    BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-OutSwitchgearTable of Contents

    Summary1.

    General2.

    Incoming Feeder and Tie Breakers3.

    Bus Bar from Main Switch to Horizontal Bus Bars4.

    Horizontal Copper5.

    Bus Bar System Vertical Sections6.

    Outgoing Units7.

    Earthing8.

    High Potential Test9.

    Insulation Measuring10.

    Meters and Protective Relays11.

    1. Summary

    Before the low voltage switchgear is ready for shipment the vendor shall make suitable tests to establish to the satisfaction of

    owners representative that all equipment, devices, protection relays and wiring have been correctly installed and are in

    satisfactory working condition and operable as requested.

    All tests shall be made in accordance with the nationally recognized standards stated in the requisition.

    The entire installation shall be constructed so as to provide maximum safety. Even if more provisions than required by law will

    be necessary, it will be vendors responsibility to include these provisions.

    Prior to testing, switchgear shall be dust-free and thoroughly cleaned of all waste material.

    The switchgear vendor shall take care that all necessary test equipment will be available in the factory or at field.

    2. General

    The switchgear shall comply with the following requirements:

    Is the switchgear of the draw-out or the

    nondraw-out type:

    draw-out/nondraw-out

    Is the incoming feeder a cable connection or a

    busduct connection

    cable/busduct connection

    Is the switchgear for indoor or outdoor use: indoor/outdoor use

    Short-circuit current of the installation: KA rms

    KA peak

    Time short-circuit current of the installation: s.

    Maximum nominal current:

    1. copper connection incoming feeder A

    2. main breaker(s) A

    3. horizontal busbar system A

    4. tie breaker A

    Nominal voltage: V

    Page 1 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switchgear

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    2/14

    Frequency: Hz

    Language to be used on the name-plates for

    operating instructions and outgoing circuits:

    Language to be used for maintenance

    instructions:

    What is the color of the outer side of the

    switchboard:

    Dimensions of the installation: length mm width mm height mm

    What are Companys numbers of the drawings

    according to which the switchgear will beinspected:

    1.

    2.

    3.

    4.

    5.

    Who will take care of the erection at site:

    Is the busduct connection between the

    transformer and the switchgear finished

    and by whom will this connection be installed:

    1. busduct connection is not included in the supply.

    2. busduct connection

    3. installation of the busduct connection by supplier/Company.

    4. no busduct connection

    The frame which shall be cast-in or connected

    to the concrete floor of the substation and will

    be supplied by:

    1. supplier of switchgear

    2. Company

    In case the frame will be supplied by the

    vendor, have the frames already been shipped:

    yes/no

    The required height and width of the substation

    door(s) are (inclusive of 4 rolls):

    height mm

    width mm

    Take care that everything will be new andunused.

    Is a crane necessary for hoisting the

    switchgear into the substation:

    If yes, contact the Field Engineer for provisions

    to hoist the switchgear into the substation.

    yes/no

    The use of plastic partitions for screening is not

    permitted.

    Page 2 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switchgear

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    3/14

    Screening shall be by Pertinax sheets or

    equivalent material.

    Equivalent material may only be used after

    approval by purchaser.

    Pay attention to the wiring, relays, terminals

    etc.; they must be coded in accordance with

    the drawings.

    The wiring shall be coded so that after

    disconnecting it can be reinstalled without

    checking at the right terminals.

    What are the colors of the wiring: 1.

    What are the colors of the wiring: 2.

    3. Incoming Feeder(s) and Tie Breaker

    There must be sufficient space for connectionof incoming feeders (check one line for

    number).

    Check whether the neutral is mounted on the

    right side, viewed from the front.

    Check the diameters of the holes for the

    connection bolts of the busbar with regard to

    the width of the busbar. Holes must be too big

    (DIN 43673).

    flat copper bar, width mm

    fastening holes, diameter mm

    It must be impossible to touch the incoming

    copper when the door is open (pay attention to

    the Pertinax sheets).

    Check whether the nominal current of the

    breaker is sufficient with regard to the

    transformer or switchgear rating.

    current of breaker A

    current of power transformer A

    KVA

    Incoming feeder and tie breaker shall be

    suitable for the dynamic short - circuit

    KA peak

    current of the transformer and thermal short

    current of

    KA rms

    s.

