Top Banner
INTEGRATED MANAGEMENT OF ENERGY PROJECTS CHINA´S CSP MARKET www.ingeteam.com
16

151111 csp today seville 2015

Apr 12, 2017

Download

Engineering

esmesm
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 151111 csp today seville 2015

INTEGRATED MANAGEMENT OF ENERGY PROJECTS

CHINA´S CSP MARKET

www.ingeteam.com

Page 2: 151111 csp today seville 2015

WHO IS INGETEAM

Power Plants is the Business Unit belonging to Ingeteam Power TechnologySA responsible for the Integrated Management of energy Projects fromconception to delivery to the end customer, adopting solutions that maximizebusiness profitability and offering:

Turnkey projects Products Services

Page 3: 151111 csp today seville 2015

SERVICES & PRODUCTS

Engineering Components Manufacture

EPC Operation & Maintenance

Feasibility ReportsBasic EngineeringDetail EngineeringRe-engineering of existing power plants

Control SystemAutomation of existing power plants

CSP Power PlantsCST Plants

O&M procedures and ManualO&M Services

Page 4: 151111 csp today seville 2015

Poland

Italy

France

Germany

CzechRepublic

INGETEAM INTERNATIONAL PRESENCE AND SUBSIDIARIES

SpainChina

India

Australia

South Africa

BrazilChile

Mexico

USA

Panama

Rumany

Zamudio(Bizkaia)

Sarriguren (Navarra)

Sesma (Navarra)

Power Plants(Araba)

Indar(Gipuzkoa)

Page 5: 151111 csp today seville 2015

MAIN REFERENCESSolar Thermal Projects

Plant Pot. Client Ingeteam Scope Year Status

Delingha 50 MW CGN SEDC Feasibility studyBasic engineering 2014 In construction

Gujarat Solar One 25 MW Cargo Power Owner’s engineering 2013 In construction

MoronOlivenza

50 MW50 MW Ibereólica Electrical Equipment and Solar

Field Control System 2013 In operationItalia 50 MW Teknosolar Basic engineering

and permitting2012 Permits stage

MajadasOrellana

50 MW50 MW Acciona Electrical Equipment and Solar

Field Control System2010 2012 In operation

Pág.. n

Total accumulated power : 539 MW

Orellana 50 MW Acciona Field Control System 2012 In operationPalma del

Río I50 MW Acciona EPC Power Block

Electrical Equipment and Solar Field Control System

2011In operation

Palma del Río II 50 MW Acciona

EPC Power BlockElectrical Equipment and Solar

Field Control System2010 In operation

Alvarado 50 MW Acciona Owner’s engineering 2010 In operationNevada

Solar One 64 MW Acciona Owner’s engineering 2008 In operation

Page 6: 151111 csp today seville 2015

CHINA´S CSP MARKET

• CSP plants suitable location• Why CSP?• Solar Park Configuration• China CSP Localization

• CSP plants suitable location• Why CSP?• Solar Park Configuration• China CSP Localization

Pág.. n

Page 7: 151111 csp today seville 2015

SUITABILITY LOCATION OF SOLAR THERMAL POWER PLANTS

SOLAR RESOURCE PARTICULATES

Pág.. n

•Close to existing electrical grid•High DNI resource•Low dust and pollution•Close to existing electrical grid•High DNI resource•Low dust and pollutionELECTRICAL GRID

Page 8: 151111 csp today seville 2015

WHY CSP ??? ELECTRICAL GENERATION FUEL MATRIX

Coal; 63%

Hydro ; 22%

Wind; 6%PV; 1% biomass;

1%CSP; 0%

CHINA Coal; 45%

Nuclear ; 15%

Gas; 12%Fuel; 2%

Hydro ; 5%

Wind; 9%PV; 5% biomass; 7% CSP; 0%

GERMANY

Pág.. n

Nuclear ; 1%

Gas; 4%Fuel; 2%

Coal; 11%

Nuclear ; 8%

Gas; 31%

Fuel; 3%

Hydro ; 21%

Wind; 20%

PV; 4%biomass; 1%

CSP; 1%SPAINElectrical Generation Fuel MixTransition

Reduce Coal Energy. Avoid significative increase of Nuclear and Gas Energy. Introduce Renewable Energy thatcan manage Intermitent generation of PV and Wind.

Electrical Generation Fuel MixTransition Reduce Coal Energy. Avoid significative increase of Nuclear and Gas Energy. Introduce Renewable Energy thatcan manage Intermitent generation of PV and Wind.

Page 9: 151111 csp today seville 2015

WHY CSP ???FUEL MIX TRANSITION

Renewable Energy Non

Dispatchability

Renewable Energy

Dispatchability23%

CHINAConventional

60%

Conventional Back Up

14%

Renewable Energy Non

Dispatchability14%

Renewable Energy

Dispatchability12%

GERMANYConventional : Coal + NuclearConventional back up: Gas + FuelRE Non Dispatchability: PV+WindRE Dispatchability: Hydro+CSP+Biomass.

Pág.. n

Conventional64%

Conventional Back Up

6%

Dispatchability7%

Conventional19%

Conventional Back Up

34%Renewable Energy Non

Dispatchability24%

Renewable Energy

Dispatchability23%

SPAIN

14%

PV & Wind need back up energy. Prefereably Renewable EnergyAvoid electrical systemOvercapacityAvoid Conventional sustitutionfrom Conventional back up energies.

PV & Wind need back up energy. Prefereably Renewable EnergyAvoid electrical systemOvercapacityAvoid Conventional sustitutionfrom Conventional back up energies.

Page 10: 151111 csp today seville 2015

WHERE CSP ???

SOLAR PARKSOLAR PARK Dispatchability Reduce ElectricalGrid Investment Reduce Conventional Power Plants Back-up

Pág.. n

PVPV CSPCSP

Page 11: 151111 csp today seville 2015

CHINA´S CSP MARKET

Increase the supply of equipments or

CSP Local Development

Supply key equipments and systems.

Equipments or components manufactured in

Previous Phase: CSP First Projects:

Pág.. n

equipments or components in special key equipments and systems.

manufactured in China are in operation in several CSP power plants.

CHINA CSP MARKET

Page 12: 151111 csp today seville 2015

CHINA´S CSP MARKET

Pág.. n

Page 13: 151111 csp today seville 2015

CHINA´S CSP MARKET

Pág.. n

Page 14: 151111 csp today seville 2015

LCOE EVOLUTION

100150200250300350400

PVWindCSP

INCREASE PV POWER PLANTSINCREASE ANNUAL CAPACITYINCREASE WORLD SUPPLIERS

Pág.. n

050

2000 2005 2010 2015INCREASE WIND MILL POWERINCREASE ANNUAL CAPACITYINCREASE WORLD SUPPLIERS

Page 15: 151111 csp today seville 2015

CSP DELINGHA VIDEO

Pág.. n

[email protected]

Page 16: 151111 csp today seville 2015

THANK YOU FOR YOUR ATTENTION

Pág.. n