Lower Grasse River –looking upstream from the mouth
17
Embed
2001 Capping Pilot Study –cap material placement · 2005 Remedial Options Pilot Study –main channel dredging, debris removal, and water column monitoring. 2005 Remedial Options
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Lower Grasse River – looking upstream from the mouth
2001 Capping Pilot Study – cap material placement
2001 Capping Pilot Study – material staging area
Aerial view of 2001 Capping Pilot Study
2005 Remedial Options Pilot Study – near shore excavation
2005 Remedial Options Pilot Study – main channel dredging, debris removal, and water column monitoring
2005 Remedial Options Pilot Study – armor stone placement
Aerial view of 2005 Remedial Options Pilot Study
2006 Activated Carbon Pilot Study
2006 Activated Carbon Pilot Study – carbon tiller/mixer