Top Banner
Hall 1960 3695 4680 UTILITY SITTING ROOM Mat Well ENTRANCE HALL BATHROOM BEDROOM BEDROOM BOOT ROOM DINING AREA LIVING AREA KITCHEN Proposed 2- storey extension Remove existing door, build up wall, insert new full height toughened glazed window to detail. Make good all works Remove existing window, build up wall, insert new corner window with steel beams over and steel column for support. Make good all works 4723 2805 2030 3120 1025 2515 3120 Demolish existing sub-standard extension Break out existing wall and form new window ope Block up existing window Remove part of existing 700mm solid wall and doorway, Steel Beam over to specification. Remove existing wall and window and install new bi-folding doors with steel above to form new opening to evening patio Install new Velux rooflights to new roof Open Ceiling to roof of extension Break open existing wall, remove patio door and install new bifolding door system Large Velux rooflight tunnels, either side of ridge Evening Patio +Open Ceiling to underside of eaves +2.45m high flat ceiling HOT-PRESS WC Area of ground floor extension = 34.66m2 Area of first floor extension = 22.08m2 Total floor area of extension = 56.74m2 15714 3300 3680 1060 800 2080 7600 4826 4330 280 3199 3550 9588 8170 500 2 No. Velux rooflight, either side of ridge Remove existing door and replace with Toughened glass window Remove existing window, block up and make good all works NOTE: All existing windows to be removed and replace with double/triple glazed 'Low E' Argon filled windows New full height toughened glazed window to detail. Make good all works +2.45m Ceiling Height +2.45m Ceiling Height +2.45m Ceiling Height +2.45m Ceiling Height +2.45m Ceiling Height +2.45m Ceiling Height Break out part of existing wall, window to form new entrance hall and stairway Break open existing wall, insert new door to access proposed extension 2 No. window opes to be reduced to accomodate kitchen worktops, new windows 1100mm high 3800 Triple Glazed Argon Filled Low-E, U-PVC Windows as per Spec. Min U-Value 1.4 W/m2K 320mm Cavity Wall filled with 80mm HD Insulation (Kooltherm K5 EWB or equal & approved), to achieve a min U-Value of 0.15 W/m2K. Sand & Cement Plaster to act as airtight layer internally. Concrete Path around New Extension, to provide level access to Front Door . ACO drain to be installed in front of Door. Fully Accessible Front Door with glazed screen. Velux Window. Min U0-Value 1.4 W/m2K. Light Tunnel to kitchen. Boxed Out in Plasterboard. Insulation Layer and AirTight Membrane to continue around light tunnel to ensure continuity of both between ceiling level and window. New ESB Meter located in original position Accessible Guest Bathroom. Toilet CL located min 400mm from wall. 1200x750mm Clear Space Stairs to Architect/Client's Detail. Hardwood Handrail. 15 Steps of Equal Rise from GF FFL to FF FFL (Approx 190mm Rise, 220mm Going) SCALE 1:50 @ A1, 1:100 @ A3 Proposed floor area extension = 34.66m2 5 GROUND FLOOR PLAN NOTES: Foundations Width of foundations to be at least 3 times width of external walls, min 1 layer of A393 Mesh. Ground Floor 75mm Screed on Min. on 125mm Thick 25N20 Slab on 100mm Kingspan Kooltherm Floorboard (or similar) on Radon Barrier. on 50mm sand blinding. on Min 250mm Hardcore filling (Clean permeable granular fill) compacted in layers of 225mm. Existing floors to be leveled and made good. Existing floor in the proposed kitchen area to be insulated 100mm insulation, to be approved,with 75mm screed over and made good. Explore further, as this will reduce ceiling heights in dining and living areas or create steps. Client's preference is final. First Floor 225mm x 44mm Timber Floor Joists at 350mm Centres. Bridging at 1200mm centres. 12.5mm plasterboard fixed to the underside of joists and surface skimmed. Wall Construction 320mm Cavity Wall, 100mm block inner leaf, 80mm HD Insulation (Kooltherm K5 EWB or equal & approved) fixed securely to inner leaf over full height of wall, and 100mm coloured render blockwork outer leaf, to achieve a min U-Value of 0.15 W/m2K. Windows: Aluclad Frames. Low E Argon Filled. Win Min U-Value 1.4 W/m2K Door Min U-Value 1.6 W/mwK All windows to comply with Current Building Regulations TGD Part B re Escape ope - Min 850mm high x 550 wide, Min 800 above floor level. Max 1100 above floor level. All rooms to have background ventilation to the outside. Pitched Roof Construction: Tiles to be laid to Manufacturers's Instructions. on 55 x 33mm Battens on Breather Membrane, On Proprietary Roof Trusses to spec & manufacturer's design. Roof Insulated at ceiling Level with 300 mm Fibre Insulation between and over joists, to achieve a min U-value of U=0.13 W/m2K. Eaves > Ridge Ventilation. Solar Panels To be positioned on the back or side elevations as required for a SE/SW orientation. Thermal - 2.5m long x 2.0m high - 30 Evacuated Tubes. PV - 1.6m long x 1 m high. Granite cills to windows on front elevation only, Widows W1,W2,W3,W4,W5, W6,W7. Existing chimney stack, hearth, fireplace and all associated to be decommissioned, demolished and removed. Make good all works. Walls, on both side of existing fireplace, to be set back in line with each other, and new wall in place of chimney breast, to create one new flushed wall. Make good all works. Refer to Detail A, boxing in of existing random rubble wall, conc. ring beam, to create a flushed finished wall from floor to open ceiling. Existing alcove to be filled in, plasterboard, painted etc. to match exising/proposed wall Refer to Detail A, boxing in of existing random rubble wall, conc. ring beam, to create a flushed finished wall from floor to open ceiling. Retain exsiting alvove, open to floor level, create shelving throughout. Make good all works. Doors or open shelving as per client's spec. Existing double breasted chimney, stack, hearth, fireplace and all associated to be decommissioned, demolished and removed. Make good all works. Investigate ceiling heights on site with B.Surv. Remove superficial non-structural ceiling beams Remove superficial/decorative, non-structural, timber ceiling beams Retain all existing structural beams, box in with plasterboard. Create flush finish. 1000mm concrete footpath around existing dwelling and proposed extension, as shown. Ground levels to reduced/built up around existing dwelling and extension, as required, to create equal levels throughout. Levels to allow for 150mm high footpath riser and 150mm single step riser to external doors. 1000mm concrete footpath around existing dwelling and proposed extension, as shown. Ground levels to reduced/built up around existing dwelling and extension, as required, to create equal levels throughout. Levels to allow for 150mm high footpath riser and 150mm single step riser to external doors. Finished Floor Level +0.300 Path Level +0.150 Ground Level +0.000 Tile finish to Client's Spec. 3& 6XP ½ SP 2no 203x133x30kg steel beam over to engineer's detail 2no 203x133x30kg steel beam over to engineer's detail 2no 203x133x30kg steel beam over to engineer's detail Tile finish to Client's Spec. 3& 6XP ½ SP Tile finish to Client's Spec. 3& 6XP ½ SP Wooden Floor finish to Client's Spec. 3& 6XP ½ SP Wooden Floor finish to Client's Spec. 3& 6XP ½ SP Wooden Floor finish to Client's Spec. 3& 6XP ½ SP Wooden Floor finish to Client's Spec. 3& 6XP ½ SP Wooden Floor finish to Client's Spec. 3& 6XP ½ SP Wooden Floor finish to Client's Spec. 3& 6XP ½ SP Tile finish to Client's Spec. 3& 6XP ½ SP Wooden Floor finish to Client's Spec. 3& 6XP ½ SP Wooden Floor finish to Client's Spec. 3& 6XP ½ SP Wooden Floor finish to Client's Spec. 3& 6XP ½ SP 1no 203x133x30kg steel beam over to engineer's detail SVP AJ G G G G G G G G AJ To Soakpit AJ To Soakpit SVP SVP MH MH MH MH To New Wastewater Treatment System Public Watermain Proposed Boiler House Extract vents (8 No 9" x 3" (8000mm2) Wall vent to match colour of External render / wall finish. ISSUE: PROJECT NO: 1515 DRAWN / CHECKED JD/MD DRAWING NO: SCALE: REV NO: DATE 20/05/2015 CLIENT: LOCATION: FARRELL'S CROSS, KILDARE, CO. KILDARE. PROJECT RENOVATIONS & REFURBISHMENTS 2 TITLE: TENDER T-001 1/100 GROUND FLOOR PLAN JAMES & CARMEL O BRIEN Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446 E-mail: [email protected] E-mail: [email protected] www.dalyhudson.com
12

