OREGON STANDARD
SPECIFICATIONS FOR
CONSTRUCTION
2002
Copies of this book may be obtained from:
Oregon Department of Transportation
Contractor Plans 355 Capitol Street NE, Room 28
Salem, OR 97301-3871 Telephone 503-986-3720
http://www.odot.state.or.us/ContractorPlans
-
ACKNOWLEDGEMENT Oregon Department of Transportation and the
Oregon Chapter of the American Public Works Association gratefully
acknowledges the valuable contributions and time commitment from
the Committee members and their employers who worked diligently to
develop the Oregon Standard Construction Specifications and
Standard Drawings. A partial listing is shown below. In addition,
to the Committee members, ODOT and APWA extends a special thank you
to the many public works professionals, suppliers, and contractors
who provided technical support and expert review of the draft Joint
Standards.
Douglas Adkins Adkins Engineering Kristi Evans K & D
Services Marty Andersen ODOT Terrel Evans K & D Services Andy
Anderson ODOT Traffic Control Terry Faris ODOT Bridge Design Dana
Anderson Department of Justice Russell W. Faust Abique Engineering,
Inc. Gregory Ausland OBEC Chuck Fisher City of Salem Bill Baechler
City of Portland BES Lee Franklin ODOT Operations Bill Barnhart
ODOT Region 1 Dean Fraser Washington County Steve Barrett City of
Portland Lewis H. Garrison City of Salem Walter Bartell ODOT Region
1 Orville Gaylor ODOT Traffic Mgmt. Stan Barton Morse Bros. Cary
Gaynor City of Salem Hal Beighly Beighly & Assoc. Aaron Geisler
City of North Bend Nick Betsacon Department of Justice Rob Gephardt
Department of Justice Mike Bianucci VSL Corp. James Gilmer David
Evans & Assoc. Doug Bish ODOT Traffic Mgmt. Bruce Goldson
Compass Corporation Diane Bishop City of Eugene Jeff Gower ODOT
Pavement Tad S. Blanton City of Medford PW Jeff Graham FHWA Jack
Boatwright ODOT Region 4 Sam Grossberg ODOT Bridge Design Mike
Borresen Washington County Mark Hadley W & H Pacific Robert
Braibish CH2M Hill Wendy Hain Department of Justice Tim Brown
Anderson Engineering Jim Hanks JRH Dave Burg Morse Bros. Jim Hanson
ODOT Facilities Management Darrel Burnum Clackamas County Peter
Harr City of Albany Bob Callaway ODOT Specifications John Harris
City of Gresham Claire Carder ODOT Dave Hatch City of Portland
Jeanne Caswell City of Portland Lenny Hawks Apply-A-Line Stu Cato
KPFF Consulting Bill Hayden ODOT Civil Rights Terry Chamberlin
Clean Water Services Bob Heiberg Copenhagen Utilities James Clark
City of Gresham Marc Heintz Morse Brothers Stewart Cleave Adkins
Consulting Jim Helton Murray, Smith, & Assoc. Bill Coburn
Linnco Electric Co. Tim Hendrix Wildish Barry Cook Northwest
Hydromulchers Dave Hill City of Portland Alan Danaher Kittleson
& Associates Gary Hoffecker ODOT Traffic Design Tom Davis W
& H Pacific Bill Hoffman City of Portland Michael Day
Washington County Dale Hormann Department of Justice Bud DeSantis
City of Eugene Randy Hubbard City of Lafayette Dale Deatherage ODOT
Specifications Jim Huddleston APAO Bob Deuel City of Medford Scott
Huff Portland CC Mike Dunning ODOT Field Services Bill Hughes City
of Portland Charles Eaton Eaton Engineering, Inc. Sam Hunaidi ODOT
Region 1 Paul Edgecomb ODOT Roadway Pete Hunor CSR Associated John
Emmons City of Eugene Lyle Hutchins Devco Engineering
-
Byron Inman ODOT Region 2 James Perkins Washington County Bill
Jacobsen ODOT Region 5 Bill Perry Perry Engineering & Assoc.
Bruce Johnson FHWA Howard Perry Anderson, Perry, & Assoc. Sam
Johnston ODOT Traffic Maxine Pierce MR Pierce Construction Keith
Johnston ODOT Materials Ron Polvi Oregon Parks & Rec Dept Eric
Jones City of Eugene Phil Pommier W & H Pacific Tom Jones W
& H Pacific Richard Raetz Washington County Ken Karnosh ODOT
Operations Mark Reagles City of Rogue River Gary Katsion Kittleson
and Assoc. Mike Remily ODOT Construction Randy Kessler ODOT
Construction Luis Rodea ODOT Region 2 PM Torri Kinne FHWA Michael
Ronkin ODOT Project Support Buzz Kleemeyer ODOT Region 1 Jay
Roundtree ODOT Region 5 Bill Kloos City of Portland Keith Rudisil
ODOT Traffic Design Paul Klope City of Eugene Mark Saling City of
Portland George Kolb Deschutes County John Sams CH2M Hill Bob Kortt
City of Medford Ed Savage ACPA Louis Kroeck City of Eugene Robert
Saxton Mitchell Nelson Group Greg Kurtz Marion County John Scofield
ODOT Roadway Liberty Lane City of Gresham Mel Sears Parametrix Rick
Langeliers Walt's Concrete Co. James Shier City of Yamhill PW Dave
Larson ODOT Construction Joel Smith Terrascope Inc Duane Launder
City of Portland BES Mike Smyth W & H Pacific Rick Lee City of
Corvallis Robert Smith ODOT Public Affairs Kit Leshk ODOT
Specifications Kim Snook Foress Sign Company Dale Lininger LTM,
Incorporated Brenda Stein City of Lebanon Dave Lorenzen City of
Pendleton Brad Stockton K & D Service Dan MacDonald ODOT
Standards Ken Stoneman ODOT Construction Carl Malone City of
Ontario John Stucky ODOT Region 4 Mike Maloney PCI Ron Sunnaborg
CH2M Hill Gerald W. Markel Pipe Inc. Bob Terrel City of Eugene Stan
Martin Morse Bros. Joe Thomas ODOT Region 3 PM Jay McCoy City of
Gresham Gary Thompson ODOT Pavement Pat McDougal Lee Engineering,
Inc. Joe Thompson City of Hillsboro Jim McWade CH2M Hill Abe Turki
Washington County Reg Merriman ASCG Susanne Underwood Department of
Justice Earl Mershon ODOT Mark Usselman ODOT Region Greg Miller
Washington County Stan VandeBergh City of Portland Lucinda Moore
ODOT Operations George Walker City of Springfield Mike Moore JC
Compton M.L. Walker Unified Sewerage Harlan Naegeli ODOT Traffic
Design Ron Weigel Century West Don Neron ODOT Facilities Marge West
ODOT Region 1 Gary Neuschwanger L & O Construction, Ltd. Dave
White D & D Safety Al Olson CH2M Hill Scott Williams Hamilton
Construction Roger Olson Deschutes County Ron Wilson EWEB Scott
Olson Benton County Paul Wirfs ODOT Geo/Hydro John Parsons ODOT
Specifications John Woodruff ODOT Project Support Bruce Patterson
ODOT Structural Fred Wright Clean Water Services Norm Paullus City
of La Grande Steve Zielinski Paragon Cable Gary Pederson ODOT
Bridge
-
PART 00100 - General Requirements
PART 00200 - Temporary Features and Appurtenances
PART 00300 - Roadwork
PART 00400 - Drainage and Sewers
PART 00500 - Bridges
PART 00600 - Bases
PART 00700 - Wearing Surfaces
PART 00800 - Permanent Traffic Safety and Guidance Devices
PART 00900 - Permanent Traffic Control and Illumination
Systems
PART 01000 - Right-of-Way Development and Control
PART 01100 - Water Supply Systems
PART 02000 - Materials
PART 03000 - Materials
-
i
TABLE OF CONTENTS
PART 00100 - GENERAL REQUIREMENTS
Section 00110 - Organization, Conventions, Abbreviations and
Definitions 00110.00 Organization of Standard Specifications
.............................................................................
