Page 1
4 - ANGLESES - A1
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
A1 4
A1 4 L3-1/2X3-1/2X3/8 14'-6 1/4" 494 A36
SQ-2ANGLESES
a1 20 L3-1/2X3-1/2X3/8 0'-5 1/2" 78 A36
TOTAL WEIGHT THIS DRAWING 572
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 A1
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
14'-614/
238/
118/
1'-318/ 3'-0 3'-0 3'-0 3'-0 1'-318/
1316/1316/1316/1316/
1316/5- a1 (F/S)
A
A
1316/1316/1316/1316/1316/
238/
118/
118/ 238/
A - A
Page 2
ONE - BEAM - B1
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B1 1
B1 1 W14X48 23'-11 1/2" 1150 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 1150
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B1
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
331
2/
331
2/
331
2/
22
414/
312/
414/
312/
23'-1112/
4'-914/ 4'-978/ 4'-934/ 4'-934/ 4'-878/
218/ 218/218/ 218/ 218/ 218/ 218/ 218/4 4
4 4
1316/
1316/
1316/1316/1316/ 1316/
B
B
A
A
33
331
2/
4
13
31
4
13
31
A - A B - B
Page 3
ONE - BEAM - B2
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B2 1
B2 1 W14X48 23'-4 1/16" 1120 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 1120
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B2
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
331
2/
331
2/
331
2/
414/
312/
414/
312/
23'-4116/
4'-5916/ 4'-978/ 4'-934/ 4'-934/ 4'-5316/
218/ 218/ 218/ 218/218/ 218/218/ 218/1316/
GA 4
1316/GA 4
1316/1316/
1316/ 1316/ 1316/1316/
A
AA
A
33
218/218/
331
2/
22
22
33
33
23'-4116/218/
22
22
218/1316/
1316/
2 2 2 2
2 2 2 2
A - A
Page 4
ONE - BEAM - B3
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B3 1
B3 1 W14X48 23'-7 3/4" 1135 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 1135
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B3
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
331
2/
331
2/
331
2/
218/2
414/
312/
414/
312/
23'-734/
4'-914/ 4'-978/ 4'-934/ 4'-934/ 4'-518/
218/ 218/218/ 218/218/ 218/218/ 218/4
4
1316/1316/ 1316/ 1316/1316/
1316/
B
BA
A
33
331
2/
33
23'-734/
218/4
22
22
13
31
1316/
A - A
2 2 2 2
2 2 2 2
B - B
Page 5
2 - BEAMS - B4
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B4 2
B4 2 W14X48 23'-7 7/8" 2270 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 2270
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B4
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
331
2/
331
2/
331
2/
218/
414/
312/
2
414/
312/
23'-778/
4'-9516/ 4'-978/ 4'-934/ 4'-934/ 4'-5316/
218/ 218/ 218/ 218/218/ 218/218/ 218/4
4
1316/1316/ 1316/ 1316/ 1316/1316/
B
BA
A
33
331
2/
33
23'-778/
218/
4
4
13
31
22
22
1316/
A - A2 2 2 2
2 2 2 2
B - B
Page 6
ONE - BEAM - B5
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B5 1
B5 1 W14X48 23'-7 7/8" 1135 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 1135
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B5
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
312/
331
2/
331
2/
331
2/
2
414/
312/
414/
312/
23'-778/
4'-9516/ 4'-978/ 4'-934/ 4'-934/ 4'-5316/
218/ 218/ 218/ 218/218/ 218/218/ 218/4
4
1316/1316/ 1316/ 1316/ 1316/1316/
B
BA
A218/
33
3
33
23'-778/
4 218/1
33
1
4
22
22
1316/
A - A 2 2 2 2
2 2 2 2
B - B
Page 7
ONE - BEAM - B6
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B6 1
B6 1 W14X34 18'-0 7/8" 615 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 615
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B6
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
2
412/
312/
218/
412/
312/
331
2/
331
2/
18'-078/
5'-5916/ 6'-4 6'-3516/
218/ 218/ 218/ 218/
4
4
1316/1316/ 1316/ 1316/
B
BA
A
33
18'-078/
4
4218/
1 2/27
8/27
8/1 2/
138/
22
138/ 1316/
138/ 2 2 138/
138/ 2 2 138/
A - A
B - B
Page 8
ONE - BEAM - B7
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B7 1
B7 1 W14X34 18'-4 1/2" 625 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 625
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B7
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
22
331
2/
331
2/
412/
312/
412/
312/
18'-412/
5'-914/ 6'-4 6'-314/
218/ 218/ 218/ 218/
4 4
4 4
1316/1316/
1316/
1316/
B
BA
A
44278/
278/
278/
278/
A - A
312/
B - B
Page 9
ONE - BEAM - B8
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B8 1
B8 1 W14X34 17'-9" 604 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 604
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B8
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
331
2/
218/218/
331
2/
412/
312/
412/
312/
17'-9
5'-512/ 6'-4 5'-1112/
218/ 218/ 218/ 218/
1316/GA 4
1316/GA 4
1316/1316/ 1316/ 1316/
B
BA
A
3333218/ 16'-434/ 218/
138/
22
138/
138/
22
138/
1316/1316/
138/ 2 2 138/
A - A
Page 10
3 - BEAMS - B9
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B9 3
B9 3 W14X34 17'-9 1/8" 1813 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 1813
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B9
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
218/218/
412/
312/
331
2/
331
2/
412/
312/
17'-918/
5'-5916/ 6'-4 5'-11916/
218/ 218/ 218/ 218/
1316/1316/ 1316/ 1316/
B
BA
A
33 33
138/
22
138/
138/
22
138/
218/ 16'-478/ 218/
1316/1316/
138/ 2 2 138/
A - A
2 2
B - B
Page 11
6 - BEAMS - B10
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B10 6
B10 6 W14X26 12'-11 7/8" 2040 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 2040
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B10
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
2218/
438/
312/
438/
312/
331
2/
331
2/
12'-1178/
4'-1316/ 4'-51116/ 4'-5
218/ 218/218/ 218/
1316/GA 3
1316/1316/ 1316/1316/
B
BA
A
33218/ 12'-334/11
2/11
2/ 1316/
112/ 112/
A - A
B - B
Page 12
2 - BEAMS - B11
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B11 2
B11 2 W14X26 12'-11 3/4" 679 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 679
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B11
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
438/
312/
438/
312/
331
2/
331
2/
2218/
12'-1134/
4'-1316/ 4'-51116/ 4'-41516/
218/ 218/218/ 218/
1316/GA 3
1316/
1316/1316/
1316/
B
BA
A
33
12'-1134/
218/
112/
112/
1316/
112/ 112/
A - A
B - B
Page 13
2 - BEAMS - B12
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B12 2
B12 2 W14X26 13'-3 1/2" 696 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 696
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B12
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
438/
312/
438/
312/
331
2/
331
2/
13'-312/
2RD
13'-112/ 2
4'-41516/ 4'-51116/ 4'-41516/
218/ 218/218/ 218/
1316/1316/
1316/1316/
A
AA
A
312/
A - A
Page 14
2 - BEAMS - B13
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B13 2
B13 2 W10X15 7'-8 15/16" 232 A992
SQ-2BEAMS
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 263
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B13
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
7'-81516/
114/
712/
114/
312/
331
2/
2316/ 7'-4916/ 2316/
2716/ 7'-334/ 234/
312/
331
2/ 1316/
1316/p24 (B/S)
a3 (B/S)
B
BA
A
112/
311
2/2
218/ 218/
a3 a3
1316/
A - A
112/
311
2/2
218/ 218/
p24p24
1316/
B - B
Page 15
2 - BEAMS - B14
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B14 2
B14 2 W10X22 15'-10 1/4" 700 A992
SQ-2BEAMS
P2 2 FL3/8"X5" 1'-1 3/4" 15 A36
TOTAL WEIGHT THIS DRAWING 715
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B14
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
15'-1014/
1'-1118/ 3'-0 3'-0 3'-0 3'-0 1'-1118/
15'-834/ 112/
114/
738/
112/
358/
331
2/
5
5
1316/
A
A
212/ 212/
118/
134/
212/ 1'-858/ 3'-0 3'-0 3'-0 3'-0 1'-618/ 5
247
8/47
8/2
15'-1014/
38/TYP
34/
1316/1316/1316/1316/
1316/
P2
A - A
Page 16
12 - BEAMS - B15
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B15 12
B15 12 W10X22 15'-10 3/8" 4205 A992
SQ-2BEAMS
P2 12 FL3/8"X5" 1'-1 3/4" 88 A36
p24 24 L4X3-1/2X5/16 0'-6" 92 A36
TOTAL WEIGHT THIS DRAWING 4384
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B15
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
15'-8316/ 2316/
15'-1038/
15'-512/ 478/
114/
738/
112/
358/
331
2/1316/
p24 (B/S)
A
A
15'-1038/
212/ 212/
247
8/47
8/2 38/
TYP
34/
P2
112/
331
2/
218/ 218/1316/
A - A
Page 17
2 - BEAMS - B16
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B16 2
B16 2 W10X22 15'-0 13/16" 666 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 696
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B16
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 14'-8716/ 2316/
358/
331
2/
15'-01316/
358/
331
2/ 1316/1316/
a3 (B/S)
a3 (B/S)
B
B
A
A
218/ 218/
358/
331
2/
a3 a3
1316/
A - A
358/
331
2/
218/ 218/
a3
a3
1316/
B - B
Page 18
ONE - BEAM - B17
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B17 1
B17 1 W10X30 13'-3 15/16" 401 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 416
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B17
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
811
4/
178/ 12'-11516/ 234/
331
2/
43
312/
13'-31516/
114/
811
4/
331
2/
43
312/
4'-5316/ 4'-51116/ 4'-518/
218/ 218/218/ 218/
1316/1316/ 1316/1316/
a3 (B/S)
a3 (B/S)
B
BA
A
2316/2316/ 114/
43
312/
218/ 2316/
a3
a3
1316/
A - A
312/
1316/
Page 19
2 - BEAMS - B18
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B18 2
B18 2 W10X22 18'-6 1/4" 818 A992
SQ-2BEAMS
P2 2 FL3/8"X5" 1'-1 3/4" 15 A36
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 848
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B18
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
18'-4116/ 2316/
18'-614/
358/
331
2/
1316/
a3 (B/S)
A
A
212/ 212/ 18'-114/
247
8/47
8/2
18'-614/
38/TYP
34/P2
358/
331
2/
218/ 218/
a3
a3
1316/
A - A
Page 20
2 - BEAMS - B19
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B19 2
B19 2 W10X15 18'-2 11/16" 547 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 578
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B19
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 17'-10516/ 2316/
114/
712/
114/
312/
331
2/
18'-21116/
312/
331
2/
31516/
1316/
1316/ a3 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/ a3
a3
1316/
A - A
312/
331
2/
218/ 218/
a3
a3
1316/
B - B
Page 21
2 - BEAMS - B20
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B20 2
B20 2 W10X15 18'-2 11/16" 547 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 578
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B20
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 17'-10516/ 2316/
312/
331
2/
18'-21116/
114/
712/
114/
312/
331
2/
314/
1316/1316/
a3 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/
1316/
A - A
312/
331
2/
218/ 218/
a3a3
1316/
B - B
Page 22
2 - BEAMS - B21
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B21 2
B21 2 W10X15 18'-2 13/16" 547 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 578
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B21
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 17'-10716/ 2316/
114/
712/
114/
312/
331
2/
18'-21316/
312/
331
2/
31516/
1316/
1316/ a3 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/
1316/
A - A
312/
331
2/
218/ 218/
a3
a3
1316/
B - B
Page 23
2 - BEAMS - B22
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B22 2
B22 2 W10X15 18'-2 13/16" 547 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 578
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B22
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
312/
331
2/
2316/ 17'-10716/ 2316/
114/
712/
114/
18'-21316/
312/
331
2/
314/
1316/
1316/
a3 (B/S)
a3 (B/S)
B
BA
A
218/ 218/
312/
331
2/
a3 a3
1316/
A - A
312/
331
2/
218/ 218/
a3
a3
1316/
B - B
Page 24
2 - BEAMS - B23
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B23 2
B23 2 W10X15 18'-2 15/16" 548 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 578
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B23
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
312/
331
2/
18'-21516/
2316/ 17'-10916/ 2316/
114/
712/
114/
312/
331
2/
31516/
1316/1316/
a3 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/
a3 a3
1316/
A - A
312/
331
2/
218/ 218/
a3a3
1316/
B - B
Page 25
2 - BEAMS - B24
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B24 2
B24 2 W10X15 18'-2 15/16" 548 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 578
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B24
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
312/
331
2/
2316/ 17'-10916/ 2316/
312/
331
2/
18'-21516/
114/
712/
114/
314/
1316/
1316/
a3 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/a3
a3
1316/
A - A
312/
331
2/
218/ 218/
a3
a3
1316/
B - B
Page 26
11 - BEAMS - B25
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B25 11
B25 11 W10X22 18'-10 3/8" 4583 A992
SQ-2BEAMS
P2 11 FL3/8"X5" 1'-1 3/4" 80 A36
p24 22 L4X3-1/2X5/16 0'-6" 84 A36
TOTAL WEIGHT THIS DRAWING 4748
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B25
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
18'-8316/ 2316/
358/
331
2/
114/
738/
112/
18'-1038/
478/1316/
p24 (B/S)
A
A
247
8/47
8/2
212/ 212/
18'-1038/
38/TYP
34/
P2
358/
331
2/
218/ 218/
p24
p24
1316/
A - A
Page 27
5 - BEAMS - B26
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B26 5
B26 5 W10X15 18'-6 7/8" 1394 A992
SQ-2BEAMS
a3 10 L4X3-1/2X5/16 0'-6" 38 A36
p24 10 L4X3-1/2X5/16 0'-6" 38 A36
TOTAL WEIGHT THIS DRAWING 1470
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B26
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 18'-212/ 2316/
312/
331
2/
114/
712/
114/
18'-678/
312/
331
2/
114/
738/
1516/
2716/ 378/
1316/
1316/
p24 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/a3
a31316/
A - A
312/
331
2/
218/ 218/
p24
p24
1316/
B - B
Page 28
3 - BEAMS - B27
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B27 3
B27 3 W10X15 18'-6 7/8" 836 A992
SQ-2BEAMS
a3 6 L4X3-1/2X5/16 0'-6" 23 A36
p24 6 L4X3-1/2X5/16 0'-6" 23 A36
TOTAL WEIGHT THIS DRAWING 882
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B27
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
312/
331
2/
2316/ 18'-212/ 2316/
114/
738/
1516/
114/
712/
114/
343
8/
18'-678/
9'-612/ 4'-1 4'-1 10716/
218/ 218/218/ 218/218/ 218/
2716/ 378/
a3 (B/S)
p24 (B/S)
1316/1316/
1316/
1316/1316/
B
BA
A
343
8/
343
8/
312/
331
2/
312/
331
2/
218/ 218/a3
a3
1316/
A - A
312/
331
2/
218/ 218/
p24p24
1316/
B - B
Page 29
14 - BEAMS - B28
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B28 14
