/ Government of India Ministry of Power Northern Regional Power Committee 18-A,lnstitutional Area, Shaheed Jeet Singh Marg , Kalwana Sarai, New Delhi -110 016 FAX MESSAGE No: NRPCI OPRl103/02/20191 '''2. -4 ;) - 1 :5 21 <: To : 1 Director (SLDC) , UP State Load Despatch Centre, Vibhuti Khand, Lucknow- 226010 2 ED, NRLDC, New Delhi. 3 S.E.(Elect. -Op.), U.T. , Chandigarh. 4 GM (SLDC), DTL, New Delhi. 5 CE (Plg.&Comml.),HVPNL, Panchkula, Haryana. 6 CE, (HPPC), Panchkula, Haryana.Fax No.0172-2586836 7 CE (SP), HPSEB, Shimla (HP). 8 CE (SO),PDD, J&K, Jammu, (J&K). 9 CE (SO&C), PSEB, Patiala (Punjab). 10 CE (LD), RVPN, Jaipur (Rajasthan). 11 CE (RPCC), Jaipur (Rajasthan). 12 Director (Transmission ), UPPCL, Lucknow (UP). 13 Director (Operation), UPCL, Dehradun (Uttarakhand). 14 Station Director, NAPS, NPCIL,Narora (UP). 15 Site Director, RAPS-3&4, NPCIL,Rawatbhata, Kota (Raj. ). 16 Executive Director (F) , NPCIL, Mumbai. 17 ED (Comml.), NHPC, Faridabad(Haryana) 18 ED (Comml.), NTPC, New Delhi. Fax No. 24361018 19 ED (NCR), NTPC, Noida (UP).Fax No. 0120 - 2410082 20 ED (NR), NTPC, Lucknow(UP).Fax No. 0522 - 2305851 21 GM (C & SO), SJVNL, Himfed Building, New Shimla(HP). 22 AGM(Comml.), THDC, Rishikesh, Ultarakhand. 23 GM, Indira Gandhi Super Thermal Power Station,Jhajjar. 012G-2425944 24 AGM(SO & Comml. ), NWN, New Delhi. Fax No. 011-24362009 , 24367021 25 CEO, Meja Urja Nigam Limited, Prayagraj (UP). Fax No. 0532-2693158 Subject : Revision in allocation of power from Central Generating Stations of NR Revision No - 07/2019-20 Date: 30.10.2019 1. MoP vide its letter no 511f2016-Th. 1I dated 18.05.2017 has allocated power from Tanda Stage-II TPS (2'600MW) to its various beneficiaries which stands as: AllocatIon S.Ne. State/UT (rounded off to two decimal places) MW % of installed capacity 1 Chandigarh 5.18 0. 39 2 Deihl 0.00 0.00 3 Haryana 44.07 3.34 4 H.P. 0.00 0.00 5 J& K 69.39 5. 26 6 Punjab 0.00 0.00 7 Rajasthan 67.97 6. 66 8 U.P. 943.45 71.47 9 uttarakhand 37.93 2.87 10 Unallocated 132.00 10.00 Total 1320. 00 100.00 2. NTPC via mail dated 29.10.2019 has infomned that Unit·1 (660 MW) of Tanda Stage-II is planned for commercial operation w.e.! 00:00 hrs of 01.11 .2019. 3. As per directions issued by MoP vide letter dated 01.03.2016, the unallocated power (66 MW) from Unit-1 of Tanda Stage-II has been added to the regional unallocated pool of NR and allocated to beneficiares as per existing proportion of allocation from the unallocated pool. 4. Details of revised allocation from Central Generating stations of NR due to the above mentioned allocation are available on nrpc website (www.nrpc.gov.in). 5. NRLDC and UP SLOG are requested to implement this order w. e.f. 00:00 hrs of date of commercial operation of Unit-1 of Tanda Stage-II TPS. 6. All beneficiaries shall maintain lC commensurate with their allocation and follow PSM. Copy to: 1. Chief Engineer (GM), CEA, New Delhi. 2. Director (OM), MOP, New Delhi. (Naresh Bhandari) Member Secretary
6
Embed
'''2. · 2019-10-30 · 14 Station Director, NAPS, NPCIL,Narora (UP). 15 Site Director, RAPS-3&4, NPCIL,Rawatbhata, Kota (Raj.). 16 Executive Director (F), NPCIL, Mumbai. ... 4 Specific
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
/ Government of India
Ministry of Power Northern Regional Power Committee
To : 1 Director (SLDC) , UP State Load Despatch Centre, Vibhuti Khand, Lucknow- 226010 2 ED, NRLDC, New Delhi. 3 S.E.(Elect. -Op.), U.T. , Chandigarh. 4 GM (SLDC), DTL, New Delhi. 5 CE (Plg.&Comml.),HVPNL, Panchkula, Haryana. 6 CE, (HPPC), Panchkula, Haryana.Fax No.0172-2586836 7 CE (SP), HPSEB, Shimla (HP). 8 CE (SO),PDD, J&K, Jammu, (J&K). 9 CE (SO&C), PSEB, Patiala (Punjab). 10 CE (LD), RVPN, Jaipur (Rajasthan). 11 CE (RPCC), Jaipur (Rajasthan). 12 Director (Transmission), UPPCL, Lucknow (UP). 13 Director (Operation), UPCL, Dehradun (Uttarakhand). 14 Station Director, NAPS, NPCIL,Narora (UP). 