1 00110.05 Conventions Used Throughout the Specifications
Include.................................................. 1
00110.10 Abbreviations
......................................................................................................................
2 00110.20 Definitions
...........................................................................................................................
4 00110.30 Metrication
........................................................................................................................
12 00110.31 Use of Metric or Customary ("English")
System................................................................
13
Section 00120 - Bidding Requirements and Procedures 00120.00
Prequalification of Bidders
................................................................................................
14 00120.05 Requests for Solicitation Documents
................................................................................
14 00120.10 Bid
Booklet........................................................................................................................
14 00120.15 Examination of Work Site and Solicitation Documents;
Consideration of
Conditions to be
Encountered...........................................................................................
15 00120.16 Material, Equipment and Method
Substitutions.................................................................
15 00120.17 Use of Agency-Owned Land for Staging or Storage
Areas............................................... 16 00120.20
Interpretation of Quantities in Bid
Schedule......................................................................
16 00120.25 Subsurface
Investigations.................................................................................................
16 00120.30 Changes to Plans, Specifications, or Quantities before
Opening of Bids.......................... 17 00120.40 Preparation
of Bid
.............................................................................................................
17 00120.45 Submittal of Bids
...............................................................................................................
19 00120.50 Submitting Bids for More than One
Contract.....................................................................
19 00120.60 Revision or Withdrawal of Bids
.........................................................................................
19 00120.65 Opening and Comparing
Bids...........................................................................................
20 00120.70 Rejection of Nonresponsive Bids
......................................................................................
20 00120.80 Reciprocal Preference for Oregon Resident Bidders
........................................................ 21
00120.90 Disqualification of
Bidders.................................................................................................
21 00120.91 Rejection of Bid on Grounds of Nonresponsibility of
Bidder.............................................. 22
Section 00130 - Award and Execution of Contract 00130.00
Consideration of
Bids........................................................................................................
23 00130.10 Award of Contract
.............................................................................................................
23 00130.15 Right to Protest Award
......................................................................................................
24 00130.20 Cancellation of Award
.......................................................................................................
24 00130.30 Contract Booklet
...............................................................................................................
24 00130.40 Contract Bonds, Certificates, and
Registrations................................................................
24 00130.50 Execution of Contract and
Bonds......................................................................................
25 00130.60 Failure to Execute Contract and Bonds
............................................................................
26 00130.70 Release of Bid Guaranties
................................................................................................
26 00130.80 Restrictions on Commencement of
Work..........................................................................
26 00130.90 Notice to Proceed
.............................................................................................................
26
Section 00140 - Scope of Work 00140.00 Purpose of Contract
..........................................................................................................
27 00140.10 Typical
Sections................................................................................................................
27 00140.20
Thickness..........................................................................................................................
27 00140.30 Agency-Required Changes in the
Work............................................................................
27 00140.40 Differing Site Conditions
...................................................................................................
28 00140.50 Environmental Pollution Changes
.....................................................................................
28 00140.60 Extra Work
........................................................................................................................
30
-
ii
00140.65 Disputed Work
..................................................................................................................
30 00140.70 Cost Reduction
Proposals.................................................................................................
30 00140.80 Use of Publicly Owned
Equipment....................................................................................
32 00140.90 Final Trimming and
Cleanup.............................................................................................
32
Section 00150 - Control of Work 00150.00 Authority of the
Engineer
..................................................................................................
33 00150.01 Project Manager's Authority and Duties
............................................................................
33 00150.02 Inspectors' Authority and Duties
.......................................................................................
33 00150.10 Coordination of Specifications and
Plans..........................................................................