B28 14 W10X15 18'-6 7/8" 3902 A992
SQ-2BEAMS
a3 28 L4X3-1/2X5/16 0'-6" 107 A36
p24 28 L4X3-1/2X5/16 0'-6" 107 A36
TOTAL WEIGHT THIS DRAWING 4117
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B28
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
312/
331
2/
114/
738/
1516/
18'-678/
2316/ 18'-212/ 2316/
312/
331
2/
114/
712/
114/ 31516/ 378/
1316/
1316/
p24 (B/S)a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/a3
a3
1316/
A - A
312/
331
2/
218/ 218/
p24 p24
1316/
B - B
Page 30
4 - BEAMS - B29
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B29 4
B29 4 W10X15 18'-6 7/8" 1115 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
p24 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 1176
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B29
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/
331
2/
114/
738/
1516/
312/
331
2/
114/
712/
114/
9'-6716/ 4'-1 4'-1 10716/
218/ 218/ 218/ 218/218/ 218/31516/ 378/
1316/1316/
1316/1316/
1316/
p24 (B/S)
a3 (B/S)
B
BA
A
343
8/
343
8/
343
8/
18'-678/
18'-212/ 2316/
312/
312/
331
2/
218/ 218/a3
a3
1316/
A - A 312/
331
2/
218/ 218/
p24p24
1316/
B - B
Page 31
6 - BEAMS - B30
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B30 6
B30 6 W10X15 18'-6 7/8" 1672 A992
SQ-2BEAMS
a3 12 L4X3-1/2X5/16 0'-6" 46 A36
p24 12 L4X3-1/2X5/16 0'-6" 46 A36
TOTAL WEIGHT THIS DRAWING 1764
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B30
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 18'-212/ 2316/
18'-678/
312/
331
2/
114/
738/
1516/
312/
331
2/
114/
712/
114/
314/ 378/
1316/
1316/p24 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/
a3a3 1316/
A - A
312/
331
2/
218/ 218/
p24 p24
1316/
B - B
Page 32
ONE - BEAM - B31
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B31 1
B31 1 W10X22 17'-10 1/2" 395 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 410
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B31
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 17'-618/ 2316/
358/
331
2/
358/
331
2/
17'-1012/
1316/1316/
a3 (B/S)
a3 (B/S)
B
BA
A
358/
331
2/
218/ 218/a3
a31316/
A - A
4/
218/
1316/
- B
Page 33
3 - BEAMS - B32
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B32 3
B32 3 W10X30 17'-10 1/2" 1613 A992
SQ-2BEAMS
a3 12 L4X3-1/2X5/16 0'-6" 46 A36
TOTAL WEIGHT THIS DRAWING 1659
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B32
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
17'-1012/
2316/ 17'-618/ 2316/
43
312/
43
312/
1316/
1316/a3 (B/S)
a3 (B/S)
B
BA
A
43
312/
218/ 218/a3
a31316/
A - A
43
312/
218/ 218/
a3
a3
1316/
B - B
Page 34
ONE - BEAM - B33
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B33 1
B33 1 W10X30 17'-10 7/16" 538 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p6 2 FL3/8"X3 3/4" 0'-6" 5 A36
p17 3 FL1/2"X5 1/4" 1'-7 1/4" 43 A36
p18 6 FL1/2"X5 1/4" 0'-7 15/16" 36 A36
TOTAL WEIGHT THIS DRAWING 636
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B33
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
218/
43
312/
1316/
a3 (B/S)
a3 (B/S)
A
AD
D
C
C
B
B
9'-2316/ 4'-1 4'-112/ 534/
9'-01316/ 234/ 3'-1014/ 234/ 3'-1014/ 234/ 478/
343
8/
343
8/
17'-618/ 2316/
43
312/
17'-10716/
218/ 218/ 218/ 218/
38/TYP
12/TYP
12/TYP
1316/1316/GA 3
p17p17p17
1316/
1316/ 1316/
1316/
p18
p18
p18
p18
p18
p18
218/ 3 3
112/
112/
1316/
1316/1316/
33
958/
138/
112/ 518/ 518/ 112/
12/TYP
p18p18
p17
B - B
33
318/
343
8/
2716/ 2716/
958/
138/
112/ 518/ 518/ 112/
p6 p6
C - C
112/ 3 518/ 518/ 3 112/
918/
138/
p17
p18p18
D - D
43
312/
218/ 218/
112/ 112/a3
a3
1316/
A - A
Page 35
2 - BEAMS - B34
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B34 2
B34 2 W10X30 17'-10 5/8" 1076 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
p6 4 FL3/8"X3 3/4" 0'-6" 10 A36
p17 6 FL1/2"X5 1/4" 1'-7 1/4" 86 A36
p18 12 FL1/2"X5 1/4" 0'-7 15/16" 71 A36
TOTAL WEIGHT THIS DRAWING 1274
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B34
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
218/
43
312/
1316/a3 (B/S)
a3 (B/S)
A
A D
D
C
C
B
B
3 3 8'-478/ 234/ 3'-1014/ 234/ 3'-1014/ 234/ 5
2316/218/
43
312/
9'-2516/ 4'-1 4'-112/ 578/
343
8/
343
8/
17'-1058/
218/ 218/218/ 218/
212/
12/TYP
12/TYP
38/TYP
p17p17
p6 (B/S) 1316/1316/ 1316/
p18
p17
p18
p18
p17
p18
p18
218/ 3 3
112/
112/
1316/
1316/ 1316/1316/ p17
p18
3 3
918/
138/
112/ 518/ 518/ 112/
12/TYP
12/TYP
p18p18
p17
B - B
3412/ 518/ 518/ 112/
318/
343
8/
918/
138/
238/ 238/
p17
p18 p18
p6
p6
C - C
938/
138/
112/ 3 518/ 518/ 3 112/
p17
p18p18
D - D
43
312/
218/ 2316/
112/ 112/a3
a3
1316/
A - A
Page 36
ONE - BEAM - B35
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B35 1
B35 1 W10X30 17'-10 7/8" 539 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p6 2 FL3/8"X3 3/4" 0'-6" 5 A36
p17 3 FL1/2"X5 1/4" 1'-7 1/4" 43 A36
p18 6 FL1/2"X5 1/4" 0'-7 15/16" 36 A36
TOTAL WEIGHT THIS DRAWING 637
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B35
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
218/
43
312/
1316/
a3 (B/S)
a3 (B/S)
A
A D
D
C
C
B
B
43
312/
3 3 8'-5 234/ 3'-1014/ 234/ 3'-1014/ 234/ 518/
343
8/
343
8/
2316/218/
9'-2716/ 4'-1 4'-112/ 6
17'-1078/
218/ 218/218/ 218/
12/TYP
12/TYP
38/TYP
1316/1316/
1316/
1316/
1316/ 1316/
p18
p17
p18
p18
p17
p18
p18
218/ 3 3
112/
112/
1316/
1316/ 1316/1316/ p17
p18
3 3
938/
138/
112/ 518/ 518/ 112/
12/TYP 12/
TYP
p18p18
p17
B - B518/ 33
918/
138/
112/ 518/ 112/
318/
343
8/
238/ 238/
p6 p6
p18p18
C - C
918/
138/
112/ 3 518/ 518/ 3 112/
p17
p18p18
D - D
43
312/
218/ 218/
112/ 112/
1316/
A - A
Page 37
ONE - BEAM - B36
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B36 1
B36 1 W10X30 17'-10 7/8" 539 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 554
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B36
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
218/ 17'-6916/ 2316/
17'-1078/
43
312/
43
312/
1316/GA 3
1316/GA 3
1316/
1316/
a3 (B/S)
a3 (B/S)
B
BA
A
218/ 3 3
17'-1078/
138/
112/ 11
2/13
8/
1316/
43
312/
218/ 218/
112/ 112/a3
a3
1316/
A - A 43
312/
218/ 218/
a3
a3
1316/
B - B
Page 38
ONE - BEAM - B37
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B37 1
B37 1 W10X30 17'-10 7/16" 538 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p6 2 FL3/8"X3 3/4" 0'-6" 5 A36
p17 3 FL1/2"X5 1/4" 1'-7 1/4" 43 A36
p18 6 FL1/2"X5 1/4" 0'-7 15/16" 36 A36
TOTAL WEIGHT THIS DRAWING 636
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B37
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
218/
43
312/ 1316/
a3 (B/S)
a3 (B/S)
A
A D
D
C
C
B
B
3 3 8'-434/ 234/ 3'-1014/ 234/ 3'-1014/ 234/ 478/
321
2/17
8/
321
2/17
8/
9'-2316/ 4'-1 4'-078/ 638/
2316/218/
43
312/
17'-10716/
218/ 218/
218/ 218/
12/TYP
38/TYP
12/TYP
1316/GA 3
1316/
1316/ 1316/
17'-10716/
p18
p17
p18
p18
p17
p18
p18
218/ 3 3
112/
112/
1316/
1316/1316/1316/
p18
p17
3 3
918/
138/
112/ 518/ 518/ 112/
12/TYP 12/
TYP
p17
p18p18
B - B
518/ 33
318/
321
2/17
8/
112/ 518/ 112/
918/
138/
238/ 238/
p18
p18
p17
p6
p6
C - C
112/ 3 518/ 518/ 3 112/
918/
138/
p17
p18p18
D - D
43
312/
2316/ 2316/
112/ 112/a3
a3
1316/
A - A
Page 39
2 - BEAMS - B38
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B38 2
B38 2 W10X30 17'-10 5/8" 1076 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
p6 4 FL3/8"X3 3/4" 0'-6" 10 A36
p17 6 FL1/2"X5 1/4" 1'-7 1/4" 86 A36
p18 12 FL1/2"X5 1/4" 0'-7 15/16" 71 A36
TOTAL WEIGHT THIS DRAWING 1274
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B38
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
218/
43
312/
1316/
a3 (B/S)
a3 (B/S)
A
A D
D
C
C
B
B
3 3 8'-478/ 234/ 3'-1014/ 234/ 3'-1014/ 234/ 5
9'-2516/ 4'-1 4'-078/ 612/
2316/218/
343
8/
343
8/
43
312/
17'-1058/
218/ 218/ 218/ 218/
38/TYP12/
TYP
12/TYP
p6
1316/GA 3
1316/
1316/
1316/
17'-1058/
p18
p17
p18
p18
p17
p18
p18
218/ 3 3
112/
112/
1316/
1316/ 1316/1316/ p17
p18
3 3
918/
138/
112/ 518/ 518/ 112/
12/TYP
12/TYP
p17
p18p18
1316/
B - B
518/ 33
318/
321
2/17
8/
918/
138/
112/ 518/ 112/
238/ 238/
p6
p6
p18p18
C - C
112/ 3 518/ 518/ 3 112/
918/
138/
p17p18
p18
D - D
43
312/
2316/ 2316/
112/ 112/a3
a3
1316/
A - A
Page 40
ONE - BEAM - B39
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B39 1
B39 1 W10X30 17'-10 7/8" 539 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p6 2 FL3/8"X3 3/4" 0'-6" 5 A36
p17 3 FL1/2"X5 1/4" 1'-7 1/4" 43 A36
p18 6 FL1/2"X5 1/4" 0'-7 15/16" 36 A36
TOTAL WEIGHT THIS DRAWING 637
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B39
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
218/
218/4
331
2/
a3 (B/S)
A
A D
D
C
C
B
B
3 3 8'-5 234/ 3'-1014/ 234/ 3'-1014/ 234/ 518/
7'-3516/ 1'-9 4'-1 4'-078/ 4716/ 2316/
343
8/
343
8/
331
2/
43
312/
17'-1078/
218/ 218/218/ 218/ 218/ 218/
12/TYP
38/TYP
38/TYP
1316/GA 3
1316/
1316/
1316/
1316/
1316/
a3 (B/S)
1316/
p18
p18
p17
p18
p18
218/ 3 3
112/
112/ 1316/
1316/1316/
p17
p18
p18
p17
3 3
918/
138/
112/ 518/ 518/ 112/
12/TYP
12/TYP
p18p18
p17
B - B
518/ 33
318/
321
2/17
8/
918/
138/
112/ 518/ 112/
238/ 238/
p6p6
p18 p18
C - C
918/
138/
112/ 3 518/ 518/ 3 112/
p17
p18p18
D - D
43
312/
2316/ 2316/
112/ 112/a3
a3
1316/
A - A
Page 41
2 - BEAMS - B40
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B40 2
B40 2 W10X15 18'-2 7/8" 548 A992
SQ-2BEAMS
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 578
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B40
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 17'-1012/ 2316/
312/
331
2/
114/
738/
1516/
18'-278/
312/
331
2/
378/
1316/
1316/p24 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/
a3a3
1316/
A - A
312/
331
2/
218/ 218/
p24
p24
1316/
B - B
Page 42
ONE - BEAM - B41
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B41 1
B41 1 W10X15 18'-2 7/8" 274 A992
SQ-2BEAM
a3 2 L4X3-1/2X5/16 0'-6" 8 A36
p24 2 L4X3-1/2X5/16 0'-6" 8 A36
TOTAL WEIGHT THIS DRAWING 289
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B41
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 17'-1012/ 2316/
312/
331
2/
114/
738/
1516/
18'-278/
312/
331
2/
312/
331
2/
7'-512/ 10'-9716/
218/ 2316/ 378/1316/1316/
1316/
p24 (B/S)a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/a3
a31316/
A - A
312/
331
2/
218/ 218/
p24
p24
1316/
B - B
Page 43
ONE - BEAM - B42
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B42 1
B42 1 W10X30 18'-2 13/16" 549 A992
SQ-2BEAM
a3 2 L4X3-1/2X5/16 0'-6" 8 A36
p24 2 L4X3-1/2X5/16 0'-6" 8 A36
TOTAL WEIGHT THIS DRAWING 564
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B42
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
18'-21316/
43
312/
218/ 17'-1012/ 2316/
43
312/
134/
7716/
1516/
378/1316/GA 3
1316/GA 3
1316/1316/
p24 (B/S)
a3 (B/S)
B
BA
A
218/ 3 3
18'-21316/
112/
112/
1316/
43
312/
218/ 218/
112/ 112/a3
a3
1316/
A - A
43
312/
218/ 218/
p24
p24
1316/
B - B
Page 44
4 - BEAMS - B43
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B43 4
B43 4 W10X15 18'-2 3/4" 1094 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
p24 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 1156
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B43
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 17'-1038/ 2316/
312/
331
2/
114/
738/
1516/
18'-234/31
2/3
312/
378/
1316/
1316/
p24 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/a3
a3
1316/
A - A
312/
331
2/
218/ 218/
p24
p24
1316/
B - B
Page 45
2 - BEAMS - B44
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B44 2
B44 2 W10X22 18'-2 5/8" 805 A992
SQ-2BEAMS
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 835
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B44
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 17'-1014/ 2316/
358/
331
2/
114/
738/
112/
358/
331
2/
18'-258/
478/
1316/
1316/
p24 (B/S)a3 (B/S)
B
BA
A
358/
331
2/
218/ 218/a3
a3
1316/
A - A
358/
331
2/
218/ 218/
p24p24
1316/
B - B
Page 46
4 - BEAMS - B45
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B45 4
B45 4 W10X15 18'-2 5/8" 1094 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
p24 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 1155
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B45
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
312/
331
2/
114/
738/
1516/
2316/ 17'-1014/ 2316/
18'-258/
312/
331
2/378/
1316/
1316/
p24 (B/S)a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/a3
a3
1316/
A - A
312/
331
2/
218/ 218/
p24p24
1316/
B - B
Page 47
24 - BEAMS - B46
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B46 24
B46 24 W8X18 5'-6 5/16" 2374 A992
SQ-2BEAMS
a3 48 L4X3-1/2X5/16 0'-6" 184 A36
p24 48 L4X3-1/2X5/16 0'-6" 184 A36
TOTAL WEIGHT THIS DRAWING 2742
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B46
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3 4916/
7 8/61
4/1
258/
321
2/
7 8/61
4/1
258/
321
2/
5'-6516/
2316/ 5'-11516/ 2316/
212/ 5'-1116/ 234/
1316/GA 234/ (FS)
1316/1316/
p24 (B/S)a3 (B/S)
B
BA
A258/
321
2/218/ 218/
a3a3
1316/
A - A
258/
321
2/
218/ 218/
138/ 138/
p24
p24
1316/
B - B
Page 48
12 - BEAMS - B47
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B47 12
B47 12 W8X18 4'-8 9/16" 1013 A992
SQ-2BEAMS
a3 24 L4X3-1/2X5/16 0'-6" 92 A36
p24 24 L4X3-1/2X5/16 0'-6" 92 A36
TOTAL WEIGHT THIS DRAWING 1196
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B47
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
258/
321
2/
7 8/71
4/
3 178/4916/
2316/ 4'-4316/ 2316/
7 8/61
4/1
258/
321
2/
4'-8916/
234/
1316/GA 234/ (NS)
1316/
1316/
a3 (B/S)
p24 (B/S)
B
BA
A
258/
321
2/
218/ 218/
138/ 138/
p24
p24
1316/
A - A
258/
321
2/
218/ 218/
a3 a31316/
B - B
Page 49
12 - BEAMS - B48
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B48 12
B48 12 W8X18 4'-4 5/8" 942 A992
SQ-2BEAMS
a3 24 L4X3-1/2X5/16 0'-6" 92 A36
p24 24 L4X3-1/2X5/16 0'-6" 92 A36
TOTAL WEIGHT THIS DRAWING 1126
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B48
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3
7 8/61
4/
258/
3
2316/ 4'-014/ 2316/
4916/
4'-458/
7 8/61
4/1
258/
321
2/
234/
178/1316/GA 234/ (FS)
1316/1316/
a3 (B/S)
p24 (B/S)
B
BA
A
258/
321
2/
218/ 218/
138/ 138/
1
p24
p24
1316/
A - A
258/
321
2/
218/ 218/
a3
a3
1316/
B - B
Page 50
2 - BEAMS - B49
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B49 2
B49 2 W10X15 10'-10 7/16" 326 A992
SQ-2BEAMS
P2 2 FL3/8"X5" 1'-1 3/4" 15 A36
