it is placed in the Company archives.

421.74 Hold Points - In planning the work flow, the Fabricator shall coordinate with the Ministry Inspector to decide "hold" points for inspection or non-destructive testing. A list of hold points shall be drawn up by the Fabricator and the Ministry at a prefabrication meeting. The Ministry shall be informed of progress so that delays are minimized.

The "hold" points will typically include some of, but not be limited to, the following:

• verification of materials

• after plate is prepared for splicing

• after splicing of plates

• after web to flange weld

• after stiffeners are applied

• camber of girders

• shop assembly

• cleaning and coating

• bearing plate attachment

• shipping arrangements

Page 393: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STRUCTURAL STEELWORK SECTION 421

BC - MOT 2006 421 (13 of 20)

• subassemblies.

Work shall not proceed past a "hold" point until it has been signed off by Quality Control and Quality Assurance. Reports shall be completed promptly.

421.75 Transportation and Installation Procedures - Transportation and installation procedures shall be prepared and submitted for review before any installation takes place on site. The procedures shall be sealed by a professional engineer experienced in bridge erection and registered with the APEGBC. Consideration shall be given to the following items during the preparation of the procedures:

a) Girder Transportation

i) Brief description of hauling equipment;

ii) Location of girder support points;

iii) Engineering backup if supports vary from specifications.

iv) Details of coating protection during loading transporting and erection.

b) Installation Drawings

i) Bridge site plan showing piers, abutments and access roads;

ii) Crane make, crane chart, boom length(s) and crane locations;

iii) Mass of girder and access to crane(s);

iv) Special installation equipment such as a launching truss, head frames and falsework.

c) Commentary

i) Brief point form description of installation sequence.

d) Bearings

i) Placement procedure for bearings to be included for multiple span continuous girders.

e) Traffic Control

i) Any arrangements that will be made for road and/or rail traffic.

f) Utilities

i) Safety and protection.

g) Fall Protection

i) Method and date of installation as required in specifications.

PAYMENT

421.91 Payment

421.91.01 Supply and Fabrication - Payment for supply and fabrication of structural steelwork will be made at the lump sum price bid. Payment shall be for quality control, shop drawings, the supply, bending, cutting, assembly and welding of steelwork, including any galvanizing required. Payment shall also cover trial assembly and storage as necessary.

421.91.02 Shipping and Erection - Payment for shipping and erection of structural steelwork will be made at the lump sum price bid. Payment shall be for quality control, erection drawings and the loading, shipping and unloading of steelwork. Payment shall also cover falsework if necessary and the erection of steelwork.

421.91.03 Painting - Payment for painting of structural steelwork will be made at the lump sum price bid. Payment shall be for the surface preparation and the supply, application and touch-up of paint as required.

Page 394: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 395: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STRUCTURAL STEELWORK SECTION 421

BC - MOT 2006 421 (15 of 20)

SAMPLE FORM #1 - RECEIVING REPORT

Page 396: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 421 STRUCTURAL STEELWORK

421 (16 of 20) 2006 BC - MOT

SAMPLE FORM #2

NON-CONFORMANCE REPORT

BRIDGE NAME: __________________________________ BRIDGE NUMBER: _____________

JOB NUMBERS: __________________________________

IDENTIFICATION DETAILS: ________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

DESCRIPTION OF NON-CONFORMITY: ________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

_______________________ 20____ ______________________________________ Date Signature

CORRECTIVE ACTION: ________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

ACTION AGREED UPON: ___________________________ ___________________________ Quality Control Supervisor Quality Assurance Inspector

DATE COMPLETED: ______________ 20 ___ ______________________________________ Signature

HOLD REMOVED BY: ____________________________________ _________________ 20___ Date QUALITY CONTROL SUPERVISOR: ________________________ _________________ 20___ Date QUALITY ASSURANCE INSPECTOR: _______________________ _________________ 20___ Date

Page 397: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STRUCTURAL STEELWORK SECTION 421

BC - MOT 2006 421 (17 of 20)

SAMPLE FORM #3

MoT

Steel Fabrication Compliance Check List

BRIDGE NAME: _____________________________________ BRIDGE NO. ________________

MARK NUMBER/S: _______________________________________________________________

Q.C. Q.A.

Material: Mill Certificates _____ _____

(Physicals, Chemicals, Impact Category) _____ _____

Identification on materials check _____ _____

Heat number transferred and recorded _____ _____

Welding: Procedures approved for each process _____ _____

Consumables checked _____ _____

Date Completed _____ _____

Page 398: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 421 STRUCTURAL STEELWORK

421 (18 of 20) 2006 BC - MOT

SAMPLE FORM #4

MoT

Steel Fabrication Compliance Check List

BRIDGE NAME: ______________________________________ BRIDGE NO. ________________

MARK NUMBER/S: ________________________________________________________________

Q.C. Q.A.

Welding: Weld preparation and fit up ______ _______ Welding within parameters ______ _______ Identification on materials check ______ _______ Shear studs ______ _______ Visual Inspection ______ _______ NDT outside agency results ______ _______

Q.C. Q.A.

_________________________ _____________________

Req'd Actual Verified

Dimensions: Flanges Top Width 1 ___________ ___________ ______________ Width 2 ___________ ___________ ______________ Flatness ___________ ___________ ______________ Tilt ___________ ___________ ______________

Bottom Width 1 ___________ ___________ ______________ Width 2 ___________ ___________ ______________ Flatness ___________ ___________ ______________ Tilt ___________ ___________ ______________

Web Depth ___________ ___________ ______________

Section Length ___________ ___________ ______________ Bearing Ctr. Length ___________ ___________ ______________ Sole Plate Contract ___________ ___________ ______________

Camber ___________ ___________ ______________ Sweep Tolerance ___________ ___________ ______________ (1/1000)

Splicing Camber ___________ ___________ ______________ Alignment ___________ ___________ ______________ Holes ___________ ___________ ______________

Date Completed ___________ ___________ ______________

Page 399: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

STRUCTURAL STEELWORK SECTION 421

BC - MOT 2006 421 (19 of 20)

SAMPLE FORM #5

MoT

Coating Compliance Check List

BRIDGE NAME: ______________________________________ BRIDGE NO. ________________

MARK NUMBER/S: _______________________________________________________________

Q.C. Q.A.

Coating: WHMIS Safety Data Sheets ______ _____

Technical Spec. Sheets ______ _____

Surface Preparation ______ _____

Ambient Conditions - Req'd ______ _____

- Actual ______ _____

Application ______ _____

Test Results ______ _____

Date Completed ______ _____

Page 400: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 421 STRUCTURAL STEELWORK

421 (20 of 20) 2006 BC - MOT

SAMPLE TAG #6

Page 401: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 422 (1 of 4)

SECTION 422

MISCELLANEOUS STEELWORK

DESCRIPTION

422.01 Scope - This Section covers steelwork apart from major structural steel elements (see Section 421).

422.02 Adherence to Drawings - Steelwork items shall be fabricated in strict accordance with the Drawings.

422.03 Working Drawings - The working drawings shall show all information necessary for the fabrication of the steelwork.

Working drawings shall be in the same system of units as the design Drawings.

Working drawings shall be on D size sheets approximately 560 mm (22") by 865 mm (34"), (one drawing per sheet). Lettering for notes and dimensions shall be at least 2.5 mm and 4 mm for headings. Drawings shall be legible when half-sized or microfilmed.

In the case of simple items, where the design Drawings are complete enough to be used for fabrication, the Contractor may, with approval of the Ministry, dispense with working drawings. The Contractor shall notify the Ministry Representative of such intention in writing.

The Contractor shall submit to the Ministry Representative four sets of all working drawings, for the Ministry's information only, two weeks prior to the fabrication of the steelwork.

422.04 Inspection - The Contractor shall notify the Ministry Representative at least 14 days before fabrication. The Contractor shall allow the Ministry's representatives access to all parts of the work, and shall supply such information and assistance as is required. When the Ministry requests, the Contractor shall provide samples of any materials. Inspection by the Ministry shall not relieve the Contractor from obligation to perform the work in accordance with the contract.

Any welding work found to be unacceptable shall be corrected in accordance with CSA W59-M, Section 5.10.

422.05 Rejections - The Ministry may reject any items which do not comply with the requirements of the contract.

MATERIALS

422.11 Materials - Structural steel, except where shown otherwise on the drawings, shall conform to CAN/CSA-G.40.21-M, Grade 260W or better.

Chemical composition of steel to be galvanized shall be in accordance with Subsection 422.36 – Galvanizing.

The quality and care of electrodes shall conform to the requirements of the latest CSA W59-M.

422.12 Storage of Materials - Structural material shall be stored above ground. It shall be kept free from dirt and other foreign matter, and shall be protected as far as practicable from corrosion. Long members shall be supported on skids placed near enough together to prevent injury from deflection.

CONSTRUCTION

422.31 Welding - All welding shall be done in accordance with procedures approved by the Canadian Welding Bureau (CWB) and reviewed by the Ministry.

All welded fabrication shall be done to the requirements of the latest CSA W59-M.

Welding shall be undertaken by a company approved by the CWB to the requirements of CSA W47.1, Division 3 or better.

422.32 Welders and Welding Operators - The Contractor shall produce evidence that all welders and welding operators to be employed on the work are currently qualified by CWB in the processes in which they are to be employed.

422.33 Flame Cutting - Steel may be flame cut, using a mechanical guide, provided a smooth surface is secured. Flame cutting by hand shall be done only where approved by the Ministry, and the surface shall be made smooth by planing, chipping or grinding. The cutting flame shall be so adjusted and manipulated as to avoid cutting beyond the prescribed lines. Re-entrant cuts shall be filleted to a radius of not less than 10 mm. Edges of tension members shall be ground to a radius of 2 mm.

All exposed corners of members, which are to be painted, shall be ground to a radius of 2 mm.

422.34 Bent Plates - Plates to be bent shall be taken from the stock plates so that the bend line will be at right angles to the direction of rolling. The inside radius of the bend shall not be less than the thickness of the plates. Before bending, the corners of the plate shall be ground to a radius of 2 mm throughout the part to be bent.

422.35 Shop Painting - This subsection applies to those parts of the steelwork which are to be painted.

Coating work shall be in accordance with SS 216 unless noted otherwise in SS 422.

All steelwork, which is to be painted, shall be given three shop coats of paint - primer, stripe coat and midcoat. Paint shall be chosen from SS308 System SS1. Paint shall be supplied by the Contractor.

The topcoat may be applied in the shop or in the field. The topcoat coat shall be chosen from either SS308 System SS1 or SF2. If the topcoat is to be applied in the shop, then the Quality Control Program shall specifically address the

Page 402: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 422 MISCELLANEOUS STEELWORK

422 (2 of 4) 2006 BC - MOT

integrity of the topcoat through to project completion.

Faying surfaces shall receive the prime coat only, as per SS 421.31.06. Faying surfaces shall not be coated with the stripe coat, midcoat or topcoat paint.

Paint shall be applied in a covered area in accordance with the manufacturer's specifications and SS 216.

All edges, corners, crevices, bolts, nuts, protrusions and welds (unless ground flush) shall be stripe painted by brush for a width of 50 mm with the midcoat paint before the midcoat coat is applied. Stripe coating paint shall be applied as per SSPC-PA1 and may be applied by spray, but shall be brushed in. Stripe painting shall be allowed to cure before the midcoat coat is applied.

Surfaces shall be cleaned to "near-white" per SSPC-SP10 / NACE No. 2 and 50 µm to 75 µm (2 to 3 mils) sharp/angular profile.

The midcoat shall be applied to all surfaces including tops and sides of the top flanges, except faying surfaces. The midcoat shall not be applied until the primer and stripe coat are accepted by the Ministry Representative to be sufficiently cured.

Any surfaces inaccessible after erection, except faying surfaces, shall be given, in addition to the three shop coats, one coat of the topcoat paint appropriate for the paint system being used.

If the topcoat is to be applied in the shop, then the topcoat shall be applied after the midcoat is accepted by the Ministry Representative to be sufficiently cured.

The colour of the topcoat will be selected by the Ministry. The proposed colour shall be subject to the acceptance of the Ministry Representative.

422.36 Galvanizing (if required) - All steelwork to be galvanized shall be galvanized after complete fabrication to the requirements of CAN/CSA-G164-M. The galvanizer shall safeguard against embrittlement as required in CAN/CSA-G164-M, Appendix A. Galvanized members shall be subject, at the discretion of the Ministry, to the tests for embrittlement outlined in CAN/CSA-G164-M, Section 5.5.

The chemical composition of steel being galvanized shall be as follows:

• Carbon less than 0.25%

• Phosphorus less than 0.05%

• Manganese less than 1.35%

• Silicon less than 0.03% or between 0.15% and 0.25%

For steel not meeting these chemical composition requirements, special galvanizing techniques shall be developed by the galvanizer to ensure that the specified

coating thickness and adherence is achieved. A detailed description of the special techniques shall be submitted to the Ministry Representative for review 2 weeks prior to galvanizing.

422.37 Metallizing (if required) - All surfaces to be metallized shall be treated after complete fabrication in accordance with CSA G189. The zinc coating shall not be less than 0.3 mm in thickness.

422.38 Installation - Steelwork shall be installed as shown on the Drawings.

Railings and fences shall be adjusted to produce uniform height and smooth alignment.

Field welding will be permitted only as shown on the Drawings.

422.39 Field Painting (if required) - This section applies to those parts of the steelwork which are to be painted .

Coating work shall be in accordance with SS 216 unless noted otherwise in SS 422.

All steelwork shall be thoroughly cleaned of all rust, dirt, dust, oil and other foreign materials. Non-visible salts shall meet the SSPC-SP 12 / NACE No. 5 NV-2 levels. The shop coats of paint shall be touched up as necessary.

422.39.01 Field Touch-up - Bare, rusty or damaged areas shall be cleaned to SSPC-SP11, Power Tool Cleaning to Bare Metal. Feather edges into the existing coating and build the coating as per SS216.. Build the coating using coatings from the specified SS308 System. Coating system shall be from the same manufacturer as the shop coating system on the steel.

422.39.02 Topcoat - The topcoat coat shall be chosen from either SS308 System SS1 or SF2.

If the topcoat has not been applied in the shop, then the steelwork shall be given one topcoat coat of paint applied in accordance with the manufacturer's specifications and SS216.

The colour of the finish coat will be selected by the Ministry. The proposed colour shall be subject to the acceptance of the Ministry Representative.

422.40 Touch-Up of Galvanizing and Metallizing - All field welds and other damage in galvanized and metallized coatings shall be touched up as follows:

If the contract documents call for touch-up by metallizing, the damaged areas shall be locally sandblasted to "near white" per SSPC-SP10. All sandblasted areas shall be metallized in accordance with CSA G189, to provide a zinc coating not less than 0.3 mm in thickness.

Otherwise, the damaged areas shall be thoroughly cleaned, and painted with two coats of Ministry-approved organic

Page 403: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

MISCELLANEOUS STEELWORK SECTION 422

BC - MOT 2006 422 (3 of 4)

zinc-rich paint.

422.41 Clean-up - At the completion of the contract, all miscellaneous steelwork shall be cleaned of concrete spatter, mud, oil and other foreign materials.

PAYMENT

422.91 Payment - Payment for miscellaneous steelwork will be made at the lump sum price(s) bid. Payment shall be for shop drawings and the supply, fabrication, galvanizing and/or painting if required and installation of the steelwork.

Page 404: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 422 MISCELLANEOUS STEELWORK

422 (4 of 4) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 405: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC – MOT 2006 501 (1 of 26)

SECTION 501

HOT MIXED ASPHALT PAVEMENT

PART A - GENERAL

501.01 Preliminary and General - This Section describes the materials, equipment and quality of work required for the construction of hot mixed, hot laid asphalt pavement.

501.02 General Description of Work - Generally, the work consists of:

a) Supplying, screening, crushing or any other method of processing, and improving aggregate to produce asphalt mix aggregate.

b) Priming or tack coating the prepared surface.

c) Heating the asphalt mix aggregate and mixing it with asphalt cement to produce asphalt mix.

d) Hauling, placing and finishing the asphalt mix to produce a high quality asphalt pavement.

501.03 Asphalt Pavement Classifications - The Class of asphalt pavement required under the contract will be stated in the Special Provisions and will be generally designated as follows:

• Class 1 - Highways for Heavy Traffic • Class 2 - General Highways

Pavement Classification as Determined by ESAL

Class 1 pavements shall be utilized where the estimated Equivalent Single Axle Load (ESAL) is greater than 1,000,000 based on a twenty year life span of the pavement structure and an average 4% annual traffic growth rate.

Class 2 pavements shall be utilized where the ESALs are less than 1,000,000 based on the same premise.

PART B - MATERIALS

All types of hot mix material produced under this section shall be paver laid and of high quality and carefully controlled.

Asphalt mix referred to in this text means any and all of the asphalt cement bound mixes listed in this section.

501.11 Definitions

501.11.01 Hot Mix Asphalt Cement - penetration grade asphalt used in the asphalt pavement.

501.11.02 Cutback Asphalt - penetration grade asphalt

which has been blended with light petroleum distillates.

501.11.03 Emulsified Asphalt - penetration grade asphalt that has been blended with water and emulsifying agents to form aqueous emulsions, including anionic type, cationic type and High Float type.

501.11.04 Aggregate - the crushed or screened gravel.

501.11.05 Asphalt Mix Aggregate - the processed crushed aggregate just prior to the addition of asphalt cement.

501.11.06 Asphalt Base Course Mix Aggregate - the processed crushed 25 mm minus aggregate just prior to the addition of asphalt cement.

501.11.07 Recycled Asphalt Mix Aggregate - the processed crushed aggregate for blending with reclaimed asphalt pavement just prior to the addition of asphalt cement and reclaimed asphalt pavement.

501.11.08 Supplementary Aggregate - a crushed or uncrushed aggregate of specified gradation, which, when added to aggregate meeting the requirements of Subsections 501.15.01 through 501.15.03 will produce asphalt mix aggregate required by the asphalt mix design.

501.11.09 Asphalt Mix (AM) - hot plant mixture of asphalt cement and dense graded high quality aggregate.

501.11.10 Asphalt Levelling Course (LC) - asphalt mix used to improve crossfall, level, and strengthen existing pavements.

501.11.11 Asphalt Pavement (AP) - paver laid asphalt mix compacted to uniform density.

501.11.12 Additives - solid or liquid materials to enhance the properties of the liquid asphalt cement or mix.

501.11.13 Reclaimed Asphalt Pavement (RAP) - asphalt pavement that has been milled with a cold milling machine.

501.11.14 Asphalt Base Course Mix (ABC) - a hot plant mix of asphalt cement and asphalt base course aggregate with lower asphalt cement content than conventional mixes.

501.11.15 Recycled Asphalt Mix (RAM) - a carefully controlled, hot plant mix of asphalt cement, graded high quality aggregate and reclaimed asphalt pavement.

501.11.16 Recycled Asphalt Base Course Mix (RABC) - a hot plant mix of asphalt cement, reclaimed asphalt pavement and asphalt base course aggregate.

Page 406: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 501 HOT MIXED ASPHALT PAVEMENT

501 (2 of 26) 2006 BC – MOT

501.11.17 Reject Mix - shall be that mix that is deemed unacceptable for use in the project by the Ministry Representative.

501.11.18 Surplus Mix - shall be that mix that is deemed to be surplus by the Ministry Representative through improper construction practices, poor estimating at shift end and tie-ins, truck overloads and poor operational practices.

501.12 Supply and Handling of Asphalt Materials

501.12.01 Asphalt Cement and Liquid Asphalt Cutback and Emulsion - Unless otherwise specified, the Ministry will supply the asphalt cement and liquid asphalts required for the work f.o.b. plant site and job site, respectively.

501.12.02 Labour and Equipment - The Contractor shall supply all labour and equipment to remove asphalt cement and liquid asphalts from tank trucks. No separate payment will be made for taking delivery, removal, transportation within the job site and storage of said materials.

501.12.03 Demurrage-free Unloading Period - The demurrage-free unloading period for trucks hauling asphalt material to the job will be two hours.

501.12.04 Demurrage Incurred - Demurrage incurred due to the Contractor's method of operation shall be certified by the Contractor's Representative at the job site.

501.12.05 Invoicing - The Asphalt Supplier will invoice the Ministry directly within one month from the demurrage occurrence; and in turn the Ministry will review the charges and will recover from the Contractor the approved amount as certified in Subsection 501.12.04, plus a 10% surcharge to cover administration and overhead.

Freight costs resulting from the delivery and return of asphalt to the refinery will be recovered from the Contractor as specified in Subsection 951.06.03 without any other surcharge.

501.12.06 Asphalt Shipments - The Contractor shall give adequate notice to the Asphalt Supplier both to ship asphalt and to cancel ordered shipments. By agreement with the Asphalt Suppliers, notice to ship must be given:

i) For tank truck deliveries, 24 hours before dispatch of a load.

ii) For rail tank car deliveries, 72 hours before dispatch of a load, except that the period between 17:00 Saturday and 08:00 Monday is not included in the 72 hour notice time.

Notice of cancellation of shipments must reach the Supplier

four hours before the dispatch time of a load.

The original order to ship or cancel may be given by telephone, but a confirmatory telegram, telex, or facsimile must reach the Supplier's shipper four hours before the time for dispatch of a shipment or the telephone order may be considered to be cancelled. Cancellation must also be confirmed by telegram before the dispatch time for a shipment. The cost of all telephone calls, telegrams and telexes made by the Contractor shall be to the Contractor's account.

501.13 Standard Tests

501.13.01 Asphalt Mix Aggregates - The asphalt mix aggregates will be tested in accordance with the listed ASTM tests or, when no ASTM test is designated, the applicable British Columbia Ministry of Transportation (Geotechnical and Materials Engineering Branch) Manual of Test Procedures for Paving Materials and Mixes except tests BCH I - 5, I - 8, I - 9, I - 10, I - 11, and I - 12 which are in the Manual of Test Procedures Soils and Mineral Aggregates (see Table 501-A).

501.13.02 Asphalt Mix and Asphalt Pavement - The asphalt mix and asphalt pavement will be tested in accordance with the listed ASTM tests or, when no ASTM test is designated, the British Columbia Ministry of Transportation (Geotechnical and Materials Engineering Branch) Manual of Test Procedures for Paving Materials and Mixes (see Table 501-B).

501.13.03 Granular Shoulder Materials and Constructed Shoulders - The granular shoulder materials and the constructed shoulders will be tested in accordance with the listed ASTM tests or, when no ASTM test is designated, the British Columbia Ministry of Transportation (Geotechnical and Materials Engineering Branch) Manual of Test Procedures Soils and Mineral Aggregates (see Table 501-C).

501.14 Asphalt Mix Aggregate Requirements - The crushing of all paving aggregate shall conform to the requirements of Subsection 202.09.

No asphalt mix aggregate shall have a degradation factor of less than 35 when tested in accordance with BCH test BCH I-9.

501.14.01 Coarse Aggregates:

i) shall be all mineral matter retained on the sieve designated for each individual test.

ii) shall consist of crushed stone, crushed gravel, or combination thereof, or materials naturally occurring in a

Page 407: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

HOT MIXED ASPHALT PAVEMENT SECTION 501

BC – MOT 2006 501 (3 of 26)

fractured condition, or materials naturally occurring of highly angular nature or rough texture.

iii) shall be free from coating of clay, silt or other deleterious material, and shall meet the requirements listed in Table 501-D.

501.14.02 Fine Aggregate:

i) shall be all mineral matter passing the sieve designated for each individual test.

ii) shall be clean, tough, durable, moderately sharp, and free from coatings of clay, silt, or other deleterious material, and shall contain no clay balls or other aggregations of fine material.

iii) shall have a maximum mass loss after five cycles of

not more than 18% and 23% for pavement Classes 1 and 2 respectively when tested in accordance with Test BCH I-5.

iv) shall have a sand equivalent value of not less than 40 when tested in accordance with Test BCH I-8.

501.14.03 Mineral Filler and Mineral Dust

i) The Mineral filler shall consist of all mineral matter passing the 0.600 mm sieve and the mineral dust shall consist of all mineral matter passing the 0.075 mm sieve.

ii) Mineral filler and mineral dust shall be free from organic matter.

iii) Mineral filler shall be non-plastic mineral filler when tested in accordance with Test BCH I-11 and BCH I-12.

TABLE 501-A TESTS FOR ALL ASPHALT MIX AGGREGATES AND SUPPLEMENTARY AGGREGATES

TEST DESIGNATION TITLE OF TEST

BCH ASTM

I - 1 C - 136 Sieve Analysis (Dry)

I - 2 C - 117 Sieve Analysis (Wash)

I - 3 C - 127 Relative Density & Absorption - Coarse Aggregate

I - 4 C - 128 Relative Density & Absorption - Fine Aggregate

I - 5 C - 88 Aggregate Soundness (Magnesium Sulphate) Tests Granular Surfacing & Base Aggregates

I - 6 D - 2216 Moisture Content Determination

C - 566

I - 7 ----- Clay Lumps and Friable Particles in Aggregates

I - 8 D - 2419 Sand Equivalent Test

I - 9 ----- Degradation Test

I - 10 D - 421 Preparation of Samples for Atterberg Limit

I - 11 D - 4318 Liquid Limit

I - 12 D - 4318 Plastic Limit

I - 13 Method

B

----- Fracture Count for Coarse Aggregate - by mass - retained on the 4.75 mm sieve

TABLE 501-B TESTS FOR ASPHALT MIX AND ASPHALT PAVEMENT

BCH ASTM TITLE OF TEST

II - 6 D - 2172 Quantitative Extraction of Asphalt from Bituminous Mixes

II - 7 --- Degree of Compaction of Insitu Asphalt Mix Using Cored Samples

II - 9 D - 2950 Degree of Compaction of Insitu Asphalt Mix by Nuclear Method

II - 10 --- Procedure for the Determination of the British Columbia Pavement Smoothness Rating

II - 11 --- British Columbia Segregation Rating

II - 15 --- Form Plant Briquettes

TABLE 501-C TESTS FOR GRANULAR SHOULDER MATERIALS AND CONSTRUCTED SHOULDERS

BCH ASTM TITLE OF TEST

D - 698 Moisture Density Relation Determination, Standard Proctor

I – 15 D - 2167 In-situ Density, using the Washington Densometer

I – 16 D - 2922D - 3017

Field Density Test using Nuclear Gauge

Page 408: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 501 HOT MIXED ASPHALT PAVEMENT

501 (4 of 26) 2006 BC – MOT

501.15 Asphalt Mix Design

501.15.01 Gradation Limits - The Contractor shall supply aggregates falling within the grading limits as specified in Table 501-E when tested in accordance with Test BCH I-2.

501.15.02 Gradation Refinements - If the gradation of the aggregate supplied by the Contractor does not fall within the gradation limits specified, such refinements will be made to the gradation as are necessary to comply with the said gradation limits at the Contractor's expense.

501.15.03 Grading Curve - Once the grading curve is established within the above limits, the maximum permissible variation of the mean of any four consecutive tests from the grading curve shall be within the tolerance specified in Table 501-F.

These tolerances do not waive the requirement that the running average of four consecutive tests must be maintained at all times inside the limits specified in Subsection 501.15.01. Should the Contractor be unable to maintain the grading curve within the limits specified in Subsection 501.15.01, the Contractor shall, at the Contractor's cost, carry out refinements as required to shift the grading curve away from the limits of Subsection 501.15.01 so as to ensure that a variation cushion, as

specified by the maximum permissible tolerances shown in Table 501-F, is effected within the limits of Subsection 501.15.01.

501.15.04 Asphalt Mix Design - Unless otherwise specified, the Ministry (C) will carry out the asphalt mix design with the aggregate supplied by the Contractor.

TABLE 501-D REQUIREMENTS FOR COARSE AGGREGATES

BCH REQUIREMENTS PAVEMENT CLASSES

TEST 1 2

I - 3 Maximum water absorption: % by mass

2 2

I - 5 Maximum loss after 5 cycles 15 20

I - 7 Maximum % by mass of clay balls and friable particles

1.0 1.5

I - 13 Method B - 2 Fractured Faces: Minimum % by Mass retained on the 4.75 mm sieve

85 70

TABLE 501-E GRADATION LIMITS FOR AGGREGATES

SIEVE PERCENTAGE BY MASS PASSING (BCH I - 2)

SIZE (mm) COARSE

ASPHALT MIX MEDIUM

ASPHALT MIX FINE ASPHALT

MIX ASPHALT BASE COURSE MIX

ASPHALT BOUND OPEN GRADED

BASE MIX

37.5 100 --- --- --- ---

25.0 80 - 100 --- --- 100 100

19.0 60 - 92 100 --- 80 - 94 75 - 100

12.5 50 - 85 84 - 95 100 --- ---

9.50 40 - 80 73 - 90 90 - 100 50 - 84 30 - 60

4.75 30 - 65 50 - 75 55 - 80 25 - 55 5 - 30

2.36 20 - 50 35 - 57 32 - 64 20 - 45 0 - 10

1.18 15 - 35 26 - 45 24 - 51 15 - 35 ---

0.600 8 - 30 18 - 34 17 - 40 --- ---

0.300 6 - 22 10 - 26 13 - 29 5 - 20 0 - 8

0.150 3 - 15 6 - 17 8 - 18 --- ---

0.075 1 - 7 3 - 7 4 - 10 0 - 5 0 - 4

Page 409: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

HOT MIXED ASPHALT PAVEMENT SECTION 501

BC – MOT 2006 501 (5 of 26)

The asphalt mix design will establish the design grading curve which will define the proportional amounts of coarse, fine and supplementary aggregates required in the mix.

Should the Contractor, after having provided an aggregate whose gradation falls entirely within the gradation requirements as set out in Subsections 501.15.01 through 501.15.03, be directed to reject or add other aggregate(s) in order to meet the design grading curve established by the Ministry Representative, the Contractor will be compensated at the rate(s) specified in Appendix C.

501.15.05 Transportation by Barge - Any material transported by barge must be tested and approved by the Ministry Representative prior to loading onto the barge, and shall be rechecked prior to unloading before being accepted for use.

501.15.06 Requirements - All ingredients supplied by the Contractor for incorporation into the asphalt pavement shall meet all the applicable requirements of Sections 501 and 951 as determined by the Ministry Representative. The mix and finished pavement shall meet all the requirements of this section.

The asphalt mix design, meeting the appropriate Marshall Design requirements of Appendix A, will be performed by the Ministry.

The Contractor shall provide the Ministry Representative with the following at least seven days prior to commencement of the paving:

i) A 100 kg sample of representative asphalt mix aggregate, properly bagged and labelled. The label is to show Project No., type of aggregate, source and stockpile location.

ii) A 5 l sample of asphalt cement showing refinery, batch number and date sampled.

iii) A stockpile gradation showing daily test results and stockpile average as determined by BCH Tests I-1 and I-2.

501.15.07 - The Ministry Representative shall further determine the need to modify the asphalt mix design for all lifts of pavement to minimize any deformation identified by the Hveem Design criteria in Appendix A. The Hveem Design will be performed by the Ministry.

Should the Contractor, having provided a mix design meeting the requirements of Appendix A, be directed to reject aggregate or add supplementary aggregate or additives to meet these modifications, the Contractor will be compensated at the rate(s) specified in Appendix C.

501.16 Asphalt Mix Requirements

501.16.01 Test - Asphalt Mix Aggregate - During all phases of the construction of asphalt pavement, the gradation of the asphalt mix aggregate will be determined in accordance with Test BCH I-1 and BCH I-2.

i) Samples for this test will be obtained at the asphalt plant prior to addition of the asphalt cement and/or after extraction of the asphalt cement from the asphalt mix, obtained from samples taken at the asphalt plant and/or at the roadway before and/or after compaction.

ii) For this test the maximum permissible variation from the design grading curve on correlation with data obtained by Test BCH I-2 from the crusher, when the aggregate is tested according to BCH1-2, shall be as detailed in Subsections 501.15.01 and 501.15.03. If a consistent variation in the gradation occurs in after production aggregate tests, the cold feed bin settings may be adjusted to produce the correct gradation at the road as directed by the Ministry Representative.

501.16.02 Test - Asphalt Mix - The asphalt mix will be tested in accordance with Test BCH II-6 and the measured asphalt cement content shall not vary from the design asphalt content by more than " 0.3 kg/100 kg of aggregate.

501.16.03 Mixing Temperature - The mixing temperature of the asphalt mix will be selected by the Ministry Representative. (It will normally be within the temperature range which corresponds to a kinematic viscosity of 150 to 300 mm2/s of the asphalt cement.)

501.16.04 Temperature Behind Screed - The asphalt mix

TABLE 501-F MAXIMUM PERMISSIBLE TOLERANCE OF AGGREGATE FROM THE GRADING CURVE

SIEVE SIZE(mm)

MAXIMUM PERMISSIBLE TOLERANCE % PASSING BY MASS (TEST BCH I - 1 AND 2)

25.0 and larger ± 5.0

4.75 to 19.0 ± 4.5

1.18 and 2.36 ± 4.0

0.600 ± 3.5

0.300 ± 2.5

0.150 ± 1.5

0.075 ± 1.0

Page 410: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 501 HOT MIXED ASPHALT PAVEMENT

501 (6 of 26) 2006 BC – MOT

temperature immediately behind the screed shall not be more than 15oC lower than the mixing temperature.

501.16.05 Residual Moisture Content - The residual moisture content of the asphalt mix taken in the loaded truck, at the point of loading, shall not exceed 1% by mass. Should foaming or bubbling persist, even below the allowed percentage of moisture, the Contractor shall modify the operations accordingly.

501.17 Asphalt Pavement

501.17.01 In-place Density - The in-place density of the asphalt pavement will be obtained at random locations and the Degree of Compaction will be computed from the formula:

Degree of Compaction

= In-Place Density of Sample Plant Briquette Density

x 100

The Degree of Compaction of the mean of any five consecutive tests shall be greater than 97%.

501.17.02 Smoothness Rating - The smoothness rating of the finished asphalt pavement will be determined in accordance with BCH II-10. Wherever multiple lifts are used, the top lift must meet the requirements of "A" or "B" as defined in Appendix B of this section when measured with the B.C. Smoothness Gauge. Notwithstanding the above, where multiple lift construction is carried out, no matter what method of construction is used, each lift shall have an equal or better rating than the previous course. Where single lift paving is carried out, the B.C.P.S.G. requirements shall meet the "C" rating and shall be better than the original surface rating. The ratings referred to in this section are those laid out in Appendix B of this section.

For test purposes, the B.C.P.S.G. reading will be taken at random locations throughout the length of the project, prior to the commencement of work. Testing of the newly placed surface shall utilize the same locations as the original test sections. However, should any area of the contractor work be suspect it shall be tested using the B.C.P.S.G. and the rating shall be compared to the average of the previous course's test results for acceptance or rejection purposes.

501.17.03 Finished Pavement - All finished pavement shall be free from depressions, bumps, or other irregularities exceeding 5 mm over a 3 m straight edge, placed in any direction.

501.17.04 Requirements - The pavement shall be homogeneous, free from segregation and shall be uniform with respect to surface texture, and when tested in accordance with BCH Test II-11 shall have a segregation rating of lower than 20%.

501.17.05 Remedial Work - Areas failing to meet the requirements of Subsections 501.17.01 through 501.17.04 shall be corrected at the Contractor's expense. Remedial procedures may be selected by the Contractor subject to approval by the Ministry Representative.

The remedial work shall meet all specification requirements and criteria intended for the original work.

PART C - EQUIPMENT AND PLANT

All equipment, plant and instrumentation shall be capable of performing the work in accordance with this section.

501.21 Requirements for the Pressure Distributor and Liquid Asphalt Storage

501.21.01 Pressure Distributor - The pressure distributor shall be provided with at least the following equipment:

i) A quick opening gate in the dome.

ii) An external, readily visible depth gauge, indicating the quantity of asphalt in the tank to the nearest 50 l and:

• a dipstick calibrated in 20 mm increments and a calibration chart showing the volume for each 20 mm of depth, or;

• the manufacturer's calibrated dipstick and chart.

iii) A means of heating the asphalt material uniformly to any temperature up to 175oC and maintaining the contents constantly at any selected temperature, without any local overheating.

iv) A heavy duty, industrial type thermometer or remote reading dial thermometer.

v) Rear mounted spray bars and nozzles set parallel to the surface to be sprayed and capable of vertical and lateral adjustment.

The spray bars shall be capable of adjustment to provide a uniformly sprayed surface from a minimum of 0.6 m to a maximum of 6 m.

The spray bars shall be capable of producing double coverage at one pass.

The feed to the spray bars shall be so arranged that there is a constant circulation of hot asphalt material to the bars to ensure a constant pressure of the liquid asphalt at each nozzle during spraying operations.

The feed manifolds to the spray bars shall be provided with adequate filtration to prevent clogging of bars and

Page 411: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

HOT MIXED ASPHALT PAVEMENT SECTION 501

BC – MOT 2006 501 (7 of 26)

nozzles.

Spray bar nozzles shall be of the same type, size and manufacture and set to produce uniformly fan-shaped sprays without atomization.

Spray nozzles shall be provided with valves capable of instant full opening and positive cut-off.

vi) A connection to a circulating pressure manifold to which a hose may be attached for a single nozzle hand operated outlet.

vii) A pressure pump capable of applying the asphalt material at a minimum rate of 180 l per minute per metre of spray bar.

viii) A pressure gauge accurate to within 15 kPa and a meter calibrated in litres per minute, shall be readily visible.

ix) A fifth wheel tachometer, calibrated in metres per minute and readily visible.

501.21.02 Liquid Asphalt Storage - The Contractor shall provide a minimum 40 000 l capacity of on site storage for primer materials.

501.22 Requirements for all Mixing Plants

501.22.01 Uniformity - Plants shall be capable of producing a uniform and homogeneous asphalt mix, as specified.

501.22.02 Equipment - Preparation of Asphalt Cement

i) The Contractor shall supply a minimum of two insulated tanks for the storage of asphalt cement. The tanks shall be equipped with means for heating the material under effective control at all times to the temperatures required, and shall have a total minimum storage capacity equivalent to 10 hours of plant actual maximum production capacity.

The tanks shall be connected to the circulating system such that each tank can be separately isolated from the system, without interfering with the circulation of asphalt cement to the plant.

Each tank shall be provided with its own calibrated dipstick and chart.

ii) Asphalt cement shall be supplied to the mixing plant by a force feed pump placed at the outlet manifold from the storage tank.

iii) The asphalt circulating system shall conform to the requirements indicated on Drawings SP501-01 through SP501-03.

iv) All pipe lines, valve boxes, pumps, meter weigh buckets, other containers or flow lines shall be provided with a suitable means of heating or insulation to prevent heat loss and to maintain the asphalt cement at the specified temperature between storage tank and mixer.

501.22.03 Dust Collectors

i) The Contractor shall provide and install such systems of dust collection as may be required to meet all existing regulations.

ii) Provisions shall be made to re-use the collected material, if required.

501.22.04 Asphalt Cement Control Unit

i) Satisfactory means shall be provided to measure the amount of asphalt cement to be added to the mix with all measuring devices being accurate to ± 2%.

ii) A readily accessible totalizer meter shall be provided to record the total asphalt cement delivered to the mixer during mixing operations.

iii) Mix production from plants equipped with volumetric metering devices shall stop whenever the temperature of the asphalt cement passing through the devices fluctuates by more than ± 5oC from the temperature established by the Ministry Representative and for which the metering device has been calibrated. Mixing shall only resume when the temperature of the asphalt has been brought within the permissible operating range.

501.23 Requirements for Batch Plants and Continuous Plants

501.23.01 Screens - Screens shall be capable of screening all aggregate to the sizes required for accurate proportioning and shall have a designed capacity slightly in excess of the full operating capacity of the mixer.

501.23.02 Plant Bins

i) The plant shall be provided with hot aggregate storage bins of sufficient size to ensure uniform and continuous operation of the plant at its rated capacity. There shall be at least three bins. All bins shall normally be utilized for gradation control of the aggregate.

Page 412: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 501 HOT MIXED ASPHALT PAVEMENT

501 (8 of 26) 2006 BC – MOT

A minimum number of two bins may be used, with the approval of the Ministry Representative, if the variation in the crusher gradation analyses conforms to the maximum variation allowances described in Subsection 501.15.03.

The bins shall be arranged to ensure separate and adequate storage of the required fractions of aggregate. Each bin shall be provided with an overflow chute of such size and at such location as to prevent backing up of material into other bins. Overflow material shall be wasted.

ii) An adequate additional dry storage bin shall be provided for additives when required, and satisfactory provision made for proportioning into the mix.

iii) Bins shall be provided with electronic type telltales which shall register on an indicator board plainly visible to the plant operator. When the bins empty to the lower third a red lamp shall light up and mixing shall stop immediately.

iv) Convenient means shall be provided for obtaining truly representative samples from each bin.

501.23.03 Thermometric Equipment

i) An accurate multipoint continuous recording pyrometer or other approved instrument having a temperature range of 50oC to 200oC subdivided into 2oC graduations shall be centrally situated in a protected position where it is readily visible to the plant operator.

ii) Premium grade thermocouples or resistance thermometer bulbs shall be properly installed and protected at the following reference points:

• In the dryer exhaust manifold between the exhaust fan and the primary dust collector.

• In the dryer discharge chute. • In the fine aggregate bin, not higher than the

bottom quarter point of the bin and as near to the bin discharge point as practicable. The temperature reference point must protrude sufficiently into the aggregate stream flow and be protected by a small diameter tube to prevent the build up of a coat of fine material.

• In the asphalt circulating main pipe at the nearest elbow or junction to the spray bars or asphalt bucket.

• In each asphalt storage tank, to register the true temperature of the asphalt cement at the level of the tank outlet without sensing temperature effects from the tank heating coils or external conditions.

501.24 Special Requirements for Batch Plants

501.24.01 Plant Scales - Scales for any weigh box or hopper may be either standard beam or springless dial type accurate to 0.5% of the maximum indicated load.

Scales shall be tested as often as the Ministry Representative may deem it necessary to ensure their accuracy. The Contractor shall provide and have at hand a satisfactory number of standard weights for frequent testing of all scales. For each scale, a suitable cradle or platform shall be provided for applying the test load so that the load is uniformly distributed. The test weights shall be kept clean and stored near the scales.

501.24.02 Time Lock and Batch Counter - The mixer shall have an accurate time lock to control the operation of a complete mixing cycle by locking the weigh box gate after the charging of the mixer, until the closing of the mixer gate at the completion of the cycle. It shall lock the mixer gate throughout the dry and wet mixing periods.

The dry mixing period is defined as the interval of time between the opening of the weigh box gate and the application of asphalt cement; the wet mixing period is the interval of time between the application of asphalt cement and the opening of the mixer gate.

The control of the timing shall be flexible and capable of being set at intervals of not more than two seconds throughout cycles up to three minutes. A mechanical batch counter shall be installed as part of the timing device and shall be designed to register only completely mixed batches.

501.25 Special Requirements for Continuous Plants

501.25.01 Calibration of Asphalt Pumps and Aggregate Feed

i) The plant shall be provided with a means of calibrating gate openings and volumetric pumps by means of mass test samples.

The asphalt mix aggregate fed through individual bin orifices shall be capable of being diverted into a suitable test box with separate compartments for each aggregate size.

The test box shall be equipped to handle conveniently such test samples varying between 100 kg and 250 kg. The plant shall be equipped with an accurate revolution counter mounted on the aggregate feed apron to the mixer.

ii) In order to calibrate the volumetric proportioning of asphalt cement, the section of the asphalt flow line

Page 413: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

HOT MIXED ASPHALT PAVEMENT SECTION 501

BC – MOT 2006 501 (9 of 26)

between the circulating return valve and the spray bar shall be provided with a valve and outlet suitable for bypassing the flow from the volumetric proportioning device into containers capable of holding not less than 2500 l. The sampling line shall be fitted with nozzles equal in type and quantity to the pugmill spray bar. The operating pressure, as registered by the gauge installed upstream of the asphalt meter, for a selected pump setting shall not vary during mixing.

iii) A platform scale shall be provided by the Contractor for determining the mass of test samples of aggregate and asphalt cement.

501.25.02 Aggregate - Asphalt Cement Interlock - Synchronization of aggregate and asphalt cement feeds shall be provided to allow interlocking control between the flow of aggregate from the bins and the flow of asphalt cement from the meter or other proportioning source.

501.25.03 Asphalt Mix Aggregate Sampling - An efficient and satisfactory method shall be provided for obtaining truly representative samples of the total aggregate being fed into the pugmill.

501.26 Special Requirements for Drum Mixers

501.26.01 Plant Generally

i) The drum mixer shall be a parallel flow or counter flow type and of approved manufacture.

ii) The drum mixer shall be used in conjunction with a hot storage silo meeting all requirements of this Section.

