Document No. / Numéro de document: 18RF 31170 TS 001
Doc. Collection ID ID de la collection de doc.
SI Répertoire du sujet
Section Serial No. N
o de série
Document Details / Détails sur le document
Title
Titre
Total no. of pages
Nbre total de pages
Seal Ring for the End Fitting to Feeder Pipe Connection 21
For Release Information, refer to the Document Transmittal Sheet accompanying this document. / Pour des renseignements portant sur la diffusion, consultez la feuille de transmission de documents ci-jointe.
Revision History / Liste de révisions
Revision / Révision
Details of Rev. / Détails de la rév. Prepared by Rédigé par
Reviewed by Examiné par
Approved by Approuvé par
No./No
Date (yyyy/mm/dd)
dsfpdffm 18RF-31170-TS-001 2011/07/15
D1 2011/05/20 Issued for “Review and Comment”. C. Georgescu S. Afzalimehr
A. Crandell D. Zdravecky
V. Tume
T. De
0 2011/07/15 Issued as “Approved for Use”. C. Georgescu A. Crandell V. Bleoca
7.1.1 C3 - Inspection and Test Plan (Quality Plan) .............................................. 7-1 7.1.2 C4 - Inspection and Test Procedures ........................................................... 7-1
8. INSPECTION, TEST AND REPORTS ............................................................ 8-1
8.1 General ............................................................................................................ 8-1
8.2 Inspection and Test Failure .............................................................................. 8-1 8.3 Re-inspection ................................................................................................... 8-1
9. QUALITY CONTROL RECORDS ................................................................. 9-1
9.1 Contents of File ................................................................................................ 9-1
9.2 Maintenance and Access to Records ................................................................. 9-1 9.3 History File ...................................................................................................... 9-1
10. PACKAGING AND SHIPMENT ...................................................................10-1
PROTECTED - SENSITIVE
18RF-31170-TS-001 Page 1-1
Rev. 0
18RF-31170-TS-001 2011/07/15
1. SCOPE
This document establishes the technical requirements for the manufacturing, inspection, testing,
packaging and shipping of the Seal Rings for the end fitting to feeder pipe connections for the
Embalse Life Extension Project.
Note: Where dual values / dimensions (Imperial and Metric) are given in the text, the base
design unit is indicated by an underline.
PROTECTED - SENSITIVE
18RF-31170-TS-001 Page 2-1
Rev. 0
18RF-31170-TS-001 2011/07/15
2. ABBREVIATIONS
AR Authorized Representative.
AECL Atomic Energy of Canada Limited
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
ITP Inspection and Testing Plan
PT Liquid Penetrant Examination
MT Magnetic Particle Examination
NASA Nucleoelectrica Argentina Sociedad Anonima
NDE Nondestructive Examination
QA Quality Assurance
TS Technical Specification
TRP Technical Requirement Package
PROTECTED - SENSITIVE
18RF-31170-TS-001 Page 3-1
Rev. 0
18RF-31170-TS-001 2011/07/15
3. DEFINITION OF TERMS
In this document, unless the context specifies otherwise, the following meaning shall apply:
“The Purchaser” means the Nucleoelectrica Argentina Sociedad Anonima.
“The Supplier” means the company rewarded with the contract.
PROTECTED - SENSITIVE
18RF-31170-TS-001 Page 4-1
Rev. 0
18RF-31170-TS-001 2011/07/15
4. APPLICABLE CODES, STANDARDS AND DRAWINGS
All documents listed below shall apply as specified herein. In the event of any conflict between
the requirements in this Technical Specification (TS) and those in the documents listed below, or
between the Technical Requirements Package (TRP) and this TS, the Purchaser shall be notified
and the governing requirements shall be at the discretion of the Purchaser.
4.1 Drawings
The drawing applicable to the Seal Ring is listed in the TRP. The Supplier shall prepare all the
necessary shop drawings required for manufacturing. The shop drawings shall be submitted to
the Purchaser for review and acceptance prior to issuance to manufacturing.
4.2 Codes, Standards and Specifications
The Supplier shall conform to and have available for reference copies of the applicable codes
and standards as listed in this document. The Supplier shall ask and obtain approval from the
Purchaser in order to use standards other than those listed in this document.
Code or Standard Edition Title
CSA CANADIAN STANDARDS ASSOCIATION
CSA B95 1962
(R 2002)
Surface Texture (Roughness, Waviness, and Lay)
CSA-N285.0 2006,
Including
2007 update
No. 1
General Requirements for Pressure Retaining Systems and
Components in CANDU Nuclear Power Plants
ASME BPVC AMERICAN SOCIETY OF MECHANICAL
ENGINEERS BOILER & PRESSURE VESSEL
CODE
Section II, Part A 2004 ASME Boiler and Pressure Vessel Code, Ferrous Material
Specifications
Section III,
Subsection NB
2004 ASME Boiler and Pressure Vessel Code, Rules for
Construction of Nuclear Power Plant Components, Class 1
Components
Section III,
Subsection NCA
2004 ASME Boiler and Pressure Vessel Code, General
Requirements
Section V 2004 ASME Boiler and Pressure Vessel Code, Nondestructive
Examination
ASME BPVC MATERIAL SPECIFICATIONS
Section II, Part A
SA-479 / SA-479M
2004 Specification for Stainless Steel Bars and Shapes for Use
in Boilers and Other Pressure Vessels
Section II, Part A
SA-370
2004 Test Methods and Definitions for Mechanical Testing of
Aqueous cleaning materials, when analysed by techniques acceptable to the Purchaser, shall
contain less than 100 g of halogens per gram of made up solution and the sulphur content shall
be less than 350 g per gram of made up solution.