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 356
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B49
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
10'-814/ 2316/
114/
738/
1516/
312/
331
2/
10'-10716/
378/
P2
1316/
p24 (B/S)
A
A
212/ 10'-71516/
247
8/47
8/2
10'-10716/
38/TYP
34/
P2
312/
331
2/
218/ 218/
p24
p24
1316/
A - A
Page 51
ONE - BEAM - B50
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B50 1
B50 1 W10X15 10'-8 7/8" 161 A992
SQ-2BEAM
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 176
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B50
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 10'-412/ 2316/
10'-878/
312/
331
2/
114/
738/
1516/
312/
331
2/
7 8/71
5 16/13
16/
234/ 378/
1316/
1316/
p24 (B/S)
p24 (B/S)
B
B
A
A
312/
331
2/
218/ 218/
p24
p24
1316/
A - A
312/
331
2/
218/ 218/
p24
p24
1316/
B - B
Page 52
ONE - BEAM - B51
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B51 1
B51 1 W10X15 10'-8 7/8" 161 A992
SQ-2BEAM
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 176
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B51
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/
312/
331
2/
114/
738/
1516/
10'-878/
312/
331
2/
7 8/71
5 16/13
16/
1'-8716/ 4'-1 4'-1 10716/
218/ 218/ 218/ 218/218/ 218/234/ 378/
1316/
1316/
1316/
1316/
1316/ p24 (B/S)
p24 (B/S)
A
AA
A
343
8/
343
8/
343
8/
2316/ 10'-412/
312/
331
2/
218/ 218/p24
p24
1316/
A - A
Page 53
2 - BEAMS - B53
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B53 2
B53 2 W10X68 19'-9 3/16" 2677 A992
SQ-2BEAMS
P1 4 FL3/8"X3 1/2" 0'-8 13/16" 13 A36
TOTAL WEIGHT THIS DRAWING 2690
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B53
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2 4'-678/ 4'-1012/ 4'-1012/ 5'-178/ 112/
331
2/
331
2/
331
2/
378/
331
2/
378/
331
2/
19'-9316/
218/ 218/218/ 218/ 218/ 218/
3 3
3 338/
TYP
1316/
1316/1316/1316/
1316/
A
A
3 19'-3316/ 3
19'-4316/ 5
2116/
2116/
2116/
2116/
P1
P1
378/
331
2/
214/ 214/
1316/
P1
P1
A - A
Page 54
8 - BEAMS - B54
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B54 8
B54 8 W8X18 12'-11 3/16" 1852 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 1852
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B54
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
321
2/
321
2/
258/
321
2/
258/
321
2/
12'-11316/
358/ 4'-1 4'-1 4'-2 358/
218/ 218/ 218/ 218/ 218/ 218/218/ 218/
1316/1316/ 1316/ 1316/
A
AA - A
Page 55
8 - BEAMS - B55
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B55 8
B55 8 W8X18 5'-5 15/16" 787 A992
SQ-2BEAMS
a3 16 L4X3-1/2X5/16 0'-6" 61 A36
TOTAL WEIGHT THIS DRAWING 848
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B55
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3
2316/ 5'-214/ 112/
4316/7 8/61
4/1
258/
321
2/
5'-51516/
258/
321
2/
212/
212/212/
1
1316/GA 234/ (FS)
1316/
1316/
a3 (B/S)
B
BA
A
258/
321
2/
218/ 218/a3
a31316/
A - A
138/ 138/1316/
B - B
Page 56
4 - BEAMS - B56
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B56 4
B56 4 W8X18 4'-8 3/16" 335 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 366
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B56
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3
4'-8316/
258/
321
2/
112/ 4'-412/ 2316/
414/
258/
321
2/
212/178/
7 8/1
1316/GA 234/ (NS)
1316/
1316/
a3 (B/S)
B
BA
A
138/ 138/1316/
A - A
258/
321
2/
218/ 218/
a3a3
1316/
B - B
Page 57
4 - BEAMS - B57
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B57 4
B57 4 W8X18 4'-4 1/4" 312 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 342
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B57
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3
258/
321
2/
112/ 4'-0916/ 2316/
4'-414/
414/
258/
321
2/
212/178/
7 8/1
1316/GA 234/ (FS)
1316/
1316/
a3 (B/S)
B
BA
A
138/ 138/1316/
A - A 258/
321
2/
218/ 218/
a3a3
1316/
B - B
Page 58
2 - BEAMS - B58
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B58 2
B58 2 W10X68 21'-3 5/16" 2882 A992
SQ-2BEAMS
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 2897
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B58
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
331
2/
378/
331
2/
378/
331
2/
2 5'-1716/ 5'-418/ 5'-4316/ 5'-1716/ 2316/
21'-3516/
114/
778/
114/
218/ 218/ 218/ 218/218/ 218/
4378/
4378/
1316/1316/1316/ 1316/ 1316/
a3 (B/S)
B
BA
A
331
2/
331
2/
4
4
3116/
3116/
312/
A - A
378/
331
2/
214/ 214/
a3
a3
1316/
B - B
Page 59
ONE - BEAM - B59
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B59 1
B59 1 W10X68 19'-1 1/2" 1295 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 1295
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B59
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2 6'-214/ 6'-5 6'-214/ 2
331
2/
331
2/
378/
331
2/
378/
331
2/
19'-112/
218/ 218/218/ 218/
4 4
4 4
1316/
1316/
1316/ 1316/
A
AA
A
4 18'-512/ 4
3116/
3116/
3116/
3116/
312/
A - A
Page 60
2 - BEAMS - B60
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B60 2
B60 2 W10X45 19'-1 1/2" 1731 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 1731
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B60
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2 4'-718/ 4'-934/ 4'-934/ 4'-678/ 2
331
2/
331
2/
331
2/
358/
331
2/
358/
331
2/
19'-112/
218/ 218/ 218/ 218/218/ 218/
4 4
4 4
1316/
1316/
1316/ 1316/
1316/
A
AA
A
4 18'-512/ 4
33
33
312/
A - A
Page 61
4 - BEAMS - B61
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B61 4
B61 4 W10X45 19'-1 5/8" 3464 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 3464
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B61
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
331
2/
331
2/
331
2/
358/
331
2/
358/
331
2/
2 4'-7316/ 4'-934/ 4'-934/ 4'-61516/ 2
19'-158/
218/ 218/ 218/ 218/218/ 218/
4 4
4 4
1316/
1316/ 1316/ 1316/1316/
A
AA
A
4 18'-558/ 4
33
33
312/
A - A
Page 62
ONE - BEAM - B62
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B62 1
B62 1 W10X68 17'-4 1/2" 1177 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 1177
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B62
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
331
2/
331
2/
378/
331
2/
378/
331
2/
2 6'-114/ 6'-4 4'-714/ 2
17'-412/
218/ 218/218/ 218/
4 4
4 4
1316/
1316/ 1316/ 1316/
A
AA
A
4 16'-812/ 438/
3116/
3116/
3116/
3116/
312/
A - A
Page 63
2 - BEAMS - B63
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B63 2
B63 2 W10X45 17'-4 1/2" 1573 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 1573
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B63
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
358/
331
2/
358/
331
2/
2 6'-114/ 6'-4 4'-714/ 2
331
2/
331
2/
17'-412/
218/ 218/218/ 218/
4 4
44
1316/1316/
1316/ 1316/
A
AA
A
4 16'-812/ 4
33
33
312/
A - A
Page 64
4 - BEAMS - B64
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B64 4
B64 4 W10X45 17'-4 5/8" 3148 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 3148
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B64
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work3
312/
331
2/
358/
331
2/
358/
331
2/
2 6'-1516/ 6'-4 4'-7516/ 2
17'-458/
218/ 218/218/ 218/
4 4
4 4
1316/
1316/
1316/
1316/
A
AA
A
4 16'-858/ 4
33
33
312/
A - A
Page 65
ONE - BEAM - B65
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B65 1
B65 1 W10X68 19'-1 1/2" 1295 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 1295
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B65
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2 4'-21516/ 4'-51116/ 4'-51116/ 5'-714/ 2
331
2/
331
2/
331
2/
378/
331
2/
378/
331
2/
19'-112/
218/ 218/218/ 218/218/ 218/
4 4
4 4
1316/
1316/
1316/ 1316/ 1316/
A
AA
A
4 18'-512/ 4
3116/
3116/
3116/
3116/
312/
A - A
Page 66
2 - BEAMS - B66
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B66 2
B66 2 W10X45 19'-1 1/2" 1731 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 1731
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B66
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
331
2/
331
2/
331
2/
358/
331
2/
358/
331
2/
2 4'-21516/ 4'-51116/ 4'-51116/ 5'-714/ 2
19'-112/
218/ 218/218/ 218/218/ 218/
4 4
4 4
1316/
1316/1316/ 1316/ 1316/
A
AA
A
4 18'-512/ 4
33
33
312/
A - A
Page 67
3 - BEAMS - B67
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B67 3
B67 3 W10X45 19'-1 5/8" 2598 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 2598
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B67
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
331
2/
331
2/
331
2/
358/
331
2/
358/
331
2/2 4'-3 4'-51116/ 4'-51116/ 5'-7516/ 2
19'-158/
218/ 218/ 218/ 218/ 218/ 218/
4 4
4 4
1316/
1316/
1316/1316/1316/
A
AA
A
4 18'-558/ 4
33
33
312/
A - A
Page 68
ONE - BEAM - B68
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B68 1
B68 1 W10X45 19'-1 5/8" 866 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 866
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B68
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
358/
331
2/
358/
331
2/
2 8516/ 6'-3 6'-3 5'-7516/ 2
331
2/
331
2/
331
2/19'-158/
218/ 218/ 218/ 218/218/ 218/
4 4
4 4
1316/
1316/
1316/
1316/
A
AA
A
4 18'-558/ 4
33
33
312/
A - A
Page 69
ONE - BEAM - B69
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B69 1
B69 1 W10X15 4'-10 7/8" 74 A992
SQ-2BEAM
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 89
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B69
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
312/
331
2/
114/
738/
1516/
4'-1078/
2316/ 4'-612/ 2316/
312/
331
2/
7 8/71
5 16/13
16/
234/ 378/
1316/1316/
p24 (B/S)
p24 (B/S)
B
BA
A
312/
331
2/218/ 218/
p24
p24
1316/
A - A
312/
331
2/
218/ 218/p24
p241316/
B - B
Page 70
ONE - BEAM - B70
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B70 1
B70 1 W10X15 4'-10 7/8" 74 A992
SQ-2BEAM
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 89
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B70
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 1'-614/ 3'-014/ 2316/
312/
331
2/
343
8/
4'-1078/
312/
331
2/
114/
738/
1516/
7 8/71
5 16/13
16/
218/ 218/
234/ 378/
1316/
1316/1316/
p24 (B/S)
p24 (B/S)
B
BA
A
312/
331
2/218/ 218/
p24
p24
1316/
A - A
312/
331
2/
218/ 218/p24
p24
1316/
B - B
Page 71
2 - BEAMS - B71
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B71 2
B71 2 W10X15 4'-11 11/16" 149 A992
SQ-2BEAMS
P2 2 FL3/8"X5" 1'-1 3/4" 15 A36
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 179
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B71
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
4'-912/ 2316/
4'-111116/
312/
331
2/
114/
738/
1516/
378/
1316/
p24 (B/S)
A
A
212/ 212/ 4'-61116/
247
8/47
8/2
4'-111116/
38/TYP
34/
P2
312/
331
2/
218/ 218/
p24p24
1316/
A - A
Page 72
2 - BEAMS - B72
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B72 2
B72 2 W8X10 4'-9 15/16" 97 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 128
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B72
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
1
2316/ 4'-5916/ 2316/
238/
321
2/
4'-91516/
238/
321
2/
178/
1316/
1316/ a3 (B/S)
a3 (B/S)
B
BA
A
238/
321
2/
218/ 218/
a3
a3
1316/
A - A
238/
321
2/
218/ 218/
1
a3a3
1316/
B - B
Page 73
2 - BEAMS - B73
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B73 2
B73 2 W8X10 4'-9 7/8" 97 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 128
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B73
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
1
2316/ 4'-512/ 2316/
238/
321
2/
4'-978/
238/
321
2/
178/
1316/
1316/ a3 (B/S)
a3 (B/S)
B
BA
A
238/
321
2/
218/ 218/
a3a3 1316/
A - A
238/
321
2/
218/ 218/
1
a3 a31316/
B - B
Page 74
3 - BEAMS - B74
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B74 3
B74 3 W8X10 4'-9 3/4" 145 A992
SQ-2BEAMS
a3 12 L4X3-1/2X5/16 0'-6" 46 A36
TOTAL WEIGHT THIS DRAWING 191
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B74
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 4'-538/ 2316/
1
238/
321
2/
238/
321
2/
4'-934/
178/
1316/
1316/
a3 (B/S)a3 (B/S)
B
BA
A
238/
321
2/
218/ 218/
a3a3
1316/
A - A
238/
321
2/
218/ 218/
1
a3a3
1316/
B - B
Page 75
2 - BEAMS - B75
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B75 2
B75 2 W10X39 15'-0 13/16" 1180 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 1210
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B75
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 14'-8716/ 2316/
331
2/
15'-01316/33
8/3
312/
338/
331
2/
12'-4716/ 2'-8716/
214/ 214/
1316/1316/
1316/
a3 (B/S)
a3 (B/S)
B
BA
A
338/
331
2/
2316/ 2316/
a3a3
1316/
A - A
312/
1316/
Page 76
2 - BEAMS - B76
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B76 2
B76 2 W10X22 15'-10 1/4" 700 A992
SQ-2BEAMS
P2 2 FL3/8"X5" 1'-1 3/4" 15 A36
TOTAL WEIGHT THIS DRAWING 715
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B76
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
15'-834/ 112/
1'-1118/ 3'-0 3'-0 3'-0 3'-0 1'-1118/
358/
331
2/
114/
738/
112/
5
5
1316/GA 312/ (FS)
1316/
A
A
134/
118/
212/ 212/
247
8/47
8/2
15'-1014/
38/TYP34/ 1316/1316/
1316/1316/
1316/
P2
2 478/ 478/ 2
A - A
Page 77
ONE - BEAM - B77
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B77 1
B77 1 W10X15 11'-2" 168 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 183
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B77
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 10'-958/ 2316/
11'-2
312/
331
2/
114/
712/
114/
321
2/
312/
331
2/
114/
712/
114/
4'-912/ 6'-412/
2116/ 2116/178/ 11516/
1316/
1316/ 1316/
a3 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/a3
a31316/
A - A
312/
331
2/
218/ 218/
a3
a31316/
B - B
Page 78
6 - BEAMS - B78
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B78 6
B78 6 W10X15 9'-6 7/8" 862 A992
SQ-2BEAMS
a3 24 L4X3-1/2X5/16 0'-6" 92 A36
TOTAL WEIGHT THIS DRAWING 954
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B78
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
9'-678/
2316/ 9'-212/ 2316/
321
2/
312/
331
2/
114/
712/
114/
312/
331
2/
114/
712/
114/
4'-912/ 4'-938/
218/ 2116/178/
11516/
1316/1316/
1316/
a3 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/a3
a3
1316/
A - A
312/
331
2/
218/ 218/
1316/
B - B
Page 79
7 - BEAMS - B79
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B79 7
