7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important http://slidepdf.com/reader/full/1job-procedure-for-tank-how-to-fabricate-or-eriction-important 1/15 DOC NO DATE PAGE NO 03 OF 16 PROJECT TITLE PROCEDURE FOR FABRICATIO N & ERECTION OF TANKAGES BY JACKING UP M ETH OD JOB PROCEDURE FOR FABRICATION & ERECTION OF TANKAG E BY JACKING ME T HO D 1. SCOPE: This procedure covers detailed activities for fabrication, erection and testing of the storage tanks, and also equipment & manpower required for the same. All the tasks / activities need to be carried out with atmost care with good workmanship and in accordance with the specifications to achieve satisfactory completion of the whole activities. 2. PURPOSE: The purpose of this document is to follow proper methodology to carry out the activities in a proper sequence for fabrication, Erection and Testing of the storage tanks. 3. REFERENCE: A! "#$ A%E %ec !' A%E %ec ( Tender %pecification.i.e. )*+)**+--+$+(+$+$$)+A0 (%%$$0 )*+)**+$$/1+$$+ $$)0 )*+)**+--+$$+(.$+$$#+A etc Approved 2rawing / %pecification. 4. RESPONSIBILITY: The responsibility of implementation of this procedure rests with 3onstruction anager of /% (ishal %tructurals vt. 4td. 5. METHOD OF CONSTRUCTION: 5.1 IDENTIFICATION OF MATERIALS Each iece of lates, fittings or any other component of tankage system shall be clearly identified by marking heat no. on the part 5e.g.6 !% $" 7r.8, 9.:o.+'''; using hard punching. Each weld <oint shall be marked with <oint :umber with =elder :umber. 5.2 FABRICATION WORK All fabrication work involving material identification, marking, cutting, rolling and welding shall be done in accordance with this <ob procedure, A! "#$ 54atest edition;, >E %pec and tender documents. The workmanship shall be good in every respect meeting all safety, ?3 & :2T requirements, with the coordination of Engineer+!n+3harge. Prepared by CONTRACTOR Concurred by Name : Design: Hindustan Petroleum Crop. Ltd. Approved by Name : Design: Hindustan Petroleum Crop. Ltd
15
Embed
1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
J O B P R O C E DU R E F O R F A BR IC A T IO N & E R E CTI O N O F T A NK AG E BY J A C K I NG ME T HO D
1. SCOPE:
This procedure covers detailed activities for fabrication, erection and testing of thestorage tanks, and also equipment & manpower required for the same. All the tasks /activities need to be carried out with atmost care with good workmanship and in
accordance with the specifications to achieve satisfactory completion of the wholeactivities.
2. PURPOSE:
The purpose of this document is to follow proper methodology to carry out theactivities in a proper sequence for fabrication, Erection and Testing of the storagetanks.
The responsibility of implementation of this procedure rests with 3onstructionanager of /% (ishal %tructurals vt. 4td.
5. METHOD OF CONSTRUCTION:
5.1 IDENTIFICATION OF MATERIALSEach iece of lates, fittings or any other component of tankage system shall beclearly identified by marking heat no. on the part 5e.g.6 !% $" 7r.8, 9.:o.+''';using hard punching.Each weld <oint shall be marked with <oint :umber with =elder :umber.
5.2 FABRICATION WORK
All fabrication work involving material identification, marking, cutting, rolling andwelding shall be done in accordance with this <ob procedure, A! "#$ 54atestedition;, >E %pec and tender documents. The workmanship shall be good in everyrespect meeting all safety, ?3 & :2T requirements, with the coordination of Engineer+!n+3harge.
Prepared by
CONTRACTOR
Concurred by
Name :Design:
Hindustan Petroleum Crop. Ltd.
Approved by
Name :Design:
Hindustan Petroleum Crop. Ltd
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
4ay all the plates, %tructural & pipes in such a way prior to fabrication tofacilitate proper checking of dimensions & heat no.
ark the components as per the drawings.
5.2.1 ANNULAR & BOTTOM PLATE FABRICATION:
ark the plates as per drawing 3arry out the cutting operation after proper inspection. All the cutting operation shall be carried out by 7as 3utting. 7rind the cut edges smooth to remove burrs and slag. %tack the plates at designated place in the fabrication yard in proper
sequence. 8acking @ strip shall be fitted and tacked with annular plate as per drg. After completion of the fabrication under side of annular and bottom plates shall
be blast cleaned and painted as per the specification to the satisfaction of theengineer+in+charge.