Certification of the halogen and sulphur content in accordance with the above requirements shall
be provided for each batch number for each material and the actual test results shall be reported
when applicable.
6.6 Passivation
The Seal Rings shall be passivated. Passivation shall be performed in accordance with
ASTM A967 and ASTM A380 (Table A2.1 Part II), including recommendations and precautions
for acid cleaning of stainless steels. The passivation procedures shall be submitted to the
Purchaser for review and acceptance.
PROTECTED - SENSITIVE
18RF-31170-TS-001 Page 6-3
Rev. 0
18RF-31170-TS-001 2011/07/15
6.7 Identification
Each Seal Ring shall be permanently marked on the surface indicated in the drawing. The mark
shall contain the information listed below:
a) The Material Code;
b) The Heat Number and Heat Treatment Batch Number of Material;
c) The Unique Serial Number;
d) The Supplier’s Identification.
PROTECTED - SENSITIVE
18RF-31170-TS-001 Page 7-1
Rev. 0
18RF-31170-TS-001 2011/07/15
7. QUALITY ASSURANCE REQUIREMENTS
All activities associated with the manufacturing and supply of the Seal Rings shall meet the
requirements of CSA N285.0 / ASME Section III NCA-3800.
The Supplier Quality Assurance (QA) program shall meet the requirements of ISO 9001 and the
requirements in Section 7.1. Any exclusion, permitted under clause 1.2 of ISO 9001, shall be
limited to those specified in the Tender Document. The Supplier shall comply with all other QA
requirements specified in the Tender Document. Any other exclusion shall be identified and
justified by the Supplier and accepted by the Purchaser.
7.1 AECL Supplementary Clauses
7.1.1 C3 - Inspection and Test Plan (Quality Plan)
a) The Supplier shall prepare an ITP to describe the inspections, tests and verifications planned
for the product or service specified in the contract. Regardless of who prepares the ITP, it shall be approved by the organizations primarily responsible for QA.
b) Unless otherwise specified in the contract:
1) The ITP shall be submitted to the Purchaser for review and acceptance following the
award of the contract but before the commencement of work;
2) The ITP shall be updated during the life of the contract to reflect the revisions and re-submitted for acceptance.
c) Referenced inspection and test procedures within the ITP shall be supplied upon request
when this is specified in the contract.
d) The ITP shall indicate:
1) What products or services are to be subcontracted and specify the QA program to be applied (Subcontracted services must meet NCA-3125);
2) How the Supplier will verify the sub-Supplier’s conformance to specified requirements
by one or more of the following methods:
i) Inspection and tests by the Sub-supplier as defined in the Sub-supplier’s ITP;
ii) Inspection and tests by the Supplier at the Sub-supplier’s facility;
iii) Surveillance by the Supplier;
iv) Incoming inspection.
3) Where each inspection and test point is integrated in the production cycle.
4) What characteristics shall be inspected, what acceptance criteria shall be used and whether a sampling plan shall be considered at each inspection point.
5) Where the Purchaser has established witness/hold or verification points.
7.1.2 C4 - Inspection and Test Procedures
The inspection and test procedures for the characteristics to be inspected are listed in the ITP.
It is the responsibility of the Supplier to review the Sub-supplier procedures and ITP to ensure
that the specified requirements are met.
PROTECTED - SENSITIVE
18RF-31170-TS-001 Page 8-1
Rev. 0
18RF-31170-TS-001 2011/07/15
8. INSPECTION, TEST AND REPORTS
8.1 General
The product shall be carefully inspected to verify that it meets all the requirements of this TS.
The Supplier shall prepare and submit a detailed ITP to the Purchaser for review and acceptance.
The ITP shall outline the inspection procedures, the testing procedures, the methods to be used in
dimensional control and the recording of the inspection and testing data.
The Supplier shall be responsible for and shall ensure that all the inspection and testing required
is conducted in accordance with the ITP procedures accepted by the Purchaser or its Authorized
Representative (AR) prior to commencement of work.
Surveillance by the Purchaser or its AR shall not in any way relieve the Supplier of inspection
duties called for herein. Checks on the spot by the Purchaser or its AR shall be considered part
of the normal inspection procedure and within the scope of the contract without extra charge.
The Supplier shall maintain records of all inspections and tests, which shall be freely available to
the Purchaser or its AR.
8.2 Inspection and Test Failure
In the event of any failure of any part to meet an inspection or test requirement, the Supplier
shall notify the Purchaser or its AR. The Supplier shall ask and obtain approval from the
Purchaser before any repair work is undertaken.