B79 7 W8X10 6'-2 5/8" 438 A992
SQ-2BEAMS
a3 14 L4X3-1/2X5/16 0'-6" 54 A36
TOTAL WEIGHT THIS DRAWING 492
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B79
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 5'-101516/ 112/
6'-258/
238/
321
2/
238/
321
2/
11516/ 134/
1
1316/1316/
a3 (B/S)
A
A
238/
321
2/
2116/ 2116/
a3
a3
1316/
A - A
Page 80
2 - BEAMS - B80
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B80 2
B80 2 W10X15 12'-2 5/8" 367 A992
SQ-2BEAMS
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p6 2 FL3/8"X3 3/4" 0'-6" 5 A36
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 402
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B80
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
6'-6516/ 5'-8516/
2316/ 6'-10116/ 5'-014/ 2316/
312/
331
2/
12'-258/
331
2/
312/
331
2/
114/
738/
1516/
218/ 218/
378/
378/
38/TYP
1316/1316/
1316/
p24 (B/S)a3 (B/S)
C
CA
A B
B
412/
321
2/
238/
1316/p6
B - B
312/
331
2/
218/ 218/
a3a3
1316/
A - A
312/
331
2/
218/ 218/p24
p24
1316/
C - C
Page 81
2 - BEAMS - B81
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B81 2
B81 2 W10X19 12'-2 5/8" 467 A992
SQ-2BEAMS
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 498
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B81
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 5'-4916/ 6'-534/ 2316/
334/
331
2/
112/
7716/
1516/
12'-258/
331
2/
334/
331
2/
218/ 218/
378/
1316/
1316/ 1316/
p24 (B/S)
a3 (B/S)
B
BA
A
334/
331
2/
218/ 218/
a3a3
1316/
A - A
334/
331
2/
218/ 218/p24
p24
1316/
B - B
Page 82
ONE - BEAM - B82
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B82 1
B82 1 W10X15 12'-2 5/8" 183 A992
SQ-2BEAM
a3 2 L4X3-1/2X5/16 0'-6" 8 A36
p6 1 FL3/8"X3 3/4" 0'-6" 2 A36
p24 2 L4X3-1/2X5/16 0'-6" 8 A36
TOTAL WEIGHT THIS DRAWING 201
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B82
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
12'-258/
331
2/
2316/ 6'-10116/ 5'-0316/ 2316/
6'-6516/ 5'-814/
312/
331
2/
118/
738/
112/
312/
331
2/
218/ 218/478/
38/TYP
1316/1316/ 1316/
p24 (B/S)a3 (B/S)
C
C
A
A B
B
112/ 238/
412/
321
2/ 1316/
p6
B - B
312/
331
2/
218/ 218/
a3
a3
1316/
A - A
312/
331
2/
218/ 218/p24p24
1316/
C - C
Page 83
ONE - BEAM - B83
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B83 1
B83 1 W10X19 12'-2 5/8" 234 A992
SQ-2BEAM
a3 2 L4X3-1/2X5/16 0'-6" 8 A36
p24 2 L4X3-1/2X5/16 0'-6" 8 A36
TOTAL WEIGHT THIS DRAWING 249
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B83
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
12'-258/
2316/ 5'-4916/ 6'-51116/ 2316/
331
2/
334/
331
2/
1516/
7716/
112/
334/
331
2/
218/ 218/
478/
478/
1316/
1316/1316/
p24 (B/S)
a3 (B/S)
B
BA
A
334/
331
2/
218/ 218/
a3
a3
1316/
A - A
334/
331
2/
218/ 218/p24
p24
1316/
B - B
Page 84
2 - BEAMS - B84
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B84 2
B84 2 W10X15 12'-2 3/4" 367 A992
SQ-2BEAMS
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p6 2 FL3/8"X3 3/4" 0'-6" 5 A36
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 403
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B84
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
6'-6716/ 5'-8516/
312/
331
2/
12'-234/
114/
738/
1516/
312/
331
2/
331
2/
2316/ 6'-10316/ 5'-014/ 2316/
218/ 218/
378/
38/TYP
p6
1316/
1316/
1316/ p24 (B/S)
a3 (B/S)
C
CA
A B
B
412/
321
2/
238/
1316/p6
B - B
312/
331
2/
218/ 218/
a3
a31316/
A - A
312/
331
2/
218/ 218/
p24
p241316/
C - C
Page 85
2 - BEAMS - B85
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B85 2
B85 2 W10X19 12'-2 3/4" 468 A992
SQ-2BEAMS
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 498
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B85
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
12'-234/
2316/ 5'-41116/ 6'-534/ 2316/33
4/3
312/
331
2/
334/
331
2/
112/
7716/
1516/
218/ 218/
378/
1316/1316/
1316/ p24 (B/S)
a3 (B/S)
B
B
A
A
334/
331
2/
218/ 218/
a3
a3
1316/
A - A
334/
331
2/
218/ 218/p24
p241316/
B - B
Page 86
2 - BEAMS - B86
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B86 2
B86 2 W10X15 12'-2 7/8" 367 A992
SQ-2BEAMS
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p6 2 FL3/8"X3 3/4" 0'-6" 5 A36
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 403
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B86
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
6'-6916/ 5'-8516/
2316/ 6'-10516/ 5'-014/ 2316/
312/
331
2/
12'-278/
312/
331
2/
331
2/
114/
738/
1516/
218/ 218/
378/
38/TYP
p61316/
1316/
1316/p24 (B/S)
a3 (B/S)
C
CA
A B
B
412/
321
2/238/
1316/p6
B - B
312/
331
2/
218/ 218/
a3a3
1316/
A - A
312/
331
2/
218/ 218/p24
p241316/
C - C
Page 87
ONE - BEAM - B87
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B87 1
B87 1 W10X19 12'-2 7/8" 234 A992
SQ-2BEAM
a3 2 L4X3-1/2X5/16 0'-6" 8 A36
p24 2 L4X3-1/2X5/16 0'-6" 8 A36
TOTAL WEIGHT THIS DRAWING 249
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B87
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
331
2/
331
2/
2316/ 5'-41316/ 1'-812/ 4'-914/ 2316/
12'-278/
334/
331
2/
334/
331
2/
112/
7716/
1516/
218/ 218/ 218/ 218/
378/
1316/
1316/
1316/ 1316/ p24 (B/S)
a3 (B/S)
B
B
A
A
334/
331
2/
218/ 218/
a3a3
1316/
A - A
334/
331
2/
218/ 218/
p24 p24
1316/
B - B
Page 88
ONE - BEAM - B88
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B88 1
B88 1 W10X30 12'-2 13/16" 368 A992
SQ-2BEAM
a3 2 L4X3-1/2X5/16 0'-6" 8 A36
p24 2 L4X3-1/2X5/16 0'-6" 8 A36
TOTAL WEIGHT THIS DRAWING 383
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B88
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
218/ 5'-41316/ 6'-534/ 2316/
134/
7716/
1516/
43
312/
43
312/
12'-21316/
331
2/
218/ 218/
378/
1316/1316/
1316/
p24 (B/S)
a3 (B/S)
B
BA
A
218/ 3 3
12'-21316/
112/
112/
1316/
43
312/
2316/ 2316/
112/ 112/a3
a3
1316/
A - A
43
312/
218/ 218/p24
p24
1316/
B - B
Page 89
ONE - BEAM - B89
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B89 1
B89 1 W10X15 11'-10 1/2" 178 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 194
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B89
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 11'-618/ 2316/
312/
331
2/
11'-1012/
312/
331
2/
1316/
1316/
a3 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/
a3 a3
1316/
A - A
312/
331
2/
218/ 218/a3
a31316/
B - B
Page 90
3 - BEAMS - B90
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B90 3
B90 3 W10X30 11'-10 1/2" 1072 A992
SQ-2BEAMS
a3 12 L4X3-1/2X5/16 0'-6" 46 A36
TOTAL WEIGHT THIS DRAWING 1118
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B90
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 11'-618/ 2316/
11'-1012/
43
312/
43
312/
1316/1316/
a3 (B/S)
a3 (B/S)
B
BA
A
43
312/
218/ 218/a3
a31316/
A - A
43
312/
4516/
218/ 218/
1316/
B - B
Page 91
2 - BEAMS - B91
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B91 2
B91 2 W10X30 11'-10 7/16" 714 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
p17 2 FL1/2"X5 1/4" 1'-7 1/4" 29 A36
p18 4 FL1/2"X5 1/4" 0'-7 15/16" 24 A36
TOTAL WEIGHT THIS DRAWING 797
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B91
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
234/ 8'-101316/
2316/ 2'-8116/ 8'-10116/ 218/
11'-10716/
43
312/
43
312/
218/ 218/
12/TYP
12/TYP
1316/GA 3
1316/GA 3
1316/1316/
1316/
a3 (B/S)a3 (B/S)
C
CA
A B
B
343
8/2'-878/
3 3 218/
112/
112/
1316/
1316/
p17
p18
p18
33
858/
178/
112/ 518/ 518/ 112/
p18p18
p17
1316/
B - B
43
312/
218/ 218/a3
a31316/
A - A 43
312/
218/ 218/
112/ 112/
1316/
C - C
Page 92
4 - BEAMS - B92
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B92 4
B92 4 W10X30 11'-10 5/8" 1431 A992
SQ-2BEAMS
a3 16 L4X3-1/2X5/16 0'-6" 61 A36
p17 4 FL1/2"X5 1/4" 1'-7 1/4" 57 A36
p18 8 FL1/2"X5 1/4" 0'-7 15/16" 47 A36
TOTAL WEIGHT THIS DRAWING 1597
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B92
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
8'-101516/
2316/ 2'-8316/ 8'-10316/ 218/
343
8/
11'-1058/
334/
331
2/
43
312/
218/ 218/
12/TYP
12/TYP
1316/GA 3
1316/1316/ 1316/
a3 (B/S)a3 (B/S)
C
CA
A B
B
2'-9 234/
3 3 218/
112/
112/
1316/
1316/
p17
p18 p18
33
918/
138/
112/ 518/ 518/ 112/
12/TYP 12/
TYP
p18p18
p17
B - B
43
312/
218/ 218/
a3 a31316/
A - A
43
312/
218/ 218/
112/ 112/a3
a3
1316/
C - C
Page 93
ONE - BEAM - B93
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B93 1
B93 1 W10X30 11'-10 7/8" 358 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p17 1 FL1/2"X5 1/4" 1'-7 1/4" 14 A36
p18 2 FL1/2"X5 1/4" 0'-7 15/16" 12 A36
TOTAL WEIGHT THIS DRAWING 400
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B93
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
218/ 8'-10516/ 2'-8516/ 2316/
8'-11116/ 234/ 2'-918/
11'-1078/
43
312/
43
312/
218/ 218/
12/TYP
12/TYP1316/
GA 3
1316/GA 3
1316/1316/
1316/
a3 (B/S)
a3 (B/S) C
CA
A B
B
343
8/
218/ 3 3
112/
112/
1316/
1316/
p17
p18
p18
518/ 33
918/
138/
112/ 518/ 112/
12/TYP12/
TYP
1316/p17
p18p18
B - B
43
312/
218/ 218/
112/ 112/a3
a3
1316/
A - A
43
312/
218/ 218/a3
a3
1316/
C - C
Page 94
ONE - BEAM - B94
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B94 1
B94 1 W10X30 11'-10 7/8" 358 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 374
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B94
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
218/ 11'-6916/ 2316/
11'-1078/
43
312/
43
312/
1316/GA 3
1316/GA 3
1316/1316/
a3 (B/S)a3 (B/S)
B
BA
A
218/ 3 3
112/
112/
1316/
43
312/
2316/ 2316/
112/ 112/
a3
a3
1316/
A - A
43
312/
2316/ 2316/a3
a31316/
B - B
Page 95
ONE - BEAM - B95
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B95 1
B95 1 W10X30 11'-10 7/8" 358 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p17 1 FL1/2"X5 1/4" 1'-7 1/4" 14 A36
p18 2 FL1/2"X5 1/4" 0'-7 15/16" 12 A36
TOTAL WEIGHT THIS DRAWING 400
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B95
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
43
312/
1'-9 7'-1516/ 218/
343
8/
11'-1078/
43
312/
218/ 218/ 218/ 218/
12/TYP
12/TYP
1316/GA 3
1316/1316/ 1316/
1316/
a3 (B/S)
a3 (B/S)
C
CA
A B
B
2'-918/ 234/ 8'-11116/
331
2/
2316/ 2'-8516/
3 3 218/
11'-101516/
112/
112/
1316/
1316/
p17
p18
p18
33
918/
138/
112/ 518/ 518/ 112/
12/TYP
12/TYP
1316/
p17
p18p18
B - B
43
312/
2316/ 2316/a3
a31316/
A - A
43
312/
2316/ 2316/
112/ 112/
1316/
a3
a3
1316/
C - C
Page 96
8 - BEAMS - B96
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B96 8
B96 8 W10X15 12'-6 7/8" 1509 A992
SQ-2BEAMS
a3 16 L4X3-1/2X5/16 0'-6" 61 A36
p24 16 L4X3-1/2X5/16 0'-6" 61 A36
TOTAL WEIGHT THIS DRAWING 1632
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B96
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 12'-212/ 2316/
12'-678/
312/
331
2/
114/
738/
1516/
312/
331
2/
114/
712/
114/
31516/ 378/
31516/ 378/
1316/1316/
p24 (B/S)a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/
a3
a3
1316/
A - A
312/
331
2/
218/ 218/p24
p24
1316/
B - B
Page 97
4 - BEAMS - B97
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B97 4
B97 4 W10X15 12'-6 7/8" 755 A992
SQ-2BEAMS
a3 8 L4X3-1/2X5/16 0'-6" 31 A36
p24 8 L4X3-1/2X5/16 0'-6" 31 A36
TOTAL WEIGHT THIS DRAWING 816
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B97
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 9'-214/ 3'-014/ 2316/
343
8/
312/
331
2/
114/
738/
1516/
312/
331
2/
114/
712/
114/
12'-678/
218/ 218/
31516/ 378/
31516/ 378/
1316/
1316/1316/
p24 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/
a3a3
1316/
A - A
312/
331
2/
218/ 218/p24
p241316/
B - B
Page 98
6 - BEAMS - B98
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B98 6
B98 6 W10X19 12'-6 7/8" 1443 A992
SQ-2BEAMS
a3 12 L4X3-1/2X5/16 0'-6" 46 A36
p24 12 L4X3-1/2X5/16 0'-6" 46 A36
TOTAL WEIGHT THIS DRAWING 1535
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B98
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 7'-214/ 5'-014/ 2316/
12'-678/
331
2/
334/
331
2/
114/
734/
114/
334/
331
2/
112/
7716/
1516/
218/ 218/31516/
378/
31516/ 378/
1316/
1316/1316/
p24 (B/S)
a3 (B/S)
B
BA
A
334/
331
2/
218/ 218/
a3a3
1316/
A - A
334/
331
2/
218/ 218/p24
p241316/
B - B
Page 99
6 - BEAMS - B99
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B99 6
B99 6 W10X19 12'-6 7/8" 1443 A992
SQ-2BEAMS
a3 12 L4X3-1/2X5/16 0'-6" 46 A36
p24 12 L4X3-1/2X5/16 0'-6" 46 A36
TOTAL WEIGHT THIS DRAWING 1535
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B99
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 5'-614/ 2316/
12'-678/
331
2/
321
2/
334/
331
2/
112/
7716/
1516/
334/
331
2/
114/
734/
114/
218/ 218/
2116/ 2116/
314/378/
314/ 378/
1316/1316/
1316/p24 (B/S)
a3 (B/S)
B
BA
A
5'-834/ 1112/
334/
331
2/
218/ 218/
a3
a3
1316/
A - A
334/
331
2/
218/ 218/p24
p24
1316/
B - B
Page 100
5 - BEAMS - B100
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B100 5
B100 5 W10X15 12'-6 7/8" 944 A992
SQ-2BEAMS
a3 10 L4X3-1/2X5/16 0'-6" 38 A36
p24 10 L4X3-1/2X5/16 0'-6" 38 A36
TOTAL WEIGHT THIS DRAWING 1020
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B100
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 12'-212/ 2316/
12'-678/
312/
331
2/
114/
738/
1516/
312/
331
2/
114/
712/
114/
2716/ 378/
2716/ 378/
1316/1316/
p24 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/
a3a3
1316/
A - A
312/
331
2/
218/ 218/p24
p24
1316/
B - B
Page 101
3 - BEAMS - B101
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B101 3
B101 3 W10X15 12'-6 7/8" 566 A992
SQ-2BEAMS
a3 6 L4X3-1/2X5/16 0'-6" 23 A36
p24 6 L4X3-1/2X5/16 0'-6" 23 A36
TOTAL WEIGHT THIS DRAWING 612
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 B101
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 9'-2516/ 3'-014/ 2316/
312/
331
2/
312/
331
2/
12'-678/
114/
738/
1516/
114/
712/
114/
438/
218/ 218/
2716/ 378/
2716/ 378/
1316/1316/
1316/
p24 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/218/ 218/
a3
a3
1316/
A - A
312/
331
2/
218/ 218/p24
p241316/
B - B
Page 102
9 - BEAMS - B102
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B102 9
B102 9 W10X15 12'-10 3/8" 1738 A992
SQ-2BEAMS
P2 9 FL3/8"X5" 1'-1 3/4" 66 A36
p24 18 L4X3-1/2X5/16 0'-6" 69 A36
TOTAL WEIGHT THIS DRAWING 1872
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B102
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
12'-8316/ 2316/
12'-1038/
312/
331
