Top Banner
2 nd National Energy Efficiency Strategy Review EELN Consultation Workshop 24 April 2013 1
13

2 nd National Energy Efficiency Strategy Review EELN Consultation Workshop 24 April 2013

Feb 25, 2016

Download

Documents

liseli

2 nd National Energy Efficiency Strategy Review EELN Consultation Workshop 24 April 2013. 2 nd NEES Review Process . - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

2nd National Energy Efficiency Strategy Review

EELN Consultation Workshop

24 April 2013

1

Page 2: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

2nd NEES Review Process

• The second review of the National Energy Efficiency Strategy (NEES) started in

2011, with public and sector workshops to discuss the scope and elements of the

NEES that needs review.

• The draft second NEES review document was then presented to the Government’s

Infrastructure Development Cluster on the 10th October 2012, and later to Cabinet

by end October 2012.

• Cabinet approved the publication of the draft second NEES review document for

public comment, and was then published through the government gazette on the

29th November 2012. The closing date for the submission of the comments was 30 th

January 2013.

Page 3: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

2nd NEES Review Process Cont…

• All comments have been analysed, and response provided resulting in an adjusted

NEES document.

• The comments have been discussed in a Government and Private Sector workshop

that was held on the 8th March 2013, and March 2103 respectively.

• However, this workshop is exclusively for those who have submitted comments, and

there is no intention of opening another process for public consultation.

• During this period more than 30 comments were received, and these includes

– (i) use of year 2000 baselines, (ii) whether NEES targets are aspirational or mandatory,

– (iii) the need for an organisational structure, (iv) definition of energy efficiency as it relates to the

mining sector, (v) use of green procurement, (vi) energy services company development and

support,

– (vii) alignment with National Development Plan, (viii) inclusion of energy efficiency indicators,

– (ix) monitoring and verification of energy savings, (x) funding mechanism for energy efficiency

measures, etc.

Page 4: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

2nd NEES Review Process Cont…

• In addition to the NEES comments, the Department will also present the NEEAP

activities to address some of the comments, and also to kick start the consultation

process for NEEAP development.

• It is however, expected that the final reviewed 2013 NEES and final NEEAP will

then be presented to Cabinet for approval by end of April 2013.

Page 5: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

Proposal for SA NEEAP StructureNEEAP for South Africa

High Level Contextual Environment, Objectives and Targets – with reference to National EE Strategy

Sector 1   Sector 2  Sector 4  Sector 3

Sector Breakdown – as defined in the National EE Strategy

Sector outline, overall targets and approach.Opportunities and challenges.Methodological approach.Applicable legislationTargeted / priority areas 

 

Details of specific initiative number 1Compliance with legislation or policy

Details of specific initiative number 1 Programme analysis and detail activities

 

Details of specific initiative number 2Compliance with legislation or policy

Details of specific initiative number 2 Programme analysis and detail activities

 

Energy Efficiency Trends in South Africa 2000 – 2015 (to be conducted)

    

Alig

nmen

t bet

ween

indi

vidu

al p

rogr

amm

es a

nd o

vera

ll ob

ject

ives

5

Page 6: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

SUMMARY OF NEES COMMENTS (1)

6

COMMENTS DoE Responses1. Use of 2000 baseline or base year The 2015 target against the

baseline of 2000 remains a government policy. The targets are aspirational targets and set for broad energy-use sectors. From these aspirational targets, individual energy users are expected to develop their own baselines and performance targets within this NEEAP cycle (up to 2015). The baseline from which improvements will be measured remains the year 2000.  

2. Target (mandatory or aspirational?) Targets in the NEES are aspirational with the final year of assessment being 2015.

3. Develop/include a program management structure and system to ensure successful implementation of the strategy.

Institutional arrangement will be included in the NEEAP.

4. EE definition (impact on mining sector) Reduction in energy intensity (however, there is a need to discuss this with the Chamber of Mines).

Page 7: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

SUMMARY OF NEES COMMENTS (2)

7

COMMENTS DoE Responses5. Cogeneration (waste etc),

IPPs (relationship with cogen)

The reuse of waste in energy generation, efficient use of energy resources is not prohibited however at the same time the is a need to ensure responsible usage that does not impact negatively on ambient air quality. Therefore co-gen as envisaged in the NEES would be implemented in accordance with the prescripts of Air Quality and Waste Acts. 