501.26.02 Cold Aggregate Feeders and Bins

i) The Contractor shall provide sufficient cold feed bins or feeders to allow for the accurate blending of all materials, including supplemental aggregate(s), required to meet the Marshall Mix Design. Should the Ministry wish to add additional new material to improve the gradation once the criteria for a Marshal Mix Design is met, the use of any additional bin/feeders will be paid for by the Ministry at cost. The blending of supplemental materials already being supplied by the Contractor shall not be classified as new material.

ii) Each bin shall be equipped with a variable speed feeder, adjustable gate and other devices ensuring uniform flow of material.

iii) All feeders shall be quick adjusting and interlockable and shall maintain a constant and uniform flow throughout their range of calibration.

iv) The total flow of asphalt mix aggregate shall be metered by an electronic belt scale interlocked with a variable asphalt feed system, so that the proportions of asphalt cement and aggregate entering the drum remain constant.

v) The main feed belt shall have a vibrating scalping screen, with openings as required to prevent the feeding of oversize or deleterious material.

vi) A readily accessible approved device shall be provided for obtaining samples from the main feed belt.

vii) Feed bins shall be equipped with bin level tell-tale lights which are visible to the plant operator. When the bins empty to the lower third, a red lamp shall light up and mixing shall stop immediately.

viii) The Contractor shall provide and have at hand a satisfactory number of standard weights for frequent scale testing.

501.26.03 Calibration - The asphalt cement and asphalt mix aggregate feed systems shall have provisions to enable easy calibration.

501.26.04 Monitors, Recorders and Controls - The drum mixer control console shall have at least the following monitors, recorders and controls:

• Individual variable quantity feed belt controls which govern the output from each feed bin.

• Master variable quantity feed control which governs the combined output from the bin feeders in their proper predetermined ratios.

• Belt scale totalizer showing accumulated mass of wet aggregate delivered to the dryer drum mixer.

• Moisture content input control for changing internally the system's wet mass to dry mass.

• Indicator showing the computed total mass per hour of dry aggregate delivered to the drum mixer.

• Control for setting the required percentage of asphalt cement based on the mass of dry asphalt mix aggregate.

• Totalizer for accumulated litres of asphalt cement delivered to the drum.

• Master switch to start and stop the asphalt cement and asphalt mix aggregate feeds.

501.26.05 Thermometric Equipment

i) An accurate multipoint continuous recording pyrometer or other approved instrument having a temperature range of 50oC to 200oC, subdivided into 2oC graduations, shall be centrally situated in a protected position where it is readily visible to the plant operator.

Page 414: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 501 HOT MIXED ASPHALT PAVEMENT

501 (10 of 26) 2006 BC – MOT

ii) Premium grade thermocouples or resistance bulb thermometers shall be installed:

• in the asphalt cement circulating main at the nearest elbow or junction to the supply manifold

• in each asphalt cement storage tank to measure the true temperature of the stored asphalt at the level of the tank outlet without sensing temperature effects from the tank heating coils or external conditions

• in the drum discharge chute • in the hot storage silo, not higher than the bottom

quarter point.

501.27 Requirements for Hot Storage Silos - Hot storage silos shall be enclosed and be of a design that will not cause segregation in the asphalt mix. The conveyor shall discharge into an automatically controlled batching device having a minimum capacity of 1.8 t, mounted on top of the hot storage silo. However, should segregation be detected, the Contractor shall modify the operation immediately.

The silo must be equipped with a remote indicator light, visible to the plant operator, indicating when silo is less than one quarter full.

The silo shall be set up so as to allow enough room for the haul trucks to pass below the discharge hopper thus allowing direct discharge into the trucks. Loading the haul trucks with the use of a conveyor system will not be allowed.

501.28 Requirements for Mixing Plants Producing Sulphur Extended Asphalt Mix

501.28.01 General - Equipment normally in contact with sulphur must be thoroughly heat jacketed. All those parts, which may be invaded by sulphur, should also be jacketed.

501.28.02 Pipe Lines

i) Sulphur lines smaller than 25 mm in diameter are not permitted.

ii) Pipe systems should be kept full of liquid sulphur all the time to prevent severe corrosion.

501.28.03 Valves - Steam jacketed valves, lubricated or non-lubricated plug valves are accepted. Steam jacketed gate, globe, check and relief valves are also accepted.

A sampling valve shall be installed in the emulsion feed line immediately after the blender.

501.28.04 Pumps - Sulphur shall be supplied to the mixing plant by a positive displacement pump, placed at the outlet manifold from the storage tank.

501.28.05 Storage Tanks

i) Storage tanks shall be insulated. Coils shall be able to maintain the sulphur at a temperature of 127oC to 137oC. Temperature indicators and controllers shall be installed.

ii) Sulphur storage tank shall have a minimum storage capacity equivalent to 20 hours of maximum plant capacity.

iii) Storage tanks shall be grounded.

PART D - CONSTRUCTION

501.31 Spray Prime Coat and Tack Coat

501.31.01 Prepared Granular Bases and Old Pavements - All prepared granular bases or old pavements which are to be paved shall be prime coated or tack coated at specified rates and at locations as directed by the Ministry Representative.

501.31.02 Liquid Asphalt - Prime Coat or Tack Coat - The liquid asphalt for prime coat or tack coat shall be applied when surface and weather conditions are favourable and when the air temperature is above 10oC and rising.

501.31.03 Tack Coating - Surface - The surface to be tack coated shall be cleaned of dirt and other foreign material by brooming or other acceptable methods. Payment for this work is considered to be included in the price bid for spray primer and tack coat.

501.31.04 Liquid Asphalt - Spray Temperature - The liquid asphalt shall be sprayed at a designated temperature within the temperature range which corresponds to a kinematic viscosity of 100 to 150 mm2/s.

501.31.05 Vertical Surfaces - The vertical surfaces of roadway appurtenances shall be hand sprayed with liquid asphalt to the top of the new pavement only. Over spraying shall be cleaned at no expense to the Ministry.

501.31.06 Spray Overlapping - The liquid asphalt spray shall not be excessively overlapped.

501.31.07 Spraying Faults - Any spraying faults resulting from the Contractor's method of operation shall be corrected as directed by the Ministry Representative at no expense to the Ministry.

501.31.08 Excess Liquid Asphalt - Any excess liquid asphalt remaining unabsorbed shall be blinded with sand or fine aggregate at no expense to the Ministry.

Page 415: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

HOT MIXED ASPHALT PAVEMENT SECTION 501

BC – MOT 2006 501 (11 of 26)

501.31.09 Traffic - Traffic shall not be permitted on tack coat until it has cured and on prime coat until the primer has been absorbed into the granular surfacing.

Where it is not possible to keep the traffic off the treated surface, the surface shall be blinded with sand or fine aggregate prior to allowing traffic on same.

501.31.10 Prime Coat and Tack Coat - Curing - Normally prime coats shall be allowed to cure for a minimum of 24 hours prior to the placing of asphalt mix. No asphalt mix shall be placed on fresh tack coat that has not had a minimum of 30 minutes to cure or until directed to do so by the Ministry Representative.

501.31.11 Prime Coat - Maintenance - The Contractor shall, at the Contractor's expense, maintain the prime coat and/or tack coat except that any liquid asphalt required for such maintenance will be supplied by the Ministry.

501.31.12 Tack Coat - Application - Tack coat shall not be applied on sections of roadway longer than can be covered by one day of asphalt plant production.

501.32 Stockpiling Aggregates

501.32.01 Aggregates - The Contractor shall supply all aggregates for the work from approved sources. Ministry of Transportation pits may be used without charge provided they are developed and worked in accordance with Section 202 Part C and the pit development plan. Deviation from the pit development plan will require the approval from the Ministry Representative. No guarantee is given or implied that aggregate from Ministry pits will meet the Specification requirements or provide requisite quantities.

501.32.02 Stockpile Requirements Pre-Mixing - Before plant mixing commences, the Contractor shall have in stockpile a minimum of 20 000 t of asphalt mix aggregate or 50% of the total quantity of asphalt aggregate required for the mix, whichever quantity is greater. These quantities shall be maintained throughout the crushing period.

501.32.03 Stockpile Construction - Stockpiles shall be constructed as specified in Subsection 202.21. For drum mixer or continuous or batch plant using cold feed gradation control the Contractor will be required to split the aggregate into coarse and fine stockpiles unless the requirement is waived in writing by the Ministry Representative.

The method and screen size used to split the aggregate will be subject to the approval of the Ministry Representative and the following shall govern:

• Generally, the screen size separating the coarse from the fines shall be 6.3 mm.

• Screening efficiency, when the coarse stockpile is tested according to BCH I-1, is calculated as follows:

• Allowable operating variation in screening efficiency shall be 5%.

• Screening efficiency shall in no case be less than 85%. • The percentage split for each stockpile shall be

provided to the Ministry Representative by the Contractor by the time that 25% of the paving aggregate is placed in stockpile(s). This information is to be provided in writing. Any surplus aggregate arising from an inaccurate split supplied will be paid for as Type 3 material. From the start of production until 25% of the material is in stockpile the contractor shall have a maximum carry-over on the splitting screen of 15% and at no time shall vary by more than ± 2.5%.

501.32.04 Crushed Aggregates - Aggregates crushed during the plant-mixing operation shall be stockpiled in such a manner as to avoid their direct feeding into the mixing plant.

501.32.05 Stockpiles - Stockpiles of different types of material shall be located and constructed in such a manner as to prevent intermingling of the types.

501.32.06 Supplementary Aggregate - Prior to the commencement of the plant mixing the total estimated quantity of supplementary aggregate shall be stockpiled at the plant site.

501.33 Mixing Plant Operation

501.33.01 Mixers

i) With pugmill mixers the asphalt mix aggregate shall be dry mixed for a minimum period of ten seconds. The wet mixing time of the asphalt mix shall be a minimum period of 30 seconds, although this period will be increased, if required, to ensure that a uniform, evenly coated mixture is produced.

ii) With drum mixers, the mix retention period shall be dictated by the time required to ensure complete coating.

501.33.02 Rejection and Disposal - All asphalt mix failing to meet the requirements of this section will be rejected and shall be disposed of at the Contractor's expense as approved by the Ministry Representative and shall meet all environmental requirements.

E = Material that Passed the Splitting Screen

Total Aggregate Material Smaller than the Splitting Screen

X 100

Page 416: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 501 HOT MIXED ASPHALT PAVEMENT

501 (12 of 26) 2006 BC – MOT

If more than 2% by mass of total asphalt mix is rejected, the Contractor will be charged for the cost of the asphalt cement and the cost of the aggregate incorporated in that portion of the mix in excess of the 2%.

501.33.03 Residual Coating of Particles - Asphalt mix aggregate particles shall not be coated with residue from improper fuel combustion.

501.33.04 Lubrication - Lubrication of conveyor belts with diesel fuel will not be permitted.

501.34 Hauling the Asphalt Mix

501.34.01 Hauling Vehicles - General - The hauling vehicles shall have tight smooth metal boxes cleaned of all accumulations of asphalt mix and foreign materials. Prior to loading, the truck box may be lightly lubricated with a heat resistant asphalt releasing emulsion, having a maximum silicone content of 1 part per 1000 parts of diluted emulsion. Lubrication with diesel fuel will not be permitted.

501.34.02 Insulation - All vertical sides of truck boxes shall be adequately insulated.

All haul vehicles shall be equipped with and use at all times an insulated tarpaulin of such size so as to completely protect the asphalt mix from the weather.

501.34.03 Mechanical Condition - Haul vehicles shall be in sound mechanical condition and free from oil and fuel leaks.

501.34.04 Audible Back Up Warning Device - See Subsection 145.30.04.

501.34.05 Delivery - Asphalt mix shall be delivered to the paver at a constant rate sufficient to allow continuous placement.

501.34.06 Traffic Control Person - A haul vehicle traffic control person shall be provided. This individual's sole duty during asphalt mix laydown operations shall be to ensure safe conditions and to signal and direct trucks accessing the paver lane.

501.35 Placing the Asphalt Mix

501.35.01 - When in the vicinity of an operating paver, workers and inspectors shall stand in full view of the paver operator, clear of side arms and screed, and never in front of the machine hopper.

501.35.02 - Asphalt mix shall only be placed on clean dry surfaces free from all foreign materials, when weather and conditions are suitable.

All lifts of asphalt mix shall only be placed on a dry surface when the ambient air temperature is 5oC and rising and in addition, the top lift shall not be placed when the average surface temperature is below 10oC. The temperature shall be taken in the centre of the travelled lane being paved.

501.35.03 Pick-up Machines - When the Contractor elects to utilize pick-up machines they shall be approved by the Ministry Representative. When this type of equipment is utilized, the Contractor will only place the equivalent of two tandem loads of mix on the roadway at any given time. When the legal load of a single box on a haul vehicle exceeds 20 tonnes, the full load may be spread only after the paving operation is picking up the last load spread. Further dumping will not be permitted until such time as 50% of the greater than 20 tonne load of mix has been picked up.

501.35.04 Asphalt Levelling Course - Prior to the placement of an asphalt pavement overlay, the Ministry Representative may require that sections of the existing pavement receive a levelling course of asphalt mix to correct superelevation and to level the roadway as required.

501.35.05 Asphalt Levelling Course - Requirements - Asphalt levelling course shall be the class of asphalt pavement as stated in the Special Provisions and shall meet all the requirements of this Section.

501.35.06 Paving Machine - The asphalt mix shall be placed by a self-propelled paving machine equipped with an activated screed and strike-off that are heated. The machine shall be capable of spreading the mix to the thicknesses and widths as indicated in the Special Provisions, or on the Drawings. A lift thickness shall be not less than 2.0 nor more than 3.5 times the designated aggregate size of the mix.

501.35.07 Paving Machine - Equipment - The paving machine shall be equipped with an automatic grade control device capable of controlling the spreading of the asphalt mix to the desired longitudinal grade and to the designated transverse slope within 1.5 mm/m.

501.35.08 Speed

i) The speed of the paver shall be adjusted to achieve a continuous lay-down operation producing a smooth homogeneous mat, which meets the requirements of this section.

ii) When paver speed is in excess of 300 m per hour, the Contractor shall be required to have two qualified joint rakers raking the joint.

501.35.09 Processing - During the processing of asphalt mix windrowed in front of pick-up machines the

Page 417: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

HOT MIXED ASPHALT PAVEMENT SECTION 501

BC – MOT 2006 501 (13 of 26)

temperature loss between the haul vehicle and the paver hopper shall not exceed 8oC in any part of the windrow.

501.35.10 Placing - Other Methods - When it is impractical to spread and finish the asphalt mix by paving machine, it may be placed and spread by other methods consistent with prevalent construction practices.

501.35.11 Hydraulic Screed Extension - Hydraulic screed extension duplicating the effectiveness of the main screed may be used for narrow pavement widenings. If it is determined that the screed extension is affecting the ride of the finished pavement, the Ministry Representative will order it removed from the paving machine.

501.35.12 Longitudinal Joints - Longitudinal joints in the top lift of asphalt pavement will only be permitted where lane dividing lines are to be painted.

Longitudinal joints in a lift shall be offset at least 150 mm from joints in the underlying lift.

Longitudinal joints in underlying lifts shall not be offset more than 150 mm from lane dividing lines without written permission from the Ministry Representative.

501.35.13 Traffic - Traffic will not be permitted over an unmatched longitudinal joint except at locations designated by the Ministry Representative.

501.35.14 Longitudinal Edge - At places where the unprotected longitudinal edge of previously placed mat has been damaged by traffic or equipment it shall be trimmed to provide a standard abutting face against which new mix can be placed and compacted.

501.35.15 Contact Edge - The contact edge of abutting cooled pavements shall be thoroughly painted with a thin uniform coat of emulsified asphalt supplied by the Contractor.

501.35.16 Paving Adjoining Parallel Mats - When paving an adjoining parallel mat there shall be at least a 50 mm overlap onto the previously paved surface. This overlap shall be properly "raked" to form a homogeneous bond between the two mats.

501.35.17 Raking - Any material that is "raked" from the joint shall be placed in a wheelbarrow and deposited and immediately levelled on the shoulder where it can be covered by shoulder aggregate, for all lifts of paving, unless otherwise directed by the Ministry Representative. At no time shall "raked" material be placed in front of the paver.

501.35.18 Discontinued Paving - When paving is discontinued in any lane on a traffic bearing roadway, the

asphalt pavement shall be tapered down at a maximum slope of 25:1. From the location of the tar paper letdown there shall be at least 1.0 m of pavement that follows the profile and grade of the pavement prior to the start of the 25:1 taper (see Drawing SP501-04).

When paving resumes and the tar paper letdown is lifted it shall be loaded out for disposal as it is removed. Disposal shall be in an environmentally sound manner.

When paving resumes, the temporary taper shall be cut back to provide a straight vertical face at the transverse joint, which shall be heated and painted as specified in Subsection 501.35.15.

501.35.19 Contact Faces - Contact faces of curbs, gutters, manholes, catchbasins, headers, etc., shall be painted as specified in Subsection 501.35.15 before placing the asphalt pavement.

501.35.20 Fixed Structures - After compaction, the pavement surface adjacent to gutters, manholes, headers or other fixed structures shall be slightly higher than the surface of such structures, but never exceeding 6 mm.

501.36 Compacting the Asphalt Mix

501.36.01 Compaction - The asphalt mix shall be compacted to a minimum density consistent with the requirements of Subsection 501.17.

The Contractor shall supply compaction equipment of specific types to ensure a uniform degree of compaction and surface finish consistent with the requirements of this section. However, one rubber tired roller having a minimum mass of 15 t and capable of providing one complete coverage equal to the rolling width of the machine in one pass, will be required on every project.

Once the compacting effort required to obtain the specified degree of compaction and surface finish is ascertained, the compacting effort and procedure shall not be changed without the written permission of the Ministry Representative.

501.36.02 Equipment - Compaction equipment shall be capable of producing the required density and surface finish.

501.36.03 Wheels - The wheels of compaction equipment in contact with the asphalt mix shall be clean. In addition, compactors shall be equipped with mats.

All wheels shall be moistened by water or by an approved diluted asphalt release agent to prevent pickup, but an excess will not be permitted.

Page 418: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 501 HOT MIXED ASPHALT PAVEMENT

501 (14 of 26) 2006 BC – MOT

501.36.04 Operation - Compaction equipment shall normally be operated with the drive roll or wheels nearest the paving machine.

501.36.05 Longitudinal Joints - Longitudinal joints shall be rolled immediately behind the paving operation, after which rolling shall begin longitudinally at the lower edge of the mat proceeding toward the higher edge of the mat overlapping on successive passes by at least one half of the effective roller width.

501.36.06 Roller Speed - The speed of the roller shall not exceed 8 km/h.

501.36.07 Rollers - Rollers shall not be driven on to, or off, the unprotected longitudinal edge of the unfinished mat, nor will rollers be allowed to park on the mat prior to complete cooling.

501.36.08 Vibrating Tampers and Hand Rollers - Along curbs, manholes, headers and similar structures which are not accessible to rollers, thorough compaction shall be obtained by use of vibrating tampers and hand rollers.

501.36.09 Traffic - Traffic will not be permitted on the finished pavement until it has cooled to such a temperature as to ensure that no deformation or excess flushing of the surface will occur.

501.37 Shouldering - The materials, equipment and work practice required for the construction of granular shoulders shall be as follows:

a) The gradation of the crushed aggregate supplied for granular shoulders shall be within the limits set for medium mix under Subsections 501.15.01 and 501.15.02, or as specified by the Ministry Representative, and the aggregate quality shall meet all the requirements of Section 202.

The finished surface of the granular shoulder shall be true to grade and cross section, and be free from ruts, ravel, segregation or other irregularities.

b) Shouldering machines shall comply with the following minimum requirements:

• The machine shall travel on the adjacent asphalt pavement on pneumatic tires or rubber tracks.

• The machine may be self-propelled, towed or pushed.

• The speed of the aggregate feeder shall be adjustable and the feeder shall have sufficient power to feed required quantities of aggregate.

• The machine shall have an adjustable strike-off and cut-off plate to regulate the depth, width and

cross slope of the deposited shoulder aggregate. • The machine shall be capable of spreading

material from widths of 0.5 m to 2.5 m. • All granular shoulder materials shall be handled in

such a manner that segregation does not occur.

c) If necessary for compacting, water shall be applied to the granular shoulders.

The in-place dry density of the granular shoulders will be obtained at random locations in accordance with Test BCH I-15 or I-16, after completion of final rolling.

The maximum dry density of the granular shoulder material will be obtained in accordance with Test BCH I-14, Method C.

The Degree of Compaction of each in-place density test will be computed from the formula:

The average Degree of Compaction of the granular shoulder shall be greater than 98%.

d) If the adjacent asphalt pavement is damaged during the shouldering operation, the damage shall be repaired at the direction of the Ministry Representative, at no expense to the Ministry.

e) For safety reasons, when a roadway with gravel shoulders is used by the travelling public, an intermediate layer of shouldering aggregate shall be placed following final rolling of levelling course or multiple lifts of asphalt pavement thicker than 50 mm, in advance of the main shouldering operation.

The additional Shouldering Work involved in the construction of this layer will be paid for at the unit price bid for Shouldering Work.

f) Should the work extend past the completion date and be carried over to the next paving season, all shoulders shall be built up to the elevation of the adjacent asphalt pavement, and the additional shouldering work will be considered a subsidiary obligation of the Contractor, and no additional Shouldering Work will be paid.

PART E - PAYMENT AND DEDUCTIONS

501.41 General

501.41.01 Payment - Payment for the work will be at the unit price bid for each respective item as listed in the Schedule of Approximate Quantities and Unit Prices, and at

100 x Density Dry Maximum

Density Dry Place-In =Compaction of Degree

Page 419: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

HOT MIXED ASPHALT PAVEMENT SECTION 501

BC – MOT 2006 501 (15 of 26)

the fixed unit prices as detailed in Appendix C.

501.41.02 Contractor: Cost to – Crusher Reject within Ministry Pits - If the Contractor is required, prior to the asphalt plant feed operation, to reject a portion of the aggregate or add supplementary aggregate to comply with the requirements of Subsections 501.14 and 501.15, the Contractor shall bear all costs associated with these improvements, save that the ensuing rejected materials will be paid for as crusher reject - surplus aggregate Type 3 within Appendix C when produced in Ministry pits only.

501.41.03 Contractor: Payment to

i) If the Contractor, having provided an aggregate whose gradation falls entirely within the gradation requirements as set out in Subsections 501.15.01 through 501.15.03, is required to blend supplementary aggregate or an additive at the crusher or at the plant to meet the design grading curve, the Contractor will be paid for the blending at the actual cost under Appendix C and in accordance with Subsections 501.44 and 501.45.

ii) If the Contractor, having provided an aggregate whose gradation falls entirely within the gradation requirements as set out in Subsections 501.15.01 through 501.15.03, is required by the Ministry Representative to reject a portion of the aggregate at the crusher or at the plant in order to meet the design grading curve, the Contractor will be paid the fixed unit price for all surplus aggregate (Type 1) arising from the rejecting operation.

501.41.04 Transportation by Barge

i) If the Contractor elects to transport material(s) by barge, the Contractor shall provide facilities at the off- loading site which meet the requirements of Subsection 145.18.04.

ii) Payment for material(s) barged will only be made for acceptable materials actually incorporated in the works.

501.42 Schedule Items – Contrary to Section 202, Base Aggregates will be paid in stockpile only for projects classified by the Ministry as Rehabilitation Projects.

501.42.01 Payment for items in Subsections 501.42.01 (i) through 501.42.01 (iii) shall be at the unit price bid per tonne.

i) Crushed Aggregates into Stockpile - The Contractor shall be responsible for determining that there is enough material in stockpile to cover each contract material type. Payment for crushed aggregates in stockpile shall be full compensation for pit development, crushing, screening and stockpiling of all aggregates required. Upon

completion of crushing, the Contractor shall be paid for the quantity of material for each item estimated on the Schedule of Approximate Quantities and Unit Prices. The Ministry Representative shall estimate the quantity of aggregate in stockpile, for monthly progress estimate purposes. These payments do not infer that the crushed aggregate in stockpile will be accepted for use. Should the aggregate(s) not meet the requirements for which it is intended all previous payment(s) for this aggregate(s) will be deducted from monies owed to the Contractor. Upon the completion of the work, the actual quantity used of each aggregate type shall be determined in accordance with Subsection 501.43.03. If the quantities are greater than those estimated and the Contractor has crushed sufficient to cover the overage then payment shall be for the actual quantity used. If it has been determined that less than the required quantity was placed into stockpile, there shall be a deduction under the appropriate Schedule Item equal to the shortfall in quantity.

ii) Placing Base Aggregates - Payment for the placing of base aggregate(s) shall be full compensation for loading, weighing, hauling, placing, grading and compacting of the aggregate to the required grades and crossfall. This item may or may not include the supply of water for compaction and/or dust control.

iii) Placing Asphalt Mixes - Payment for all L.C., A.P., A.B.C., R.A.M., and R.A.B.C. shall be full compensation for loading the aggregate into the feeders, drying the aggregate, taking delivery of; heating and storing the asphalt cement and any other additives required, mixing, loading, weighing, hauling, dumping, spreading, compacting and finishing the asphalt pavement.

501.42.02 Asphalt Mix f.o.b. Plant - Payment for Asphalt Mix f.o.b. Plant will be at the unit price bid per tonne.

The unit price shall be full compensation for loading the aggregate into the feeders, drying the aggregate, taking delivery of; heating and storing the asphalt cement and any other additives required, mixing, loading and weighing the mix into trucks at the plant.

501.42.03 Payment for Spray Primer, Tack Coat and Blinding Sand

i) Payment for Spray Primer and Tack Coat will be at the unit price bid per litre of liquid asphalt/diluted emulsion actually sprayed. The asphalt volume shall be that measured at 15oC.

ii) Payment for Blinding Sand will be by Work Order, if its use is necessary due to conditions beyond the control

Page 420: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 501 HOT MIXED ASPHALT PAVEMENT

501 (16 of 26) 2006 BC – MOT

of the Contractor, other than weather.

501.42.04 Shouldering - Payment for Shouldering will be at the unit price bid per tonne or cubic metre to the neat lines, whichever is specified in the Schedule of Approximate Quantities and Unit Prices. The price bid shall be full compensation for loading, weighing, hauling, placing, spreading and compacting the aggregate to the required grades and crossfall. This item may or may not include the supply of water for compaction and/or dust control.

501.42.05 Shouldering Work - Payment for Shouldering Work will be at the unit price bid per shoulder kilometre of the road. The price bid shall include blading, shaping, compacting and finishing granular shoulders. Water will be paid for as detailed in Subsection 202.31.

501.43 Surplus Aggregate in Stockpile - At the discretion of the Ministry Representative, the Ministry may or may not purchase surplus aggregate in stockpile in a private pit. Generally, the Ministry will purchase surplus aggregate in stockpile in Ministry Pits only. However, should the Contractor produce surplus aggregate in a private pit, and the Ministry intends to purchase these surplus aggregates, the Contractor shall be required to provide a written agreement with the owner of the property that the Ministry will have free access to and use of the surplus aggregate in stockpile for a period of 12 months after the completion of the contract work. If the Contractor undertakes private work from within the private pit, measurements for surplus aggregate in stockpile will not be taken until the completion of the private work, ensuring that the Ministry does not pay for aggregate used on private works.

501.43.01 General - Types - All surplus aggregate shall be properly stockpiled.

There shall be three types:

i) Type 1 - all surplus aggregate in stockpile which is produced as a result of rejecting material in order to meet the design grading curve after the Contractor has provided aggregate meeting the requirements of Subsections 501.15.01 through 501.15.03.

ii) Type 2 - surplus aggregate, in split or unsplit stockpiles, which singly or when combined will give the gradation as supplied by the Contractor to meet Subsection 501.15.01 through 501.15.03.

iii) Type 3 - aggregate in stockpile of whatever kind not included in Subsection 501.43.01 (i) or 501.43.01 (ii), except for private pits.

501.43.02 Ministry Purchase of Surplus Aggregates - If the Ministry is proceeding with the purchase of surplus

aggregates as per Subsection 501.43, upon completion of the contract, the Ministry will purchase all the surplus paving mix aggregate as per Subsection 501.43.02 (i) through 501.43.02 (iv) and all surplus crushed base and/or shoulder aggregates as per Subsection 501.43.02 (v) and 501.43.02 (vi) at the unit price bid in the Schedule of Approximate Quantities and Unit Prices or under Appendix C, whichever applies.

i) The Ministry will purchase the surplus Type 2 aggregate up to the estimated quantity required by the contract at the Contract Unit Price per tonne for crushing for each aggregate type.

ii) Surplus Type 2 aggregate from the estimated contract requirement to 105% of the contract requirement will be paid for as specified in Appendix C for Type 2. Should more than the estimated quantity be utilized for the work, the calculation for the surplus material will be based on the original estimated quantity unless an official quantity change has been reflected within the Schedule of Approximate Quantities and Unit Prices.

iii) Any remaining surplus Type 2 aggregate will be purchased at the rate specified in Appendix C for Type 3.

iv) Any remaining surplus aggregate in stockpile not meeting the requirements of surplus Type 2 aggregate as per Subsection 501.43.02 (ii) and 501.43.02 (iii) will be paid for as surplus Type 3 aggregate as specified in Appendix C.

v) When crushed base and/or shoulder aggregate(s) are required in the contract and are specified to meet the requirements of Subsection 202.05 and Subsection 501.37 (a) respectively, the Ministry will purchase the surplus aggregate(s) up to the estimated quantity required by the contract at the Contract Unit Price per tonne.

vi) All remaining surplus crushed base and/or shouldering aggregates, beyond the contract requirements, will be purchased at the rate specified in Appendix C for Type 3.

vii) Any excess aggregate produced from Ministry Pits and taken to a private pit shall be returned to the Ministry Pit prior to its being purchased by the Ministry.

viii) The Ministry may purchase surplus aggregate, in accordance with Subsections 501.43.02 (i) through 501.43.02 (vi), in private pits at the rates listed in Appendix C.

Page 421: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

HOT MIXED ASPHALT PAVEMENT SECTION 501

BC – MOT 2006 501 (17 of 26)

501.43.03 Measurement - To determine the quantity of Asphalt Mix Aggregate used in the production of asphalt mix the following formula will be applied:

When the Ministry has supplied supplementary aggregate, the percentage incorporated into the Asphalt Mix Aggregate shall be recorded. When determining the quantity of surplus material that meet specifications, and is to be paid for under Subsections 501.43.02 (i) through 501.43.02 (iii), the quantity of Ministry supplied supplementary aggregate shall be determined and deducted from the total. Payment will be made for only that portion of the remaining piles required to meet specifications.

i) Measurement for payment under Subsections 501.43.02 (i) through 501.43.02 (vi) will be determined by digital terrain models and/or cross-sectioning and average end area computation and converted to mass using the conversion factor of 2.0 tonnes per cubic metre. The Ministry Representative will authorize payment for surplus aggregate in stockpile at the rates specified in Subsections 501.42.01 and 501.43.02.

ii) The quantity of crusher reject aggregate in stockpile will be determined by digital terrain models and/or cross-sectioning and average end area computation and converted to mass using a factor of 2.0 tonnes per cubic metre.

iii) All reject mix shall be weighed in tonnes prior to disposal. Calculation of the quantity of Aggregate incorporated in the mix shall be determined by the formula in 501.43.03. The quantity of asphalt cement shall be calculated by subtracting the quantity of aggregate incorporated in the mix from the total quantity of mix.

501.43.04 Payments/Deductions - Payment for Surplus Aggregate in Stockpile will be at the fixed rate per tonne as listed in Appendix C, Item 7.

The fixed unit price shall be full compensation for pit development; supplying, crushing, screening and stockpiling the surplus aggregate.

A deduction will be made for any reject mix in excess of 2% of the quantity of mix placed on the roadway. This deduction will be divided into two sections as specified in Appendix C, Item 18.

i) Asphalt Mix Aggregate Incorporated in the Mix: The deduction for this aggregate will be at the Contract

Unit Price for paving aggregate in stockpile.

ii) Asphalt Cement Incorporated in the Mix: The quantity of asphalt cement will be calculated as per Subsection 501.43.03 (iii). The deduction for the asphalt cement will be at the purchase order price plus PST.

501.44 Supplementary Aggregate - The need for supplementary aggregate will be determined by the Ministry Representative.

501.44.01 Ministry-Controlled Sources - All Ministry controlled supplementary aggregate sources shall be developed and worked in accordance with Section 202 Part C.

501.44.02 Supplementary Sources - All supplementary aggregate sources will be developed as directed; the work, including loading out, will be performed on a Work Order and payment will be made under Appendix C, Item 1.

501.44.03 Screening - If required by the Ministry Representative, the supplementary aggregate will be screened, and payment will be by a Work Order.

501.44.04 Payment - Hauling Supplementary Aggregate

i) Payment for hauling supplementary aggregate will be at the fixed rate per tonne-kilometre as described in Appendix C, Item 4. The rates shown are not accumulative and therefore only one rate shall apply for all kilometres hauled, appropriate to the total hauling distance listed in Appendix C, Item 4. The quantity used for payment for hauling supplementary aggregate will be the actual quantities of supplementary aggregate weighed into stockpile at the plant site, in accordance with Subsection 501.32.05.

ii) When the crusher or mixing plant is located in a private pit, and at the end of production the Contractor is required to haul processed aggregate and/or Reclaimed Asphalt Pavement from the private pit to a Ministry Pit, they shall be reimbursed for haul at the rates indicated under Appendix C, Item 4. For payment purposes, the material shall be accurately weighed over an approved scale, into stockpile.

501.44.05 Payment - Blending Supplementary Aggregate - The quantity used for payment for blending supplementary aggregate will be the computed quantities added at the plant, increased to include the actual moisture content, determined at the time of stockpiling at the plant site.

Payment for blending supplementary aggregate will be at the actual cost under Appendix C, Item 5.

content asphaltcalculated average 100

100 x mix' oftonnes ' = Aggregate MixAsphalt ofTonnes

+

Page 422: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 501 HOT MIXED ASPHALT PAVEMENT

501 (18 of 26) 2006 BC – MOT

The price under Appendix C shall be full compensation for excavating, loading and blending the supplementary aggregate at the plant.

501.44.06 Deductions

i) Should the Contractor be required to purchase supplementary aggregate, either processed or unprocessed, the Contractor will be reimbursed the actual costs of that aggregate, less a deduction equal to the fixed price for Type 2 Surplus Aggregate in Stockpile, for each tonne of supplementary aggregate actually incorporated in the asphalt mix.

ii) The above deductions will also be effected when the supplementary aggregate is paid for by the Ministry under Subsections 501.44.01 through 501.44.05.

501.45 Blending Additives - The need for additives will be determined by the Ministry Representative.

501.45.01 Ministry-Supplied Additives - If the Contractor has provided aggregate whose gradation falls entirely within Subsections 501.15.01 through 501.15.03, and is required to blend additives, the Ministry will supply the additives f.o.b. the asphalt plant site.

501.45.02 Payment - Payment for blending additives will be at the actual cost incurred by the Contractor.

This price will be full compensation for unloading, handling, storing and blending the additive through a separate feeder.

501.46 Adjustment for Haul - To compensate for variation in haul caused by an order of the Ministry Representative changing the application rate to differ from that specified in the Special Provisions or on the Drawings, an adjustment will be made for each applicable item. The difference between the average haul cost per tonne of the quantities at the specified application rate and the average haul cost of the quantities at the changed application rate, based on the haul from the Contractor's selected source(s), shall be calculated using the rate specified in Appendix C, Item 8. The adjustment, equal to the calculated difference, times the number of tonnes actually placed, may result in an addition or a deduction. This adjustment applies to all items in the Schedule supplied by the tonne.

501.47 Extra Handwork - Where letdowns extend more than the minimum requirement of 1 m from the edge of the paver-laid pavement or immediately behind the concrete curb, the Contractor will be compensated at the rate specified in Appendix C, Item 9 for mix laid beyond the 1 m or immediately behind the concrete curb to compensate for extra handwork. This rate shall also apply to the lift used in capping traffic islands.

No additional compensation over the price bid per tonne of asphalt mix for the appropriate items in the Schedule of Approximate Quantities and Unit Prices will be made for intersection work; acceleration and deceleration tapers; miscellaneous widening work; handwork around manholes, catch basins and water valves, and/or long letdowns placed by a paving machine.

501.48 Single Stockpile - Should the requirement of Subsection 501.32.03 be waived, and the Contractor is allowed to place all aggregate for the mix in a single stockpile, a monetary deduction as specified in Appendix C, Item 10 will be made. This deduction will not be effected on mixing plants equipped with and utilizing hot screening decks.

501.49 Reducing of Top Size of Aggregate - If the Contractor, having supplied an aggregate meeting all the requirements of Subsections 501.14 and 501.15, is required by the Ministry Representative to reduce the top size, the Contractor will be compensated at the negotiated price under Appendix C, Item 11 for all tonnage of aggregate so produced.

501.50 Accommodation for Inspection Trailer including Supply of Water and Electricity - The Contractor shall provide prepared site(s) for inspection trailer(s), if required by the Ministry Representative, at the plant site. The site must be made available upon commencement of crushing, or as directed by the Ministry Representative. The trailer will require a constant supply of water and will be on 100A demand.

The water tank will be supplied by the Ministry.

Payment for this work will be at the fixed rate set in Appendix C, Item 12 and shall cover only the time that the Contractor's activities on actual project work are in effect. Heating fuel for the inspection trailer will be supplied by the Ministry.

Regardless of whether accommodation for inspection trailer is requested by the Ministry Representative as above, the Contractor will be required to provide material testing facilities at the crusher and plant as described in Subsection 145.18.02, the cost of which is considered to be included in the unit prices bid.

501.51 Surplus Mix - The cost of any mix that has been deemed to be surplus by the Ministry Representative will be deducted under Appendix C, Item 15 per tonne. This shall include all costs incurred by the Ministry and shall include but shall not be limited to the following: the cost of crushing, if applicable, royalties on the aggregate, and the cost of the asphalt cement incorporated into the surplus mix. The Contractor shall be responsible for the disposal of said

Page 423: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

HOT MIXED ASPHALT PAVEMENT SECTION 501

BC – MOT 2006 501 (19 of 26)

surplus materials in a sound environmental manner.

Page 424: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 501 HOT MIXED ASPHALT PAVEMENT

501 (20 of 26) 2006 BC – MOT

APPENDIX A

1) MARSHALL DESIGN CRITERIA (See Subsection 501.15.06)

PROPERTY OF LABORATORY COMPACTED PAVING MIXTURE

A.M. or R.A.M. PAVEMENT CLASS

A.B.C. or R.A.B.C. PAVEMENT CLASS

1 2 1 2

ESALs >106 <106 >106 <106

Number of blows each face of test specimens 75 75 75 75

Minimum % Voids in mineral aggregate for maximum particle size: 25.0 mm

--- 13 13 13

Minimum % Voids in mineral aggregate for maximum size: 19.0 mm

14 14 --- ---

Minimum % Voids in mineral aggregate for maximum size: 12.5 mm

14 14 --- ---

Minimum % Voids in mineral aggregate for maximum size: 9.5 mm

16 16 --- ---

Percentage of air voids in laboratory compacted mixture for: Coarse Mix

--- 3 to 8 4 to 6 3 to 8

Percentage of air voids in laboratory compacted mixture for: Medium Mix

3 to 5 3 to 5 --- ---

Percentage of air voids in laboratory compacted mixture for: Fine Mix

4 to 6 3 to 8 --- ---

Minimum Marshall Load, N @ 60oC for 80 - 100 9000 7000 8000 7000

Minimum Marshall Load, N @ 60oC for 150 - 200 and 200 – 300

7000 6000 7000 6000

Flow index, units of 0.25 mm 8 to 14 8 to 16 8 to 14 8 to 16

Minimum Index of Retained Stability after immersion in water at 60oC for 24 hours

85% 75% --- ---

2) HVEEM DESIGN CRITERIA (See Subsection 501.15.07)

CLASS 1 CLASS 2

Minimum Hveem Stability for 80 - 100 37 35

Minimum Hveem Stability for 150 - 200 and 200 - 300 35 33

Minimum Cohesion 120 100

Page 425: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

HOT MIXED ASPHALT PAVEMENT SECTION 501

BC – MOT 2006 501 (21 of 26)

APPENDIX B

B. C. P. S. G.*

TABLE OF STANDARDS FOR NEW PAVEMENT (See Subsection 501.17.02)

INTERVAL/ CLASSIFICATION

(mm) A B C D E

- 0.50 to + 0.50 44 34 30 20 15

- 1.00 to + 1.00 50 47 45 35 29

- 1.50 to + 1.50 --- 50 49 44 39

- 2.00 to + 2.00 --- --- 50 48 45

- 2.50 to + 2.50 --- --- --- 49 47

- 3.00 to + 3.00 --- --- --- 50 48

- 3.50 to + 3.50 --- --- --- --- 49

- 4.00 to + 4.00 --- --- --- --- 50

* Using BCH Test II-10

APPENDIX C

SCHEDULE OF MONETARY ADJUSTMENTS

1 Pit Development for Supplementary Aggregates and Loading

W.O. 501.44.02 ---

2 Screening Supplementary Aggregates W.O. 501.44.03 ---

3 Purchasing Supplementary Aggregates Actual Cost 501.44.06 Actual Cost

4 Hauling Supplementary Aggregates: 0 - 1 km tonne/km 501.44.04 $0.61

Hauling Supplementary Aggregates: 1 - 2 km $0.79

Hauling Supplementary Aggregates: 2 - 3 km $0.98

Hauling Supplementary Aggregates: 3 - 4 km $1.16

Hauling Supplementary Aggregates: 4 - 5 km $1.34

Hauling Supplementary Aggregates: 5 - 6 km $1.48

Hauling Supplementary Aggregates: 6 - 7 km $1.59

Hauling Supplementary Aggregates: 7 - 8 km $1.70

Hauling Supplementary Aggregates: 8 - 9 km $1.80

Hauling Supplementary Aggregates: 9 - ? km add $0.10/km

Page 426: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 501 HOT MIXED ASPHALT PAVEMENT

501 (22 of 26) 2006 BC – MOT

5 Blending Supplementary Aggregate: tonne (t) 501.41.03 (i) Actual Cost Coarse and Fine Actual Cost 501.44.05

Blending Supplementary Aggregate: Mineral Fillers

501.44.05 Actual Cost

6 Blending Additives: Mineral Dust, Commercial tonne (t) 501.41.03 (i) Actual Cost Fillers and Crushed Limestone Actual Cost 501.45.02

Blending Additives: Chemicals, Fibre, etc. l 501.41.03 (i) Actual Cost

Actual Cost 501.45.02

7 Surplus Aggregate in Stockpile: Type 1 501.41.03 (ii) $3.00

501.15.01

Surplus Aggregate in Stockpile: Type 2 501.43.02 (ii) $1.50

tonne (t) 501.43.02 (iii) $0.40

Crusher Reject – Surplus Aggregate: Type 3 501.41.02 $0.40

Surplus Aggregate in Stockpile: Type 3 501.43.02 (iv) $0.40

501.43.02 (vi) $0.40

8 Adjustment for Haul tonne/kilometre (t/km)

501.46 $0.15

9 Extra Handwork m2 501.47 $4.75

10 Single Stockpile (Drum Mixers) tonne (t) 501.48 $0.25 Deduction

11 Reducing Top Size tonne (t) 501.49 Negotiated Unit Price

12 Accommodation for Inspection Trailer trailer/month 501.50 $500.00

13 Supplementary Aggregate Supplied or Paid for by the Ministry

tonne (t) 501.44.06 (i) & 501.44.06 (ii)

$1.50 Deduction

14 Not Used

15 Surplus Mix Deduction Tonne 501.51 Calculated Cost

16 Further to the provision of Section 202.23, should the Contractor be instructed to move out from their chosen gravel pit due to reasons other than the ones mentioned in said clause, the Contractor will be paid, on completion of the move, a lump sum of $2,500.00 for a normal crushing complex and a further sum of $500.00 if any additional primary unit is involved, which will be deemed to be full compensation for all costs and expenses incurred by the Contractor as a result of the authorized move.

17 Supply of additional bins/feeders Substantiated Actual Cost

501.26.02 (i) Substantiated Actual Cost

18 Reject Mix Asphalt Mix Aggregate tonne

501.33.02 Crushing Cost Deduction

Reject Mix Asphalt Cement 501.33.02 Actual Cost Deduction

Page 427: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 428: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 429: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 430: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 431: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC – MOT 2006 502 (1 of 24)

SECTION 502

END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

PART A - GENERAL

502.01 Preliminary and General – This Section describes the materials, equipment, professional standards and end product requirements for the construction of hot mixed hot laid asphalt pavement.

End Product Specifications contain the acceptance and payment criteria based on the results of specified sampling and testing. Payment of the contract Unit Prices for the asphalt pavement product is subject to adjustments upward and downward in accordance to the provisions provided in End Product Specifications (EPS).

502.02 General Description Of Work - Generally, the work associated with the construction of asphalt pavement by EPS consists of the following:

• Preparing a Quality Control Plan for evaluation before commencing the Work and providing at the production site a testing facility to provide the data needed to implement that plan.

• Supplying, screening, crushing, processing and improving aggregate to produce asphalt mix aggregate.

• Supplying and delivering asphalt cement and spray primer meeting the requirements of Section 952.

• Preparing mix designs which, once reviewed and accepted by the Ministry Representative, become the basis for the accepted Job Mix Formula.