1515-T_Drawings

Apr 15, 2017

Download

Documents

Mark Daly
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1515-T_Drawings

Hall

1960

3695 4680

UTILITY

SITTING ROOM

Mat Well

ENTRANCE HALL

BATHROOM

BEDROOM BEDROOM

BOOT ROOM

DINING AREA

LIVING AREA

KITCHEN

Proposed 2- storey extension

Remove existing door, build up wall,insert new full height toughened glazedwindow to detail. Make good all works

Remove existing window, build up wall,insert new corner window with steel beamsover and steel column for support. Make goodall works

4723

2805

2030

3120

1025

2515

3120

Demolish existing sub-standard extension

Break out existing wall andform new window ope

Block up existing window

Remove part of existing 700mmsolid wall and doorway, SteelBeam over to specification.

Remove existing wall and window andinstall new bi-folding doors with steelabove to form new opening to eveningpatio

Install new Velux rooflights to new roof

Open Ceiling to roof of extensionBreak open existing wall, removepatio door and install new bifoldingdoor system

Large Velux rooflight tunnels,either side of ridge

Evening Patio

+Open Ceiling to underside of eaves

+2.45m high flat ceiling

HOT-PRESS

WC Area of ground floor extension = 34.66m2Area of first floor extension = 22.08m2Total floor area of extension = 56.74m2

15714 3300

3680 1060

800 2080

7600

4826

4330

280

3199

3550

9588

8170

500

2 No. Velux rooflight, either side of ridge

Remove existing door andreplace with Toughenedglass window

Remove existing window, block upand make good all works

NOTE: All existing windows to be removed and replacewith double/triple glazed 'Low E' Argon filled windows

New full height toughened glazedwindow to detail. Make good all works

+2.45m Ceiling Height

+2.45m Ceiling Height

+2.45m Ceiling Height

+2.45m Ceiling Height

+2.45m Ceiling Height

+2.45m Ceiling Height

Break out part of existingwall, window to form newentrance hall and stairway

Break open existing wall, insert new doorto access proposed extension

2 No. window opes to be reduced to accomodatekitchen worktops, new windows 1100mm high

3800

Triple Glazed Argon Filled

Low-E, U-PVC Windows

as per Spec.

Min U-Value 1.4 W/m2K

320mm Cavity Wall

filled with 80mm HD

Insulation (Kooltherm K5

EWB or equal & approved),

to achieve a min U-Value of

0.15 W/m2K.

Sand & Cement Plaster to

act as airtight layer internally.

Concrete Path around New

Extension, to provide level

access to Front Door .

ACO drain to be installed

in front of Door.

Fully Accessible Front

Door with glazed screen.

Velux Window.

Min U0-Value 1.4 W/m2K.

Light Tunnel to kitchen.

Boxed Out in Plasterboard.

Insulation Layer and AirTight

Membrane to continue

around light tunnel to ensure

continuity of both between

ceiling level and window.

New ESB Meter located in

original position

Accessible Guest Bathroom.

Toilet CL located min

400mm from wall.

1200x750mm Clear Space

Stairs to Architect/Client's

Detail. Hardwood Handrail.

