Top Banner

of 27

14 GSM BSS Network KPI Call Setup Time Optimization Manual

Jun 03, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    1/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    Product Name Confidentiality Level

    G3BSC INTERNAL

    Product Version Total 27 pages

    GSM BSS Network KPI (Call Setup Time)

    Optimization Manual

    For internal use only

    Prepared by Yang Chunjie (ID: 00119951) fromthe GSM&UMTS NetworkPerformance Research Dept.

    Date 2008-12-24

    Reviewed by Date yyyy-mm-dd

    Reviewed by Date yyyy-mm-dd

    Approved by Date yyyy-mm-dd

    Huawei Technologies Co., Ltd.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    2/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    All rights reserved

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    3/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 3 of 27

    Contents

    1 Overview of the Call Setup Time....................... ............................................... 7

    1.1 Definition of the Call Setup Time ..................... .................... ..................... .................... .... 7

    1.2 Recommended Formulas ................... .................... ..................... ..................... .................. 7

    1.3 Signaling Procedure and Measurement Points ................ ..................... .................... .......... 8

    2 Influencing Factors............................................................................................ 10

    2.1 Procedure Configuration ......................... .................... ........................ ................. ........... 10

    2.2 Parameter Settings ................ ........................ .................... ..................... .................... ..... 10

    2.3 Routing .......................................................................................................................... 10

    2.4 Hardware, Transmission, Coverage, and Interference ...... ...... ...... ...... ..... .... ...... ...... ..... ..... 11

    3 Analysis Process and Optimization Method ............................... .................. 12

    3.1 Analysis Process ................ ..................... .................... ........................ ..................... ....... 12

    3.2 Process Description ............................. .................... ..................... ....................... ........... 13

    3.2.1 Procedure Configuration ......................... .................... ..................... .................... .. 13

    3.2.2 Parameter Setting ..................... .................... ..................... ..................... ................ 15

    3.2.3 Routing.................................................................................................................. 18

    3.2.4 Hardware, Transmission, Coverage, and Interference .............................................. 19

    4 Test Method ....................................................................................................... 21

    5 Optimization Cases ........................................................................................... 22

    5.1 Long Call Setup Time Due to Long Period of Assignment Command Delivery ................ 22

    5.1.1 Problem Description ................ .................... ..................... ..................... ................ 22

    5.1.2 Problem Analysis ..................... .................... ..................... ..................... ................ 22

    5.1.3 Suggestion and Summary ........................ .................... ..................... .................... .. 22

    5.2 Long Call Setup Time Due to Reporting of Two Classmark Change Messages .... ..... ...... .. 23

    5.2.1 Problem Description ................ .................... ..................... ..................... ................ 23

    5.2.2 Problem Analysis ..................... .................... ..................... ..................... ................ 23

    5.2.3 Suggestion and Summary ........................ .................... ..................... .................... .. 24

    5.3 Long Call Setup Time Due to Calling and Called MSs Under Different MSCs ................. 24

    5.3.1 Problem Description ................ .................... ..................... ..................... ................ 24

    5.3.2 Problem Analysis ..................... .................... ..................... ..................... ................ 24

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    4/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 4 of 27

    5.3.3 Suggestion and Summary ........................ .................... ..................... .................... .. 24

    5.4 Long Call Setup Time Due to Inconsistency in Signaling Procedures ............................... 25

    5.4.1 Problem Description ................ .................... ..................... ..................... ................ 25

    5.4.2 Problem Analysis ..................... .................... ..................... ..................... ................ 25

    5.4.3 Suggestion and Summary ........................ .................... ..................... .................... .. 26

    6 Information Feedback ....................................................................................... 27

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    5/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 5 of 27

    Revision Record

    Date Revision Change Description Author

    2008-12-24 V0.3 Draft completed. Yang Chunjie

    2009-1-20 V1.0 This document is modifiedaccording to review comments.

    Yang Chunjie

    References

    SN Document Author Date

    1 GSM BSS Network KPI

    (Call Setup Time) Baseline

    Wu Zhen 2007-08-24

    2 GSM Call Setup Time(CS) Analysis Report

    Zha Shuangliu, LiXiaomeng, Zhang Lida,

    and Wu Baishan

    2008-10-25

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    6/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 6 of 27

    GSM BSS Network KPI (Call Setup Time)

    Optimization Manual

    Keywords

    Call setup time

    Abstract

    This document describes the method of optimizing the call setup time.