3heck the >oint osition, oot gap for welding after welding !nspection by weldvisual & :2T as per A! "#$ / Tender document.
5.2.2 SHELL PLATE FABRICATION
4ay all the plates in the open area such a way easy for marking and cutting. ark the plates as per drawing and to the satisfaction of Engineer+in+charge. The cutting operation includes beveling shall be carried out by gas cutting
method on all the four sides. 7rind the cut edges smooth to remove slag and burr. The edge prepared plates shall be shifted by hydra crane to the rolling area. The plates shall be fed to rolling m/c. by means of hydra crane & proper lifting
tools and tackles.
Prepared by
CONTRACTOR .
Concurred by
Name :
Design:
Hindustan Petroleum Crop. Ltd.
Approved by
Name :
Design:
Hindustan Petroleum Crop. Ltd
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
The plate shall be rolled as per drawing details and the radius shall be checkedusing Template.
roper care shall be taken for the smooth curvature. "BB 4ong 5# to "mm thk.; Template shall be used to check rolling curvature
accurately.
The Template shall be checked and cleared by inspection authority. The rolled plates shall be inspected and shall be within $mm. of tolerance
limit. The rolled plates shall be shift to shot blasting yard to carryout the shot blast
as per >E specification. Cinal profile and dimensions check shall be carried out before sent for rection.
5.2.3 ROOF PLATE FABRICATION
ark the roof plate as per drawing
All the cutting operation as per requirement shall be carried out after gettingthe clearance from the inspection authority.
All the cutting operation shall be carried out by gas cutting method on all thefour side.
7rind the cut edges smooth to remove burrs &slag. %tructural item of the roof shall be fabricated as per drawing. These roof plates shall be shifted to blasting yard to carryout the blasting and
painting.
Prepared by
CONTRACTOR .
Concurred by
Name :Design:
Hindustan Petroleum Crop. Ltd.
Approved by
Name :Design:
Hindustan Petroleum Crop. Ltd
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
inimum laps shall be maintained while the fit+up of long+seam as per approved
drg. >oggling shall be carried out by hammering wherever it necessary. 5Three plate
>oining <unction.;
8efore starting the welding, channels shall be tacked along the long+seam to avoid
the distortion.
After completion of shot seam welding long seam welding will be carried out
alternatively to avoid distortion.
?ualified welder shall be engaged and welding shall be carry out as per approved
=%.
After 3ompletion of welding thoroughly clean the weld I<oint by wire brushing and
grinding. %ketch to annular plate <oint shall be welded only after shell to bottom <oint welding.
All the bottom plateGs <oints vacuum boH test shall be carried out as per approved
procedure and code specification.
!f any defect found the defect weld shall be removed by grinding and re+weld and
conduct the vacuum boH test. epeat the sequence until the defect cleared.
5.3.3. SHELL COURSE ERECTION
After the completion of welding of Annular plates and bottom plates, mark the tankinner radius on the annular plates.
CiH # :os. of erection stools at the equal interval on the annular plates & transfer the inside tank diameter on the stools.
The top one shell courses shall be erected by conventional method. 8alance shell courses shall be erected by hydraulic <ack method. The rolled shell plates shall be shifted to the tank foundation area stacked around
the periphery by using hydra crane.
roper care shall be taken while handling the rolled plates.
3are shall be taken that the shell plate erected to the diameter marked on theannular plate.
>igs and fiHtures shall be use to align the shell plates. 3omplete the fit up eHcept the final <oint which shall be fitted and weld after
completion of the welding of the other <oints. 5To avoid the shrinkage;
Prepared by
CONTRACTOR .
Concurred by
Name :
Design:
Hindustan Petroleum Crop. Ltd.