If any repair, including associated re-design, is likely to impact the results of inspection or tests
previously completed, appropriate re-inspection and re-testing shall be carried out. The quality
control procedures required to ensure a satisfactory repair has been done are subject to review
and acceptance by the Purchaser.
8.3 Re-inspection
The Purchaser shall have the right to specify additional inspection or testing. Unacceptable
defects so revealed shall be cause for rejection of the part or, alternatively, for repair and
subsequent re-inspection. The cost of re-inspection before and after repairs shall be at the
expense of the Supplier. In case no unacceptable defects are revealed the cost of re-inspection
and testing shall be borne by the Purchaser.
8.4 Material Tests
Proof in the form of certified material test reports that the required tests have been carried out
at the source will be acceptable. If those are not available, the Supplier shall perform the tests.
PROTECTED - SENSITIVE
18RF-31170-TS-001 Page 8-2
Rev. 0
18RF-31170-TS-001 2011/07/15
8.5 Nondestructive Examination Personnel
All personnel performing Nondestructive Examination (NDE) to meet the requirements of this
specification shall be qualified as follows, subject to acceptance by the Purchaser:
In Canada
Personnel shall be qualified in accordance with CGSB 48.9712. Level 2 or 3 personnel shall
interpret results. Only Level 3 personnel shall establish techniques.
In U.S.A.
Personnel shall be qualified to American Society for Nondestructive Testing (ANST) Standard
SNT-TC-1A. Level II or III personnel shall interpret results. Only Level III personnel shall
establish techniques.
In Other Countries
All personnel performing NDE to meet the requirements of this TS shall have documented
evidence of qualification to the standards of a recognized regulatory body acceptable to the
Purchaser and Regulatory Authority.
8.6 Magnetic Particle Examination
Magnetic Particle Examination (MT) shall be performed in accordance with the ASME BPVC,
Section III, NB-2545 except as modified by Section 8.6.1 of this TS. The MT using the yoke
technique is not permitted.
The Seal Rings shall be de-magnetized after MT. The residual magnetism shall not exceed
3 Oersteds. The indication material shall be removed after completing the examination.
8.6.1 Acceptance Standards
Any imperfections producing indications with a major dimension greater than 0.8 mm (1/32 in.)
located on the seating surfaces, identified with surface finish requirements on the drawing, shall
be considered relevant and shall be cause for rejection.
On surfaces other than the seating surfaces the requirements of the ASME BPVC, Section III,
NB-2545.3 shall apply. On these surfaces only, defects may be eliminated in accordance with
the ASME BPVC, Section III, NB-2538, subject to Purchaser acceptance.
8.7 Visual Defect Acceptance Criteria
The surface finish, identified as such on the drawing, shall comply with the requirements
specified in the drawing and the CSA B95 standard.
Circumferential or transverse defects that can be felt with the fingernail shall not be acceptable.
Circular defects with a maximum dimension NOT greater than 0.25 mm (0.010 in.) are
acceptable provided that two such defects are NOT closer than 1.6 mm (1/16 in.) AND there are
no more than three such circular defects per surface.
PROTECTED - SENSITIVE
18RF-31170-TS-001 Page 8-3
Rev. 0
18RF-31170-TS-001 2011/07/15
Other surface flaws which appear as non-recurring nicks, pits, scratches or local areas of surface
roughness which stand out from the general surface shall be considered acceptable provided that
their dimensions or frequency does not exceed the above.
Visual examination shall be performed in accordance with ASME BPVC, Section V, Article 9.
8.8 Reports
Test and examination report data (two copies of each) shall be signed by a responsible technical
representative at the Supplier end. The reports covering all tests and analysis shall be submitted
to the Purchaser during the course of the work. When examination or testing is subcontracted to
a third party, the reports shall be signed by a responsible technical representative of such party
and countersigned by the Supplier.
PROTECTED - SENSITIVE
18RF-31170-TS-001 Page 9-1
Rev. 0
18RF-31170-TS-001 2011/07/15
9. QUALITY CONTROL RECORDS
9.1 Contents of File
The Supplier shall maintain a complete file of records for all material, manufacturing, inspection,
examination and test data taken before, during and after manufacturing, including procedures,
specifications and drawings used; all fully identified by pertinent identifications numbers.
The records shall include all the closely related data such as qualifications and acceptance of
procedures, NDE personnel and equipment, required items, records of deviations, concession
requests and acceptances.
The Supplier shall maintain an inspection, examination and test checklist.
9.2 Maintenance and Access to Records
The records specified in Section 9.1 shall be stored and maintained to provide access for the
Purchaser or its AR to information contained therein at any time during manufacturing.
The Supplier shall take all required precautions to protect the records from deterioration or
damage.
9.3 History File
The Supplier shall prepare a History File as required by the AECL document 00-00660-TS-001,
“Permanent Manufacturing Records (History Docket/History File)”. In addition, each document
of the History File shall be cross-referenced with the serial number or numbers and the material
code or codes of the relevant equipment. The History File shall be reviewed and accepted by the
Purchaser’s representative at the conclusion of work and prior to the shipment of the product.