    Acronyms and Abbreviations

    MOC Mobile Originated Call

    MTC Mobile Terminated Call

    PSTN Public Switched Telephony Network

    TMSI Temporary Mobile Station Identity

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    7/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 7 of 27

    1 Overview of the Call Setup Time1.1 Definition of the Call Setup Time

    The call setup time indicates the mean time from the originating of a call by a

    subscriber to the setup of the call. A long call setup time will severely affectthe user experience. Therefore, the call setup time is one of the KPIs that

    operators are most concerned about.

    1.2 Recommended FormulasThe call setup time is obtained through drive tests. It refers to the time for an

    MS to set up an end-to-end call through radio network equipment. There arethree types of call setup time:

    l MS to PSTN: average interval between the transmission of the Channel

    Request message from the MS and the MS's reception of the Alertingmessage sent from the MSC

    l MS to MS: average interval between the transmission of the Channel

    Request message from the calling MS and the calling MS's reception ofthe Alerting message sent from the MSC

    l PSTN to MS: average interval between MS's receiving of the pagingmessage from the MSC and sending of the Alerting message from theMS to the MSC

    Note that the call setup time is the average setup time of multiple successful

    calls. You need to conduct multiple dialing tests.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    8/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 8 of 27

    1.3 Signaling Procedure and Measurement Points

    Figure 1-1Measurement points in an MOC setup procedure (with the earlyassignment procedure as an example)

    BTS BSC

    Channel RequestChannel Required

    Channel Active

    Channel Active

    ACK

    Immediate Assignment Command

    SABM

    UA

    Established

    Indication CR

    CC

    CM Service Accepted

    Setup

    Call ProceedingAssignment

    RequestChannel Active

    Channel Active

    ACK

    Assignment Command

    SABM

    UA

    Established

    Indication

    Assignment Complete

    Assignment

    Complete

    A

    B

    MS

    Alerting

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    9/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 9 of 27

    Figure 1-2Measurement points in an MTC setup procedure (with the earlyassignment procedure as an example)

    MS BTS BSC MSC

    Channel Request

    Channel Required

    Channel Active

    Channel Active

    ACKImmediate Assignment Command

    SABM

    UAEstablished

    Indication CR

    CC

    CM Service Accepted

    Setup

    Call Control

    Assignment

    RequestChannel Active

    Channel Active

    ACK

    Assignment Command

    SABM

    UA

    Established

    Indication

    Assignment Complete

    Assignment

    Complete

    Alerting

    C

    D

    paging

    Paging CommandPaging Required

    In Figure 1-1 and Figure 1-2:

    l A is the time when the MS sends a Channel Request message.

    l B is the time when the MS receives the Alerting message from the MSC.

    l C is the time when the MS receives a paging message.

    l D is the time when the MS sends an Alerting message.

    In the tests of MS-to-MS or MS-to-PSTN calls, the call setup time is equal to

    B minus A; in the tests of PSTN-to-MS calls, the call setup time is equal to D

    minus C.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    10/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 10 of 27

    2Influencing Factors

    2.1 Procedure ConfigurationThe setup of either an MOC or an MTC involves many procedures such asauthentication and ciphering mode setting and relates to multiple NEs such asthe MSC, BSC, BTS, and MS. Therefore, the configuration of the call

    procedures directly determines the length of the call setup time.

    2.2 Parameter SettingsThe call setup time is related to the entire procedure of an MOC or MTC, andtherefore, many parameters can affect the call setup time.

    The following are some examples:

    l BS-PA-MFRAMS

    l Use Imm_Ass Retransmit Parameter

    l Max Delay of Imm_Ass Retransmitand Max Transmit Times ofImm_Ass

    l Pre-paging function, which is set on the MSC

    lImmediate Assignment Opt.

    l ECSC, which means early classmark sending control

    l Allow Reassign

    l Late assignment function, which is set on the MSC

    l Assignment command optimization

    l Force Queue In Assignment

    l T11(s)

    2.3 Routing

    The network equipment of different manufacturers varies. Therefore, in thecase of interworking between equipment of different manufacturers or changein routing, analysis and handling should be performed, on the basis of drive

    test results.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    11/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 11 of 27

    2.4 Hardware, Transmission, Coverage, andInterference

    A problem in hardware, transmission, coverage, or interference may result in

    an increase in the call setup time.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    12/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 12 of 27

    3Analysis Process and OptimizationMethod

    3.1 Analysis Process

    Figure 3-1Analysis processCall setup time

    too long

    Collect the testdata

    Is it due to a problemin parameter settings?