• Heating the asphalt mix aggregate and mixing it with asphalt cement to produce asphalt mix that meets the Job Mix Formula.

• Hauling, placing, compacting and finishing the asphalt mix.

The Contractor shall provide an end product conforming in quality and accuracy of detail to the dimensional and tolerance requirements of the contract. Where no tolerances are specified, the standard of workmanship shall be in accordance with normally accepted good practice and those identified in Section 501. Payment is subject to adjustments based on quality acceptance tests performed by the Ministry Representative and calculations performed by the Contractor with respect to application rate.

502.03 Definitions Relevant To End Product Specification

502.03.01 End Product Specification (EPS) - A specification whereby the Contractor is entirely responsible for quality control of the construction processes, and

whereby the Ministry performs the specified quality assurance sampling and testing of the end product for the purpose of determining acceptance/rejection and payment.

502.03.02 Job Mix Formula - The Job Mix Formula establishes the aggregate proportions, gradation, and the asphalt content to be used for production of asphalt mix. The Job Mix Formula is based on a Ministry reviewed asphalt mix design, in accordance with Subsection 502.05.07, or on an accepted variation in accordance with Subsection 502.05.09. In either case, each Job Mix Formula requires the evaluation of the Ministry Representative.

502.03.03 Asphalt Content - Asphalt Content means the quantity of asphalt cement in the mix expressed as a percentage by weight of the total dry aggregate in the mix.

Design Asphalt Content - The asphalt content upon which the Job Mix Formula is initially established.

Approved Asphalt Content - The design asphalt content or subsequent adjustment to it, embodied in a Job Mix Formula or revised Job Mix Formula which has been evaluated in writing by the Ministry Representative.

Actual Asphalt Content - Actual asphalt content is the amount of asphalt cement in the mix as determined by the Ministry’s Quality Assurance Program.

502.03.04 Smoothness - Smoothness is a measure of the longitudinal profile of the pavement surface. The unit for measurement is the International Roughness Index (IRI).

502.03.05 Sample Mean - The Sample Mean is the arithmetic mean of a set of test results constituting the sample.

502.03.06 Stratified Random Sample - A Stratified Random Sample is a set of test measurements taken one each from a number of separate (stratified) areas or Sub-Lots within a Lot in an unbiased way.

502.03.07 Lot - A Lot is a portion of the work being considered for acceptance and for the determination of payment. A Lot is defined as follows.

For the application of the contract requirements for:

• Density, • Asphalt Content, • Aggregate Gradation, and • Material Application Rate,

Page 432: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (2 of 24)

A Lot shall be one day’s scheduled production of at least 7 hours plant production where no changes have occurred to criteria such as but not limited to:

• accepted Job Mix Formula, • the specific lift that is being placed, • the required material application rate.

A change in any above criteria may require a new Lot designation.

One day’s production of less than 7 hours will be dealt with as follows:

• the material will be added to the next Lot that has the same criteria, as described above, except that if a test indicates that this production is subject to a payment adjustment or to rejection, or if no further material will be produced with the same criteria, this production will be designated as a separate Lot,

A Lot shall be no more than two days total production even if the above criteria have not changed or been met.

For application of the contract requirements for:

• segregation, and • smoothness,

A Lot shall be one kilometre length of top lift pavement for each driving lane.

502.03.08 Sub-Lots for Density, Asphalt Content, Gradation, and Smoothness - For the application of the contract requirements for:

• density, asphalt content, and gradation, each Lot shall be divided into three equal Sub-Lots, defined by lineal metres of production.

• smoothness, each Lot shall be divided into 100 metre Sub-Lots.

502.03.09 Driving Lane - A driving lane shall mean a single lane in any area of the pavement other than a shoulder or a barrier flare.

502.03.10 Surplus Aggregate - Surplus aggregate is aggregate surplus to the works, in split or un-split stockpiles which singly or combined will meet the asphalt mix aggregate gradation. Surplus aggregate will be paid for as indicated in Subsection 502.32.01. There will be no payment for reject aggregate.

502.04 Quality Control

502.04.01 General - Quality Control, by the Contractor, is the sum total of activities by the Contractor to ensure that a

product meets contract specification requirements. Quality Control includes material handling and construction procedures, calibration and maintenance of equipment, production process control and any sampling, testing and inspection that is done for these purposes.

The Contractor is responsible for all Quality Control under this specification. The Ministry Representative will audit and monitor the Contractor’s operations and the implementation of the Contractor’s Quality Control Plan.

The Ministry will not take samples for quality control testing and will in no manner assist in any degree or in any aspect of the Contractor's operation in the production of asphalt pavement, beginning from the production of aggregate through the compaction of asphalt mix.

The Ministry Representative may issue a Stop Work Order to the Contractor if the Contractor fails to adhere to the Quality Control Plan. The Ministry Representative will not issue a Resume Work Order until the Contractor has given the Ministry Representative satisfactory assurance that it has in place adequate capacity to fulfil the requirements of the Quality Control Plan.

502.04.02 Quality Control Plan - The Contractor shall prepare a detailed written Quality Control Plan that fulfils or exceeds the requirements of Appendix 1 and functions integrally with any other Quality Management provisions of the Contract. The Contractor’s Quality Control Plan shall be submitted to the Ministry Representative not less than five working days before the production of paving aggregate is started. The Ministry Representative will review the plan for approval based on whether or not it meets the Quality Control Requirements and Guidelines, and will respond, in writing, within five days. Any subsequent change to the Contractor’s Quality Control Plan must also be submitted to the Ministry Representative, for approval, not less than twenty-four hours before such change is implemented.

The Contractor’s Quality Control Plan shall include a description and schedule of the intended sampling, testing and reporting. The Quality Control Plan must also include a detailed description of the means by which the Contractor shall use the quality control test results to ensure that the asphalt materials, aggregate, mix production, paving and pavement compaction processes will be controlled to keep the end product within the specified limits. The Quality Control Plan must clearly show the flow of information from the quality control laboratory to the individuals who shall make the actual adjustments to the processes and equipment to affect this control. The plan will show time allowance for each step, the names and positions of all the people involved, and a clear description of the responsibilities of each.

Page 433: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR SECTION 502 ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (3 of 24)

502.04.03 Quality Control Testing and Inspection - The Contractor shall provide and maintain equipment and qualified personnel to perform all laboratory testing, field testing and inspection necessary to determine and monitor the characteristics and properties of all the materials produced and incorporated into the work. They shall also monitor the workmanship of the final product in accordance with the Quality Control Plan as most recently submitted.

The Contractor’s Quality Control testing and inspection shall utilise a qualified registered member of the Association of Professional Engineers and Geoscientists of British Columbia or a qualified, registered member of the Applied Science Technologists and Technicians of British Columbia who shall oversee all aspects of the Quality Control testing and inspection. This person shall be designated as the Quality Control Manager for the purposes of these specifications. The Quality Control Manager shall be responsible for preparation and sign off of the Quality Control Plan, approving all quality control staff, all Quality Control testing and inspections and for the signing and the submission, within 5 working days, of all Quality Control testing and inspection records to the Ministry.

The Contractor shall provide a testing facility(s) that meets the requirements necessary to carry out all the test procedures listed within this Section. The facility(s) must have the equipment specified under the appropriate test designation to perform the tests. The Ministry shall have access at all times to the quality control facility(s).

502.04.04 Quality Control Records - The results from quality control testing shall be reported on test logs and plotted on charts immediately after each test is completed. The Contractor shall report all test results on Ministry supplied forms available from the Ministry Representative. Reports and charts shall be available for viewing to the Ministry Representative, within 24 hours of the end of each shift.

For the purposes of confirming delivery of asphalt mix to the road and the calculation of material application rates, the Contractor shall provide to the Ministry Representative a copy of the Road Checker’s Summary and the weigh tickets for each load received at the paving operation at the end of each shift. The Road Checker’s Summary shall include, but not be limited to, the following information:

TABLE 502-A-2 – STANDARD SAMPLING AND TESTING PROCEDURES FOR ASPHALT CEMENT

Item Procedure Test Reference No.

1 Penetration of Bituminous Materials ASTM D-5

2 Viscosity of Asphalt by Vacuum Capillary Viscometer ASTM D-2171

TABLE 502-A-1 – STANDARD SAMPLING AND TESTING PROCEDURES FOR AGGREGATES

All aggregate tests shall use the following sieve sizes: 37.5mm, 25mm, 19mm, 16mm, 12.5mm, 9.5mm, 4.75mm, 2.36mm, 1.18mm, 0.600mm, 0.300mm, 0.150mm, and .075mm.

Item Procedure Test Reference No.

1 Sieve Analysis of Fine And Coarse Aggregates ASTM C-136

2 Materials Finer Than 0.075 mm (No. 200) Sieve in Mineral Aggregate by Washing ASTM C-117

3 Specific Gravity and Absorption of Coarse Aggregate ASTM C-127

4 Specific Gravity and Absorption of Fine Aggregate ASTM C-128

5 Determining the Percentage of Fractured Particles in Coarse Aggregate ASTM D-5821

6 Total Moisture Content of Aggregate by Drying ASTM C-566

7 Standard Practices for Sampling of Aggregates ASTM D-75

Page 434: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (4 of 24)

a) Truck Number

b) Weigh Ticket Number and Net Weight of load

c) Time and location by station of delivery

d) Material Application Rate Dimensions and Calculations. Calculation frequency minimally shall be for every 10 loads.

e) Notes pertaining to the paving of any appurtenances (letdowns, intersections, tapers, etc.)

ASTM test procedures are to be followed.

All equipment and the laboratory shall be well maintained and in good working condition. All testing equipment shall be calibrated and evidence of the calibration shall be provided when requested by the Ministry Representative. For the purpose of obtaining accurate and consistent results between the Contractor’s Quality Control testing and the Ministry’s Quality Acceptance testing, correlation of the Marshall hammer and ignition ovens to be used on the project shall be performed during the verification of the Job Mix Formula.

TABLE 502-A-4 – TEST SAMPLE SOURCE LOCATIONS

Test Sample Source:

Density 100mm dia. road cores; 150mm dia. Road cores for Superpave

Asphalt Content Loose Mix Samples

Smoothness Centre of the Lane

Aggregate Gradation Loose Mix Samples

Segregation Roadway Pavement

TABLE 502-A-3 – STANDARD SAMPLING AND TESTING PROCEDURES FOR ASPHALT MIX AND PAVEMENT

Item Procedure Test Reference

1 Bulk Specific Gravity and Density of Non-Absorptive Compacted Bituminous Mixtures

ASTM D-2726

2 Bulk Specific Gravity and Density of Compacted Bituminous Mixtures Using Paraffin Coated Specimens

ASTM D-1188

3 Resistance to Plastic Flow of Bituminous Mixtures Using Marshall Apparatus

ASTM D-1559

4 Effect of Water on Compressive Strength of Compacted Bituminous Mixtures

ASTM D-1075

5 Theoretical Maximum Specific Gravity and Density of Bituminous Paving Mixtures

ASTM D-2041

6 Percent Air Voids in Compacted Dense and Open Bituminous Paving Mixtures

ASTM D-3203

7 Calculating Percent Asphalt Absorption by the Aggregate in an Asphalt Pavement Mixture

ASTM D-4469

8 Sampling Compacted Bituminous Mixtures for Laboratory Testing

ASTM D-5361

9 Determining Asphalt Content by Ignition Method ASTM D-6307

10 Combining Loose Mix for the purpose of Determining Asphalt Content and Gradation

APPENDIX 2

Page 435: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR SECTION 502 ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (5 of 24)

502.04.05 Final Quality Control Testing Reports - Prior to the issuance of a Completion Certificate, the Contractor shall provide the Ministry Representative with:

• a summary of all aggregate quality control test results; • copies of all quality control test results for asphalt mix

properties and compaction; and • copies of all quality control charts.

502.04.06 Minimum Acceptable Construction Practices - Good construction practices shall be considered as standard construction procedures to be followed and shall include but not be limited to the procedures described below.

Tack Coating - The surface to be tack coated shall be cleaned of dirt or other foreign material.

Vertical Surfaces – Vertical surfaces of roadway appurtenances shall be hand sprayed to the top of the new pavement only.

Tack Coat – Application – Tack coat shall not be applied on sections of roadway longer than will be covered by one day of asphalt plant production.

Stockpiles – Stockpiles of different types of material shall be located and constructed in such a manner as to prevent intermingling of the types and to prevent segregation.

Haul Vehicles – Lubrication of the truck boxes with diesel fuel will not be permitted. All vehicles shall have adequately insulated truck boxes and shall be equipped with an insulating tarpaulin of such size as to completely protect the asphalt mix.

Longitudinal Joints – Longitudinal joints in the top lift of asphalt pavement will only be permitted where lane dividing lines are to be painted. Longitudinal joints in a lift shall be offset at least 150 mm from joints in the underlying lift.

Longitudinal Edge – Where an unprotected longitudinal edge has been damaged by traffic or equipment it shall be trimmed to provide a vertical abutting face.

Contact Edge – The contact edge of abutting cooled asphalt pavement shall be thoroughly painted with a uniform coat of emulsified asphalt.

Paving Adjoining Mats – When paving an adjoining parallel mat there shall be at least a 50-mm overlap onto the previously paved surface. This overlap shall be properly constructed to form a homogeneous bond between the two mats.

Raking – Any material that is raked from the joint shall not be placed on the new mat or placed in or in front of the

paver. The Contractor shall dispose of the material in an environmentally acceptable manner.

Discontinued Paving – When paving is discontinued in any lane on a traffic bearing roadway, the asphalt pavement shall be tapered down at a minimum slope of 25:1. When paving resumes this letdown shall be cut back so as to form a vertical face that matches the required depth being paved. Material removed from the taper shall be disposed of in an environmentally friendly manner.

Rollers – Rollers shall normally operate with the drive wheel nearest the paver and at a speed not in excess of 8 km/h. They shall not be driven on to or off, the unprotected longitudinal edge of the unfinished mat and shall not be allowed to park on the mat prior to complete cooling.

502.05 Supply Of Aggregates, Asphalt Materials, Asphalt Mix Design And Job Mix Formula

502.05.01 Work in Ministry Pits or Quarries - When operating in a Ministry pit or quarry, the Contractor shall comply with all provisions of Subsection 145.26.

502.05.02 Supply of Aggregates, Aggregate Production and Characteristics -The Contractor shall not produce paving aggregate until the Contractor has received written notification that their Quality Control Plan is in accordance with Subsection 502.04.02, and has in place testing facilities for aggregate production that are in accordance with the Quality Control Plan.

For the production of Asphalt Mix Aggregate, within Ministry pits, the Contractor shall provide crushing equipment such that all aggregate which will pass through 375 mm x 450 mm slotted openings shall be used for the production of crushed aggregate. Rocks, which will not pass through these openings, shall be stockpiled as directed by the Ministry Representative. Crushing and screening equipment shall be provided with adequate facilities and capacity to be able to bleed off reject aggregate and remove any excess fine aggregate, dust or objectionable aggregate coatings, to make it generally acceptable for use. No portion of the products from crushing or screening plants that can be used shall be wasted, but shall be stockpiled or used as directed by the Ministry Representative.

Where the Ministry has available any test result information on the properties shown in Table 502-B, for a Ministry pit or other source, the Ministry Representative will upon request, provide that information to the Contractor. Otherwise, sampling and testing to determine and demonstrate the compliance of paving aggregate with the requirements of this Section shall be the responsibility of the Contractor.

Paving aggregates shall meet the following requirements:

Page 436: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (6 of 24)

a) Coarse Aggregates

i) shall be all mineral matter retained on the sieve designated in the test procedures for each individual test.

ii) shall consist of crushed stone, crushed gravel, or combination thereof, or materials naturally occurring in a fractured condition, or materials naturally occurring of highly angular nature or rough texture.

iii) shall be free from coating of clay, silt or other deleterious material, and shall meet the requirements listed in Table 502-B.

b) Fine Aggregate

i) shall be all mineral matter passing the sieve designated in the test procedure for each individual test.

ii) shall be clean, tough, durable, moderately sharp, and free from coatings of clay, silt, or other deleterious material, and shall contain no clay balls or other aggregations of fine material.

iii) shall have a maximum mass loss after five cycles of not more than 18% and 23% for pavement Class 1 and 2 respectively when tested in accordance with ASTM Test C-88.

iv) shall have a sand equivalent of not less than 40 when tested in accordance with ASTM Test D-2419

v) shall have a minimum value of 45 when tested according the AASHTO Test T 304, Method “A”, - Uncompacted Void Content of Fine Aggregate when

determining Fine Aggregate Angularity.

c) Mineral Filler and Mineral Dust

i) Mineral filler shall consist of all matter passing the 0.600-mm sieve and mineral dust shall consist of all mineral matter passing the 0.075-mm sieve.

ii) Mineral filler and mineral dust shall be free from organic matter.

iii) Mineral filler shall be non-plastic when tested in accordance with ASTM Test D-4318.

iv) determination of aggregate properties and gradation for Superpave

d) For the purposes of the mix design for Superpave, the gradation of the design mix and the subsequent Job Mix Formula, shall be of the properties and the gradation limits as specified below and in accordance with the SHRP Standards for a Superpave Level I Mix Design contained in the Asphalt Institute’s Superpave Series Publication - Superpave Level I Mix Design SP-2. Changes and/or variations from these limits shall be outlined within the Contract Special Provisions.

i) 90% fractured aggregate with a 12.5mm nominal maximum size, including sufficient manufactured fines to provide fine aggregate angularity. The aggregates must meet all the requirements for angularity, toughness, soundness, deleterious materials, clay content and thin, elongated particles. Design ESALs will be 10 – 30 million.

ii) A dense graded gradation with a 19.0mm

TABLE 502-B – REQUIREMENTS FOR COARSE AGGREGATES

PAVEMENT CLASSES TEST REF. # PROCEDURES

Superpave

1 2

ASTM C-127 Maximum Water Absorption: % by mass 2 2 2

ASTM C-88 Soundness of Aggregate Maximum loss after 5 cycles 15 15 20

ASTM C-142 Maximum % by mass of clay balls and friable particles 1.0 1.0 1.5

BCH 1-9 Minimum Degradation Factor 35 35 35

ASTM D-5821 2 Fractured Faces: Minimum % by Mass retained on the 4.75 mm sieve

90 85 70

Page 437: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR SECTION 502 ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (7 of 24)

maximum size aggregate restricted to the following:

1) Passing below the following boundaries of the aggregate restricted zone:

SIEVE SIZE MIN/MAX PERCENT PASSING BOUNDARIES FOR 12.5mm Nominal Max. Aggregate Size

2.36mm 39.1/39.1

1.18mm 25.6/31.6

0.600mm 19.1/23.1

0.300mm 15.5/15.5

2) The design gradation shall be within the following specified control points:

CONTROL POINT (PERCENT PASSING)

SIEVE SIZE Minimum Maximum

0.075mm 2.0 10.0

2.36mm 28.0 58.0

9.5mm - 90.0

Nominal Maximum (12.5mm)

90.0 100.0

Maximum (19.0mm)

100.0 -

502.05.03 Supply of Asphalt Cement and Spray Primers - The Contractor shall supply the types and grades of asphalt cement and spray primers as specified in the Special Provisions and in accordance with Section 952. The supply of these materials includes, but is not limited to, ordering, scheduling delivery of, receiving, handling, storing, sampling, and testing of the materials and other related work.

The Contractor shall supply the Ministry Representative with copies of the asphalt supplier’s weigh-bill and records of all asphalt materials received on a daily basis.

502.05.04 Responsibility for Asphalt Mix Design -

Preparation and submission of the project asphalt mix designs for Ministry review is the responsibility of the Contractor. All costs incurred in mix design formulation are the responsibility of the Contractor.

The Contractor shall utilise a qualified registered member of the Association of Professional Engineers and Geoscientists of British Columbia or a qualified, registered member of the Applied Science Technologists and Technicians of British Columbia who shall sign off the asphalt mix design. The Contractor shall also utilise a qualified testing laboratory meeting the requirements of Subsection 502.04.03 and acceptable to the Ministry, to assess the aggregate material proposed for use and to carry out the asphalt mix designs.

502.05.05 Requirements for Asphalt Mix Design - The asphalt mix design for Class 1 and Class 2 pavements shall be carried out under the design criteria for Marshall design using the designated equipment and procedures as contained in the Asphalt Institute’s Mix Design Methods for Asphalt Concrete MS-2, latest edition.

Asphalt mix designs, Job Mix Formulas and field adjustments made in accordance with Subsection 502.05.09, must all be based on an aggregate gradation meeting the requirements of Table 502-C-1.

The divergence limits, as defined in Table 502-G, when applied to the gradation of the Job Mix Formula, shall not result in a gradation that is outside of the limits as shown in Table 502-C-1.

The Superpave asphalt mix design shall be carried out in accordance with the Superpave Level I Mix Design contained in the Asphalt Institute’s Superpave Series Publication - Superpave Level I Mix Design SP-2.

Asphalt mix designs shall be performed using asphalt cement of the penetration grade described in the Special Provisions and which is from the same refinery contracted to supply the asphalt cement for the duration of the project.

Any subsequent change in the asphalt cement supplied by the Contractor will require a new asphalt mix design unless permitted otherwise by the Ministry Representative.

Marshall asphalt mix designs shall be performed to meet the criteria specified in Table 502-C-2 for the class of pavement specified in the Special Provisions.

Page 438: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (8 of 24)

TABLE 502-C-2 – MARSHALL DESIGN CRITERIA

PAVEMENT CLASS PROPERTY OF LABORATORY COMPACTED PAVING MIXTURE 1 2

Number of blows each face of test specimens 75 75

Minimum % Voids in mineral aggregate for maximum particle size: 25.0 mm -- 13

Minimum % Voids in mineral aggregate for maximum particle size: 19.0 mm 14 14

Minimum % Voids in mineral aggregate for 16 mm Asphalt Mix 14.5 14.5

Minimum % Voids in mineral aggregate for maximum particle size: 12.5 mm 15 15

Minimum % Voids in mineral aggregate for maximum particle size: 9.5 mm 16 16

Percentage of air voids in laboratory compacted mixture for: Coarse Mix -- 3 to 6

Percentage of air voids in laboratory compacted mixture for: Medium Mix 2.5 to 4.5 2.5 to 4.5

Percentage of air voids in laboratory compacted mixture for: 16 mm Mix 2.5 to 4.5 2.5 to 4.5

Percentage of air voids in laboratory compacted mixture for: Fine Mix 4 to 6 4 to 6

Minimum Marshall Load, N @ 60oC for 80 – 100 Pen. 9000 7000

Minimum Marshall Load, N @ 60oC for 150 – 200 and 200 – 300 Pen. 7000 6000

Flow index, units of 0.25 mm 8 to 14 8 to 16

Asphalt Film Thickness Min. 7.5 microns Min. 7.5 microns

Minimum Index of Retained Stability after immersion in water at 60oC for 24 hours

85% 75%

TABLE 502-C-1 – AGGREGATE GRADATION LIMITS

Note to readers: This is a November 2004 revision to this Table, with 16mm Asphalt Mix differing from that indicated in earlier Special Provisions by the elimination of any material over 16mm sieve size.

SIEVE PERCENTAGE PASSING BY MASS MEDIUM SIZE (mm) COARSE

ASPHALT MIX 19 mm ASPHALT MIX

16mm ASPHALT MIX

FINE ASPHALT MIX

37.5 100 --- --- 25.0 80 - 100 --- --- 19.0 60 - 92 100 --- 16.0 --- --- 100 12.5 50 - 85 84 – 95 90-100 100 9.50 40 - 80 73 – 90 73 – 90 90 - 100 4.75 30 - 65 50 – 75 50 – 75 55 - 80 2.36 20 - 50 35 – 57 35 – 57 32 - 64 1.18 15 - 35 26 – 45 26 – 45 24 - 51 0.600 8 - 30 18 – 34 18 – 34 17 - 40 0.300 6 - 22 10 - 26 10 - 26 13 - 29 0.150 3 - 15 6 - 17 6 - 17 8 - 18 0.075 1 - 7 3 - 7 3 - 7 4 - 10

Page 439: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR SECTION 502 ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (9 of 24)

502.05.06 Asphalt Mix Design Submittals - The Contractor shall submit each asphalt mix design to the Ministry Representative for review that it complies with the requirements of the Contract, and shall not proceed until the review is received in writing from the Ministry Representative. The Contractor's submissions shall include the following information:

• The gradation of each aggregate to be used in each mixture.

• The percentage by mass of each aggregate to be used in each mixture.

• The design gradation of the combined aggregate for each mixture.

• All asphalt mix design data used in arriving at the final mix designs.

• The design asphalt content expressed as a percentage of the dry weight of the aggregate.

502.05.07 Review of Asphalt Mix Design - The Ministry Representative will require up to 5 calendar days from the time of receipt of the asphalt mix design for review. The mix design must be reviewed prior to commencement of pavement construction.

When the Ministry Representative has confirmed in writing that the Contractor’s asphalt mix design has been accepted, the accepted asphalt mix design becomes the Job Mix Formula for the start of production.

502.05.08 - Verification of Job Mix Formula - Verification of the Job Mix formula will be carried out by the Contractor during the course of production of the first Lot. The Contractor will provide a Job Mix Formula with supporting verification data, which shall include all the information, but not limited to, the requirements of Subsections 502.05.05 and 502.05.06.

502.05.09 Field Adjustment of Job Mix Formula - A field adjustment to the Job Mix Formula is defined as a

change in the asphalt cement content of the mix, aggregate gradation and/or proportioning of various aggregate sizes, within the specified limits as shown in Table 502 - D without review and acceptance of a new asphalt mix design.

The proposed field adjustment shall be submitted in writing together with supporting documentation to the Ministry Representative. Within four hours of receipt of the proposed field adjustments, the Ministry Representative will review the field adjustment for conformance with the contract requirements and notify the Contractor whether or not it is acceptable.

The Contractor’s field adjustment to the Job Mix Formula must comply with the Asphalt Mix Design requirements of Subsections 502.05.05 and 502.05.06. The Contractor shall provide all supporting verification data

After the Job Mix Formula has been established in accordance with Subsection 502.05.09, no field adjustment to that Job Mix Formula will be permitted without prior written acceptance by the Ministry Representative. The Ministry Representative will limit the number of field adjustments to the Job Mix Formula originally derived from the laboratory mix design, to two.

No field adjustment will be acceptable if it results in a change from the Job Mix Formula, for any property, in excess of the maximum adjustment for that property permitted in the following table:

PART B - PAYMENT ADJUSTMENTS 502.11 Density

502.11.01 Coring - The Contractor shall be responsible for providing all core samples for quality assurance and payment adjustment purposes. The randomly selected locations for the cores shall be supplied by the Ministry

TABLE 502-D – FIELD ADJUSTMENT OF JOB MIX FORMULA

Job Mix Formula Property Maximum Field Adjustment

Asphalt cement content ± 0.2

Percentage passing 25.0 mm, 19.0 mm, and 16.00 mm sieves ± 2.0

Percentage passing12.5 mm and 9.5 mm sieves ±2.0

Percentage passing 4.75 mm and 2.36 mm ±1.5

Percentage passing 1.18mm and 0.600mm ± 1.5

Percentage passing 0.300mm and 0.150mm sieves ± 1.5

Percentage passing 0.075 mm sieve ± 0.50

Page 440: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (10 of 24)

Representative to the Contractor. The Contractor shall provide 100mm diameter cores for these purposes. For projects utilizing a Superpave product, 150mm diameter cores shall be required. The Contractor shall prepare the cores prior to the submission by removing all material not representative of the pavement lift to be tested. The Contractor shall deliver these cores to the Ministry Representative on site, within 24 hours of being provided the locations for the coring.

The Contractor shall fill and compact the core holes immediately after the extraction of the cores.

All costs associated with the obtaining the cores, including the filling and compaction of the core holes are considered incidental to the contract and are the responsibility of the Contractor.

502.11.02 Percent Density - The average in-place density will be determined from core samples of the completed lift of pavement.

One random core sample will be obtained from each Sub-Lot and the test results for the three Sub-Lots will be averaged to determine the percent density for the Lot.

Marshall Mixes

Marshall Percent Density

= In-Place Density of Sample Plant Briquette Density

x 100

For the determination of Mix Briquette Density, the Contractor shall obtain the samples as outlined in Appendix 2 for each Sub-lot. All costs associated with sampling, shall be the Contractor’s responsibility.

From each Sub-lot sample, the Contractor will form three briquettes as per the procedure identified in Table 502-A-3 and tested, and the test results will be averaged to obtain the test value for that sample.

The Mix Briquette Density for a Lot is the average of the test results from the three Sub-lots. The Mix Briquette Density value for the Lot shall be provided to the Ministry Representative prior to the provision of the coring locations to the Contractor.

At the discretion of the Ministry Representative, the Ministry may at any time, perform and use the Ministry results in accordance with procedures as outlined above, to obtain the value for Mix Briquette Density which will replace the values achieved under the Quality Control Testing.

Should the initial test results in any Sub-Lot be lower than 92.0%, one additional core will be taken and tested, and that result shall replace and be averaged with the initial result to determine the percent density for the Sub-Lot.

Superpave Mixes

Superpave Percent Density

= In-Place Density of Sample Maximum Theoretical Density (ASTM D-2041)

x 100

The average in-place density will be determined from 150mm diameter core samples of the completed lift of pavement.

The Maximum Theoretical Density for a Lot is the value calculated defined as the average of the test results from the three sub lots. The Maximum Theoretical Density value for the Lot shall be provided to the Ministry Representative prior to the provision of the coring locations to the Contractor.

502.11.03 Payment Adjustments - The payment adjustment for percent density will be the amount shown in Table 502-E-1 and 502-E-2 for the Sample Mean of the test results for the Lot.

502.11.04 Rejection Limit - The rejection limit for percent density is the limiting value of the Sample Mean as shown in Table 502-E-1 and 502-E-2, beyond which the Sub-Lot is rejected and not paid for.

Acceptance or rejection will be determined for each Sub-Lot. One opportunity will be provided to the Contractor, using non-destructive test methods, to isolate the area of low density and conduct additional compaction providing no damage is incurred to the new pavement. One additional core will be taken randomly in the area of low density and will replace the core with previous low density and a new value will be calculated. The Ministry Representative shall be advised as to the scheduling of the re-compaction effort prior to the work taking place.

Where the Lot average density is less than 96%, the Contractor shall either overlay or remove and replace the previously placed mix.If the test result for density of a Sub-Lot is outside the acceptance limits, the Sub-Lot is rejected automatically regardless of the values of other acceptance parameters. To minimize the cost of rejection to the Contractor, the Contractor will be provided the opportunity to isolate the area of low density within the Sub-lot. The limits of the low density area must be verified and approved by the Ministry Representative before remedial work proceeds.

Page 441: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR SECTION 502 ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (11 of 24)

Where the Lot average density is less than 91%, the Contractor shall either overlay or remove and replace the previously placed mix.

502.11.05 Payment for Rejected Work Made Acceptable The payment adjustment for density will be based on testing of the replacement or overlay material where applicable. Where replacement or overlay material does not cover the entire Lot or Sub-Lot, prior tests of the uncovered area will be averaged with new tests on the corrective work.

502.12 Asphalt Content

502.12.01 Determination of Asphalt Content - The asphalt content of the asphalt mix will be determined from loose mix samples obtained from each Sub-Lot (3 per Lot) and tested in accordance with ASTM test procedures listed

in Table 502-A-3.

One random sample will be obtained from each Sub-lot as per Appendix 2. The asphalt content of the asphalt mix will be determined using the average of the results obtained from all of the Sub-lot samples. The Actual Asphalt Content of the Lot will be compared to the Job Mix Formula Asphalt Content and the deviation will be used for payment adjustment purposes.

502.12.02 Payment Adjustments - The payment adjustment for asphalt content will be the amount shown in Table 502-F.

502.12.03 Rejection Limit - Rejection limits for asphalt content are the limiting values of the Sample Mean as shown in Table 502-F, beyond which the Lot is rejected and not paid for.

If the asphalt content of a Lot is outside the acceptance limits, the Lot is rejected automatically regardless of the

TABLE 502-E-2 – PAYMENT ADJUSTMENTS FOR DENSITY - SUPERPAVE

% Density Lot Average

Payment Adjustment ($ Per Tonne) for Design Lift Thickness

95.0 Plus

94.0 – 94.9

93.0 – 93.9

92.0 – 92.9

91.6 – 91.9

91.0 – 91.5

90.9 or less

+$1.00

+$0.75

+$0.50

+$0.25

-$0.50

-$1.00

Reject

If any Sub-Lot has a density below 91%, the Sub-Lot shall be considered rejectable, and, subject to the Contractor’s opportunity to increase the density as described in Subsection 502.11.04, shall be rejected. Percent Density is based on a comparison to the Maximum Theoretical Density.

TABLE 502-E-1 – PAYMENT ADJUSTMENTS FOR DENSITY – MARSHALL

% Density Lot Average

Payment Adjustment ($ Per Tonne) for Design Lift Thickness

98.6 Plus

98.1 – 98.5

97.6 – 98.0

97.0 – 97.5

96.6 – 96.9

96.0 – 96.5

95.9 or less

+$1.00

+$0.75

+$0.50

+$0.25

-$0.50

-$1.00

Reject

If any Sub-Lot has a density below 96%, the Sub-Lot shall be considered rejectable, and, subject to the Contractor’s opportunity to increase the density as described in Subsection 502.11.04, shall be rejected.

Page 442: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (12 of 24)

values of other acceptance parameters.

502.12.04 Payment for Rejected Work Made Acceptable - The payment adjustment for Asphalt Content will be based on testing of the replacement or overlay material where applicable. Where replacement or overlay material does not cover the entire Lot or Sub-Lot, prior tests of the uncovered area will be averaged with new tests on the corrective work.

502.13 Aggregate Gradation

502.13.01 Determination of Aggregate Gradation - Table 502-C-1, Aggregate Gradation Limits specifies the aggregate gradation limits which asphalt mix design, Job Mix Formulas, and field adjustments made in accordance with Subsection 502.05.09, must be based.

Table 502-G shows the limiting values for acceptance and for the determination of payment adjustments. These limits are expressed as departures, on each specified sieve size, from the percentage of material passing that sieve according to the Job Mix Formula. Aggregate gradation will be determined for each Lot from loose mix samples of the completed lift of pavement. One random sample will be obtained from each Sub-lot, and the aggregate gradation for the Lot will be determined by using the average of the 3 sub-lot tests to determine the Sample Mean.

Divergence from the job mix formula gradation shall not vary outside of the limits identified in Table 502-C-1.

502.13.02 Payment Adjustments -

a) Where the Sample Mean for every specified sieve size falls within the applicable limiting value prescribed in Column 3 of Table 502-G, the Lot will be accepted with a payment adjustment of + $0.75 per tonne.

b) Where the Sample Mean for every specified sieve size falls within the applicable limiting value prescribed in Column 2 of Table 502-G, but the Lot is not eligible under (a) above, the Lot will be accepted with no payment adjustment.

c) Where the Sample Mean for every specified sieve size falls within the applicable limiting value prescribed in Column 1 of Table 502-G, but the Lot is not eligible under either (a) or (b) above, the Lot will be accepted with a payment adjustment of - $1.50 per tonne (a deduction of $1.50 per tonne).

502.13.03 Rejection Limit - Rejection limits for aggregate gradation are the limiting values of the Sample Mean for any one, or more, of the specified sieve sizes, as shown in Column 1 of Table 502-G.

If the Sample Mean value for any specified sieve size exceeds the values shown in Table 502-G, or the divergence of the job mix formula gradation is outside the limits of Table 502-C-1, the Lot will be rejected and not paid for, regardless of the values of other acceptance parameters.

TABLE 502-F – PAYMENT ADJUSTMENTS FOR ASPHALT CONTENT

Payment Adjustment for Asphalt Content $ per tonne

Deviation of the Actual Asphalt Content from the Approved Asphalt Content (either above or below) kg/100kg of Dry Aggregate Top Lift Lower Lift

From 0 to 0.15

From 0.16 to 0.30

From 0.31 to 0.35

From 0.36 to 0.40

From 0.41 to 0.45

From 0.46 to 0.50

From 0.51 to 0.55

0.56 and greater

$0.50

$0.00

-$1.00

-$2.00

-$3.00

-$4.00

Reject

Reject

$0.50

$0.00

-$1.00

-$2.00

-$3.00

-$4.00

-$5.00

Reject

For top lift deviations of more than 0.50 the Contractor shall either overlay or remove and replace the Lot.

For lower lift deviations of more than 0.55, no payment will be made and the Ministry Representative will determine whether removal and replacement is necessary.

Page 443: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR SECTION 502 ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (13 of 24)

502.14 Material Application Rate

502.14.01 Determination of Material Application Rate - Asphalt mix shall be applied to the roadway at the rate or rates specified in the Special Provisions, on the Drawings or as otherwise directed by the Ministry Representative. Material Application Rates will be determined by the tonnage delivered to the paver as recorded by weigh tickets generated by automated scales, divided by the area covered by the Lot after allowance has been made for entrance letdowns and/or intersections. The Contractor shall provide the material application rate calculations to the Ministry Representative at the end of each shift.

502.14.02 Payment Adjustments - The payment adjustment for material application rate will be applied as shown in Table 502-H.

502.14.03 Acceptance and Rejection Limits - The acceptance limit for material application rate is the limiting value of the actual material application rate, expressed as a percentage of the specified material application rate, for the Lot, below which the Lot is rejected, as shown in Table 502-H.

If the application rate of a Lot is outside the acceptance limit, the Lot is rejected automatically regardless of the values of other acceptance parameters.

502.15 Surface Segregation

502.15.01 Determination of Surface Segregation - The finished pavement shall be homogeneous, free from segregation and shall be uniform with respect to surface

texture. A segregated area is defined as an area within the driving lanes of the pavement wherein the texture differs visually from the texture of the surrounding pavement.

Due to the nature of variation in asphalt mixes and their compactive characteristics, the definition of degrees of segregation will be established on a project by project basis. The Contractor and the Ministry Representative shall establish through the use of photographs or other mutually agreed tools, the definition of slight, moderate and severe segregation. The Ministry Representative and the Contractor shall evaluate the first two Lots upon completion of the second Lot, after opening to traffic, to confirm the “agreed to” guidelines. Segregation will then be evaluated only when all paving is complete.

The Ministry Representative, with the Contractor’s Representative, will observe the finished pavement to evaluate the existence, severity and extent of segregation and other surface defects. The evaluation will be completed prior to the issuance of the Completion Certificate

The rating system for categorizing the severity of top lift surface segregation, and repair methodology is shown in Table 502-I-1.

502.15.02Payment Adjustments - The payment adjustment for top lift segregation will be the applicable amount shown in Table 502-I-2.

502.15.03 Repair - On the final driving pavement surface, all segregation shall be repaired according to Table 502-I-1. The Lot will not be re-evaluated for segregation payment

TABLE 502-G – ACCEPTANCE AND PAYMENT ADJUSTMENTS FOR AGGREGATE GRADATION

Divergence from job mix formula grading curve Percentage passing by mass ASTM C-117 and C-136

Sieve Size mm

COLUMN 1

Limiting Values for Acceptance Conditional

Upon a Payment Adjustment of - $1.50 per

tonne of mix (a deduction of $1.50 per t)

COLUMN 2

Limiting Values for Acceptance with No Payment Adjustment

COLUMN 3

Limiting Values for Acceptance with a Payment Adjustment of + $0.75 per

tonne of mix

12.5 ±7.0 ±4.5 ±3.5

4.75 ±6.0 ±4.5 ±3.0

0.600 ±4.0 ±3.5 ±2.0

0.075 ±1.5 ±1.0 ±0.75

Any material with a gradation outside the limits set out in Column 1 is reject and the Contractor shall either overlay or, remove and replace the previously placed mix. Reject Bottom Lift shall remain in place, however no payment will be made for this material under the applicable Items

Page 444: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (14 of 24)

adjustments. The Lot will be re-evaluated for acceptance. Repair shall be to the neat lines and dimensions of the segregated area using a sand cement slurry. The Ministry Representative shall provide the formula for the slurry to the Contractor.

The Contractor shall be responsible for all costs associated with the repair of segregated areas.

Remedial work is required for any occurrences of segregation.

502.16 Smoothness

502.16.01 Determination of Pavement Smoothness - The

finished pavement surface shall be tested by the Ministry using a Class I precision rolling profile measuring instrument, to determine the longitudinal profile and compute the International Roughness Index (IRI) in each driving lane. Profiles shall be measured and the IRI calculated in the centre of the lane for each Sub-Lot.

For any Sub-Lot between 50 m and 100 m in length, the IRI value shall be considered representative of a complete Sub-Lot. For any Sub-Lot less than 50 m in length, the IRI value will be combined with the proceeding Sub-Lot IRI value.

The profile shall be measured over the entire length of the pavement exclusive of structures and shoulder areas. Acceleration, deceleration and turning lanes are considered part of the driving lanes and shall be tested in accordance with this provision. For the measuring process, the Contractor shall provide the Ministry Representative a chalk guide line in the centre of the lane immediately prior to measurement.

TABLE 502-H – PAYMENT ADJUSTMENTS FOR MATERIAL APPLICATION RATE

Actual Application Rate Expressed as % of Specified Application Rate

Assessment for Application Rate $ per tonne

Bottom Lift or Single Lift

Top Lift of Multiple Lifts

110 + -$6.00 for all material in the Lot up to 110% and no payment for

product in excess of 110.0%

106.0 – 109.9 -$6.00 for all material in the Lot up to 106% and no payment for product

in excess of 106.0%

105.0 – 105.9

-$4.00 for all material in the Lot

-$4.00 for all material in the Lot

104.0 – 104.9 $0.00 -$2.00 for all material

96.0– 103.9 +$0.50 + $0.50

94.0 - 95.9 -$1.00 -$1.00

92.0 - 93.9 -$2.00 -$2.00

90.0 - 91.9 -$3.00 -$3.00

85.0 – 89.9 -$5.00 -$5.00

84.9 or lower Rejected, Mill and Fill, and/or rejected with no remedial work required at the discretion of the

Ministry Representative

Rejected, Mill and Fill, Overlay, and/or rejected with no remedial

work required at the discretion of the Ministry Representative

Page 445: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR SECTION 502 ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (15 of 24)

502.16.02 Auxiliary Lanes - For smoothness testing, sections of the driving lanes that do not fall within the continuous through lanes, such as acceleration lanes, deceleration lanes and turning lanes, and lanes which are less than 1 km in length, shall be treated as follows. The ratio of the section length to the standard Lot length of 1 km shall be determined and the payment adjustment shall be pro-rated on this basis as in the following example:

Length of segment, i.e. 565 metres = 0.565 times the Standard Lot Length of 1000m.

Hence the applicable payment adjustment is 0.565 times the payment adjustment for a 1-km Lot as determined from Table 502-J.

502.16.03 Acceptance Limits – The acceptance limit and payment adjustments applicable to a road for smoothness are

as shown in Table 502-J or when so indicated in the Special Provisions, Table 502-J-2. The International Roughness Index (IRI) value, calculated for each Sub-Lot, will be used to determine if the Lot will be accepted, and if so whether it will be subject to any payment adjustment.

502.16.04 Payment Adjustments - Acceptance of any Lot for payment will occur if it contains no obvious defects as per Subsection 502.22 and in the case of top lift pavement only, the pavement smoothness, as reported by the International Roughness Index (IRI) meets the following requirements:

• No Sub Lot shall have a value greater than the “Acceptance Limit” as shown in Table 502-J or when so indicated in the Special Provisions, Table 502-J-2

TABLE 502-I-2 – SEGREGATION – TOP LIFT ONLY – PAYMENT ADJUSTMENTS

Category Payment Adjustment Slight Moderate Severe

+$1,000 per lane km. (If the criteria in all three adjacent columns are met)

0 - 3 0 0

+$500 per lane km. (If the criteria in all three adjacent columns are met)

4-5 0 0

No payment adjustment 6 – 10 0 – 1 0

-$500 per lane km. (If the criteria in any one or more of the adjacent columns applies)

11 - 15 2 – 5 0 – 1

-$1,000 per lane km. (If the criteria in any one or more of the adjacent columns applies)

16+ 6+ 2+

TABLE 502-I-1 – SEGREGATION – TOP LIFT ONLY – REMEDIATION METHODOLOGY

Segregation Severity Visual Appearance Repair Procedures

None Completely uniform surface texture N/A

Slight Matrix of asphalt binder, coarse and fine

aggregate exists; visually increased presence of stone sizes

sand cement slurry

Moderate Significantly more stone than surrounding

pavement; matrix of asphalt binder and coated sand particles is reduced

seal coat or sand cement slurry patch or neat hot mix patch or mill and fill

patch

Severe Appears as an area of very stony mix - stone

against stone - little or no matrix remove and replace or overlay to limits

defined by Ministry Representative

Page 446: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (16 of 24)

Table 502-J-2 – LOT ASSESSMENT AND ALTERNATIVE PAYMENT ADJUSTMENTS FOR SMOOTHNESS

For the final surface course only, and only where specifically invoked by the Special Provisions, the following payment adjustments shall apply to each Lot on a road designated by the Ministry for application of alternative smoothness payment adjustments

Lot IRI (m/km) Payment Adjustment <1.00 +$2000

1.01 – 1.10 +$1000 1.11 – 1.20 +$500 1.21 – 1.30 +$250 1.31 – 1.40 0 1.41 – 1.60 -$300 1.61 – 1.80 -$750 1.81 – 1.90 -$1500 1.90 – 2.00 -$2500

2.00 ACCEPTANCE LIMIT. Reject or corrective work required above this level

The Lot IRI is the average IRI calculated for the Sub-Lots within the Lot

502.16.05 Rejection Limit - When there are one or more Sub-Lots with an IRI greater than the Acceptance Limit shown in table 502-J or when so indicated in the Special Provisions, Table 502-J-2, the sub-lot or sub-lots is rejected, subject to Subsection 502.16.06. A Sub-Lot for calculation of smoothness is defined in Subsection 502.03.08.