34 00150.15 Construction Stakes, Lines and
Grades............................................................................
34 00150.20
Inspection..........................................................................................................................
35 00150.25 Acceptability of Materials and Work
..................................................................................
36 00150.30 Delivery of Notices
............................................................................................................
36 00150.35 Plans and Working
Drawings............................................................................................
36 00150.37 Equipment Lists and Other
Submittals..............................................................................
37 00150.40 Cooperation and Superintendence by the Contractor
....................................................... 37 00150.50
Cooperation with
Utilities...................................................................................................
38 00150.55 Cooperation with Other
Contractors..................................................................................
45 00150.60 Construction Equipment Restrictions
................................................................................
46 00150.70 Detrimental Operations
.....................................................................................................
47 00150.75 Protection and Maintenance of Work During Construction
............................................... 47 00150.80 Removal
of Unacceptable and Unauthorized Work
.......................................................... 47
00150.90 Final
Inspection.................................................................................................................
48 00150.95 Final Acceptance
..............................................................................................................
48 00150.96 Maintenance Warranties and Guarantees
........................................................................
48 00150.97 Responsibility for Materials and Workmanship
.................................................................
48
Section 00160 - Source of Materials 00160.00 Definitions
.........................................................................................................................
49 00160.01 Notification of Source of Supply and
Materials..................................................................
49 00160.05 Qualified Products List
(QPL)............................................................................................
49 00160.10 Ordering, Producing, and Furnishing
Materials.................................................................
49 00160.20 Preferences for
Materials..................................................................................................
50 00160.30 Agency-Furnished Materials
.............................................................................................
51 00160.40 Agency-Furnished
Sources...............................................................................................
51 00160.50 Agency-Controlled Land; Limitations and Requirements
.................................................. 52 00160.60
Contractor-Furnished Materials and
Sources....................................................................
52 00160.70 Requirements for Plant
Operations...................................................................................
53 00160.80 Requirements for Sources of Borrow and
Aggregate........................................................
53
Section 00165 - Quality of Materials 00165.00 General
.............................................................................................................................
54 00165.01 Rejected Materials
............................................................................................................
54 00165.02 Materials Conformance and Quality Compliance
Documents........................................... 54 00165.03
Testing by Agency
............................................................................................................
54 00165.04 Costs of Testing
................................................................................................................
54 00165.10 Materials Acceptance Guides
...........................................................................................
54 00165.20 Materials Specifications and Test Method References
..................................................... 54 00165.30
Field-Tested Materials
......................................................................................................
55 00165.35 Nonfield-Tested Materials
.................................................................................................
56 00165.40 Statistical Analysis
............................................................................................................
57 00165.50 Statistical Acceptance Sampling and Testing
...................................................................
63 00165.70 Use of Materials without Acceptable Materials
Conformance Documents ........................ 64 00165.75 Storage
and Handling of
Materials....................................................................................
64
-
iii
00165.80 Measurement
....................................................................................................................
64 00165.90 Incidental
Basis.................................................................................................................
64 00165.91 Fabrication Inspection Expense
........................................................................................
65
Section 00170 - Legal Relations and Responsibilities 00170.00
General
.............................................................................................................................
66 00170.01 Other Agencies Affecting Agency Contracts
.....................................................................
66 00170.02 Permits, Licenses, and Taxes
...........................................................................................
67 00170.03 Furnishing Right-of-Way and Permits
...............................................................................
68 00170.04 Patents, Copyrights, and
Trademarks...............................................................................
68 00170.05 Assignment of Antitrust Rights
..........................................................................................
68 00170.10 Required Payments by Contractors
..................................................................................
69 00170.32 Protection of Navigable
Waters.........................................................................................
70 00170.60 Safety, Health, and Sanitation Provisions
.........................................................................
70 00170.61 Industrial Accident
Protection............................................................................................
70 00170.62 Labor Nondiscrimination
...................................................................................................
70 00170.63 Payment for Medical
Care.................................................................................................
70 00170.65 Minimum Wage and Overtime Rates for Public Works
Projects ....................................... 71 00170.70
Insurance
Coverages........................................................................................................
75 00170.71 Independent Contractor Status
.........................................................................................
76 00170.72 Indemnity; Hold
Harmless.................................................................................................
76 00170.74 Employee Drug Testing
Program......................................................................................
76 00170.78 Conflict of Interest
.............................................................................................................
76 00170.79 Third Party
Beneficiary......................................................................................................
76 00170.80 Responsibility for Damage to
Work...................................................................................
77 00170.82 Responsibility for Damage to Property and
Facilities........................................................
78 00170.85 Responsibility for Defective Work
.....................................................................................
78 00170.89 Protection of Utility, Fire-control, and Railroad
Property and Services;
Repair; Roadway Restoration
...........................................................................................
79 00170.92 Fencing, Protecting Stock, and Safeguarding
Excavations............................................... 79
00170.93 Trespass
...........................................................................................................................
80 00170.94 Use of Explosives
.............................................................................................................
80
Section 00180 - Prosecution and Progress 00180.00
Scope................................................................................................................................
81 00180.05 Assignment/Delegation of
Contract...................................................................................
81 00180.06 Assignment of Funds Due under the Contract
..................................................................
81 00180.10 Responsibility for Contract
................................................................................................
81 00180.15 Agency's Right to Do Work at Contractor's Expense
........................................................ 81
00180.20 Subcontracting
Limitations................................................................................................
82 00180.21 Subcontracting
..................................................................................................................
82 00180.22 Payments to Subcontractors and Agents of the Contractor
.............................................. 84 00180.30
Materials, Equipment, and Work
Force.............................................................................
85 00180.31 Required Materials, Equipment and Methods
...................................................................
85 00180.32 Alternative Materials, Equipment, and
Methods................................................................
86 00180.33 Metric Submittals
..............................................................................................................
86 00180.40 Limitation of Operations
....................................................................................................
