17/18 May 2003 IMACS SAC meeting update 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan, Ann Arbor
30

17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

Dec 30, 2015

Download

Documents

June Cain
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

1

IMACS:Inamori-Magellan Areal Camera and

Spectrograph

Magellan SAC Status Report

17/18 May 2003

Univ. of Michigan, Ann Arbor

Page 2: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

3

Page 3: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

4

Page 4: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

5

Optics Status:

Field lens and Collimator optics : done, installed

f/4 camera optics: done, installed

f/2 camera optics*: done, installed

Grisms: 200 l/mm* done, installed

300 l/mm ready to mount in cell

600 l/mm ready to mount in cell

Filters: 2 sets, CTIO B,V,I, done, installed

2 sets of CTIO R done, installed

CTIO U (LCAM) awaits ADC coating

*new since last report

Page 5: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

6

Optics Status cont.

Imaging Mirrors: Ag mirror installed

Al mirror ready to mount

Echellette Optics

Grating done

Prism (Zygo) due end of May

Durham IFU: due end of May

Page 6: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

8

Mechanical Engineering Status:

Guide camera stages (Hare) done, mounted

Calibration lamp system (Hare) done, mounting IP

Mask server (Bigelow) done, mounted

Field Lens (Hare) done, mounted

Shutters (Hare) done, mounted

Filter servers (All hands...) done, mounted

Disperser server (Hare) done, mounted

- 6 Grating cells (Bigelow) done, mounted

- 3 Grism cells (Bigelow) 1 done, 2 IP

- 2 Mirror cells (Bigelow) 1 done, 1 IP

Page 7: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

9

IFU mass dummy and old center field guider

Page 8: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

10

New center-field guide camera stage

Page 9: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

11

4 of 6 grating cells

Page 10: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

12

Grating cell mounted in tilt mechanism, on DSS wheel

Page 11: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

13

Mechanical Engineering cont.

Collimator mech. (Bigelow) done

f/4 camera opto-mech. (Bigelow) done

f/2 camera opto-mech. (Bigelow) done

Dewar (Luppino) done

Instrument Structure (Gunnels) done

Instrument Carriage (Gunnels) done

Instrument Enclosures (Gunnels) done

Instrument Utility wrap (Gunnels) done

Page 12: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

14

“Changing the oil” in the short camera quartet

Page 13: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

15

Short camera with quartet installed

Page 14: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

16

Installing the f/2 camera

Page 15: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

17

200 l/mm grism in cell, on DSS wheel

Page 16: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

18

Science array CCDs installed in dewar

Page 17: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

19

Dewar integrated with SA controller

Page 18: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

20

Grism spectra with “Gus’ mask”

Page 19: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

21

Flexure map, f/2 camera, imaging mode

Page 20: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

22

Flexure map, f/4 camera, imaging mode

Page 21: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

23

Electronic Engineering (Baggish):

Schematics design (all motion stages) done

(4) Motion control (MC) chassis, done

(1) Power supply chassis, done

(1) Shutter control chassis done

(2) Electronics racks for chassis done

(2) SA + FC power supply chassis done

(2) Guider power supply chassis done

Instr. wiring harnesses done

Temperature, pressure, voltage sensors IP

Page 22: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

24

Detector systems:

Flexure sensor detectors

- First light on first sensor 5/15/03!

Science array CCD/controller performance:

- SITe RN spec: 4.5e- min < 5.2e- typ < 6.5e- max, 20us/px

- Measured single chip RN 3.5e- at 10us/px

- Full array 4.8e- at 10us/px (estimate, not optimized)

- No measurable crosstalk

- CCD operating temperature: -110C

- Column-wise image bleeding - in CCDs?

- Additional cold room testing in May

Page 23: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

25

First light image from one of two flexure control detectors in the IMACS focal plane.

Page 24: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

26

Software:

Instrument Control (Birk)

Individual module testing:Module GUI status SW/HW Int.Pr. Guider done doneSH guider done doneCF guider done IPSlit Mask Server done doneDisperser Server done doneLong Camera Focus done doneFilter Servers (2) done doneFlexure Control (LUT) done doneDetector Focus done doneHP Sensor System done IP

Page 25: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

27

Software:

Instrument Control cont.

Test and integration instrument control:

- One GUI at this level, showing all

critical aspects of each module: ready to ship

User Level Software:

- Two GUIs at this level:

- Instrument control interface: ready to ship

- Graphical Instr. Status Display: ready to ship

Page 26: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

28

Software:

Science Array Control (Birk)

Shutter control:

- micro-controller for linear motors done

CCD readout / camera control:

- “ccdserver” for array readout ready to ship

- “camgui” for user interface ready to ship

Quick-Look Tool: ready to ship

Page 27: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

29

Coming up:

- Function and performance testing (in progress)

- Cold testing of mechanisms (in progress)

- Cold testing of optical systems

- Thermal focus look-up table for f/4 camera

- Flexure maps and control loops (open and closed)

- Plumbing of liquid cooling system (in progress)

- Installation of air over-pressure and circulation systems

- Mounting of last two grisms and Al imaging mirror

- Design of echellette opto-mechanics

- Final test and integration of FC detectors (“wing chips”)

Page 28: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

30

Shipping and installation:

- Pre-shipment review 5/28/03

- External reviewers:

- Harland Epps, UCSC

- Jerry Nelson, UCSC

- Dan Fabricant, Harvard/SAO

- Bob Fata, Harvard/SAO

- Disassembly starts week of 6/16/03

- Shipment to Long Beach on 7/1/03

- Columbus voyage #357 departs 7/5/03, arrives 7/23/03

- Container arrives at LCO on or around 8/1/03

Page 29: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

31

Shipping and installation:

Continued:

- Installation preparation starts 8/1/03

- Installation time runs 8/6 - 8/18

Local Preparations:

- Installation schedule (Bigelow) 90%

- Commissioning schedule (Dressler, Oemler) IP

- Shipping plan (Bigelow) IP

- LCO Support agreement (Bigelow, Dressler) IP

- Shipping crates and containers (OCIW) 90%

Page 30: 17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,

17/18 May 2003 IMACS SAC meeting update

32

Shipping and installation:

- Instrument document suite (all web-based):

- Engineering manual + drawings IP

- Electronics manual + schematics IP

- Software manual IP

- Detector systems manual IP

- User’s manual IP