Approved by
Name :
Design:
Hindustan Petroleum Crop. Ltd
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
eaking to be checked after the fit+up of the vertical <oints. eaking shall be withinthe tolerance as per A! + "#$. 5Tolerance )/J;
eaking shall be checked at top, middle and bottom of the vertical <oints using a
%weep board of "K long.
lumbness shall be checked for the verticality of the shell course at every "$L
and shall be within the tolerance 5tolerance )/$$ of the total shell height;
Cor perfect verticality, channels shall be provided at the regular interval inside of
the shell course 5 to # meters; roviding the channels shall be facilitates the
alignment last shall course. Tack welds of the fitted vertical <oints shall be ground smooth. Fffer for inspection and get clearance from Engineer+in+charge for the vertical
fit+up 3omplete the first side welding by using qualified welders. 3are shall be taken while the welding to avoid the peaking and the roundness
distortion After completion of first side welding, back+chip shall be carried out for sound metal
from other side of the weld by grinding.
8ack+chipped grooves shall be offered for inspection before starting the welding.
3omplete the nd side welding using qualified welders.
>oint :os. & welder :o. shall be marked on both side of the weld .<oint.
3are shall be taken to avoid the peaking and roundness distortion. 3lean weld <oints from both sides by wire brushing and grinding. After completion of welding from both sides remove all the temporary <igs and
fiHtures and flush grind the tacks. 52o the weld fill up wherever required; and the
portion checked by 2..test.
3heck the peaking, plumb ness, circumference and the radius, offer for inspectionto the satisfaction of the Engineer+in+3harge.
Erect last shell course plate on top of the erected shell plate, mm thick spacersshall be kept between first and last but one shell course plates to maintainhoriDontal seam gap.
Erection channels shall be fiHed between last but one shell course plates andlast shell course plates at regular intervals to align and hold the last shell in
vertical position.
Prepared by
CONTRACTOR .
Concurred by
Name :
Design:Hindustan Petroleum Crop. Ltd.
Approved by
Name :
Design:Hindustan Petroleum Crop. Ltd
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
After all the shell plates for last shell course is erected, fit+up the vertical <oint using
<ig plates which has been fiHed during erection and tack weld the <oints. 3heck peaking at vertical <oints of shell using a sweep board of "J wide,
acceptable tolerance shall the as per A!+"#$ clause #.#. 5local deviation shallnot eHceed )/J;
3omplete welding of last course vertical seam inside after getting clearance fromthe Engineer+in+charge.
8ack chip & welding shall be carried out following as same as for other shellcourse to the satisfaction of Engineer + in + 3harge. After completion of welding, weld visual, peaking & circumference shall be
checked out and recorded to the satisfaction of Engineer + in+3harge. Cit up the 9oriDontal seam between top shell courses and tack welded, remove the
spacers provided during erection, tack weld shall be ground smooth and ensurethat the tacks are sound and there are no defects like cracks and porosity etc.
3heck peaking at vertical <oints of shell using a sweep board of "J wide,acceptable clearance shall be as per A! "#$ clause #.#. 5local deviation shallnot eHceed )/J; Msing a vertical sweep board "J long, check banding athoriDontal <oints. 2eviation shall not eHceed )/J.
3heck (erticality of the last shell course, (erticality 5plumb ness; tolerance shall
be as per A! + "#$ clause #.#. 5maH. out of plumbness at the top of the shellrelative to the bottom of the shell not to eHceed )/$$ of total shell height from top
of last shell to 8ottom; =hile welding care shall be taken for banding and the roundness.
8ack+chip shall be carried out by grinding for the sound metal and to the
satisfaction of Engineer+in+3harge. 3omplete the nd side welding and clean the <oint thoroughly from both sides by
grinding and wire brushing. 3heck banding, plumb ness and recorded in the approved format to the
satisfaction of Engineer + !n+3harge. Fffer weld visual to the satisfaction of Engineer+!n+3harge. .
ark the T spots as per the instruction of the Engineer +!n+3harge, and completethe T as per A! + "#$ %ec+" requirements.
Prepared by
CONTRACTOR .
Concurred by
Name :
Design:Hindustan Petroleum Crop. Ltd.
Approved by
Name :
Design:Hindustan Petroleum Crop. Ltd
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
Fffer the T film for reviewing to the Engineer+!n+3harge, and if any repair occursthe repair spot shall be repaired by grinding for the sound metal, e+ weld therepair spot as per code A! +"#$ sec+" requirements.
Take the repair spot T and re offer for the inspection to the satisfaction of Engineer+!n+ 3harge
%piral staircase Erection shall be carried out as per drawing including brackets.
emove all the temporary cleats and tacks by grinding. !nstall <acks as per requirement and the distance between the <acks shall not be
more than .# meter. 3onnect the power pack and check the total system is readyfor erection of the shell.