86 00180.41 Project Work
Schedules....................................................................................................
87 00180.42 Preconstruction
Conference..............................................................................................
89 00180.43 Commencement and Performance of
Work......................................................................
89 00180.50 Contract Time to Complete
Work......................................................................................
89 00180.60 Notice of
Delay..................................................................................................................
90 00180.65 Right-of-Way and Access
Delays......................................................................................
91 00180.70 Suspension of
Work..........................................................................................................
91 00180.80 Adjustment of Contract
Time.............................................................................................
92
-
iv
00180.85 Failure to Complete on Time; Liquidated Damages
.......................................................... 94
00180.90 Termination of Contract and Substituted Performance
..................................................... 95
Section 00190 - Measurement of Pay Quantities 00190.00
Scope................................................................................................................................
97 00190.10 Measurement Guidelines
..................................................................................................
97 00190.20 Contractor to Provide Vehicle Weigh
Scales.....................................................................
98 00190.30 Plant
Scales....................................................................................................................
101
Section 00195 - Payment 00195.00 Scope and Limit
..............................................................................................................
102 00195.10 Payment For Changes in Materials
Costs.......................................................................
102 00195.20 Changes to Plans or Character of Work
.........................................................................
102 00195.30 Differing Site Conditions
.................................................................................................
103 00195.40 Unreasonable Delay by the
Agency................................................................................
103 00195.50 Progress Payments and Retained Amounts
...................................................................
103 00195.60 Advance Allowance for Materials on
Hand......................................................................
107 00195.70 Payment under Terminated Contract
..............................................................................
108 00195.80 Allowance for Materials Left on Hand
.............................................................................
109 00195.90 Final Payment
.................................................................................................................
109 00195.95 Error in Final Quantities and Amounts
............................................................................
110
Section 00196 - Payment for Extra Work 00196.00 General
...........................................................................................................................
111 00196.10 Negotiated Price
.............................................................................................................
111 00196.20 Force
Account.................................................................................................................
111
Section 00197 - Payment for Force Account Work 00197.00
Scope..............................................................................................................................
112 00197.01 General
...........................................................................................................................
112 00197.10 Materials
.........................................................................................................................
112 00197.20
Equipment.......................................................................................................................
113 00197.30
Labor...............................................................................................................................
114 00197.40 Invoices for Special Services
..........................................................................................
115 00197.80 Percentage Allowances
..................................................................................................
115 00197.90 Billings
............................................................................................................................
116
Section 00199 - Disagreements, Protests and Claims 00199.00
General
...........................................................................................................................
117 00199.10 Procedure for Resolving Disagreements
........................................................................
117 00199.20 Protest Procedure
...........................................................................................................
117 00199.30 Claims Procedure
...........................................................................................................
118 00199.40 Claim Decision; Review; Exhaustion of Administrative
Remedies .................................. 120 00199.50 Mediation
........................................................................................................................
124
PART 00200 - TEMPORARY FEATURES AND APPURTENANCES
Section 00205 - Field Laboratory, Weighhouse, Etc. 00205.00
Scope..............................................................................................................................
125 00205.10 Contractor-Furnished Field Laboratory
...........................................................................
125 00205.11 Agency-Furnished Field Laboratory
................................................................................
125 00205.12
Weighhouse....................................................................................................................
126 00205.80 Contractor-Furnished Field Laboratory
...........................................................................
126 00205.81 Agency-Furnished Field Laboratory
................................................................................
126 00205.82
Weighhouse....................................................................................................................
126
-
v
00205.90 Contractor-Furnished Field Laboratory
...........................................................................
126 00205.91 Agency-Furnished Field Laboratory
................................................................................
127 00205.92
Weighhouse....................................................................................................................
127
Section 00210 - Mobilization 00210.00
Scope..............................................................................................................................
128 00210.40
Mobilization.....................................................................................................................
128 00210.80 Lump Sum
Basis.............................................................................................................
128 00210.90 Lump Sum
Basis.............................................................................................................
128 00210.91 Incidental
Basis...............................................................................................................
128
Section 00220 - Accommodations for Public Traffic 00220.00
Scope..............................................................................................................................
129 00220.01 Beginning of Contractor's
Responsibility.........................................................................
129 00220.02 Public Safety and Convenience
......................................................................................
129 00220.40 General
Requirements....................................................................................................
130 00220.60 Surface Maintenance Responsibilities
............................................................................
131 00220.70 Opening Sections To
Traffic............................................................................................
132 00220.80 Measurement
..................................................................................................................
133 00220.90
Payment..........................................................................................................................
133
Section 00225 - Work Zone Traffic Control 00225.00
Scope..............................................................................................................................
134 00225.01 Abbreviations, Definitions, and Standards
......................................................................
134 00225.02 General
Requirements....................................................................................................
134 00225.03 Traffic Control Outside Contract Limits
...........................................................................
135 00225.04 Regulations and
Codes...................................................................................................
135 00225.05 Contractor's Traffic Control Plan
.....................................................................................
135 00225.06 Routing Traffic Over Surfacings
......................................................................................
135 00225.10 General
...........................................................................................................................
135 00225.11 Temporary
Signing..........................................................................................................
136 00225.12 Temporary Barricades, Guardrail, Barrier, Attenuators,
and Pedestrian
Fencing
...........................................................................................................................
137 00225.13 Temporary Traffic
Delineation.........................................................................................
138 00225.14 Temporary Illumination
...................................................................................................
138 00225.15 Temporary Traffic
Signals...............................................................................................
138 00225.16 Temporary Electrical Signs
.............................................................................................
139 00225.17 Temporary Illumination for Nighttime Flaggers
............................................................... 139
00225.20 General
...........................................................................................................................
139 00225.27
Flaggers..........................................................................................................................
139 00225.28 Traffic Control Supervisor
...............................................................................................
140 00225.29 Pilot Cars
........................................................................................................................
140 00225.30 General
...........................................................................................................................
