1 HG2013 3-6 may 2013 Trieste Testing with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics
22

1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Dec 23, 2015

Download

Documents

Evelyn Simpson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 1HG2013 3-6 may 2013 Trieste

Testing with beams in CTF3: breakdown kick and advanced diagnostics

Page 2: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 2

Contents

• Two Beam test stand equipments and tools• Beam used for structures RF diagnostics• Energy gain / spread measurement and optimization• RF power measurements• BD detection• Test bench for beam diagnostics• Wake Field Monitors study• Beam kicks study• Beam shape distortion and multipolar field modeling• Conclusion

HG2013 3-6 may 2013 Trieste

Page 3: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 3HG2013 3-6 may 2013 Trieste

Drive beam(24 Amps)

Probe beam(1 Amp)

QuadrupolesDipoles

BPMs PMTs

Correctors

Screens

Variable phase shifters& On/Off mechanisms

RF couplers

Water thermal probes and flow meters

Ion analyzerFCU

Wake Field Monitors

Spectrometer lines

The Two Beam Test Stand

Franck Peauger - IRFUGermana Riddone

Page 4: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 4

Operational models for beam optimization

HG2013 3-6 may 2013 Trieste

For beam focusing:Current in quadrupoles -> beam enveloppe.

For beam trajectory:Current in correctors -> beam position on BPMs

From Quad scan…

… to beam optimization.

Page 5: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 5

Tuning frequency validation of the structures

HG2013 3-6 may 2013 Trieste 5

LO = 11994.2 - 10 MHz LO = 11994.2 - 1 MHz LO = 11994.2 MHz

LO = 11994.2 + 1 MHz LO = 11994.2 + 2 MHz LO = 11994.2 + 10 MHz

• RF output generated by a short beam pulse (3 ns: 5 bunches) is down-mixed with a local reference oscillator -> structure resonant frequency .

• Nominal tuning: 11.9942 GHz checked (accuracy < 1 MHz).

Page 6: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 6

RF production with longer pulses

HG2013 3-6 may 2013 Trieste

Pulse 150 ns LO = 11894.2 MHz Pulse 194 ns LO = 11994.2 MHz

Extracted Faraday cup acts as a button pick-up

• RF output frequency forced by the probe beam pulse frequency RF output rising time = ACS filling time (65 ns)RF output rising time + sustain time = pulse lengthRF output falling time = ACS filling time (65 ns)

• Delays between the (RF couplers , Faraday cup, BPMs, PMTs, WFMs) -> instrumentation calibration

Page 7: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 7

Energy gain measurement

HG2013 3-6 may 2013 Trieste

• Accelerated /non-accelerated beam -> dipole strength to be adapted • Califes beam energy fluctuation +/- 2 MeV , period around 150 s

(temperature oscillations ?)• Sinusoidal function fit -> valid at least during 30 minutes

Accurate measurement of the energy gain despite CALIFES beam energy fluctuations.

Double pulsing method for energy gain lower than 30 MeV

Page 8: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 8

Energy gain optimization

HG2013 3-6 may 2013 Trieste

• Inter-structures phase shifter position set for no acceleration whatever Drive Beam / Califes phase.

• This phase is then shifted by 180 deg -> accelerating crest.

RF power control

• PETS On/Off mechanism • Timing between drive beam pulse and probe beam pulse.• 2 phase shifters (RF/ probe beam phase and inter-structures phase)

Drive beam and probe beam detected by PMT

Structures phase in opposition

Page 9: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 9

Energy gain as function of RF power check

HG2013 3-6 may 2013 Trieste

Phase scan

Power fluctuations

Energy gain lower than the nominal one -> uncertainties in the calibration of the RF chains ?

• Califes / Drive beam phase scanned over 360 deg of 12 GHz

Page 10: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 10

Thermal method for RF power measurements

HG2013 3-6 may 2013 Trieste

Water cooling circuit

Finite differences thermal model of structure and cooling circuit.