502.16.06 Remedial Work - If the test results on a Sub-Lot of pavement indicate a payment reduction or rejection because of smoothness, the Contractor may propose remedial work to improve the smoothness. Such proposals are subject to the approval of the Ministry Representative, but such approval does not imply that the proposed remedy will be successful, and does not reduce the Contractor’s responsibility for meeting the acceptance requirements. Grinding may be acceptable, but an overlay may be required. Only one attempt may be made to improve smoothness, and this must be completed within ten (10) calendar days from the time the Contractor receives notification from the Ministry Representative of the original smoothness test results for that Sub-Lot.

Following any attempt to improve the smoothness of a Sub-Lot or Sub-Lots, the Ministry Representative will retest the Sub-Lot or Sub-Lots, and the new results will replace the previous data for the purposes of determining acceptance and payment.

No payment will be made for any material, equipment or manpower used to improve, or attempt to improve, smoothness.

502.16.07 Smoothness Deficiencies - Smoothness deficiencies (bumps and dips) less than 8mm over 3m will not have remedial work required. Individual deficiencies between 8mm and 12mm over 3m will result in a $200.00 penalty. Deficiencies exceeding 12mm over 3m will require remedial work.

PART C - ACCEPTANCE AND REJECTION

502.21 Acceptance At Reduced Or Adjusted Payment - Acceptance of any Lot at reduced payment will occur if it contains no obvious defects as per Subsection 502.22, and if:

• the test results for acceptance parameters are such that the Lot or Sub-Lot meets the requirements for acceptance at a reduced payment; and

• the Lot or Sub-Lot is approved in respect of all other requirements; and if

• the Contractor has not notified the Ministry Representative in writing that it will exercise its option to either repair or remove and replace the work, at its own cost, with work meeting the requirements for acceptance at full or increased payment.

TABLE 502-J – LOT ASSESSMENT AND PAYMENT ADJUSTMENTS FOR SMOOTHNESS

For the final surface course only, the following payment adjustments shall apply to each Lot.

Lot IRI (m/km) Payment Adjustment

≤ 0.80 +$2,000

0.81 to 0.90 +$1000

0.91 to 1.00 +$500

1.01 to 1.10 +$200

1.11 to 1.20 0

1.21 to 1.30 -$100

1.31 to 1.40 -$250

1.41 to 1.50 -$600

1.51 to 1.60 -$1,400

1.61 to 1.70 -$2,000

1.71 to 1.80 -$3,000

1.80 ACCEPTANCE LIMIT.

Reject or corrective work required above this level

The Lot IRI is the average IRI value calculated for the Sub-Lots within the Lot.

Page 447: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR SECTION 502 ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (17 of 24)

502.22 Rejection For Workmanship Defects - The finished surface of any lift shall have a uniform "closed" texture and be free of visible signs of poor workmanship. Any obvious defects as determined by the Ministry Representative such as, but not limited to the following, will be cause for automatic rejection of asphalt pavement regardless of the values of any other acceptance parameter:

• individual bumps and dips that exceed 12mm over 3m;

• areas of excess or insufficient asphalt; • improper matching of longitudinal and transverse

joints; • roller marks; • tire marks; or • cracking or tearing.

When asphalt pavement is rejected by reason of obvious defects, the minimum area of rejection will be the actual length of the defect for the full width of the driving lane in which the defect exists.

Rejected work shall be promptly repaired, remedied, overlaid, or removed and replaced in a manner acceptable to the Ministry Representative. The Contractor shall be responsible for all costs including materials.

No payment will be made for work in any Lot or Sub-Lot, which has been rejected, until the defects have been remedied.

502.23 Appeal Testing

502.23.01 Density, Asphalt Content and Gradation - The Contractor may appeal the results of acceptance testing for density, asphalt content and/or aggregate gradation for any Lot only once. Appeals will only be considered if quality control results support an appeal and can be presented.

Quality control test results for density which are provided to the Ministry Representative subsequent to the Contractor's receipt of the quality assurance test results for that Lot will not be considered (when evaluating evidence) for an appeal. The appeal shall be for all tests within the Lot, and there will be no appeal allowed for single tests within a Lot.

Any attempt to improve density on the appealed Lot after the Ministry Representative has tested the Lot for acceptance shall void the appeal and the original test results will apply.

The following procedures will apply for an appeal:

• For Density, Gradation and Asphalt Content, the Contractor shall serve notice of appeal to the Ministry Representative, in writing, within two working days of receipt of the test results;

• The Ministry Representative will arrange for an independent testing laboratory to perform the appeal testing. The personnel employed or testing laboratory retained by the Contractor for quality control testing on the project will not be used for appeal testing;

• The Contractor will sample the pavement and provide the core samples to the independent testing laboratory. The Ministry Representative shall observe the sampling process.

• For density appeals, the original core test results will be discarded and a new sample mean will be obtained from 5 random cores. The appeal agency shall prepare new briquette densities from the previously taken companion samples as per Appendix 2.

• For asphalt content and gradation, the original test results will be discarded. A new sample mean for three new test results will be determined using the companion samples and will be used for acceptance and payment adjustments.

502.23.02 Smoothness - The Contractor may appeal acceptance test results of a Lot only once.

The Ministry Representative will perform, and the Contractor will be given the opportunity to witness, the appeal testing and the new results will be binding on the Contractor and the Ministry.

502.23.03 Segregation - Appeals of segregation ratings will first be handled by a joint review with the Contractor. If consensus cannot be reached then the Ministry Representative shall engage the Joint Committee, comprised of representatives from the Ministry and B.C. Roadbuilders, to assess the area(s) in question.

502.23.04 Application of Appeal Testing Results - For density, gradation and asphalt content appeals, the original test results will be discarded.

For density, five (5) new random cores will be tested within the next three (3) site occupancy days to establish a new Sample Mean and used for acceptance and payment adjustment.

For gradation and asphalt content appeals, companion samples prepared as per Appendix 2 shall be used to establish a new Sample Mean and used for acceptance and payment adjustment.

The new values, thus determined, in all cases, will be binding on the Contractor and the Ministry.

502.23.05 Payment for Appeal Testing - If the new results indicate a change in the payment adjustment in the Contractor’s favour, then sampling and testing costs incurred during the appeal procedures for that Lot will be

Page 448: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (18 of 24)

borne by the Ministry.

If the new results verify that any payment reduction or rejection remains valid for that Lot, then the costs of testing (plus 10% mark-up) incurred during the appeal procedure will be charged to the Contractor.

502.23.06 Time Limits For Appeal Of Test Results – All appeals shall be in writing and submitted within three (3) site occupancy days of receipt of the applicable test results.

502.24 Overlays As A Corrective Measure - If an overlay is used as a corrective measure on a defective Lot or Sub-Lot, the overlay thickness will be subject to the approval of the Ministry Representative, but shall not be less than 40mm. In all other respects, the whole overlay will be subject to the same specifications as the pavement being overlaid. Where an overlay is used as a corrective measure in any lane, adjacent lanes shall also be overlaid whether acceptable or not.

Whether the overlay is applied as a corrective measure or is placed over otherwise acceptable pavement in order to match an adjacent lane, acceptability and payment will be determined as follows:

• acceptability, and eligibility for either positive or negative payment adjustment, will be determined entirely on the results of testing and observations conducted on the overlay, regardless of test results that have been obtained on the underlying, overlaid lift of pavement; but

• the payment quantity, for application of the Unit Prices for asphalt pavement, and the quantity, to which any payment adjustment is to be applied, will be derived from the tonnage of mix in the underlying, overlaid lift.

PART D - PAYMENT

502.31 General - Payment at the Unit Prices for the supply of primer/tack coat materials, the application of the spray primer/tack coat, the supply of paving aggregates into stockpile, and the construction of asphalt pavement including the supply of asphalt cement, shall be full compensation for completing the supply and installation of asphalt pavement on prepared surfaces in accordance with the contract requirements. Applicable payment adjustments (Additions or subtractions as applicable) shall be applied in accordance with Part B of this Section.

The first 1,000 tonnes of asphalt mix production and placement will not be subject to bonus/penalty payment adjustments but will be required to meet minimum Specification requirements for quality and workmanship. The location where this material is to be placed shall be

defined in the Special Provisions or by the Ministry Representative.

Section 501, including the monetary adjustments set out in Appendix C thereof, shall not apply to these payments, and the cost of all work listed in Appendix C shall be considered incidental to the Unit Prices for asphalt pavement.

502.31.01 Primer

Supply of Spray Primer and Tack Coat - Payment to Supply Spray Primer and Tack Coat shall be at the Unit Price per litre for the quantity of material actually sprayed onto the roadway measured prior to any additional diluting by the Contractor where applicable. The measured quantity shall not be greater than the total of the bills of lading.

Such payment shall be full compensation for supplying, handling, storing, sampling and testing of the material and all other related work.

Application of Spray Primer and Tack Coat - Payment for the application of Primer and Tack Coat will be at the Unit Price per litre of primer actually sprayed onto the roadway. In the case of an emulsion the payment quantity shall include any water added by the Contractor with the approval of the Ministry Representative. Such payment shall be full compensation for diluting the material when required and spraying it on the surfaces to be paved, and for all incidental costs arising from priming and tack coating.

502.31.02 Paving Aggregate into Stockpile – EPS - Payment for Paving Aggregate into Stockpile - EPS shall be at the Unit Price per tonne for the quantity of paving aggregate placed into stockpile accordance with the following:

• The paving aggregate quantity will be identical to (100%) of the asphalt mix quantity. As the aggregate is crushed into stockpile, progress payments will be made against the bid item, up to the quantity shown in the “Approximate Quantity” column of the Schedule of Approximate Quantities and Unit Prices.

Such payment shall be full compensation for all work including but not limited to the production, supply and stockpiling of all paving aggregates, and shall include all costs of quality control.

502.31.03 Asphalt Pavement – EPS - Payment for Asphalt Pavement - EPS constructed in place shall be at the Unit Price per tonne for the quantity of mix placed in accordance with the Contract requirements.

Subject to the exception noted below, only acceptable asphalt pavement will be included in the payment quantity.

Page 449: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR SECTION 502 ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (19 of 24)

Where overlays are used as a corrective measure, in accordance with Subsection 502.24:

• the overlay quantity will not be included in the payment quantity, but

• the quantity of asphalt pavement covered by the overlay will be included in the payment quantity, whether or not it was acceptable.

Such payment shall be compensation in full for all work including but not limited to: loading the aggregate into the feeders; drying the aggregate; supplying, metering, and adding the asphalt cement; mixing, loading, weighing, hauling, dumping, spreading, compacting and finishing the asphalt pavement; and shall also include all costs of quality control.

502.31.04 Payment for Acceptable Work - The following end product properties of asphalt pavement will be measured for acceptance:

• Density • Asphalt Content • Aggregate Gradation • Smoothness • Material Application Rate • Segregation

502.31.05 Payment for Rejected Work Made Acceptable - When defects have been remedied in Lots or Sub-Lots which had been rejected, payment for the original quantity of material in those Lots or Sub-Lots will be made subject to payment adjustments and penalty assessments and subject to Subsection 502.24.

No payment will be made for any material used to replace, repair or overlay rejected work and all corrective work shall be performed entirely at the Contractor's expense.

502.31.06 Payment Adjustment - Payment adjustments resulting from the application of this Section will be effected on each progress payment as follows:

a) For each Lot paid for by the tonne (t), the applicable payment adjustment derived from Tables 502-E (Density), 502-F (Asphalt Content), and 502-G (Gradation), in dollars per tonne, will be expressed as positive in the case of increases and negative in the case of decreases. The algebraic sum of these unit adjustments will then be applied to the payment quantity for the Lot. The resulting amount, in dollars, will be the net payment adjustment, positive or negative, for that Lot.

Payment Adjustments from Table 502-H (Application Rate) shall be computed for each Sub-Lot and then

aggregated for the Lot.

The algebraic sum of the net payment adjustments for all such Lots for which payment is authorized on the current progress payment, computed in dollars, shall be the total payment adjustment for density, asphalt content, aggregate gradation, and material application rate for the current progress payment.

b) For each Lot (km) with payment adjustments based on kilometre, the applicable unit adjustment derived from Table 502-I-2 (Segregation) and Table 502-J or 502 J-2 (Smoothness), in dollars per Lot ($/lane km), will be expressed as positive in the case of increases and negative in the case of decreases, and will be the payment adjustment, positive or negative, for that Lot.

The algebraic sum of the payment adjustments for all such Lots for which payment is authorized on the current progress payment, computed in dollars, shall be the total payment adjustment for segregation for the current progress payment.

c) The algebraic sum of the total payment adjustments for density, asphalt content, aggregate gradation, material application rate, segregation and smoothness, derived in accordance with a) and b) above, shall be the total payment adjustment, positive or negative, in dollars, for all attributes for the current progress payment. This amount shall be added, if positive, or subtracted, if negative, by a single entry in computing the current progress payment.

d) The process set out in a) to c) above will be used in computing each progress payment to which it is applicable. 502.32 Surplus Aggregate In Stockpile - At the discretion of the Ministry Representative, the Ministry may or may not purchase surplus aggregate in stockpile in a private pit. Generally the Ministry will provide payment for the processing costs of surplus aggregate in stockpile in Ministry Pits only, and only to a limited quantity. However, should the Contractor produce surplus aggregate in a private pit, and the Ministry intends to purchase these surplus aggregates, the Contractor shall be required to provide a written agreement with the owner of the property. This document shall indicate that the Ministry will have free access to and use of the surplus aggregate in stockpile for a period of 12 months after the completion of the contract work. If the Contractor undertakes private work from within the private pit, measurements for surplus aggregate in stockpile will not be taken until the completion of the private work, ensuring that the Ministry does not pay for aggregate used on private works. All surplus aggregate shall be properly stockpiled.

Page 450: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (20 of 24)

502.32.01 Ministry Purchase of Surplus Aggregate - Should the Ministry proceed with the purchase of surplus aggregate, upon completion of the contract, the Ministry will purchase surplus paving mix aggregate as indicated herein. Surplus shoulder aggregates shall be paid for according to the Standard Specifications Section 501. Surplus surfacing, base and sub-base aggregates will be paid in accordance with SS202.

If the quantity of Asphalt Pavement actually incorporated into the works is less than the estimated quantity, as stated in the Schedule of Approximate Quantities and Unit Prices, the Ministry will purchase surplus aggregate up to 100% of the

quantity required by the contract. The surplus aggregate must, when singly or combined, meet the gradation requirements set out in the Job Mix Formula. The maximum total surplus aggregate to be purchased will be the quantity of aggregate required to produce the quantity of mix as stated in the Schedule of Approximate Quantities and Unit Prices minus the quantity of aggregate actually incorporated in the works.

No payment shall be made for any surplus paving aggregate remaining at contract completion in excess of the contract requirement. Material remaining in the pit is the property of the Ministry.

Page 451: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR SECTION 502 ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (21 of 24)

APPENDIX 1 QUALITY CONTROL REQUIREMENTS AND GUIDELINES

1.01 GENERAL

The Contractor’s guidelines for preparing, submitting and adhering to a Quality Control Plan are specified in Subsection 502.04. This Appendix titled “Quality Control Requirements and Guidelines” sets out the requirements and guidelines for the Contractor’s Quality Control Plan, in addition to those set out in Subsection 502.04 and the Special Provisions.

1.02 QUALITY CONTROL PLAN

The Contractor shall prepare and submit a Quality Control Plan for evaluation. The Plan may be operated wholly or in part by a qualified Subcontractor or an independent organization/agency. However, the Quality Control Plan, including compliance with the Plan and its modifications, must remain the responsibility of the Contractor.

The Plan shall address all elements that affect the quality of the hot mix, hot laid asphalt pavement, including but not limited to the following:

• Supply of Asphalt Materials • Identification of source and proof of quality of

aggregates to be supplied; • Aggregate production and its gradation control; • Quality of aggregate components; • Stockpile management; • Mix Design(s); • Asphalt plant calibration and proportioning of

aggregate components; • Mixing including asphalt cement content control; • Process temperature controls; • Material application rates, placing and finishing; • Joints; • Compaction; • Smoothness; • Segregation;

The plan shall also include the following:

• The name of the Quality Control testing agency and its proven capability to provide the specific services required for the project.

• The list of dedicated technical staff, if available, (including names, qualifications and relevant experience) and their proposed roles.

• The list of testing equipment available for project work.

The Quality Control Plan shall include the designation of

specific personnel to be responsible for specific quality control duties.

• There shall be a Quality Control Manager (QCM) who will be responsible for the development and management of the Quality Control Plan. This person shall be qualified as per the requirements identified in Subsection 502.04.03. This individual shall also be responsible for the signing off of Quality Control Testing and Inspection records. This individual shall also be responsible for approving all quality control staff, implementing and documenting any changes or improvements to the Quality Control Plan.

• There should be a designated Process Control Technician (PCT), with 5 years of related experience, who will ensure that laboratory test results and other quality control practices are used to control the quality of aggregates and other mix components, and to adjust and control mix proportions to meet the mix design(s). The PCT is responsible for ensuring that testing equipment, utilized for proportioning and mixing are calibrated and in good working order. The Plan shall describe how the PCT’s duties, including sampling methods and responsibilities are to be accomplished and documented. The Plan should also describe the criteria to be used by the PCT to correct or reject unsatisfactory materials.

• There should also be a Pavement Quality Control Technician (PQT), with 5 years of related experience, who will ensure that delivered materials meet the requirements of the specifications. In addition, the PQT shall be responsible for periodically inspecting all equipment used in placing, finishing, and compacting to assure its proper operating condition and to assure that placing, application rate, finishing, joint construction, and compaction is in conformance with this specification and the contract requirements.

1.03 CONTRACTOR’S RECORD OF QUALITY CONTROL TESTING

Test results should be made on specified forms or charts immediately after completion of each test. These test results are to be made available to the Ministry Representative upon request.

Records of gradation control, both during aggregate production and also during the asphalt mixing operation, should be kept on the form H-295 - Mechanical Analysis of Aggregates.

1.04 MATERIAL APPLICATION RATE

Page 452: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (22 of 24)

The Contractor shall control the Material Application Rate by monitoring the amount of asphalt mix delivered to the road against the area covered by checking the application rate minimally every ten loads.

The Contractor shall advise the Ministry Representative in writing on an ongoing basis of the application rate.

1.05 DENSITY

The Contractor should take core samples to determine actual pavement density. At the start of paving, the Contractor should take a minimum of two pavement cores from each Sub-Lot. The Contractor may employ a nuclear densometer to ensure intermediate density control. Two nuclear densities

may be determined for each Sub-Lot, based on job mix densities obtained from the most recent plant briquettes.

1.06 OTHER QUALITY CONTROL PROCEDURES

The Contractor may initiate other Quality Control procedures as necessary for ensuring production of a quality product and include them in the Quality Control Plan. Procedures may also be introduced after the start of work as necessary as amendments to the Quality Control Plan.

1.07 QUALITY CONTROL TESTING FREQUENCY

TABLE 1 – TEST FREQUENCY GUIDELINES

Test *Minimum Frequency Tests During Aggregate Production

ASTM C-136, Dry Sieve Analysis of Aggregate

- Split Stockpiles: 1 for each stockpile for every 2 hours of production. - One main stockpile: for every 300 tonnes. - Blend Sand: 1 for every 100 tonnes during stockpiling. - Natural filler: 1 for every 50 tonnes during stockpiling.

ASTM D-5821 Determining the Percentage of Fractured Particles in Coarse Aggregate

Every second coarse aggregate sieve test.

ASTM C-117 Sieve Analysis of Aggregates by Washing (Field Lab)

1/shift on reduced sample obtained from combined samples from the crusher

ASTM 136, Dry Sieve Analysis of Aggregate 1 of combined aggregate (off the belt) every 300 tonnes.

ASTM C-566 & D-2216, Moisture Content Aggregate: 2 tests/Lot Asphalt mix: 1 on first Sub-Lot and every second day.

ASTM C-117 Sieve Analysis of Aggregates by Washing (Field Lab)

1/shift on reduced sample obtained from combined samples from the plant cold feed

ASTM D-5581, Resistance to Plastic Flow Using Marshall Apparatus.

One set of three briquettes for 1,200 tonnes or Lot, whichever is less.

Asphalt Extraction Test ASTM D-6307 Ignition Method

One/Lot.

Penetration of Bituminous Materials ASTM D-5

One per Manufacturer’s Batch. Samples should be taken for every 3000 tonnes of mix production

Tests During Asphalt Plant Mixing

Viscosity ASTM D-2171 Contractor’s Option

Asphalt Products Tests Tack and Prime Contractor’s option.

BCH II-15 Test to obtain Briquettes from Asphalt Mix

One 15 kg sample for every Sub-Lot or minimum 1/day for field testing

Test During Asphalt Paving for Density Testing Core Samples At start, two cores for each Sub-Lot. After rolling pattern

established, only one core for each Sub-Lot. All cores to be a minimum of 100mm diameter; Superpave mixes shall require minimum 150mm diameter cores

* These are the recommended minimum frequencies and the Contractor is responsible to assess the need to increase testing frequency, where aggregate source is not uniform or any other condition exists that may warrant it.

Recommended test frequency requirements for Quality Control are described in the following table:

Page 453: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR SECTION 502 ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (23 of 24)

APPENDIX 2 LOOSE MIX SAMPLE PREPARATION

1. 3 samples per Sub-Lot shall be obtained by the Contractor from the paver augers, at locations and times chosen by the Ministry Representative. The first sample shall be used by the Contractor for Quality Control, the second sample by the Ministry for Quality Assurance, with the third retained by the Ministry for potential appeal testing.

2. The samples taken shall meet the requirements of ASTM D-979 Sampling of Bituminous Mixtures, Table 1, Size of Sample

3. The sample size shall be reduced to required laboratory sample size for Marshall and Superpave gyratory briquettes, asphalt content and hot mix gradation determination as outlined below:

I. The sample shall either be reduced using a Riffle splitter or shall be quartered into four approximately equal portions. The two diagonally, opposite quarters shall be combined resulting in two samples. Identify and designate one of the samples as the Quality Companion Sample and set aside. Identify and designate the other resulting sample as the Quality Control Sample. Use the Quality Control Sample for testing.

II. The Quality Control Sample shall be weighed to ensure that the sample so obtained meets the minimum mass required for the ignition test. If the sample does not meet the minimum mass requirements, then the additional materials will be obtained and added to the Quality Control Sample from the Companion Sample. This will be achieved by quartering the Quality Companion sample and adding one quarter of the Quality Companion Sample to the Quality Control Sample.

III. This process is to be repeated for each sample to provide the Quality Acceptance and Appeal Samples.

4. The third sample for appeal purposes shall be set aside and retained in a Contractor-supplied, suitable container labeled with sample location, date sampled, and project information. These shall be delivered to the Ministry Representative for storing.

5. The areas sampled shall be filled with mix immediately after sampling, and shall receive the same compactive effort as the rest of the mat.

Page 454: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 502 END PRODUCT SPECIFICATION FOR ASPHALT PAVEMENT CONSTRUCTION

BC – MOT 2006 502 (24 of 24)

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 455: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 503

BASE PREPARATION AND BASE PROCESSING

503.01 Base Preparation - The work shall consist of shaping and compacting the existing granular base course to the designated grade and cross-section.

The existing base course material shall be watered, graded and compacted to provide a non-segregated, tightly-knit surface which conforms to the line, grade and cross sections shown on the Drawings or staked by the Ministry Representative to an accuracy of ± 10 mm.

If necessary, the existing surface shall be scarified and bladed to achieve this. No imported materials are to be incorporated into the work, except where failed areas have to be backfilled.

a) Failed Areas - Where a failed area is present in the existing base, the Contractor shall excavate and dispose of the material, all as directed by the Ministry Representative. The area shall be backfilled using crushed granular base or surfacing aggregate or road-mix as directed by the Ministry Representative and compacted to the same density as the rest of the base course.

b) Compaction - If watering is required to attain compaction or for any other reason, it shall be applied uniformly from a distributor of the pressure type, equipped with a spray bar mounting nozzles similar to those used on asphalt distributors. Splash plate type distributors or those equipped with spray bars that eject fine streams of water will not be permitted. The distributor must be provided with a satisfactory means for accurately measuring the quantity of water sprayed. If the Ministry Representative so requires, the measuring equipment shall be calibrated under the Ministry Representative's inspection.

The final surface of the base course shall be compacted to a minimum 100% of the laboratory density obtained by the current ASTM test method D 698.

c) Surplus Aggregate - All surplus loose aggregate arising from the base preparation shall be bladed clear into windrows on the shoulder for later incorporation into the shouldering aggregate or bladed to the side slope and trimmed, as directed by the Ministry Representative.

d) Payment - Payment for Base Preparation will be at the unit prices bid in the Schedule of Approximate Quantities and Unit Prices per square metre for the area actually prepared and shall be full compensation for scarifying done to a maximum depth of 40 mm, blading, shaping, trimming, compacting, finishing and maintaining the granular base to the required line, grade, cross-section and density.

Payment for supply of material used for backfilling and compaction of failed areas will be at the unit price bid in the Schedule for the material used. Payment for excavating and disposing of the material from the failed areas will be by Order for Extra Work.

Payment for Water Applied to Roadway will be at the unit price bid per kilolitre for the actual quantity applied to the road and shall be full compensation for everything furnished and done to supply, haul and apply water.

503.02 Base Processing - Where, in the opinion of the Ministry Representative, the base is so deformed, rutted or unsuitable, that it cannot be adequately prepared for priming under the provisions for base preparation, the Ministry Representative shall order in writing how it shall be processed. This work shall be carried out on an Order for Extra Work basis.

Payment will not be made for superintendence, provision or placement of barriers, lights or other equipment which should normally be provided and available for the general performance of the contract.

BC - MOT 2006 503 (1 of 2)

Page 456: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 503 BASE PREPARATION AND BASE PROCESSING

THIS PAGE IS LEFT INTENTIONALLY BLANK

503 (2 of 2) 2006 BC - MOT

Page 457: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 504

PAVEMENT DRAINAGE

i) The type of curb to be placed (Type "A" or Type "B") will be as specified or as determined by the Ministry Representative.

DESCRIPTION

504.01 Scope - This Section covers the provision of pavement drainage with the construction of necessary asphalt curbing and drainage outlets using cast iron catch basins or asphalt spillways together with pipe or paved outfalls. Concrete curbs, concrete and corrugated steel catch basins, cast iron grates and frames where applicable are specified by Section 582.

ii) Prior to construction of the curb, the affected pavement area shall be dry and cleaned of loose or deleterious materials. A tack coat of liquid or emulsified asphalt determined by the Ministry Representative or specified in the Special Provisions or Purchase Order shall be uniformly applied at a rate of 0.25 to 0.5 l/m2, to a width 0.1 m wider than the proposed curb. MATERIALS

iii) The production and transportation of asphalt mix for curb construction shall be in accordance with Sections 501 and 951 and shall meet the requirements for Class 1 Fine Mix.

504.11 Materials

a) Unless otherwise specified the Ministry will supply f.o.b. the Contractor's job site yard or the Ministry's yard or other location as indicated in the Special Provisions or Purchase Order the following materials: iv) The machine for constructing the curb shall be

self-propelled extrusion-type equipment with a material hopper, distributing screw and adjustable curb forming devices capable of placing and compacting the asphalt mix to the required alignment, grade and cross-section in an even homogeneous manner free of surface defects. The asphalt concrete mix shall be handled to provide a curb meeting the applicable density requirements of Section 501 and the curbing equipment shall be operated in a manner that ensures a smooth, uniform finished curb alignment. Where handforming of curb is required, the finished curb shall conform to all dimension, alignment, density and finish requirements for machine-laid curb.

• Cast Iron Catch Basin Box and Adaptor plate (Drawing SP582-02.05).

• Cast Iron Catch Basin Grates (Drawing SP582-05.02).

• 200 mm Nominal diameter Corrugated Galvanized Steel Pipes, Bends and Connectors (Section 320).

b) The Contractor shall provide and/or fabricate as required:

i) All strap iron binding hoops, angle iron pipe supports, brackets, bolts and studs or other hardware not provided by the Ministry. 504.32 Location of Drainage Outlets - On completion of

pavement and curb construction and in conjunction with the installation of any precast concrete barriers, the Contractor shall install or construct drainage outlets at the low point of curves in the vertical alignment and at such other locations designated by the Ministry Representative.

ii) All other building or construction materials that may be required to construct the outlets according to the intent of this Section.

iii) Asphalt mix required for the work with payment to be made in accordance with Subsection 504.93. Note: The exact low point on the pavement may be

determined by allowing water to flow along the surface to the actual lowest point on the pavement adjacent to the curb or barrier. This low point shall be clearly marked on the pavement.

CONSTRUCTION

504.31 Asphalt Curbs

504.33 Excavation - At the locations designated by the Ministry Representative, the asphalt pavement and any curbing shall be accurately cut away and the highway shoulder excavated to the dimensions consistent with the installation of Cast Iron Catch Basins (Drawing SP504-03) or the construction of Asphalt Spillways (Drawing SP504-02). The excavation shall, as nearly as possible, have vertical sides and shall be so done as to cause minimum disturbance of the adjacent compacted base and pavement structures. The outside dimensions of the excavation shall

504.31.01 Integral Asphalt Curb - Where specified in the Contract Documents, asphalt concrete curb integral with the asphalt concrete highway pavement shall be constructed to the dimensions indicated on Drawing SP504-01.

504.31.02 Machine-Laid Asphalt Curb - Where specified, machine laid (extruded) asphalt concrete curbs shall be constructed in accordance with Drawing SP504-01 and as follows:

BC - MOT 2006 504 (1 of 6)

Page 458: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 504 PAVEMENT DRAINAGE

be the smallest compatible with the efficient construction of the drainage facility, as any excess or irregular excavation will be required to be repaired with asphalt mix.

Where applicable, appropriate trench excavation shall be performed to permit the installation and embedment of outlet pipe and associated fittings. Excavation for installation and embedment of outlet pipe shall be considered incidental to the rate bid for pipe installation.

504.34 Drainage Outlets

504.34.01 Cast Iron Catch Basins - Bedding and surrounding mortar for catch basins shall be composed of one part Portland cement to three parts clean well-graded fine aggregate mixed to proper consistency.

Bedding shall be a minimum of 125 mm thick to permit accurate setting of the catch basin in mortar at the correct level true to alignment with curbing, barrier or pavement edge as shown on Drawing SP504-03. After securely fixing the adaptor, watertight gasket and connecting pipe, the catch basin shall be surrounded with mortar to the full perimeter of the excavation, and the mortar well tamped and worked around the connecting pipe for 300 mm from the side of the catch basin.

The mortar shall be allowed to set prior to backfilling and further work.

504.34.02 Asphalt Spillways - Asphalt spillways shall be constructed to the general dimensions shown on Drawing SP504-02 with the necessary handforming in accordance with Subsection 504.31.02 (iv).

504.34.03 Pipe Outfalls General - Except where paved outfalls are specified, corrugated galvanized metal outlet pipes of the required diameter shall be installed, as shown generally on Drawing SP504-03. Should the fill material preclude pipe embedment, the pipe shall be secured to the slope by dual angle iron posts placed at 3 m intervals, as shown. The pipe shall be similarly secured at the bend at the base of the slope and at a point approximately 150 mm from its outlet.

The pipe trench shall be backfilled with excavated material as may be directed by the Ministry Representative and the fill thoroughly compacted.

Riprap of 200 mm minimum dimension shall be placed at the pipe outlet as shown on Drawing SP504-03.

504.35 Dishing, Spillways and Completion - The asphalt pavement adjacent to the drainage outlet shall be constructed

to the profile and cross-sections indicated for the type of outlet being installed. The asphalt pavement surface shall be so shaped as to channel all collected water to the outlet orifice and no ridges or other obstructions shall be left which may impede the flow of water to the drainage outlet.

The asphalt paving mix shall be compacted to the density specified by the Ministry Representative to provide an integral and impervious drainage area. Where the asphalt pavement abuts a cast iron catch basin box, the contact face of the box shall be painted with liquid or emulsified asphalt as specified in Subsection 501.23.15 prior to placing the asphalt concrete.

On completion, the area shall be cleared and cleaned up to the satisfaction of the Ministry Representative.

MEASUREMENT

504.81 Pavement Drainage Outlets - Pavement drainage outlets will be measured per EACH of the type specified.

504.82 Corrugated Metal Pipe - Corrugated metal pipe will be measured by the METRE along its centre line as installed.

504.83 Asphalt Concrete Mix - Unless otherwise specified, asphalt concrete mix used to form drainage aprons, curbs, spillways and outfalls will be measured by the TONNE.

504.84 Asphalt Curb - Asphalt curb will be measured by the METRE.

PAYMENT

504.91 Pavement Drainage Outlets - Payment for the installation of PAVEMENT DRAINAGE OUTLETS will be at the Contract Unit Price for each complete outlet of the type specified. The Contract Unit Price shall be full compensation for taking delivery of cast iron basins, boxes and grates; excavation (see Subsection 504.33); provision of all materials required for setting basins to correct grade including cement mortar; backfill and compaction; spreading, shaping and compaction of asphalt concrete aprons and spillways; provision and setting of riprap at the outfall and all labour, materials, tools, warning signs, barriers and superintendence required to complete the installation of the drainage outlet.

504.92 Corrugated Metal Pipe - Payment for CORRUGATED METAL PIPE will be at the Contract Unit Price per metre. The Contract Unit Price shall be accepted as full compensation for taking delivery and installation including all necessary transport of components, excavation

504 (2 of 6) 2006 BC - MOT

Page 459: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PAVEMENT DRAINAGE SECTION 504

and backfilling; provision of posts, brackets, hoops and hardware; labour for connecting and securing pipe fittings, compaction, superintendence, lights, warning signs, barriers and all other things or services necessary for the proper installation of the pipe.

504.93 Asphalt Concrete Mix - Unless otherwise specified, payment for ASPHALT CONCRETE MIX used

to form drainage aprons, curbs, spillways and outfalls will be at the Contract Unit Price per tonne.

504.94 Asphalt Curb - Payment for ASPHALT CURB will be at the Contract Unit Price per metre of the appropriate curb type placed. The Contract Unit Price shall include the formation of offset curb alignment at drainage outlets in accordance with Subsection 504.31.

BC - MOT 2006 504 (3 of 6)

Page 460: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 461: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 462: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 463: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 507

PRODUCTION AND STOCKPILING OF ASPHALT MIX

507.01 General - This Section covers the supply of aggregate, mixing it with a specified asphalt material in a central plant and placing the produced mix in a stockpile.

f) Mineral filler shall:

• consist of all mineral matter passing the 0.425 mm sieve.

• be dry, free from organic matter, clay particles or lumps. 507.02 Aggregate

• be non-plastic when tested in accordance with Test BCH I-11 (ASTM D 423) and BCH I-12 (ASTM D 424).

a) The Contractor shall supply aggregate with gradation wholly within the limits listed in Table 507-A when tested in accordance with BCH Test I-2 (Wash Test).

g) Mineral dust shall consist of all mineral matter passing the 0.075 mm sieve. Once a crushed aggregate gradation has been accepted,

the maximum permissible variation of the mean of any four consecutive tests from the accepted gradation curve shall be within the limits specified in Table 507-B. TABLE 507-A GRADATION REQUIREMENTS

FOR AGGREGATE

SIEVE SIZE PERCENT PASSING (BY MASS)

(mm) PATCH MIX PAVING MIX

19.0 --- 100

16.0 --- 100 - 92

13.2 --- 100 - 80

9.5 100 90 - 65

4.75 85 - 55 75 - 45

2.36 65 - 40 60 - 30

1.18 50 - 25 45 - 20

0.300 30 - 15 25 - 10

0.150 18 - 8 17 - 5

0.075 12 - 5 9 - 2

Should there be a substantial change in the type of aggregate exposed as the work proceeds, the Ministry Representative may authorize a change in the mean gradation.

b) A minimum of 50% by count of all aggregate particles retained on the 4.75 mm sieve shall have at least one fractured face or shall be naturally angular with sharp edges (BCH Test I-13 Method A). If this requirement cannot be met for a specified crushed aggregate type then the Contractor shall, at no additional charge, crush aggregate to the next smaller size or such intermediate size as the Ministry Representative may direct in order that the crushed granular aggregate shall meet the requirement.

c) All aggregates shall be free from coatings of clay, silt or other objectionable matter and shall contain no clay lumps or other aggregations of fine-grained materials.

d) Crushed aggregate shall conform to the following requirements:

• The sand equivalent value in accordance with BCH Test I-8 shall not be less than 40.

• The degradation factor in accordance with the Ministry's procedure shall not be less than 20.

TABLE 507-B MAXIMUM PERMISSIBLE VARIATION OF CRUSHED AGGREGATE GRADATION FROM THE GRADATION CURVE

SIEVE SIZE VARIATION LIMITS % PASSING

4.75 mm and larger ± 5

1.18 mm to 4.75 mm ± 3.5

0.300 mm to 1.18 mm ± 2

0.075 mm to 0.300 mm ± 1

• In the absence of satisfactory performance records for a particular source of aggregate, its soundness shall be tested according to BCH Test I-5. Aggregate so tested shall be considered unsatisfactory if the loss after five cycles exceeds 20% for coarse aggregate or 25% for fine aggregate.

e) For testing purposes, fine aggregate shall be all mineral matter passing the 4.75 mm sieve including mineral fillers. It shall consist of natural and/or manufactured material derived by crushing stone, slag or gravel.

BC - MOT 2006 507 (1 of 4)

Page 464: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 507 PRODUCTION AND STOCKPILING OF ASPHALT MIX

507.03 Asphalt Material e) The asphalt mix shall not contain more than 1% moisture by mass at the discharge from the plant.

a) The type of asphalt material to be used will be specified in the Contract's Special Provisions. f) The asphalt mix shall be uniform in appearance with

all particles thoroughly coated. The mixing time will be increased if the mix is not completely coated with asphalt.

b) Normally the Ministry will supply the Liquid Asphalts or High Float Emulsified Asphalts f.o.b. the Contractor's Plant site.

g) The Ministry reserves the right to adjust the asphalt content in the mix up to the maximums listed in Table 507-D.

c) Should the Contractor be required to supply a particular type of asphalt material, such shall meet the requirements of Section 951.

507.06 Hauling - When the haul distance from the mixing site to the stockpile is greater than 1 km, the hauling vehicles shall be equipped with and use a tarpaulin of such size as to completely protect the asphalt mix from the weather and inhibit premature curing of the mix by aeration.

507.04 Mix Design

a) Unless otherwise specified, the Ministry will carry out the Asphalt Mix design with the aggregate supplied by the Contractor.

The tarpaulin shall be double quilted canvas or other approved material treated to prevent absorption of the asphalt.

b) At least seven days prior to commencement of mixing, the Contractor shall submit the following to the Ministry Representative:

507.07 Stockpiling • A 50 kg sample of aggregate which is

representative of the aggregate to be used on the project.

a) The exact location of the stockpile site will be determined by the Ministry. The Contractor shall place the cold mix within the boundaries of the designated • If available, a 30 kg sample of plant produced

asphalt mix whose gradation is deemed to be representative of the gradation of the aggregate to be used on the project.

TABLE 507-C MIX TEMPERATURES

TYPE OF ASPHALT

ASPHALT STORAGE TEMPERATURE

RANGE oC

MIX TEMPERATURE

RANGE oC SC - 250 65 - 80 60 - 80

MC - 250 65 - 80 60 - 80

HF - 500M 55 - 65 100 - 120*

HF - 1000M 55 - 65 100 - 120* * High temperatures are used when the mix is hauled directly to the road and when dictated by high moisture in the aggregate.

• When the Contractor is to supply the asphalt material, a 5 l sample of the type of asphalt to be used on the project.

c) Once the design grading curve is established, the maximum permissible variation will be as specified under Subsection 507.02 (a).

507.05 Mixing Requirements

a) Mixing operations shall be performed in a mixing plant capable of producing the asphalt mix within the required specifications.

b) The maximum moisture content of the aggregate immediately prior to mixing with a liquid asphalt (MC or SC) shall not be over 2% by mass of dry aggregate.

TABLE 507-D MAXIMUM PERCENT BY MASS

ASPHALT TYPE MAXIMUM PERCENT BY MASS

OF DRY AGGREGATE

SC - 250 6.0

MC - 250 6.0

HF - 500M 7.3

HG - 1000M 7.3

c) Temperatures of the mix shall be generally in accordance with the limits specified in Table 507-C. Mix temperatures may be lowered to reduce the emission of "blue smoke" from the discharge chute.

d) The asphalt content in the mix shall not vary from the design asphalt content by more than 0.3 by mass of total aggregate.

507 (2 of 4) 2006 BC - MOT

Page 465: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PRODUCTION AND STOCKPILING OF ASPHALT MIX SECTION 507

stockpile site.

b) The Contractor shall prepare the stockpile site, which shall be shaped to a uniform smooth surface and graded to ensure good drainage.

c) Temporary stockpiling of the mix on the ground or in storage bins will be allowed, however, the Contractor will be required to minimize the handling of the mix to prevent premature curing of the mix.

d) If conveyor belts are used for temporary stockpiling or final stockpile construction, the free fall distance from the conveyor belt to the stockpile shall not exceed 2 m.

e) If the stockpile is constructed using a front end loader or end dumping by truck, the mix shall be deposited in layers of approximately 1 m in depth.

f) Plank or protected runways shall be provided for operating equipment on stockpiles when the Ministry Representative deems them necessary to prevent

contaminants being tracked onto the stockpile and to minimize consolidation of the mix.

g) The final stockpile shall be constructed in such a manner that height is not more than 4 m.

h) Mixing, hauling or stockpiling will not be permitted during periods of atmospheric precipitation.

507.08 Measurement - The asphalt mix will be measured in TONNES and the asphalt material(s) in LITRES, corrected to 15oC.

507.09 Payment - Payment for ASPHALT MIX in stockpile will be at the contract unit price per tonne, and per litre of asphalt material(s) added to the asphalt aggregate as specified in the tender form.

The unit price will be full compensation for preparing the stockpile site; supplying and heating the aggregate; heating and storing the asphalt material; mixing, hauling and stockpiling the mix.

BC - MOT 2006 507 (3 of 4)

Page 466: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 507 PRODUCTION AND STOCKPILING OF ASPHALT MIX

507 (4 of 4) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 467: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508

END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

b) Fine Aggregate – Fine aggregate is defined as all materials passing the 4.75 mm.

PART A – GENERAL

508.01 Preliminary and General - This section describes the materials, equipment, professional standards and the end product requirements for the construction of graded aggregate seal coats. This section shall be read and construed together with all applicable Standard Specifications for Highway Construction. Should this Section conflict with any other Section, this Section shall be take precedence unless otherwise stated in the Special Provisions.

BC – MOT 2006

c) Mineral Filler and Mineral Dust – Mineral filler shall consist of all mineral matter passing the 0.600 mm sieve and the mineral dust shall consist of all mineral matter passing the 0.075 mm sieve.

d) Blinding Sand – Fine aggregate used as large aggregate support.

508.04 Graded Aggregate Seal General Usage 508.02 General Description of Work - Surface seals shall consist of the application of a selected asphalt emulsion and embedment of the selected aggregate so as to provide a new, uniformly textured surface. This surface shall be impervious to moisture, be skid-resistant and have good riding qualities. There are six classes of Graded Aggregate Seal, as specified in Table 508-A below. These include but are not limited to graded aggregate seals, a coarse or fine sand seal or any other graded aggregate surface treatment outlined in the Special Provisions of the Contract.

• Class A & B - Double seals on gravel highways • Class B - Low traffic paved roads • Class C, Mod C, & D - Major Highways • Class E - Second seals

PART B - SUPPLY OF MATERIALS

508.11 Asphalt Materials - The Contractor shall supply the asphalt emulsion as specified in the Special Provisions which shall meet the requirements of SS 952. TABLE 508-A GRADATION LIMITS FOR GRADED

AGGREGATE SEAL Asphalt(s) to be used on surface seals may be standard rapid curing cutback asphalt; medium curing cutback asphalts; or anionic or cationic emulsions including high float emulsified asphalts. Types and grades of asphalt binder proposed for use on the Project will be specified in the Special Provisions.

