Top Banner
"Energy solutions with 'best in class' gas engine technology" 2G 2G - - The Way Biogas CHP was Meant to Be The Way Biogas CHP was Meant to Be 2G EnergieTechnik
17

15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

Sep 01, 2018

Download

Documents

trinhtu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

2G 2G -- The Way Biogas CHP was Meant to BeThe Way Biogas CHP was Meant to Be

2G EnergieTechnik

Page 2: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

• Gas engine based CHP and other distributed generation systems– 50-500 kW with 2G optimized MAN gas engines

– 500-4400 kW with 2G packaged Jenbacher gas engines

– 30-1000 kW with Capstone MicroTurbines

• Emission control technology– HUG/Miratech/COdiNOx

• System management– Tenergy Services North America

• Operation and Maintenance– Parts, Service, Plant operation

– Cross Canada Service Network

EPS Business Overview

Page 3: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

2011 Delivery Program - 60 Hz – 2G Biogas

Model Electrical Output1)

ekW

Thermal

Output2)

kW

Total

Output

kW

Electrical Efficiency (LHV)

%

Thermal Efficiency

%

System Efficiency

%

2G-KWK-100BGG4) 100 140 240 36.4 51.0 87.4

2G-KWK-190BGG4) 190 237 427 36.4 45.3 81.7

2G-KWK-250BGG4) 250 269 519 39.5 42.0 82.8

2G-KWK-370BGG4) 370 458 828 36.9 45.8 82.7

2G-KWK-500BGG5) 500 634 1134 36.6 46.4 83.0

2G-KWK-633BGG5) 633 787 1420 38.1 47.4 85.5

2G-KWK-850BGG5) 850 918 1768 40.1 43.3 83.4

2G-KWK-1060BGG5) 1060 1272 2332 39.0 46.7 85.7

2G-KWK-1135BGG5) 1135 1225 1360 40.2 43.4 83.6

2G-KWK-1425BGG5) 1425 1535 2960 40.3 43.4 83.7

2G-KWK-1625BGG5) 1625 1652 3277 42.0 42.7 84.8

2G-KWK-2175BGG5) 2175 2206 4381 42.1 42.7 84.9

2G-KWK-2725BGG5) 2725 2750 5475 42.3 42.7 85.0

1) As measured at the generator terminals

2) Exhaust cooled to 120oC

3) Water cooled enclosure

4) Prime mover is MAN gas engine

5) Prime mover is Jenbacher gas engine

• All data measured at full load, subject to technical modifications and change

• Electrical output based on ISO standards and conditions in accordance with

ISO3046/1-1991 and VDE-0530 with respective tolerances

Page 4: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

We supply, service and operate CHP systems, providing project developers, plant operators & end-users with “Best-In-Class” energy solutions.

Our Area of ExpertiseOur Area of Expertise

EPS Area of Expertise

Page 5: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

Business as UsualPackaging the North-American Way

Page 6: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

Customers are seeking:• High quality design, packaging and component

selection, suitable for 20 year project life

• Reliable system operation (maximize revenues)

• Predictable operating and maintenance cost (minimize O&M cost)

• High electrical and thermal efficiencies (minimize fuel cost)

What Customers Really Want

Page 7: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

Pump & CirculationCompartment

Electronic ControlSection

Heat ExchangerCompartment

Heat Exchanger and Exhaust System

Compartment

The CHP Module

Page 8: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

Pump & CirculationCompartment

Electronic ControlSection

Heat ExchangerCompartment

Special Sound AttenuatedEnclosure for Inside Installation

The CHP Module

Page 9: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

Fully Containerized & Sound Attenuated CHP Modules

The entire CHP Plant in one Container.

Containerized CHP Modules

Page 10: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

Containerized CHP Modules

Page 11: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

Containerized CHP Modules

Page 12: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

Containerized CHP Modules

Page 13: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

Containerized CHP Modules

Page 14: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

®

Agenitor 306Best in Class 250 kW CHP System

Page 15: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

Increased Revenue Potential of Optimized Gas Engine Technology

Model 2G JMS312(reduced pwr)

2G-KWK-250-BGGStandard V8

Twin-pack with 2 x agenitor 306

Quantity: 1 2 2

Power Output (kW) 500 kW 500 kW 500 kW

Thermal Output (kW) 634 kW 648 538

Thermal Output (btu/hr) 2,165,254 2,213,036 1,838,000

Fuel Consumption (kW) 1,366 1,388 1,266

Fuel Consumption (btu/hr) 4,666,313 4,740,268 4,323,617

Electrical Efficiency (%) 36.6 36 39.5

Thermal Efficiency (%) 46.4 46.8 42.0

Total Efficiency (%) 83 82.8 81.5

Cost of ownership – capital + maintenance (20 yrs)

$1,956,967 $2,217,475 $1,970,287

Fuel savings (m3/yr) 29,046 0 163,642

Fuel savings (m3 in 20 yr) 580,920 0 3,272,840

Revenue potential of fuel saved ($0.16/kWh):

$211,027 $1,283,143

Page 16: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

First Major Overhaul 60,000 Hours

First Top-End Overhaul 30,000 Hours

Systems Designed for Maximum Durability and Reliability

Page 17: 15 2G - Jan Buijk - Deutsch-Kanadische AHKkanada.ahk.de/fileadmin/ahk_kanada/05.Publications/2011_Bioenergie/... · – HUG/Miratech/COdiNOx ... Service: 519-760-9477 EPS Ltd. Title:

"Energy solutions with 'best in class' gas engine technology"

EPS Ltd.2425 Matheson Blvd. East, 8th Floor

Mississauga, On., L4W 5K4Tel: 416-804-2203 / Fax: 416-907-3976

Service: 519-760-9477www.epsenergy.ca

EPS Ltd.