15 Steps of Equal Rise

from GF FFL to FF FFL

(Approx 190mm Rise,

220mm Going)

SCALE 1:50 @ A1, 1:100 @ A3

Proposed floor area extension = 34.66m2

5

GROUND FLOOR PLAN

NOTES:

Foundations

Width of foundations to be at

least 3 times width of external

walls, min 1 layer of A393

Mesh.

Ground Floor

75mm Screed on Min.

on 125mm Thick 25N20 Slab

on 100mm Kingspan

Kooltherm Floorboard (or

similar)

on Radon Barrier.

on 50mm sand blinding.

on Min 250mm Hardcore

filling (Clean permeable

granular fill) compacted in

layers of 225mm.

Existing floors to be leveled

and made good. Existing

floor in the proposed kitchen

area to be insulated 100mm

insulation, to be

approved,with 75mm screed

over and made good.

Explore further, as this will

reduce ceiling heights in

dining and living areas or

create steps. Client's

preference is final.

First Floor

225mm x 44mm Timber Floor

Joists at 350mm Centres.

Bridging at 1200mm centres.

12.5mm plasterboard fixed to

the underside of joists and

surface skimmed.

Wall Construction

320mm Cavity Wall, 100mm

block inner leaf, 80mm HD

Insulation (Kooltherm K5

EWB or equal & approved)

fixed securely to inner leaf

over full height of wall, and

100mm coloured render

blockwork outer leaf, to

achieve a min U-Value of

0.15 W/m2K.

Windows:

Aluclad Frames.

Low E Argon Filled.

Win Min U-Value 1.4 W/m2K

Door Min U-Value 1.6 W/mwK

All windows to comply with

Current Building Regulations

TGD Part B re Escape ope - Min

850mm high x 550 wide, Min

800 above floor level.

Max 1100 above floor level.

All rooms to have background

ventilation to the outside.

Pitched Roof Construction:

Tiles to be laid to

Manufacturers's Instructions.

on 55 x 33mm Battens

on Breather Membrane,

On Proprietary Roof Trusses to

spec & manufacturer's design.

Roof Insulated at ceiling Level

with 300 mm Fibre Insulation

between and over joists, to

achieve a

min U-value of U=0.13 W/m2K.

Eaves > Ridge Ventilation.

Solar Panels

To be positioned on the back or

side elevations as required for a

SE/SW orientation.

Thermal - 2.5m long x 2.0m

high - 30 Evacuated Tubes.

PV - 1.6m long x 1 m high.

Granite cills to windowson front elevation only,Widows W1,W2,W3,W4,W5,W6,W7.

Existing chimney stack,

hearth, fireplace and all

associated to be

decommissioned,

demolished and removed.

Make good all works.

Walls, on both side of

existing fireplace, to be set

back in line with each other,

and new wall in place of

chimney breast, to create

one new flushed wall. Make

good all works.

Refer to Detail A, boxing

in of existing random rubble

wall, conc. ring beam, to

create a flushed finished wall

from floor to open ceiling.

Existing alcove to be filled in,

plasterboard, painted etc. to

match exising/proposed wall

Refer to Detail A, boxing

in of existing random rubble

wall, conc. ring beam, to

create a flushed finished wall

from floor to open ceiling.

Retain exsiting alvove, open

to floor level, create shelving

throughout. Make good all

works. Doors or open

shelving as per client's spec.

Existing double breasted chimney,

stack, hearth, fireplace and all

associated to be decommissioned,

demolished and removed. Make good

all works.

Investigate ceiling heights on site with

B.Surv.

Remove superficial non-structural

ceiling beams

Remove superficial/decorative,

non-structural, timber ceiling beams

Retain all existing structural beams,

box in with plasterboard. Create flush

finish.

1000mm concrete footpath aroundexisting dwelling and proposed extension,as shown.

Ground levels to reduced/built up around existingdwelling and extension, as required, to create equallevels throughout. Levels to allow for 150mm highfootpath riser and 150mm single step riser to external doors.

1000mm concrete footpath aroundexisting dwelling and proposed extension,as shown.

Ground levels to reduced/built up around existingdwelling and extension, as required, to create equallevels throughout. Levels to allow for 150mm highfootpath riser and 150mm single step riser to external doors.

Finished Floor Level

+0.300

Path Level

+0.150

Ground Level

+0.000

Tile finish to Client's Spec.PC Sum €60 p/m2 2no 203x133x30kg steel beam over to engineer's detail

2no 203x133x30kg steel beam over to engineer's detail2no 203x133x30kg steel beam over to engineer's detail

Tile finish to Client's Spec.PC Sum €50 p/m2

Tile finish to Client's Spec.PC Sum €40 p/m2

Wooden Floor finishto Client's Spec.PC Sum €50 p/m2

Wooden Floor finishto Client's Spec.PC Sum €50 p/m2

Wooden Floor finishto Client's Spec.PC Sum €50 p/m2

Wooden Floor finishto Client's Spec.PC Sum €50 p/m2

Wooden Floor finishto Client's Spec.PC Sum €50 p/m2

Wooden Floor finishto Client's Spec.PC Sum €70 p/m2

Tile finish to Client's Spec.PC Sum €40 p/m2

Wooden Floor finishto Client's Spec.PC Sum €70 p/m2

Wooden Floor finishto Client's Spec.PC Sum €70 p/m2

Wooden Floor finishto Client's Spec.PC Sum €70 p/m2

1no 2

03x1

33x3

0kg s

teel b

eam

over

to en

ginee

r's de

tail

SVP

AJ

GG

GG

GGGG

GG

GG

GG GG

AJ

To Soakpit

AJ

To Soakpit

SVP

SVP

MH

MH

MH

MH

To New

Wastewater

Treatment System

Public Waterm

ain

Proposed Boiler House

Extract vents (8 No 9" x 3"

(8000mm2)

Wall vent to match colour of

External render / wall finish.

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

20/05/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, KILDARE, CO. KILDARE.