Sieve size % PASSING BY MASS by CLASS (mm) A B C Mod C D E

19 100 - - - - - 16 - 100 100 100 - -

12.51 60-90 60-90 - - 100 - 9.5 40-80 35-75 30-70 25 -55 30-80 100

4.75 20-60 15-50 25-45 7 - 30 25-45 0-30 0.600 0-25 0-15 5-20 0 -10 5-20 0-10 0.075 0-7 0-5 0-3 0 - 3 0-3 0-3 Ratio2

(9.5/4.75) - - - 1 - 1.5 - -

The Ministry Representative may require the use of anti-stripping additives or any other materials formulated to improve the coating and adhesive properties of the asphalt binder to the cover aggregate. Instructions concerning the type of additive to be supplied and the method of incorporation with the asphalt binder will be specified in the Special Provisions.

508.12 Aggregates

508.12.01 Mineral Aggregate Supply - Mineral cover aggregate meeting the requirements described hereunder shall be supplied by the Contractor unless specifically described otherwise in the Special Provisions.

Notes: 1 The Contractor may use either the 12.5 mm or the 13. 2 mm

sieve, at the Contractor’s option. 2 The “Ratio” is the ratio of the mass of material retained on the

9.5 mm sieve, divided by the mass of material retained on the 4.75 mm sieve. The Ministry may supply the aggregates. If the Ministry

does supply aggregates, then the Ministry will supply quality control information, if available, to the Contractor. The Contractor must verify and be satisfied that the Ministry supplied aggregates will meet the quantity and quality requirements prior to submitting a bid.

508.03 Definitions

a) Coarse Aggregate – Coarse aggregate is defined as all material retained on or above the 4.75 mm sieve.

508 (1 of 22)

Page 468: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508 END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

508.12.02 Mineral Aggregate – Test Methods - Mineral Aggregate will be sampled and tested in accordance with the standard ASTM procedures and tests listed in Table 508-B

508.12.04 Graded Aggregate Seal Gradation.-.Gradations shall meet the requirements stated in Table 508-A for each Class of graded aggregate seal.

508 (2 of 22) 2006

a) Variation Limits – For all Classes of seal except Class E, once the grading curve is established within the above limits, the maximum permissible variation of the mean of any four consecutive tests from the grading curve shall be within the tolerances specified in Table 508-C

TABLE 508-B TEST METHODS FOR MINERAL AGGREGATE

ASTM DESIGNATION

NAME OF TEST

D 75 Sampling stone, slag, gravel, sand, and stone block for use as Highway materials

C 136 Sieve Analysis of Aggregates

C 117 Wash Test of Aggregates

C 142 Clay Lumps and Friable Particles in Aggregates

D 6928 Micro-Deval

D 5821 Fracture Count on Coarse Aggregate

D 4791 Flat and Elongated Particles

TABLE 508-C VARIATION LIMITS

Sieve Size (mm)

Maximum Permissible Tolerance % Passing by Mass

4.75 to 19.0 ± 5.0

0.600 ± 3.5

0.075 ± 1.0

These tolerances do not waive the requirement that the running average of four consecutive tests must be maintained at all times inside the limits specified in Table 508-A. Should the Contractor not be able to maintain the grading within the variation limits specified above they shall be required to construct a second stockpile. This does not alleviate the Contractor from consistently maintaining the grading curve within the tolerances indicated in the gradation curves.

508.12.03 Test Requirements - Mineral cover aggregate shall consist of clean, sound, hard, durable particles or fragments of sand, gravel or crushed stones or combination thereof; containing a minimum of thin elongated or flaky pieces. It shall be substantially free from loosely bonded aggregations, clay lumps or other objectionable matter and shall not be markedly hydrophilic in character.

The mineral cover aggregate, when tested by the methods listed in Table 508-B, shall meet the following criteria: 508.12.05 Aggregate Characteristics

a) Coarse Aggregate Coarse aggregate shall consist of crushed stone or gravel, or a combination thereof; or materials naturally occurring in a fractured condition; or materials naturally occurring of highly angular nature or rough texture.

a) Clay Lumps - Coarse aggregate shall not contain more than 0.5% by mass of clay lumps or other aggregation of fine material.

b) Micro-Deval - No individual test shall have a loss factor of more than 20%. b) Fine Aggregate Fine aggregate shall be clean, hard,

durable, moderately sharp, and free from coatings of clay, silt or other deleterious material and shall contain no clay balls or other aggregations of fine material. All aggregate passing the 4.75 mm sieve shall be non-plastic.

c) Flat and Elongated Particles - The percent flat and or elongated particles must be less than 10% using 4:1 ratio.

d) Fracture - Contrary to ASTM D 5821, only those particles retained on or above the 4.75 mm sieve with two or more fractured faces shall be measured. The minimum % by mass, for coarse aggregate shall be as follows:

c) Mineral Filler and Mineral Dust Mineral filler and mineral dust shall be free from organic matter. Mineral filler shall be non-plastic.

508.12.06 Blinding Sand - The Contractor shall be responsible for the supply of blinding material meeting the requirements of Table 508-D. That portion of blinding sand

• Classes A & B = 75% • Classes C, Mod C, & D = 85% • Class E = not applicable

BC - MOT

Page 469: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT SECTION 508

aggregate passing the 4.75 mm sieve shall be non-plastic.

TABLE 508-D Gradation for Blinding Sand

SIEVE SIZE (mm) PERCENTAGE PASSING

4.75 100

2.36 50 - 100

1.18 30 - 80

0.300 10 - 55

0.150 3 - 20

0.075 0 - 3

508.13 Graded Aggregate Seal Design - The contractor shall provide a graded aggregate seal coat design, professionally prepared by qualified and experienced personnel. For this purpose, the Contractor shall use a qualified registered member of the Association of Professional Engineers and Geoscientists of British Columbia or a qualified registered member of the Applied Science Technologists and Technicians of British Columbia.

This design shall include the asphalt emulsion application rate in litres per square metre, spray temperature and the aggregate spread rate in kilograms per square metre. The design shall be presented to the Ministry Representative for review, at least three (3) days prior to the commencement of work and at any time subsequent changes are made to these rates.

The Contractor shall submit to the Ministry Representative four litres of a representative sample of the emulsion(s) and a twenty kilogram sample of the aggregate(s) intended for use on the project. These samples shall be supplied at least three (3) days prior to the commencement of the work.

PART C – EQUIPMENT

508.20 General The Contractor shall supply plant and equipment necessary for the proper and efficient completion of the work, including clear and effective means of calibration.

508.20.01 The Ministry Representative shall have access at all times to any plant, equipment or machinery to be used on the Project.

508.20.02 If plant or equipment adjustment is necessary, it shall be done by a competent operator or mechanic or

instrument repair technician, as required.

508.21 EQUIPMENT GUIDELINES – The following are guidelines and as such are not mandatory.

508.21.01 Pressure Distributor - The pressure distributor used for applying asphalt materials to consist of a fully insulated tank with a minimum capacity of 5000 l, permanently and rigidly mounted on a truck or fifth wheel trailer provided with pneumatic tires and propelled by a power unit capable of maintaining a constant and uniform speed.

The pressure distributor should be provided with the following equipment:

a) A quick opening gate in the dome.

b) A dipstick calibrated in 20 mm increments and a calibration chart showing the volume for each 20 mm of depth, or provide the manufacturer dipstick and chart. Readily visible external depth gauge indicating the quantity of asphalt in the tank to the nearest 50 l.

c) A means of heating the asphalt material uniformly to any temperature up to 125°C and maintaining the contents constantly at any selected temperature without any local overheating.

d) A heavy duty, industrial-type thermometer and a remote reading dial thermometer.

e) Rear-mounted spray bars and nozzles set parallel to the surface to be sprayed and capable of vertical and lateral adjustment. The spray bars to be capable of adjustment to provide a uniformly sprayed surface from a minimum of 0.6 m to at least 4 m width.

The spray bars to be capable of producing up to triple coverage at one pass. The feed to the spray bars must be arranged so that there is a constant circulation of hot asphalt material to the bars to ensure a uniform viscosity and constant pressure of the liquid asphalt at each nozzle both before and during spraying operations.

f) The feed manifolds to the spray bars to be provided with positive filtration to prevent clogging of bars and nozzles.

g) Rotary adjustable spray bar nozzles to be of the same type, correct size and manufacture; and set to produce uniformly fan-shaped sprays without atomization. Nozzles to be inspected daily and any nozzle having nicked or damaged edges should be replaced.

BC – MOT 2006 508 (3 of 22)

Page 470: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508 END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

h) Spray nozzles to be provided with valves capable of instant full opening and positive cut-off.

i) A connection to a circulating pressure manifold to which a hose may be attached for a single nozzle hand-operated outlet.

j) A pressure pump capable of applying the asphalt material at a minimum rate of 180 l per minute, per metre of spray bar.

k) A pressure gauge accurate to within 15 kPa and a meter calibrated in litres per minute, should be readily visible.

l) A fifth wheel tachometer, calibrated in metres per minute and readily visible to the operator of the distributor.

m) Vehicle spring "tie-downs" to prevent the change in height of the spray bars due to the reduction of the asphalt load during spraying.

n) Electronic distance measuring device, with print out connected to the transmission, that is capable of measuring each spray length and the total length sprayed during the day.

508.21.02 Mechanical Spreader - Cover aggregate to be spread by means of an efficient, self-propelled spreader mounted on pneumatic tires and capable of continuously and uniformly spreading closely regulated quantities of crushed aggregates at the application rates selected. The loading hopper should be of such a capacity as to ensure continuous operation between dumps of aggregate. Aggregate to be transferred from the loading hopper to the front spreading device in such a manner as to ensure a uniform flow and prevent segregation of particles.

The spreading mechanism to be so designed as to distribute and spread aggregate across the selected width without segregation. Aggregate to be applied to the freshly sprayed surface by use of a comb screen for Class A and B Graded Aggregate Seals so that the largest particles are first placed on the road with the smaller fractions falling on top. The comb screen is to be mounted beneath the discharge openings of the spreader mechanism in such a manner that the angle of the comb screen relative to the road surface can be easily and quickly changed. Reverse flow aggregate spreaders are exempt from this clause.

Suitable provision to be made to prevent aggregate from rolling on the freshly sprayed surface. The cover aggregate should be applied ahead of the spreader wheels, with sharply defined, straight edges and without any lateral movement of

the aggregate after initial application.

The spreader to be designed to apply aggregate at any application width between 2 m and 4.12 m. (Note: a 4.26 m hopper is required).

All joints should be at centreline or lane line.

508.21.03 Rollers - Self-propelled pneumatic tired rollers (minimum mass of 11,000 kg) to be used on the work.

All rollers shall be provided with equipment for spraying water continuously on all tires or wheels, while rolling is in progress, and also be provided with such means as may be required to keep the tires clean and free of adhering asphaltic binder.

508.21.04 Power Brooms - Brooming work to be carried out using rotary power brooms. The brooms to have sufficient width, power and brushing capacity to completely clean the surface of the standard lane to be treated or which has been treated within three coverages.

508.21.05 Water Truck - Water trucks to have a minimum capacity of 9000 l. Water to be applied from a distributor of the pressure type, equipped with a spray bar mounting nozzles similar to those used on asphalt distributors and capable of applying the water accurately and uniformly.

Splash plate type of distributors or those equipped with spray bars that eject fine streams of water will not be permitted.

The distributor to be provided with a satisfactory means for accurately measuring the quantity of water sprayed. Measuring equipment is to be calibrated. The Contractor shall make all necessary arrangements for obtaining water.

508.21.06 Tanks, Mobile Asphalt Heating, & Storage – Insulated liquid asphalt storage tanks should meet the following minimum criteria:

a) A heating system, capable to heat from 10° to 200°C.

b) An automated heating and control system with safety shutdown.

PART D – CONSTRUCTION

508.31 Daylight Hours Only – Construction shall be carried out during daylight hours only.

508.32 Traffic Control and Signing – The Contractor shall submit, for the approval of the Ministry

508 (4 of 22) 2006 BC - MOT

Page 471: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT SECTION 508

508.37 Sweeping – Sweeping shall meet the requirements of SS 145, and SS 165 and the following:

Representative, a Traffic Control Plan at least seven days prior to the pre-construction meeting.

BC – MOT 2006 508 (5 of 22)

a) Immediately prior to the commencement of the sealing operations, all loose aggregates, dust, dirt, caked clay or foreign materials shall be removed from the width of the surface to be treated by brushing with power brooms supplemented by hand push brooms, shovels or the use of a power grader, and where necessary by flushing.

Traffic Control on Seal Coat projects shall be in accordance SS 194 as well as the Ministry’s publication “Traffic Control for Work on Roadways”.

The Traffic Control shall be maintained at all times when in the opinion of the Ministry Representative, the risk of damage to the mat is likely to become a safety issue or to result in unnecessary vehicular damage from loosened rock. Additional traffic control to protect the quality of the product is also the responsibility of the Contractor.

b) Particular care shall be taken to thoroughly clean to outside edges of the strips to be treated and to ensure that the sweepings are not so deposited on the shoulder as to permit subsequent contamination of the treated surface. Traffic through the work zone shall be limited to 50 km per

hour, or as directed by the District Manager Transportation, until completion of final sweeping. 508.38 Repair – Any patching or repair work required, in

the opinion of the Ministry Representative, before sealing operations begin, may be done by the Contractor as directed by the Ministry Representative and paid for under as Extra Work.

Extending traffic control beyond the end of the shift, in order to maintain safety and reduce vehicular damage risks, will not preclude the Contractor from providing and applying blinding material to further reduce these risks.

508.39 Double Seal, Second Pass – Where the design calls for a double seal, the second pass of the surface treatment shall commence not less than 24 hours after completion of the first pass, subject to acceptable weather conditions as detailed in SS 508.33, and as the Ministry Representative may direct.

The Contractor shall, after discontinuing the application of product for the day, continue to maintain flag-person assisted traffic control over the extent of the day’s production, for a minimum of 24 hours for work on numbered routes, 2 hours on other routes, or as specified in the Special Provisions.

PART E - QUALITY CONTROL AND QUALITY ASSURANCE

508.33 Temperature and Weather – Air temperature shall be a minimum of 6°C for application of graded aggregate seals, and application shall cease when the temperature falls below that level. 508.41 Quality Control by the Contractor – The

contractor shall be responsible for providing all resources required to carry out the quality control on all the constituent materials, processes and products, their testing and inspection, within the construction of the seal coat and the quality of the end product. (See SS 508 Appendix E - Quality Control Requirements and Guidelines).

No application shall take place when the weather is misty or rainy.

508.34 Grade Preparation – Immediately prior to the application of the graded aggregate seal coat on a previously constructed granular surface, the surface shall be watered, graded and compacted and/or broomed to provide a non-segregated, tightly knit surface free from loose rock. Cross-fall will be at 3% or as directed by the Ministry Representative and super-elevations developed uniformly and carried consistently through each curve.

508.41.01 Quality Control Plan – The Contractor shall prepare and submit a Quality Control Plan, in accordance with the Contract requirements, at least 7 days prior to the pre-construction meeting.

508.41.02 Sampling, Testing and Observing – The contractor shall provide properly maintained equipment, qualified personnel and shall maintain access to a qualified laboratory so that quality control tests and observations are performed and the results must be reported to the Ministry Representative within 48 hours. For asphalt emulsions, the test results must be received within 21 days of sampling.

508.35 Joints – All joints between adjacent passes of seal shall be at centreline or lane lines.

508.36 Communications – The flagpeople, pilot car or cars, sign truck, spreader and supervisor's vehicle shall have an effective electronic means of communication so that instructions and information can be quickly and accurately relayed over the total length of the control area. The Contractor’s Quality Control Plan shall provide details

Page 472: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508 END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

ii) The samples shall be identified and retained by the Contractor until demobilization at which time permission may be granted by the Ministry Representative to discard the samples in an environmentally friendly manner.

of the equipment provided, its calibration, and application methodology to meet the Contract requirements.

508.42 Quality and Quantity Control Records

508 (6 of 22) 2006 BC - MOT

iii) The Ministry Representative may provide the Contractor with a copy of the test results from the Ministry’s Quality Management program. The Contractor shall not utilize these tests in place of their own Quality Control Program.

508.42.01 Emulsion Quality – The Contractor is referred to tests performed on asphalt emulsion (SS 508 Appendix A). Quality control tests results for each batch of emulsion supplied to the job site must be made available to the Ministry.

iv) The absence of Ministry test results shall not relieve the Contractor’s obligation to remedy any defect in materials or construction.

508.42.02 Aggregate Quality–

The Contractor shall assess the supplied aggregate to determine and satisfy themselves as to its suitability regarding quantity and quality for the intended application. Any modifications deemed necessary to ensure a quality product shall be made at the Contractor’s expense.

508.42.07 Final Quantity Report – The Contractor shall supply to the Ministry Representative, prior to final acceptance of the work, the total amount of emulsion and graded aggregate seal aggregate used on the project, and the volume of unused emulsion remaining in the tank(s). 508.42.03 Emulsion Usage – Daily emulsion usage shall be

made available to the Ministry Representative on the Form “Emulsion Usage” (SS 508 Appendix C). Information shall be made available to the Ministry Representative within 48 hours and prior to demobilization of the storage tanks and pressure distributor from the Site.

PART F - END PRODUCT ASSESMENT

508.51 General - The Contractor shall provide an end product conforming in accuracy and detail as specified by the contract. Payment is based on end product assessment by the Ministry Representative.

Emulsion usage will be reconciled against initial tank volume, delivery records and remaining volume prior to the Contractor demobilizing from the Site.

508.52 Surface Deficiency Definitions – See SS 508 Appendix F “Surface Defects And Photographs” for examples and details of the conditions listed below.

508.42.04 Aggregate Usage – The Contractor shall monitor the aggregate spread rate on a production day basis and make the results available, in an acceptable format, to the Ministry Representative within 48 hours. 508.52.01 Blackening – Blackening is the emergence of

excess asphalt onto the finished surface whereby the finished surface becomes discoloured but the coarse surface texture remains. Under this condition, the effective cover stone can still be seen to protrude above the level of the asphalt binder’s upward migration

508.42.05 Daily Activity Log – The Contractor’s Superintendent or designate shall complete and make available to the Ministry Representative the “Daily Activity Log” (SS 508 Appendix D) within 48 hours. This form shall be completed and submitted for all calendar days from the first day of mobilization to the last day of demobilization, for any day on which work was performed on Site.

508.52.03 Flushing and Bleeding – Flushing and bleeding is the emergence of excess asphalt and fines onto the finished surface and the significant loss of coarse surface texture, leaving little or no effective cover aggregate visible.

508.42.06 Emulsion Sampling 508.52.04 Pock Marks – Pock Marks are indentations in the mat texture, normally less than the thickness of the graded seal layer, evidenced by the absence of effective cover aggregate in a small area. (No photograph available)

i) The Contractor shall, procure and store a four litre sample of the emulsion from each tanker for use by the Ministry and/or Contractor.

These samples shall be obtained, handled and stored in accordance with ASTM procedure D 140 “Standard Practice for Sampling Bituminous Materials” and also with the manufacturer’s recommendations.

508.52.05 Pot Holes – Pot Holes are the loss of all cover aggregate and base material(s) into the underlying asphalt or gravel base. Pot Holes may develop because of seal and/or base weakness.

Page 473: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT SECTION 508

508.52.06 Ravelling – Ravelling is a general term for loss of cover aggregate, which can include numerous pock marks.

508.52.07 Streaking – Streaking is a continuous visible absence of effective cover aggregate often seen paralleling a ‘ridge’ of excess cover aggregate, characterized by the narrowness of its width and the significant extent of its length. Where streaking displays an absence of effective cover aggregate, the condition is unlike ravelling in that there was originally little or no effective aggregate in the area.

508.52.08 Washboard – Washboard is a condition of non-uniform surface texture caused by the buildup of transverse ridges within the graded seal layer itself, and characterized by a very rough, vibratory or chattering ride. (No photograph available)

508.53 End Product Evaluation

508.53.01 Lot Definition – A Lot shall be one lane kilometre of highway sealed. Sections of any road/highway remaining which are less than one-half (0.5) kilometres in length, will be included in the previous Lot. Sections remaining which are 0.5 kilometres or greater, but less than one kilometre will receive a Lot designation unique for the road/highway.

508.53.02 Rating Time Criteria – The Ministry Representative will rate each Lot, within thirty (30) days of final brooming.

508.53.03 Performance Rating Criteria – Performance rating will be in accordance with the two tables in SS 508 Appendix F: The Surface Defect Parameters Table and the Surface Defects Frequency Definitions, and the photographs.

508.54 Deficiency Repair and Replacement – Any Lot of sealed surface which is found unacceptable shall be remedied in accordance with the (SS 508 Appendix F) “Surface Treatment Repair/Replacement Criteria”, until the whole project has been repaired or replaced as necessary and accepted by the Ministry Representative.

On double seal applications both the lower and upper lifts must be free of deficiencies prior to being accepted.

The sealing Contractor will not be responsible for deficiencies attributed to base, base failures and base work done by others. These may be repaired under a Provisional Sum Item provided for that purpose, or as ordered by the Ministry Representative.

For any defects being repaired through re-seal, the repair

must cover the entire width of the highway (or to a centerline barrier), unless the Contractor can demonstrate that a compliant repair can be achieved at a narrower width without any longitudinal ridging which may adversely affect driver control or trap water adjacent to the edge of the repair.

508.55 Attention to Potential Safety Hazards – If, in the opinion of the Ministry Representative, remedial Work is required to correct a potential safety hazard it shall be undertaken immediately.

PART G - MEASUREMENT AND PAYMENT

508.61 Surface Seals – Surface Seal will be measured and paid by the square metre.

Payment in a double pass application will be for final top lift surface area only.

Payment will be full compensation for pre-cleaning the surface; loading, hauling, placing the asphalt emulsion and aggregate; compaction; brooming the finished surface; quality control and traffic control.

No extra payment will be made for any additional equipment, tools, labour or material used to replace, repair or overlay Unacceptable Work.

No extra payment will be made for any additional equipment, tools or labour employed to satisfy special brooming requirements.

508.62 Asphalt Emulsion – Asphalt emulsion will be measured and paid in litres of emulsion actually sprayed on the road, including supply, storage, heating and handling.

508.63 Aggregates - Aggregates will be measured by the cubic metre in stockpile. The volume will be determined by surveying and surface-to-surface volume calculations. Measurement shall be performed by the Contractor at the Contractor’s expense using an independent surveying company. Survey results must be verified and signed off by the independent surveying company and survey results must be supplied to the Ministry.

Payment for aggregates will be at the Contract Unit Price per cubic metre in stockpile. Payment for aggregate will be only up to 100% of the Approximate Quantity as stated in Schedule 7.

No payment will be made for the supplying, hauling and placing of blinding sand.

BC – MOT 2006 508 (7 of 22)

Page 474: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508 END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

The supply of extra aggregate, required to repair or overlay Unacceptable Work, will be the Contractor’s responsibility. Where sufficient aggregate quantities are remaining in stockpile, the Ministry will make these available at no cost to the Contractor.

508.64 Stockpile Bases - The stockpile base must be prepared prior to surveying and stockpiling. No payment will be made for stockpile base preparation work and no payment will be made for materials required for the preparation of stockpile bases.

508 (8 of 22) 2006

508.65 Claims for Vehicular Damage - Without in any way limiting the Contractor’s obligations or liabilities herein, during construction and up until final acceptance of the whole project by the Ministry Representative, the Contractor shall be fully responsible for all claims for damages caused by the work and shall address and deal with each claim submitted.

BC - MOT

Page 475: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT SECTION 508

APPENDIX A

Quality Control Tests, to be obtained by the Contractor from the Supplier, for High Float Emulsified Asphalts

Test ASTM VERSIONS

ASTM D 140 Standard Practice for Sampling Bituminous Materials

ASTM D88 Saybolt Furol Viscosity

ASTM D-113 Ductility Test for Polymer Modified Emulsions

ASTM D-244 (CAN2-16.5-M84)

Residue by Distillation

ASTM D-5 (CAN2-16.5-M84)

Penetration of Asphalt Materials

ASTM D 4957 (CAN2-16.5-M84)

Absolute Viscosity of Asphalts

ASTM D-139 (CAN2-16.5-M84)

Method of Float Tests for Bituminous Materials

BC – MOT 2006 508 (9 of 22)

Page 476: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508 END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

APPENDIX B

HIGH FLOAT EMULSIFIED ASPHALT REPORT (H-539)

508 (10 of 22) 2006

Project No: Refinery: _______________________

Contract: Asphalt Grade: __________________

Location: Batch No: _______________________

Sampling Date: Testing Date: ____________________

SPECIFICATIONS REQUIREMENTS RESULTS

MAXIMUM MINIMUM

Residue by Distillation % by mass

Oil Distillation % by volume

Saybolt Furol Viscosity (SFS) 50°C

Penetration 5 s/100 g/25° C

Viscosity, mK or CM (Pa•s) 60° C

Ductility, at 4°C

Float Test (s) 60° C

BC - MOT

Page 477: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT SECTION 508

508 (11 of 22) BC – MOT 2006

Page 478: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508 END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

APPENDIX D

DAILY ACTIVITY LOG

1. General

Contractor_____________________________Address_____________________________

Superintendent_________________________Phone____________Fax________________

Project No.____________________________Hwy/Road____________________________

Project Description__________________________________________________________

Emulsion Manufacturer________________ Emulsion Type_________________________

Aggregate Source(s)____________________Aggregate Class________________________

2. Equipment (e.g.: type, make and model of chip spreader) _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

3. Weather at start-up at shut-down

Ambient Temperature: ____________ _______________

Road Surface Temp.: ____________ _______________

General Conditions: ____________ _______________

4. Traffic Control Number/Type Duration (From/to)

Pilot Vehicles _______________ __________________

T.C.P.’s _______________ __________________

Signs (specify) _______________ __________________

5. General Remarks (e.g.: weather, dust, traffic volumes, mechanical, materials) ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(Contractor’s Representative) (Date)

508 (12 of 22) 2006 BC - MOT

Page 479: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT SECTION 508

APPENDIX E QUALITY CONTROL REQUIREMENTS AND GUIDELINES

1.01 GENERAL

BC – MOT 2006

The Contractor’s guidelines for preparing, submitting and adhering to a Quality Control Plan are specified in SS 101, SS 508 Part E, the Special Provisions and this Appendix.

The QC Manager shall have at a minimum 5 years related experience in Quality Management.

1.02 QUALITY CONTROL PLAN

The Plan shall address all elements that affect the quality of the materials, end product seal coat, including but not limited to the following:

• Supply of Asphalt Materials • Identification of source and proof of quality of aggregates to be supplied • Aggregates production and its gradation control • Quality of aggregate components during production • Stockpile management • Sealcoat Design(s) • Distributor and spreader calibration • Process temperature controls • Material application rates • Joints and tapers

1.03 CONTRACTOR’S RECORD OF QUALITY CONTROL TESTING

Test results should be made on specified forms or charts immediately after completion of each test. These test results are to be made available to the Ministry Representative upon request.

Records of gradation control during aggregate production should be kept on the form H-295 – Mechanical Analysis of Aggregates, or on a similar gradation analysis form acceptable to the Ministry Representative.

1.04 MATERIAL APPLICATION RATE

The Contractor shall control the Material Application Rate by monitoring the amount of emulsion and aggregate delivered to the road against the area covered by checking the application rates of the distributors and spreader.

1.05 OTHER QUALITY CONTROL PROCEDURES

The Contractor may initiate other Quality Control procedures as necessary for ensuring production of a quality product and include them in a Quality Control Plan. Procedures may also be introduced after the start of work as amendments to the Quality Control Plan.

1.06 QUALITY CONTROL TESTING FREQUENCY

Recommended test frequency requirements for Quality Control are described in Table 1 following:

508 (13 of 22)

Page 480: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508 END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

TABLE 1 – TEST FREQUENCY GUIDELINES

508 (14 of 22) 2006

ASTM Test Designation *Minimum Frequency

D-75 Sampling Stone, slag, gravel, sand and stone block for use as Highway Materials When Required

C-117 Test for Materials Finer than 75 µm (No.200) Sieve in Mineral Aggregates by Washing 1 test (Representative Sample)

C -142 Test Method for Clay Lumps and Friable Particles in Aggregates 1 test (Representative Sample)

D 6928 Micro Deval 1 test (Representative Sample)

D-5821 Fracture Count on Coarse Aggregate 1 test (Representative Sample)

Tests Before Aggregate Production

D-4791 Test Method for Flat Particles, or Flat and Elongated Particles in Coarse Aggregate 1 test (Representative Sample)

C-136, Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

- Main Stockpile -1 per each 1.5 hours production.

D-5821, Determining the Percentage of Fractured Particles in Course Aggregate

- Main Stockpile -1 per each 1.5 hours production.

Tests During Aggregate Production

C-117 – Test for Materials Finer than 75 µm (No 200) Sieve in Mineral Aggregates by Washing

- 1/shift on reduced sample obtained from combined samples from the crusher.

D-244, Residue by Distillation - minimum 1 per batch

D-244, Saybolt Furol Viscosity - minimum 1 per batch

D-5, Penetration of Bituminous Materials - minimum 1 per batch

D-139, Float Test - minimum 1 per batch

D-4957, Apparent Viscosity on Residue - minimum 1 per batch

Tests on Emulsified Asphalt Products

D-113, Ductility - minimum 1 per batch on polymer modified emulsions.

Emulsion Pan Test

- 3 per distributor/day. Test procedure, variation limits and actions should be outlined in Contractor’s Quality Control Plan.

Tests on Application of Sealcoat Materials

Aggregate Pan Test

- 2 per spreader/day. Test procedure, variation limits and actions should be outlined in Contractor’s Quality Control Plan.

* These are the recommended minimum frequencies and the contractor is responsible to assess the need to increase testing when required.

BC - MOT

Page 481: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT SECTION 508

APPENDIX F SURFACE DEFECT AND TREATMENT REPAIR/REPLACEMENT CRITERIA

SURFACE DEFECTS

SEVERITY RATING PARAMETERS REPAIR/REPLACEMENT METHOD

Very good No noticeable aggregate loss None

Good A few pock marks, less than 5 per 0.1 m2 None

Fair Frequent pock marks closely spaced, more than 5 per 0.1 m2

Reseal of affected area***

Poor Extensive pock marks or few surface disintegrations

Reseal of affected area***

Loss of cover aggregate

(Ravelling)

Very poor Disintegration with potholes Reseal of affected area***

Very good Few minor potholes, only involves graded aggregate seal

All potholes to be filled with asphaltic patching material at contractor's expense

Good Few deep potholes, involves granular base All potholes to be filled with asphaltic patching material.(see SS 508.54)

Fair Intermittent potholes Patch potholes and reseal affected area*** (see SS 508.54)

Poor Frequent potholes Patch potholes and reseal affected area*** (see SS 508.54)

Potholes

Very poor Extensive or potholes throughout Patch potholes and reseal affected area*** (see SS 508.54)

Very good No/very faint colour change in wheel path None

Good Few sections with asphalt on surface None

Fair Intermittent sections with asphalt on surface Application of sand blotter

Poor Frequent sections with asphalt on surface, has wet look or asphalt on surface throughout

Reseal of affected area. Removal of initial surface treatment at Contractor’s option***

Flushing / bleeding

Very poor Wet look with noise like a wet pavement Reseal of affected area. Removal of initial surface treatment at Contractor’s option***

Total failure Any Any condition where the asphalt material softens or disintegrates under traffic and aggregate is picked up or “kicked off” by traffic

Remove and dispose of failed surface treatment in its entirety and apply new surface treatment

Streaking (see raveling)

Any Absence of cover aggregate caused by too little binder - characterized by long, narrow sections of little or no stone cover

Reseal of affected area

Washboard Any Any condition of repetitive build-up across the travel lane

Remove and reseal affected area

NOTE:*** Reseal for these defects shall consist of a new graded aggregate surface treatment, single pass application. Area of the reseal repair/replacement shall not be less than one lane width, 10 metres in length. If there is less than 10 metres between two sections in the application pass designated for repair/replacement, the repair/replacement shall be continuous.

BC – MOT 2006 508 (15 of 22)

Page 482: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508 END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

APPENDIX F (Continued)

SURFACE DEFECTS FREQUENCY DEFINITIONS

DENSITY OF SURFACE DEFECTS**

SEVERITY RAVELLING (% LENGTH)

POTHOLES (NUMBER)

FLUSHING/BLEEDING (% LENGTH)

Very Good <5% 0 - 1 <5%

Good 5% - 20% 2 - 15 5% - 20%

Fair 21% - 50% 16 - 30 21% - 50%

Poor 51% - 80% 31 - 50 51% - 80%

Very Poor >80% >50 >80%

Note: ** Based on number of surface defects or percent of surface affected by defect, per Lot as defined in SS 508.53.01.

508 (16 of 22) 2006 BC - MOT

Page 483: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508

508 (17 of 22)

END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

BC – MOT 2006

Blackening

Page 484: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508 END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

508 (18 of 22) BC - MOT 2006

Flushing or Bleeding

Page 485: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT SECTION 508

Pot Hole

BC – MOT 2006 508 (19 of 22)

Page 486: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508 END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

Raveling or Stripping

508 (20 of 22) 2006 BC - MOT

Page 487: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT SECTION 508

Streaking

BC – MOT 2006 508 (21 of 22)

Page 488: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 508 END PRODUCT SPECIFICATION FOR GRADED AGGREGATE SEAL COAT

THIS PAGE IS INTENTIONALLY BLANK

508 (22 of 22) 2006 BC - MOT

Page 489: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 511

COLD MILLING

At the end of the milling shift or at the end of each section to be milled, prior to reopening the road to traffic, the pavement shall be cleaned and swept so that all loose material is removed. Also, the transition from the milled surface to the existing paved surface shall be tapered at a maximum slope of 25:1, or as directed by the Ministry Representative. The Ministry Representative shall indicate whether the taper is to be milled or a tar paper letdown shall be constructed using asphalt mix.

DESCRIPTION

511.01 Scope - This work consists of preparing a foundation for placement of new surfacing by cold milling the existing pavement surface to the depth and width as indicated in the Special Provisions and/or drawings.

EQUIPMENT

511.21 Milling Machine - The milling machine shall be self-propelled and shall be equipped with automatic longitudinal and transverse grade control, which shall be used when directed by the Ministry Representative. A profiling ski or boom of a minimum 4 m length, approved by the Ministry Representative, must be used. No substitute equipment will be permitted. The cutting drum shall be a minimum of 1.8 m in width, totally enclosed and with replaceable cutting teeth. There shall be an effective means of removing the loosened material from the surface and for preventing dust from escaping into the air.

On extensive milling projects no more than one milling shift shall be carried out in any one lane so as to minimize the length of the grade difference between the lanes. At no time, at the end of a shift, shall there be a grade difference that is not at lane dividing lines, centre line or at locations indicated by the Ministry Representative. When the milling operation traverses intersecting roads or on and off ramps, the transition from the milled surface to the existing pavement shall be at a maximum slope of 25:1 or as directed by the Ministry Representative. This transition can be done with the milling machine or by using tar paper letdowns as approved by the Ministry Representative. 511.22 "Kill" Switch - All pavement milling machines

shall be equipped with a "kill" switch installed or approved by the manufacturer of the milling machine. This "kill" switch shall be automatically actuated whenever the operation of the machine is so impeded that a hazardous situation, such as "kick back", would result were that operation to continue. When so actuated the "kill" switch shall instantly shut down the operation of the milling machine.

If, due to delays between the milling and paving operations, the milled surface starts to pothole or deteriorate, repairs shall be carried out at once using asphalt mix. At no time shall there be a grade difference between lanes of more than 50 mm at the end of a shift. If the milling is carried out to a depth greater than 50 mm, the full width of the driving surface shall be milled or a lift of leveling course shall be constructed to maintain a maximum depth of 50 mm.

511.23 Audible Back Up Warning Device - See Subsection 145.30.04. At those locations where milling is conducted the Contractor

shall cut drainage channels as required to prevent water from collecting in the milled area. CONSTRUCTION If washouts occur at any time during the milling operations, they shall be immediately repaired by the Contractor, at the Contractor's own expense, with approved materials and as directed by the Ministry Representative.

511.31 Traffic Control Person - A haul vehicle traffic control person shall be provided during cold milling operations. This individual's sole duty shall be to signal and direct hauling vehicles to exit, back into and pull away from the milling machine, and to re-enter the traffic stream in a safe manner in accordance with existing requirements. 511.33 Disposal of Materials - The disposal of materials

removed under this section which are not recycled and used on the project shall become the property of the Contractor at the point of removal, unless otherwise specified. Materials shall be disposed of outside the limits of the project in a manner satisfactory to the Ministry Representative and shall meet all environmental requirements. The procurement of a disposal site, if required, shall be the Contractor's responsibility.

511.32 Pavement Removal - The existing pavement shall be removed to the depth and width as specified in the Special Provisions, on the drawings or as directed by the Ministry Representative to provide a surface that is free of longitudinal and transverse irregularities. The use of a heating device to soften the pavement will not be permitted.

At all times, during the milling operation, the traveled roadway shall be kept clean of all loose materials.

BC - MOT 2006 511 (1 of 2)

Page 490: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 511 COLD MILLING

MEASUREMENT

511.81 General - Cold Milling will be measured by the SQUARE METRE or the TONNE. The area quantities will be determined by measurement of the actual surface area from which the materials have been removed and computed to the nearest square metre. Measurement of material by mass shall be done in accordance with Subsections 145.18.04 and 145.19 before moving to stockpile.

PAYMENT

511.91 General - Payment for COLD MILLING will be at the unit price bid per square metre or tonne as specified in the Special Provisions. The unit price shall be for all things furnished and done including servicing all equipment, replacing teeth on the cutting drum, performing all work to remove the existing pavement by milling, and the provision

for a traffic control person as set out in Subsection 511.31. No additional payment will be made to load, haul and place the material in stockpile.

511.92 Asphalt Mix - Asphalt mix required to repair the milled surface as set out in Subsection 511.32 shall be paid for as set out in the Special Provisions.

511.93 Contractor - The Contractor will be advised of the existence of manholes, catch basins, valves, boxes and other utilities on the project. Care must be taken not to disturb or damage any such structures or devices. Damage to visible, referenced, or plan-indicated manholes, catch basins, valves, valve covers and concrete/asphalt curb, or any other infrastructure shall be repaired at the Contractor's expense. All metal and concrete faces must be cleaned of old pavement and painted with primer, at the Contractor's expense, prior to repaving.

511 (2 of 2) 2006 BC - MOT

Page 491: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 514

HOT IN-PLACE RECYCLE

DESCRIPTION EQUIPMENT

514.21 General - All equipment and instrumentation shall be capable of performing the work in accordance with these specifications.

514.01 Scope - This Specification describes the equipment, work practice and materials required for carrying out Hot In-Place Recycle operations.

514.22 Processing Equipment - The equipment shall have the capability to process the existing pavement to a minimum depth of 50 mm yielding an average mass of 120 kg/m² of existing pavement being processed.

MATERIALS

514.11 Rejuvenating Agent-Requirements - The Contractor shall supply only a Ministry of Transportation approved rejuvenating agent meeting the requirements as shown in Table 514-A. The equipment shall be capable of heating the existing

pavement to a width 100 to 200 mm wider than the width to be processed and to a temperature, behind the screed, of not less than 110oC. The equipment shall be regulated so that excessive heating and burning of the existing asphalt cement does not occur. This will generally require the existing surface to be radiantly heated and no open flame will be permitted.

514.12 Asphalt Mix - When the Special Provisions require the addition of virgin mix to be incorporated into the recycled asphalt mix, it shall meet the requirements as shown in the Special Provisions. The Ministry Representative shall be advised five working days in advance of commencement of work of the source of Virgin Mix for testing purposes.

The scarifying tines or cutting drum(s) shall mill to the specified cross-section and shall be set so as to produce a fully homogenous recycled mixture free of lumps.

When the Contractor is required to supply asphalt mix for repair work, the Ministry Representative is to be advised of the mix source so that it may be tested and approved prior to being required. The equipment shall have an activated heated screed

complete with augers and strike-off device, in accordance with Section 501, capable of distributing and placing the reprocessed mix to the full width of the pavement being recycled.

TABLE 514-A SPECIFICATIONS

BCH Test ASTM Test TITLE OF TEST SPECIFICATION

II-1 D-2726 Bulk Relative Density of Compacted Bituminous Mixtures using Saturated Surface Dry Method

II-2 D-1188 Bulk Relative Density of Compacted Mixes Using Paraffin Coated Method

II-3 D-1559 Resistance to Plastic Flow of Bituminous Mixtures Using Marshall Apparatus

III-4 D-2170 Kinematic Viscosity @ 60oC 200-500 mm²/sec

III-7 D-70 Specific Gravity 0.98-1.02

III-11 D-92 Flash Point by Cleveland Open Cup 204oC Min.

D-1160 (10 mm Hg)

Volatility - IPB - 2%v. - 6%v.

150oC min. 190oC min. 210oC min.

D-2007 Saturates, %w 28 max.

D-2006-70 Asphaltenes, %w 1.5 max.

D-2006-70 Chemical Composition (PC+A1)/(S+A2) 0.4-0.8

BC - MOT 2006 514 (1 of 4)

Page 492: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 514 HOT IN-PLACE RECYCLE

The equipment shall have a minimum production rate of 500 m² per hour except between June 1st and September 8th when the minimum rate shall be 700 m² per hour.

CONSTRUCTION

514.31 Preliminary - If required, prior to starting work, as directed by the Ministry Representative, the existing paved surface shall be cleaned to avoid contamination of the recycled pavement. It shall be swept back at least 20 cm wider than the area to be processed.

Rejuvenating agents that contain water will not be permitted.

The hot recycling unit shall be equipped and capable to add and homogeneously blend any specified proportion of virgin Asphalt Mix into the reclaimed material and shall be equipped with a means to introduce a rejuvenating agent homogeneously into the reclaimed mixture.

Prior to proceeding with the road work, the Contractor shall ensure that all catch basins and manholes, which are within the operating area of the heating units, are clear of any flammable liquids or otherwise hazardous fumes/gases. The local Fire Authority may be of assistance in this regard. The Contractor's compaction equipment shall conform to

Subsection 501.36 in its entirety. 514.32 Recycling - The existing highway pavement shall be heated, planed, reprocessed, with or without the addition of a rejuvenating agent or virgin mix as specified, remixed, replaced and compacted using a heater scarification or hot milling process and rollers.

Individual pre-heating and reprocessing units shall be equipped in such a way that the operator and other workers are not exposed to any hazardous fumes or gases produced from the equipment operation, the heated pavement or from the addition of the rejuvenating agent, in accordance with all applicable regulations. The recycled material shall not be heated over an average of

150oC in order to avoid excessive oxidation and hardening of the recycled Asphalt Cement. 514.23 Rejuvenating Agent Equipment - To accurately

proportion the rejuvenating agent into the scarified mixture the equipment shall comply with the following requirements:

At locations where reprocessing operations begin and end, the Contractor shall ensure that the transition between the processed and unprocessed surface is smooth and without irregularities. If any irregularities occur resulting from the reprocessing operation, the Contractor shall repair these areas with fresh asphalt mix and/or additional reprocessing, at the Contractor's own expense, as directed by the Ministry Representative.

a) positive feed and shut off of the rejuvenating agent, governed by the movement of the reprocessing machine

b) control of the quantity of rejuvenating agent to ± 0.05 l/m² of surface reprocessed with an agent application range of 0.0 l/m² to 1.0 l/m²

At all times the Contractor shall ensure that the appropriate cross slopes for safety and positive pavement drainage are maintained.

c) measurement of the rejuvenating agent applied by means of a metering device, which is capable of recording accumulated litres to the accuracy of "± 2%, and which is fully visible to both the operator and the Ministry Representative

The Contractor shall ensure that the longitudinal edges of the recycled pavement are blended to conform in elevation with the adjacent pavement unless this surface is scheduled to be recycled. d) mechanically or electronically controlled application

of the rejuvenating agent relative to and variable with the processing rate of the equipment Generally, the outer edge of each lane will be tapered to a

12:1 slope. e) a mechanical or electronic metering device capable of supplying an accurate indication of the quantity of rejuvenating agent being applied per square metre

Excess materials shall be removed and deposited in a location such that they can be reincorporated into the recycled mixture. At no time shall excess material be cast across the newly processed surface or incorporated into the granular shoulders.

f) a mechanical, electronic or manual method of measuring the quantity of rejuvenating agent in the tank

514.33 Compaction and Finishing - Immediately behind the reprocessing operation, the Contractor shall supply roller compaction to obtain a minimum of 97% laboratory density. The laboratory density will be the specimen density (Test

g) heating of the agent to within ± 5oC of the application temperature established by the manufacturer and/or the Ministry Representative.

514 (2 of 4) 2006 BC - MOT

Page 493: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

HOT IN-PLACE RECYCLE SECTION 514

514.82 Rejuvenating Agent - Rejuvenating agent will be measured by the LITRE.

BCH II-1 or 2) that results from heating a representative sample of the existing pavement, or rejuvenated and blended mixture, as applicable, to a temperature of 130oC and producing a compacted laboratory specimen using the procedure for 75 blow Marshall method. (Sample preparation shall be in accordance with applicable portions of Test BCH II-3).