• Inlet/outlet water temperature difference -> mean RF power deposited• 10 % discrepancy factor found (power overvalued by the RF couplers)

0.02 oC

Page 11: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 11

Reviewed power and energy spread

HG2013 3-6 may 2013 Trieste

Structures performances much closer to the nominal

Energy spread maximal at the zero crossing due the phase extension of the bunch on the 12 GHz period -> bunch length measurement method.

Page 12: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 12

Reliable breakdown detection on 2 ACSs

HG2013 3-6 may 2013 Trieste

• Two criteria used: Reflected Power and Missing Energy

Miss = Enerin – Enerout x attenuation

• Data are post processed with adaptative thresholds.Thresholds = mean + 3.72 s

[ PGauss(X>3.72s) = 10-4]

• Compromise between Detection prob. and False Alarm prob.

• A BD sometime triggers the other structure BD.

• Reflected power and Missing energy are data logged for each RF pulse• Faraday cup and Photomultiplier tube activity also used to confirm BD

Page 13: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 13

Test bench for beam diagnosticsRui Pan (PhD student), Electro-0ptical Bunch Profile Measurement at CTF3 IPAC’13 MOPME077.

HG2013 3-6 may 2013 Trieste

Inside CLEX optical tables for laser beam injection

F. Cullinan (PhD student), J. Towner A Prototype Cavity Beam Position Monitor for the CLIC Main Beam, IBIC'12 MOPA18

Sophie Mallows(PhD student), A fiber Based BLM System Research and Development at CERN, HB2012 THO3C05

Position and beam charge linearity

Page 14: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 14

Wake Field Monitors as BPMs

HG2013 3-6 may 2013 Trieste

0.12 mm

• Two types of WFM installed on the structures : (HOMs: 18 GHz and 24 GHz). • Resolution already better than 20 mm.• First successful results: realignment of the ACSs tank.• Robustness with nominal 12 GHz RF power (42 MW) still under investigation

F. Peauger - IRFU

18 GHz on diodes

24 GHz on log

detectors

WFM signals without 12 GHz RF power

WFM signals with RF power

WFM signals from a PB pulse

Page 15: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 15

Breakdown beam kick studyPhD research of A. Palaia

HG2013 3-6 may 2013 Trieste

• Average measured kick to the beam orbit : 29 +/- 14 keV• Kicks angle measured not isotropic, not clear why

cavity BPM CA.BPM0745V

0.68 mm0.75 mm

Screen MTV 790

w/o BD With BD

Page 16: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 16

Beam observed on MTV0790

HG2013 3-6 may 2013 Trieste

Hor

. Pos

ition

[mm

]

Vert. Pos.

• Beam kicks during acceleration observed, especially when beam is passing off-axis through the 12 GHz structures.

• Beam shape can also be distorted

Horizontal beam kick during scan in horizontal positions within the ACSs

Non-accelerated (left) and accelerated (right) beam shapes observed on the straight line screen, 4.75 m downstream the ACS

accelerated

non accelerated

[mm]

Page 17: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 17

Observation of octupolar shapes

HG2013 3-6 may 2013 Trieste

Without RF power

At zero-crossing (rising RF power

side), 25 MW

At zero-crossing (falling RF power

side)

On crests (accelerating or

decelerating)

• Used of a non-focused beam to fully observe beam shape distortion -> full structure aperture covered (4.7 mm bore diameter).

• The octupolar beam shape changes from positive to negative at the RF crest phases.

Page 18: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 18

Modeling of the octupolar fields

HG2013 3-6 may 2013 Trieste

A. Grudiev

0 0.05 0.1 0.15 0.2 0.25 0.3 0.35-10

0

10on crest

{E

acc

(0)

} [V

/m]

@ 1

V

r = 2 mm

r = 1 mmr = 0

0 0.05 0.1 0.15 0.2 0.25 0.3 0.35-10

0

10

{E

acc

(1)

} [V

/m2 ]

@ 1

V

0 0.05 0.1 0.15 0.2 0.25 0.3 0.35-1

0

1x 10

4

{E

acc

(2)

} [V

/m3 ]

@ 1

V

0 0.05 0.1 0.15 0.2 0.25 0.3 0.35-2

0

2x 10

6

{E

acc

(3)