PROJECT

RENOVATIONS & REFURBISHMENTS

2

TITLE:

TENDER

T-001

1/100

GROUND FLOOR PLAN

JAMES & CARMEL O BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]

Page 2: 1515-T_Drawings

MASTER BEDROOM

Landing

4205

VOID TO ENTRANCE HALL BELOW

Walk-inWardrobe

(linen storage)

En-Suite

Lower existing window ope &cill level and install newwindow

BEDROOM 2

LINEN-PRESS

1488

2no. Velux rooflightsabove entrance hall

4911

3280

2191

1850

4899 1350

900

Install new Velux rooflights to existing roof

Install new Velux rooflight to existing roof

Install new Velux rooflight to existing roof

SHOWER ROOM

OFFICE

Existing ceilings on first floor level to beraised to min. 2.4m high

3449

4558

1909

3114

Elec. Shower

80mm Acoustic Insulation to

existing timber partitions

forming dormer roof

100mm Timber Stud Wall,

with Acoustic Insulation.

Landing

100mm Timber Stud Wall,

with Acoustic Insulation to

form new linen store in

dormer roof.

A

Lower existing window ope &cill level and install newwindow

320mm Cavity Wall

filled with 80mm HD

Insulation (Kooltherm K5

EWB or equal & approved),

to achieve a min U-Value of

0.15 W/m2K.

Sand & Cement Plaster to

act as airtight layer internally.

A

FIRST FLOOR PLAN

B B

6

SCALE 1:50 @ A1, 1:100 @ A3

Proposed floor area extension = 22.08m2

1735

1047

2630

Wooden Floor finishto Client's Spec.PC Sum €50 p/m2

Wooden Floor finishto Client's Spec.PC Sum €50 p/m2

Wooden Floor finishto Client's Spec.PC Sum €70 p/m2

Wooden Floor finishto Client's Spec.PC Sum €70 p/m2

Wooden Floor finishto Client's Spec.PC Sum €50 p/m2

Wooden Floor finishto Client's Spec.PC Sum €70 p/m2

Tile finish to Client's Spec.PC Sum €50 p/m2

Tile finish to Client's Spec.PC Sum €50 p/m2

SVP

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

19/05/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, KILDARE, CO. KILDARE.

PROJECT

RENOVATIONS & REFURBISHMENTS

2

TITLE:

TENDER

T-002

1/100

FIRST FLOOR PLAN

JAMES & CARMEL O BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]

Page 3: 1515-T_Drawings

5920

2423

Large Velux rooflight tunnels,either side of ridge

Install new Velux rooflights to new roof

Widen ope, lower existingwindow cill level and installnew window

Remove existing door, build up wall,insert new full height toughened glazedwindow to detail. Make good all works

Remove existing window, build up wall,insert new corner window as shown. Make goodall works

Proposed 2- storey extension

1100

Moulded Plinth to

Match Window

Surround.

Coloured Nap

Render as per

Spec

Paving Rising at Max 1:20

slope to provide level

access to front door.

ACO drain to be installed

in front of Door.

Fully Accessible Front

Door with glazed screen.

Refer to Door Schedule.

SCALE 1:50 @ A1, 1:100 @ A3

FRONT ELEVATION

1

W1 W2

W4

W6 W7

W9

W15 W16

W17

W18 W19

D1

5996

2498

2653

4032

Install new Velux rooflights to new roof

2 No. Velux rooflight, either side of ridge

New corner window as shown. Make goodall works

Proposed 2- storey extension

2800

SCALE 1:50 @ A1, 1:100 @ A3

4

SIDE ELEVATION

W9

W10 W11

W21W22

W23

W20

W1

W5

W8

6150

2653

4032

5528

Large Velux rooflight tunnels,either side of ridge

Remove existing door andreplace with Toughenedglass window

Break open existing wall, removepatio door and install new bifoldingdoor system

W12

W13

W25

W24

W27

W11

W26

D3

Remove existing wall and window andinstall new bi-folding doors with steelbeam above to form new opening toevening patioRemove existing window, block up

and make good all works

2 No. Velux rooflight, either side of ridge

Solar Panels to be

positioned on the back or

side elevations as required

for a SE/SW orientation.

Thermal - 2.5m long x 2.0m

high - 30 Evacuated Tubes.

PV - 1.6m long x 1 m high.

See M&E Spec for Exact

Quantities. and Specification

SCALE 1:50 @ A1, 1:100 @ A3

SIDE ELEVATION

3

W14

D2

W3

W28

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

14/05/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, KILDARE, CO. KILDARE.

PROJECT

RENOVATIONS & REFURBISHMENTS

1

TITLE:

TENDER

T-003

1/100

ELEVATIONS

JAMES & CARMEL O BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]

Page 4: 1515-T_Drawings

Trial HoleT2

T3

T1

p3

P2

P1

7017

2300

mm

9000

1000

1000

5231

1570

97

1438

71

1

1

3

9

8

71627

13792

8434

2814

40720

1323

60

1521

6

7959

Location of Public Site Notice

Existing Recessed Entrance toDwelling

Existing Dwelling

Existing Garden

Proposed Aswaflow TreatmentSystem and Percolation Areasupplied and installed as perMolloy Precast Specifications

Existing mature boundary

Existing mature boundary

Proposed extension

A

A

+98.55

Existing DwellingFFL +98.35FRH +104.27

FFL +98.30FRH +104.22

+98.15

+98.15

+98.30

+98.20

+98.90

+98.95

+98.90

+99.00 +99.10

+99.00

+99.10

+99.00

Existing Dwelling

Proposed saokawayExisting saokaway

Existing septic tank tobe decomissioned & removedfrom site

7714

Existing mains waterline

Existing septic tank & percolationarea

Existing septic tank & percolationarea

Flow of water

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

20/05/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, BROWNSTOWN, CO. KILDARE.