514.83 Additional Virgin Mix - Additional Virgin Mix will be measured by the TONNE.

PAYMENT

The mix for compaction testing shall be obtained behind the screed of the laydown machine, and the roadway shall be marked at that location for subsequent drilling of the core. The core shall be cut at the specified heater recycling thickness prior to obtaining its density.

514.91 General - Payment for HOT IN-PLACE RECYCLE of asphalt pavement will be at the Contract Unit Price per square metre. The Contract Unit Price shall be for all things furnished and done including sweeping, processing, compacting, and patching as necessary to complete the work. There shall be no additional payment for areas of "overlap" such as at tapers and joints. The reprocessed mat shall have a uniform appearance. Any

deficiencies shall be corrected, at the Contractor's expense, to the satisfaction of the Ministry Representative. 514.92 Rejuvenating Agent - Payment for

REJUVENATING AGENT will be at the Contract Unit Price per litre. The Contract Unit Price shall be to supply, store, heat, apply and blend with the asphalt pavement mixture reclaimed from the roadway.

The completed Hot In-Place Recycled surface shall conform to all requirements of Subsection 501.10.

MEASUREMENT 514.93 Additional Virgin Mix - Payment for adding VIRGIN MIX at the recycling train will be at the Contract Unit Price per tonne. The Contract Unit Price shall be for all things furnished and done to produce the mix, haul and add the mix to the recycling operation.

514.81 General - Hot In-Place Recycle will be measured by the SQUARE METRE of finished product. The area will be determined by measurement of the reprocessed mat and computed to the nearest square metre.

BC - MOT 2006 514 (3 of 4)

Page 494: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 514 HOT IN-PLACE RECYCLE

514 (4 of 4) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 495: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 515 (1 of 18)

SECTION 515

END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYCLED ASPHALT PAVEMENT

PART A - GENERAL

515.01 General – This Section describes the materials, equipment, professional standards and end product requirements for the construction of Hot In Place Recycled Asphalt Pavement.

End Product Specifications contain the acceptance and payment criteria based on the results of specified sampling and testing. Payment of the contract Unit Prices for the hot in place asphalt pavement product is subject to adjustments upward and downward in accordance to the provisions provided in End Product Specifications (EPS).

515.02 General Description Of Work - The Contractor will be responsible for the following work associated with the construction of hot in place asphalt pavement by EPS:

• Preparing a Quality Control Plan for evaluation before commencing the Work and providing at the production site a testing facility to provide the data needed to implement that plan.

• Supplying, screening, crushing, processing and improving aggregate to produce virgin asphalt mix aggregate.

• Supplying and delivering asphalt cement meeting the requirements of Section 952.

• Supplying and delivering rejuvenating agents meeting the requirements of Subsection 514.11 and Subsection 514.23.

• Heating the virgin asphalt mix aggregate and mixing it with asphalt cement to produce asphalt admix that meets the Job Mix Formula.

• Hauling, and adding the asphalt admix into the recycling process.

• Recycling the existing highway pavement by heating, milling, reprocessing, with or without the addition of rejuvenating agents or admix (virgin mix) as specified, re-mixing, replacing and compacting using a multi-stage, hot milling process and rollers.

The Contractor shall provide an end product conforming in quality and accuracy of detail to the dimensional and tolerance requirements of the contract. Where no tolerances are specified, the standard of workmanship shall be in accordance with normally accepted good practice and those identified in Section 514. Payment is subject to adjustments based on quality assurance tests performed by the Ministry Representative.

The Ministry shall provide information pertaining to the gradation of the admix, asphalt content, addition rates for rejuvenating agents and the percentage of admix to be incorporated.

515.03 Definitions Relevent To End Product Specification

515.03.01 End Product Specification (EPS) - A specification whereby the Contractor is entirely responsible for quality control of the construction processes, and whereby the Ministry performs the specified quality assurance sampling and testing of the end product for the purpose of determining acceptance/rejection and payment.

515.03.02 Job Mix Formula - The Job Mix Formula, supplied by the Ministry, establishes the virgin aggregate proportions, gradation, the asphalt content and type of asphalt to be used for production of asphalt admix. The Job Mix Formula is based on an asphalt mix design, in accordance with Subsection 515.05.06, or on a variation in accordance with Subsection 515.05.07.

515.03.03 Asphalt Admix - The Asphalt Admix is virgin asphalt mix added to the recycled mix. The Asphalt Admix is project specific designed and is blended homogeneously within the recycling process. The Asphalt Admix becomes an integral component of the recycled pavement structure.

515.03.04 Asphalt Content - Asphalt Content means the quantity of asphalt cement in the virgin admix expressed as a percentage by weight of the total dry aggregate in the mix.

Design Asphalt Content - The asphalt content upon which the Job Mix Formula is initially established.

Approved Asphalt Content - The design asphalt content or subsequent adjustment to it, embodied in a Job Mix Formula or revised Job Mix Formula.

Actual Asphalt Content - Actual asphalt content is the amount of asphalt cement in the admix as determined by the Contractor’s Quality Control Testing.

515.03.05 Smoothness - Smoothness is a measure of the longitudinal profile of the pavement surface. The unit for measurement is the International Roughness Index (IRI).

515.03.06 Sample Mean - The Sample Mean is the arithmetic mean of a set of test results constituting the sample.

515.03.07 Stratified Random Sample - A Stratified Random Sample is a set of test measurements taken one each from a number of separate (stratified) areas or Sub-Lots within a Lot in an unbiased way.

515.03.08 Lot - A Lot is a portion of the work being considered for acceptance and for the determination of

Page 496: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 515 END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYCLED ASPHALT PAVEMENT CONSTRUCTION

515 (2 of 18) 2006 BC - MOT

payment. A Lot is defined as follows.

For the application of the contract requirements for:

- Density,

A Lot shall be one day’s scheduled production of at least 7 hours of pavement recycling where no changes have occurred to criteria such as but not limited to:

• approved Job Mix Formula, • the specific thickness to be processed, • the required materials addition rate, • change in the ratio of the components making up the

Hot In Place Recycled Pavement.

A change in any above criteria may require a new Lot designation.

One day’s production of less than 7 hours will be dealt with as follows:

• the material will be added to the next Lot that has the same criteria, as described above, except that

• if a test indicates that this production is subject to a payment adjustment or to rejection, or if no further material will be produced with the same criteria, this production will be designated as a separate Lot,

A Lot shall be no more than two days total production even if the above criteria have not changed or been met.

For application of the contract requirements for:

- Smoothness,

A Lot shall be one kilometre length of recycled pavement for each driving lane.

515.03.09 Sub-Lots for Density and Smoothness - For the application of the contract requirements for:

• Density, each Lot shall be divided into three equal Sub-Lots.

• Smoothness, each Lot shall be divided into 100 metre Sub-Lots.

515.03.10 Driving Lane - A driving lane shall mean a single lane in any area of the pavement other than a shoulder or a barrier flare.

515.03.11 Surplus Aggregate - Surplus aggregate is aggregate surplus to the works, in split or un-split stockpiles which singly or combined will meet the virgin asphalt mix aggregate gradation. Surplus aggregate will be paid for as indicated in Subsection 515.32.01. There will be no payment for reject aggregate.

515.03.12 Hot In Place Recycled Pavement - Hot In Place Recycled Pavement shall be the result of the process where recycling, the addition of admix and/or rejuvenating agents, the spreading, compacting and finishing of the asphalt pavement have taken place to form a quality finished product. The Hot In Place Recycled Pavement may be comprised of the following components: existing asphalt pavement, admix, and/or rejuvenating agents.

515.04 Quality Control

515.04.01 General - Quality Control, by the Contractor, is the sum total of activities by the Contractor to ensure that a product meets contract specification requirements. Quality Control includes material handling and construction procedures, calibration and maintenance of equipment, production process control and any sampling, testing and inspection that is done for these purposes.

The Contractor is responsible for all Quality Control under this specification. The Ministry Representative will audit and monitor the Contractor’s operations and the implementation of the Contractor’s Quality Control Plan.

The Ministry will not take samples for quality control testing and will in no manner assist in any degree or in any aspect of the Contractor's operation in the production of asphalt pavement, beginning from the production of aggregate through the compaction of asphalt mix. The only exception shall be in accordance with the provisions of Subsection 515.05.07, where the Ministry shall have the ability to adjust the ratio of the components of the Hot In Place Recycled Pavement based upon the Contractor’s Quality Control Results and visual inspections.

The Ministry Representative may issue a Stop Work Order to the Contractor if the Contractor fails to adhere to the Quality Control Plan. The Ministry Representative will not issue a Resume Work Order until the Contractor has given the Ministry Representative satisfactory assurance that it has in place adequate capacity to fulfil the requirements of the Quality Control Plan.

515.04.02 Quality Control Plan - The Contractor shall prepare a detailed, written Quality Control Plan, based on the guidelines as shown in Appendix 1 and functions integrally with any other Quality Management provisions of the Contract. The Contractor’s Quality Control Plan shall be submitted to the Ministry Representative not less than five working days before starting the production of paving aggregate. The Ministry Representative will evaluate the Contractor's Quality Control plan and will respond, in writing, within five days. Any subsequent changes to the Contractor's Quality Control Plan must also be submitted to the Ministry Representative for evaluation.

Page 497: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR HOT-IN-PLACE SECTION 515 RECYCLED ASPHALT PAVEMENT CONSTRUCTION

BC - MOT 2006 515 (3 of 18)

The Contractor’s Quality Control Plan shall include a description and schedule of the intended sampling, testing and reporting. The Quality Control Plan must also include a detailed description of the means by which the Contractor shall use the quality control test results to ensure that the asphalt materials, aggregate, mix production, recycling and pavement compaction processes will be controlled to keep the end product within the specified limits. The Quality Control Plan must clearly show the flow of information from the quality control laboratory to the individuals who shall make the actual adjustments to the processes and equipment to this control. The plan will show time allowance for each step, the names and positions of all the people involved, and a clear description of the responsibilities of each.

515.04.03 Quality Control Testing and Inspection - The Contractor shall provide and maintain equipment and qualified personnel to perform all laboratory testing, field testing and inspection necessary to determine and monitor the characteristics and properties of all the materials produced and incorporated into the work. They shall also monitor the workmanship of the final product in accordance with the Quality Control Plan as most recently submitted.

The Contractor shall use a qualified registered member of the Association of Professional Engineers and Geoscientists of British Columbia or a qualified, registered member of the Applied Science Technologists and Technicians of British Columbia. This person shall be designated as the Quality Control Manager for the purposes of these specifications. The Quality Control Manager shall be responsible for preparation and sign off of the Quality Control Plan, shall be responsible for all Quality Control testing and inspections and shall be responsible for the signing of all Quality Control testing and inspection records and submissions to the Ministry.

The Contractor shall provide a testing facility(s) that meets the requirements necessary to carry out all the test procedures listed within this Section. The facility(s) must have the equipment specified under the appropriate test designation to perform the tests.

All equipment and the laboratory shall be well maintained and in good working condition. All testing equipment shall be calibrated and evidence of the calibration shall be provided when requested by the Ministry Representative.

515.04.04 Quality Control Records - The results from quality control testing shall be reported on test logs and plotted on charts immediately after each test is completed. These test results, reports and charts shall be available,

within 24 hours of the end of each shift, to the Ministry Representative and at all times during the progress of the work.

For the purposes of confirming delivery of asphalt mix to the road and the calculation of material application rates, the Contractor shall prepare and provide to the Ministry Representative, a copy of the Road Checker’s Summary and the weigh tickets for each load received at the recycling operation at the end of each shift. The Road Checker’s Summary shall include, but not be limited to, the following information:

a) Truck Number

b) Weigh Ticket Number and Net Weight of load

c) Time and location by station of delivery

d) Admix and Rejuvenator Material Application Rate Calculations

e) Processed Depth, Lengths and Widths

f) Temperatures (behind screed, windrow, ambient and admix)

g) Notes pertaining to the paving of any appurtenances (intersections, tapers, etc.)

515.04.05 Final Quality Control Testing Reports - Prior to the issuance of a Completion Certificate, the Contractor shall provide the Ministry Representative with:

• a summary of all virgin aggregate quality control test results;

• copies of all quality control test results for asphalt admix properties, Hot In Place Recycled Pavement and compaction; and

• copies of all quality control charts.

515.04.06 Minimum Acceptable Construction Practices - Good construction practices shall be considered as standard construction procedures to be followed and shall include but not be limited to the procedures described below.

Stockpiles – Stockpiles of different types of material shall be located and constructed in such a manner as to prevent intermingling of the types and segregation of material.

Haul Vehicles – Lubrication of the truck boxes with diesel fuel will not be permitted. All vehicles shall have adequately insulated truck boxes and shall be equipped with an insulating tarpaulin of such size as to completely protect the asphalt mix.

Page 498: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 515 END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYCLED ASPHALT PAVEMENT CONSTRUCTION

515 (4 of 18) 2006 BC - MOT

Existing Paved Surfaces – Existing paved surfaces shall be clean to avoid contamination of the recycled pavement. The existing surfaces shall be swept back at least 20cm wider than the area to be processed.

Existing Utility Structures – The Contractor shall ensure all catch basins and manholes, which are within the operating area of the heating units are clear of any flammable liquids or otherwise hazardous fumes/gases.

Heating of Recycled Material – The recycled material shall not be heated over an average of 150°C in order to avoid excessive oxidation and hardening of the recycled Asphalt Cement.

Minimum Admix Temperature – Based on the most recent Temperature Viscosity Curve supplied by the Asphalt Cement Supplier. This information will be used to set

TABLE 515-A-3 STANDARD SAMPLING AND TESTING PROCEDURES FOR VIRGIN ASPHALT ADMIX AND HOT IN PLACE RECYCLED PAVEMENT

Item Procedure Test Reference

1 Bulk Specific Gravity and Density of Non-Absorptive Compacted Bituminous Mixtures

ASTM D-2726

2 Theoretical Maximum Specific Gravity and Density of Bituminous Paving Mixtures

ASTM D-2041

3 Sampling Compacted Bituminous Mixtures for Laboratory Testing ASTM D-5361

4 Resistance to Plastic Flow of Bituminous Mixtures Using Marshall Apparatus

ASTM D-1559

5 Determining Asphalt Content by Ignition Methods for Admix. ASTM D-6307

TABLE 515-A-1 STANDARD SAMPLING AND TESTING PROCEDURES FOR VIRGIN AGGREGATES

All virgin aggregate tests shall use the following sieve sizes: 37.5mm, 25mm, 19mm, 16mm, 12.5mm, 9.5mm, 4.75mm, 2.36mm, 1.18mm, 0.600mm, 0.300mm, 0.150mm, and 0.075mm.

Item Procedure Test Reference

1 Sieve Analysis of Fine And Coarse Aggregates ASTM C-136

2 Materials Finer Than 0.075 mm (No. 200) Sieve in Mineral Aggregate by Washing

ASTM C 117

3 Specific Gravity and Absorption of Coarse Aggregate ASTM C-127

4 Specific Gravity and Absorption of Fine Aggregate ASTM C-128

5 Determining the Percentage of Fractured Particles in Coarse Aggregate

ASTM D-5821

6 Total Moisture Content of Aggregate by Drying ASTM C-566

TABLE 515-A-2 STANDARD SAMPLING AND TESTING PROCEDURES FOR ASPHALT CEMENT

Item Procedure Test Reference.

1 Penetration of Bituminous Materials ASTM D-5

2 Viscosity of Asphalt by Vacuum Capillary Viscometer ASTM D-2171

TABLE 515-A-4 TEST SAMPLE SOURCE LOCATIONS

Test Sample Source:

Density 150mm diameter. road cores

Smoothness Center of Lane

Page 499: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR HOT-IN-PLACE SECTION 515 RECYCLED ASPHALT PAVEMENT CONSTRUCTION

BC - MOT 2006 515 (5 of 18)

minimum and maximum mixing temperatures.

Longitudinal Joints – Longitudinal joints in the top lift of asphalt pavement will generally only be permitted where lane dividing lines are to be painted.

Longitudinal Edges – Are to be blended to conform in elevation with the adjacent pavement unless this surface is scheduled to be recycled.

Minimum Temperature – Minimum Temperature behind the paver screed of the recycled material shall not be less than 110°C.

Metering of Rejuvenating Agents – To accurately proportion the rejuvenating agent into the hot milled material, the equipment shall control the quantity of the rejuvenating agent to ±0.05 l/m2 of surfaced reprocessed with an agent application range of 0.0 l/m2 to 1.0 l/m2. The measurement of the rejuvenating agent applied by means of a metering device shall be capable of recording accumulated litres to the accuracy of ±2%, and be fully visible to both the operator and the Ministry Representative.

Outer Edges – The outer edge of each lane shall generally be tapered to a 12:1 slope.

Recycling Adjoining Mats – When recycling an adjoining parallel mat there shall be at least a 50-mm overlap onto the previously recycled surface. This overlap shall be properly “raked” to form a homogeneous bond between the two mats.

Raking – Any material that is raked from the joint shall not be placed on the new mat or placed on or in front of the paver. This material may be introduced at a point of the operation where the material shall be reheated and remixed with the Hot In Place Recycled Pavement.

Discontinued Paving - At locations where reprocessing operations begin and end, the Contractor shall ensure that the transition between the processed and unprocessed surface is smooth and without irregularities. If any irregularities occur resulting from the reprocessing operation, the Contractor shall repair these areas with fresh asphalt mix and/or additional reprocessing, at the Contractor’s own expense.

Pavement Drainage – The Contractor shall at all times ensure that the appropriate cross slopes for safety and positive pavement drainage are maintained.

Rollers – Rollers shall normally operate with the drive wheel nearest the paver and at a speed not in excess of 8 km/h. They shall not be allowed to park on the mat prior to complete cooling.

515.05 Supply Of Virgin Aggregates, Asphalt Materials, Asphalt Admix Design And Job Mix Formula

515.05.01 Work in Ministry Pits or Quarries - When operating in a Ministry pit or quarry, the Contractor shall comply with all provisions of Subsection 145.26.

515.05.02 Supply of Virgin Aggregates, Aggregate Production and Characteristics - The Contractor shall not produce paving aggregate until the Contractor has received written notification that the Quality Control Plan is in accordance with Subsection 515.04.02, and has in place testing facilities for aggregate production that are in accordance with the Quality Control Plan.

For the production of virgin Asphalt Mix Aggregate, within Ministry pits, the Contractor shall provide crushing equipment that will permit all aggregate, that passes through 375 mm x 450 mm slotted openings, to be used for the production of crushed aggregate. Rocks, which will not pass through these openings, shall be stockpiled or disposed of as directed by the Ministry Representative. Crushing and screening equipment shall be provided with adequate facilities and capacity to be able to bleed off reject aggregate and remove any excess fine aggregate, dust or objectionable aggregate coatings, to make it acceptable for use. All products from crushing or screening plants, that can be used shall not be wasted, and shall be stockpiled or used as directed by the Ministry Representative.

Where the Ministry has available any test result information on the properties shown in Table 515-B, for a Ministry pit or other source, the Ministry Representative will upon request, provide that information to the Contractor. Otherwise, sampling and testing to determine and demonstrate the compliance of paving aggregate with the requirements of this Section shall be the responsibility of the Contractor.

Paving aggregates shall meet the following requirements:

a) Virgin Coarse Aggregates;

i) shall be all mineral matter retained on the sieve designated in the test procedures for each individual test.

ii) shall consist of crushed stone, crushed gravel, or combination thereof, or materials naturally occurring in a fractured condition, or materials naturally occurring of highly angular nature or rough texture.

iii) shall be free from coating of clay, silt or other deleterious material, and shall meet the requirements listed in Table 515-B.

Page 500: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 515 END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYCLED ASPHALT PAVEMENT CONSTRUCTION

515 (6 of 18) 2006 BC - MOT

b) Virgin Fine Aggregate

i) shall be clean, tough, durable, moderately sharp, and free from coatings of clay, silt, or other deleterious material, and shall contain no clay balls or other aggregations of fine material.

ii) shall have a maximum mass loss after five cycles of not more than 23% when tested in accordance with ASTM Test C-88.

iii) shall have a sand equivalent of not less than 40 when tested in accordance with ASTM Test D-2419

iv) shall have a minimum value of 45 when tested according the AASHTO Test T 304, Method “A”, - Uncompacted Void Content of Fine Aggregate when determining Fine Aggregate Angularity.

c) Virgin Mineral Filler and Mineral Dust

i) Mineral filler shall consist of all matter passing the 0.600-mm sieve and mineral dust shall consist of all mineral matter passing the 0.075-mm sieve.

ii) Mineral filler and mineral dust shall be free from organic matter.

iii) Mineral filler shall be non-plastic when tested in accordance with ASTM Test D-4318.

515.05.03 Supply of Asphalt Cement and Rejuvenating Agents - The Contractor shall supply the types and grades of asphalt cement and rejuvenating agents as specified in the Special Provisions. The supply of these materials includes, but is not limited to, ordering, scheduling delivery of, supply of Temperature Viscosity Curve information, receiving, handling, storing, heating, blending, sampling, and testing of the materials and other related work.

The Contractor shall supply the Ministry Representative with copies of the supplier’s weigh-bill and records of all asphalt and rejuvenating materials received on a daily basis. The amount of asphalt cement used will be calculated based on the Contractor’s Quality Control testing results.

The supply of asphalt cement and rejuvenating agents shall be at the Unit Price bid for asphalt cement and rejuvenating materials.

515.05.04 Responsibility for Asphalt Admix Design - As the Ministry is responsible for all pre-engineering for the project, preparation of the asphalt admix design is the responsibility of the Ministry. The Ministry shall provide to the Contractor, pre-engineering information related to the Asphalt Admix. All costs incurred in admix design formulation are the responsibility of the Ministry.

515.05.05 Evaluation of Asphalt Admix Materials - The Ministry Representative will require up to 5 calendar days upon notification from the Contractor to evaluate the Contractor’s Asphalt Admix materials.

515.05.06 Samples Required for Asphalt Admix Evaluation - At the discretion of the Ministry Representative, the Ministry may request samples of the Admix materials and Quality Control results and documentation for evaluation. Shipping costs for samples delivered to the Ministry Representative are the responsibility of the Contractor.

515.05.07 Field Adjustment of the Job Mix Formula and/or Recycled Pavement - During construction, the Ministry may require field adjustments to the job mix formula and/or recycled pavement. A field adjustment to the Job Mix Formula is defined as a change in the asphalt cement content of the admix, aggregate gradation, rejuvenating agent and/or proportioning of various aggregate sizes.

PART B - PAYMENT ADJUSTMENTS

515.11 Density

515.11.01 Coring - The Contractor shall be responsible for providing all core samples for quality assurance and payment adjustment purposes. The location of the cores shall be randomly selected and provided to the Contractor by the Ministry Representative. The Contractor shall

TABLE 515-B – REQUIREMENTS FOR VIRGIN COARSE AGGREGATES

Test Reference Requirements

ASTM C-127 Maximum Water Absorption: % by Mass 2

ASTM C-88 Soundness of Aggregate Maximum Loss After 5 Cycles 20

ASTM C-142 Maximum % by Mass of Clay Lumps and Friable Particles 1.5

BCH I - 9 Minimum Degradation Factor 35

ASTM D-5821 2 Fractured Faces: Minimum % by Mass Retained on the 4.75 mm sieve 85

Page 501: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR HOT-IN-PLACE SECTION 515 RECYCLED ASPHALT PAVEMENT CONSTRUCTION

BC - MOT 2006 515 (7 of 18)

provide 150 mm diameter cores for these purposes. The minimum core thickness shall be 37 mm. The Contractor shall prepare the cores prior to submission by removing all material not representative of the pavement lift to be tested. The Contractor shall deliver these cores to the Ministry Representative on site, within 24 hours of being provided the locations for the coring.

In the case of a core sample location falling in an obvious non representative area, such as a previously patched area, at the sole discretion of the Ministry Representative, a new random core location will be chosen for that sample.

All costs associated with obtaining the cores, including the filling and compaction of the core holes are considered incidental to the contract and are the responsibility of the Contractor.

515.11.02 Percent Density - One random core sample will be obtained from each Sub-Lot and tested. The test results for the three Sub-Lots will be averaged to determine the percent density for the Lot.

In Place Density of Sample Hot-In-Place % Density = Maximum Theoretical Density

(ASTM D-2041) X 100

The Maximum Theoretical Density for the lot will be determined by combining the Sub-Lot cores. Prior to testing to determine the maximum theoretical density, the cores should be prepared in accordance with the procedure outlined in Appendix 3.

515.11.03 Payment Adjustments - The payment adjustment for percent density will be the amount shown in Table 515 C for the Sample Mean of the test results for the Lot.

515.11.04 Rejection Limit - The rejection limit for percent density is the limiting value of the Sample Mean as shown in Table 515 C.

If the test result for density of a Sub-lot is outside the acceptance limits, the Sub-lot is rejected automatically regardless of the values of other acceptance parameters. To minimize the cost of rejection to the Contractor, the Contractor shall isolate the area of low density within the Sub-lot and perform the necessary corrective measures to ensure specifications are met. The limits of the low density area must be verified and approved by the Ministry Representative before remedial work proceeds.

515.11.05 Payment for Rejected Work Made Acceptable - The payment adjustment for density will be based on testing of the reprocessed, replaced, or overlaid material

where applicable. Where replacement or overlay material does not cover the entire Lot or Sub-Lot, prior tests of the uncovered area will be averaged with new tests on the corrective work.

515.12 Smoothness

515.12.01 Determination of Pavement Smoothness - The finished pavement surface shall be tested by the Ministry using a Class I precision rolling profile measuring instrument, to determine the longitudinal profile and compute the International Roughness Index (IRI) in each driving lane. Profiles shall be measured and the IRI calculated in the centre of the lane for each Sub-Lot. IRI values will be recorded to a precision of 0.01 m/km for each Sub-Lot. The Lot IRI value is the average of the IRI values calculated for the Sub-Lots within the Lot.

For any Sub-Lot between 50 m and 100 m in length, the IRI value shall be considered representative of a complete Sub-Lot. For any Sub-Lot less than 50 m in length, the IRI value will be combined with the proceeding Sub-Lot IRI value.

The profile shall be measured over the entire length of the pavement exclusive of structures and shoulder areas. Acceleration, deceleration and turning lanes are considered part of the driving lanes and shall be tested in accordance with this provision. For the measuring process, the Contractor shall provide the Ministry Representative a chalk guide line in the centre of the lane immediately prior to measurement.

515.12.02 Auxiliary Lanes - For smoothness testing, sections of the driving lanes that do not fall within the continuous through lanes, such as acceleration lanes, deceleration lanes and turning lanes, and lanes which are less than 1 km in length, shall be treated as follows. The

TABLE 515 C PAYMENT ADJUSTMENTS FOR DENSITY

% MAXIMUM THEORETICAL DENSITY LOT

AVERAGE

PAYMENT ADJUSTMENT ($ PER m2) FOR DESIGN

LOT

95.6 Plus + $0.25

95.0 – 95.5 + $0.15

94.0 – 94.9 + $0.10

93.0 – 93.9 0.00

92.6 – 92.9 - $0.10

92.0 – 92.5 - $0.25

91.9 or less Reject

Page 502: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 515 END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYCLED ASPHALT PAVEMENT CONSTRUCTION

515 (8 of 18) 2006 BC - MOT

ratio of the section length to the standard Lot length of 1 km shall be determined and the payment adjustment shall be pro-rated on this basis as in the following example:

Length of segment, i.e. 565 metres = 0.565 times the Standard Lot

Length of 1000m.

Hence the applicable payment adjustment is 0.565 times the payment adjustment for a 1-km Lot as determined from Table 515-D.

515.12.03 Acceptance Limits - The acceptance limit for smoothness is the limiting value as shown in Table 515-D, beyond which corrective work is required. Payment adjustments are shown in Table 515-D. The International Roughness Index (IRI) value, calculated for each Sub-Lot, will be used to determine if the Lot will be accepted, and if so whether it will be subject to any payment adjustment.

515.12.04 Payment Adjustments for Full or Increased Payment - Acceptance of any Lot at full or increased payment will occur if it contains no obvious defects as per Subsection 515.22 and in the case of top lift pavement only, the pavement smoothness, as reported by the International Roughness Index (IRI) meets the following requirements:

- All Sub-Lots shall have an IRI value ≤ 2.0

515.12.05 Rejection Limit - If a Sub-Lot has an IRI ≥2.0, the Sub-Lot is rejected.

515.12.06 Remedial Work - If the test results on a Sub-Lot of pavement indicate a payment reduction or rejection because of smoothness, the Contractor may propose remedial work to improve the smoothness. Such proposals

are subject to the approval of the Ministry Representative, but such approval does not imply that the proposed remedy will be successful, and does not reduce the Contractor’s responsibility for meeting the acceptance requirements. Reprocessing may be acceptable, but cold milling and repaving may be required. Only one attempt may be made to improve smoothness, and this must be completed within ten (10) calendar days from the time the Contractor receives notification from the Ministry Representative of the original smoothness test results for that Sub-Lot.

Following any attempt to improve the smoothness of a Sub-Lot or Sub-Lots, the Ministry Representative will retest the Sub-Lot or Sub-Lots, and the new results will replace the previous data for the purposes of determining acceptance and payment.

No payment will be made for any material, equipment or manpower used to improve, or attempt to improve, smoothness.

515.12.07 Smoothness Deficiency Repairs - Smoothness deficiencies (bumps and dips) less than 8 mm over 3 m will not have a fix or remedial work requirement. Individual Smoothness deficiencies between 8 mm and 12 mm over 3 m will result in a $200.00 penalty per deficiency and Smoothness deficiencies over 12 mm over 3 m will require remedial work. (see Subsection 515.22).

PART C - ACCEPTANCE AND REJECTION

515.21 Acceptance At Reduced Or Adjusted Payment - Acceptance of any Lot at reduced payment will occur if it contains no obvious defects as per Subsection 515.22, and if:

• the test results for acceptance parameters are such that the Lot or Sub-Lot meets the requirements for acceptance at a reduced payment; and

• the Lot or Sub-Lot is approved in respect of all other requirements; and if

• the Contractor has not notified the Ministry Representative in writing that it will exercise its option to either repair or remove and replace the work, at its own cost, with work meeting the requirements for acceptance at full or increased payment.

515.22 Rejection For Workmanship Defects - The finished surface of any lift shall have a uniform "closed" texture and be free of visible signs of poor workmanship. Any obvious defects as determined by the Ministry Representative such as, but not limited to the following, will be cause for automatic rejection of asphalt pavement regardless of the values of any other acceptance parameter:

TABLE 515-D – LOT ASSESSMENT AND PAYMENT ADJUSTMENTS FOR SMOOTHNESS For the final surface course only, the following payment adjustments shall apply to each Lot.

Lot IRI (m/km) Payment Adjustment

≤ 0.80 +$2,000

0.81 to 1.0 +$1000

1.01 to 1.10 +$500

1.11 to1.40 0

1.41 to 1.6 -$250

1.61 to 1.7 -$500

1.71 to 1.99 -$1,000

≥ 2.00 Reject and corrective work required

Page 503: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR HOT-IN-PLACE SECTION 515 RECYCLED ASPHALT PAVEMENT CONSTRUCTION

BC - MOT 2006 515 (9 of 18)

• individual bumps and dips that exceed 12 mm over 3 m.;

• areas of excess or insufficient asphalt; • improper matching of longitudinal and transverse

joints; • roller marks; • tire marks; or • cracking or tearing.

When asphalt pavement is rejected by reason of obvious defects, the minimum area of rejection will be the actual length of the defect for the full width of the driving lane in which the defect exists.

Rejected work shall be promptly repaired, remedied, or removed and replaced in a manner acceptable to the Ministry Representative. The Contractor shall be responsible for all costs including materials.

No payment will be made for work in any Lot or Sub-Lot, which has been rejected, until the defects have been remedied.

515.23 Appeal Testing

515.23.01 Density - The Contractor may appeal the results of acceptance testing for density for any lot only once. Appeals will only be considered if quality control results can be presented to support the appeal.

Quality control test results for density which are provided to the Ministry Representative subsequent to the Contractors receipt of the quality assurance test results for that Lot will not be considered (when evaluating evidence) for an appeal. The appeal shall be for all tests within the Lots, and there will be no appeal allowed for single tests within the Lot.

The following procedures will apply for the appeal:

• The Ministry Representative will arrange for an independent testing laboratory to perform the appeal testing. The personnel employed or testing laboratory retained by the Contractor for quality control testing on the project will not be used for appeal testing.

• The original quality assurance results will not be considered in the appeal. The Contractor will sample the pavement at locations randomly re-selected by the Ministry within three site occupancy days following receipt of the appeal such that a total of (5) new core specimens are extracted throughout the Lot. The Ministry Representative will observe the sampling process. The procedures used to determine the test results shall be consistent with the original acceptance testing methods.

515.23.02 Smoothness - The Contractor may appeal smoothness acceptance test results of any rejected or penalised Lot, once. The appeal shall be in writing and submitted within the next three site occupancy days following receipt of the test results.

Any attempt to improve smoothness on the appealed Sub-Lot after the Ministry Representative has tested the Lot for acceptance shall void the appeal and the original test results will apply.

The Ministry Representative will perform, and the Contractor will be given the opportunity to witness, the appeal testing and the new results will be binding on the Contractor and the Ministry.

515.23.03 Application of Appeal Testing Results - For density appeals, the original test will be discarded. A new Sample Mean for the five new test results will be determined and used for acceptance and payment adjustment.

The new values, thus determined, in all cases, will be binding on the Contractor and the Ministry.

515.23.04 Payment for Appeal Testing - If the new results indicate a change in the payment adjustment in the Contractor’s favour, then sampling and testing costs incurred during the appeal procedures for that Lot will be borne by the Ministry.

If the new results verify that any payment reduction or rejection remains valid for that Lot, then the costs of sampling and testing (plus 10% mark-up) incurred during the appeal procedure will be charged to the Contractor.

515.23.05 Time Limits for Appeals of Test Results - All appeals shall be in writing and submitted within the next three site occupancy days of receipt of the test results.

515.24 Cold Milling And Re-Paving As A Corrective Measure - If cold milling and re-paving is used as a corrective measure on a defective Lot or Sub-Lot, the thickness will be subject to the approval of the Ministry Representative, but shall not be less than 40mm. In all other respects, the re-paving will be subject to the same specifications as the pavement being replaced.

Whether the cold milling and re-paving is applied as a corrective measure, acceptability and payment will be determined as follows:

• acceptability, and eligibility for either positive or negative payment adjustment, will be determined entirely on the results of testing and observations conducted on the re-paving, regardless of test results

Page 504: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 515 END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYCLED ASPHALT PAVEMENT CONSTRUCTION

515 (10 of 18) 2006 BC - MOT

that have been obtained on the hot-in-place recycled pavement;

• the payment quantity, for application of the Unit Prices for asphalt pavement, and the quantity, to which any payment adjustment is to be applied, will be derived from the square meters of recycled pavement affected by the re-paving.

PART D - PAYMENT

515.31 General - Payment at Unit Prices for the supply of virgin aggregates, the supply of asphalt cement, the supply of rejuvenating agents, the supply of virgin asphalt mix and the Hot In Place recycling construction of asphalt pavement, shall be full compensation for completing the supply and installation of Hot In Place asphalt pavement on prepared surfaces in accordance with the contract requirements. Applicable payment adjustments (Additions or subtractions as applicable) shall be applied in accordance with Part B of this Section

The first 4,000 m2 of hot in place asphalt pavement recycling production will not be subject to bonus/penalty payment adjustments but will be required to meet minimum Specification requirements for quality and workmanship.

515.31.01 Rejuvenating Agent and Asphalt Cement -

Rejuvenating Agent - Payment to Supply Rejuvenating Agent shall be at the Unit Price per litre for the quantity of material actually metered into the recycling process.

Such payment shall be full compensation for supplying, handling, storing, heating, sampling, testing and blending the material and all other related work.

Asphalt Cement - Payment for Supply of Asphalt Cement for admix shall be at the Unit Price per tonne for the payment quantity determined from:

Av. Actual Asphalt Content X Payment Quantity of Asphalt Admix Payment Quantity of

Asphalt Cement = Average Actual Asphalt Content + 100

Where: -Payment Quantity of Asphalt Admix is the quantity determined in accordance with Subsection515.31.03, -Actual Asphalt Content is as defined in Subsection515.03.04,

The actual asphalt content shall be determined on a Lot by Lot basis by averaging the values obtained from the Quality Control tests from each Lot. This average will be used to determine the tonnage of Asphalt Cement used for payment

purposes for the Asphalt Cement for the Lot.

The quantity of asphalt cement so determined shall be used for payment purposes regardless of any discrepancy that may be noted between it and any quantity calculated using delivery quantities, tank dips, or other data. No payment will be made for asphalt cement used in reject mix.

Such payment shall be full compensation for supplying the material to the project, handling, storing, heating, sampling, and testing of the material, and other related work.

515.31.02 Paving Aggregate into Stockpile – EPS - Payment for Paving Aggregate into Stockpile - EPS shall be at the Unit Price per tonne for the quantity of paving aggregate placed into stockpile accordance with the following:

• The paving aggregate quantity will be identical to (100%) of the asphalt admixture quantity. As the aggregate is crushed into stockpile, progress payments will be made against the bid item, up to the quantity shown in the “Approximate Quantity” column of the Schedule of Approximate Quantities and Unit Prices. At contract completion, the final payment quantity for asphalt admix aggregate in accordance with the following calculation:

‘tonnes of mix x 100’ Tonnes of Asphalt Admix

Aggregate

= 100 + actual calculated asphalt content as per Subsection 515.03.04

Such payment shall be full compensation for all work including but not limited to the production, supply and stockpiling of all paving aggregates, and shall include all costs of quality control.

515.31.03 Asphalt Admix – EPS - Payment for Asphalt Admix - EPS constructed in place shall be at the Unit Price per tonne for the quantity of admix placed in accordance with the Contract requirements.

Subject to the exception noted below, only acceptable asphalt admix will be included in the payment quantity.

Where cold milling and re-paving is used as a corrective measure, in accordance with Subsection 515.24;

• the overlay quantity will not be included in the admix payment quantity, but

• the admix used in quantity of recycled pavement removed by the cold milling and re-paving will be included in the admix payment quantity, whether or not it was acceptable.

Such payment shall be compensation in full for all work

Page 505: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR HOT-IN-PLACE SECTION 515 RECYCLED ASPHALT PAVEMENT CONSTRUCTION

BC - MOT 2006 515 (11 of 18)

including but not limited to: loading the aggregate into the feeders, drying the aggregate, metering and adding the asphalt cement, mixing, loading, weighing, hauling, dumping, spreading, compacting and finishing the asphalt pavement, and shall also include all costs of quality control.

515.31.04 Hot In Place Recycled Asphalt Pavement – EPS - Payment for Hot In Place Recycled Asphalt Pavement - EPS constructed in place shall be at the Unit Price per square meter for the quantity of recycled pavement in accordance with the Contract requirements.

Subject to the exception noted below, only acceptable recycled asphalt pavement will be included in the payment quantity.

Where cold milling and re-paving is used as a corrective measure, in accordance with Subsection 515.24;

• the overlay quantity will not be included in the admix payment quantity, but

• the admix used in quantity of recycled pavement removed by the cold milling and re-paving will be included in the admix payment quantity, whether or not it was acceptable.

Such payment shall be compensation in full for all work including but not limited to: recycling, metering adding the rejuvenating agent, adding, spreading, compacting and finishing the asphalt pavement, and shall also include all costs of quality control.

515.31.05 Payment for Acceptable Work - The following end product properties of recycled asphalt pavement will be measured for acceptance:

• Density • Smoothness

515.31.06 Payment for Rejected Work Made Acceptable - When defects have been remedied in Lots or Sub-Lots which had been rejected, payment for the original quantity of material in those Lots or Sub-Lots will be made subject to payment adjustments and penalty assessments and subject to Subsection515.24.

No payment will be made for any material used to replace, repair or overlay rejected work and all corrective work shall be performed entirely at the Contractor's expense.

515.31.07 Payment Adjustment - Payment adjustments resulting from the application of this Section will be effected on each progress payment as follows.

1. For each Lot paid for by the square metre (m2), the applicable payment adjustment derived from Table

515-C (Density), in dollars per square metre will be expressed as positive in the case of increases and negative in the case of decreases. The algebraic sum of these unit adjustments will then be applied to the payment quantity for the Lot. The resulting amount, in dollars, will be the net payment adjustment, positive or negative, for that Lot.

The algebraic sum of the net payment adjustments for all such Lots for which payment is authorized on the current progress payment, computed in dollars, shall be the total payment adjustment for density for the current progress payment.

2. For each Lot, the applicable payment adjustment derived from Table 515-D (Smoothness), in dollars per Lot, will be expressed as positive in the case of increases and negative in the case of decreases, and will be the payment adjustment, positive or negative, for that Lot.

The algebraic sum of the payment adjustments for all such Lots for which payment is authorized on the current progress payment, computed in dollars, shall be the total payment adjustment for smoothness for the current progress payment.

3. The algebraic sum of the total payment adjustments for density and smoothness, derived in accordance with 1 and 2 above, shall be the total payment adjustment, positive or negative, in dollars, for all attributes for the current progress payment. This amount shall be added, if positive, or subtracted, if negative, by a single entry in computing the current progress payment.

4. The process set out in 1 to 3 above will be used in computing each progress payment to which it is applicable.

515.32 Surplus Aggregate In Stockpile - At the discretion of the Ministry Representative, the Ministry may or may not purchase surplus aggregate in stockpile in a private pit. Generally the Ministry will provide payment for the processing costs of surplus aggregate in stockpile in Ministry Pits only, and only to a limited quantity. However, should the Contractor produce surplus aggregate in a private pit, and the Ministry intends to purchase these surplus aggregates, the Contractor shall be required to provide a written agreement with the owner of the property. This document shall indicate that the Ministry will have free access to and use of the surplus aggregate in stockpile for a period of 12 months after the completion of the contract work. If the Contractor undertakes private work from within the private pit, measurements for surplus aggregate in

Page 506: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 515 END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYCLED ASPHALT PAVEMENT CONSTRUCTION

515 (12 of 18) 2006 BC - MOT

stockpile will not be taken until the completion of the private work, ensuring that the Ministry does not pay for aggregate used on private works.

All surplus aggregate shall be properly stockpiled.

515.32.01 Ministry Purchase of Surplus Aggregate - Should the Ministry proceed with the purchase of surplus aggregate, upon completion of the contract, the Ministry will purchase surplus paving mix aggregate as indicated herein. Surplus crushed base and/or shoulder aggregates shall be paid for according to Section 501.

If the quantity of Asphalt Pavement actually incorporated into the works is less than the estimated quantity, as stated in

the Schedule of Approximate Quantities and Unit Prices, the Ministry will purchase surplus aggregate up to 100% of the quantity required by the contract. The surplus aggregate must, when singly or combined, meet the gradation requirements set out in the Job Mix Formula. The maximum total surplus aggregate to be purchased will be the quantity of aggregate required to produce the quantity of mix as stated in the Schedule of Approximate Quantities and Unit Prices minus the quantity of aggregate actually incorporated in the works.

No payment shall be made for any surplus aggregate remaining at contract completion in excess of the contract requirement. Material remaining in the pit is the property of the Ministry.

Page 507: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR HOT-IN-PLACE SECTION 515 RECYCLED ASPHALT PAVEMENT CONSTRUCTION

BC - MOT 2006 515 (13 of 18)

APPENDIX 1

QUALITY CONTROL REQUIREMENTS AND GUIDELINES

1.01 GENERAL

The Contractor’s responsibilities for preparing, submitting and adhering to a Quality Control Plan are specified in Subsection 515.04. This Appendix provides requirements and guidelines for the Contractor’s Quality Control Plan, in addition to those set out in Subsection515.04.

1.02 QUALITY CONTROL PLAN

As a requirement, the Contractor shall prepare and submit a Quality Control Plan for evaluation. The Plan may be operated wholly, or in part by a qualified Subcontractor or an independent organization/agency. However, the Quality Control Plan, including compliance with the Plan and its modifications, is the responsibility of the Contractor.

The Plan shall address all elements that affect the quality of the hot in place recycled asphalt pavement, including but not limited to the following:

• Supply of Asphalt Materials • Supply of rejuvenating agents • Identification of source and proof of quality of virgin

aggregates to be supplied; • Virgin aggregate production and its gradation

control; • Quality of virgin aggregate components; • Stockpile management; • Asphalt plant calibration and proportioning of

aggregate components; • Mixing including asphalt cement content control; • Process temperature controls; • Admix Material and Rejuvenating Agent application

rates and processed dimensions, placing and finishing;

• Joints; • Density; • Smoothness; • Segregation;

The plan shall also include the following:

• The name of the Quality Control testing agency and its proven capability to provide the specific services required for the project.

• The list of dedicated technical staff, if available, (including names, qualifications and relevant experience) and their proposed roles.

The list of testing equipment available for project work.

The Quality Control Plan shall include the designation of specific personnel responsible for specific quality control duties.