15 Site Director, RAPS-3&4, NPCIL,Rawatbhata, Kota (Raj.). 16 Executive Director (F), NPCIL, Mumbai. 17 ED (Comml.), NHPC, Faridabad(Haryana) 18 ED (Comml.), NTPC, New Delhi. Fax No. 24361018 19 ED (NCR), NTPC, Noida (UP).Fax No. 0120 - 2410082 20 ED (NR), NTPC, Lucknow(UP).Fax No. 0522 - 2305851 21 GM (C & SO), SJVNL, Himfed Building, New Shimla(HP). 22 AGM(Comml.) , THDC, Rishikesh, Ultarakhand. 23 GM, Indira Gandhi Super Thermal Power Station,Jhajjar. 012G-2425944 24 AGM(SO & Comml.), NWN, New Delhi. Fax No. 011-24362009 , 24367021 25 CEO, Meja Urja Nigam Limited, Prayagraj (UP). Fax No. 0532-2693158
Subject : Revision in allocation of power from Central Generating Stations of NR
Revision No - 07/2019-20
Date: 30.10.2019
1. MoP vide its letter no 511f2016-Th.1I dated 18.05.2017 has allocated power from Tanda Stage-II TPS (2'600MW) to its various beneficiaries which stands as:
AllocatIon
S.Ne. State/UT (rounded off to two decimal places)
2. NTPC via mail dated 29.10.2019 has infomned that Unit·1 (660 MW) of Tanda Stage-II is planned for commercial operation w.e.! 00:00 hrs of 01.11 .2019. 3. As per directions issued by MoP vide letter dated 01.03.2016, the unallocated power (66 MW) from Unit-1 of Tanda Stage-II has been added to the regional unallocated pool of NR and allocated to beneficiares as per existing proportion of allocation from the unallocated pool.
4. Details of revised allocation from Central Generating stations of NR due to the above mentioned allocation are available on nrpc website (www.nrpc.gov.in).
5. NRLDC and UP SLOG are requested to implement this order w.e.f. 00:00 hrs of date of commercial operation of Unit-1 of Tanda Stage-II TPS.
6. All beneficiaries shall maintain lC commensurate with their allocation and follow PSM.
Copy to: 1. Chief Engineer (GM), CEA, New Delhi . 2. Director (OM), MOP, New Delhi.
(Naresh Bhandari) Member Secretary
PERCENTAGE SHARES AND ENTITLEMENTS OF NORTHERN REGION UTILITIES IN VARIOUS CENTRAL SECTOR GENERATING STATIONS
1 Unallocated Pool (excluding special alloc. to HVDe & Railways) 2 Additional specific allocation to MP from UA Pool 3 Additional specific allocation to UP from UA Pool
4 Specific Allocation to J&K from RAPS-C and Uri-II 5 Specific Allocation to NWN for bundling of solar power from
NTPC's Coal stations
6 Specific Alloeation to HPSEB Ltd.!or bundling with power from Singrauli Solar PV power plant
7 Allocation to Bangladesh
8 Balance Unallocated Pool for beneficiaries of the Region
·.!~ i!~lg~~~ IIII~111111 ~! .... ~.;:2~~~!:;;~ O O O O OO OO O~
!<~II§I§l i .I§§.§§§§11 ,..-:ddo~dO <o ~oodod o odo~
! ~~I~~~~~~~II~ •• ~~I I ~.~ O~ODoO.~ O _00000000 8
!~< ! II .~ ~! I !~§I~II~lli i ,.O OO OO C~"'O_ OOOOO OOO~
• ! ·I "!i!I!·II~"· ~11 } I I O. ~ . O.O •. "".O~OOOO.O~0 08 l~;~i~ ~! !~ ~~ ~~~~~ ~ ~~~i . "
·.I' ~I~!~~I!~I~~"~~ II 1~~O ~OOoo.~ o _oooo000 08
~i: ~§§~~i~ ~~@§8~§§~§ §§ " oo ooddm~ d~ Od do oci oo~
Percentage Entitlements of equivalent capacity from NTPC Coal Stations for bundling with Solar PV Power
State/UT SINGRAUU I RIHAND.J I RIHAND'j RIHAND.JII I UNCHAHAR~I I UNCHAHAR.JI I UNCHAHAR.JII I NCT Power I UNCHAHAR-N I Tanda-JI TPS STPS STPS STPS STPS TPS TPS TPS Station Oadrf ~" TPS
HP 0.18 0.18 0.19 0.21 0.07 0.21 0.21 0.20 Total Bundled Power 9.79 9.74 10.159 11.76 3.73 11.74 11.56 10.76
Percentage Entitlements of equivalent capacity from NTPC Coal Stations for bundling with Solar PV Power under Migration Scheme and New Scheme of JNNSM Phase - I
Percentage Entitlements of equivalent capacity from NTPC Coal Stations for bundling with Solar PV Power under Migration Scheme and New Scheme of JNNSM Phase-II
0.53 0.35 9.09 6.06 1.93 1.29
11,55 7.70
0.21 0.15
11.76 7.85
StatelUT SINGRAULI I RIHAND-I I RIHANO-III RIHAND-III I UNCHAHAR.J I UNCHAHAR.JI I UNCHAHAR-II I NCT Power I UNCHAHAR-IV I Tanda-II TPS STPS STPS STPS STPS TPS TPS TPS Station Dadrl -n TPS