PROJECT

TITLE:

TENDER

T-004

1/500

SITE LAYOUT PLAN

JAMES & CARMEL O'BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]

Extension to side of dwelling, minor

alterations to elevations, installation of a new

wastewater treatment system

Page 5: 1515-T_Drawings

Trial Hole T2

T3

T1

p3

P2

P1

7017

2300

mm

9000

1000

1000

5231

1570

97

63102

1438

71

1

1

3

9

8

71627

13792

8434

2814

40720

1323

60

1521

6

7959

Location of Public Site NoticeExisting Recessed Entrance toDwelling

Existing Dwelling

Existing Garden

Aswaflow Treatment System and PercolationArea supplied and installed as per MolloyPrecast Specifications

Existing matureboundary

Existing matureboundary

Existing matureboundary

Existing mature boundary

Site underapplicationoutlined in red

Proposedextension

A

A

+98.55

Proposed ExtensionFFL +98.35FRH +104.27

FFL +98.30FRH +104.22

+98.15

+98.15

+98.30+98.20

+98.90

+98.95+98.90

+99.00 +99.10

+99.00

+99.10+99.00

+99.10

+99.30+99.40

+99.40

+99.60

+99.90

+99.60

+100.10

+99.70

+100.00

ExistingNeighbouringDwellings

Proposed saokaway Existing saokaway

Existing septic tankto be decommissionedand removed

7714

Existing mains waterline

Existing septic tank & percolation area

Existing septic tank & percolation area

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

20/05/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, BROWNSTOWN, CO. KILDARE.

PROJECT

TITLE:

TENDER

T-005

1/1000

SITE LAYOUT PLAN

JAMES & CARMEL O'BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]

Extension to side of dwelling, minor

alterations to elevations, installation of a new

wastewater treatment system

Page 6: 1515-T_Drawings

ROAD

gl 98

.100

gl 98

.900

Proposed ExtensionF.R.H. = 81.901

1/200 fall

Inlet pipe:I.L. 97.685

Site Boundary

Aswaflow Treatment System Proposed percolation area

gl 97

.900

gl 98

.150

gl 98

.200

gl 98

.450

Outlet Pipe:I.L. 74.875

Percolation pipe: I.L. 97.784300mm topsoil on Geotextile membrane,on 150mm subsoil on,100mm dia. percolation pipe, on300mm subsoil

Longitudinal Site SectionScale 1:250

Proposed ExtensionF.F.L.=75.75

Existing Ground Level 75.60

2450

2300

1800

1725

1/100 fall 1/100 fall

550

300

2188

Base of percolation trenchBase of trial hole, no watertable encountered36

7623

39

3073

950

Discharge hoseAerator

Siphon hose

InputOutlet

2300mm

AJ's to beinstalled by others.

Grade pipes only at 1:200

Protected flushing valve &inspection cambers

AJ's to beinstalled by others.

Treatment System & Percolation Area - PlanScale 1:100

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

20/05/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, BROWNSTOWN, CO. KILDARE.

PROJECT

TITLE:

TENDER

T-006

1/500

LONGITUDINAL SITE SECTION A-A

PERCOLATION DETAILS

JAMES & CARMEL O'BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]

Extension to side of dwelling, minor

alterations to elevations, installation of a new

wastewater treatment system

Typical Section through Percolation AreaScale nts

Section through Treatment SystemScale nts

Page 7: 1515-T_Drawings

SCALE 1:50 @ A1, 1:100 @ A3

Proposed floor area extension = 34.66m2

5

FOUNDATION PLAN

Radon:

Max distance to radon sump

of 15m. Max area 250m2.

Cross Vent Gaps to be left in

rising walls to allow Radon

Gas to reach the Radon

Sump. Gap to be 12,500

mm2 per metre run of wall

(eg a quarter of a block in

each 4 block length.

75mm Screed on Min.

on 125mm Thick 25N20 Slab

on 100mm Kingspan Kooltherm

Floorboard (or similar)

on Radon Barrier.

on 50mm sand blinding.

on Min 250mm Hardcore filling

(Clean permeable granular fill)

compacted in layers of 225mm.

Radon Sump Proprietary

Collection Box for max 250sqm

floor area (max distance 15m).

100mm Ø pipe to sump

terminates outside and is

capped.

320mm Cavity Wall on 960 x

300mm Reinforced Concrete

Foundations with min 1 layer of

A393 Mesh.

See Foundation Detail 1.

Cross Vent Gaps to be left in

rising walls to allow Radon Gas

to reach the Radon Sump as

per Building Regulation

Requirements. Gap to be

12,500 mm2 per metre run of

wall (eg a quarter of a block in

each 4 block length.

100mm Blockwork Wall on

700mm x 300mm Reinforced

Concrete Foundations with min

1 layer of A393 Mesh. See

Foundation Detail 2.

215mm Blockwork Wall on

815mm x 300mm Reinforced

Concrete Foundations with min

1 layer of A393 Mesh. See

Foundation Detail 3.

.

215mm Blockwork Wall on

815mm x 300mm Reinforced

Concrete Foundations with min

1 layer of A393 Mesh. See

Foundation Detail 3.

.

Radon:

Max distance to radon sump

of 15m. Max area 250m2.

Cross Vent Gaps to be left in

rising walls to allow Radon

Gas to reach the Radon

Sump. Gap to be 12,500

mm2 per metre run of wall

(eg a quarter of a block in

each 4 block length.

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

06/06/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, KILDARE, CO. KILDARE.

PROJECT

RENOVATIONS & REFURBISHMENTS

1

TITLE:

TENDER

T-007

1/100

FOUNDATION PLAN

JAMES & CARMEL O BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]

Page 8: 1515-T_Drawings

1065

300

980

180

75mm Screed on Min. on

125mm Thick 25N20 Subfloor Slab

All Services Laid Prior To Pouring & Power

Floated To Smooth Level Finish

S&C Screed is Airtight Layer - to be fully sealed

and taped to wall prior to S&C plastering.

165mmCavity Wall filled with 120mm HD

Insulation (Kooltherm K5 EWB or equal and

approved to achieve a minimum U-Value of

0.15 W/m2K.

300x 1050mm Reinforced Concrete Foundation

below 350mm Cavity Wall

25N20 Concrete, with min 1 Layer of A393

Mesh.