2/
118/
738/
112/
478/
478/
1316/
p24 (B/S)
A
A
247
8/47
8/2
212/ 212/12'-1038/
38/TYP
34/
P2
312/
331
2/
218/ 218/p24
p241316/
A - A
Page 103
ONE - BEAM - B103
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B103 1
B103 1 W10X19 12'-10 3/8" 246 A992
SQ-2BEAM
P2 1 FL3/8"X5" 1'-1 3/4" 7 A36
p24 2 L4X3-1/2X5/16 0'-6" 8 A36
TOTAL WEIGHT THIS DRAWING 261
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B103
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
7'-8 5'-0316/ 2316/
12'-1038/
334/
331
2/
1516/
7716/
112/
331
2/
218/ 218/478/
478/
1316/
1316/
p24 (B/S)
A
A
247
8/47
8/2
212/ 212/
12'-1038/
38/TYP
34/
P2
334/
331
2/
218/ 218/p24
p24
1316/
A - A
Page 104
ONE - BEAM - B104
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B104 1
B104 1 W10X19 12'-10 3/8" 246 A992
SQ-2BEAM
P2 1 FL3/8"X5" 1'-1 3/4" 7 A36
p24 2 L4X3-1/2X5/16 0'-6" 8 A36
TOTAL WEIGHT THIS DRAWING 261
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B104
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
331
2/
6'-212/ 1112/ 5'-6316/ 2316/
321
2/
12'-1038/
334/
331
2/
1516/
7716/
112/
218/ 218/2116/ 2116/
478/
478/
1316/
1316/
p24 (B/S)
A
A
212/ 212/
247
8/47
8/2
12'-1038/
38/TYP
34/
P2
334/
331
2/
218/ 218/p24
p241316/
A - A
Page 105
ONE - BEAM - B105
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B105 1
B105 1 W10X15 12'-0 15/16" 181 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 197
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B105
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 11'-8916/ 2316/
12'-01516/234/
312/
331
2/
114/
712/
114/
312/
331
2/
114/
712/
114/
234/11516/
11516/
1316/
1316/
a3 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/a3
a31316/
A - A
312/
331
2/
218/ 218/
a3
a3
1316/
B - B
Page 106
6 - BEAMS - B106
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B106 6
B106 6 W10X15 12'-1" 1088 A992
SQ-2BEAMS
a3 24 L4X3-1/2X5/16 0'-6" 92 A36
TOTAL WEIGHT THIS DRAWING 1180
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B106
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2316/ 11'-858/ 2316/
12'-1
312/
331
2/
114/
712/
114/
312/
331
2/
114/
712/
114/
11516/ 11516/
11516/ 11516/
1316/
1316/
a3 (B/S)
a3 (B/S)
B
BA
A
312/
331
2/
218/ 218/a3
a31316/
A - A
312/
331
2/
218/ 218/
a3a3
1316/
B - B
Page 107
2 - BEAMS - B107
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B107 2
B107 2 W10X15 7'-6 15/16" 227 A992
SQ-2BEAMS
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
p24 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 258
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B107
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
7'-61516/
2316/ 7'-2916/ 2316/
312/
331
2/
7 8/71
5 16/13
16/
312/
331
2/
114/
712/
114/
2716/234/
2716/ 234/
1316/
1316/
p24 (B/S)
a3 (B/S)
B
B
A
A
312/
331
2/
218/ 218/
a3
a3
1316/
A - A
312/
331
2/
218/ 218/p24
p24
1316/
B - B
Page 108
ONE - BEAM - B108
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B108 1
B108 1 W14X48 23'-11 1/2" 1150 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 1150
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B108
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
331
2/
331
2/
331
2/
2 9'-518/ 4'-934/ 4'-934/ 4'-678/ 2
414/
312/
414/
312/
23'-1112/
218/ 218/ 218/ 218/218/ 218/
4 4
44
1316/1316/1316/ 1316/1316/
A
AA
A
4 23'-312/ 4
33
33
312/
A - A
Page 109
ONE - BEAM - B109
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B109 1
B109 1 W14X48 23'-4 1/16" 1120 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 1120
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B109
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3
33
218/ 9'-1516/ 4'-934/ 4'-934/ 4'-3116/ 218/
414/
312/
414/
312/
331
2/
331
2/
331
2/
23'-4116/
218/ 218/ 218/ 218/218/ 218/1316/GA 4
1316/GA 4
1316/GA 4
1316/GA 4
1316/1316/1316/ 1316/1316/
A
A
3
33 33218/ 21'-111316/ 218/
22
22
1316/
1316/
2 2
A - A
Page 110
ONE - BEAM - B110
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B110 1
B110 1 W14X48 23'-7 3/4" 1135 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 1135
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B110
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
331
2/
331
2/
331
2/
2 23'-358/ 218/
414/
312/
414/
312/
23'-734/
9'-718/ 4'-934/ 4'-934/ 4'-518/
218/ 218/ 218/ 218/218/ 218/4
4
1316/GA 4
1316/GA 4
1316/1316/
1316/
1316/1316/
B
BA
A
33
4
438/ 22'-758/ 218/
22
33
1316/
312/
A - A 2 2
B - B
Page 111
2 - BEAMS - B111
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B111 2
B111 2 W14X48 23'-7 7/8" 2270 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 2270
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B111
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
414/
312/
2 9'-5316/ 4'-934/ 4'-934/ 4'-3116/ 218/41
4/31
2/
23'-778/31
2/
312/
312/
218/ 218/ 218/ 218/218/ 218/4
4
1316/GA 4
1316/GA 4
1316/1316/
1316/
1316/1316/
B
BA
A
33
4
4 22'-734/ 218/
22
33
1316/31
2/
A - A2 2
B - B
Page 112
ONE - BEAM - B112
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B112 1
B112 1 W14X48 23'-7 7/8" 1135 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 1135
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B112
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
331
2/
331
2/
331
2/
2 9'-5316/ 4'-934/ 4'-934/ 4'-3116/ 218/41
4/31
2/
414/
312/
23'-778/
218/ 218/ 218/ 218/218/ 218/4
4
1316/GA 4
1316/GA 4
1316/1316/
1316/
1316/1316/
B
BA
A
33
4
4 22'-734/ 218/
22
33
1316/
312/
A - A 2 2
B - B
Page 113
ONE - BEAM - B113
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B113 1
B113 1 W14X34 18'-0 7/8" 615 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 615
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B113
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
218/ 11'-7716/ 6'-1516/ 2
412/
312/
412/
312/
18'-078/
312/
218/ 218/
4
41316/GA 4
1316/GA 4
1316/
1316/1316/
B
BA
A
33218/ 17'-034/ 438/
22
278/
278/1316/
1316/
2 2
A - A
312/
B - B
Page 114
ONE - BEAM - B114
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B114 1
B114 1 W14X34 18'-4 1/2" 625 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 625
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B114
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
2 11'-1114/ 6'-114/ 2
331
2/
412/
312/
412/
312/
18'-412/
218/ 218/
4 4
4 4
1316/1316/
1316/
A
AA
A
4 17'-812/ 4
278/
278/
278/
278/
312/
A - A
Page 115
ONE - BEAM - B115
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B115 1
B115 1 W14X34 17'-9" 604 A992
SQ-2BEAM
TOTAL WEIGHT THIS DRAWING 604
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B115
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
218/ 11'-738/ 5'-938/ 218/
331
2/
412/
312/
412/
312/
17'-9
218/ 218/
1316/GA 4
1316/GA 4
1316/GA 4
1316/GA 4
1316/1316/ 1316/
B
BA
A
33 33218/ 16'-434/ 218/
22
22
1316/
1316/
1316/
1316/
2 2
A - A
Page 116
3 - BEAMS - B116
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B116 3
B116 3 W14X34 17'-9 1/8" 1813 A992
SQ-2BEAMS
TOTAL WEIGHT THIS DRAWING 1813
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 B116
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
33
218/ 11'-7716/ 5'-9716/ 218/
412/
312/
412/
312/
331
2/
17'-918/
218/ 218/
1316/GA 4
1316/GA 4
1316/GA 4
1316/GA 4
1316/1316/ 1316/
B
BA
A
33 33218/ 16'-478/ 218/
22
22
1316/
1316/
1316/
1316/
2 2
A - A
2 2
B - B
Page 117
ONE - BEAM - B117
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
B117 1
B117 1 W10X30 13'-3 15/16" 401 A992
SQ-2BEAM
a3 4 L4X3-1/2X5/16 0'-6" 15 A36
TOTAL WEIGHT THIS DRAWING 416
REV DESCRIPTION DATE
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/05/2015 003 B117
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
234/12'-11316/11516/
331
2/
331
2/
218/218/
4'-518/4'-51116/4'-5316/
114/
114/
8
218/ 218/
43
312/
43
312/
13'-31516/
a3 (B/S)
a3 (B/S)
A
A B
B
1316/
1316/ 1316/
1316/
1316/
1316/
2316/2316/ 114/
811
4/
43
312/
218/ 2316/1316/ 1316/
a3
a3
A - A
43
312/
2316/2316/a3
a3
1316/1316/
B - B
Page 118
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C1 1
C1 1 W6X25 11'-11 1/2" 299 A992
SQ-2COLUMN
BP2 1 PL1 1/2"X12" 1'-0" 61 A36
TOTAL WEIGHT THIS DRAWING 360
ONE - COLUMN - C1
GRID LOCATION BOTTOM ELEVATION
A/5 17'-5"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C1
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
2'-0
1 2/9'
-241
2/
12'-1
EL 2
9'-6
1316/
+17'-51316/
516/TYP
1316/GA 414/ (FS)
1316/GA 414/
BB
A A
12'-1
414/
414/
112/ 412/ 412/ 112/
112/
412/
412/
112/ 516/
516/
1 14/
BP2
A - A
218/
218/
1316/
B - B
Page 119
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C2 1
C2 1 W8X58 24'-7 1/2" 1433 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P6 1 FL1/2"X4" 0'-10" 6 A36
p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36
p13 1 PL1/2"X7 7/8" 1'-2 1/8" 13 A36
p22 2 FL1/2"X6" 0'-10" 17 A36
TOTAL WEIGHT THIS DRAWING 1579
ONE - COLUMN - C2
GRID LOCATION BOTTOM ELEVATION
A/4 17'-5"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C2
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
24'-7
1 2/
24'-9
3'-4
5116/ 334/
278/ 112/112/
278/
2
431
2/3 8/
38/TYP
38/TYP
516/
38/516/
TYP
1316/
1316/
1316/
1316/
1316/
EE
A A
DD
DD
BB
3
312/
312/
33
112/
2'-7
9'-5
9'-5
5116/ 31116/
33
3
24'-9
12'-0
9'-5
3'-4
112/ 234/
158/ 212/212/
158/
231
2/
414/
312/
3 8/
658/
p11
p11
1316/
1316/
p13
P6
33
33
3
33
4916/ 414/
234/
2316/
218/
P6 1316/
B - B
33
33
658/
112/
112/ 4 112/
4916/ 4316/ 212/ 112/
112/
112/
1316/
p22
p11
D - D
112/ 512/ 512/ 112/
112/
512/
512/
112/
516/
516/
1 14/
BP1
A - A
3278/ 278/
212/
212/
1316/
E - E
Page 120
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C3 1
C3 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p13 2 PL1/2"X7 7/8" 1'-2 1/8" 26 A36
p22 4 FL1/2"X6" 0'-10" 34 A36
TOTAL WEIGHT THIS DRAWING 1017
ONE - COLUMN - C3
GRID LOCATION BOTTOM ELEVATION
A/4 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C3
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work112/ 112/
p22
p22
p22
p22
1316/GA 5"(NS)
1316/
1316/
1316/GA 4516/ (FS)
1316/GA 4516/ (FS)
AA
A A
CC
BB
BB
731
2/3
23@
3
43 8/
312/
3 8/
EL 4
2'-2
1316/
EL 6
1'-0
1316/
6'-1
9'-5
3'-4
112/ 112/
38/TYP
316/
38/316/
TYP
316/
38/316/
TYP18'-1
0
9'-5
6916/
212/ 212/
212/ 212/
p11
p11
p11
p11
1316/
1316/
1316/
1316/
p13
p13
23@
3
33
414/
312/
3 8/
6'-1
33
3
33
2
414/
312/
3 8/
3'-4
6916/
33
33
6916/
112/
4716/ 4116/ 212/ 112/
112/
112/
2316/ 178/
1316/p22
p11
B - B
6916/
33
112/
316/ 4116/212/
3 3 112/
112/
112/
2316/ 178/
1316/
p22
p11
C - C
212/
212/
1316/
A - A
Page 121
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C4 1
C4 1 W8X40 15'-8" 624 A992
SQ-2COLUMN
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p13 2 PL1/2"X7 7/8" 1'-2 1/8" 26 A36
p22 4 FL1/2"X6" 0'-10" 34 A36
TOTAL WEIGHT THIS DRAWING 738
ONE - COLUMN - C4
GRID LOCATION BOTTOM ELEVATION
A/4 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C4
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
2
15'-8
112/ 112/
38/TYP
316/
38/316/
TYP316/
38/316/
TYP
1316/GA 4516/ (FS)
p22
p22
p22
p22
1316/
1316/GA 4516/ (FS)
A A
EE
EE
EE
EE
312/
312/
23@
3
33
43 8/
43 8/
EL 6
1'-0
1316/
EL 7
6'-8
1316/
6'-1
9'-5
331
2/31
2/3 8/
15'-8
6'-1
9'-5
2
6916/
6916/
212/ 212/
p11
p11
p11
p11
1316/
1316/
1316/
p13
p13
3
23@
3
414/
33
3 8/41
4/
33
33
4516/ 31516/212/
112/
6916/
112/
2 2
112/
112/
1316/
p11
p22
E - E
212/
212/1316/
A - A
Page 122
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C5 1
C5 1 W8X58 24'-7 1/2" 1433 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P6 3 FL1/2"X4" 0'-10" 17 A36
p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36
p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36
TOTAL WEIGHT THIS DRAWING 1574
ONE - COLUMN - C5
GRID LOCATION BOTTOM ELEVATION
A/3 17'-5"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C5
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
22'-2
12'-0
9'-5
3'-4
24'-9
4916/ 4316/
231
2/
5116/ 334/
312/
112/ 112/
38/TYP
38/TYP
1316/
1316/
1316/
EE
A A
CC
DD
BB
312/
33
33
3
2'-7
33
3
24'-9
12'-0
9'-5
3'-4
658/ 234/
2
312/
412/
312/
3 8/
212/ 212/
p11
p11
1316/
1316/
P6
p14
P6P6
33
33
3
33
4916/ 414/
234/
234/
218/
218/
P6
P6 1316/
B - B
33
218/
218/
412/ 4316/
234/
658/
112/
2 2
P6
1316/
p11
D - D
33
4916/ 414/
658/
112/
2 2
P6
p14
1316/
p11
C - C
112/
512/
512/
112/
112/ 512/ 512/ 112/
516/
516/
1 14/
BP1
A - A
212/
212/
1316/
E - E
Page 123
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C6 1
C6 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
P6 2 FL1/2"X4" 0'-10" 11 A36
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36
TOTAL WEIGHT THIS DRAWING 995
ONE - COLUMN - C6
GRID LOCATION BOTTOM ELEVATION
A/3 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C6
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
6'-1
9'-5
3'-4
112/ 112/
112/ 112/
1316/GA 414/ (FS)
1316/GA 414/ (FS)
1316/GA 5"(NS)
1316/
1316/
AA
A A
FF
EE
BB
CC
23
33
33
3
33
18'-1
0
2
4716/ 4116/
4716/ 4116/
312/
33
312/
EL 4
2'-2
1316/
EL 6
1'-0
1316/
18'-1
0
9'-5
212/
212/ 212/
38/TYP
38/TYP
316/
38/316/
TYP
p11
p11
p11
p11
1316/
1316/
1316/
1316/
p14
P6
p14
P6
33
23@
3
6916/ 21116/
412/
312/
3 8/
6'-1
33
3
33
2
412/
312/
3 8/
6916/ 21116/
3'-4
212/
33
2 2
4716/ 418/
211 16/
6916/
112/
218/
218/
p14
P61316/
p11
C - C
33
4716/ 418/
6916/
112/
2 2
p14
P6
1316/
p11
B - B
4716/ 418/
6916/
33
112/
2 2
P6
1316/
p11
E - E
211 16/
6916/
33
112/
218/
218/
2 2
1316/
p11
F - F
212/
212/
1316/
A - A
Page 124
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C7 1
C7 1 W8X40 15'-8" 624 A992
SQ-2COLUMN
P6 2 FL1/2"X4" 0'-10" 11 A36
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p13 1 PL1/2"X7 7/8" 1'-2 1/8" 13 A36
p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36
TOTAL WEIGHT THIS DRAWING 715
ONE - COLUMN - C7
GRID LOCATION BOTTOM ELEVATION
A/3 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C7
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
4516/ 31516/
4516/ 31516/
231
2/
15'-8
EL 6
1'-0
1316/
EL 7
6'-8
1316/
6'-1
9'-7
15'-6
2
112/ 112/
1316/GA 414/ (FS)
1316/GA 414/ (FS)
1316/
A A
CC
BB
EE
FF
3@3
33
312/
33
3
6916/ 21116/
412/
312/
3 8/
15'-8
15'-6
2
6'-1
9'-7
212/ 212/
316/
38/316/
TYP
38/TYP
38/TYP
p11
1316/
1316/