    Is it due to a

    problem in routing?

    Analyze the problembased on the signaling

    and data configurationand take proper measures

    Is the problemsolved?

    End

    Yes

    Yes

    Yes

    Yes

    No

    No

    No

    Is it due to a problem inprocedure configuration?

    No

    Optimize the procedureconfiguration and then

    verify the optimization

    Adjust the parameter

    settings and then

    verify the adjustment

    Is it due to a problem inhardware, transmission,

    coverage, or

    interference?

    Solve the problem

    according to the relatedoptimization manual

    Yes

    No

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    13/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 13 of 27

    3.2 Process Description

    3.2.1 Procedure Configuration

    During the setup of a call, some procedures are optional, such asauthentication, ciphering mode setting, and TMSI reallocation, and

    independent of each other. Therefore, flexible configuration of the proceduresaccording to operators' requirements is applicable.

    On the existing networks, ciphering is generally enabled, and authenticationand TMSI reallocation are enabled on a proportion (that is, 10% to 20%) ofMSCs.

    Authentication

    For a 3G subscriber, during the authentication when the mobile accesses a

    GSM network, the MSC sends an authentication message to the mobile. Themessage contains the RAND, AUTN, and RES, and is longer than 23 bytes.

    Therefore, the LAPDm needs to divide the message into two and deliver themseparately.

    Thus, in a GSM network, a 3G subscriber requires 240 ms to 260 ms morethan a 2G subscriber in terms of the call setup time.

    In addition, when the BSC assigns an AMR channel, the AssignmentCommand message will be longer than 23 bytes if the frequency hopping MAis too long. This results in 240 ms to 260 ms more in the call setup time.

    Ciphering Mode Setting

    During the setup of an MOC, if the ciphering mode setting procedure is not

    performed, the MS does not send a Setup message until it receives a CM

    Service Accepted message from the MSC; if ciphering is to be enabled,however, the MS can send a Setup message immediately after the cipheringmode setting procedure is performed.

    Therefore, for an MOC, the call setup time in the case of ciphering enabled is

    generally only 250 ms to 300 ms longer than the call setup time in the case ofciphering not enabled. This is because the MS sends one more message (thatis, the Ciphering Mode Complete message) to the network in the case of

    ciphering enabled.

    TMSI Reallocation

    The TMSI is reallocated according to the settings on the network side after

    each operation or several operations on the air interface, such as a call or alocation update.

    Classmark Enquiry

    The Core Network (CN) can obtain the MS's information about their

    multiband and multislot capabilities through the classmark enquiry procedure.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    14/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 14 of 27

    At the BSS, the cell-oriented parameter ECSCis set. The BSS sends the

    parameter through the system information type 3. Once an MS accesses thenetwork, the MS reports Classmark3. According to the protocol, this must beimplemented at MSs that support multiband, multislot, and Voice Group Call

    Service (VGCS).

    In practice, competitors generally do not enable classmark enquiry in theirCNs but use ECSC. Thus, the LAPDm signaling interaction on the air

    interface is reduced, and the call setup time is shortened. Huawei, however,enables classmark enquiry in all its CNs by default. In addition, the classmark

    enquiry is not user-configurable. It can be controlled by the related reservedsoftware parameter only.

    Therefore, when ECSC is enabled at both competitor's BSS and Huawei BSS,

    Huawei CN results in at least 240 ms more than competitor's CN in terms of

    the call setup time. For specific cases, see sections 5.2 "Long Call Setup TimeDue to Reporting of Two Classmark Change Messages" and 5.4 "Long Call

    Setup Time Due to Inconsistency in Signaling Procedures."

    Optimization on I frames at the LAPDm

    Before the optimization, Huawei BTS does not support the function of

    downlink I frames acknowledging uplink I frames at the LAPDm. That is,

    after receiving an uplink I frame from an MS, the BTS immediately sends anRR response message to the MS. During this process, if the BTS receives adownlink I frame from the BSC, the BTS has to postpone the delivery of the

    downlink I frame, that is, the BTS sends the downlink I frame in the nextdelivery period. Thus, the delay increases. This problem can be solved afterthe upgrade.

