    Rapid Development of a Flood

    Acquisition Project

    Decisions and Opportunities

    Illinois Association for Floodplain and Stormwater Management

    2012 Annual Conference March 14, 2012

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    2/18

    What makes a good project?

    Review of risk and/or previous damage

    caused by hazards, matched with an activitythat produces a reasonable level of protection

    for the cost involved

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    3/18

    Benefits of Project Scoping

    Helpsestablishthat

    youreontheright

    track

    Developsalternatives

    thatensures

    the

    selectedactionis

    eligibleand

    competitive

    Allowsyoutosync

    yourmitigationidea

    withthe

    appropriate

    fundingmechanism

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    4/18

    Initial Project Scoping

    Usethebestinformationavailabletoidentify:

    Vulnerableareas

    Mitigationsolutions

    and

    alternatives

    Bestinformationmayincludedocumentssuch

    as:

    Localhazardmitigationplan

    Specialstudies

    and

    reports

    FloodInsuranceRateMaps

    PreliminaryDamageAssessmentData

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    5/18

    Scoping Components

    Eligible

    Project?

    Cost

    Effectiveness

    Environmental

    Impacts

    Eligibilityand

    Feasibility

    Other

    FactorsHistoricPreservationCommunitySupport

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    6/18

    Scoping Project Eligibility

    Confirmthattheproject:

    Communityhasanapprovedlocalmitigation

    plan

    Conformswithstateandlocalmitigation

    plans

    Meetsallprogramspecificeligibility

    requirements

    Independently

    solves

    a

    problem

    caused

    by

    hazards

    Directlyreducesdamages

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    7/18

    Scoping Feasibility

    ProjectEffectiveness

    howwellwilltheprojectreducelosses?

    definedby

    the

    level

    of

    protection

    provided

    by

    the

    project

    Sinceproject

    effectiveness

    is

    generally

    linked

    to

    thelevelofdesign,someamountofconceptual

    engineeringreviewwillberequired

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    8/18

    Scoping Feasibility

    Howwillitmitigatethelosses?

    Whatis

    the

    proposed

    and

    possible

    level

    of

    protection

    of

    mitigatingthehazard?

    Whatwill

    be

    the

    residual

    risk

    after

    mitigation?

    Cantheprojectbeconstructed?

    Whataretheanticipatedimpactsofconstruction?

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    9/18

    Scoping Cost Effectiveness

    Calculationofriskisbasedonfrequencyandseverityof

    thehazard(s)

    Higherthe

    frequency

    and

    severity,

    the

    higher

    the

    risk

    Projectsthateffectivelymitigatehighrisksituationsare

    usuallycosteffective

    Costeffectivenessrepresentshowoftentheinvestment

    ofmitigationwillproduceareturn

    Addressesexpected

    and

    historical

    damages

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    10/18

    Scoping Cost Effectiveness

    AccuratepreparationofaBCAisacriticalelementofa

    projectapplication

    Projectsubapplication

    BCR

    must

    be

    1.0

    or

    greater

    Alldataentries(otherthanFEMAstandardordefault

    values)MUSTbedocumentedintheapplication

    DataMUSTbefromacrediblesource

    ContactyourSHMOaboutBCAtechnicalassistanceand

    trainingopportunities

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    11/18

    Scoping Environmental Impacts

    Whatareenvironmentalconcernsoftheproject?

    Minorornegligible

    Major(e.g.

    moving

    flooding

    problem

    downstream)

    Cantheprojectbepermitted?

    Willenvironmental

    issues

    impact

    project

    design?

    Adjustcostestimateaccordingly

    Doesenvironmentalremediationneedtobe

    includedin

    the

    project

    design?

    Adjustcostestimateaccordingly

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    12/18

    Scoping Historic Preservation

    Structuresover50yearsoldrequireahistoric

    preservationreview

    Coordinatewith

    the

    SHMO

    and

    SHPO

    Mayrequireactionssuchasrecordation

    beforedemolition

    Adjustcostestimateaccordingly

    Scopethepropermitigationactionforthe

    structure

    Considerelevationorrelocationvs.

    demolition

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    13/18

    Scoping Community Support

    Istheprojectacceptabletothecommunity?

    Istheprojectacceptabletothejurisdictionslegislative

    body?

    Arepropertyownersinterestedinparticipating?

    Canthecommunity,Stateorpropertyownersupplythe

    localmatch?

    Canthe

    community

    manage

    the

    project?

    Doesthecommunityhavethenecessarytechnical

    resourcestodevelopandimplementtheproject?

    Isthe

    community

    willing

    and

    able

    to

    maintain

    the

    implementedmeasure?

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    14/18

    Scoping Summary

    Byusingascopingandselectionprocess,youcanconfirm

    thatyouhaveagoodproject,oreliminateapoorproject

    early

    in

    the

    process

    Nextstepistoclearlyandcompletelyarticulatehowyou

    haveestablishedagoodprojectthroughapplication

    development

    Thecomparisonofalternativesshouldbedocumented

    andyoushouldhaveacompletedecisionmakingprocess

    outlined

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    15/18

    Available Funding Sources

    FederalprogramssuchasHMGP,PDM,FMA,RFC,SRL

    ConsultwithyourSHMOonthebestfundingsourcefor

    your

    project

    Localprograms

    Generalorcapitalfunds

    Revolvingloan

    funds

    CDBGFundsPassThrough

    Utilitytaxes(e.g.stormwater)

    Propertyownerresponsibility

    InKind

    Projectmanagement

    Labor,equipment,materials

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    16/18

    Important Considerations for Project

    Application Development CoordinatewithyourSHMOearlyintheprocess

    Assumethereviewerdoesnotknowanythingaboutyour

    area/regionand

    may

    never

    be

    able

    to

    visit

    the

    project

    site

    Mostoftheinformationusedtoevaluatealternative

    projectswillbeneededintheapplication

    Fullydescribetheresultsoftheprojectsdecisionmaking

    process

    Readtheprogramguidancecarefullyandprovide

    informationaccordingly

    Beginpreparingtheenvironmentalworkearlyinthe

    process

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    17/18

  • 8/13/2019 1A_Rapid Deployment of a Floood Acquisition Project

    18/18

    Summary

    Wellpreparedapplicationsdonotalwaysmeanyouhave

    aneligibleandcompetitiveproject

    Thebestpreparedapplicationwillnotbesuccessfulifthe

    projectisnotfeasibleandeffectiveinmitigatingthehazard(s)identified

    Effectiveprojectidentification,scoping,andscreeningis

    essential

    Startearly!

    NotallmitigationactivitiesareeligibleforFEMAfunding.

    Aproject

    may

    be

    ahigh

    community

    priority

    but

    just

    not

    therightfitunderFEMAHMAprograms