1316/
P6
p14
p13
P6
23@
3
3
33
414/
312/
3 8/
21116/ 6916/
33
4516/ 4
2 2112/
6916/
211 16/
218/
218/
P61316/
p11
F - F
33
4516/ 4
112/
6916/
4116/
2 2
p13
P6
1316/p11
E - E
33
2 2
6916/
112/
4516/ 4
p14
P6
1316/
p11
B - B
33
2 2
4516/ 4
211 16/
6916/
112/
218/
218/
p14
P6
1316/
p11
C - C
212/
212/
1316/
A - A
Page 125
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C8 1
C8 1 W8X58 24'-7 1/2" 1433 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P6 3 FL1/2"X4" 0'-10" 17 A36
p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36
p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36
TOTAL WEIGHT THIS DRAWING 1574
ONE - COLUMN - C8
GRID LOCATION BOTTOM ELEVATION
A/2 17'-5"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C8
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3'-4
24'-9
12'-0
12'-9
4916/ 414/2
312/
3
112/ 112/
38/TYP
38/TYP
1316/
1316/
1316/
1316/
1316/
EE
A A
DD
CC
BB
312/
312/
33
33
2'-7
18'-1
0
33
3
21'-5
24'-9
12'-0
12'-9
234/ 234/
234/ 658/31
2/31
2/2
412/
312/
3 8/
212/ 212/
p11
1316/
1316/
p14
P6
P6
P6
33
33
33
3
33
3'-4
4916/ 414/
412/ 414/
234/
234/
218/
218/
P6
P61316/
B - B
658/
33
412/ 414/
112/ 2 2
P6
1316/
p11
C - C
218/
658/
33
2 2
412/ 414/
112/
234/
218/
1316/
p11
D - D
112/ 512/ 512/ 112/
112/
512/
512/
112/
516/
516/
1 14/
BP1
A - A
212/
212/
1316/
E - E
Page 126
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C9 1
C9 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
P6 2 FL1/2"X4" 0'-10" 11 A36
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36
TOTAL WEIGHT THIS DRAWING 995
ONE - COLUMN - C9
GRID LOCATION BOTTOM ELEVATION
A/2 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C9
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
112/ 112/
112/ 112/
316/
316/
38/316/
TYP
1316/GA 5"(NS)
1316/GA 5"(NS)
1316/GA 414/ (FS)
1316/GA 414/ (FS)
1316/GA 5"(NS)
1316/GA 5"(NS)
1316/
1316/
AA
A A
FF
EE
BB
CC3
33
33
3
33
33
18'-1
0
22
4716/ 4116/
312/
312/
EL 4
2'-2
1316/
EL 6
1'-0
1316/
6'-1
9'-5
3'-4
2
18'-1
0
9'-5
212/ 212/
212/ 212/
38/TYP
38/TYP
p11
p11
p11
p11
1316/
1316/
1316/
1316/
P6
p14
P6
p14
33
23@
3
412/
312/
3 8/
21116/ 6916/
6'-1
33
412/
312/
3 8/
21116/ 6916/
3'-4
6916/
33
112/
211 16/
438/ 418/
218/
218/
2 2
P6
1316/ p11
C - C
6916/
33
112/
438/ 418/
2 2
1316/
p11
B - B
112/
33
6916/
2 2
18/ P6
1316/
p11
E - E
18/
112/
33
6916/
211 16/
218/
218/
2 2
P6 1316/
p11
F - F
212/
212/
1316/
A - A
Page 127
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C10 1
C10 1 W8X40 15'-8" 624 A992
SQ-2COLUMN
P6 1 FL1/2"X4" 0'-10" 6 A36
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36
p22 2 FL1/2"X6" 0'-10" 17 A36
TOTAL WEIGHT THIS DRAWING 727
ONE - COLUMN - C10
GRID LOCATION BOTTOM ELEVATION
A/2 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C10
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
EL 7
6'-8
1316/
15'-8
6'-1
9'-5
2112/ 112/
316/
38/316/
TYP
316/
38/316/
TYP
38/TYP
p22
p22
1316/GA 5"(NS)
1316/GA 414/ (FS)
1316/
1316/GA 4516/ (NS)
A A
CC
BB
FF
EE
312/
23@
3
3
33
312/
4516/ 31516/
4516/ 31516/
43 8/
EL 6
1'-0
1316/
341
2/31
2/3 8/
15'-8
6'-1
9'-5
2
6916/
212/ 212/
38/TYP
p11
p11
p11
p11
1316/
1316/
1316/
p14
P6
p14
3
23@
3
33
21116/ 6916/
412/
312/
3 8/3
33
3
112/
6916/
2 2
4516/ 31516/212/
112/
112/
112/
1316/
p22
p11
E - E
33
33
4516/ 31516/212/
112/
6916/
2 2
112/
112/
1316/
p22
p11
F - F
33
112/
6916/
2 2
414/ 4
1316/
p11
B - B
33
414/ 4
112/ 4 112/
112/
6916/
211 16/
218/
218/
P6
1316/
p11
C - C
212/
212/
1316/
A - A
Page 128
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C11 1
C11 1 W8X58 24'-7 1/2" 1433 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P6 1 FL1/2"X4" 0'-10" 6 A36
p10 2 PL1/2"X7 1/8" 1'-1 7/8" 24 A36
p15 1 PL1/2"X7 7/8" 1'-2 1/4" 13 A36
p22 2 FL1/2"X6" 0'-10" 17 A36
TOTAL WEIGHT THIS DRAWING 1576
ONE - COLUMN - C11
GRID LOCATION BOTTOM ELEVATION
A/1 17'-5"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C11
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
24'-9
3'-4
414/
2
43 8/
112/ 112/
18/
38/TYP
316/
38/316/
TYP
316/
38/316/
TYP
1316/
p22
p22
P6
1316/
1316/
1316/
1316/
1316/
DD
A A
CC
BB
312/
312/
33
33
312/
2'-7
9'-5
9'-5
412/
33
3
3
33
3
21'-5
3'-4
24'-9
438/
312/
3 8/
2
658/
212/ 212/
2316/ 2316/
234/
p10
p10
1316/
1316/
p15
P6
3
138/
234/
412/ 414/
P6
B - B
3
33
3
112/ 112/
112/
658/
412/ 414/ 212/ 112/
112/
112/
1316/
p10
p22
C - C
112/
512/
512/
112/
112/ 512/ 512/ 112/
516/
516/
1 14/
BP1
A - A
212/
212/
1316/
D - D
Page 129
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C12 1
C12 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
p10 4 PL1/2"X7 1/8" 1'-1 7/8" 49 A36
p15 2 PL1/2"X7 7/8" 1'-2 1/4" 26 A36
p22 4 FL1/2"X6" 0'-10" 34 A36
TOTAL WEIGHT THIS DRAWING 1012
ONE - COLUMN - C12
GRID LOCATION BOTTOM ELEVATION
A/1 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C12
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
112/ 112/
316/
38/316/
TYP
1316/GA 5"(NS)
p22
p22
p22
p22
1316/
1316/
1316/GA 4516/ (NS)
1316/GA 4516/ (NS)
AA
A A
CC
BB
18'-1
0
312/
312/
23@
33
33
33
2
43 8/
43 8/
EL 4
2'-2
1316/
EL 6
1'-0
1316/
6'-1
9'-5
3'-4
112/ 112/
18/
18/
38/TYP
316/
38/316/
TYP
18'-1
0
9'-5
212/ 212/
212/ 212/
p10
p10
p10
p10
1316/
1316/
1316/
1316/
p15
p15
33
438/
312/
3 8/
6'-1
2
6916/
33
3
33
2
6916/
438/
312/
3 8/
3'-4
33
33
18/ 418/ 212/ 112/
112/
6916/
112/ 112/
112/
112/
1316/p22
p10
B - B
3
33
3
112/
6916/
112/ 112/
418/ 212/ 112/
112/
112/
1316/
p22
p10
C - C
212/
212/
1316/
A - A
Page 130
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C13 1
C13 1 W8X40 6'-3" 249 A992
SQ-2COLUMN
p10 2 PL1/2"X7 1/8" 1'-1 7/8" 24 A36
p15 1 PL1/2"X7 7/8" 1'-2 1/4" 13 A36
p22 2 FL1/2"X6" 0'-10" 17 A36
TOTAL WEIGHT THIS DRAWING 303
ONE - COLUMN - C13
GRID LOCATION BOTTOM ELEVATION
A/1 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C13
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
312/
3
23@
3
6'-3
EL 6
1'-0
1316/
EL 6
7'-3
1316/
18/
6'-1
2
47 8/
112/ 112/
38/TYP
316/
38/316/
TYP
316/
38/316/
TYP
p22
p22
1316/GA 5"(NS)
1316/GA 5"(NS)
1316/
1316/GA 4516/ (NS)
A A
CC
CC
23@
3
33
6'-3
6'-1
2
438/
312/
3 8/
6916/
212/ 212/
p10
p10
1316/
1316/
p15
212/
33
33
112/
6916/
112/ 112/
18/ 4 112/
112/
112/
1316/
p22
p10
C - C
212/
212/1316/
A - A
Page 131
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C14 1
C14 1 W6X25 11'-11 1/2" 299 A992
SQ-2COLUMN
BP2 1 PL1 1/2"X12" 1'-0" 61 A36
P4 2 FL1/2"X3 1/2" 0'-7" 7 A36
TOTAL WEIGHT THIS DRAWING 367
ONE - COLUMN - C14
GRID LOCATION BOTTOM ELEVATION
B/6 17'-5"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C14
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
12'-1
C C
38/TYP
BB
A A
2'-7
9'-5
1
218/
218/
331
2/3
312/
1316/
P4
P4
1516/
218/
14/
P4
A - A
218/
14/ P41316/
B - B
112/ 412/ 412/ 112/
112/
412/
412/
112/516/
516/
1 14/
C - C
Page 132
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C15 1
C15 1 W6X25 19'-10 5/16" 496 A992
SQ-2COLUMN
BP2 1 PL1 1/2"X12" 1'-0" 61 A36
P5 2 FL1/2"X5" 0'-7" 10 A36
TOTAL WEIGHT THIS DRAWING 567
ONE - COLUMN - C15
GRID LOCATION BOTTOM ELEVATION
B/5 9'-7"
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C15
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
EL 9
'-7
112/
10'-4
5 16/9'
-51
331
2/3
312/
EL 2
9'-6
1316/
19'-1
113 16/
14/
14/
38/TYP
1316/GA 414/ (NS)
1316/GA 414/ (NS)
1316/GA 4516/ (FS)
1316/GA 4516/
BB
A A
414/
414/
31116/
10'-5
1316/
9'-5
1
331
2/3
312/
31116/
1316/
1316/
P5
P5
112/
412/
412/
112/
112/ 412/ 412/ 112/
516/
516/
1 14/
BP2
A - A
3716/ 21516/
1516/
218/ 21
8/
1516/
7 8/23
16/ 2316/
7 8/
P5
1316/
B - B
Page 133
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C16 1
C16 1 W8X58 32'-6 5/16" 1893 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P3 5 FL1/2"X4" 0'-7" 20 A36
TOTAL WEIGHT THIS DRAWING 1996
ONE - COLUMN - C16
GRID LOCATION BOTTOM ELEVATION
C/4 9'-7"
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C16
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
29'-2
5 16/
10'-4
5 16/
32'-7
1316/
112/ 112/
14/
14/
316/
38/316/
TYP
38/TYP
1316/GA 5"(NS)
1316/GA 4516/ (NS)
1316/GA 4516/ (FS)
1316/GA 4516/ (NS)
1316/GA 4516/ (FS)
1316/GA 414/ (NS)
1316/GA 414/ (FS)
1316/
EE
A A
CC
BB
DD
112/
112/
312/
33
3
3
3'-4
9'-5
12'-9
23
312/
331
2/
32'-7
1316/
9'-5
158/ 212/212/
158/
218/ 218/
218/ 218/
218/ 218/
1316/
1316/
1316/
1316/
P3
P3
P3
P3
P3
234/ 234/
234/ 234/
331
2/3
312/
10'-5
1316/
9'-5
33
3
234/
3'-4
331
2/2
218/
218/
234/
316/
P3
1316/
D - D
234/
234/
218/
218/
14/
P3
P3
1316/
B - B
234/
234/
218/
218/
316/P3
P3 1316/
C - C
112/
512/
512/
112/
112/ 512/ 512/ 112/
516/
516/
1 14/
BP1
A - A
212/
212/1316/
E - E
Page 134
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C17 1
C17 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
P3 2 FL1/2"X4" 0'-7" 8 A36
TOTAL WEIGHT THIS DRAWING 912
ONE - COLUMN - C17
GRID LOCATION BOTTOM ELEVATION
C/4 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C17
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3@3
2
331
2/3
312/
EL 4
2'-2
1316/
EL 6
1'-0
1316/
6'-1
9'-5
3'-4
112/ 112/
112/ 112/
38/TYP
1316/GA 5"(NS)
1316/GA 4516/ (FS)
1316/GA 4516/ (FS)
1316/GA 5"(NS)
1316/
1316/
AA
A A
BB
BB
2
33
3
3@3
18'-1
0
212/ 212/
23
312/
331
2/
6'-1
9'-5
3'-4
212/ 212/
218/ 218/
218/ 218/
1316/
1316/
1316/
1316/
P3
P3
2
33
3
218/
218/
211 16/
316/
P3
1316/
B - B
212/
212/
1316/
A - A
Page 135
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C18 1
C18 1 W8X40 15'-8" 624 A992
SQ-2COLUMN
P3 2 FL1/2"X4" 0'-7" 8 A36
TOTAL WEIGHT THIS DRAWING 632
ONE - COLUMN - C18
GRID LOCATION BOTTOM ELEVATION
C/4 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C18
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
312/
312/
3@3
33
316/
316/
2
15'-8
EL 6
1'-0
1316/
EL 7
6'-8
1316/
6'-1
9'-5
2
112/ 112/
38/TYP
1316/GA 4516/ (FS)
1316/GA 4516/ (FS)
1316/GA 4516/ (NS)
1316/GA 4516/ (NS)
1316/GA 5"(NS) 1316/
BB
A A
BB
23@
3
331
2/3
312/
6'-1
9'-5
2
212/ 212/
2316/ 2316/
2316/ 2316/
1316/
1316/
1316/
P3
P3
2316/
2316/
211 16/
316/P3
1316/
B - B
212/
212/
1316/
A - A
Page 136
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C19 1
C19 1 W8X58 32'-6 5/16" 1893 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P3 6 FL1/2"X4" 0'-7" 24 A36
TOTAL WEIGHT THIS DRAWING 2000
ONE - COLUMN - C19
GRID LOCATION BOTTOM ELEVATION
C/3.1 9'-7"
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C19
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
10'-5
1316/
32'-7
1316/
3'-4
14/
316/
38/TYP
1316/GA 5"(NS)
1316/GA 414/ (NS)
1316/GA 4316/ (FS)
1316/GA 414/ (NS)
1316/GA 4316/ (FS)
1316/GA 4316/ (FS)
1316/GA 414/ (NS)
1316/DD
A A
CC
BB
CC
EL 9
'-7
212/
212/
212/
33
33
33
EL 4
2'-2
1316/
112/ 112/
331
2/3
312/
331
2/
2
316/
9'-5
9'-5
32'-7
1316/
9'-5
5
218/ 218/
218/ 218/
218/ 218/
1316/
1316/
1316/
1316/
P3
P3
P3P3
P3
P3
331
2/3
312/
10'-5
1316/
9'-5
33
32
331
2/
3'-4
234/
234/
218/
218/
316/
P3
P3
1316/
C - C
234/
234/
218/
218/
14/P3
P3
1316/
B - B
112/
512/
512/
112/
112/ 512/ 512/ 112/
516/
516/
1 14/
BP1
A - A
212/
212/
1316/
D - D
Page 137
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C20 1
C20 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
P3 4 FL1/2"X4" 0'-7" 16 A36
TOTAL WEIGHT THIS DRAWING 920
ONE - COLUMN - C20
GRID LOCATION BOTTOM ELEVATION
C/3.1 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C20
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
18'-1
0
EL 4
2'-2
1316/
EL 6
1'-0
1316/
6'-1
9'-5
3'-4
112/ 112/
316/
38/TYP
1316/GA 414/ (NS)
1316/GA 414/ (NS)
1316/GA 5"(NS)
1316/GA 4316/ (FS)
1316/GA 4316/ (FS)
1316/GA 5"(NS)
1316/
1316/
AA
A A
BB
BB
212/
212/
3@3
33
3@3
2
316/
331
2/3
312/
2
112/ 112/
331
2/3
312/
6'-1
9'-5
3'-4
5
212/ 212/
218/ 218/
218/ 218/
1316/
1316/
1316/
1316/
P3 P3
P3 P3
23@
3
21116/ 21116/
3@3
2
211 16/
211 16/
218/
218/
316/
P3
P3
1316/
B - B
212/
212/
1316/
A - A
Page 138
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C21 1
C21 1 W8X40 15'-8" 624 A992
SQ-2COLUMN
P3 4 FL1/2"X4" 0'-7" 16 A36
TOTAL WEIGHT THIS DRAWING 640
ONE - COLUMN - C21
GRID LOCATION BOTTOM ELEVATION
C/3.1 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C21
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
33
2
331
2/3
312/
15'-8
EL 6
1'-0
1316/
EL 7
6'-8
1316/
6'-1
9'-5
2
112/ 112/
316/
316/
38/TYP
1316/GA 414/ (NS)
1316/GA 4316/ (FS)
1316/GA 4316/ (FS)
1316/GA 414/ (NS)
1316/GA 5"(NS)
1316/
BB
A A
BB
212/
212/
3@3
3@3
21116/ 21116/
21116/ 21116/
331
2/3
312/
6'-1
9'-5
2
212/ 212/
218/ 218/
218/ 218/
1316/
1316/
1316/
P3
P3
P3 P3
2
211 16/
211 16/
218/
218/316/
P3
P3
1316/
B - B
1916/
212/
212/
1916/1316/
A - A
Page 139
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C22 1
C22 1 W8X58 32'-6 5/16" 1893 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P3 6 FL1/2"X4" 0'-7" 24 A36
TOTAL WEIGHT THIS DRAWING 2000
ONE - COLUMN - C22
GRID LOCATION BOTTOM ELEVATION
C/2.1 9'-7"
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C22
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
10'-4
5 16/
312/
23
312/
331
2/
316/
112/ 112/
32'-7
1316/
14/
316/
38/TYP
1316/GA 414/ (NS)
1316/GA 414/ (NS)
1316/GA 414/ (NS)
1316/GA 5"(NS)
1316/
DD
A A
CC
BB
CC
112/
3@3
9'-5
9'-5
3'-4
3
32'-7
1316/
32'-7
1316/
9'-5
23
312/
331
2/3
312/
218/ 218/
218/ 218/
218/ 218/
1316/
1316/
1316/
1316/
P3
P3
P3
P3
P3
P3
234/ 234/
234/ 234/
10'-5
1316/
9'-5
3@3
212/ 212/
234/ 234/
3'-4
234/
234/
316/
P3
P31316/
C - C
234/
234/
14/
P3
P31316/
B - B
112/
512/
512/
112/
112/ 512/ 512/ 112/
516/
516/
1 14/
BP1
A - A
212/
212/
1316/
D - D
Page 140
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C23 1
C23 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
P3 4 FL1/2"X4" 0'-7" 16 A36
TOTAL WEIGHT THIS DRAWING 920
ONE - COLUMN - C23
GRID LOCATION BOTTOM ELEVATION
C/2.1 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C23
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
331
2/3
312/
112/ 112/
316/
EL 4
2'-2
1316/
EL 6
1'-0
1316/
6'-1
9'-5
3'-4
112/ 112/
316/
38/TYP
1316/GA 414/ (NS)
1316/GA 414/ (NS)
1316/GA 5"(NS)
1316/GA 5"(NS)
1316/
1316/
AA
A A
BB
BB
23@
3
3@3
18'-1
0
2
21116/
18'-1
0
212/ 212/
23
312/
331
2/
6'-1
9'-5
3'-4
212/ 212/
218/ 218/
218/ 218/
1316/
1316/
1316/
1316/
P3P3
P3P3
23@
3
21116/
3@3
21116/ 21116/