25mm High Density Vertical Insulation

separating the warm concrete slab from the

structural wall. Lightweight Concrete Blocks to

be used where the insulation layer meets the

wall.

Min. 120mm HD Floor Insulation - K3

Kooltherm Floorboard or equal and approved.

1200 Gauge D.P.M Laid to Manufacturers

Instructions.

Proprietary Radon Barrier, Continuous with all

joints lapped and sealed, and with the

appropriate number of sumps and outlets.

Foundation Detail 1

SCALE 1:10 @ A1, 1:20 @ A3

1

Min 50mm Sand Blinding.

Min 250mm Hardcore Filling (Clean graded

crushed stone) Compacted in Layers of 225mm.

Radon Pipe 100mm pipe to sump

Pipe Terminates outside and is capped.

All penetrations of radon layer sealed with

resisting sealing tape.

Fountation Depth and Hardcore

Depth vary due to sloping site.

Refer to Long Section, T03

Drawing 2 for more info.

Formation Level -1200mm

300

75mm Screed on Min. on

125mm Thick 25N20 Subfloor Slab

All Services Laid Prior To Pouring & Power

Floated To Smooth Level Finish

300x 700mm Reinforced Concrete Foundation

below Single Leaf Blockwork Wall.

25N20 Concrete, with min 1 Layer of A393

Mesh.

25mm High Density Vertical Insulation

separating the warm concrete slab from the

structural wall.

Min. 120mm HD Floor Insulation - K3

Kooltherm Floorboard or equal and approved.

1200 Gauge D.P.M Laid to Manufacturers

Instructions.

Proprietary Radon Barrier, Continuous with all

joints lapped and sealed, and with the

appropriate number of sumps and outlets.

Min 35mm Sand Blinding.

Min 250mm Hardcore Filling (Clean graded

crushed stone) Compacted in Layers of

225mm.

70

0

250

12

012

57

5

Foundation Detail 2

SCALE 1:10 @ A1, 1:20 @ A3

2

495

Formation Level -1200mm

Lightweight Concrete Blocks to be used where

the insulation layer meets the wall.

300

75mm Screed on Min. on

125mm Thick 25N20 Subfloor Slab

All Services Laid Prior To Pouring & Power

Floated To Smooth Level Finish

300x 815mm Reinforced Concrete Foundation

below 215mm Blockwork Wall.

25N20 Concrete, with min 1 Layer of A393

Mesh.

25mm High Density Vertical Insulation

separating the warm concrete slab from the

structural wall. Lightweight Concrete Blocks to

be used where the insulation layer meets the

wall.

Min. 120mm HD Floor Insulation - K3

Kooltherm Floorboard or equal and approved.

1200 Gauge D.P.M Laid to Manufacturers

Instructions.

Proprietary Radon Barrier, Continuous with all

joints lapped and sealed, and with the

appropriate number of sumps and outlets.

Min 35mm Sand Blinding.

Min 250mm Hardcore Filling (Clean graded

crushed stone) Compacted in Layers of

225mm.

81

5

25

01

20

12

57

5Foundation Detail 3

SCALE 1:10 @ A1, 1:20 @ A3

3

49

5

240

Formation Level -1200mm

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

04/06/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, KILDARE, CO. KILDARE.

PROJECT

RENOVATIONS & REFURBISHMENTS

2

TITLE:

TENDER

T-D-001

As Shown

JAMES & CARMEL O BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]

FOUNDATION AND FLOOR DETAILS

ACCEPTABLE CONSTRUCTION DETAILS

Sign off required to ensure Thermal Bridging Value

Page 9: 1515-T_Drawings

165mmCavity Wall filled with 120mm HD

Insulation (Kooltherm K5 EWB or equal and

approved to achieve a minimum U-Value of

0.15 W/m2K. Insulation to be secured firmly

against the innter leaf of the cavity.

225mm x 44mm Timber Joists (C16) at

350mm Centres, supported on wall hangers.

To take floor loadings as noted in

Specification.

Allow for min 12mm Carpet

on 18mm Plywood.

Thicknesses as noted in Specification.

12.5mm Proprietary Fire Grade Plasterboard

with joints taped and filled and backed by

timber with Skim Finish to Ceilings, as noted in

Specification.

Airtight layer must continue past intermediate

floor, either through continuous S&C render

layer or through installation of airtight

membrane taped to primed blockwork prior to

fitting joist hangers.

Acoustic Insulation to be fitted between Joists

to reduce sound transfer between rooms..

165mmCavity Wall filled with 120mm HD

Insulation (Kooltherm K5 EWB or equal and

approved to achieve a minimum U-Value of

0.15 W/m2K. Insulation to be secured firmly

against the innter leaf of the cavity.

75mm Screed to first floor.

All services to be laid in screed.

Carpet on Substrate.

Thicknesses as noted in Specification.

50mm Timber Lats to be fixed to underside of

concrete floor to provide zone for services.

12.5mm Plasterboard with Skim Finish to

Ceilings, as noted in Specification.

Airtight layer must continue past intermediate

floor, either through continuous S&C render

layer or through installation of airtight

membrane taped to primed blockwork prior to

installing the concrete slab.

85mm Wide Reinforced Concrete Slab with

A142 Mesh, on Floor Hangers.

To take floor loadings as noted in

Specification.

First Floor Detail 1

SCALE 1:10 @ A1, 1:20 @ A3

1

First Floor Detail 2

SCALE 1:10 @ A1, 1:20 @ A3

2

INTERMEDIATE FLOOR DETAILS

ACCEPTABLE CONSTRUCTION DETAILS

Sign off required to ensure Thermal Bridging Value

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

04/06/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, KILDARE, CO. KILDARE.

PROJECT

RENOVATIONS & REFURBISHMENTS

TITLE:

TENDER

T-D-002

As Shown

JAMES & CARMEL O BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]

Page 10: 1515-T_Drawings

165mmCavity Wall filled with 120mm HD

Insulation (Kooltherm K5 EWB or equal and

approved to achieve a minimum U-Value of

0.15 W/m2K. Insulation to be secured firmly

against the innter leaf of the cavity.

