Top Banner
15.4.04 TRD Status meeting Heidelberg Clemens Adler Chamber production Production status/ Material status
9

15.4.04TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.

Dec 21, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 15.4.04TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.

15.4.04 TRD Status meeting Heidelberg Clemens Adler

Chamber production

Production status/Material status

Page 2: 15.4.04TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.

15.4.04 TRD Status meeting Heidelberg Clemens Adler

Production Status

• 4 week delay due to tooling

issues (winding frame, gluing table fixtures, little things here and there)

• 3 Frames glued to optimize gluing procedure.

2xL2C0, 1xL1C0

Page 3: 15.4.04TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.

15.4.04 TRD Status meeting Heidelberg Clemens Adler

Production problems

• L-profiles are bent more than expected

-need additional clamps on gluing table.-Production is optimized

Page 4: 15.4.04TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.

15.4.04 TRD Status meeting Heidelberg Clemens Adler

Production To Do

• Second Video measureing tableneed rails and camera holder.

• Produce wire ledge gluing toolH.Daues‘ design for TPC

• Design distance ledge gluing tool

• Start routine production(So far heavily disrupted by above mentioned problems...)

• Wiretension measuring device:Prototype from Münster was delivered last week by Holger and Damian. Need mounting, computer, infrastructure...

Page 5: 15.4.04TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.

15.4.04 TRD Status meeting Heidelberg Clemens Adler

Production Sites

• Chamber Construc. Manual: 1st version is on the web. Please comment!!!

• Dubna: got first Material/Tooling delivery (End of March). All tooling+Material for 2 L1C0 Chambers. Next delivery is planned by Christian.

• Bukarest:Visit to Hd now (2-3 weeks) to build chambers (1xL1C0, 2xL2C0, 1xL6C1(?)). Delivery of tooling and materials upcoming.

Page 6: 15.4.04TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.

15.4.04 TRD Status meeting Heidelberg Clemens Adler

Material Status

• L2C0 Padplanes arrived 4 weeks late:At Frankfurt for signal

cable soldering

• L6C1 Padplanes: Arrive at CERN Fri (16.4).

• L-Profiles:8 x C0 ready4 x L5/6C1 readyProduction rate: 2pc. Per day max.

• Front Profiles:22 x L125 x L2 ready.8 x L6 ready (next week)

• All other types in preparation (gluing of Wacosit to Al starts now)

Page 7: 15.4.04TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.

15.4.04 TRD Status meeting Heidelberg Clemens Adler

Material Cont.

• Fischer Panels:Production under way.

• Distance/Wire ledge machining:Ready ~5 weeks from nowFor first Bukarest transport machining will be done at Heidelberg.

Page 8: 15.4.04TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.

15.4.04 TRD Status meeting Heidelberg Clemens Adler

Material in Graphs

0

50

100

150

200

250

LxC0 L1C1 L2C1 L3C1 L4C1 L5/L6C1

finished3 SM

60% TRD

finished

3 SM

60% TRD

L-Profiles:

0

20

40

60

80

100

120

L1 L2 L3 L4 L5 L6

finished

3 SM

60% TRD

finished

3 SM

60% TRD

Front-Profiles:

Padplanes (no confirmation of dates, might slip):

Status 14.4.04

Page 9: 15.4.04TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.

15.4.04 TRD Status meeting Heidelberg Clemens Adler

Critical Issues

• Material delivery/ finishing schedule:- Padplanes- Frame profiles

• Distribution of Chamber Types:Goal: 2 Types/site

Dubna: LxC0Bukarest: L1/2C1 (+L6C1)GSI: L3/L4C1 (+xx?)Hd: L6/L5C1 (mainly)

• Alternative:

Bukarest: L1/L2C1 (poss. L6C1)

GSI: L5/L3C1Hd: L6/L4C1 (+ Test beam chambers: 3xL1C0, 3xL2C0)