211 16/
211 16/
316/
P3
P3
1316/
B - B
212/
212/
1316/
A - A
Page 141
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C24 1
C24 1 W8X40 15'-8" 624 A992
SQ-2COLUMN
P3 4 FL1/2"X4" 0'-7" 16 A36
TOTAL WEIGHT THIS DRAWING 640
ONE - COLUMN - C24
GRID LOCATION BOTTOM ELEVATION
C/2.1 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C24
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3@3
15'-8
331
2/3
312/
2EL 6
1'-0
1316/
EL 7
6'-8
1316/
6'-1
9'-5
2
112/ 112/
316/
316/
38/TYP
1316/GA 414/ (NS)
1316/GA 414/ (NS)
1316/GA 5"(NS)
1316/
BB
A A
BB2
3@3
15'-8
21116/ 21116/
21116/ 21116/
331
2/3
312/
6'-1
9'-5
2
212/ 212/
218/ 218/
218/ 218/
1316/
1316/
1316/
P3P3
P3P3 21
1 16/21
1 16/
316/
P3
P3
1316/
B - B
212/
212/
1316/
A - A
Page 142
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C25 1
C25 1 W8X58 32'-6 5/16" 1893 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P3 3 FL1/2"X4" 0'-7" 12 A36
TOTAL WEIGHT THIS DRAWING 1988
ONE - COLUMN - C25
GRID LOCATION BOTTOM ELEVATION
C/1 9'-7"
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C25
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
10'-4
5 16/
112/
316/
331
2/3
312/
331
2/
EL 4
2'-2
1316/
32'-7
1316/
14/
316/
38/TYP
1316/GA 5"(NS)
1316/
1316/
1316/
1316/
1316/GA 4516/
1316/GA 4516/
1316/GA 4516/
BB
A A
EL 9
'-7
112/
3@3
9'-5
9'-5
3'-4
2
112/
32'-7
1316/
331
2/3
312/
10'-5
1316/
9'-5
9'-5
3'-4
2316/ 218/
2316/ 2316/
2316/ 2316/
234/
234/
1316/
1316/
1316/
1316/
P3
P3
P3
3@3
2
212/ 212/
234/
331
2/
112/
512/
512/
112/
112/ 512/ 512/ 112/
516/
516/
1 14/
BP1
A - A
234/
212/
212/
P3
B - B
Page 143
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C26 1
C26 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
P3 2 FL1/2"X4" 0'-7" 8 A36
TOTAL WEIGHT THIS DRAWING 912
ONE - COLUMN - C26
GRID LOCATION BOTTOM ELEVATION
C/1 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C26
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
312/
2
316/
112/ 112/
EL 4
2'-2
1316/
EL 6
1'-0
1316/
6'-1
9'-5
3'-4
112/ 112/
316/
38/TYP
P3
P3
1316/GA 5"(NS)
1316/GA 5"(NS)
1316/
1316/
1316/
1316/
1316/GA 4516/
1316/GA 4516/
AA
A A
3@3
3@3
18'-1
0
23
312/
3
23
312/
331
2/
212/ 212/
18'-1
0
6'-1
9'-5
3'-4
2316/ 218/
2316/ 2316/
21116/
21116/
212/ 212/
1316/
1316/
1316/
1316/
P3
P3
23@
33@
3
212/
212/
1316/
A - A
Page 144
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C27 1
C27 1 W8X40 15'-8" 624 A992
SQ-2COLUMN
P3 2 FL1/2"X4" 0'-7" 8 A36
TOTAL WEIGHT THIS DRAWING 632
ONE - COLUMN - C27
GRID LOCATION BOTTOM ELEVATION
C/1 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C27
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
312/
3
3@3
2
331
2/
EL 6
1'-0
1316/
EL 7
6'-8
1316/
15'-8
6'-1
9'-5
2112/ 112/
316/
316/
1316/GA 5"(NS)
38/TYP
P3
P3
1316/
1316/
1316/GA 4516/
BB
A A
23@
33
312/
331
2/
6'-1
9'-5
2
15'-8
2316/ 218/
21116/
212/ 212/
1316/
1316/
P3
P3
212/
212/
1316/
A - A
211 16/
1316/
B - B
Page 145
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C28 1
C28 1 W6X25 11'-11 1/2" 299 A992
SQ-2COLUMN
BP2 1 PL1 1/2"X12" 1'-0" 61 A36
TOTAL WEIGHT THIS DRAWING 360
ONE - COLUMN - C28
GRID LOCATION BOTTOM ELEVATION
D/5 17'-5"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C28
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
12'-1
A A
2'-7
9'-5
1
331
2/3
312/
2316/ 2316/
2316/ 2316/
1316/
1316/
112/
412/
412/
112/
112/ 412/ 412/ 112/
516/
516/
1 14/
BP2
A - A
Page 146
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C29 1
C29 1 W8X58 24'-7 1/2" 1433 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P6 1 FL1/2"X4" 0'-10" 6 A36
p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36
p13 1 PL1/2"X7 7/8" 1'-2 1/8" 13 A36
p22 2 FL1/2"X6" 0'-10" 17 A36
TOTAL WEIGHT THIS DRAWING 1579
ONE - COLUMN - C29
GRID LOCATION BOTTOM ELEVATION
D/4 17'-5"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C29
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3'-3
5 8/
3@3
24'-9
316/
316/2
112/ 112/
38/TYP
316/
38/316/
TYP
38/TYP
1316/
P6
1316/
1316/
p22
p22
1316/
EE
A A
CC
CC
BB
2'-0
1 2/3
9'-2
38'
-10
107 8/
9'-5
24'-9
9'-5
3 8/
331
2/
312/
212/ 212/
658/
234/
218/ 218/
218/ 218/
218/ 218/
316/
38/316/
TYP
p11
p11
1316/
1316/
1316/
1316/
p13
P6
33
2'-7
9'-1
1 2/
12'-0
33@
3
33
3'-7
1 2/3'-4
23
414/
312/
234/
316/P6 1316/
B - B
33
33
658/
112/
2 2
112/ 212/ 4916/ 4316/
112/
112/
p131316/
p22
p11
C - C
112/
512/
512/
112/
112/ 512/ 512/ 112/
516/
516/
1 14/
BP1
A - A
212/
212/1316/
E - E
Page 147
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C30 1
C30 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p13 2 PL1/2"X7 7/8" 1'-2 1/8" 26 A36
p22 4 FL1/2"X6" 0'-10" 34 A36
TOTAL WEIGHT THIS DRAWING 1017
ONE - COLUMN - C30
GRID LOCATION BOTTOM ELEVATION
D/4 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C30
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
316/
38/316/
TYP
p22
p22
p22
p22
1316/GA 5"(NS)
1316/GA 5"(NS)
1316/
1316/
AA
A A
BB
CC
CC
33
3@3
3@3
5'-2
1 2/4
378/
8'-6
1 8/4
378/
3'-3
5 8/
2
316/
316/2
18'-1
0
EL 4
2'-2
1316/
EL 6
1'-0
1316/
112/ 112/
112/ 112/
18'-1
09'-5
9'-5
218/ 218/
38/TYP
316/
38/316/
TYP
p11
p11
p11
p11
1316/
1316/
1316/
1316/
p13
p13
23@
3
33
3
5'-9
1 2/
414/
312/
3 8/
6'-1
6916/
212/ 212/
3@3
33
3
3'-7
1 2/
2
414/
312/
3 8/
3'-4
6916/
212/ 212/
218/ 218/
33
33
6916/
112/2 2
112/ 212/ 4716/ 4116/
112/
112/
1316/
p22
p11
C - C
6916/
33
112/
2 2
112/ 3 3 212/ 414/ 316/
112/
112/
1316/
p22
p11
B - B
212/
212/
1316/
A - A
Page 148
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C31 1
C31 1 W8X40 15'-8" 624 A992
SQ-2COLUMN
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p13 2 PL1/2"X7 7/8" 1'-2 1/8" 26 A36
p22 4 FL1/2"X6" 0'-10" 34 A36
TOTAL WEIGHT THIS DRAWING 738
ONE - COLUMN - C31
GRID LOCATION BOTTOM ELEVATION
D/4 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C31
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
107 8/
8'-6
1 8/10
7 8/15
8/
EL 6
1'-0
1316/
EL 7
6'-8
1316/
15'-8
112/ 112/
38/TYP
316/
38/316/
TYP
1316/GA 5"(NS)
1316/GA 4516/ (NS)
1316/GA 4516/ (NS)
1316/
A A
DD
DD
CC
378/
33
23@
3
378/
316/
316/
5'-2
1 2/
9'-5
312/
6'-1
9'-5
2
6916/
6916/
212/ 212/
2316/ 2316/
2316/ 2316/
316/
38/316/
TYP
p11
p11
1316/
1316/
1316/
p13
p13
23@
3
33
3
5'-9
1 2/
414/
3
512/
414/
33
312/
3 8/3 8/
33
33
316/
6916/
112/2 2
112/ 212/
112/
112/
1316/
p22
p11
C - C
212/33
33
112/ 4516/ 31516/
6916/
112/2 2
112/
112/
1316/
p11
p22
D - D
212/
212/1316/
A - A
Page 149
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C32 1
C32 1 W8X58 24'-7 1/2" 1433 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P6 3 FL1/2"X4" 0'-10" 17 A36
p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36
p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36
TOTAL WEIGHT THIS DRAWING 1574
ONE - COLUMN - C32
GRID LOCATION BOTTOM ELEVATION
D/3 17'-5"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C32
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
24'-9
3'-4
24'-9
23
312/
331
2/
112/ 112/
316/
316/
38/TYP
38/TYP
1316/
1316/
1316/
1316/
1316/
EE
A A
CC
DD
BB
32'
-01 2/
12'-0
9'-5
3@3
22'-2
9'-5
3 8/
23
312/
212/ 212/
218/ 218/
218/ 218/
218/ 218/
p11
p11
1316/
1316/
1316/
1316/
P6
p14
P6
P6
33
2'-7
12'-0
234/ 234/
312/
33
33
3@3
3'-4
658/ 234/
312/
412/
312/
234/
234/
316/ P6
P61316/
B - B
33
2 2
412/ 4316/
234/
658/
112/
P6
1316/
p11
D - D
33
658/
112/
4916/ 414/
2 2
p14
P6
1316/
p11
C - C
112/
512/
512/
112/
112/ 512/ 512/ 112/
516/
516/
1 14/
BP1
A - A
212/
212/
1316/
E - E
Page 150
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C33 1
C33 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
P6 2 FL1/2"X4" 0'-10" 11 A36
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36
TOTAL WEIGHT THIS DRAWING 995
ONE - COLUMN - C33
GRID LOCATION BOTTOM ELEVATION
D/3 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C33
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3'-4
112/ 112/
112/ 112/
316/
316/
38/TYP
1316/GA 5"(NS)
1316/GA 414/ (NS)
1316/GA 414/ (NS)
1316/
1316/
AA
A A
FF
BB
CC
3@3
3@3
18'-1
0
22
331
2/3
312/
EL 4
2'-2
1316/
EL 6
1'-0
1316/
6'-1
9'-5
18'-1
0
6'-1
9'-5
3'-4
212/ 212/
316/
38/316/
TYP
p11
p11
p11
p11
1316/
1316/
1316/
1316/
P6p14
P6p14
33
23@
3
33
312/
6916/ 21116/
412/
312/
3 8/
33
3@3
33
312/
6916/ 21116/
2
212/ 212/
412/
312/
3 8/
33
316/
112/ 2 2 112/
6916/
112/
211 16/
1316/
p11
C - C
33
6916/
112/
316/
2 2
P6
1316/
p11
B - B316/
2 2
638/
33
112/
P6
1316/
p11
F - F
212/
212/
1316/
A - A
Page 151
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C34 1
C34 1 W8X40 15'-8" 624 A992
SQ-2COLUMN
P6 2 FL1/2"X4" 0'-10" 11 A36
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p13 1 PL1/2"X7 7/8" 1'-2 1/8" 13 A36
p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36
TOTAL WEIGHT THIS DRAWING 715
ONE - COLUMN - C34
GRID LOCATION BOTTOM ELEVATION
D/3 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C34
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
15'-8
6'-1
9'-5
2
312/
23
312/
2EL 6
1'-0
1316/
EL 7
6'-8
1316/
112/ 112/
316/
316/
38/TYP
1316/GA 414/ (NS)
1316/GA 414/ (NS)
1316/
A A
CC
BB
EE
3
3@3
33
15'-8
6916/ 21116/
312/
414/
312/
3 8/
312/
15'-6
2
6'-1
9'-7
212/ 212/
218/ 218/
218/ 218/
38/TYP
316/
38/316/
TYP
p11
p11
p11
p11
1316/
1316/
1316/
P6
p14
P6
p13
33
23@
3
33
412/
33
21116/ 6916/
312/
2
3 8/
33
414/ 31516/
112/
6916/
2 2
P6
1316/
p11
E - E
33
2 2
6916/
112/
414/ 31516/
P6
1316/
p11
B - B
33
112/ 2 2 112/
6916/
112/
414/ 31516/
211 16/ P6
1316/
p11
C - C
212/
212/
1316/
A - A
Page 152
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C35 1
C35 1 W8X58 24'-7 1/2" 1433 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P6 3 FL1/2"X4" 0'-10" 17 A36
p11 2 PL1/2"X7 1/8" 1'-1 7/8" 27 A36
p14 1 PL1/2"X7 7/8" 1'-2 3/8" 13 A36
TOTAL WEIGHT THIS DRAWING 1574
ONE - COLUMN - C35
GRID LOCATION BOTTOM ELEVATION
D/2 17'-5"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C35
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3@3
3
2'-0
1 2/
12'-0
9'-1
1 2/3'
-71 2/
24'-9
231
2/
112/ 112/
316/
316/
1316/
38/TYP1316/
1316/
1316/
1316/
FF
A A
DD
BB
3
8'-7
1 2/
21'-5
24'-9
234/ 234/
312/
412/
312/
3 8/
331
2/218/ 218/
218/ 218/
218/ 218/
p14
1316/
1316/
1316/
1316/
P6
P6 P6
33
2'-7
9'-5
33
3
33
33
2
212/ 212/
3'-7
1 2/ 3'-4
234/ 658/
234/
234/
18/
P6
P61316/
B - B
33
412/ 414/
112/ 2 2 112/
112/
658/23
4/
P6 1316/
p11
D - D112/
512/
512/
112/
112/ 512/ 512/ 112/
516/
516/
1 14/
BP1
A - A
212/
212/1316/
F - F
Page 153
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C36 1
C36 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
P6 2 FL1/2"X4" 0'-10" 11 A36
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36
TOTAL WEIGHT THIS DRAWING 995
ONE - COLUMN - C36
GRID LOCATION BOTTOM ELEVATION
D/2 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/28/2015 003 C36
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
EL 4
2'-2
1316/
EL 6
1'-0
1316/
112/ 112/
112/ 112/
316/
316/
1316/GA 5"(NS)
1316/GA 414/ (NS)
1316/GA 414/ (NS)
1316/GA 5"(NS)
1316/
1316/
AA
A A
BB
CC
2
3@3
33
3@3
18'-1
0
2
5'-9
1 2/9'
-53'
-71 2/
21116/ 6916/
18'-1
0
9'-5
218/ 218/
218/ 218/
p11
p11
38/TYP
316/
38/316/
TYP
p11
p11
1316/
1316/
1316/
1316/
P6
p14
P6
p14
33
23@
3
21116/ 6916/
412/
312/
3 8/
6'-1
212/ 212/
3@3
33
2
412/
312/
3 8/
3'-4
212/ 212/
18/
6916/
33
112/
211 16/
2 2
p14
P6
1316/
p11
C - C
6916/
33
112/
2 2
18/
p14
P6
1316/p11
B - B
212/
212/
1316/
A - A
Page 154
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C37 1
C37 1 W8X40 15'-8" 624 A992
SQ-2COLUMN
P6 1 FL1/2"X4" 0'-10" 6 A36
p11 4 PL1/2"X7 1/8" 1'-1 7/8" 54 A36
p14 2 PL1/2"X7 7/8" 1'-2 3/8" 26 A36
p22 2 FL1/2"X6" 0'-10" 17 A36
TOTAL WEIGHT THIS DRAWING 727
ONE - COLUMN - C37
GRID LOCATION BOTTOM ELEVATION
D/2 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C37
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
378/
158/
EL 6
1'-0
1316/
EL 7
6'-8
1316/
15'-8
112/ 112/
316/
316/
38/TYP
316/
38/316/
TYP
1316/GA 4516/ (NS)p22
p22
1316/GA 414/ (NS)
1316/GA 5"(NS)1316/
A A
CC
BB
EE
33
23@
3
5'-6
1 2/8'
-10
4
21116/ 6916/
312/
15'-8
6'-1
9'-5
2
6916/
212/ 212/
218/ 218/
218/ 218/
316/
38/316/
TYP p11
p11
p11
p11
1316/
1316/
1316/
p14
P6
p14
23@
3
33
412/
33
412/
312/
3 8/3 8/
212/33
33
112/ 418/ 316/
112/
6916/
2 2
112/
112/ p14
1316/
p22
p11
E - E
33
414/ 4
2 2112/
6916/
p14
P6
1316/p11
B - B
33
112/ 4 112/
414/ 4
112/
6916/
211 16/
p14
P6
1316/p11
C - C
212/
212/1316/
A - A
Page 155
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C38 1
C38 1 W8X58 24'-7 1/2" 1433 A992
SQ-2COLUMN
BP1 1 PL1 1/2"X14" 1'-2" 83 A36
P6 1 FL1/2"X4" 0'-10" 6 A36
p10 2 PL1/2"X7 1/8" 1'-1 7/8" 24 A36
p15 1 PL1/2"X7 7/8" 1'-2 1/4" 13 A36
p22 2 FL1/2"X6" 0'-10" 17 A36
TOTAL WEIGHT THIS DRAWING 1576
ONE - COLUMN - C38
GRID LOCATION BOTTOM ELEVATION
D/1 17'-5"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
10/29/2015 003 C38
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
12'-9
24'-9
437
8/3'
-35 8/
2
112/ 112/
18/
18/
38/TYP
316/
38/316/
TYP
38/TYP
1316/
1316/
1316/
1316/
p22
p22
1316/
1316/
DD
A A
CC
BB
312/
33
3
33
12'-0
2'-0
1 2/9'
-28'
-10
3@3
21'-5
12'-9
331
2/
331
2/
658/
212/ 212/
2316/ 2316/
2316/ 2316/
2316/ 2316/
234/
316/
38/316/
TYP
p10
p10
1316/
1316/
1316/
1316/
p15
P6
2'-7
9'-5
33@
3
33
3'-4
2
438/
312/
3 8/
678/
33
33
112/
658/
112/ 112/
112/ 18/
112/
112/ p15
1316/
p10p22
B - B
212/
33
33
112/
658/
112/ 438/ 18/
112/
112/
112/ 112/
p151316/
p10
p22
C - C
112/
512/
512/
112/
112/ 512/ 512/ 112/
516/
516/
1 14/
BP1
A - A
212/
212/
1316/
D - D
Page 156
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C39 1
C39 1 W8X48 18'-10" 904 A992
SQ-2COLUMN
p10 4 PL1/2"X7 1/8" 1'-1 7/8" 49 A36
p15 2 PL1/2"X7 7/8" 1'-2 1/4" 26 A36
p22 4 FL1/2"X6" 0'-10" 34 A36
TOTAL WEIGHT THIS DRAWING 1012
ONE - COLUMN - C39
GRID LOCATION BOTTOM ELEVATION
D/1 42'-2"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/02/2015 003 C39
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work112/ 112/
38/TYP
316/
38/316/
TYP
1316/GA 4516/ (NS)
1316/GA 4516/ (NS)
p22
p22
p22
p22
1316/
1316/
AA
A A
BB
CC3
3
3@3
3@3
5'-2
1 2/4
378/
8'-6
1 8/4
378/
3'-3
5 8/
2
2
18'-1
0
EL 4
2'-2
1316/
EL 6
1'-0
1316/
112/ 112/
18/
18/
18'-1
0
9'-5
6916/
2316/
2316/ 2316/
316/