    Check whether the outgoing or incoming

    copper is directly mounted above the arcingchutes.

    (This is not permitted. The ionized air must be

    able to rise freely and may not introduce a

    short circuit).

    Make sure that there are no obstacles which

    can hamper the gas flow on the upper and front

    side.

    A

    Page 3 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switchgear

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    4/14

    When protective relays are installed on the

    breaker, check the current and time settings.

    s.

    When an inverse current/time relay is used, ask

    for relay curve.

    inverse

    current

    setting

    time

    definite

    current

    setting

    time

    Type, number and brand of relay(s):

    It shall be possible to operate the main breaker

    with the compartment door closed (manually

    and electrically)

    yes/no

    Check whether arcing chutes are undamaged

    and uncracked. Try to remove the arcing

    chutes from the breakers.

    This must be possible without touching any

    obstacles.

    Wires going from the main busbars to fuses (forexample for closing the main breaker) may not

    touch other wiring or steel constructions and

    must be short as possible.

    Check especially the bolt connections of the

    copper bars to the main breaker, even if

    something shall be removed. Check the

    number of bolts and the bolt diameters with

    regard to the mounting busbar. Check also the

    tensile strength of bolts.

    Check the distance of the busbars with regard

    to each other and with regard to earth (neutral).

    The distance shall be at least 2 cm.

    Check whether there is a link in the neutral of

    the incoming feeders.

    The presence of a link shall be clearly indicated

    with a nameplate.

    Check especially that the air circulation along

    the breaker is not obstructed. This is for cooling

    of the breaker. (Wrong positioning of the

    Pertinax plates.)

    How is the incoming breaker controlled: automatically/manually

    Is the transfer from one feeder to another

    automatic or manual:

    1. manual

    2. automatic

    3. no automatic

    4. one feeder

    Are both feeders in parallel while transferring: 1. manual transfer yes/no

    Page 4 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switchgear

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    5/14

    2. automatic transfer: yes/no

    What is the position of the tie breaker in normal

    operation:

    1. open

    2. closed

    3. no tie breaker

    Are feeder breakers and tie breaker of the draw

    -out type:

    Check especially the draw-out contacts when

    the breakers are of the draw-out type.

    yes/no

    Are feeder breakers and tie breaker

    interchangeable:

    yes/no

    Can one feeder handle the total load: % continuous

    % h

    Are protective relays installed on the tie

    breaker:

    yes/no

    Is the coupler a breaker, link or a load switch: breaker/link/load switch

    When a link is installed, an ampere meter shall

    be installed:

    Ampere meter: yes/no

    Close the feeder breaker and try to withdraw

    the switch in the closed position.

    Also try in the opposite sequence.

    Take the feeder breaker out of the switchgear,

    close the breaker and try to insert the breaker.

    Before the main contacts touch each other the

    breaker will be switched off.

    Even when it is not possible to insert thebreaker in the closed position, this will be an

    acceptable construction.

    When the feeder breaker is inserted, but is in

    the off-position with charged springs for fast

    closing, the breaker must be able to unload

    automatically, or further movement of breaker

    must be prevented.

    4. Busbars from Main Switch to Horizontal Busbars

    Vertical busbars from main switch to horizontal

    busbars must have the same cross-section as

    the copper of the incoming feeders. Is this so?

    yes/no

    It shall be impossible to touch this copper, even

    with an open door (screening with Pertinax

    plates).

    If there are lids instead of doors, screening of

    the busbar is not necessary. The lids must be

    Page 5 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switchgear

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    6/14

    fastened with captive screws. Fastening the

    lids with toggles is not permitted.

    Check the voltage distances with regard to

    each other and with regard to earth. Take into

    account where these distance are found.

    Take care of the bolt connections in the busbar.

    Check the bolt connections with a torquewrench.

    This is applicable to the entire busbar system.

    Check whether all bolts are easily accessible.

    If current transformers are applied, take care of

    the current direction (current goes always from

    K to L).

    Check the following characteristics of the

    current transformers:

    1. ratio:

    2. class:

    3. output: VA

    4. excess current: N =

    5. suitably for short-circuit current or during a

    time of:

    KA peak

    KA rms

    1 s.

    The wiring connected to the secondary side of

    the current transformer inclusive of earthing

    shall be at least 4 mm2.