    With the optimization, the BTS can acknowledge uplink I frames by downlinkI frames. That is, after receiving an uplink I frame from an MS, the BTS doesnot send an RR frame immediately. Instead, the BTS waits a period of time

    and checks whether it receives a downlink I frame. If the BTS receives adownlink I frame during this period, it acknowledges the uplink frame by thedownlink I frame. Thus, the delay is decreased by one delivery period.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    15/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 15 of 27

    Figure 3-2 shows the effect of the optimization.

    Figure 3-2Optimization on I frames at the LAPDm

    The optimization can be achieved by BTS upgrade only. It is incorporated into

    V300R008C11B337 of the BTS. During the optimization on the call setuptime on site, the optimization on I frames can be considered.

    3.2.2 Parameter Setting

    The main parameters that affect the call setup time are as follows:

    l BS-PA-MFRAMS

    This parameter specifies the number of multi-frames used as a unit of thepaging sub-channel.

    If this parameter is set to a high value, the average paging delay is great.

    Thus, the MS-to-MS call setup time and the PSTN-to-MS call setup timeare prolonged.

    l Use Imm_Ass Retransmit Parameter

    If this parameter is set to Yes, the BSC sends the immediate assignmentretransmission parameter to the BTS. Otherwise, the BSC does not sendthe immediate assignment retransmission parameter to the BTS.

    The immediate assignment retransmission function can help increase the

    call completion rate of MSs but may increase the access delay of MSsand the load of the BSC.

    It is recommended that this function be disabled.

    l Max Delay of Imm_Ass Retransmitand Max Transmit Times ofImm_Ass

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    16/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 16 of 27

    These two parameters specify the maximum delay of the immediate

    assignment retransmission and the maximum number of immediateassignment retransmissions respectively.

    When the network quality is poor, an immediate assignment messagemay need to be retransmitted. If these parameters are set to high values,

    the average call setup time may be prolonged.

    l Pre-paging function

    This parameter is set on the MSC.

    If the pre-paging function is enabled, the MSC pages the called partyas soon as the MSC receives the Setup message from the callingparty.

    If this function is not enabled, the MSC pages the called party as soonas the MSC sends the Call Proceeding message.

    Therefore, for MS-to-MS calls, the call setup time can be shortened if the

    pre-paging function is enabled.

    It is recommended that this function be enabled.

    l Immediate Assignment Opt.

    The channel activation and immediate assignment commands are sent atthe same time to accelerate the signaling processing, thus improving theresponse speed of the network.

    It is recommended that this function be enabled.

    l ECSC

    This parameter specifies whether the MSs in a cell use early classmarksending.

    If this parameter is set to Yes, after a successful immediate

    assignment, the MS sends additional classmark information to thenetwork as early as possible.

    For dual-band MSs, if this parameter is set to No, the MSC sends aClassmark Request message after the MS reports an Establish

    Indication message. The MS then reports the Classmark Updatemessage. The access delay of the MS is affected.

    l Allow Reassign

    If this parameter is set to Yes, the BSC initiates a reassignment whenreceiving an assignment failure message over the Um interface. Thishelps increase the call completion rate and improve the QoS of the

    network. The successful reassignment, however, results in an increase inthe access delay of MSs and the load of the BSC.

    It is recommended that this function be disabled.

    l Late assignment procedure

    This parameter is set on the MSC. With the late assignment function, theassignment command is sent after alerting. This can shorten the call

    setup time. In the late assignment procedure, however, the reception ofthe Alerting message does not necessarily indicate the establishment of acall. Therefore, the call setup time is not measured in the late assignmentprocedure.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    17/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 17 of 27

    It is recommended that this function be disabled.

    l Assignment command optimization

    If frequency hopping is enabled at Huawei BTS, the ARFCNs in the

    assignment command are delivered in the form of CA+MA by default,

    which may result in the assignment command longer than 23 bytes. Then,the message is divided into two I frames at the LAPDm, which aredelivered separately. Thus, the delay is increased by about 230 msbecause of the addition of a delivery period.

    To shorten the call setup time, the ARFCNs can be delivered in the formof frequency list so that the assignment command can be delivered in oneI frame.

    On live networks, the frequency list mode is recommended. Table 3-1describes how to set this parameter.

    Table 3-1Setting of the assignment command optimization parameterParameter Setting Decrease in

    the Delay

    Assignment

    commandoptimizationparameter

    Bit 1 of the

    cell-orientedreserved parameter1 is 1, that is, the

    parameter value is65535.