} [V

/m4 ]

@ 1

V

0 0.05 0.1 0.15 0.2 0.25 0.3 0.35-2

0

2x 10

9

{E

acc

(4)

} [V

/m5 ]

@ 1

V

z [m]

Comparison b(4) @Vx=1VLF: 0.17 +3.23i [mTm/m2]PW: 0.22 +3.22i [mTm/m2]

0 0.05 0.1 0.15 0.2 0.25 0.3 0.35-0.08

-0.06

-0.04

-0.02

0

0.02

0.04

0.06

0.08

z [m]

Oct

upol

ar k

ick

in [

T/m

3 ] @

1V

90o off crest

F(4)x /ec

j4/w*Eacc(4)

Dipolar field

Quadrupolar field

Sextupolar field

Octupolar field

Panofsky-Wenzel (PW) theorem

Lorenz Force (LF)or

Page 19: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 19

sjnr

ns

n ebnunuerrp )(1)( )sin()cos(),,(

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 0 MeV

Consequences

HG2013 3-6 may 2013 Trieste

for Vz = 22.8 MV; Pin = 46.5 MWTD24_vg1p8

f [GHz] 11.994

Vz(x=0) [MV] 22.8 +0i

Vx [MV] 0

b(2) [mTm/m] 0 - 15i

b(3) [Tm/m2 ] 0

b(4) [kTm/m3] -4.6 +73.4i

ΔVy@Δx=2mm/structure Δx after 5m for 180 MeV beam

18 V

176000 V ~5 mm

A. Grudiev

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

Beam spots in the structure Beam spots on the screen-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 0.5 MeV

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 1 MeV

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 1.5 MeV

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 2 MeV

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 2.5 MeV

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 3 MeV

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 3.5 MeV

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 4 MeV

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 4.5 MeV

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 5 MeV

-4 -3 -2 -1 0 1 2 3 4

x 10-3

-4

-3

-2

-1

0

1

2

3

4x 10

-3

x [mm]

y [m

m]

Vz = 6 MeV

Page 20: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 20

Conclusion• A facility with a well controlled beam and a full

set of diagnostics is an important tool for testing RF structures.

• In addition it attracts many users and PhD students who develop innovative diagnostics.

• But of course it requires significant resources for operation and maintenance.

HG2013 3-6 may 2013 Trieste

I would like to thank all of them, CERN staff and collaborators, for their constant effort in running CTF3.

Page 21: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 21HG2013 3-6 may 2013 Trieste

Page 22: 1HG2013 3-6 may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.

Testing with beam in CTF3 - W. Farabolini 22

Detail of the computations

HG2013 3-6 may 2013 Trieste

Ln

rnn

L

kickzkick

L

cvz

kickzkickcvkickzkick

zcj

kick

zcj

kick

dzFnunurc

rp

dzHuZEc

edz

v

Frp

HuZEeBvEeF

eHHeEE

z

z

0

)(1)(

0

0

0

0

)sin()cos(1

),(

),(

;

)(1)(

0

)sin()cos(),(

1:where

~for;),,(),(

naccr

nn

r

tjL

acc

Vnununrje

rp

ru

ru

eEzrEdzje

rp

n

nnacc

n

innnaccacc

Lnacc

nacc

L

accacc

zcj

zacc

nrVerVrV

dzzEVdzzrErV

ezrEzrE

)cos(),(

)(;),,(),(

),,(),,(

)()(

0

)()(

0

Accelerating gradient:

Accelerating voltage:

Multipole expansion in vacuum only:

Panofsky-Wenzel (PW) theorem:

Gives an expression for multipolar RF kicks:

Lorenz Force (LF):Gives an expression for kick directly from the RF EM fields:

Which can be decomposed into multipoles:

Equating the RF and magnetic kicks, RF kick strength can be expressed in magnetic units:

]/[1

]/[1

1

0

)(

0

)()()(

1)()()(

nL

nacc

Lnnn

nnacc

nn

mTmVnj

dzFec

dzBb

mTEnj

Fec

B

A. Grudiev