K iln Start-up Procedures Presentation & Instructor Notes Operator Development Kiln Control Best Practices
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 1/18
K i ln Start-up Procedu res Presentat ion & Instructor Notes
Operator DevelopmentKiln Control Best Practices
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 2/18
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 3/18
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 4/18
Pyro-processing: Kiln Control 4
Kiln Start-up Procedures
Learning Objectives
At the end of this session you should be:
fami l iar with the start-up BP
able to l ist the major steps invo lved
name the requ ired pro cess ind icators
able to explain the cus tom izat ion dif ferences w ith
you r plants SOPs
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 5/18
End-users: Production Operators/technicians
Content: Checks p r ior to start-up
Kiln preheat preparat ion: Bu rner pip e, Refractory
Kiln Preheat schedu le: Parameters to monitor
Tire Creep
Turning schedule
Start-up Process data sheet
Kiln lining preheat schedule Feeding raw m ix
What to do in c ase of deviat ions
Start-up Pos t-aud it
Kiln Start-up Procedures
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 6/18
Pyro-processing: Kiln Control 6
Pre Start-up Checks
Dry run & complete check sheets
Feed Sys tem
Cooler & Clinker Handl ing
ID fan
Coal Conveying System
Ki ln Baghouse ESP
Pre-heat sy stem
Pre-heater tour
Bu rner Pipe al ignment
Common & auxi l iary equipment
Check sheets should include room for comments
& assigned responsibility
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 7/18Pyro-processing: Kiln Control 7
Sample:
Pre Start-up Checks
Feed System
recirculat ion mode & cal ibrate
if no recirculation ... run briefly check operation, leaks
run dust evacuat ion (e levators, screws & pumps)
Cooler & clinker handling
run cooler dr ives & inspect for loose grates
check cooler alignment while running
run for 12 hours (mechanical integrity)
Breaker, fans, con veying equ ipment
alignment, motor direction, automation & full motion
operation & seal of all Plattco valves
calibration of all pressure transmitters
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 8/18Pyro-processing: Kiln Control 8
Kiln Preheat Prep
Burner pipe alignment
exact ly w here is th e pipe in relat ion to the ki ln
laser al ignm ent measu red in 3 places
Refractory preparation manage the ins tallat ion o f refractory ,
proper installation is key to longevity
fo l low p rocedu re for preheat ing to maximize br ick l i fe
Burner pipe lining
pou red castable mus t cure 24 hrs before remov ing
forms or at temp t ing bake-out
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 9/18Pyro-processing: Kiln Control 9
Burner Pipe Lining Preheat Schedule
Four inch refractory lining
50
100
150
200 200 200 200 200
250
300
350
400
450
500
550
600 600 600 600 600
0
100
200
300
400
500
600
700
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Temperature C
bake-out - adjust per inch of refractory
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 10/18Pyro-processing: Kiln Control 10
Kiln Preheat Schedule
Determined Prior to Start-up
10-14 process parameters should be recorded l ist di f fers for precalciner & long ki lns
Example list (incomplete) oxygen
back -end, BZ temperatures
tyre creep, tyre & bear ing temperature
hood pressure
fuel con sumpt ion
turn ing schedule
Kiln shell temperature ( BZ)
ESP/Baghouse
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 11/18Pyro-processing: Kiln Control 11
Kiln Start-up Process Data Sheet
Date: _________________ Time of Flame On:_________________ Preheat Schedule: -
_____ Hours
___________________ Hour of the
Preheat
Tyre Creep
#1 Tyre
Tyre Creep
#2 tyre
Hour of the
Day
Chain Gas
Temp
Fuel Rate Feed End
Oxygen
Swirl Air
Setting
Axial Air
Setting
Feed End
Temp
I.D. Fan
Speed
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 12/18Pyro-processing: Kiln Control 12
Tyre Creep Control
Minimum heating-up period
determ ined by the t ime required to s tabi l ize the
temperatur e difference, hence the clearance
shel l heats up faster than tyre
Tyre #2 is critical
too rapid heat ing w i l l constr ic t ki ln shel l
resul t in permanent shel l deform ation
excessive tyre sl ip after no rmal temp. regained
Creep should be monitored at regular intervals i f low, heat ing shou ld be slowed
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 13/18
Pyro-processing: Kiln Control 14
Turning Schedule
Ensures slow, uniform heating of the kiln and
refractory
increase in temperature over t ime
allows for the expansion of refractory and s hel l
br ick remains in p lace and shel l expands uni form ly
along its long itudinal axis
Too Slow
overheat ing o f refracto ry and shel l
shell & refractory damage (e.g. “duck - nesting” )
Too Fast
longer preheat t imes du e to poo r heat transfer
potent ia l br ick spiral ing
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 14/18
Pyro-processing: Kiln Control 15
Turning Schedule Example
KILN TURNING PROCEDURE WITH
AUXILIARY DRIVE
UP TO 120 C KEEP THE KILN STOPPED
120 C TO 210 C TURN 90 TO 120 EVERY 45 MINUTES
210 C TO 450
C TURN 90
TO 120
EVERY 30 MINUTES
450 C TO 600 C TURN 90 TO 120 EVERY 15 MINUTES
600 C TO 750 C TURN 90 TO 120 EVERY 10 MINUTES
750 C UP TO FEEDING CONTINUOUS TURNING
Reference temperature (Lower
stage)
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 15/18
Pyro-processing: Kiln Control 16
Kiln Preheat Schedule
Major & short shutdown
0
100
200
300
400
500
600
700
800
900
1000
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42
HEATING-UP GRAPH FOR ROTARY CEMENT KILNS
K i l n e x i t g a s t e m p e r a t u r e a t i n l e t a r e a
Heating-up Time, hours
º
{START OF MATERIAL FEED ACCORDING TO
{KILN TYPE AND OPERATING PROCESS
1300*
1200*
900*
600*
300*
curve 1:
Limited
repairs
30-35 C/h
curve 2:
Complete
relining
20-25 C/h
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 16/18
Pyro-processing: Kiln Control 17
Kiln Preheat Schedule - Detailed
stepped to inclu de two holdin g patterns (300, 550 C)
allows refractor to “catch- up” with gas temperature
24 HOUR PREHEAT SCHEDULE
0
100
200
300
400
500
600
700
800
900
1000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28HOURS
T E M P E R A T U R E
0.0
5.0
10.0
15.0
20.0
25.0
O X Y G E N STG 4 TEMP
STG 1 TEMP
STG1 OXYGEN
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 17/18
Pyro-processing: Kiln Control 18
Feeding of Raw Material
Raw material feed “ON”
when burning zone is ready
Start of feed and arrival in sintering (burning) zone is
critical to tyre creep
fue l supply m ust be increased
com pensate for heat absorb ed by raw mater ial
Close attention to tyre slip
i f sl ip ceases, coun ter measures m us t be taken
Limited feed may be introduced prior to optimaltemperature to assist coating
7/27/2019 174105579-Start-Up-Procedures.pdf
http://slidepdf.com/reader/full/174105579-start-up-procedurespdf 18/18
Pyro-processing: Kiln Control 20
Start-up Post Audit
Analyze deviations from the planned schedule to
continuously improve operational performance
produ ct ion coo rdinator , ki ln coach & operators
ident i fy reason s for deviat ion s
make jo int recommendat ions
correct SOPs and circu late among al l operators
Develop a table of variances and explanations
Use our collective knowledge & experience to
become the world’s best cement producer!