    The busbar shall be marked with painted dots

    in the color specified in the requisition. This

    shall be done at different places in the

    switchgear.

    Check whether there is a partition plate

    between the vertical copper and the horizontal

    copper. If there is no partition plate, check

    whether the horizontal copper has partition

    plates on both sides of the incoming feeder

    panel.

    If parallel buses are used, check whether there

    are copper pieces and check how they are

    fastened; bolts screwed in the copper of the

    busbar are not acceptable.

    Spring washers shall be placed under the nuts

    of the fastening bolts of the buses.

    Page 6 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switchgear

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    7/14

    5. Horizontal Copper

    The horizontal copper must have the same

    cross-section through the entire switchboard.

    What is the cross-section of the horizontal

    copper with regard to the incoming feeder

    panel?

    Check also the cross-section of the neutral.

    Is the horizontal busbar compartment

    separated from the vertical compartments?

    (Partition plates between horizontal copper and

    outgoing vertical copper)

    Check especially the distance of the busbars

    with regard to earth where the angle iron of the

    vertical sections have been mounted.

    Insulation tape or Pertinax to improve the

    situation at certain spots is not acceptable. Thisis applicable to the entire switchgear.

    Check especially the bolt connections. The bolt

    has to come just through the nuts. This applies

    to the entire busbar system. Check whether all

    bolts are easily accessible.

    Check whether the supporting of the busbars is

    sufficient. A strip of insulation material mounted

    on the top of the insulators to improve the

    maximum allowed force in acceptable.

    The busbars at the ends of the switchgear shall

    be finished in such a way that an extension ofthe switchgear is possible without any further

    mechanical handling.

    Check the bolt connections of the horizontal

    copper with the downgoing vertical copper.

    Take care of possible torques. This occurs on

    those places where an angle is in the copper

    and no support is placed in the angle, because

    torques reduce the short-circuit capacity. This

    applies to the entire busbar system.

    All high-tensile strength steel bolts, nuts andrings shall be corrosion-proof.

    Check the interconnections of the horizontal

    busbars. With how may bolts are they

    connected? What are the sizes of the bolts?

    What are the dimensions of the copper

    overlapping?

    Threading in the main rail system is not

    acceptable.

    Page 7 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switchgear

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    8/14

    Top of insulators may not be used for

    interconnections of the busbar system.

    The insulators on the supporting iron shall be

    installed so that also the outer rim of the

    insulator bottom is supported and the insulator

    is supported completely on its bottom surface.

    When insulators are fastened with a bolt, it isnot permitted that the insulator is turned to be

    fastened, but the bolt shall be screwed into the

    insulator. Pay attention to welded tap ends;

    these are places where such things happen.

    The insulators shall be free of paint, dust and

    damage.

    When partitions are used to support the

    busbar, check whether the copper is firmly

    enclosed by the supports and check whether

    the partitions are fabricated of nonhygroscopic

    material.

    Check whether the bolts of the steel top cover

    do not come too close to the busbars.

    6. Busbar System Vertical Sections

    Check the dimensions of the vertical copper

    and the supporting of the vertical copper:

    dimensions copper

    x mm

    distance between two insulators in the length and width

    It shall be impossible to touch the vertical

    copper (even not from an adjacent panel orwhen the units are drawn-out).

    Check especially the lower part of the copper.

    This must be protected so that ionized air

    cannot flow into adjacent panels.

    Check the connections between the vertical

    copper and the various units.

    Check especially the distances, supports and

    bolt connections.

    If there is a copper connections between

    vertical copper and a unit, it must be screened

    with an insulating material, which is fireproof

    (no tape or similar).

    When working in an outgoing panel, it must be

    absolutely impossible to touch any live parts,

    even not the live parts of an adjacent unit.

    It shall always be possible to insert the

    outgoing cables without touching the busbar

    system.

    Page 8 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switchgear

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    9/14

    Installation of the cables will be done energized

    busbar system.

    The maximum fuse rating of the back-up fuse

    may not be more than 200 A.

    It is allowed to provide the units behind that

    back-up fuse with fuse holders and fuses of the

    screw type.

    Check whether the vertical sections are totally

    enclosed:

    Check also the bottom.

    totally enclosed: yes/no

    Check whether soft packing rims are used

    between the vertical sections to avoid

    openings.