    CA+MA No

    Bit 1 of the

    cell-orientedreserved parameter

    1 is 0, that is, theparameter value is

    65533.

    Bit 2 of reserved

    parameter 1 is 0, thatis, the parameter valueis 65529.

    Frequency list

    with thevariable bit mapcoding scheme

    About200 ms

    Bit 2 of reservedparameter 1 is 1, thatis, the parameter valueis 65533.

    Frequency listwith the bit map0 codingscheme

    The assignment command optimization is incorporated into BSC6000V900R008C11B168SP11 and later releases.

    For specific cases, see chapter 5 "Optimization Cases."

    l Force Queue In Assignment

    When this parameter is set to Yes, the BSC puts an assignmentrequest message into the assignment request message queue if noTCH is available for assignment, or the BSC assigns a TCH to theMS if the TCH is available for assignment.

    If this parameter is set to No, the value of queuing allowed indicatorin the assignment request message is 0, which means that the

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    18/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 18 of 27

    assignment request message cannot be put into the assignment

    request message queue. Then, the channel request is rejected when noTCH is available for assignment.

    The default value of this parameter is No.

    l

    T11(s)This parameter specifies the length of the timer that is started to wait fora channel requested by an assignment request message. When the BSCreceives an assignment request but no channel is available forassignment, the BSC starts the queuing procedure and this timer. If thechannel request is accepted before the timer expires, the timer stops. Ifthe timer expires, the channel assignment fails.

    When queuing is enabled, a high value of this parameter directly leads toa long call setup time.

    3.2.3 Routing

    On live networks, when swapping is performed, the BSC and MSC are

    re-deployed and thus the call routing changes. Therefore, the setup time ofinter-MSC calls is affected. In this case, tests should be conducted, and theanalysis should be performed on the basis of the test results obtained before

    and after the swapping.

    For a specific case, see section 5.3 "Long Call Setup Time Due to Calling and

    Called MSs Under Different MSCs."

    Table 3-2 lists the example values of delay during an MS-to-MS call made inthe lab. On live networks, the delay values are related to the actual situations.

    The data in Table 3-2 is provided only for reference.

    Table 3-2Example values of delay during an MS-to-MS call made in the labSignaling of an Outgoing MS-to-MS Call (Authentication,Ciphering, and TMSI Reallocation Enabled, Whereas ClassmarkEnquiry Disabled)

    Relative Delay(Unit: s)

    Channel Request (UL) -> Immediate Assignment (DL) 00.050

    Immediate Assignment (DL) -> SABM-CMD (UL) 00.132

    SABM-CMD (UL) -> Authentication Request (DL) 00.708

    Authentication Request (DL) -> Authentication Response (UL) 00.125

    Authentication Response (UL) -> Ciphering Mode Command (DL) 00.564

    Ciphering Mode Command (DL) -> Ciphering Mode Complete (UL) 00.000

    Ciphering Mode Complete (UL) -> Setup (DL) 00.005

    Setup (UL) -> TMSI Reallocation Command (DL) 00.458

    TMSI Reallocation Command (DL) -> TMSI Reallocation Complete (UL) 00.001

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    19/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 19 of 27

    Signaling of an Outgoing MS-to-MS Call (Authentication,Ciphering, and TMSI Reallocation Enabled, Whereas ClassmarkEnquiry Disabled)

    Relative Delay(Unit: s)

    TMSI Reallocation Complete (UL) -> Call Proceeding (DL) 00.466

    Call Proceeding (DL) -> Assignment Command (DL) 00.466

    Assignment Command (DL) -> Assignment Complete (UL) 00.011

    Assignment Complete (UL) -> SABM-CMD (UL) 00.039

    SABM-CMD (UL) -> Alerting (DL) 04.797

    Total delay 07.822

    The versions of NEs used in the test are as follows:

    l

    CN: G9MSC90 MSOFTX3000V100R003l BSC: V900R008C01B051

    l BTS: V3.03R002.20011015

    3.2.4 Hardware, Transmission, Coverage, andInterference

    If a TRX or combiner is faulty or if an RF cable is incorrectly connected,

    seizing the SDCCH or TCH becomes difficult, and thus the call setup timeincreases.