Timber Stud Partition. 100mm x 44mm

Timber Joists (C14) at 400mm Centres.

12.5mm Proprietary Fire Grade Plasterboard

with joints taped and filled and backed by

timber with Skim Finish to Ceilings, as noted in

Specification.

Acoustic Insulation to be fitted between Studs

to reduce sound transfer between rooms..

165mmCavity Wall filled with 120mm HD

Insulation (Kooltherm K5 EWB or equal and

approved to achieve a minimum U-Value of

0.15 W/m2K. Insulation to be secured firmly

against the innter leaf of the cavity.

100mm Blockwork Wall, with Sand and

Cement Render on Both Sides to form airtight

layer.

12.5mm Plasterboard to both sides.

Moisture Resistant Plasterboard to be used in

wet rooms, eg bathrooms, ensuites etc.

165mmCavity Wall filled with 120mm HD

Insulation (Kooltherm K5 EWB or equal and

approved to achieve a minimum U-Value of

0.15 W/m2K. Insulation to be secured firmly

against the innter leaf of the cavity.

215mm Blockwork Separating Wall to Semi-D,

with Sand and Cement Render on Both Sides

to form airtight layer.

15mm Firmacell Boards at Party Wall for

Additional Sound Insulation.

Ensure Insulation is firmly secured against the

inner leaf of cavity wall, as per manufacturers

instructions.

Proprietary Cavity Closer between houses, to

suit width of the cavity (165mm), to be fitted to

manufacturers instructions.

Ensure Insulation continues across the

abutment zone, and is firmly secured against

the inner leaf of cavity wall, as per

manufacturers instructions.

All penetrations through the air tight layer to

be full sealed.

All penetrations through the air tight layer to

be full sealed.

External Wall to be Sand and Cement

Rendered before fixing Stud Partitions to

ensure continuity of air tight layer. All

penetrations through the air tight layer to be

full sealed.

Wall Junction Detail 1

SCALE 1:10 @ A1, 1:20 @ A3

1

Wall Junction Detail 2

SCALE 1:10 @ A1, 1:20 @ A3

2

Wall Junction Detail 3

SCALE 1:10 @ A1, 1:20 @ A3

3

Where fire-rating is required for

compartmentation in Semi-D (See Drawings),

Standard Blockwork should suffice.

Ensure all penetrations are fully sealed.

Where fire-rating is required to partitions for

compartmentation in Semi-D, (see drawings)

Ensure 12.5mm Plasterboard with all joints

taped and filled, on either side of Timber

Stud Partition (44mm Timber Studs at

400mm Centres.)

WALL TYPES AND JUNCTIONS

INTERMEDIATE FLOOR DETAILS

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

04/06/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, KILDARE, CO. KILDARE.

PROJECT

RENOVATIONS & REFURBISHMENTS

TITLE:

TENDER

T-D-003

As Shown

JAMES & CARMEL O BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]

Page 11: 1515-T_Drawings

2 Coats Sand & Cement Plaster

With Napped Finish.

Wall Ties - min 4.9 per sq m.

as noted in Specification

100mm Block Inner Leaf

Steelite Lintel to fully close cavity

320mm Cavity to include 80mm Kooltherm

K5 EWB (or equal and approved)

100mm Block Outer Leaf

Triple Glazed Low-e, Argon Filled Window.

Min U-Value 1.4W/m2K.

Fitted in the Line of the Insulation.

Stepped DPC

Weathered and Throated Cill

on DPC.

Hardwood Window Board

Carefully Fitted HD Insulation to

minimize thermal bridges. Thermal

resistance through the cavity

closer of not less than 0.45

m2K/W.

Wall Ties - min 4 per sq m.

As noted in Specification

100mm Block Inner Leaf

100mm Brick Outer Leaf (where

noted on elevations)

Triple Glazed Low-e, Argon Filled Window.

Min U-Value 1.4W/m2K.

Fitted in the Line of the Insulation.

Stepped DPC

Weathered and Throated Cill

on DPC.

Hardwood Window Board

Carefully Fitted HD Insulation to

minimize thermal bridges.

Moulded Window Surround / Lintel

Reinforced Precast Concrete Lintel

120mm Cavity to include 80mm Kooltherm

K5 EWB (or equal and approved)

Window Detail 1

SCALE 1:10 @ A1, 1:20 @ A3

1

Window Detail 3

SCALE 1:10 @ A1, 1:20 @ A3

3

Proprietary Cavity Closer to

ensure compliance with fire

regulations.

Insulation tightly fitted to close cavity

To eusure the cavity is fully closed,

Plasterboartd to be tightly fitted to the

underside of the lintel and tight against the

window frame, with skim coat plaster finish.

Triple Glazed Low-e, Argon Filled Window.

Min U-Value 1.4W/m2K.

Fitted in the Line of the Insulation.

Airtight Membrane to extend from blockwork

wall (where not S&C rendered), to be sealed

to Window Frame with Air Tight Tape.

Proprietary Cavity Closer or Block of Insulation

to insure the insulation layer remains

continuous between the wall insulation and the

window and ensure fully sealed for fire regs.

Min 150mm Wide Vertical DPC to be installed

against outer leaf and firmly fixed in position.

Triple Glazed Low-e, Argon Filled Window.

Min U-Value 1.4W/m2K.

Fitted in the Line of the Insulation.

Airtight Membrane to extend from blockwork

wall (where not S&C rendered), to be sealed

to Window Frame with Air Tight Tape.

Proprietary Cavity Closer or Block of Insulation

to insure the insulation layer remains

continuous between the wall insulation and the

window and to ensure fully sealed for fire regs.

Min 150mm Wide Vertical DPC to be installed

against outer leaf and firmly fixed in position.

Moulded Window Surround to be provided

where indicated on elevations.