• There shall be a designated Quality Control Manager, as per Subsection 515.04.03. The Quality Control Manager shall be qualified as per Subsection 515.04.03. The Quality Control Manager shall be responsible for the preparation and sign off of the Quality Control Plan, responsible for all Quality Control testing, and inspections, responsible for the sign off of all quality control testing and inspection records and responsible for all quality control submissions to the Ministry. The individual shall be identified and named in the Quality Control Plan submission. If the Contractor requests a change in the Quality Control Manager, then a formal request to the Ministry Representative shall be made and the Ministry will review the request for approval.

• There may be a designated Process Control Technician (PCT) who would be responsible to ensure that laboratory test results and other quality control practices are used to control the quality of aggregates and other mix components and to adjust and control mix proportions to meet the mix design(s). The PCT is responsible for ensuring that testing equipment, utilized for proportioning and mixing are calibrated and in good working order. The Plan may describe how the PCT’s duties, including sampling methods and responsibilities are to be accomplished and documented. The Plan should also describe the criteria to be used by the PCT to correct or reject unsatisfactory materials.

• There may also be a Pavement Quality Control Technician (PQT) who would be responsible to ensure that delivered materials meet the requirements of the specifications. In addition, the PQT shall be responsible for periodically inspecting all equipment used in recycling, placing, finishing, and compacting to assure its proper operating condition and to assure that recycling, placing, application rate, finishing, joint construction, and compaction is in conformance with this specification and the contract requirements.

1.03 CONTRACTOR’S RECORD OF QUALITY CONTROL TESTING

Test results shall be made on specified forms or charts

Page 508: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 515 END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYCLED ASPHALT PAVEMENT CONSTRUCTION

515 (14 of 18) 2006 BC - MOT

immediately after completion of each test. These test results are to be made available to the Ministry Representative upon request.

Records of gradation control, both during aggregate production and also during the asphalt mixing operation, should be kept on the form H-295 - Mechanical Analysis of Aggregates.

1.04 MATERIALS APPLICATION RATE

The Contractor shall control the Material Application Rate by monitoring the amount of asphalt admix delivered to the road against the area covered by checking the application rate every five loads.

The Contractor shall monitor the addition of rejuvenating agents by calculating the application rate, through comparing the metered amount with the total area processed every one-half hour.

The Contractor is to advise the Ministry Representative on an ongoing basis of the application rates.

1.05 DENSITY

The Contractor shall take core samples to determine actual pavement density. At the start of paving, the Contractor may take a minimum of two pavement cores from each Sub-Lot. The Contractor may employ a nuclear densometer to ensure intermediate density control.

1.06 OTHER QUALITY CONTROL PROCEDURES

The Contractor may initiate other Quality Control procedures as necessary for ensuring production of a quality product and include them in the Quality Control Plan. Procedures may also be introduced after the start of work as necessary as amendments to the Quality Control Plan.

1.07 QUALITY CONTROL TESTING FREQUENCY GUIDELINES

Test frequency guidelines for Quality Control are described in TABLE 1:

Page 509: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR HOT-IN-PLACE SECTION 515 RECYCLED ASPHALT PAVEMENT CONSTRUCTION

BC - MOT 2006 515 (15 of 18)

TABLE 1 –TEST FREQUENCY GUIDELINES

Test Minimum Frequency

ASTM C-136, Dry Sieve Analysis of Aggregate

Split Stockpiles: One for each stockpile for every 2 hours of production. One main stockpile: for every 300 tonnes. Blend Sand: One for every 100 tonnes during stockpiling. Natural filler: One for every 50 tonnes during stockpiling.

ASTM D-5821 Determining the Percentage of Fractured Particles in Coarse Aggregate

Every second coarse aggregate sieve test.

TestsDuring Crushing (Virgin Aggregate)

ASTM C-117 Sieve Analysis of Aggregates by Washing (Field Lab)

One per day on reduced sample obtained from combined samples from the crusher

ASTM C-136, Dry Sieve Analysis of Aggregate

One of combined aggregate every 100 tonnes.

ASTM C-566 & D-2216, Moisture Content

Aggregate: 2 tests/Lot Asphalt mix: 1 on first Sub-Lot and every second day.

ASTM C-117 Sieve Analysis of Aggregates by Washing (Field Lab)

One per shift on reduced sample obtained from combined samples from the plant cold feed

Asphalt Extraction Test ASTM D-6307 Ignition Method

One per Lot.

Penetration of Bituminous Materials ASTM D-5

One per Manufacturer’s Batch

Tests During Asphalt Plant Mixing (Admix)

Viscosity ASTM D-2171 Contractor’s Option

Rejuvenating Agents Tests

Rejuvenating Agent Contractor’s option.

ASTM D-1559, Resistance to Plastic Flow of Bituminous Mixtures Using Marshall Apparatus

Contractor's Option

ASTM D-2726 Bulk Specific Gravity and Density of Non-Absorptive Compacted Bituminous Mixtures (Briquette or Cores)

One per Sub-lot

ASTM D-2041 Theoretical Maximum Specific Gravity of Bituminous Paving Mixtures

One (see Appendix 3 for Combining Cores)

Test During Asphalt Paving for Density Testing (Hot In Place Recycled Pavement)

Core Samples One core for each Sub-Lot. All cores to be 150mm diameter.

Page 510: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 515 END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYCLED ASPHALT PAVEMENT CONSTRUCTION

515 (16 of 18) 2006 BC - MOT

APPENDIX 2

REQUIREMENT FOR PRODUCTION OF ADMIX AGGREGATES

2.01 GRADATION MAXIMUM PERMISSIBLE VARIATION LIMITS:

Sieve Size

19.0 mm or 16.0 mm 0%

12.5 mm +/-3.5%

9.5 mm +/-3.5%

4.75 mm +/-3.0%

2.36 mm +/-3.0%

1.18 mm +/-2.0%

0.600 mm +/-2.0%

0.300 mm +/-1.5%

0.150 mm +/-1.0%

0.075 mm +/-0.75%

The variation limits, when applied to the Ministry specified design Admix gradation, shall not result in a gradation that is outside of the limits as specified by the Ministry.

Page 511: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

END PRODUCT SPECIFICATION FOR HOT-IN-PLACE SECTION 515 RECYCLED ASPHALT PAVEMENT CONSTRUCTION

BC - MOT 2006 515 (17 of 18)

APPENDIX 3

METHOD TO COMBINE ROAD CORES INTO A SINGLE COMBINED SAMPLE FOR THE DETERMINATION OF MAXIMUM THEORETICAL DENSITY.

3.01 INTRODUCTION

After the individual Density for each core has been determined, the Sub-lot road cores shall be combined into one single sample for the determination of maximum theoretical density.

3.02 SAMPLE PREPARATION

The upper re-cycled portion of the cores shall be separated from other pavement layers by sawing or other effective methods.

The minimum combined sample size required shall be 2000 grams and 2500 grams for 19.0 mm and 25.0 mm maximum aggregate size respectively.

Select a core trimmer to ensure that the minimum sample size is obtained depending on the thickness of the samples. 100 mm, 114 mm, or 127 mm core trimmers may be used.

Place the core samples in a pan and heat to 130° C ± 5°C for about 20 minutes to allow the specimens to be easily trimmed. Do not overheat. The cores can be stacked on top

of each other and trimmed together or individually.

Select a core trimmer to attain the minimum combined sample size. Heat the base of the trimmer by placing on a burner for a few minutes.

Centre the heated trimmer on the heated cores (allow equal clearance on all sides of the core).

Hold the trimmer vertically by its handle, then press it down through the core until it reaches the bottom of the pan. Apply a slight twist if the heated cores(s) are difficult to penetrate.

Remove the outside cut rock mix by means of a spatula spoon and discard.

Thoroughly mix the resultant combined sample prior to testing to ensure uniform aggregate coating.

The complete combined sample must be tested. If the resultant sample size exceeds the available capacity of the container used for vacuum saturation, it may be tested a portion at a time.

Page 512: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 515 END PRODUCT SPECIFICATION FOR HOT-IN-PLACE RECYCLED ASPHALT PAVEMENT CONSTRUCTION

515 (18 of 18) 2006 BC - MOT

THIS PAGE IS LEFT INTENTIONALLY BLANK

Page 513: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 521

ASPHALT STABILIZED BASE COURSE MIXED IN PLACE

DESCRIPTION

521.01 Scope - This Section describes the materials, plant, equipment and work practice required for the in place stabilization of granular base course material mixed with selected bituminous binder.

EQUIPMENT

521.21 General Condition of Plant and Equipment

521.21.01 The Contractor, when submitting the bid for work under this contract shall at the same time submit a list of equipment available and ready for use on the contract, and shall further certify that the equipment listed meets the requirement of this Section in every respect.

521.21.02 Before any work is permitted to commence, the Contractor's equipment and plant will be carefully inspected; should any of it fail to meet the required standards, work will not be permitted to commence until such deficiency is corrected.

521.21.03 All equipment and plant shall be in good mechanical condition and adjustment and be capable of efficiently performing the work required of it.

521.21.04 Once the Contractor's bid has been accepted, provision and maintenance of all equipment listed shall become an essential part of the contract and no equipment or plant may be released from the contract work for use elsewhere until completion, except by the express written permission of the Ministry Representative.

521.21.05 The Ministry Representative shall have access at all times to any plant, equipment or machinery to be used on this contract in order to check calibration, control or operating adjustments. Where adjustment appears necessary, it shall be done by a competent technician or instrument repair laboratory.

521.21.06 Plant, machinery and equipment specified hereafter shall represent a minimum requirement for the type of machine described and does not represent a comprehensive list of equipment to be supplied by the Contractor, who shall supply whatever plant and equipment may be necessary to the proper and efficient completion of the work.

521.21.07 All plant and equipment shall be under the control of experienced and skilled operators.

521.22 Pressure Distributor - The pressure distributor

used for applying bituminous materials shall consist of a fully insulated tank with a minimum capacity of 5000 l permanently and rigidly mounted on a truck or trailer provided with pneumatic tires and propelled by a power unit capable of maintaining a constant and uniform speed. In order to be acceptable, the distributor shall be provided with the following minimum equipment:

a) quick opening gate in the dome.

b) a measuring dipstick calibrated in 100 l increments or in 20 mm gradations and provided with a calibration chart indicating the number of litres for each 20 mm in depth of contained bituminous material for accurate checking of the distributor contents. In addition an external and readily visible depth gauge or levelometer indicating the asphalt content of the tank to the nearest 100 l and having an accuracy of ± 50 l.

c) an efficient and positive means of heating the bituminous contents uniformly to any temperature up to 175°C and maintaining the contents constantly at any selected temperature without any local overheating.

d) an approved industrial type thermometer so situated that its face shall always be readily visible to the spray bar operator. The sensing element of the thermometer shall be placed either directly in contact with the hot bituminous material or enclosed in a thin walled well of approved manufacture, so placed as to accurately measure the temperature of the material in the tank. The thermometer shall have a minimum range of 10° to 175°C subdivided into 1°C graduations and be accurate to ± 0.5°C

e) rear mounted spray bars and nozzles set parallel to the surface to be sprayed and capable of vertical and lateral adjustment. The spray bars shall be capable of adjustment to provide a minimum spraying width of 1.8 m and a maximum spraying width of 7.5 m.

The feed to the spray bars must be so arranged that there shall be a constant circulation of hot bituminous material to the bars such as will ensure a uniform viscosity and constant pressure of the bituminous material at each nozzle, both before and during spraying operations. Feed manifolds to spray bars shall be provided with strainers to prevent clogging of bars and nozzles.

f) rotary adjustable, spray bar nozzles which shall be so designed and set as to ensure a uniformly fan shaped spray without atomization, overlapping on the surface to be sprayed, such that there shall be produced a uniformly sprayed surface to clearly defined edges of the sprayed

BC - MOT 2006 521 (1 of 4)

Page 514: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 521 ASPHALT STABILIZED BASE COURSE MIXED IN PLACE

lane without any reduction of the rate of application adjacent to the edges of the lane. Spray nozzles shall be provided with valves capable of instant full opening or positive cut-off.

TABLE 521-A CRITERIA FOR BLADE GRADERS

Minimum Weight 7.25 t

Minimum Blade Length 3.6 m

Minimum Wheel Base 5.5 m

Minimum Cubic Displacement of Pistons: 4 Cycle Motors 7.0 l

Minimum Cubic Displacement of Pistons: 2 Cycle Motors 4.0 l

g) a connection to a circulating pressure manifold to which a hose may be attached for a single nozzle, hand operated outlet.

h) a pressure gauge accurate to 15 kPa and calibrated pressure pump, equipped with a tachometer registering litres per minute and driven by an independent mechanically governed power unit, so designed as to be capable of applying through the spray nozzles fitted, accurately measured quantities of bituminous material at a minimum rate of 900 l per minute.

Both pressure gauge and tachometer shall be mounted so as to be readily visible to the operator.

i) a fifth wheel tachometer, registering metres per minute and so calibrated and mounted as to be readily visible to the driver of the distributor, to enable the operator to maintain the constant speed required for application of bituminous material to the road at the specified rate.

521.23 Blade Graders - Self-propelled blade graders mounted on pneumatic tires shall be of approved modern type, either four wheel drive or tandem type having sufficient capacity to efficiently perform all work that may be required on the contract. Unless otherwise approved by the Ministry Representative, all graders shall meet the criteria listed in Table 521-A.

521.24 Pulverizing and Rotary Mixing Machines - Pulverizing and rotary mixing machines to be used on the work shall be standard machines, factory produced by a reputable manufacturer, so designed and constructed as to satisfactorily break up all base aggregations into constituent particles and capable of thoroughly and uniformly mixing the granular base material and applied asphaltic binder so as to produce a uniformly coated mix free from lumps, balls or segregation. The Contractor may use any machine of the Contractor's choice, subject to the approval of the Ministry Representative.

521.25 Compaction Equipment - Compaction equipment shall consist of approved steel wheel rollers, pneumatic tired rollers, vibrating rollers or tampers.

521.25.01 Self Propelled Steel Rollers - Self propelled steel rollers may be three-wheel rollers or tandem rollers. These rollers shall be equipped with power units of not less than four cylinders unless otherwise approved by the

Ministry Representative, and under working conditions shall be capable of developing a compression in the rear wheels of not less than 4.0 kg/mm² over a minimum roller width of 500 mm. At least one roller on each job shall be capable of developing a roll pressure of 4.5 kg/mm² of width. Rollers shall be in good working condition and free from backlash, faulty steering mechanism or worn parts. Rollers shall be equipped with adjustable scrapers to keep the rolls clean and with an efficient means of keeping the wheels wet to prevent mixes from sticking to the rolls. Rolls shall be free of flat areas, dents, openings or projections which will mar the surface of the pavement.

521.25.02 Pneumatic Tire Rollers - Pneumatic tire rollers shall be either self-propelled or towed type, single or double axle, having a minimum effective rolling width of 1.2 m. The rollers shall be equipped with smooth tread pneumatic tires of equal size and diameter. The wheels of the roller shall be so spaced that two passes of a single axle roller or one pass of a two axle roller will accomplish one complete coverage equal to the rolling width of the machine. There shall be a minimum 6 mm overlap of the tracking wheels of a double axle roller. The wheels of towed rollers to be used on granular base preparation may wobble. The roller shall be so constructed that the contact pressure shall be uniform for all wheels and the tire pressure of the several tires shall not vary more than 35 kPa. Pneumatic tire rollers shall be constructed with ample ballast space to provide an operating weight of 4.5 to 8 kg/mm² of tire track width. The total operating weight of the roller may be varied by the Ministry Representative. The towing vehicle for towed type roller shall be equipped with smooth tread pneumatic tires.

521.25.03 Vibrating Tampers - Vibrating tampers to be used for the compaction of bituminous base in places inaccessible to rollers, shall be of a type suitable for the work to be performed and shall be subject to the approval of the Ministry Representative.

521.25.04 Vibrating Compaction Equipment - The Contractor may use vibrating compaction equipment to compact the stabilized base, provided that such equipment produces compaction and surface finish equal to that

521 (2 of 4) 2006 BC - MOT

Page 515: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ASPHALT STABILIZED BASE COURSE MIXED IN PLACE SECTION 521

obtainable by using a steel wheel finish roller having a minimum compression roll pressure of 4.5 kg/mm².

CONSTRUCTION

521.31 Method I - When the roadway has been completed in its entirety by others, the following method shall apply:

a) The granular base shall be regraded to true line, grade and cross-section; the top 65 mm of the base shall be loosened by means of scarifying. The lumps of bonded material are to be broken to constituent gravel by harrowing, blading or rotary tilling. The loose material is to be bladed into a windrow, approximately 10 cm in height on both sides of the road. This windrow will act as a dam in case of spillage or the occurrence of rain after the spraying has taken place.

b) The prepared gravel surface shall be primed on the side not obstructed by the windrow, to the outside width required at a rate of 1 to 1.5 l/m² or as may be ordered, employing the bituminous binder selected by the Ministry Representative within a spraying temperature range which corresponds to a kinematic viscosity of 150 to 200 mm²/s in the binder.

Priming shall be applied only when the surface is dry or slightly damp, and unless otherwise permitted by the Ministry Representative, when the air temperature in the shade is not less than 10°C rising or 12°C falling. When the prime has been completely absorbed by the prepared surface, blade the windrow of loose surface course onto the primed half of the road and prime the untreated half of the surface in a like manner.

Generally, this work shall be governed by the applicable provisions of Subsection 501.31.

c) Immediately prior to application of the bituminous binder, the windrow of loose gravel shall be bladed across the road to a full width uniform cross section. If wet or damp, it shall be first bladed back and forth until dry unless an emulsion is to be used. Cutback bituminous binder shall not be applied until the moisture content has been reduced to 1.5%. In the case of emulsions, mixing may commence when the moisture content of the gravel has been reduced to 4%. No asphaltic binder shall be sprayed on the granular aggregate unless the average temperature of the aggregate on the road is 13°C or higher and such temperature can be maintained in the aggregate until the full mixing cycle has been completed.

Upon the layer of graded aggregate, the bituminous binder shall be applied uniformly at a rate of 1.35 l/m²,

at application temperature required to produce a kinematic viscosity of 150 to 200 mm²/s in the binder.

A disc harrow or rotary type mixer shall immediately follow the distributor after the application of the bituminous binder and shall continue to operate on the treated strip until all free bituminous material has been mixed into the mineral aggregate. The treated mixture shall then be further mixed with a blade grader until a thoroughly uniform mixture results.

The mixture shall then be spread uniformly across the road once more, a second uniform application of bituminous binder at a rate of 0.9 to 1.8 l/m² as may be directed by the Ministry Representative shall be sprayed at application temperature so as to give a final asphalt content of 4 to 6% of the mix. The second application of bituminous binder shall be mixed with the mineral aggregate in a similar manner to the first application, taking care that during the blade mixing none of the untreated base below the prime or shoulder material is brought into the mix. Blade mixing shall be continued until the bituminous binder and mineral aggregates are thoroughly mixed to uniform colour, free from fat spots, balls and uncoated particles. If the mixture should become wet before the mixing process is complete, the mixing operations shall be continued until it has dried out. After final mixing, the mixture shall be brought to a single windrow.

d) Before the finished mixture is finally spread for compaction, a triangular cut shall be made with a blade at each edge of the base course to provide for a thickened edge of bituminous mixture. The cut shall be approximately 50 mm deep at the outer edge and slope to zero, 0.6 m in toward the centre. In making the cut, the excavated material shall be thrown to the shoulder in a small windrow against which the mixture shall be spread. The bituminous mixture shall be spread for compaction from the large windrow. It shall be bladed from this windrow in a succession of thin layers to correct thickness and a uniform cross section with a camber of 1 in 45 (except at curves, where the correct superelevation originally set for base shall be followed).

After the mixture has been spread as specified, it shall be compacted by means of rollers, which operation shall begin at the edges of the course and progress toward the centre parallel to the centreline of the roadway, overlapping in successive passes by at least one-half the width of the roller. Initial breakdown compaction may be obtained by use of steel or rubber tired rollers until no appreciable surface movement or roller marks are visible and the surface has been satisfactorily sealed. Final rolling to eliminate rubber tire or other marks and irregularities shall be carried out

BC - MOT 2006 521 (3 of 4)

Page 516: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 521 ASPHALT STABILIZED BASE COURSE MIXED IN PLACE

using an approved steel wheel finish roller or steel wheel vibrating rollers or other satisfactory equipment.

Compaction shall be carried out to the satisfaction of the Ministry Representative.

Should unsatisfactory areas develop during compaction, they shall be corrected as directed by the Ministry Representative.

521.32 Method II - When the granular base and base stabilization are included in the contract, Method II shall apply as described hereunder:

a) The first lift of granular base, 90 mm, shall be hauled to the roadway, spread, graded to line, grade and cross-section, compacted to 100% of the density as obtained in the laboratory following BCH Test 1-14 (ASTM Designation 0698) Method D.

On completion of the above roadways, as described in the foregoing, priming may be commenced.

On completion of priming and curing the second lift, 60 mm of granular base may be hauled to the primed roadway and spread in a uniform windrow and mixing commenced as described in Subsection 521.31(c).

On completion of base stabilization, the remaining granular base may be applied, i.e., from the edge of the stabilized base to the shoulder.

MEASUREMENT

521.81 Spray Asphalt - Spray asphalt will be measured by the LITRE sprayed on the road.

521.82 Process Base Gravel - Process base gravel will be measured by the SQUARE METRE of completed surface, constructed to dimensions ordered.

PAYMENT

521.91 Payment - Payment for asphalt stabilizing granular base course in place will be made as follows:

a) Spray Asphalt - Payment for SPRAY ASPHALT will be at the Contract Unit Price per litre for the actual number of litres sprayed on the road converted to its volume at 15.6°C. The rate for spraying asphalt shall cover acceptance of asphalt at points of delivery, storing, heating, transport, spraying, traffic control, labour superintendence, equipment and machinery required to carry out all asphalt spraying work including priming described in this Section.

b) Process Base Gravel - Payment for PROCESSING BASE GRAVEL will be at the Contract Unit Price per square metre of measured completed surface, constructed to dimensions ordered. Payment will not be made for extra width of surface mixed or compacted beyond the limits specified.

The rate for processing base gravel shall cover provision of all tools, labour, equipment and services required to cut, shape, dry, pulverize, mix and lay out the base; all compaction; warning signs, barriers, lights, traffic control and superintendence required to thoroughly mix and compact the asphalt and aggregate in place on the road.

Payment of measured quantities at the bid rates for the above two items shall be full compensation for all work and services performed and materials and equipment supplied to complete asphalt stabilization of granular base course material according to the description and intent of this Section.

521 (4 of 4) 2006 BC - MOT

Page 517: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 531

ASPHALT SURFACE TREATMENTS

DESCRIPTION

531.01 Scope - This Section specifies the materials, plant, equipment and quality of work required for the construction of asphalt surface treatments with cover aggregates.

531.02 Description of Work - Surface treatment shall consist of the application of a selected asphalt binder material to a previously constructed bituminous pavement, or a well compacted crushed granular surface followed by the application and embedment of a course(s) of selected aggregate to provide a new surface which shall be impervious to moisture, have a non-skid texture, high luminosity and good riding qualities. This normally would be a chip seal, graded aggregate seal or a coarse sand seal or any other surface treatment outlined in the Special Provisions for the Project work of the Contract.

531.03 Types of Chip Seals - There are five types of chip seals characterized by the principal size of the cover aggregate. Unless specifically described otherwise in the Special Provisions, an asphalt chip seal shall be constructed using medium cover aggregate as defined in Subsection 531.16.

531.04 Types of Graded Aggregate Seals - There are six types of graded aggregate seals as characterized by the maximum and minimum gradations of the cover aggregate as defined in Subsection 531.17.

MATERIALS

531.11 Asphalt Materials - Asphalt(s) to be used on surface treatment may be standard rapid curing cutback

asphalt; medium curing cutback asphalts; or anionic or cationic emulsions including high float emulsified asphalts meeting the requirements of Section 951. Types and grades of asphalt binder proposed for use on the Project will be specified in the Special Provisions.

531.12 Coating and Anti-Stripping Additives - For general use or for experimental or trial purposes, the Ministry Representative may direct the use of surface active "coating and anti-stripping additives" or any other materials formulated to improve the coating and adhesive properties of the asphalt binder to the selected cover aggregate. In such cases, instructions concerning the type of additive to be supplied and the method of incorporation with the asphalt binder will be specified in the Special Provisions or, if the work has commenced, will be the subject of supplementary written instructions to the Contractor.

531.13 Mineral Aggregate Supply - Mineral cover aggregate meeting the requirements described hereunder shall be supplied by the Contractor unless specifically described otherwise in the Special Provisions.

531.14 Mineral Aggregate - Method of Test - Mineral Aggregate will be tested in accordance with the standard British Columbia Ministry of Transportation (BCH) and ASTM tests listed in Table 531-A.

531.15 Mineral Aggregate - Physical Requirements

531.15.01 Composition - Mineral cover aggregate shall consist of clean, sound, hard, durable particles or fragments of sand, gravel or crushed stones or combination thereof; containing a minimum of thin elongated or flaky pieces such

TABLE 531-A TEST METHODS FOR MINERAL AGGREGATE

BCH TEST ASTM DESIGNATION

NAME OF TEST

D 75 Sampling stone, slag, gravel, sand, and stone block for use as Highway materials

I - 1 Sieve Analysis of Aggregates

I - 2 Wash Test of Aggregates

I - 7 Clay Lumps and Friable Particles in Aggregates

I - 3 Bulk Relative Density and Absorption of Coarse Aggregates

I - 4 Bulk Relative Density and Absorption of Fine Aggregates

I - 5 Soundness of Aggregates by use of Magnesium Sulphate

I - 9 Degradation Test

I - 13 Fracture Count on Coarse Aggregate

I - 6 Moisture Content of Aggregate by Drying

I - 11 & 12 Liquid Plastic Limit Determination

BC - MOT 2006 531 (1 of 12)

Page 518: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 531 ASPHALT SURFACE TREATMENTS

as may cause the height constant of the particles to be less than 0.6 (refer to BC Highways Paving Branch Manual of Test Procedures BCH-VI). It shall be substantially free from loosely bonded aggregations, clay lumps or other objectionable matter and shall not, in the Ministry Representative's opinion, be markedly hydrophilic in character.

531.15.02 Test Requirements - For the purpose of testing, the mineral cover aggregate shall be considered to be divided into coarse and fine (sand) fractions. Fine aggregates shall consist of all material passing through a 4.75 mm standard sieve, unless some other boundary shall be specifically described under the respective Method of Test. The mineral cover aggregate, when tested by the methods listed in Subsection 531.14, shall meet the following criteria:

a) Clay Lumps - Coarse aggregate shall not contain more than 0.5% by mass of clay lumps or other aggregation of fine material.

b) Absorption - maximum 1.0% by mass for coarse aggregate; maximum 1.5% by mass for fine aggregate.

c) Soundness - When tested for soundness by BCH Test I-5, the aggregate shall not show a weighted loss for five cycles in excess of 12% when Magnesium Sulphate is used (or have a satisfactory record of service).

d) Degradation - No individual test shall have a degradation factor of less than 40.

531.16 Chip Seal Aggregates - Requirements

531.16.01 Screen Analysis - Chips shall be subjected to a washed screen analysis. The result will be shown on a chart, with the total percent passing each screen plotted against the logarithm of the screen opening. Sufficient screens of suitable size shall be used to result in a reasonably well-defined and smooth curve. The values on the screen opening scale at which this curve intersects the 5%, 10%, 50%, 90% and 100% lines on the percentage scale shall be noted; likewise, the percentage passing the 0.075 mm mesh screen. The screen opening corresponding to the 50% point will hereafter be referred to as the Principal Size.

531.16.02 Aggregate Size - The variation in Principal Size for each of the described aggregate grades shall be as tabulated in Table 531-B.

While the grade description for the project may have been stated, the acceptance of the corresponding size range in any aggregate not described or previously approved in order to make the most economic use of the aggregate resources,

shall be at the discretion of the Ministry Representative, since the shape and other characteristics of the aggregate determine its suitable principal size in use.

531.16.03 Gradation - The size openings determined as described in Subsection 531.16.01 shall meet the requirements stated in Table 531-C, the ratio in each case being that of the screen opening corresponding to the percentage specified to the Principal Size or 50% opening.

Grading Chart Drawing SP531-01 illustrates the grading requirements.

In addition, the percentage of material passing the 0.075 mm mesh sieve shall not exceed the amounts stated in Table 531-D for the various grades.

531.17 Graded Aggregate Seal - Requirements

531.17.01 Gradation - Gradations shall meet the limit stated in Table 531-E for each Class of graded aggregate seal.

a) Fracture - When tested according to BCH Test I-13 Method B-2 fractured faces, the minimum % by mass on course aggregate shall be as follows:

• Classes A & B = 70% • Classes C, D, & E = 85%

b) Variation Limits - Once the grading curve is established within the above limits, the maximum permissible variation of the mean of any five consecutive tests from the grading curve shall be within the tolerance specified in Table 531-F

These tolerances do not waive the requirement that the running average of five consecutive tests must be maintained at all times inside the limits specified in Subsection 531.17.01. Should the Contractor not be able to maintain the grading within the variation limits

TABLE 531-B VARIATIONS IN PRINCIPAL SIZES FOR VARIOUS AGGREGATE GRADES

GRADE DESCRIPTION PRINCIPAL SIZE (mm)

MINIMUM MAXIMUM

Fine Cover Sand 0.7 2.0

Coarse Cover Sand 2.0 3.5

Small Cover Aggregate 3.5 6.5

Medium Cover Aggregate 5.0 11.0

Large Cover Aggregate 11.0 19.0

531 (2 of 12) 2006 BC - MOT

Page 519: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ASPHALT SURFACE TREATMENTS SECTION 531

b) Mineral filler and mineral dust shall be free from organic matter.

specified above they shall be required to construct a second stockpile. This does not alleviate the Contractor from consistently maintaining the grading curve within the tolerances indicated in the gradation curves. c) Mineral filler shall be non-plastic when tested in

accordance with BCH Test I-11 and BCH Test I-12. c) General Usage

531.18 Presealing Sand - Sand required for use as a fine aggregate in connection with presealing operations conducted under Subsection 531.36 shall meet the physical requirements of Subsection 531.15, but unless otherwise specified by the Ministry Representative, shall have a grading as specified in Table 531-G.

• Class A & B - Double seals on gravel highways • Class B - Low traffic paved roads • Class C & D - Major Highway • Class E - Residential areas & Second seals

531.17.02 Coarse Aggregate

All aggregate passing the 0.425 mm sieve shall be non-plastic. a) will be defined as all material retained on the

4.75 mm sieve.

531.19 Blinding Sand - Sand required for use as blinding material applied on the completed chip seal as described in Subsection 531.37.04 (b), shall meet the physical requirements of Subsection 531.15.02 (a) for Clay Lumps and shall, in addition, meet the grading requirements shown in Table 531-H.

b) shall consist of crushed stone or gravel, or a combination thereof; or materials naturally occurring in a fractured condition; or materials naturally occurring of highly angular nature or rough texture with a minimum degradation factor of 40.

c) shall be free from coating of clay, silt or other deleterious material and shall meet the applicable tests requirements of Subsections 531.14 and 531.15.

All aggregate passing the 0.425 mm sieve shall be non plastic. In the event that the Contractor is unable to provide blinding material within this gradation, payment shall be made only for the proportion of material applied to the road which falls within the gradation curve. 531.17.03 Fine Aggregate

a) will be defined as all materials passing the 4.75 mm sieve and shall meet the applicable test requirements of Subsections 531.14 and 531.15.

EQUIPMENT

531.21 General

b) shall be clean, hard, durable, moderately sharp, and free from coatings of clay, silt or other deleterious material and shall contain no clay balls or other aggregations of fine material.

531.21.01 When submitting the bid for work under the Contract, the Contractor shall, at the same time, submit a list of equipment available and ready for use on the Project.

531.21.02 Before any work is permitted to commence, the Contractor's equipment and plant will be carefully inspected and should any of it fail to meet the required standards, work will not be permitted to commence until such deficiency is corrected.

531.17.04 Mineral Filler and Mineral Dust

a) Mineral filler shall consist of all mineral matter passing the 0.600 mm sieve and the mineral dust shall consist of all mineral matter passing the 0.075 mm sieve.

TABLE 531-D PERCENT OF MATERIAL PASSING VARIOUS GRADES

GRADE OF AGGREGATE

MAXIMUM PERMISSIBLE % PASSING 0.075 mm SIEVE

Fine Cover Sand 2.0 Coarse Cover Sand 1.5 Small Cover Aggregate 1.0 Medium Cover Aggregate 0.5 Large Cover Aggregate 0.5

TABLE 531-C REQUIREMENTS FOR SIZE OPENINGS

PERCENTAGE LIMITING RATIO

PASSING MINIMUM MAXIMUM

5% 0.4 ---

10% 0.6 ---

90% --- 1.50

100% --- 2.00

BC - MOT 2006 531 (3 of 12)

Page 520: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 531 ASPHALT SURFACE TREATMENTS

531.21.03 Once the Contractor's bid has been accepted, provision of all equipment listed shall become an essential part of the contract and no equipment or plant may be released from the Project work for use elsewhere until completion, except by the express written permission of the Ministry Representative.

TABLE 531-E GRADATION LIMITS FOR GRADED AGGREGATE SEAL

Sieve size

CLASS Mass Percent Passing

(mm) A B C D E 19 100 - - - - 16 - 100 100 - -

13.2 60 - 90 60 - 90 - 100 - 9.5 40 - 80 35 - 75 30 - 70 30 - 80 100

4.75 20 -60 15 - 50 25 - 45 25 - 45 0 - 30 0.600 0 - 25 0 - 15 5 - 20 5 - 20 0 - 10 0.075 0 - 7 0 - 5 0 - 3 0 - 3 0 - 2

531.21.04 The Ministry inspectors shall have access at all times to any plant, equipment or machinery to be used on the Project in order to check calibration, control or operating adjustments. Where adjustment appears necessary, it shall be done by a competent operator or mechanic or instrument repair technician, as required.

531.21.05 Plant, machinery and equipment specified hereafter shall represent a minimum requirement for the type of machine described and does not represent a comprehensive list of equipment to be supplied by the Contractor who shall supply whatever plant and equipment may be necessary to the proper and efficient completion of the work.

531.21.06 All plant and equipment shall be under the control of experienced and skilled operators.

531.22 Pressure Distributor - The pressure distributor used for applying asphalt materials shall consist of a fully insulated tank with a minimum capacity of 5000 l, permanently and rigidly mounted on a truck or fifth wheel trailer provided with pneumatic tires and propelled by a power unit capable of maintaining a constant and uniform speed.

The pressure distributor, to be acceptable, shall be provided with at least the following equipment:

a) A quick opening gate in the dome.

b) A dipstick calibrated in 20 mm increments and a calibration chart showing the volume for each 20 mm of depth, or provide the manufacturer dipstick and chart. Readily visible external depth gauge indicating the quantity of asphalt in the tank to the nearest 50 l.

c) A means of heating the asphalt material uniformly to any temperature up to 175°C and maintaining the contents constantly at any selected temperature without any local overheating.

d) A heavy duty, industrial-type thermometer and a remote reading dial thermometer.

e) Rear-mounted spray bars and nozzles set parallel to the surface to be sprayed and capable of vertical and lateral adjustment. The spray bars shall be capable of

adjustment to provide a uniformly sprayed surface from a minimum of 0.6 m to at least 4 m width.

The spray bars shall be capable of producing up to triple coverage at one pass. The feed to the spray bars must be arranged so that there is a constant circulation of hot asphalt material to the bars to ensure a uniform viscosity and constant pressure of the liquid asphalt at each nozzle both before and during spraying operations.

f) The feed manifolds to the spray bars shall be provided with positive filtration to prevent clogging of bars and nozzles.

g) Rotary adjustable spray bar nozzles shall be of the same type, correct size and manufacture; and set to produce uniformly fan-shaped sprays without atomization. Nozzles shall be inspected daily and any nozzle having nicked or damaged edges shall be replaced.

h) Spray nozzles shall be provided with valves capable

TABLE 531-F VARIATION LIMITS

Sieve Size (mm)

Maximum Permissible Tolerance % Passing by Mass

(Test B.C.H. I-1 & I-2)

4.75 to 19.0 ± 4.5

1.18 and 2.36 ± 4.0

0.600 ± 3.5

0.300 ± 2.5

0.150 ± 1.5

0.075 ± 1.0

531 (4 of 12) 2006 BC - MOT

Page 521: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ASPHALT SURFACE TREATMENTS SECTION 531

of instant full opening and positive cut-off. TABLE 531-G PHYSICAL REQUIREMENTS FOR SAND IN A FINE AGGREGATE

SIEVE SIZE (mm) PERCENTAGE PASSING

4.75 100

2.36 80 - 100

1.18 60 - 90

0.300 25 - 70

0.150 10 - 40

0.075 2 - 12

i) A connection to a circulating pressure manifold to which a hose may be attached for a single nozzle hand-operated outlet.

j) A pressure pump capable of applying the asphalt material at a minimum rate of 180 l per minute, per metre of spray bar.

k) A pressure gauge accurate to within 15 kPa and a metre calibrated in litres per minute, shall be readily visible.

l) A fifth wheel tachometer, calibrated in metres per minute and readily visible to the operator of the distributor.

A walkway with protective railings, conforming to the applicable W.C.B. Regulations, shall be provided at the front of the spreader so that the hopper operator has safe access to the individual gate control levers. m) Vehicle spring "tie-downs" to prevent the change in

height of the spray bars due to the reduction of the asphalt load during spraying. The spreader shall be designed to apply aggregate at any

application width between 2 m and 4.12 m. (Note: a 4.26 m hopper is required.) n) Electronic distance measuring device, with print out

connected to the transmission, that is capable of measuring each spray length and the total length sprayed during the day.

531.24 Rollers - Self-propelled pneumatic tired rollers (mass range from 13 600 kg to 19 000 kg) shall be used on the work. The rollers shall have a minimum effective rolling width of 1.83 m. The rollers shall be equipped with smooth, wide-tread compaction tires of equal size and diameter. The wheels of the roller shall be spaced so that one pass of the roller shall accomplish one complete coverage equal to the rolling width of the machine. There shall be a minimum overlap of 6 mm of the tracking wheels of the roller. The wheels shall be so mounted as to oscillate in pairs. The roller shall be provided with ample ballast space and be so constructed that the specified wheel load can be uniformly applied to all the wheels, to provide similar contact pressure under all wheels when rolling on a level pavement.

531.23 Mechanical Spreader - Cover aggregate shall be spread by means of an efficient, self-propelled spreader mounted on pneumatic tires and capable of continuously and uniformly spreading closely regulated quantities of crushed aggregates at the application rates selected. The loading hopper shall be of such a capacity as to ensure continuous operation between dumps of aggregate. Aggregate shall be transferred from the loading hopper to the front spreading device in such a manner as to ensure a uniform flow and prevent segregation of particles.

The spreading mechanism shall be so designed as to distribute and spread aggregate across the selected width without segregation. Aggregate shall be applied to the freshly sprayed surface by use of a screen so that the largest particles are first placed on the road with the smaller fractions falling on top. The approved screen is to be mounted beneath the discharge openings of the spreader mechanism in such a manner that the angle of the screen relative to the road surface can be easily and quickly changed.

The tires shall have a minimum of 16 ply and their inflation pressure shall not normally exceed the specified pressure by

TABLE 531-H PHYSICAL REQUIREMENTS FOR SAND IN A BLINDING MATERIAL

SIEVE SIZE (mm) PERCENTAGE PASSING

4.75 100

2.36 50 - 90

1.18 30 - 80

0.300 10 - 55

0.150 5 - 25

0.075 0 - 3

Suitable provision shall be made to prevent aggregate from rolling on the freshly sprayed surface. The cover aggregate shall be applied ahead of the spreader wheels, with sharply defined, straight edges and without any lateral movement of the aggregate after initial application.

BC - MOT 2006 531 (5 of 12)

Page 522: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 531 ASPHALT SURFACE TREATMENTS

more than 35 kPa and shall at no time be less than specified. Inflation pressure of all of the tires shall be controlled from a central location while the machine is in motion and capable of varying the tire pressure from 206 kPa to 827 kPa. Rollers shall be ballasted and operated to the manufacturers recommended specifications.

The Ministry Representative may approve the use of compactors equal to but differing from the above requirements provided the Ministry Representative is satisfied that equally effective compaction will be obtained by use of the alternative equipment.

The Ministry Representative may approve the use of rubber-covered, vibrating drum rollers (minimum width of 1.52 m and mass of 3000 kg) or tandem steel wheel rollers in the static mode provided the drum or drums can contact the road surface over the entire width of the drums (no bridging). On shoulder seals, the use of pulled wobbly wheel rollers may be used at the discretion of the Ministry Representative. They also may be used on graded aggregate seal on gravel surfaces, where the road is wide enough to permit units to turn without damage to the road surface, sealed or otherwise.

All rollers shall be provided with equipment for spraying water continuously on all tires or wheels, while rolling is in progress, and also be provided with such means as may be required to keep the tires clean and free of adhering asphaltic binder.

531.25 Power Brooms - Brooming work shall be carried out using rotary power brooms mounted on self-propelled, pneumatic tired tractor units. The brooms shall be capable of vertical and horizontal angular adjustment and must be provided with equipment for spraying water, as required, on the surface to be broomed while the equipment is in operation. The brooms shall have sufficient power and brushing capacity to completely clean the surface of the standard lane to be treated or which has been treated within three coverages.

This Subsection is to be read in conjunction with Subsection 145.19 and Section 165.

531.26 Blade Graders - Self-propelled blade graders mounted on pneumatic tires shall be of approved modern type, either four wheel drive or tandem type, having sufficient capacity to efficiently perform all work that may be required on the contract.

531.27 Water Truck - Water trucks shall have a minimum capacity of 9000 l. Water shall be applied from a distributor of the pressure type, equipped with a spray bar mounting nozzles similar to those used on asphalt distributors and

capable of applying the water accurately and uniformly. Splash plate type of distributors or those equipped with spray bars that eject fine streams of water will not be permitted.

The distributor must be provided with a satisfactory means for accurately measuring the quantity of water sprayed. If the Ministry Representative so requires, measuring equipment shall be calibrated under the Ministry Representative's inspection. The Contractor shall make all necessary arrangements for obtaining water at the Contractor's own expense. In addition, the water truck shall be equipped so that it may be used as a flush truck with front-mounted, adjustable spray nozzles that produce a fan-shaped spray in the horizontal mode and can be adjusted in vertical or horizontal direction (ball-mounted). The delivery of water should be variable to single or multiple nozzles so that the desired flushing can be achieved. The water truck shall be equipped with a loading pump capable of pumping 1360 l or more of water per minute.

The spraying and flushing controls must be in the cab and accessible to the driver while the unit is in motion. The minimum spray bar width will be 2.40 m. Gravity single jet or drip bar equipment unit will not be permitted.

531.28 Sign Truck - Truck(s) of sufficient capacity to store and transport all necessary signs, stands, barriers, flashing lights, batteries, flood lights, generators, high-level warning devices, project signs, etc., is required.

531.29 Tanks, Mobile Asphalt Heating, & Storage - Insulated liquid asphalt storage tanks should meet the following minimum criteria:

a) A positive high-low heating system, 10° to 200°C, with a hot oil/steam circulation system.

b) Automated heating and control system with safety shutdown.

c) Intake/Outlet, two, each with screens installed.

d) Positive locking valve on discharge line.

e) Sampling valve or spigot.

f) Pyrometer; Multi point 20° - 200°C.

g) Direct reading levelometer.

h) Manholes, at each end, with ladders.

i) Tank(s) with sufficient capacity to hold one day's production requirements.

531 (6 of 12) 2006 BC - MOT

Page 523: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ASPHALT SURFACE TREATMENTS SECTION 531

531.32.04 Traffic Through Work - Where it is not possible to detour traffic, sealing work shall normally be carried out in lane widths and traffic shall be regulated by pilot cars on the opposite traffic lane to that on which construction is in progress. Traffic travelling on the old road surface may be permitted to travel up to a maximum speed of 50 km/h consistent with safety requirements. Traffic shall only be allowed to travel on the newly-sealed lane under control of a pilot car or cars which shall enforce a 20 km/h speed limit up to 4 hours and a 30 km/h speed limit for a period of up to 24 hours, as determined by the Ministry Representative, after completion of the sealing operations; except in the case of pre-seal construction when the period of control shall be up to 4 hours after completion of the pre-sealing operation.

CONSTRUCTION

531.31 Temperature and Weather - Asphalt binder and aggregate shall be applied only during the hours of daylight when the shade air temperature is at least 10°C for graded aggregate seals and 15°C for chip seals and is rising; and when the surface of the road is dry and at a minimum temperature of 20°C and rising. Operations shall cease when the temperature falls below 20°C for chip seals and 15°C for graded aggregate seals. No application shall take place when, in the opinion of the Ministry Representative, the weather or roadbed conditions are unfavourable, i.e., weather is misty or rainy, precipitation is predicted for the construction area within 12 hours or the atmospheric temperature at the construction area of less than 12°C is predicted within 24 hours. No chip seal shall be effected before June 1 or after August 15. In the event of prolonged inclement weather, traffic control

will be maintained as long as the Ministry Representative deems necessary to protect newly laid surface seals. 531.32 Traffic Control - Traffic control shall meet the

requirements of Section 194 and the following: 531.32.05 Pilot Cars - Sufficient pilot cars shall be provided so that the delay to traffic shall be no greater than 20 minutes. They shall be equipped in accordance with Section 194.