    7. Outgoing Units

    A short circuit in a unit may never cause acomplete busbar short circuit. This shall be

    checked carefully. The most dangerous place

    is the connection between unit and busbar

    system.

    Before the main and auxiliary contacts touch

    each other, there must be a good earth

    connection between unit and enclosure, so that

    there can never be a voltage difference

    between unit and earth, not even under the

    most unfavorable circumstances. Earthing of

    the unit must be checked carefully.

    Check especially the draw-out contacts andconnections to the circuit part. Wrong insertion

    may never cause a short circuit or a damage to

    the contacts and/or pins.

    If electrical components are mounted on the

    doors, a flexible connection between door and

    fixed part shall be installed.

    All units of the same type shall be

    interchangeable. Some units shall be drawn out

    to check the wiring at the units.

    Unit compartment shall be totally enclosed and

    preferably be made of metal.

    The connection of the primary side of the fuses

    and the contacts at the back of the draw-out

    unit shall be at least 25 mm and shall run free

    of other wiring and steelwork.

    Partitions of insulating material shall be placed

    between the fuses, sticking out above the

    fuses. This is also applicable to the draw-out

    Page 9 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switchgear

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    10/14

    units to prevent a short circuit at the primary

    side of the fuses. Partitions must continue at

    the upper side.

    The air distances between the live parts at the

    primary side of the fuses shall be made as long

    as possible. A short circuit at the primary side

    of the fuses means a short circuit at the main

    busbar system (full-circuit capacity).

    Check the fuse holder rating with the fuse

    concerned. This shall be an internationally

    standardized fuse holder and fuse of the knife-

    type.

    Check type of fuse (gL preferred):

    am/gL

    In connection with the short-circuit capacity of

    the transformer pay attention to the highest

    permissible short circuit of the fuse.

    Screw-type fuses may only be used behind

    back-up fuses of maximum 200 A.

    For screw fuses only the E27 type is

    acceptable.

    The location of the components in the unit shall

    be so that ionized air around a contactor or a

    short circuit within the unit can never cause a

    short circuit at the primary side of the fuse. The

    fuse must always interrupt the short circuit of

    flash-over.

    This is very important!

    Try to make a short circuit with the fuse

    remover.

    Check the relation between the fuse rating and

    the thermal relay rating. This is to prevent

    damage of the thermal relays in case of short

    circuiting. This should only be done

    according to leaflets of thermal relay

    manufacturer and not according to any

    Company or vendors drawing!

    Check the adjusting devices of the thermal

    relays.

    Check whether the rating of the smallestcontactor is 20 A. It is not allowed to use relays

    or auxiliary relay in the primary wiring of the

    motor circuit.

    The connections in the unit shall be made with

    flexible wires. Cable lugs shall be of the crimpit

    type. Soldering connections are not acceptable.

    Wiring for protection and transfer circuits shall

    be numbered at both sides. Wiring, mounted in

    the units, must be numbered at the terminal

    Page 10 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switch...

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    11/14

    blocks so that it is not required to measure the

    wiring before reconnecting the wires to the

    terminals.

    Control fuses may be of the E27 type, if placed

    behind main fuses. If MCBs are used, check

    characteristic (L).

    It shall always be possible to check the current

    of the unit with a hook-on ampere meter in

    order to adjust the thermal relay. The wiring

    must allow space for that.

    A number of units of different types shall be

    checked on their proper electrical working. If

    any defects are found all units shall be

    checked.

    It shall be possible to reset the thermal relay

    from the outside of the unit.

    The lamp holder shall be made of copper to

    prevent sticking of the lamp at high

    temperature.

    The terminals shall be of a good quality and

    preferably be made of thermosetting material

    and not of porcelain.

    Check the quality of the short-circuit connection

    at the terminals. This in connection with short-

    circuiting of the current transformers.

    The outgoing cables of the various units shall

    be supported. The supporting saddles shall be

    supplied by the manufacturer of the switchgear.

    Check whether fuse ratings, contactor rating,

    thermal relays, etc. comply with the drawings.

    Dont forget the spare units. These shall be

    installed completely as marked on the

    drawings. Check also the space units.

    It shall not be necessary to switch off the

    switchgear while equipping the space unit.