!nstall the <acking cleats on the bottom shell course 5inside; and weld soundly thecleats to the shell. oof structure & oof shall be erected then start <acking.
%tart <acking of the assembly of top two shell course along with the wind girder.4ift till the required space for the lower shell course plate width N Erection chair height. 5$$O#$ mm;
Erect the lower shell course by using the 9ydra crane for shifting and position theplates.
Alignment and fit up shall be carried out by using <igs and fiHture and as per drawing offer the fit up for inspection.
Collowed by welding, weld visual, peaking and plumb ness before and after as
mentioned above for the top two shell courses.
After completion of the welding lower down the <acked up assembly on top of rdshell from top.$ mm thick spacer shall be kept between rd and nd shell from topto maintain the 9oriDontal <oint gap.
Cit up the 9oriDontal <oint between rd and nd shell courses from top using <igsand fiHtures and tack weld, remove the spacers provided during erection. Tackshall be ground smooth, check the banding and record. Fffer fit up and banding tothe satisfaction of Engineer+!n+3harge.
Collowed by welding, banding & plumb ness before and after welding shall becarried out as mentioned for the above 9oriDontal <oint.
T shall be carried out and cleared before the neHt lifting ortion of the spiral stairway shall be erected as per drawing
Prepared by
CONTRACTOR .
Concurred by
Name :
Design:Hindustan Petroleum Crop. Ltd.
Approved by
Name :
Design:Hindustan Petroleum Crop. Ltd
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
After clearance from inspection, the <acking cleats shall be fitted to rd shell fromtop course plates and the total assembly shall be <acked up by required height for erection of the all the shell courses.
!n the same manner erect all the shell courses and spiral stairway. The )
stshell course plates shall be erected, provide min. " mm thick packing plates
at required location in each shell plate to facilitate proper welding of the bottommost portion of the vertical <oint. This packing plate shall not be removed untilcommencement of shell to annular fit up. 4eave the final shell plate open byproviding angular frame in order for deck plate shifting and working.
After completion of welding of vertical seams of the )st shell course by followingabovementioned process and the 9oriDontal <oint between the shell courses ) and shall be aligned by lowering the <acks and the fit up shall be carried out.
Collow the above+mentioned process for the horiDontal <oint welding andclearance.
T shall be carried out as per A!+"#$ %ec." %hell to annular plate <oint shall be carried out using <igs and fiHture. After getting fit up clearance for welding, root weld shall be carried out from
inside.
After completion of inside welding clean the weld thoroughly by wire brushing,grinding and buffing.
The shell to bottom <oint area from both sides shall be cleaned thoroughly to carryout the chalk+diesel test.
Apply chalk solution from inside. Apply diesel by a hand spray pump from out side. 9old it as per instruction of the Engineer+!n+3harge and check the root weld for
any defect. !f any defect found the defect shall be repaired by grinding the defect area for the
sound metal plus )#$mm from both end of the defect. 3onduct the chalk + diesel test on the repair spot. 3arry out the whole process until
the repair cleared to the satisfaction of Engineer + !n @ 3harge.
Prepared by
CONTRACTOR .
Concurred by
Name :
Design:
Hindustan Petroleum Crop. Ltd.
Approved by
Name :
Design:
Hindustan Petroleum Crop. Ltd
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
After completion of shell to bottom out side welding visual inspection will becarried out to the satisfaction of the Engineer+!n+3harge.
Fn completion of shell to bottom welding / :2T and having completed all erectionand welding work on the tank inside related to the roof and roof structure, allunwanted materials and scrap shall be removed from inside of the tank.
T of vertical and horiDontal <oint shall be completed. %ketch to annular plate <oint fit up shall be carried out and complete the welding. (acuum boH test the shall be carried out for the bottom plate short seam, long
seam and sketch to annular plate <oint.
!f any repair occurs the same shall be repaired and re+tested as per the approvedprocedure and A!+"#$.
5.3.4 ERECTION OF CONE ROOF PLATES AND STRUCTURES
After completion of the Top two shell courses erection, fit up, welding and curb ringfit up & welding shall be done.
