Project Title : Holding Hands
Jul 12, 2015
Project Title : Holding Hands
Team Name : Hands, Body & MINDS.
Members :
• Zheng Jie ( P1349539 )• Trini ( P1349427 )• Cliff( P1350355 )• Ritchell ( P1350032 )
Organisation :
• MINDS ( Movement for the Intellectually Disable of Singapore)
• Clementi Training Centre
Initial Organisation : Singapore Children Society
Eventual Organization :MINDS(Movement for the Intellectually Disabled
of Singapore)
Accepted our proposal as of
20/1/2014 for our service.
Arts and Crafts
Planning of Activities
Simple Lantern Making
Fortune Fish making using red
packet
Appreciation Gift
Red Packet containing
Chocolate Coins
Preparation for Beneficiary’s Activity
Sports and Wellness
PentanqueTraining/Competition
Dance + Singing Event
Dates & Activities:
22/01/2014 (Wednesday) , 2pm –4pm. Arts & Crafts ( Catered to the client’s request )
Venue : MINDS training center
25/01/2014 (Friday), 1pm – 3pmPentanque Training
Venue : Clementi Hard Court
Equipment Bought :
• Coloured Paper ( x2 packets )
• Red Packets ( x 100 pieces )
• Chocolates Coins ( x 2 packets )
Items brought:
• Glue Stick(x4)• Scissors(x6)• Stapler(x4)• Tape (x1)
Activities Expected timing
Introduction + Ice Breaking 2pm – 2:15pm
Fortune Fish Making 2:15pm – 2:30pm
Simple Lantern Making 2:30pm – 3:00pm
Dance/Singing Event + Tea Break 3:00pm – 3:45pm
Distribution of Red Packets + Farewell 3:45pm – 4:00pm
Schedule for day 1
Date : 22/01/2014 (Wednesday) , 2pm – 4pm
Cliff teaching clients
how to fold the red packet
Activity 1 : Making of Fortune Fish
Clients with their completed
fortune fish
Our helper showing clients how to cut
the lantern .
Activity 2 :Making of Simple Lantern
Client happy to have their lanterns
completed
Clients attempting to cut the lantern
shape on their own.
Trini and Ritchell with their completed
lanterns?
Cliff showing client how to cut the
shape of the lantern.
Ritchell, Cliff & Trini dancing.
Trini encouraging clients to dance on
the dance floor.
Activity 3 : Dance event
Our lanterns are used to decorate the
center for the new year season.
Team photo with facilitator after
successful day 1
Activity 4 : Decorating
Schedule for day 2
Activities Expected timing
Gathering + Journey to Venue 1pm – 1:25pm
Petanque Briefing and Practice 1:25pm – 1:40pm
Client Briefing and Practice 1:40pm – 2:00pm
Tea Break 2:00pm - 2:15pm
Competition SP vs MINDS 2:15pm – 2:45pm
Journey Back + Farewell 2:45pm – 3:00pm
Date : 25/01/2014 (Friday) , 1pm – 3pm
Activity 1: Walk to Venue
Gather Clients Prepare Equipments Travel to Hard Court
Activity 2: Petanque Training
Trini and Cliff being briefed and introduced
to the game.
*Instructor/Facilitator in red color shirt.
Activity 3: Petanque Training for Client(s)
Clients separated into 2 teams for Petanque
Training
Ritchell and helper assisting client
in throwing the ball
Trini guiding client into the throw
area
Activity 4: Tea-Break Refreshments were
provided to the clients.
Zheng Jie distributing the
biscuits to the clients
Activity 5 : Mini – Competition ( SP vs MINDS) We decided to hold a mini competition to pit our
skills against them.
Worst player of SP’s team
throwing
MVP of MINDS throwing
SP:MINDS
1:2
We were no match for them!
Score Tabulation
Instructors counting the number
of steps between each ball Final ball placements
Activity 6 :
Sportsmanship
Players exchanging hi-five’s
for having sportsmanship.
Activity 7 : Journey Back to the Centre
Trini and Client holding hands. <3 ZJ and Client carrying equipment
back
Group Photo with Facilitator of Day 2
1) Before Implementation:
i. Hard time finding beneficiaries.
ii. Waiting duration of email replies were very long and draggy.
iii. Many things went unplanned e.g. We did not carry out our first plan.
Learnt how to improvise
Came straight to the point, when negotiating
Able to accede to requests
2) During the implementation:
i. Teamwork is the key to success.
ii. Carrying out individual responsibility is important.
iii. There is a need to adapt to the situation.
Role :
Events Planner & Project Manager
Things learnt:
1) Learn how to deal with people with special needs
2) How to source for activities
3) Became more patient
Difficulties :
- Clients had short attention span and cannot
well
Value Added:
- Facilitating the implementation + Activities planning
Trini Tan
Role :
Logistics Manager
Things learnt:
1. Managing my time well
2. How to interact with the clients
3. Teach what I’ve learnt
Difficulties:
- Didn’t know what to expect from the clients
Value Added:
- Materials purchasing and checking for logistic items
Cliff Chow
RoleAdministrative which includes
sourcing of beneficiaries, email
writing and negotiation.
Things I’ve Learnt1) Formal Emailing
2) Arts and Crafts namely
and fortune fish.
3) How to play petanque.
Difficulties
1. Being rejected multiple times by beneficiaries
2. Confusion in negotiations
Value Added :
- Making things organised,
- identifying major concerns within the group
Zheng Jie
Role:
Events planner & project manager
Things learnt:
1) Giving back to the community.
2) Appreciative of what I have.
3) Be flexible and adapt to the situation .
Difficulties :
-Hard time coming up with suitable activities
for the organisation
Value Added:
- Coming up with the activities and plans for
implementation
Ritchell Ho
What have we learnt?
1. Teamwork is vital. (Responsibilities)
2. Learnt how to deal with people with special needs.(Patience)
3. Self-learning.
4. Time Management
1. We would have started searching for beneficiaries earlier
2. Site Visiting to meet clients & build rapport
3. Come up with more activities for the clients.
What would we have done differently?