15.4.04 TRD Status meeting Heidelberg Clemens Adler Chamber production Production status/ Material status
Dec 21, 2015
15.4.04 TRD Status meeting Heidelberg Clemens Adler
Chamber production
Production status/Material status
15.4.04 TRD Status meeting Heidelberg Clemens Adler
Production Status
• 4 week delay due to tooling
issues (winding frame, gluing table fixtures, little things here and there)
• 3 Frames glued to optimize gluing procedure.
2xL2C0, 1xL1C0
15.4.04 TRD Status meeting Heidelberg Clemens Adler
Production problems
• L-profiles are bent more than expected
-need additional clamps on gluing table.-Production is optimized
15.4.04 TRD Status meeting Heidelberg Clemens Adler
Production To Do
• Second Video measureing tableneed rails and camera holder.
• Produce wire ledge gluing toolH.Daues‘ design for TPC
• Design distance ledge gluing tool
• Start routine production(So far heavily disrupted by above mentioned problems...)
• Wiretension measuring device:Prototype from Münster was delivered last week by Holger and Damian. Need mounting, computer, infrastructure...
15.4.04 TRD Status meeting Heidelberg Clemens Adler
Production Sites
• Chamber Construc. Manual: 1st version is on the web. Please comment!!!
• Dubna: got first Material/Tooling delivery (End of March). All tooling+Material for 2 L1C0 Chambers. Next delivery is planned by Christian.
• Bukarest:Visit to Hd now (2-3 weeks) to build chambers (1xL1C0, 2xL2C0, 1xL6C1(?)). Delivery of tooling and materials upcoming.
15.4.04 TRD Status meeting Heidelberg Clemens Adler
Material Status
• L2C0 Padplanes arrived 4 weeks late:At Frankfurt for signal
cable soldering
• L6C1 Padplanes: Arrive at CERN Fri (16.4).
• L-Profiles:8 x C0 ready4 x L5/6C1 readyProduction rate: 2pc. Per day max.
• Front Profiles:22 x L125 x L2 ready.8 x L6 ready (next week)
• All other types in preparation (gluing of Wacosit to Al starts now)
15.4.04 TRD Status meeting Heidelberg Clemens Adler
Material Cont.
• Fischer Panels:Production under way.
• Distance/Wire ledge machining:Ready ~5 weeks from nowFor first Bukarest transport machining will be done at Heidelberg.
15.4.04 TRD Status meeting Heidelberg Clemens Adler
Material in Graphs
0
50
100
150
200
250
LxC0 L1C1 L2C1 L3C1 L4C1 L5/L6C1
finished3 SM
60% TRD
finished
3 SM
60% TRD
L-Profiles:
0
20
40
60
80
100
120
L1 L2 L3 L4 L5 L6
finished
3 SM
60% TRD
finished
3 SM
60% TRD
Front-Profiles:
Padplanes (no confirmation of dates, might slip):
Status 14.4.04
15.4.04 TRD Status meeting Heidelberg Clemens Adler
Critical Issues
• Material delivery/ finishing schedule:- Padplanes- Frame profiles
• Distribution of Chamber Types:Goal: 2 Types/site
Dubna: LxC0Bukarest: L1/2C1 (+L6C1)GSI: L3/L4C1 (+xx?)Hd: L6/L5C1 (mainly)
• Alternative:
Bukarest: L1/L2C1 (poss. L6C1)
GSI: L5/L3C1Hd: L6/L4C1 (+ Test beam chambers: 3xL1C0, 3xL2C0)