    Faults such as poor transmission quality, instability of transport links,insufficiency of resources, or bit errors on the Abis and A interfaces may lead

    to an increase in the error rate on the links, which results in more messageretransmissions between switches. Thus, the message transfer delay increasesand congestion may occur on the links. In severe cases, routes changefrequently, which leads to instability and congestion on the links. If thepreceding problem occurs during call setup, the call setup time increases.

    The problem can be identified from traffic statistics. Table 3-3 lists thetransmission-related alarms at the BSC.

    Table 3-3Transmission-related alarms at the BSCAlarm ID Alarm Name

    1000 LAPD OML Fault

    11270 LAPD Alarm

    11278 E1 Local Alarm

    11280 E1 Remote Alarm

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    20/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 20 of 27

    Alarm ID Alarm Name

    20081 Loss of E1/T1 Signals (LOS)

    20082 Loss of E1/T1 Frames (LOF)

    Coverage or interference problems can be identified from the traffic statisticsor KPIs. For example, the interference information can be obtained on the

    basis of the interference band distribution in the traffic measurement results. Ifa large proportion of interference levels belong to interference bands 3!5, youcan infer that there is strong interference in the uplink. To obtain the downlink

    interference information, you can perform drive tests or analyze the trafficmeasurement results that are related to receive quality. Strong interferenceaffects the call drop rate on TCH, the TCH assignment success rate, and the

    SDCCH setup success rate, thus affecting the call setup time.

    The interference elimination can be classified into intra-network interference

    elimination and inter-network interference elimination. For details aboutinterference elimination, see the G-Guide to Eliminating Interference.

    If a coverage problem exists, you can solve the problem by using the methods

    such as adjusting the tilt of the antenna, increasing the transmit power, addingrepeaters, and changing the combining mode. For details, see the GSM BSS

    Network Performance KPI (Coverage) Optimization Manual.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    21/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 21 of 27

    4 Test MethodThe call setup time is one of drive test KPIs. It can be obtained from theresults of call quality tests or drive tests for calls between MSs or between MSand PSTN.

    The method is to perform a short MOC test. During the test, the intervalbetween two calls is 5s, each call lasts 10s, and the interval between a call

    failure and the next call attempt is 30s. The recommended number of callsduring the test is 100. The number of calls can be changed as required. Duringthe test, the signaling on the Um and A interfaces needs to be traced.

    If a value of call setup time is abnormal, analyze the signaling to checkwhether the abnormal value is due to failure of the first paging. If the

    abnormal value is due to failure of the first paging, do not take this value intomeasurement of the call setup time. Otherwise, take this value into themeasurement. Check the signaling on the A interface. If the MSC sends twoPaging messages for one call, you can infer that the first paging for the call

    fails.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    22/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 22 of 27

    5 Optimization Cases5.1 Long Call Setup Time Due to Long Period of

    Assignment Command Delivery5.1.1 Problem Description

    After swapping of Ericsson equipment for Huawei equipment at a site, the callsetup time became longer. It was found that the delivery of an assignment

    command from Huawei equipment took two or three periods whereas thatfrom Ericsson equipment generally took only one period.

    5.1.2 Problem Analysis

    In frequency hopping mode, the BSC6000 currently delivers the ARFCNs inCA+MA form through the assignment command. CA uses the TV format andits length is fixedly 17 bytes, and MA uses the TLV format and its length is

    3!10 bytes. If an AMR channel is to be assigned (coded in TLV format in thecommand), the length of the assignment command increases by 4!8 bytes.

    Thus, the assignment command is longer than 23 bytes. Therefore, at theLAPDm, the assignment command is divided for delivery. Before the

    swapping, however, the ARFCNs are delivered in the form of frequency list,which uses the TLV format, and therefore in most cases, the assignmentcommand can be delivered with one frame.

    5.1.3 Suggestion and Summary

    When setting the assignment command optimization parameter, which isavailable only when frequency hopping is enabled in a cell, at the BSC, note

    that:

    l If this parameter is set to CA+MA, the original Huawei ARFCN deliveryform is retained.

    l If this parameter is set to Frequency List, the coded ARFCNs for

    frequency hopping will be delivered in the form of frequency list.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    23/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 23 of 27

    Therefore, the assignment command will be delivered in one period, thusshortening the call setup time.

    5.2 Long Call Setup Time Due to Reporting ofTwo Classmark Change Messages

    5.2.1 Problem Description

    After swapping for Huawei equipment at a si te, the call setup time becamelonger.