531.32.01 Signs and Barriers - The Contractor shall provide all warning and instructional signs, barriers, lights, electronic communicating devices and flagpersons required to properly and safely control all traffic around or through the work in accordance with Section 194, and as may be specially required below.

531.32.06 Communications - The flagpeople, pilot car or cars, sign truck, spreader and supervisor's vehicle shall have an effective electronic means of communication so that instructions and information can be quickly and accurately relayed over the total length of the control area.

531.32.02 Detours - Where conditions indicate that traffic may be detoured, the Contractor shall arrange to close off the section of road to be sealed and erect detour and route signs. After the completion of the sealing operations traffic shall not be allowed onto the closed sections after the completion of the sealing operations, for the periods specified in Subsections 531.32.04, 531.36.06 and 531.37.04, unless otherwise directed by the Ministry Representative.

531.32.07 Flood Lights - During periods when headlights must be used, including during daytime periods of poor visibility and high dust condition, two self-contained floodlights shall be used to illuminate each of the flagging stations. These floodlights shall be of at least 1000 watts and be complete with reflector, lens and adjustable stand at least 2.15 m high. The light, reflector and lens must be mounted so that they are capable of both vertical and horizontal adjustment. The stands are to be sufficiently sturdy so that they can withstand a 30 km/h wind without the use of ballast. The generators shall have a full capacity sufficient to enable them to run one shift under full load.

531.32.03 Shoulder Detours - Where shoulders are wide and firm enough to accommodate traffic that cannot be detoured along an alternative route, the Ministry Representative may direct that traffic be detoured onto the shoulder. If required, and approved by the Ministry Representative, the shoulder shall be made up, rolled and graded on a force account basis. A designated liquid asphalt shall be sprayed from the edge of the road to the edge of the shoulder, as required, and allowed to cure before traffic is detoured off the road to be sealed and onto the shoulders.

531.32.08 Flag Personnel - Flag personnel shall be equipped in accordance with Section 194 and provided as required to safely control and conduct traffic through the job.

531.33 Preparation of Roadway - The patching and levelling of the pavement to be sealed may be part of a sealcoating contract or may be effected by others.

The Contractor shall provide sufficient pilot cars and barriers to maintain traffic movement at a maximum speed of 40 km/h solely on the shoulders, during the course of work. Once a section has been sealed, traffic will be regulated as indicated in Subsection 531.32.04.

BC - MOT 2006 531 (7 of 12)

Page 524: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 531 ASPHALT SURFACE TREATMENTS

531.34 Sweeping - Sweeping shall meet the requirements of Section 145, Section 165, and Subsection 531.27 regarding equipment for watering and the following:

531.36.04 Rolling - Rolling shall commence immediately after the application of cover sand and shall be completed within 15 minutes. Sufficient pneumatic tired rollers shall be used to ensure that the entire surface of the treated road receives complete coverage within the specified time, at a rolling speed not in excess of 8 km/h.

• Immediately prior to the commencement of the sealing operations, all loose aggregates, dust, dirt, caked clay or foreign materials shall be removed from the width of the surface to be treated by brushing with power brooms supplemented by hand push brooms, shovels or the use of a power grader, and where necessary by flushing.

531.36.05 Bleeding - Bleeding spots or areas shall receive a further application of sand blotter and be re-rolled. This process shall be repeated until no further bleeding occurs.

• Particular care shall be taken to thoroughly clean to outside edges of the strips to be treated and to ensure that the sweepings are not so deposited on the shoulder as to permit subsequent contamination of the treated surface.

531.36.06 Traffic - No traffic shall be permitted on pre-sealed sections for up to four hours or as the Ministry Representative may direct.

531.36.07 Curing Time - No seal coating work shall be carried out on the pre-sealed surface until 24 hours after completion of the pre-seal or as the Ministry Representative may direct.

531.35 Patching - In order to avoid delays to the Contractor, any patching not done, and in the opinion of the Ministry Representative required before sealing operations begin, may be done by the Contractor as directed by the Ministry Representative with materials supplied by the Ministry and paid for under an Order for Extra Work.

531.36.08 Sweeping - Prior to commencement of the main seal-coat treatment all loose, unbonded sand shall be swept from the pre-sealed surface in accordance with Subsection 531.34. 531.36 Pre-Seal Treatment

531.37 Single Pass Surface Treatment 531.36.01 Description - Wherever the pavement is in a worn, open, dry or porous condition, or on gravel surfaces which, in the opinion of the Ministry Representative, would result in high absorption of the asphalt binder, the surface shall be pre-sealed. All pre-sealing work on a Contract shall, unless otherwise ordered by the Ministry Representative, be fully completed prior to the commencement of seal coat work.

531.37.01 Application of Asphalt Material - The selected asphalt material shall be uniformly sprayed on the properly prepared surface at a rate of 0.5 to 2.75 l/m2, or as may be directed, and at such temperature as shall cause the Sayholt Furol Viscosity of the material to be within 50 - 75 seconds.

Wherever it is possible to detour traffic, the surface may be sprayed full width at one pass of the distributor. Two spreaders must be used.

531.36.02 Application of Asphalt Pre-Seal - After the surface has been prepared in accordance with Subsections 531.33 and 531.34, a selected asphalt binder shall be sprayed, at such application rates as directed, so that just sufficient asphalt material shall be applied to the most absorptive sections of the mat, avoiding an excess elsewhere. The asphalt binder shall be applied at the temperature at which the Saybolt-Furol Viscosity of the material is in the range of 50 - 75 seconds.

Normally, where it is not possible to detour traffic only one half of the roadway shall be sprayed at one time, permitting one-way controlled traffic on the other half. In no case shall a longitudinal joint be so placed that it is in a wheel path, the exception being when a double graded seal is being applied.

In order to ensure a uniform distribution of asphalt material and avoid the formation of a lap or ridge at the transverse junction of two successive applications, building paper shall be spread over the treated surface for a sufficient length back so that the spray jets are operating properly (fully open) when the uncovered surface is reached. The building paper shall then be removed and disposed of prior to the application of aggregate. (Refer to Section 165.)

531.36.03 Application of Sand Cover

a) Application of sand in sufficient quantity to completely blot up all excess unabsorbed asphalt material shall follow within five minutes or as may be directed by the Ministry Representative.

b) At the time of spreading, the sand shall not contain more than 5% moisture by mass. There shall be a maximum 100 mm overlap of sprayed

material at the longitudinal joint between sprayed lanes.

531 (8 of 12) 2006 BC - MOT

Page 525: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ASPHALT SURFACE TREATMENTS SECTION 531

c) Prior to and during the rolling operation, any non-uniformity in the distribution of the cover aggregate shall be corrected by spreading additional aggregate and/or by light raking or hand brooming over such sections of the road as the Ministry Representative directs.

The spray shall be cut off before the distributor tank has been completely emptied to ensure that a full application of asphalt material is made up to the point of cut off.

Pressure hand sprays shall be used to properly treat small patches or inaccessible places that have been missed by the distributor. Care shall be taken and building paper shall be used, if necessary, to ensure against staining any curbs, guardrails or faces of any improvements near the work.

531.37.03 Rolling - Immediately after the aggregate has been uniformly spread, the road surface shall be rolled sufficiently to embed the aggregate into the asphalt material to the satisfaction of the Ministry Representative. The progress of the application of the asphalt material shall

be governed by the weather, the curing rate of the asphalt and the rate at which the cover aggregate is applied and rolled. No traffic shall be permitted on the uncovered asphalt material. The Contractor shall organize work so that seal-coating can normally be completed to the full width of the road surface each day.

Sufficient pneumatic tired rollers shall be used to ensure that the entire surface of the aggregate receives at least five complete coverages within 15 minutes of the application of asphalt material; or when asphalt emulsion is used, five complete coverages shall be completed before the emulsion starts to break. On a chipseal, embedment of 40 to 50% of the average stone size is required from mechanical compaction before traffic is allowed on the new mat.

531.37.02 Application of Cover Aggregate

a) Application - The uniform application of the specified cover aggregate, at the spread rate set by the Ministry Representative, shall immediately follow the application of the asphalt material, before the emulsion breaks or within 2 minutes if a cutback asphalt is sprayed. An approved screen shall be used to place the larger chips or particles of aggregate onto the sprayed asphalt first so that maximum embedment of the larger material is obtained. Any segregation shall be corrected immediately.

The speed of the rollers shall be such that the suction of the tires shall not displace the aggregate from the road surface or a maximum of 8 km/h, whichever is less.

The completed surface shall present a uniform appearance. Any segregation or non-uniformity in the distribution of the aggregate shall be corrected by spreading additional material over the area and re-rolling with five coverages of the rollers.

b) Moisture Content 531.37.04 Protection of the Surface

i) Seal Coat Aggregates - At the time of spreading, the moisture content of the cover aggregate shall not exceed the percentage by mass, indicated in Table 531-I.

a) No traffic shall be permitted on the sealed surface until after the rolling has been completed and when the Ministry Representative is satisfied that the applied aggregate will not be picked up or be displaced under traffic. Generally, traffic shall not be permitted on the sealed roadway until at least 2 hours after the rolling is completed. If traffic must be passed over a sealed surface

The Contractor shall wet down dry chip stock piles prior to their use and finer aggregate piles as and when ordered by the Ministry Representative so as to provide such moisture content, below the limits specified, as may be required to ensure good coating of the aggregate particle surface by the asphalt binder. Inasmuch as this applied moisture will be weighed out of stockpile as aggregate, no extra payment will be made for wetting down aggregate stockpiles.

TABLE 531-I MAXIMUM MASS PERCENTAGE FOR MOISTURE CONTENT OF COVER AGGREGATE

AGGREGATE TYPES

MAXIMUM ALLOWABLE MOISTURE CONTENT FOR

LIQUID CUT BACK AND ASPHALT EMULSIONS

Fine Cover Sand 5%

Coarse Cover Sand 4%

Small Cover Aggregate 3%

Medium Cover Aggregate 2%

Large Cover Aggregate 1%

ii) Graded Seal Aggregates - At the time of spreading, the moisture content of the aggregates shall be such that the material will flow freely in the hopper without segregation and/or a build up of material on the screen.

BC - MOT 2006 531 (9 of 12)

Page 526: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 531 ASPHALT SURFACE TREATMENTS

before 2 hours have passed then they will be kept to a speed of 20 km/h or less. After 2 hours, then the speed may be increased to 30 km/h up to 4 hours and not more than 50 km/h for 24 hours or until the surface has been swept. The curing period shall be increased if so directed by the Ministry Representative.

531.38 Double Pass Surface Treatment

531.38.01 Preparation of Existing Surface - Existing surface preparation shall be performed in accordance with Subsections 531.33 through 531.36 as applicable and as detailed in the Special Provisions.

b) From the completion of rubber tired rolling on any section of sealed surface and for a further continuous period of 3 days or more including weekends and public holidays, the Contractor shall have a vehicle(s) and maintenance crew (a minimum of three employees) immediately available to arrest any tendency of the asphalt binder to bleed through the surface of the cover aggregate and to prevent pickup and blackening of the surface by the action of traffic. All bleeding spots shall be blotted with a sufficient quantity of blinding sand necessary to correct the defect and in such a manner as the Ministry Representative shall direct. No payment will be made for the supplying and placing of the sand.

531.38.02 Surface Treatment - First Pass - The first pass of the surface treatment shall be performed in accordance with Subsections 531.37.01 and 531.37.02, using the graded seal cover aggregate specified in the Special Provisions. Rolling, Surface Protection and Removal of Loose Aggregate shall conform to Subsections 531.37.03 through 531.37.05.

531.38.03 Surface Treatment - Second Pass - The second pass of the surface treatment shall commence not less than 24 hours after completion of the first pass, subject to acceptable weather conditions as detailed in Subsection 531.31, and as the Ministry Representative may direct. Asphalt material shall be applied in accordance with Subsection 531.37.01, followed by an application of graded seal aggregate as specified in the Special Provisions and detailed in Subsection 531.37.02, and rolling, surface protection and removal of loose aggregate per Subsections 531.37.03 through 531.37.05.

c) Blinding Sand - In the event of rain, traffic will be kept off a newly sealed surface until sand, provided by the Contractor, has been applied in sufficient quantity to protect the surface of the road from damage. Sanding will continue as long as necessary to protect the freshly laid seal.

MEASUREMENT Payment for the supply and application of this sand will be by Order for Extra Work. 531.81 Surface Treatment - Surface treatment will be

measured by the SQUARE METRE. 531.37.05 Removal of Loose Aggregate - To be read in conjunction with Sections 145 and 165. 531.82 Flag Persons - Flag persons will be measured by

the HOUR. a) The Contractor shall, when directed by the Ministry Representative, sweep off all surplus aggregate and spread it neatly along the gravel shoulders. Sweeping of the road surface will normally be completed 24 hours after the final rolling for chip seals and 48 hours for graded aggregate seals. This operation shall be done while the road surface is cool and care should be exercised not to disturb the aggregate that has been retained in the asphalt. In the event that cover aggregate is being disturbed, brooming will cease until curing is complete and the cover aggregate is firmly held in place. Water shall be used in sufficient quantity to reduce dust hazard and to meet pollution control requirements.

531.83 Pilot Cars - Pilot cars will be measured by the HOUR.

531.84 Asphalt Binder - Asphalt binder (100 000 l or less) will be measured by the LITRE.

Asphalt binder (greater than 100 000 l) will be supplied by the Ministry f.o.b. the Contractor’s tanks.

531.85 Aggregates - Where the Special Provisions requires the Contractor to supply the aggregate, the aggregate will be measured by the CUBIC METRE in stockpile. The volume will be determined by cross-sectioning and end area volume calculations. b) Alongside barriers and curbs and where catch basins

or drainage outlets are encountered, the Contractor shall pick up and dispose of the surplus aggregate, including any pertinent cleaning of catch basins, behind the barriers or curbs or within the right-of-way, in any manner the Contractor elects, subject to the approval of the Ministry Representative.

531.86 Stockpile Bases - NO MEASUREMENT will be made for work and materials required for the preparation of stockpile bases, as directed by the Ministry Representative.

531 (10 of 12) 2006 BC - MOT

Page 527: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

ASPHALT SURFACE TREATMENTS SECTION 531

531.94 Asphalt Binder - Payment for ASPHALT BINDER will be at the Contract Unit Price per litre actually sprayed.

PAYMENT

531.91 Surface Treatment - Payment for SURFACE TREATMENT will be at the Contract Unit Price per square metre. The Unit Price shall cover everything done and supplied including ordering, receiving, storing and heating of asphalt materials, traffic control equipment, and all equipment and labour required to complete the work.

531.95 Aggregates - Payment for AGGREGATE will be at the Contract Unit Price per cubic metre in stockpile.

No additional payment will be made for washing when needed in order to meet gradation requirements.

531.96 Stockpile Bases - All work and materials required for the PREPARATION OF STOCKPILE BASES, as directed by the Ministry Representative, will be paid for, on an Order for Extra Work basis from the Provisional Sum included in the Schedule of Approximate Quantities and Unit Prices.

531.92 Flag Persons - Payment for FLAG PERSONS will be at the Contract Unit Price per hour.

531.93 Pilot Cars - Payment for PILOT CARS will be at the Contract Unit Price per hour.

BC - MOT 2006 531 (11 of 12)

Page 528: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 529: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 536 (1 of 2)

SECTION 536

PAVEMENT CRACK SEALING

DESCRIPTION

536.01 Scope - This work consists of restoring the asphalt concrete pavement surface to a less permeable condition. The work includes routing when necessary, cleaning and filling the crack with sealant, and dusting or sanding.

536.02 Purpose - The purpose of crack sealing shall be to prevent moisture from penetrating into the road base through surface cracks and to extend pavement life. This shall be carried out by effectively sealing the cracked surface with a highly rubberized and elasticized or high float asphalt sealant.

MATERIALS

536.11 Asphaltic - The rubberized and elasticized asphalt sealant products shall meet the requirements listed in Table 536-A.

It shall be noted that ASTM D 3405 requirements are not mandatory in the Lower Mainland, Vancouver Island or the Sunshine Coast.

As specified in the Special Provisions the Contractor shall use a Rubberized or High Float Emulsified Asphalt HF150S or equivalent.

TABLE 536-A REQUIREMENTS

BCH Test ASTM Test DESCRIPTION

D 3405

Specification for joint sealants, hot poured for concrete and

asphalt pavements

D 1190 Specification for concrete joint sealer, hot poured elastic type

536.12 Sand - On pavements that require the use of High Float Emulsified Asphalt, the Contractor shall supply a "blinding sand." The sand, when tested according to ASTM C 117, shall meet the gradation requirements shown in Table 536-B and shall be approved by the Ministry Representative.

536.13 Dust Cover - Pavements that are sealed with rubberized or elasticized sealant shall receive a dust coating with a material such as Portland Cement, talc, lime or the equivalent material approved by the Ministry Representative.

EQUIPMENT

536.21 Router - The Contractor shall provide a vertical

router capable of routing asphaltic pavements to a depth of 25 mm and a width of 16 mm. It shall be capable of a minimum production of 200 metres per hour, even when following meandering cracks without unnecessary pavement cutting.

TABLE 536-B GRADATION REQUIREMENTS

Sieve (mm) % Passing

12.5 100

9.5 80 - 100

4.75 50 - 95

2.36 30 - 80

0.600 10 - 50

0.300 0 - 25

0.075 0 - 6

536.22 Cleaner - The cleaner unit shall be a hot compressed air fed propane fired device capable of cleaning, heating and drying routed cracks with not less than 1.7 m3/min. of compressed air at 690 kPa. It shall have valving/hoses and fittings for the mixture of liquid propane gas and compressed air. The hot air exhaust shall not exceed 315oC.

536.23 Melter - The melting kettle shall be of the double boiler type supplying indirect heating so as to slowly heat the asphaltic material with heat transfer oil. It shall have built in calibrated thermometers for both transfer oil and the sealing compound. The heating of the sealant shall be efficient and thermostatically controlled so as not to exceed the manufacturer's maximum safe heating temperature and shall be such as to maintain a constant temperature once the sealant is heated. The melter shall be capable of constantly agitating the asphaltic material as it is being heated and shall have a pump circulating the sealant from the bottom to the top of the kettle.

The melter must comply with the Gas Safety Act Regulations and Codes and any other applicable acts and regulations.

536.24 Filler Tools - Crack filler devices and strike off tools must be such that successful forming of the bead of sealant over the prepared crack is as specified in this Specification.

CONSTRUCTION

536.31 General - Crack sealing shall only be performed when the pavement surfaces are dry, and the crack and road base are dry or nearly dry (no visible moisture), and the temperature is steady at 10oC or rising.

Page 530: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 536 PAVEMENT CRACK SEALING

536 (2 of 2) 2006 BC - MOT

A random sample of virgin sealant shall be selected from each lot for testing purposes by the Ministry Representative.

Cracks up to 16 mm in width shall be widened by using a router to form a sealant reservoir 16 mm in width and from 19 to 25 mm in depth. All routing shall be performed keeping the crack centreline within ± 8 mm of the centre of the rout and shall be cleaned with a hot compressed air lance. Material removed from the cracks shall by disposed of as approved by the Ministry Representative.

The routing speed shall be such that the pavement is carefully cut, not broken or torn out, and the sides of the rout are smooth and uniform. The surface of the pavement and routed crack shall be cleaned of all dust and routing debris.

Routing should not be carried out on pavements that are of such an age that the pavement fractures or spalls occur along the edge of the freshly routed crack. Normally pavement fractures or spalls should not occur unless pavements are in excess of 10 years old. The decision to forgo routing shall be made by the Ministry Representative.

The crack shall be filled with sealant from the bottom to the surface level in such a manner that the sealant does not bridge entrapped air pockets. Material shall be placed to overfill the crack. It will then be struck off to leave a uniform amount of sealant directly over the crack, with the edges of the spread evenly feathered to overlap on the pavement surface from a minimum of 25 mm to a maximum of 40 mm on each side of the crack. The sealant overband shall not be so thick that it can be removed during snow plowing or produce a noticeable bump when traversed by traffic.

Any damage done to the sealant by stones or any other deleterious material being embedded in the sealing compound shall be repaired by the Contractor.

The Contractor shall ensure that traffic is kept off the sealed cracks until such time as the sealant has properly set up and will not be damaged or pulled out by the passage of traffic.

536.32 Rubberized and Elasticized Asphalt Sealants - These shall be used on pavements that are less than 10 years old and where the majority of cracks are less than 25 mm in width.

The sealant shall be applied to cracks that have been routed to a uniform depth and width.

Cracks having a width greater than 16 mm need not be routed but shall be cleaned to a minimum depth of 25 mm.

Within two minutes of the completion of the cleaning operation the crack shall be filled with sealant from a melter using a connecting wand or manual applicator (pouring cone) which ensures minimum pour application temperatures for the product are maintained.

Upon completion of the pouring the sealant shall be dusted to prevent the asphalt from tracking. Excess dusting material shall be removed.

536.33 High Float Emulsified Asphalt - High Float Emulsified Asphalt shall be used on pavement where there are depressions or lipping at the cracks, or the majority of cracks are over 25 mm in width.

The cracks shall be cleaned as close to the actual depth as possible and the removed material shall be disposed of as approved by the Ministry Representative. Immediately after cleaning, they shall be filled with sealant from a distributor truck or melter. The distributor truck or melter shall have an efficient means of heating the sealant to any temperature up to 100oC and maintaining it constantly at the manufacturer's prescribed temperature without overheating.

Upon completion of the sealing of the crack, the sealant shall be sanded to prevent the asphalt from tracking. Excess sand shall be removed and disposed of by the Contractor as approved by the Ministry Representative.

536.34 Warranty - The Contractor warrants to the Ministry that for a period of one year following the completion of crack sealing all work shall be free from defect resulting from work done or material supplied, and the Contractor shall rectify any such defects within 21 days from the time first detected by or reported to the Contractor to the satisfaction of the Ministry Representative.

MEASUREMENT

536.81 General - Pavement Crack Sealing will be measured by the LINEAR METRE using a line that is generally representative of the routed and/or cleaned crack..

Measuring will be done using a measuring wheel.

PAYMENT

536.91 General - Payment for PAVEMENT CRACK SEALING will be at the contract unit price bid per linear metre. The unit price shall be full compensation for all labour, equipment and material supplied as required to rout, clean and seal the pavement cracks, as specified.

Page 531: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 541

RUBBLE MASONRY

DESCRIPTION

541.01 Scope - This Section covers the construction of stone paving for grouted traffic island and median capping, dry-laid and grouted slope protection, culvert and spillway aprons, ditches and other like uses.

Paving rock minimum thickness of 100 to 200 mm will be specified depending upon location, use and setting requirements. Requirements for rock exceeding 200 mm minimum thickness are specified by Section 205 for hand-laid and grouted riprap.

MATERIALS

541.11 Materials

541.11.01 Rock - Rock for stone paving shall generally be obtained from the roadway excavation, stockpiled where designated and selected as necessary for use at the locations indicated on the Drawings, unless the supply of off-site rock is specified.

Rock will be required either as: angular rock as found or blasted, or rounded rock.

All rock shall be sound, durable and clean, relatively flat on the face to be exposed, reasonably consistent in colour tone, of acceptable size (200 to 450 mm across) and of the required thickness range.

541.11.02 Gravel Base - Gravel base shall be 25 mm minus well-graded crushed granular aggregate.

541.11.03 Bedding Mortar - Bedding mortar shall consist of one part Portland cement to three parts clean, well-graded fine aggregate or coarse sand mixed with water to give a 150 mm slump.

541.11.04 Setting and Jointing Mortar - Setting and jointing mortar shall consist of one part Portland cement to three parts clean, well-graded fine aggregate mixed with water to give a 75 mm slump.

CONSTRUCTION

541.31 Preparation - Graded surfaces to receive paving shall be trimmed and well tamped to the lines and grades indicated on the Drawings and to the approval of the Ministry Representative.

Edges of paving shall be constructed of thicker stones to form a stable foundation and protection against any undercutting in waterways.

All paved areas shall receive a minimum 150 mm layer of gravel base, well consolidated.

Gravel level inside curbs shall permit the surface of the jointing mortar to be flush with the top of the curb.

541.32 Construction - Construction shall be carried out with all material, labour, tools, equipment and incidentals supplied by the Contractor as necessary to complete all stone paving work in accordance with good work practice.

Gravel base of grouted stone paving shall be well saturated with bedding mortar slurry.

All rock shall be firmly embedded into the base material so that the voids between stones are of minimal width with the rock surfaces relatively even as indicated on Drawing SP541-01.

Voids of grouted paving rock shall be filled with setting and jointing mortar, 75 mm thick and, after consolidation and any necessary chinking of the larger voids, the mortar surface shall be smooth finished and sloped to drain freely.

Finished stone paving shall show a clean even appearance, free of disfiguring spalls and, where grouted, cleaned of mortar staining.

MEASUREMENT

541.81 General - Stone Paving work will be measured by the SQUARE METRE of stone in place.

PAYMENT

541.91 General - Payment for STONE PAVING work will be at the Contract Unit Price per square metre of stone in place.

The Contract Unit Price shall be accepted as full compensation for the supply of the gravel base, stone and mortar, for complete installation, including trimming and incidental excavation, compaction, finishing, and for all subsidiary work not required to be separately paid for.

BC - MOT 2006 541 (1 of 2)

Page 532: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 533: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 582 (1 of 34)

SECTION 582

CONCRETE CURB AND GUTTER AND STORM DRAINAGE

DESCRIPTION

582.01 Scope - This Section describes the requirements for construction of roadside curb and gutter and associated underground drainage systems. Such work shall consist of constructing and/or installing appurtenances shown or indicated on the drawings and Schedule of Approximate Quantities and Unit Prices.

MATERIALS

582.11 Drain Pipe - All drain pipe shall be of first quality, sound, true in form and free from defects of all kinds.

582.12 Salt Glazed Clay Sewer Pipe - Salt glazed clay sewer pipe shall be in accordance with the current ASTM Specifications.

582.13 Concrete Pipe

582.13.01 Reinforced Concrete Pipe - Reinforced concrete pipe shall have joints of the tongue and groove type and shall meet the requirements of the current specification ASTM C 76 Series.

582.13.02 Plain Concrete Pipe - Plain concrete pipe shall meet the requirements of the current specification ASTM C 14 Series.

582.13.03 Requirements - Pipe shall be legibly marked with the date of manufacture, the name or trademark of the manufacturer and by marks denoting plain concrete pipe, reinforced concrete pipe or extra strength reinforced concrete pipe as the case may be. Pipe containing elliptically placed reinforcement shall be marked on the inside of the pipe with the words "Top" or "Bottom" at the correct place to indicate the proper position when laid.

Upon request, the Contractor shall furnish at the Contractor's expense such test and other information as may be required regarding the concrete pipe proposed to be used.

582.14 Corrugated Steel Pipe - Corrugated metal pipe shall conform to the requirements of Section 320.

CONSTRUCTION

582.31 Portland Cement Concrete Curb and Gutter - Combined Portland cement concrete curb and gutter shall be constructed to the line and grade shown on the Drawings or as otherwise directed by the Ministry Representative and will include returns at the intersections if so directed.

The combined curb and gutter shall be constructed to the standard cross-section shown on Drawing SP582-01.01 and to such layout plans as are attached, except where the face of the curb varies and at lanes and driveways where drop curbs are ordered.

Expansion joints 13 mm in thickness cut to the cross-section of the combined curb and gutter, composed of premoulded joint filler shall be installed at approximately 15 m intervals as directed by the Ministry Representative.

582.32 Catch Basins - Catch basins shall be constructed, where shown and as required in the or as the Ministry Representative may direct, in accordance with the intent of Drawings SP582-02.01 through SP582-02.05.

582.33 Manholes - Manholes shall be constructed at the locations and to invert levels shown in Drawings or as the Ministry Representative may direct in accordance with the intent of Drawings SP582-03.01 through SP582-03.08.

582.34 Storm Drains - Storm drains shall be constructed where shown on Drawings, or as directed by the Ministry Representative, and in accordance with the Drawings and specifications covering the various types and attached herewith. The trench and other preparatory work shall be approved by the Ministry Representative before actual placing starts.

582.35 Placing

582.35.01 Spigot and Bell Pipe - Spigot and bell pipe shall be laid beginning at the lower end with the bell end pointing up-grade. Suitable excavation or bedding must be provided to accommodate the bell so that the pipe is supported along its full length and not at the ends alone.

582.35.02 Concrete Pipe - Concrete pipe shall be laid beginning at the lower end with the groove end pointing up-grade. Pipe with elliptical reinforcement shall be laid with the minor axis of the reinforcement as marked by the manufacturer in a vertical position.

When jointing salt glazed clay and concrete pipes, the trench shall be in a dry condition and the joints shall be cleaned and wetted before sealing with mortar. The mortar shall consist of one part of Portland cement to two parts of fine sand, mixed to the proper consistency. Sealing shall be neatly and thoroughly done and the interior of the pipe cleaned of all surplus mortar. Joints shall be kept damp with burlap or earth for at least three days after sealing.

582.35.03 Corrugated Steel Pipe - Corrugated steel pipe shall be laid beginning at the lower end with the outside laps

Page 534: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 582 CONCRETE CURB AND GUTTER AND STORM DRAINAGE

582 (2 of 34) 2006 BC - MOT

pointing up-grade and the longitudinal joint on the side. The separate sections shall be firmly jointed together and any metal in joints which is not thoroughly protected by galvanizing shall be coated with a suitable asphaltum paint.

582.35.04 General - The Contractor shall provide and fix at such points, as may be directed, properly painted substantial sight rails set to correct levels. At least three sight rails shall be in position for each length of sewer. Pipes shall be accurately set and laid to even gradients, concentric and in straight lines between manholes.

582.36 Special Jointing Material - Where pipe trenches are necessarily restricted in width or where unavoidable wet conditions exist, which would prevent proper normal jointing of pipes with Portland cement mortar, special prefabricated joints may be authorized to be used. In such a case, the Ministry will pay the Contractor for providing such jointing material at net cost after deducting all trade discounting and commissions. The Contractor shall install the prefabricated jointing material instead of cement mortar jointing at no extra cost.

582.37 Bedding and Backfilling - The bedding of all concrete pipes shall consist of 19 mm or 25 mm crushed gravel to a minimum depth of 150 mm below the pipe. The backfill shall consist of 19 mm or 25 mm crushed gravel with a minimum cover of 150 mm and in the remainder of the trench shall consist of the natural excavated material unless such material is considered unsuitable by the Ministry Representative. Such natural material shall have a maximum size of 75 mm. All materials shall be compacted in horizontal layers not more than 200 mm.

582.38 Concrete End Walls - See Subsection 303.31.04.

MEASUREMENT

582.81 Portland Cement Concrete Curb and Gutter - Portland Cement Concrete Curb and Gutter will be measured by the METRE.

582.82 Catch Basins - Catch Basins will be measured per EACH.

582.83 Manholes - Manholes will be measured per EACH.

The Contractor shall allow in the bid price for the construction of manholes having an overall depth of concrete section of 2 m (see dimensions marked "variable"). In addition, the Contractor shall bid a price per 0.3 m of depth of manhole, which shall be added to or subtracted from the bid price for the manhole depending on the actual depth of the manhole to be constructed.

582.84 Storm Drains - Storm drains will be measured by the METRE in place.

582.85 Bedding and Backfill - Bedding and backfill will be measured by the CUBIC METRE in place.

582.86 Concrete End Walls - Concrete end walls will be measured by the CUBIC METRE.

PAYMENT

582.91 Portland Cement Concrete Curb and Gutter - Payment for combined Portland cement CONCRETE CURB AND GUTTER will be at the Contract Unit Price per metre. The Contract Unit Price shall include everything furnished and done in connection with form setting, supply and placing of air entrained concrete; supply and installation of expansion joints; finishing, curing, protection and superintendence.

582.92 Catch Basins - Payment for CATCH BASINS will be at the Contact Unit Price per each. The Contract Unit Price shall include everything furnished and done; excavation, backfilling and tamping around catch basins, formwork, concreting, setting in of pipe drains, setting and securing of cast iron catch basin frames and gratings, steel baffles, reinstatement of surface, cleaning out, protection and superintendence and, all other things necessary.

582.93 Manholes - Payment for MANHOLES will be at the Contract Unit Price per standard 2 m manhole with appropriate depth correction as described in Subsection 582.83. The Contract Unit Price shall include everything furnished and done; formwork, concreting, setting in of storm drains, construction of smooth invert sections, cement mortar settings, steel ladder rungs, brick construction, setting of manhole frames and covers, cleaning out, protection and superintendence, and all other things necessary.

582.94 Storm Drains – Payment for STORM DRAINS will be at the Contract Unit Price per metre in place. The Contract Unit Price shall be accepted as full compensation for everything furnished and everything done in connection herewith, but shall not include payment for excavation, riprap, paving, concrete cradles, end walls, bedding and backfill. These shall be paid for at their respective prices in the Schedule of Approximate Quantities and Unit Prices.

582.95 Bedding and Backfill - Payment for BEDDING and BACKFILL will be at the Contract Unit Price per cubic metre in place.

582.96 Concrete End Walls - Payment for CONCRETE END WALLS will be at the Contract Unit Price per cubic

Page 535: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

CONCRETE CURB AND GUTTER AND STORM DRAINAGE SECTION 582

BC - MOT 2006 582 (3 of 34)

metre. The Contract Unit Price shall include provision of everything necessary; formwork, air entrained concrete, placing and tamping, stripping and cleaning, curing and any

other work necessary in connection therewith, but shall not include excavation and backfilling, riprap or other items not connected with concrete work..

Page 536: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 537: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 538: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 539: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 540: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 541: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 542: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 543: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 544: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 545: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 546: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 547: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 548: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 549: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 550: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 551: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 552: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 553: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 554: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 555: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 556: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 557: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 558: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 559: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 560: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 561: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 562: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 563: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 564: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 565: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 566: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...
Page 567: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

BC - MOT 2006 586 (1 of 4)

SECTION 586

PLANT MIXED PORTLAND CEMENT TREATED BASE COURSE

DESCRIPTION

586.01 Preliminary and General - This Specification describes the materials, plant equipment and quality of work required for the stabilization of base course material with Portland cement.

586.02 General Description of Work - The cement treated base shall consist of prepared aggregate, Portland cement and water uniformly mixed in the proportions directed, in a central mixing plant of satisfactory type, hauled out and laid on the prepared subgrade and compacted to established line and grade.

MATERIALS

586.11 Cement - Portland cement to be supplied for the work will comply with the requirements and tests of the Canadian Standards Association CAN 3-A5-M86 "Standard Portland Cements" and subsequent revisions thereof.

586.12 Water - The water shall be clean and free from substances deleterious to the hardening of the cement stabilized base course and shall be subject to the approval of the Ministry Representative.

586.13 Aggregate - The aggregate supplied shall be composed of inert durable material uniform in quality and free from organic impurities and soft or disintegrated particles. When tested according to ASTM C 136, the aggregate shall meet the gradation requirements listed in Table 586-A.

The material shall have a liquid limit not greater than

twenty-five and plasticity index not greater than six.

All aggregate shall be stockpiled in horizontal layers not more than 1.0 m in thickness. The stockpile area shall be cleared of all vegetation, trees, brush, rock and other debris and a uniform ground surface prepared before the aggregate is deposited on the site. The material shall be loaded from the stockpile into the plant in such a manner as to ensure that a uniform cut of the pile is obtained. Mixing may not commence until a minimum of 30% of the total quantities of aggregate required is in the stockpile. Subsequent addition of prepared aggregate to the pile shall be so organized to ensure continued uniformity of the aggregate supply to the mixing plant.

EQUIPMENT

586.21 Mixing Plant - The Portland cement treated base course shall be mixed in a stationary plant employing either continuous or batch type equipment. The plant shall be equipped with interlocked feeding and metering devices which will add the cement, water and aggregates in proportions established by the Ministry Representative to a tolerance of ± 3% by weight. The plant shall be capable of mixing the ingredients uniformly. Suitable storage shall be provided for bulk cement, and if required, bulk mineral filler. The capacity of the mixing plant shall be such that a minimum of 0.4 km of full width cement treated base can be laid per daily shift, i.e., sustained mixing capacity shall normally be not less than 250 tonnes per hour. Details of the plant and its operation shall be submitted to the Ministry Representative for approval prior to the commencing construction.

586.22 Cement Treated Base Spreader - The spreading device may be self-propelled, pushed or towed; and shall be so constructed and operated as to produce without segregation or surface tearing, a layer of material which is uniform in thickness and surface contour, either longitudinal or transverse, and free from irregularities in density. Whichever type of spreader may be used, it is mandatory that it be provided with a positive mechanical means for distributing the cement treated base transversely across the front of the cutoff mechanism or screed.

Spreading equipment which rides on the freshly spread material and produces tracks or partially compacted areas behind the cutoff blade will be acceptable provided no displacement of material or filling of the tracks occurs, and provided further that the tracks are not of such depth as to be visible after compaction is completed. The use of a motor grader or any other spreading device, which requires repeated trips over the same area, will not be permitted for spreading.

TABLE 586-A GRADATION REQUIREMENTS FOR AGGREGATE

SIEVE SIZE (mm) PERCENT PASSING BY MASS

25 100

19 80 - 1000

9.5 50 - 100

4.75 35 - 70

2.36 25 - 50

1.18 15 - 35

0.300 5 - 20

0.075 0 - 5

Page 568: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 586 PLANT MIXED PORTLAND CEMENT TREATED BASE COURSE

586 (2 of 4) 2006 BC - MOT

586.23 Water Distributors - Water distributors shall be the pressure type equipped with a spray bar mounting nozzles similar to those used on asphalt distributors and capable of applying the water in accurate quantities and as a uniform spray. Splash plate type distributors or those equipped with spray bars that eject fine streams of water will not be permitted. The distributor must be provided with a satisfactory accurate means of measuring the quantity of water sprayed.

CONSTRUCTION

586.31 Mixing - The mix proportions shall be determined by the Ministry Representative from samples taken at the commencement of aggregate production. The approximate estimated mix proportions of aggregate, cement, filler and water will be indicated in the Special Provisions if adequate advance information is available.

The aggregate, mineral filler and cement shall be fed into the pugmill accurately, according to the proportions required, and shall be thoroughly dry mixed. Water shall then be added in the required amount and mixing continued until uniformity is achieved.

586.32 Spreading and Compaction

586.32.01 Surface - The surface of the subgrade shall be thoroughly moistened just prior to placing the cement treated base mixture thereon and shall be kept moist but not excessively wet until covered by the mixture.

586.32.02 Cement Treated Base Mixture - The cement treated base mixture shall be hauled to the roadbed in trucks equipped with protective covers and shall then be laid through a Titan ABG paver or equivalent in a manner to produce a layer of uniform density and cross-section and in sufficient quantity to provide a compacted base conforming to the grade and cross-section set by the Ministry Representative. End dumping on the roadway followed by spreading will not be permitted. Depositing and spreading the material on the roadway shall progress continuously without breaks, except as otherwise directed by the Ministry Representative. At the end of each day's full width construction, a straight transverse construction joint shall be formed by cutting back into the completed work to form a true vertical face and by installing a temporary wooden header, if required by the Ministry Representative.

586.32.03 Compaction - Immediately following spreading, the material shall be compacted to a minimum 100% of the laboratory density obtained by the current ASTM test method D 698.

586.32.04 Compaction Equipment - While the Contractor may be given considerable discretion to select the method of compaction to be employed subject to the approval of the Ministry Representative, the compaction equipment to be used may include at least one three-wheeled tandem self-propelled steel wheel roller, able to exert a minimum pressure of 60 kg/cm per cm width of roller and generally meeting the requirements of Subsection 501.36. In addition, the Contractor must be prepared to supply a minimum of one vibratory compaction unit, either steel wheel roller or multiple plate type, if so required by the Ministry Representative. The use of compacting equipment which marks, ruts, cracks or otherwise loosens or damages the surface of the cement treated base will not be permitted. The compacting equipment shall have sufficient capacity to produce the specified degree of compaction within the time limits specified.

Wherever compaction planes are formed in the cement treated base during spreading, shaping or compaction, they shall be removed by scarifying or tilling the surface to such depth as directed by the Ministry Representative and in such a manner as to thoroughly break up the compaction planes. Scarifying and pulverization may be performed by any suitable equipment - nail drag, weeder, disk harrow or rotary tiller that will satisfactorily perform the work required. The scarified material will be regraded and recompacted, to the satisfaction of the Ministry Representative.

586.32.05 Water - Water shall be applied at the rates and in the quantities directed by the Ministry Representative. The surface of the uncompacted, partially compacted and completely compacted material shall be kept moist at all times. An adequate water supply shall be maintained at the point of compacting.

586.32.06 Speed - The speed of operations shall be such that not more than forty-five minutes shall elapse between the time of starting mixing and the time of starting compaction. Shaping and final compaction shall be completed within two hours of commencement of mixing at the plant.

586.32.07 Finished Surface - The finished surface of the compacted base shall at all points be accurate to ± 15 mm of the grade and shall not, at any point, deviate by more than 10 mm from the bottom of a 3 m straight edge laid in any direction on the surface on either side of the crown of the roadway.

586.32.08 Temperature - No construction shall be undertaken when the temperature is below 4.0oC or when the conditions indicate that the temperature will fall below

Page 569: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

PLANT MIXED PORTLAND CEMENT TREATED BASE COURSE SECTION 586

BC - MOT 2006 586 (3 of 4)

4.0oC in the next 24 hours or if the subgrade is frozen.

586.33 Protection and Cover

586.33.01 General - Protection and cover shall be provided by one of the methods, A or B, given below and as directed in the Special Provisions.

a) Method A - Crushed Gravel Course - 25 mm crushed gravel shall be laid not more than 24 hours after the treated base is laid. The surface of the treated base and the overlying gravel shall be kept moist by the application of water as directed by the Ministry Representative.

b) Method B - Bituminous Seal - As soon as possible after the cement treated base course has been finished, in accordance with preceding subsections, a bituminous seal shall be applied to the surface and sanded to protect the cement treated base course from drying out during the seven day curing period. The finished base course shall be kept continuously moist until the seal has been applied.

The bituminous sealing material shall be applied at a rate between 0.7 to 1.0 /m² or as directed by the Ministry Representative in order to give complete surface coverage without excessive runoff.

Generally, this work shall be governed by the applicable provisions of Subsection 501.31 "Spray Primer and Tack Coat". At the time of sealing, the surface of the cement treated base must be dense, free from all loose and extraneous material and shall contain sufficient moisture to prevent penetration of the bituminous material. If needed, water shall be applied in sufficient quantity to fill the surface voids of the soil cement immediately before the bituminous material is applied. The seal cover shall be effectively maintained by the Contractor during the seven day curing period.

586.33.02 Protection - Any finished portion of the base course adjacent to construction, which is travelled by equipment used in constructing an adjoining section, shall be protected in such a manner as to prevent equipment from marring or damaging the completed work.

586.33.03 Temperature - At any time when the air temperature may be expected to fall to the freezing point,

during the day or the night, sufficient above protection shall be given to the cement treated base to prevent its freezing for seven days after placement and until the soil cement has hardened.

586.34 Maintenance - The Contractor shall maintain the entire base course in good condition satisfactory to the Ministry Representative from commencement of construction until it has been paved with asphalt concrete. Maintenance shall include immediate repairs to any defects that may occur and shall be repeated at the Contractor's expense as often as may be necessary to keep the section continuously intact.

MEASUREMENT

586.81 Cement Treated Base - Cement treated base in place will be measured by the TONNE for the total mass actually accepted and incorporated in the base of the road.

586.82 Water - Water applied to the road will be measured by the THOUSAND LITRES for the actual quantity applied to the road.

PAYMENT

586.91 Cement Treated Base - Payment for CEMENT TREATED BASE will be at the Contract Unit Price per tonne for the total mass actually accepted and incorporated in the base of the road. Payment shall provide full compensation for production of aggregate; handling, hauling and storage of bulk cement and filler; provision of mixing water and plant mixing of cement treated base; haulage, spreading, grading and compaction of the base material in place; and for all labour, equipment, plant, tools, superintendence, traffic control and all other incidentals necessary to complete the work in accordance with the specifications.

586.92 Water - Payment for WATER will be at the Contract Unit Price per thousand litres for the actual quantity applied to the road, as directed, and shall be full compensation for furnishing all labour, materials, tools and equipment required, and doing all the work incidental to furnishing, hauling and applying water to the road as specified.

Page 570: 2006 STANDARD SPECIFICATIONS FOR HIGHWAY ...

SECTION 586 PLANT MIXED PORTLAND CEMENT TREATED BASE COURSE

586 (4 of 4) 2006 BC - MOT