140 00225.31 Qualifications
..................................................................................................................
140 00225.32 Traffic Control Supervisor
...............................................................................................
140 00225.34 Law Enforcement
Officer.................................................................................................
141 00225.40 General
...........................................................................................................................
142 00225.41 Temporary
Signing..........................................................................................................
142 00225.42 Temporary Barricades, Guardrail, Barrier, Attenuators,
and Pedestrian
Fencing
...........................................................................................................................
143 00225.43 Temporary Traffic
Delineation.........................................................................................
145 00225.44 Temporary Illumination
...................................................................................................
147 00225.45 Temporary Traffic
Signals...............................................................................................
147 00225.46 Temporary Electrical Items
.............................................................................................
147 00225.47
Flaggers..........................................................................................................................
148
-
vi
00225.48 Traffic Control Supervisor
...............................................................................................
148 00225.49 Pilot Cars
........................................................................................................................
148 00225.60 Temporary TCD
..............................................................................................................
148 00225.61 Existing
TCD...................................................................................................................
149 00225.62 Impact Attenuators and Portable Electrical Signs
........................................................... 149
00225.67 Temporary Illumination for Nighttime Flaggers
............................................................... 149
00225.80 General
...........................................................................................................................
150 00225.81 Temporary
Signing..........................................................................................................
150 00225.82 Temporary Barricades, Guardrail, Barrier, Attenuators,
and Pedestrian
Fencing
...........................................................................................................................
150 00225.83 Temporary Traffic
Delineation.........................................................................................
151 00225.84 Temporary Illumination
...................................................................................................
152 00225.85 Temporary Traffic
Signals...............................................................................................
152 00225.86 Temporary Electrical Signs
.............................................................................................
152 00225.87
Flaggers..........................................................................................................................
152 00225.88 Traffic Control Supervisor
(TCS).....................................................................................
152 00225.89 Pilot Cars
........................................................................................................................
152 00225.90 Method A - Unit
Basis...................................................................................................
152 00225.90A Method B - Lump Sum Basis
........................................................................................
153 00225.90B Method "C" - Incidental
Basis..........................................................................................
153 00225.91 Temporary
Signing..........................................................................................................
154 00225.92 Temporary Barricades, Guardrail, Barrier, and
Attenuators............................................ 154
00225.93 Temporary Traffic
Delineation.........................................................................................
155 00225.94 Temporary Illumination
...................................................................................................
155 00225.95 Temporary Traffic
Signals...............................................................................................
155 00225.96 Temporary Electrical Signs
.............................................................................................
156 00225.97
Flaggers..........................................................................................................................
156 00225.98 Traffic Control Supervisor
...............................................................................................
156 00225.99 Pilot Cars
........................................................................................................................
156
Section 00240 - Temporary Drainage Facilities 00240.00
Scope..............................................................................................................................
157 00240.40 General
...........................................................................................................................
157 00240.80 General
...........................................................................................................................
157 00240.90 Lump Sum
Basis.............................................................................................................
157
Section 00280 - Erosion and Sediment Control 00280.00
Scope..............................................................................................................................
158 00280.01 National Pollutant Discharge Elimination System
........................................................... 158
00280.02 Agency Controlled Lands Erosion and Sediment Control Plan
....................................... 158 00280.03 Non-Agency
Controlled Lands Erosion and Sediment Control Plan
............................... 159 00280.04 Erosion and Sediment
Control Manager (ESCM)
........................................................... 160
00280.10 General
...........................................................................................................................
160 00280.40
Installation.......................................................................................................................
165 00280.41 Work
Restrictions............................................................................................................
165 00280.42
Stabilization.....................................................................................................................
166 00280.43 Area
Preparation.............................................................................................................
167 00280.46 Application
......................................................................................................................
167 00280.47 Work Quality
...................................................................................................................
172 00280.48 Emergency Materials
......................................................................................................
172 00280.60 General
...........................................................................................................................
172 00280.61 Erosion and Sediment Control Manager
.........................................................................
172 00280.62 Ineffective Controls
.........................................................................................................
172 00280.63 Monitoring
.......................................................................................................................
173 00280.64 Sediment
Removal..........................................................................................................
173
-
vii
00280.70
Removal..........................................................................................................................
173 00280.71 Sediment Disposal
..........................................................................................................
174 00280.80 Lump Sum
Basis.............................................................................................................
174 00280.81 Unit
Basis........................................................................................................................
174 00280.82 Length Basis
...................................................................................................................
174 00280.83 Area
Basis.......................................................................................................................
174 00280.85
Limitations.......................................................................................................................
174 00280.90 General
...........................................................................................................................
174 00280.91 Lump Sum Progress Payments
......................................................................................
175
Section 00290 - Environmental Protection 00290.00
Scope..............................................................................................................................
176 00290.20 Hazardous Waste and Hazardous
Substances...............................................................
178 00290.29 Health and Safety
...........................................................................................................
180 00290.30 Pollution
Control..............................................................................................................
180 00290.31 Protection of Fish, Wildlife, and
Plants............................................................................
182 00290.40 Protection of
Forests.......................................................................................................
183 00290.41 Protection of
Wetlands....................................................................................................
183 00290.50 Protection of Cultural Resources
....................................................................................
183 00290.51 Protection of Sensitive Cultural Sites
..............................................................................
183 00290.80 General
...........................................................................................................................
184 00290.90 Lump Sum
Basis.............................................................................................................
184 00290.91 Contractor Responsible for Fines Resulting from
Violations ........................................... 184
PART 00300 - ROADWORK
Section 00310 - Removal of Structures and Obstructions 00310.00
Scope..............................................................................................................................
185 00310.01 Area of
Work...................................................................................................................
185 00310.02
Exclusions.......................................................................................................................
185 00310.40 Restrictions on Removal
Work........................................................................................
185 00310.41 Removal Work
................................................................................................................