    5.2.2 Problem Analysis

    When Huawei CN is used, an additional Classmark Change message isreported during the call setup procedure if ECSCis set to Yes. The reason is

    that the classmark enquiry procedure is enabled by default in Huawei CN.Figure 5-1 shows the difference in the signaling procedure before and after the

    swapping.

    Figure 5-1Classmark enquiry procedure enabled after the swapping

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    24/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 24 of 27

    5.2.3 Suggestion and Summary

    To avoid the preceding problem, set ECSCto Yesand CM Update OptimizeTypeto 2, or coordinate with the CN to disable classmark enquiry at the CN.

    5.3 Long Call Setup Time Due to Calling andCalled MSs Under Different MSCs

    5.3.1 Problem Description

    After swapping of some BSC in country R, the drive test results indicated thatthe call setup time was about 3,000 ms longer than that before the swapping.

    The call setup time is one of the acceptance check items of the project. It

    refers to the delay between sending of the Channel Request message and

    reception of the Alerting message.

    5.3.2 Problem Analysis

    As indicated by the parameter check result, the parameters in the network areinherited from the previous network. Therefore, the parameters related to thecall setup time remain unchanged.

    As indicated by the call signaling on the TEMS, the duration of the cipheringmode setting procedure after the swapping is the same as that before the

    swapping.

    Compared with the signaling messages before the swapping, the signaling

    messages after the swapping include another two Progress messages, whichare present between the Assignment Complete message and the Connect

    message. The description in the progress messages is "Call is not end-to-endPLMN/ISDN, further call progress information may be available in-band." Asindicated by messages traced at the CN, after the swapping, though the callednumber under the test is the same as that before the swapping, the test call isan inter-MSC one. That is because the calling MS is controlled by Huawei

    MSC whereas the called number remains under its original MSC.

    5.3.3 Suggestion and Summary

    During the drive test on site after the swapping, the called number was the

    same as that before the swapping, but the fact that the calling MS and the

    called number were under different MSCs was not noticed. Therefore, whenchecking consistency between test conditions before and after swapping, pay

    attention to such hidden changes.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    25/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 25 of 27

    5.4 Long Call Setup Time Due to Inconsistency inSignaling Procedures

    5.4.1 Problem DescriptionAfter swapping for Huawei equipment at a si te, the call setup time becamelonger.

    5.4.2 Problem Analysis

    The comparison between the call setup signaling procedures before swapping

    and those after swapping should be performed. If the call setup after swappingincludes more procedures than that before swapping, remove them. Take theGP swapping in Bengal as an example. Figure 5-2 shows the difference

    between the signaling procedures before and after the swapping.

    Figure 5-2GPRS suspension procedure enabled after the swapping

    As shown in Figure 5-2, the difference between the signaling procedures was

    the presence of a GPRS suspension procedure in the test after the swapping.The presence of this procedure is related to whether the MS in the test has

    performed GPRS attach.

    According to 3GPP TS 44.108, as shown in Figure 5-3, the MS sends a GPRSSuspension Request message to suspend PS services, regardless of whether

    the MS has any PS service in progress.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    26/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 26 of 27

    Figure 5-3GPRS suspension procedure described in the protocol

    5.4.3 Suggestion and Summary

    For CS call setup time test, the GPRS suspension procedure should beremoved. To remove this procedure, change the related setting of the mobile.

    The following are two examples:

    l On a NOKIA N73 mobile, set Tools> Settings> Connection> Packetdata> Packetdataconn> Whenneeded.

    l On a Sony Ericsson K790 mobile, set Settings> Connectivity> Datacommunication> Preferredservice> CSonly.

    The GPRS suspension procedure is always present in the test after swapping.If this procedure is not or seldom present in the test before swapping, this

    procedure can be removed to reduce the delay.

    PDF created with pdfFactory trial version www.pdffactory.com

    http://www.pdffactory.com/http://www.pdffactory.com/
  • 8/12/2019 14 GSM BSS Network KPI Call Setup Time Optimization Manual

    27/27

    GSM BSS Network KPI (Call Setup Time) Optimization Manual INTERNAL

    2011-6-28 Huawei Proprietary and Confidential Page 27 of 27

    6 Information FeedbackThe following information is required:

    l Data configuration file in .dat format

    l Log files and comparison data obtained from drive testsl Settings on the MSC, such as pre-paging and late assignment