    Terminals carrying different voltages shall be

    separated by means of partitions, which totally

    stick out of the terminal.

    Take a draw-out unit of the fuse-switch type

    from the switchgear and try to draw-in the unit

    in the switchgear again with the switch in the

    on position.

    Also try in the other way around. The unit is

    installed in the switchgear. Switch on and try

    to take it out of the switchgear.

    Page 11 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switch...

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    12/14

    8. Earthing

    There shall be an earth bar over the entire

    length of the switchgear. It shall have a

    dimension of at least 25 x 5 mm.

    The copper shall be as long as possible to

    minimize the number of connections.

    The earth bar shall be mounted directly to the

    steel structure and so that each vertical part

    has at least one connection with the main earth

    bar.

    At the end of the horizontal earth bar two holes

    shall be drilled for connection to the external

    earth system ( 13 mm).

    If there are terminals below the outgoing

    groups, the main earth bar shall have earth

    screws: for each cable at least one.

    The connection shall be so that it is possible toearth the lead sheath as well as the earth

    conductor of the cable.

    When the cables are connected directly to the

    units, there will also be an earth bar mounted

    along the units.

    It is not acceptable that the cables are stripped

    all over the height of the installation for earthing

    the cable at the bottom at the main earth bar.

    The main breakers shall have a direct copper

    connection with the main earth bar.

    When the switchgear has a bus duct, there will

    also be an earth bar inside the bus duct.

    All parts of the bus duct will be connected to

    the earth bar. There will also be an earth bar

    between switchgear and bus duct.

    The secondary side of the current transformers

    shall also be earthed. Looping of an earth wire

    is not acceptable. The connection will be at

    least 4 mm.

    9. High Potential Test

    Check whether the installation is ready to be

    put into operation; so all units, fuses, switches,

    etc. shall be present and the switches shall be

    in the off position.

    High potential tests shall be 2500 V for 1

    minute and applied between:

    Page 12 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switch...

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    13/14

    phase to phase1.

    phase to neutral2.

    phase and neutral to earth3.

    If certain components such as coils of

    contactors, motors of breakers, current

    transformers, voltage transformers, etc. lookstrange the components shall be tested in the

    following way:

    coils

    small motors of breakers

    current transformers

    small transformers

    The control fuses of the meters and relays shall

    be removed.

    The high voltage test set shall have a minimum

    capacity of 3 KVA.

    1000 V 1 minute

    1000 V 1 minute

    3000 V 1 minute

    1500 V 1 minute

    10. Insulation Measuring

    Insulation resistance will be measured after the

    high potential test. The resistance will be

    measured:

    phase to phase1.

    phase to neutral2.

    phase and neutral to earth3.

    If possible, test the meter with a calibration

    resistance.

    The resistance shall be at least 10 M if the

    installation is in dry condition.

    If the humidity is very high the switchgear must

    be dried before measuring.

    Make a connection between one phase and

    earth and check whether the megger is

    indicating zero.

    This is to be sure that the entire switchgear is

    tested.

    The insulation shall be measured with a 500 V

    megger (or higher).

    11. Meters and Protective Relays

    The working of directional relays shall be

    checked very carefully.

    Page 13 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switch...

    20/10/2012http://www.red-bag.com/jcms/specifications/159-bn-sp-es07-inspection-procedure-for-m...

  • 7/27/2019 159 Bn Sp Es07 Inspe

    14/14

    The final test shall be performed in the field.

    Check whether the wiring complies with

    vendors data: directional relays testing yes/no

    The same is applicable to the Kwh KWh meters tested: yes/no

    meters and the power factor meters: power factor meters tested: yes/no

    These are directional instruments and the

    correct working depends upon the

    KWA meters tested: yes/no

    right polarity of the connections. KW meters tested: yes/no

    Check whether the voltage on the meters and

    relays is correct. The same is applicable to the

    current. It may be possible that the current coils

    need be switched in parallel or in series.

    This is indicated on the relays.

    Are the relays of the draw-out or nondraw-out

    type.

    draw-out/non draw-out

    In how many phases are the directional relays

    placed:

    phases

    How are the Kwh meters connected: phases

    Page 14 of 14BN-SP-ES07 Inspection Procedure for Metal-Enclosed Low Voltage Draw-Out Switch...