6. Implementation plan The department through the support of GIZ is developing a detailed National Energy Efficiency Action Plan (NEEAP) that will guide successful implementation of initiatives aimed at ensuring the achievement of the target.

7. Training and skills development – Done

As government we would support the establishment of a skills development programme aimed at advancing competency in energy management measurement and auditing.

8. Procurement Strategy: Government will ensure that it procures energy efficient technologies through its green procurement framework.

Page 8: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

SUMMARY OF NEES COMMENTS (3)

8

COMMENTS DoE Responses9. Reporting The department is in the process of

developing Regulations on the Mandatory Provision of Energy Management Plans (EMP) and this regulations will also address the reporting issue. Energy Users will be informed about the reporting process by the department.

10. Focus on power generation sector is only on demand side

The implementation of the target in relation to this sector will purely be based on EE initiatives similar to the industrial processes. This shall purely exclude the thermodynamic part of the power generation process, but shall include energy consumed in all other electrical apparatus and machinery operating within the area.

Page 9: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

SUMMARY OF NEES COMMENTS (4)

9

COMMENTS DoE Responses11. Research and development Government through relevant

departments such dst & the dti is providing R&D incentives such the technological research and development tax incentive provided under Section 11D of the Income Tax Act (more details should be obtained from this departments). SANEDI will also advice on how they will implement their EE R&D.

12. Monitoring and Verification The department is developing Energy Efficiency Target Monitoring System (EETMS) with the aim of fully implementing the system in the next financial to monitor and verify progress towards achievement of EE targets.

13. Alignment with National Development Plan

It will be imperative to firstly aligned the Integrated Resource Plan (IRP) with the NDP and that will be considered when the IRP is being reviewed.

Page 10: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

SUMMARY OF NEES COMMENTS (5)

10

COMMENTS DoE Responses14. Industry and Mining should be

separate sectors. The NEES currently has combined these sectors into one, with a target of 15%.

It is acknowledged that the mining and the industry sector uses different indicators to measure energy efficiency improvement. However, the current target of 15% is a contribution from both the industry and mining until the next review in 2015. In the meantime (2013-2015), sub-sector targets on industry will be developed by government in consultation with the industry stakeholders in line with the overall target review.

15. Progress to date The NEEAP being developed will provide a high level overview of the progress to date with respect to policy and programmes. In addition, through the EETMS, economic-wide improvement of the energy efficiency will be determined.

Page 11: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

SUMMARY OF NEES COMMENTS (6)

11

COMMENTS DoE Responses16. Grid code amendment A Work Group has been established by

NERSA to review the grid code.17. Role of government in

transport sector Government has a role in the energy efficiency improvement from the transport sector. NEEAP will also define the role of government and recommend interventions in the improvement of energy efficiency in the transport.

18. Indicators not properly defined

The energy efficiency indicators are being developed in the EEMS project, and this process will be consulted with stakeholders. The NEES is a high level strategic document, whilst indicators will be part of the monitoring system.

19. Finance mechanism (MPYD, Green Fund, Fiscus, support from the International Developmental Partners)

An energy efficiency funding mechanism coordinated centrally will be explored in the proposed NEEAP period.

Page 12: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

SUMMARY OF NEES COMMENTS (7)

12

COMMENTS DoE Responses18. Status of the SA’s energy

efficiency improvement based on the 2000 baseline and 2005 NEES

Progress in the achievement of 2005 NEES sector targets, and overall EE improvement couldn’t not be assessed during this review process. However, Energy Efficiency Trends Analysis from 2000 to 2015 will for part of the NEEAP actions.

19. Inclusion of Energy Efficiency Flagship Projects in the NEES document (Policy Alignment)

The NEES considers all the sector energy efficiency interventions that could be implemented within the first NEEAP period including what is being called ‘flagship’ project in the Climate Change Policy. Therefore the proposed actions in the NEEAP are not categorized into flagship or priority projects.

20. Sector selection and involvement of government departments

The 2nd NEES review didn’t consider adding or removing sectors, and hence targets were also not changed. The measurement and evaluation of progress that will consider including or determining new targets will for part of SA’s EE Trends Analysis (2000- 2015)

Page 13: 2 nd  National Energy Efficiency Strategy Review  EELN Consultation Workshop   24 April 2013

SUMMARY OF NEES COMMENTS (8)

13

COMMENTS DoE Responses

21. NEES response to the National Climate Change Response Policy

The energy efficiency programmes as proposed in the NEEAP will automatically respond to the NCCRP.