Top Banner
YINSON PRODUCTION Ghana OCTP Development Project OCTP Offshore FPSO A1 EX-DE 00 24.07.2015 Issued For Review LC TR JS YP Rev. Validity status ENI Rev. Date Reason for issue Prep. Checked Accepted Yinson Production Pte. Ltd. 3 Church Street, Samsung Hub #17-05 Singapore 049483 Contract no. : AR/PROC/2013/08/0508 Purchase order no.: (PO issued by YP to supplier) Doc. title : BUNDLE DRAWING FOR MP INTERSTAGE HEATER (26HA2007) MO2 Tag No.: 26HA2007 Supplier document no._Rev. HJ-15-2185-DWG-05-02_A1 ENI document ID Facility Subfacility Phase Disc. code Type & subtype Sequence no. ENI Rev 3514 01 B YP document number Project no. Origin. code System code Disc. code Doc. type Sequence no. Rev Total no. of Pages 1305 - VM - 26 - R - XX - 00013 A1 2
2

1305 VM 26 R XX 00013_A1_Bundle Drawing MP Interstage Heater(26HA2007)MO2_HJ

Dec 10, 2015

Download

Documents

Stein Bakke

bundle
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1305 VM 26 R XX 00013_A1_Bundle Drawing MP Interstage Heater(26HA2007)MO2_HJ

YINSON PRODUCTION

Ghana OCTP Development Project OCTP Offshore

FPSO

A1 EX-DE 00 24.07.2015 Issued For Review LC TR JS

YP Rev.

Validity status

ENI Rev.

Date Reason for issue Prep. Checked Accepted

Yinson Production Pte. Ltd.

3 Church Street, Samsung Hub #17-05 Singapore 049483

Contract no. :

AR/PROC/2013/08/0508 Purchase order no.:

(PO issued by YP to supplier) Doc. title :

BUNDLE DRAWING FOR MP INTERSTAGE HEATER (26HA2007)

MO2

Tag No.: 26HA2007 Supplier document no._Rev. HJ-15-2185-DWG-05-02_A1

ENI document ID

Facility Subfacility Phase Disc. code Type & subtype Sequence no. ENI Rev

3514 01 B YP document number

Project no. Origin. code System code Disc. code Doc. type Sequence no. Rev Total no. of Pages

1305 - VM - 26 - R - XX - 00013 A1 2

Page 2: 1305 VM 26 R XX 00013_A1_Bundle Drawing MP Interstage Heater(26HA2007)MO2_HJ

A

9 10

B

C

D

E

F

H

9 10

G

7 84 5 621 3

A

B

C

D

7 84 5 6

E

F

G

21 3

H

GHANA OCTP DEVELOPMENT PROJECT

CLIENT DOC. NO.

VENDOR DOC. NO.

TO BE ADVISED BY CLIENT

REV.NO. DESCRIPTION PREP. BY CHK. BY APPR. BYVALIDITY

STATUS

A1 ISSUE FOR REVIEW LI CHENG THURAIN JENSON

YINSON DWG. NO. SHEET: REV:

SIZE:

SCALE:

TITLE :

PROJECT :

COMPANY : CLIENT :

1 OF 1 A1

A3

NTS

THE ORIGINAL AND ALL COPIES OF THISDRAWING TOGETHER WITH THE COPY RIGHT

THEREOF ARE THE SOLE PROPERTY OFYINSON PRODUCTION PTE LTD

VME.REV.

24.07.2015

DTAE

VENDOR :

HEATEC JIETONG PTE LTD

TO BE ADVISED BY CLIENT

HJ-15-2185-DWG-05-02

BUNDLE DRAWING FORMP SEPARATOR INTERSTAGE HEATER (26HA2007)

- -

1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED. 2. ALL BOLT HOLES SHALL STRADDLE TO THE CENTRE LINE UNLESS OTHERWISE SPECIFIED. 3. ALL GASKET SEATING FACE SHALL HAVE SERRATED CONCENTRIC SURFACE FINISH. 4. B.C.D. - BOLT CIRCLE DIAMETER O.T.L. - OUTER TUBE LIMIT. WOL - WELD OVER LAY. TBA - TO BE ADVISED BY CLIENT. 5. TUBE EXPANSION SHALL START A DISTANCE OF 14mm MEASURED FROM THE TUBESHEET SURFACE. 6. WELD OVERLAY MATERIAL SHALL BE S31803.

MATERIAL LISTMARK ITEM DESCRIPTION MATERIAL QTY REMARK

1 TUBESHEET 1 AS SHOWN SA266 Gr2 (WOL) 12 TUBESHEET 2 AS SHOWN SA266 Gr2 (WOL) 13 BAFFLE PLATE AS SHOWN SA240 316/316L 24 TIE ROD 1 AS SHOWN SS316L 65 TIE ROD 2 AS SHOWN SS316L 26 TIE ROD NUT 1/2"-13 UNC SA194 Gr.8 16

7 TUBEOD=19.05,

MIN. THK=1.651, L=6000SA 789 S31803 460

8 SPACER TUBE 1OD=19.05,

THK=1.651, L=529SA213 TP316L 6

9 SPACER TUBE 2OD=19.05,

THK=1.651, L=1061SA213 TP316L 2

10 SPACER TUBE 3OD=19.05,

THK=1.651, L=522SA213 TP316L 36

11 SPACER TUBE 4OD=19.05,

THK=1.651, L=1054SA213 TP316L 16

TIE ROD

4850 FOR TIE ROD 25380 FOR TIE ROD 1

50 20TO TUBESHEET

1/2" -13UNC 1/2" -13UNC

GENERAL NOTES

CHANNEL SIDE VIEW TUBESHEET 1 SHELL SIDE VIEW

O 700BCD64

5O

582

O

750

OD O

582

O

154 154

103,1

103,1

228

228

252 252

TUBESHEET 2CHANNEL SIDE VIEW SHELL SIDE VIEW

R 10TYP

460-O19.25u0.058-1/2"-13UNC-`20

DETAIL E

O 700BCD

40

460-O19.25u0.05

582

O

645

O

750

OD O

582

O

60

6,44,8

4,8

8 (S31803 WOL)

DETAIL F

24

TUBE HOLE DETAIL

24

21

1TUBE PROTRUSION

19,05

TUBE

OD

19,25

TUBE

WAL

L TH

ICKN

ESS

REDU

CTIO

N 2%

~3%

1.5

1

0.5mm g45vCHAMFER

DETAIL H

DETAIL I

R 1,5

2020

SEE DETAIL ESEE DETAIL F

SEE DETAIL I

SEE DETAIL H

BUNDLE ASSEMBLY

5998 (TUBESHEET SURFACE TO TUBESHEET SURFACE)

765294788532 X 9=

532

VIEW A-A

0v

90v

180v

270v

10

51TUBE EXP. LENGTH

BAFFLE PLATE

105

102

226

125

40

154 154

252 252

O580

O19.5

6-O14

SEE DETAIL BDETAIL B

10

10

90°

3D VIEW

A

A 12

1

2

3

4 5

4

5

6

7

8

9

10

11

24-O25

24-O25

12

O 571OTL

611

1215

1819

2021

2021

2223

22