38/316/
TYP
p10
p10
p10
p10
1316/
1316/
1316/
1316/
p15
p15
33
23@
3
438/
312/
3 8/
6'-1
6916/
212/ 212/
3@3
33
2
438/
312/
3 8/
3'-4
212/ 212/
2316/
112/ 3 3 212/ 414/ 18/
112/
33
6916/
112/ 112/
112/
112/ p15
1316/
p10
p22
C - C
212/
33
33
112/
6916/
112/ 112/
112/
112/
112/ 414/ 18/
p15
1316/
p10
p22
B - B
212/
212/
1316/
A - A
Page 157
BILL OF MATERIALMARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
C40 1
C40 1 W8X40 6'-3" 249 A992
SQ-2COLUMN
p10 2 PL1/2"X7 1/8" 1'-1 7/8" 24 A36
p15 1 PL1/2"X7 7/8" 1'-2 1/4" 13 A36
p22 2 FL1/2"X6" 0'-10" 17 A36
TOTAL WEIGHT THIS DRAWING 303
ONE - COLUMN - C40
GRID LOCATION BOTTOM ELEVATION
D/1 61'-0"13/16
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/02/2015 003 C40
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
Peter Zhang
CGS Iron Work
3
3@3
5'-2
1 2/4
378/
158/
2
6'-3
EL 6
1'-0
1316/
EL 6
7'-3
1316/
112/ 112/
18/p22
p22 38/TYP
316/
38/316/
TYP
1316/GA 5"(NS)
1316/GA 4516/ (NS)
1316/
A A
CC
BB33
23@
3
438/
312/
3 8/
6'-3
6'-1
2
6916/
212/ 212/
2316/ 2316/
316/
38/316/
TYP
p10
p10
1316/
1316/
p15
212/
33
33
112/
6916/112/
112/
418/ 18/
112/ 112/
p15
1316/
p10
p22
B - B
212/
33
33
112/
6916/
112/ 418/ 18/
112/
112/
112/ 112/
p15
1316/
p10
p22
C - C
212/
212/
1316/
A - A
Page 158
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/02/2015 003 S1
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
DCBA
PLAN AT EL. 9'-6
4
5
6
1
2
2.1
3
3.1
DETAIL A
DETAIL B
19'-3
3'-0
19'-1
112/
21'-4
5 8/
DET. A
C16W8X
58
C15W6X
25
15'-8 12'-8
15'-8 3'-0 12'-8
4'-1
012
'-85'
-10
13'-5
DET. B
C19W8X
58
C22W8X
58
C25W8X
58
112/ 9 112/
112/
911
2/
516/
516/
P3
112/
1111
2/
112/ 11 112/
516/
516/
Page 159
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/02/2015 003 S2
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
DCBA
PLAN AT EL. 20'-41316/
4
5
6
7
DET. B
DET. A
1
2
2.1
3
3.1
DETAIL A
DETAIL B
DETAIL C
3@6'
-524'-1
C29W8X
58
19'-1
112/
3'-0
C15W6X
25
C1 W6X25
4@4'
-101
2/
15'-8
B15 W10X22
B14 W10X22
A1 L3-12/ X3-12/ X38/
512/
7'-1
1
C14W6X
25
B53
W10
X68
B15 W10X22
B15 W10X22
4@5'
-41 8/
21'-4
5 8/ B25 W10X22
C2 W8X58
B16 W10X22
B25 W10X22
B25 W10X22
B31 W10X22
12'-8
DET. C
B15 W10X22
B15 W10X22
B15 W10X22
B76 W10X22
A1 L3-12/ X3-12/ X38/
B102 W10X15
B102 W10X15B58
W10
X68
C28W6X
25
B102 W10X15
B75 W10X39
B102 W10X15
C16W8X
58
3'-0
12'-2
6'-4
5'-1
0
18'-6
C19W8X
58
C22W8X
58
B106
W10
X15
4'-1
06'
-4
B44 W10X22
B18 W10X22
B25 W10X22
B25 W10X22
B25 W10X22
C5 W8X58
15'-8
3@4'
-511
16/
13'-5
B44 W10X22
B18 W10X22
B25 W10X22
B25 W10X22
C8 W8X58
B32 W10X30C11
W8X58
11'-3
6'-4
B104 W10X19
C32W8X
58
5'-3 7'-5
B59
W10
X68
B103 W10X19
B77
W10
X15
B74 W8X10
5'-9 1112/ 5'-1112/
B82 W10X15
B79
W8X
10
B62
W10
X68
12'-8
6'-812/ 5'-1112/
B65
W10
X68
B102 W10X15
B102 W10X15
B83 W10X19
C35W8X
58
C25W8X
58
B90 W10X30C38
W8X58
112/ 11 112/
112/
1111
2/
516/
516/
112/ 9 112/
112/
911
2/
516/
516/
247
8/47
8/2
12/
34/
Page 160
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/03/2015 003 S3
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
DCBA
PLAN AT EL. 29'-91316/
4
5
6
7
DET. C
1
2
2.1
3
3.1
DETAIL C
4'-9
3 4/
3'-0
4'-1
012/
C16W8X
58
C15W6X
25
C1 W6X25
B53
W10
X68
15'-8
4'-1
012/
A1 L3-12/ X3-12/ X38/
B14 W10X22
512/
4'-1
012/
4'-1
012/
C14W6X
25
B15 W10X22
B15 W10X22
B15 W10X22
5'-4
1 8/5'
-43 16/
5'-4
1 8/5'
-43 16/
4'-9
5 8/
B16 W10X22
B25 W10X22
B25 W10X22
B25 W10X22
B32 W10X30
C2 W8X58
B28 W10X15
12'-8
A1 L3-12/ X3-12/ X38/
B76 W10X22
B15 W10X22
B15 W10X22
B15 W10X22
C28W6X
25
B75 W10X39
B102 W10X15
B102 W10X15
B102 W10X15B58
W10
X68 B90 W10X30
C29W8X
58B96 W10X15
3'-0
5'-1
0
C22W8X
58
C19W8X
58
B7W
14X3
4
B20 W10X15C8 W8X
58
B106
W10
X15
B114
W14
X34
4'-9
7 8/4'
-10
6'-4
6'-4
B28 W10X15
B1W
14X4
8
B28 W10X15
B19 W10X15
B45 W10X15C5 W8X58
B30 W10X15
4'-9
3 4/
15'-8
4'-5
1116/
4'-5
1116/
4'-5
1116/
B12
W14
X26
B26 W10X15
B26 W10X15
B45 W10X15
B32 W10X30C11
W8X58
C32W8X
58
B60
W10
X45
B96 W10X15
B98 W10X19
B78
W10
X15
B74 W8X10B1
08W
14X4
8
B80 W10X15
B79
W8X
10
B63
W10
X45
B99 W10X19
12'-8
6'-812/ 5'-1112/
B66
W10
X45
B81 W10X19
B100 W10X15
B100 W10X15
B12
W14
X26
C35W8X
58
C25W8X
58
B90 W10X30 C38W8X
58
247
8/47
8/2
12/
34/
Page 161
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/03/2015 003 S4
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
1
2
2.1
3
3.1
4
DCBA
PLAN AT EL. 39'-21316/
9'-7
7 8/6'
-412
'-2
12'-8
6'-4
C29W8X
58
C5 W8X58
B79
W8X
10
B110
W14
X48
C32W8X
58
B63
W10
X45
B115
W14
X34
B11
W14
X26
C35W8X
58
C38W8X
5819
'-3
4'-9
3 4/
15'-8
4'-1
C16W8X
58
B29 W10X15
B45 W10X15
4'-9
5 8/
5'-7
3 8/
9'-7
C2 W8X58
B33 W10X30
B46
W8X
18B4
7W
8X18
4'-1
0
4'-9
3 4/4'
-97 8/
4'-1
0
B28 W10X15
B3W
14X4
8
B28 W10X15
B19 W10X15
12'-8
4'-2 9'-5
3'-0
4'-1
B54 W8X18
B46
W8X
18B4
7W
8X18
B55
W8X
18
B46
W8X
18
B56
W8X
18
B47
W8X
18
B91 W10X30
B97 W10X15
5'-3
C19W8X
58
B60
W10
X45
B78
W10
X15
B74 W8X10
7'-5
B96 W10X15
B98 W10X19
B80 W10X15
13'-5
4'-1
4'-5
1116/
15'-8
B11
W14
X26
B45 W10X15
B48
W8X
18B4
6W
8X18
5'-1
0
6'-4
5'-1
04'
-511
16/
B8W
14X3
4
B30 W10X15
B26 W10X15
B20 W10X15C8 W8X58
5'-7
3 8/
9'-7
4'-5
1116/
B27 W10X15
B37 W10X30C11
W8X58
5'-9
6'-812/
B106
W10
X15
B81 W10X19
C22W8X
58
1112/ 5'-1112/
B99 W10X19
5'-1112/
B100 W10X15
4'-2 9'-5
12'-8
C25W8X
58
B55
W8X
18
B46
W8X
18
B46
W8X
18
B66
W10
X45
B57
W8X
18
B48
W8X
18
4'-1
3'-0
B54 W8X18
B101 W10X15
B48
W8X
18
B91 W10X30
Page 162
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/03/2015 003 S5
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
1
2
2.1
3
3.1
4
DCBA
PLAN AT EL. 48'-71316/
6'-4
7'-5
5'-1112/
5'-1112/
12'-8
6'-4
9'-5
12'-8
9'-5
B79
W8X
10
B85 W10X19
15'-8
4'-9
3 4/
19'-3
9'-7 4'-1
C17W8X
48
4'-9
5 8/
5'-7
3 8/
B34 W10X30
B46
W8X
18
B29 W10X15
B47
W8X
18
C3 W8X48
4'-9
3 4/4'
-97 8/
4'-1
0
4'-1
0
B28 W10X15
B4W
14X4
8
B28 W10X15
B21 W10X15
B43 W10X15C6 W8X
48
4'-2
B55
W8X
18
B46
W8X
18
B46
W8X
18
3'-0
4'-1B54 W8X18
B56
W8X
18
B47
W8X
18
B92 W10X30
B97 W10X15
B47
W8X
18
5'-3
B61
W10
X45
B96 W10X15
B98 W10X19
B78
W10
X15
B84 W10X15
B73 W8X10
B64
W10
X45
C20W8X
48
4'-5
1116/
9'-7 4'-1
13'-5
B10
W14
X26
B67
W10
X45
6'-4
5'-1
04'
-511
16/
5'-1
0
B9W
14X3
4
B30 W10X15
B26 W10X15
B22 W10X15
B43 W10X15
C9 W8X48
4'-5
1116/
5'-7
3 8/
B27 W10X15
B38 W10X30C12
W8X48
5'-9
6'-812/
B106
W10
X15
B99 W10X19
C23W8X
48
1112/
B100 W10X15
4'-1 4'-2
B101 W10X15
B54 W8X18
B48
W8X
18B4
6W
8X18
B92 W10X30
B57
W8X
18
B55
W8X
18
B48
W8X
18B4
6W
8X18
B48
W8X
18B4
6W
8X18
C26W8X
48
9'-7
7 8/
B111
W14
X48
C30W8X
48
C33W8X
48
12'-2
B116
W14
X34
B10
W14
X26
C36W8X
48
C39W8X
48
Page 163
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/03/2015 003 S6
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
1
2
2.1
3
3.1
4
DCBA
PLAN AT EL. 58'-01316/
5'-9 1112/
9'-7
7 8/6'
-412
'-2
12'-8
6'-4
6'-4
C30W8X
48
C33W8X
48
B10
W14
X26
C36W8X
48
C39W8X
4819
'-3
4'-9
3 4/
4'-1
B43 W10X15
B96 W10X15
4'-9
5 8/
5'-7
3 8/
C3 W8X48
B46
W8X
18
9'-7
B34 W10X30
B29 W10X15
B47
W8X
18
4'-1
0
4'-9
3 4/4'
-97 8/
4'-1
0
B28 W10X15
B4W
14X4
8
B28 W10X15
B21 W10X15
C6 W8X48
4'-2
C17W8X
48
B55
W8X
18
B46
W8X
18
B46
W8X
18B4
7W
8X18
4'-1
B54 W8X18
B56
W8X
18
B47
W8X
18
9'-5
B92 W10X30
B97 W10X15
5'-318/
B78
W10
X15
B73 W8X10
B61
W10
X45
C20W8X
48
B64
W10
X45
7'-478/
B98 W10X19
B84 W10X15
B79
W8X
10 B99 W10X19
13'-5
4'-1
4'-5
1116/
B10
W14
X26
B27 W10X15
B43 W10X15
B67
W10
X45
B48
W8X
18B4
6W
8X18
B57
W8X
18
B48
W8X
18
B48
W8X
18
5'-1
0
5'-1
04'
-511
16/4'
-511
16/
B9W
14X3
4
B30 W10X15
B26 W10X15
B22 W10X15
C9 W8X48
9'-7
5'-7
3 8/
B38 W10X30
C12W8X
48
6'-812/
B106
W10
X15B85 W10X19
C23W8X
48
5'-1112/
5'-1112/
B101 W10X15
B100 W10X15
4'-1 4'-2 9'-5
B54 W8X18
C26W8X
48
B92 W10X30B55
W8X
18
B46
W8X
18
B46
W8X
18
B111
W14
X48
B116
W14
X34
Page 164
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/03/2015 003 S7
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
1
2
2.1
3
3.1
4
DCBA
PLAN AT EL. 58'-01316/
6'-4
7'-5
5'-1112/
5'-1112/
9'-5
9'-5
12'-8
6'-4
C6 W8X48
B79
W8X
10
C33W8X
48
B64
W10
X45 B99 W10X19
B101 W10X15
4'-1
19'-3
4'-9
3 4/
C17W8X
48
B43 W10X15
5'-7
3 8/
4'-9
5 8/
C3 W8X48
B46
W8X
18
9'-7
B34 W10X30
B29 W10X15
B47
W8X
18
4'-1
0
4'-9
3 4/4'
-97 8/
4'-1
0
B28 W10X15
B4W
14X4
8
B28 W10X15
B21 W10X15
4'-2
B55
W8X
18
B46
W8X
18
B46
W8X
18
4'-1
B54 W8X18
B56
W8X
18
B47
W8X
18
B92 W10X30
B97 W10X15
B47
W8X
18
5'-3
B61
W10
X45
C20W8X
48
B96 W10X15
B98 W10X19
B78
W10
X15
B84 W10X15
B73 W8X10
4'-113
'-5
4'-5
1116/
B43 W10X15
5'-1
0
6'-4
5'-1
04'
-511
16/
B9W
14X3
4
B30 W10X15
B26 W10X15
B22 W10X15
C9 W8X48
5'-7
3 8/
4'-5
1116/
C12W8X
48
B10
W14
X26
B27 W10X15
B38 W10X30
9'-7
5'-9
6'-812/
B106
W10
X15B85 W10X19
C23W8X
48
1112/
B100 W10X15
4'-2
C26W8X
48
B46
W8X
18
B92 W10X30
B57
W8X
18
B55
W8X
18
B48
W8X
18B4
6W
8X18
B48
W8X
18B4
6W
8X18
B67
W10
X45
B48
W8X
18
4'-1
B54 W8X18
C30W8X
48
9'-7
7 8/
B111
W14
X48
12'-2
B116
W14
X34
B10
W14
X26
C36W8X
48
C39W8X
48
Page 165
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/03/2015 003 S8
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
1
2
2.1
3
3.1
4
DCBA
PLAN AT EL. 67'-51316/
5'-1112/
6'-11
7'-5
5'-1112/
6'-4
6'-4
9'-5
9'-512'-8
12'-8
B93 W10X30
C7 W8X40
B96 W10X15
B86 W10X15
B79
W8X
10
C34W8X
40
B64
W10
X45 B99 W10X19
B107 W10X15
B107 W10X15
4'-9
3 4/
9'-7 4'-1
19'-3
C18W8X
40
5'-7
3 8/
4'-9
5 8/
B35 W10X30
C4 W8X40
B46
W8X
18
B29 W10X15
B47
W8X
18
4'-9
3 4/4'
-97 8/
4'-1
0
4'-1
0
B28 W10X15
B5W
14X4
8
B28 W10X15
B23 W10X15
B40 W10X15
1P6
FL3 8/
"X7
4'-2
B55
W8X
18
B46
W8X
18
B46
W8X
18
4'-1
B54 W8X18
B56
W8X
18
B47
W8X
18 B97 W10X15
B47
W8X
18
5'-3 6
5'-3
B61
W10
X45
C21W8X
40
B98 W10X19
B78
W10
X15
B72 W8X10
10'-10
4'-5
1116/
9'-7 4'-115'-8
13'-5
B117
W10
X30
B41 W10X15
B50 W10X15
B51 W10X15
6'-4
5'-1
04'
-511
16/
5'-1
0
B17
W10
X30
B9W
14X3
4
B30 W10X15
B24 W10X15
C10W8X
40
B13 W10X15
7'-10
4'-5
1116/
5'-7
3 8/
B10
W14
X26
B13 W10X15
B39 W10X30C13
W8X40
5'-9
5'-0
C24W8X
40
B106
W10
X15
B69 W10X15
1112/
1'-812/
B87 W10X19
4'-2
B67
W10
X45
B70 W10X15
C27W8X
40
B46
W8X
18
B55
W8X
18
B46
W8X
18
B48
W8X
18B4
6W
8X18
B48
W8X
18
B57
W8X
18
B48
W8X
18
4'-13'-0
B54 W8X18
B95 W10X30
B112
W14
X48
C31W8X
40
9'-7
7 8/12
'-2
B116
W14
X34
B10
W14
X26
C37W8X
40
C40W8X
40
Page 166
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/03/2015 003 S9
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
1
2
2.1
3
3.1
4
DCBA
PLAN AT EL. 76'-101316/
6'-11
7'-5
5'-1112/
5'-1112/
6'-4
12'-8
12'-8
12'-8
B94 W10X30
C7 W8X40
B96 W10X15
B96 W10X15
B98 W10X19
B86 W10X15
B79
W8X
10
C34W8X
40
B64
W10
X45 B99 W10X19
19'-3
15'-8
B36 W10X30
C4 W8X40
B28 W10X15
4'-1
0
B28 W10X15
B2W
14X4
8
B28 W10X15
B23 W10X15
B40 W10X15
3'-0
C18W8X
40
5'-3 6
5'-3
B61
W10
X45C21
W8X40
B78
W10
X15
B72 W8X10
10'-812/
15'-8
6'-3
C10W8X
40
5'-1
0
B6W
14X3
4
B30 W10X15
B24 W10X15
B42 W10X30
212/6'
-311
5'-9 1112/
6'-812/
C24W8X
40
B105
W10
X15
B88 W10X30
4'-934/ 212/
3'-0
B68
W10
X45
B49 W10X15
B71 W10X15
C27W8X
40
B49 W10X15
B71 W10X15
B109
W14
X48
C31W8X
40
9'-7
7 8/12
'-2
B113
W14
X34
C37W8X
40
Page 167
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/03/2015 003 S10
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
76'-10"13/16
67'-5"13/16
58'-0"13/16
48'-7"13/16
39'-2"13/16
29'-9"13/1620'-4"13/16
122.133.1456
ELEVATION ON GRID A
9'-1 9'-5
19'-3
C2
W8X
58C
4W
8X40
C3
W8X
48
C7
W8X
40
C10
W8X
40
19'-1112/ 21'-458/
C1
W6X
25
12'
-11
9'-1
3'-0
9'-5
12'-8
B7 W14X34
B8 W14X34
B9 W14X34
B9 W14X34
B9 W14X34
B3 W14X48
B1 W14X48
4'-10
C5
W8X
58
B4 W14X48
B5 W14X48
B4 W14X48
C6
W8X
48
9'-1 9'-5
13'-5
B12 W14X26
C11
W8X
58
5'-10
C8
W8X
58
1'-9
1 2/10
1 2/ 4
12'
-11
44
9'-5
B11 W14X26
9'-5
B10 W14X26
B10 W14X26C9
W8X
48
4C
12W
8X48
9'-1
44
3'-0
9'-5
B10 W14X26
C13
W8X
40
B6 W14X34B2 W14X48 4
Page 168
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/03/2015 003 S11
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
76'-10"13/16
67'-5"13/16
58'-0"13/16
48'-7"13/16
39'-2"13/16
29'-9"13/1620'-4"13/16
9'-6"
122.133.1456
ELEVATION ON GRID B
178/
9'-5
9'-5
19'-3
B47 W8X18
B47 W8X18
B47 W8X18
B56 W8X18
19'-1112/
B53 W10X68
B53 W10X68
2'-1
19'
-11
4
C14
W6X
25
21'-458/
1C
15W
6X25
B46 W8X18
B46 W8X18
B46 W8X18
B55 W8X18
8'-1
118/
8'-1
118/
9'-5
12'-84'-10
10'-1
013 16/
9'-5
5'-10 13'-5
8'-1
118/
8'-1
118/
178/
8'-1
118/
178/
178/
8'-1
118/
9'-5
B46 W8X18
B48 W8X18 B55 W8X18
B48 W8X18 B46 W8X18
B46 W8X18B48 W8X18
8'-1
118/
9'-5
8'-1
118/
B48 W8X18
Page 169
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/03/2015 003 S12
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
76'-10"13/16
67'-5"13/16
58'-0"13/16
48'-7"13/16
39'-2"13/16
29'-9"13/1620'-4"13/16
9'-6"
122.133.1456
ELEVATION ON GRID C
178/
578/
9'-1
9'-1
9'-5
9'-5
19'-3
B64 W10X45 B67 W10X45 B57 W8X18
8'-1
118/
19'-1112/
B53 W10X68
B53 W10X68
12'
-11
4
C14
W6X
25
21'-458/
B58 W10X68
C15
W6X
25
B58 W10X68 C16
W8X
58
B59 W10X68
B60 W10X45
8'-1
118/
8'-1
118/
178/
178/
C17
W8X
48
8'-1
118/
178/
C18
W8X
40
8'-1
118/
9'-5
12'-8
B67 W10X45
B67 W10X45
4'-10
B62 W10X68
B63 W10X45
C19
W8X
58
B65 W10X68
B66 W10X45
B63 W10X45
B64 W10X45
B66 W10X45
C20
W8X
48
2'-8
10'-1
013 16/
13'-55'-10
C22
W8X
58
17'
-913
16/4
9'-1
4
9'-5
C25
W8X
58
8'-1
118/
9'-5
C23
W8X
48
B57 W8X18
B57 W8X18
C26
W8X
48
B57 W8X18
8'-1
118/
3'-0
9'-5
578/
578/
578/
8'-1
118/
3'-0
C21
W8X
40
B68 W10X45
C24
W8X
40
C27
W8X
40
Page 170
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/03/2015 003 S13
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
20'-4"13/16
76'-10"13/16
67'-5"13/16
58'-0"13/16
48'-7"13/16
39'-2"13/16
29'-9"13/16
122.133.1456
ELEVATION ON GRID D
9'-5
9'-1
24'-1
C34
W8X
40
C31
W8X
40C
29W
8X58
C30
W8X
48
C37
W8X
40
19'-1112/ 21'-458/
C28
W6X
25
12'
-11
3'-0
9'-5
9'-1
12'-8
B116 W14X34
B115 W14X34
B116 W14X34
B116 W14X34
B114 W14X34
B110 W14X48
C32
W8X
58
B111 W14X48
B111 W14X48
B112 W14X48
C33
W8X
48
9'-5
4
9'-1
19'-3
B11 W14X26
B12 W14X26
C38
W8X
58
C35
W8X
58
3'-0
12'
-11
4
9'-5
43'
-0
9'-5
9'-5
9'-1
B10 W14X26
B10 W14X26
B10 W14X26
C36
W8X
48
C39
W8X
48C
40W
8X40
B113 W14X34B109 W14X48
Page 171
FAB-NAME
PROJECT NAME
DRAWN BY
DATE DRAWN
JOB No. DRG No.
132-18 41 ROAD FLUSHING
11/05/2015 003 S14
A1 Master Detailing, LLCPhone:201-622-8207Email:[email protected]
CGS Iron Work
Peter Zhang
REV DESCRIPTION DATE
3d