Page 1: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Ingredients for a Cost-based Estimate

$

$

$

$

$$

Page 2: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Today’s Topics Components of Cost Based

Estimates Results Panel Discussion

Page 3: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Components Labor Material Equipment Time Overhead & Profit

Page 4: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Labor

Actual Contractor Payrolls Department of Labor and

Industry prevailing wages. Include fringe benefits, FICA,

Unemployment insurance, Liability insurance, work comp, general overhead, and profit.

Page 5: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Labor We set up crews for each

task of an operation. Milling – we have a crew

for the actual milling (2 bit workers, 2 op-eng, and a crew for the hauling (2 drivers). We will change quantity as necessary.

Page 6: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Material Contact suppliers or

manufacturers. Inquire about quantity discounts. Include shipping, taxes, royalties.

Page 7: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Material Milling – it would seem that there

are no materials, however, the milling bits get worn, so we include bits in our material.

Page 8: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Equipment Blue Book rental rates for

equipment, we use rates for 5 year old equipment.

Regional adjustment applies.

Page 9: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Equipment Milling – To go along with the

milling crew, we have the milling machine. Trucks to go along with the trucking task.

Page 10: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Time Impact on Estimate Resources Experience

“Time = Money”

Page 11: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Time - Impacts

Superpave Asphalt Example:Production Rate Price1600 tons/day $35.671200 tons/day $38.53 800 tons/day $44.09

Page 12: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Time - Resources DOT Construction Offices Industry Trade Groups Associated General Contractors Equipment Manuals RS Means

Page 13: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Time - Experience Keep track of past jobs Practice makes perfect Look at jobs in terms of Days

Page 14: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Overhead & Profit Overhead Items

Management Offices and Storage Office Staff Estimating HR Items

$Generally varies from 5-20% depending on Company size and amount of work under contract

Page 15: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Overhead & Profit Profit

Ask Contractors (Be Selective) RS Means Be Consistent

$

Generally varies from 3-10%P&O in Items or Mobilization?

Page 16: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Results

Why do Cost Based Estimating? Provides the highest quality estimate possible. Red flags possible quantity errors, unworkable

staging, plan and contract errors and discrepancies.

Best benchmark possible. Guarantees fewer projects outside awardable

ranges. Credibility and confidence for upper management

decision making. Forms the foundation for bid collusion detection.

Page 17: 2004 TEA Conference, Mobile, AL Ingredients for a Cost-based Estimate $ $ $ $ $ $

2004 TEA Conference, Mobile,

AL

Panel Discussion George Bradfield, Georgia DOT Jennifer Carlson, Minnesota, DOT Travis Koestner, Missouri DOT