185 00310.42 Salvaging Drainage Structure
Fittings.............................................................................
186 00310.43 Disposal of Material
........................................................................................................
186 00310.44 Earthwork in Connection with Removal
..........................................................................
186 00310.60 Repair of Damages
.........................................................................................................
186 00310.80 Lump Sum
Basis.............................................................................................................
187 00310.81 Separate Item
Basis........................................................................................................
187 00310.82 Temporary Precast Concrete Barrier
..............................................................................
187 00310.90 Lump Sum
Basis.............................................................................................................
187 00310.91 Separate Unit Basis
........................................................................................................
187 00310.92 Temporary Precast Concrete Barrier
..............................................................................
188 00310.93 Incidental
Basis...............................................................................................................
188
Section 00320 - Clearing and Grubbing 00320.00
Scope..............................................................................................................................
189 00320.01 Areas of Work
.................................................................................................................
189 00320.02 Definitions
.......................................................................................................................
189 00320.40 Clearing Operations
........................................................................................................
189 00320.41 Grubbing
Operations.......................................................................................................
190 00320.42 Ownership and Disposal of Matter
..................................................................................
190 00320.43 Backfilling
Holes..............................................................................................................
191 00320.80 Measurement
..................................................................................................................
191 00320.90
Payment..........................................................................................................................
191 00320.91 Incidental
Basis...............................................................................................................
191
-
viii
Section 00330 - Earthwork 00330.00
Scope..............................................................................................................................
192 00330.01 Lines, Grades and Cross
Sections..................................................................................
192 00330.02 Definitions
.......................................................................................................................
192 00330.03 Basis of
Performance......................................................................................................
192 00330.04 Sources of Borrow
..........................................................................................................
193 00330.10 Selected Materials
..........................................................................................................
193 00330.11 Selected Topsoil
.............................................................................................................
193 00330.12 Borrow
Material...............................................................................................................
193 00330.13 Selected General Backfill
................................................................................................
193 00330.14 Selected Granular
Backfill...............................................................................................
193 00330.15 Selected Stone Backfill
...................................................................................................
193 00330.16 Stone Embankment
Material...........................................................................................
193 00330.17 Quality Control
................................................................................................................
194 00330.20 Tamping Foot
Rollers......................................................................................................
194 00330.30 Quality Control Personnel
...............................................................................................
194 00330.40 General
...........................................................................................................................
194 00330.41
Excavations.....................................................................................................................
195 00330.42 Embankment, Fills and Backfills
.....................................................................................
197 00330.43 Earthwork Compaction Requirements
............................................................................
201 00330.44 Buttress, Inlay or Shear Key
...........................................................................................
202 00330.45 Filling of Holes
................................................................................................................
202 00330.46 Watering of Materials
......................................................................................................
202 00330.47 Specified Selected Courses or Layers of
Materials.........................................................
203 00330.49 Construction Slide Removal and Repair
.........................................................................
203 00330.70 General
...........................................................................................................................
204 00330.80 General
...........................................................................................................................
204 00330.81 Excavation Basis
Measurement......................................................................................
205 00330.82 Embankment Basis Measurement
..................................................................................
205 00330.90 General
...........................................................................................................................
206 00330.91 Kinds of Pay Excavation
.................................................................................................
206 00330.92 Kinds of Incidental
Earthwork..........................................................................................
207 00330.93 Excavation Basis
Payment..............................................................................................
208 00330.94 Embankment Basis Payment
..........................................................................................
208
Section 00331 - Subgrade Stabilization 00331.00
Scope..............................................................................................................................
209 00331.10 General
...........................................................................................................................
209 00331.16 Acceptance of Backfill
.....................................................................................................
209 00331.20 General
...........................................................................................................................
209 00331.40 Excavation
......................................................................................................................
209 00331.41
Geotextile........................................................................................................................
209 00331.42 Backfill
............................................................................................................................
209 00331.80 General
...........................................................................................................................
209 00331.90 General
...........................................................................................................................
209
Section 00332 - Surfacing Stabilization 00332.00
Scope..............................................................................................................................
211 00332.10 General
...........................................................................................................................
211 00332.16 Acceptance of Backfill
.....................................................................................................
211 00332.20 General
...........................................................................................................................
211 00332.40 Excavation
......................................................................................................................
211 00332.41
Geotextile........................................................................................................................
211 00332.42 Backfill
............................................................................................................................
211
-
ix
00332.80 General
...........................................................................................................................
211 00332.90 General
...........................................................................................................................
211
Section 00335 - Blasting Methods and Protection of Excavation
Backslopes 00335.00
Scope..............................................................................................................................
213 00335.01 Definitions
.......................................................................................................................
213 00335.40 Blasting Methods
............................................................................................................
213 00335.41 Controlled Blasting Methods
...........................................................................................
215 00335.42 Production Blasting
.........................................................................................................
216 00335.43 Scaling
............................................................................................................................
216 00335.80 General
...........................................................................................................................
216 00335.90 General
...........................................................................................................................
216
Section 00340 - Watering 00340.00
Scope..............................................................................................................................
217 00340.01 Definitions
.......................................................................................................................
217 00340.02
Exclusions.......................................................................................................................
217 00340.10 Water
..............................................................................................................................
217 00340.11 Water
Mixtures................................................................................................................
217 00340.20 Watering Equipment
.......................................................................................................
217 00340.40
Watering..........................................................................................................................
218 00340.60 Avoidance of Detrimental Operations
.............................................................................
218 00340.80
Watering..........................................................................................................................
218 00340.81 Additives in Water
...........................................................................................................
218 00340.90 General
...........................................................................................................................
218 00340.91 Quantity
Variations..........................................................................................................
219 00340.92 Incidental
Basis...............................................................................................................
219
Section 00344 - Treated Subgrade 00344.00
Scope..............................................................................................................................
220 00344.01 Definitions
.......................................................................................................................