Erect the fabricated 3entre 2rum, oof Truss, and cross girders as per drawing. 3omplete the welding of oof structure by approved welders and as per approved
=%. Erect and 4ay the oof plates on the structure as per the 2rg. =hile fit up of the short seams and long seams 4ap to be maintained as per 2rg
=eld the short seams by welding alternative <oint or sequence mentioned in the2rg.to prevents the distortion.
rovided proper support lengthwise of the long seam and weld the <oints as per 2rg. sequence.
oof :oDDles and top shell noDDles fit+up and welding shall be carryout as per theapproved drawing and subsequently it has to be correlated with the concern pipingdrawing.
Prepared by
CONTRACTOR .
Concurred by
Name :
Design:
Hindustan Petroleum Crop. Ltd.
Approved by
Name :
Design:
Hindustan Petroleum Crop. Ltd
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
Clanges to pipe <oint shall be prefabricated and required :2T shall be completedbefore erection.
ark the noDDle location as per drawings. 3ut the openings by gas cutting after proper !nspection+by+inspection authority.
Erect the noDDles as per the orientation & the elevation shown in the drawing. !nstall C. pads wherever required before noDDle erection %uitable <igs & fiHtures shall be provided to prevent the distortion during the
welding.
After completion of bottom shell course welding shell noDDles shall be marked asper drawing and offer for inspection.
3ut open the noDDle opening, install the C. ads and erect the noDDles
5prefabricated; as per drawing. Frientation, elevation & pro<ection shall be maintained as per drawing and offer for
the inspection clearance. roper care shall be taken for the welding by providing <igs & CiHtures to prevent
distortion. =elding shall be as per =% and to be welded by the qualified welder. an+9ole neck shall be fabricated and the longitudinal <oint shall be radio
graphed.
All the C ad weld shall be pneumatically tested at an pressure of ).$# Pg/3m C. ad pneumatic test shall be carried out to the satisfaction of the engineer+in+
charge. All the shell noDDles final weld from both sides and C. ads welds shall be
inspected by visually and by 4T, to the satisfaction of the engineer+in+charge.
Prepared by
CONTRACTOR .
Concurred by
Name :
Design:
Hindustan Petroleum Crop.
Ltd.
Approved by
Name :
Design:
Hindustan Petroleum Crop.
Ltd
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
9ydra )$T / )T capacity. =elding transformers /ectifiers $$ a & "$$ a =elding generators. adiography source !r )-. Test ump. =ater pump Transporting Equipment. late bending achine.
ipe 8ending achine
9ydraulic >ack ) T Qwith power pack & accessoriesR and other required equipment.
7rinding machine QA7 + , A7 + , 7? @ & CCR 7as cutting equipment Qug cutting m/c & hand cutting m/cR (acuum pump and vacuum boH with 7auge. (ernier 3aliper 4ifting Tools & Tackles and 2errick other & ortable Fven All easuring Tape 5$ , )# , #, .; iano =ire, lumbob 59eavy weight;
(iewer
Aluminum 4adder + :os. )v 9and lamp set for all four tanks. EHhaust fan for all four tanks. 27 set with panel board separately for welding ectifiers and 7rinding. Elcometer r.7auge, Air+3ompressor etc.
$. MAN POWER
A% E E?M!EE:T
Prepared by
CONTRACTOR
Concurred by
Hindustan Petroleum Crop. Ltd.
Approved by
Hindustan Petroleum Crop. Ltd
7/23/2019 1)JOB PROCEDURE for Tank( How to Fabricate or Eriction) Important
This shall be followed and maintained with the compliance / adherence to the drawings,procedure and code specification. ecords shall be kept in the relevant check sheet andformats duly signed by all the concerned departments.
. SAFETY
Tested & certified 4ifting equipments should be used for lifting and shiftingpurpose.
%afety recautions should be followed during fabrication and erection as per >Especification.
=elding cables and power cables to be laid properly as per !E rules and local stategovt. rules.
roper house keeping and clean condition shall be maintained in the fabricationshop and site as per requirement.
1'. RECORDS
Coundation hand over report
aterial !nspection ecords
Electrode, 3onsumables etc. verification record =elding !nspection report :2T reports Test reports
Prepared by
CONTRACTOR .
Concurred by
Name :
Design:
Hindustan Petroleum Crop. Ltd.
Approved by
Name :
Design:
Hindustan Petroleum Crop. Ltd