Window Detail 2

SCALE 1:10 @ A1, 1:20 @ A3

2

Window Detail 4

SCALE 1:10 @ A1, 1:20 @ A3

4

100mm Block Inner Leaf

100mm Brick Outer Leaf (where

noted on elevations)

New Triple Glazed Door

Min U-Value 1.3W/m2K.

Fitted in the Line of the Insulation.

Stepped DPC

Moulded Window Surround / Lintel

Reinforced Precast Concrete Lintel

120mm Cavity to include 80mm Kooltherm

K5 EWB (or equal and approved)

Wall Ties - min 4 per sq m.

As noted in Specification

75mm Screed on Min. on

125mm Thick 25N20 Subfloor Slab

All Services Laid Prior To Pouring & Power

Floated To Smooth Level Finish

S&C Screed is Airtight Layer - to be fully sealed

and taped to wall prior to S&C plastering.

25mm High Density Vertical Insulation

separating the warm concrete slab from the

structural wall. Lightweight Concrete Blocks to

be used where the insulation layer meets the

wall.

Min. 120mm HD Floor Insulation - K3

Kooltherm Floorboard or equal and approved.

1200 Gauge D.P.M Laid to Manufacturers

Instructions.

Proprietary Radon Barrier, Continuous with all

joints lapped and sealed, and with the

appropriate number of sumps and outlets.

Finished Level of Flooring

Concrete Cill with max slope of 15 degrees.

Max threshold height of 15mm where level

access is required.

Aco Drainage Channel or Equal and Approved

where Level Access Threshold Provided.

Door unit to have proprietary lower threshold

system as required where level access

requirement is noted on drawings.

Door Threshold Detail

SCALE 1:10 @ A1, 1:20 @ A3

5

Min. 120mm HD Floor Insulation - K3

Kooltherm Floorboard or equal and approved.

1200 Gauge D.P.M Laid to Manufacturers

Instructions.

Proprietary Radon Barrier, Continuous with all

joints lapped and sealed, and with the

appropriate number of sumps and outlets.

Concrete Cill with max slope of 15 degrees.

Max threshold height of 15mm where level

access is required.

Aco Drainage Channel or Equal and Approved

where Level Access Threshold Provided.

75mm Screed on Min. on

125mm Thick 25N20 Subfloor Slab

All Services Laid Prior To Pouring & Power

Floated To Smooth Level Finish

S&C Screed is Airtight Layer - to be fully sealed

and taped to wall prior to S&C plastering.

25mm High Density Vertical Insulation

separating the warm concrete slab from the

structural wall.

Lightweight Concrete Blocks to be used where

the insulation layer meets the wall.

Triple Glazed Low-e, Argon Filled Window.

Min U-Value 1.4W/m2K.

Fitted in the Line of the Insulation.

Full Height Glazing Detail

SCALE 1:10 @ A1, 1:20 @ A3

6

Steelite Lintel to fully close cavity

100mm Block Outer Leaf

Triple Glazed Low-e, Argon Filled Window.

Min U-Value 1.4W/m2K.

Fitted in the Line of the Insulation.

Stepped DPC

Lightweight Concrete Blocks to be used where

the insulation layer meets the wall.

Airtight Membrane taped to Window Frame,

and taped back to primed blockwork wall at

first floor level.

WINDOWS AND DOORS DETAILS - HEAD, CILL AND JAMB.

ACCEPTABLE CONSTRUCTION DETAILS

Sign off required to ensure Thermal Bridging Value

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

04/06/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, KILDARE, CO. KILDARE.

PROJECT

RENOVATIONS & REFURBISHMENTS

TITLE:

TENDER

T-D-004

As Shown

JAMES & CARMEL O BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]

Page 12: 1515-T_Drawings

Slates to be laid to Manufacturers's Instructions.

50mm Clear Ventilation Gap Using

Proprietary Spacers Under Sarking

Felt Where Necessary Along Eaves

Black PVC Soffit and Fascia, with Vent to provide

continuous air ventilation gap to cold roof space.

120mmCavity Wall filled with 80mm HD

Insulation (Kooltherm K5 EWB or equal and

approved to achieve a minimum U-Value of

0.15 W/m2K.

55 x 33mm Battens on Breather Membrane

2 Coats Sand & Cement Plaster

With Napped Finish

on 100mm Block Outer Leaf

Slate Cavity Closer.

Black PVC Gutters and Downpipes,

Laid and Fixed to Manufacturer's Instructions

Sarking Felt to lap into Gutter.

Min 300mm Insulation between and

above Ceiling Joists to Continue down

to insulation in wall, providing a

continuous insulation layer.

225mm Rafters to be Strapped to wall

with 30x5mm Galvanised Straps.

100 x 75mm Wall Plate with 12mm

Rawl bolts @ 1m Centres.

12.5mm Sand & Cement Plaster Layer to

100mm Inner Blockwork Wall.

S&C Plaster acts as airtight layer, all

penetrations to be sealed and plastered over.

Airtight Membrane at Ceiling Level (on Warm

Side of Insulation), above Plasterboard Ceiling. -

All penetrations to be taped and sealed. AIrtight

Layer membrane to be taped down to blockwork

wall before plastering and plastered over to seal.

Continuous Insulation between Wall

and Roof.

Roof Detail 1

SCALE 1:10 @ A1, 1:20 @ A3

1

Additional Wall Ties at top of Wall to firmly tie

two leaves of cavity wall together

ROOF DETAILS

ACCEPTABLE CONSTRUCTION DETAILS

Sign off required to ensure Thermal Bridging Value

ISSUE:

PROJECT NO:

1515

DRAWN / CHECKED

JD/MD

DRAWING NO:

SCALE:

REV NO:

DATE

04/06/2015

CLIENT:

LOCATION:

FARRELL'S CROSS, KILDARE, CO. KILDARE.

PROJECT

RENOVATIONS & REFURBISHMENTS

TITLE:

TENDER

T-D-006

As Shown

JAMES & CARMEL O BRIEN

Ph: (087) 2658843 and (087) 6344679 Tel: (045) 531446

E-mail: [email protected] E-mail: [email protected]