220 00344.10 Soil stabilizing
materials..................................................................................................
220 00344.11 Water
..............................................................................................................................
220 00344.40 Preparation
.....................................................................................................................
220 00344.41 Addition of Stabilizing Material
........................................................................................
220 00344.42 Mixing
.............................................................................................................................
220 00344.43
Finishing..........................................................................................................................
221 00344.44 Curing
.............................................................................................................................
221 00344.45 Tolerances
......................................................................................................................
221 00344.46
Compaction.....................................................................................................................
221 00344.80 Square Unit Basis
...........................................................................................................
221 00344.81 Mass (Weight) Basis
.......................................................................................................
221 00344.90 General
...........................................................................................................................
222
Section 00350 - Geosynthetic Installation 00350.00
Scope..............................................................................................................................
223 00350.01 Definitions
.......................................................................................................................
223 00350.10 General
...........................................................................................................................
224 00350.20 Field Seam Stitching Equipment
.....................................................................................
224 00350.21 Asphalt
Distributor...........................................................................................................
224 00350.40 General
...........................................................................................................................
224 00350.41 Geotextile Installation Requirements
..............................................................................
225 00350.80 Square Unit Basis
...........................................................................................................
228 00350.90 Square Unit Basis
...........................................................................................................
228
-
x
Section 00360 - Drainage Blankets 00360.00
Scope..............................................................................................................................
230 00360.10 Sand Drainage Blanket
...................................................................................................
230 00360.11 Granular Drainage
Blanket..............................................................................................
230 00360.12 Reclaimed
Glass.............................................................................................................
230 00360.15 Quality Control
................................................................................................................
230 00360.20 General
...........................................................................................................................
230 00360.30 Quality Control Personnel
...............................................................................................
230 00360.40 Planned Locations
..........................................................................................................
231 00360.41 Other
Locations...............................................................................................................
231 00360.42 Compaction and Density
Requirements..........................................................................
231 00360.80 Measurement
..................................................................................................................
231 00360.90 General
...........................................................................................................................
231
Section 00370 - Finishing Roadbeds 00370.00
Scope..............................................................................................................................
232 00370.40 Within Roadbed Cross Section
.......................................................................................
232 00370.41 Outside Roadbed Cross
Section.....................................................................................
233 00370.60 Maintenance
...................................................................................................................
233 00370.80 Lump Sum
Basis.............................................................................................................
233 00370.90 Lump Sum
Basis.............................................................................................................
233 00370.91 Incidental
Basis...............................................................................................................
233
Section 00390 - Riprap Protection 00390.00
Scope..............................................................................................................................
234 00390.01 Definitions
.......................................................................................................................
234 00390.10 Riprap Geotextile
............................................................................................................
234 00390.11 Riprap Requirements
......................................................................................................
234 00390.12 Grouted Riprap
...............................................................................................................
235 00390.13 Filter Blanket
...................................................................................................................
236 00390.40 Preparation
.....................................................................................................................
236 00390.41 Riprap Geotextile
............................................................................................................
236 00390.42 Filter Blanket
Construction..............................................................................................
236 00390.43 Riprap
Backing................................................................................................................
236 00390.44 Riprap
.............................................................................................................................
236 00390.60 General
...........................................................................................................................
237 00390.80 Filter Blanket
...................................................................................................................
237 00390.81 Riprap
Backing................................................................................................................
237 00390.82 Riprap
.............................................................................................................................
237 00390.83 Riprap
Basins..................................................................................................................
237 00390.90 General
...........................................................................................................................
238
Section 00396 - Shotcrete Slope Stabilization 00396.00
Scope..............................................................................................................................
239 00396.01 Definitions, Standards and
Requirements.......................................................................
239 00396.10 General
...........................................................................................................................
239 00396.11 Prepackaged Product
.....................................................................................................
239 00396.12
Aggregates......................................................................................................................
239 00396.13 Steel Fiber Reinforcement
..............................................................................................
240 00396.14 Acceptance Sampling and
Testing..................................................................................
240 00396.20 General
...........................................................................................................................
240 00396.21 Pump
System..................................................................................................................
240 00396.22 Air Compressor
...............................................................................................................
241 00396.23 Dry-Mix Delivery
Equipment............................................................................................
241 00396.24 Wet-Mix Delivery
Equipment...........................................................................................
241
-
xi
00396.30 Qualifications
..................................................................................................................
241 00396.40 Surface Preparation
........................................................................................................
241 00396.41 Shotcrete Blanket Thickness Control
..............................................................................
241 00396.42 Anchor Bars
....................................................................................................................
242 00396.43 Welded Wire Fabric
........................................................................................................
242 00396.44 Weep Holes
....................................................................................................................
242 00396.45 Batching And Mixing Shotcrete
.......................................................................................
242 00396.46 Batching And Mixing Steel Fibers
...................................................................................
242 00396.47 Shotcrete Application
......................................................................................................
242 00396.48 Finishing And
Curing.......................................................................................................
243 00396.80 General
...........................................................................................................................
243 00396.90 General
...........................................................................................................................
243
PART 00400 - DRAINAGE AND SEWERS
Section 00405 - Trench Excavation, Bedding and Backfill 00405.00
Scope..............................................................................................................................
245 00405.01 General
...........................................................................................................................
245 00405.02 Definitions
.......................................................................................................................
245 00405.03 Lines, Grades, and Cross
Sections.................................................................................
246 00405.10 General
...........................................................................................................................
246 00405.11 Trench
Foundation..........................................................................................................
246 00405.12
Bedding...........................................................................................................................
246 00405.13 Pipe Zone
Material..........................................................................................................
246 00405.14 Trench Backfill
................................................................................................................
246 00405.15 Quality Control
................................................................................................................
247 00405.30 Quality Control Personnel
...............................................................................................
247 00405.40 General
...........................................................................................................................
247 00405.41 Trench Excavation
..........................................................................................................
247 00405.42 Rock Excavation
.............................................................................................................
248 00405.43
Dewatering......................................................................................................................
248 00405.44 Trench
Foundation..........................................................................................................
248 00405.45 Pipe
Bedding...................................................................................................................
249 00405.46
Backfilling........................................................................................................................
249 00405.48 Surface Removal
............................................................................................................
250 00405.80 Trench Excavation and Trench Backfill
...........................................................................
251 00405.81 Saw
Cutting.....................................................................................................................
251 00405.82 Rock and Boulder
Excavation.........................................................................................
251 00405.83 Trench
Protection............................................................................................................
252 00405.84 Trench
Foundation..........................................................................................................
252 00405.85 Pipe
Bedding...................................................................................................................
252 00405.86 Pipe Zone
Material..........................................................................................................
252 00405.87 Imported Topsoil
.............................................................................................................
252 00405.90 General
...........................................................................................................................
252 00405.92 Incidental
Basis...............................................................................................................
253
Section 00406 - Tunneling, Boring and Jacking 00406.00
Scope..............................................................................................................................
254 00406.01 Descriptive Terms
...........................................................................................................
254 00406.10 Pipe Bedding and Pipe Zone
Material.............................................................................
254 00406.11
Pipe.................................................................................................................................
254 00406.12
Casing.............................................................................................................................
254 00406.13
Grout...............................................................................................................................
254 00406.14 Sand
...............................................................................................................................
254 00406.40 Excavation
......................................................................................................................
254
-
xii
00406.41 Required
Submittals........................................................................................................
255 00406.42 Tunneling
........................................................................................................................
255 00406.43 Boring and Jacking
.........................................................................................................
255 00406.44 Concrete Pipe
.................................................................................................................
255 00406.45 Smooth Steel Casing
......................................................................................................
256 00406.46 Grouting Voids Outside
Casing.......................................................................................
256 00406.47 Cradles for Cased or Tunneled
Pipe...............................................................................
256 00406.48 Placing Fill in
Casing.......................................................................................................
256 00406.49 Railroad
Crossings..........................................................................................................
256 00406.80 Length Basis
...................................................................................................................
256 00406.90 General
...........................................................................................................................
257
Section 00420 - Salvaging Pipe 00420.00
Scope..............................................................................................................................
258 00420.10 General
...........................................................................................................................
258 00420.40 Trench Excavation
..........................................................................................................
258 00420.41 Removal of
Pipe..............................................................................................................
258 00420.42
Stockpiling.......................................................................................................................
258 00420.43
Relaying..........................................................................................................................
258 00420.80 General
...........................................................................................................................
258 00420.90 General
...........................................................................................................................
258
Section 00430 - Subsurface Drains 00430.00
Scope..............................................................................................................................
260 00430.01 Descriptive Terms
...........................................................................................................
260 00430.02 Contractor's Options
.......................................................................................................
260 00430.03 Size
Determination..........................................................................................................
260 00430.10 General
...........................................................................................................................
260 00430.11 Granular Drain Backfill Material
......................................................................................
260 00430.12 Reclaimed
Glass.............................................................................................................
261 00430.40 General
...........................................................................................................................
261 00430.41 Foundations in Unyielding Material
.................................................................................
261 00430.42 Laying Pipe
.....................................................................................................................
261 00430.43 Joining Pipe
....................................................................................................................
261 00430.44 Contact Surfaces, Aluminum to Concrete
.......................................................................
261 00430.45
Inspection........................................................................................................................
262 00430.46
Backfilling........................................................................................................................
262 00430.80 Trench Excavation and Backfill
.......................................................................................
262 00430.81 Geotextiles
......................................................................................................................
262 00430.82 Installation Under Pavement
...........................................................................................
262 00430.83 Drain Pipe
.......................................................................................................................
262 00430.84 Special Sections
.............................................................................................................
262 00430.85 Special Filter Material and Granular Drain Backfill
Material ............................................ 262 00430.86
Delineators......................................................................................................................
262 00430.87 Subsurface Drain
Outlet..................................................................................................
262 00430.90 Trench Excavation and Backfill
.......................................................................................
262 00430.91
Geotextile........................................................................................................................
262 00430.92 Installation Under Pavement
...........................................................................................
262 00430.93 Drain Pipe
.......................................................................................................................
262 00430.94 Special Filter Material and Granular Drain Backfill
Material ............................................ 263 00430.95
Delineators......................................................................................................................
263 00430.96 Subsurface Drain
Outlet..................................................................................................
263
-
xiii
Section 00435 - Wick Drains 00435.00
Scope..............................................................................................................................
264 00435.10 General
...........................................................................................................................
264 00435.11 Core
................................................................................................................................
264 00435.12 Jacket
.............................................................................................................................
264 00435.13 Assembled
Drain.............................................................................................................
264 00435.14 Acceptance
Requirements..............................................................................................
265 00435.20 General
...........................................................................................................................
265 00435.40 Wick Drain Installation Requirements
.............................................................................
265 00435.41 Splicing
...........................................................................................................................
266 00435.80 Length Basis
...................................................................................................................
267 00435.90 Length Basis
...................................................................................................................
267
Section 00440 - Commercial Grade Concrete 00440.00
Scope..............................................................................................................................
268 00440.10 General
...........................................................................................................................
268 00440.11 Proportioning of CGC Mixture
.........................................................................................
268 00440.12 Tolerance and Limits of CGC Mixtures
...........................................................................
268 00440.13 Field-Mixed
Concrete......................................................................................................
268 00440.14 Acceptance Sampling and
Testing..................................................................................
268 00440.15 Quality Control
................................................................................................................
269 00440.30 Quality Control Personnel
...............................................................................................
269 00440.40 General
...........................................................................................................................
269 00440.41 General Surface Finish
...................................................................................................
270 00440.42 Replacement or Price Reduction
....................................................................................
270 00440.80 Measurement ...