INSTALLATION MANUAL FOR EVAPORATIVE COOLING R EEVES SUPPLY CO., INC. 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 • Fax: 770-854-5540
90

130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

Sep 29, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

INSTALLATION MANUALFOR EVAPORATIVE COOLING

REEVES SUPPLY CO., INC.130 Dickerson Road • Franklin, GA 30217

1-888-854-5221 • Fax: 770-854-5540

Page 2: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

"Sharpie" Marker

Drill w/1/4" bitChalk Line

Ladder 8' StepPVC Piping Cutter

TOOLS REQUIRED FOR INSTALLATION

Transit or surveyors level

Phillips & flat Screw driver

Line & Hand Level

PVC Piping Glue

Wrench

Circular Saw

Nut DriverRatchet Set

Tape MeasurePVC Pipe Cleaner

Hammer

Center Mounted Centrifugal Pump -------------------------------------------------

Double End Feed Split Pad ----------------------------------------------------------

General Assembly Section -----------------------------------------------------------Systems & Length -------------------------------------------------------------------

TABLE OF CONTENTS

4431

sheet no.

2

1Table Of Contents --------------------------------------------------------------------

Plywood Saw Blademin. 140 tooth

130 Dickerson Road- Franklin Georgia 30217

sh-1

Reeves Supply Co., INC.

1-888-854-5221 fax 770 854 5540

Center Feed Continuous Pad -------------------------------------------------------

End Mounted Centrifugal Pump --------------------------------------------------- 57

71

SYSTEMSMaintenance and Winterizing System --------------------------------------------

Single End Feed System -------------------------------------------------------------

6

7

Parts ------------------------------------------------------------------------------------ 4Operations ----------------------------------------------------------------------------- 5

3

Center Feed Split Pad ---------------------------------------------------------------- 20

Poly Tank Option --------------------------------------------------------------------- 84

Page 3: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

STRAIGHT END FEED 10' TO 70'

UP TO 80'CENTER FEED SPLIT PAD

CONTINUOUS PADCENTER FEED

UP TO 80'

DOUBLE END FEED SPLIT PAD ELEVATION

80' TO 160'

LENGTHS UP TO 70'

END MOUNTED CENTRIFUGAL PUMP CENTRIFUGAL PUMP CENTER FEED

CONTINUOUS PAD

LENGTHS UP TO 100'

DOWN

SLOPE

See sh-7

See sh-20

See sh-31

See sh-44

See sh-57See sh-71

sh - 2

See sh - 84 POLY TANK

ALTERNATE

SUMP OR TANK OPTIONS

CENTRIFICAL PUMP OPTION

GENERAL SKETCHES OF SYSTEMSREEVES SUPPLY COMPANY OFFERS WITHTHEIR LOCATION IN INSTALLATION MANUAL

TANK OPTIONS SEE SH-84 THRU SH-89

See sh- 84 thru 89Poly Tank Option

Poly Tank OptionSee sh- 84 thru 89

See sh- 84 thru 89Poly Tank Option

See sh- 84 thru 89Poly Tank Option

Page 4: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

24

" MAX.

18

" MIN

.

TO

P B

AC

K P

AD

SUPPO

RT

TO

P O

F

DEFLE

CTO

R

TO

P B

RAC

KET

BAC

K P

AD

SUPPO

RT

FRO

NT P

AD

SUPPO

RT

4X4

PO

ST

HEAD

ER P

IPE

BO

TTO

M T

RO

UG

H

BO

TTO

M B

RAC

KET

BO

TTO

M B

RAC

KET

MIN

IMUM

2X8

2X10

TABLE "A"

TABLE "B"

ASSEM

BLY

RO

OF E

XTENSIO

N

MINIMUM WALL HEIGHT

BO

TTO

M B

RAC

KET

PAD

HEIG

HT - 3

" = "B

"PAD

HEIG

HT +

16

" = "A

"

4 1/2"

BO

TTO

M S

TRIN

GER

TO

P S

TRIN

GER

BAC

K P

AD

SUPPO

RT

8" P

VC

PIP

E T

RO

UG

HSEE P

AG

ES 8

& 9

DRIP

PAN

TO

P

BO

TTO

M B

RAC

KET

TO

P B

AC

K P

AD

SUPPO

RT

DRIP

PAN Lip

FASTENS

TO

TO

P B

OTTO

M S

TRIN

GER

FRO

NT P

AD

SUPPO

RT

FRO

NT S

PLIC

E

TO

P B

RAC

KET

TABLE "C"

TO

P T

OP B

RAC

KET

Reeve

s S

upply C

o. 1

-888 8

54 5

221

130 D

icke

rson R

oad

- Franklin G

eorg

ia 30217

sh-3

3 1

/2" E

A. 5

/16" Ø

4

" LG. LA

G B

OLTS

AT C

ENTER O

F P

OST

Page 5: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 6: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

sh-5

130 D

icke

rson R

oad

Franklin G

eorg

ia 30217

Reeve

s Sup

ply C

o. 1

-88

8 8

54

52

21

Page 7: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

Bleed

-off w

ater fro

m th

e systemW

hy

bleed

off w

ater? As w

ater is recycled

thro

ug

h your system

the impur-

ities beco

me m

ore co

ncen

trated. W

hen

water ev

aporates no

impurities

are carried alo

ng

, therefo

re the am

ou

nt o

f imp

urities in th

e water that have

no

t evap

orated

remain

in th

e system

. Th

e chem

icals, minerals and other

imp

urities th

at are left beh

ind

thro

ug

h ev

apo

ration

build up in the reservoiran

d sh

ou

ld b

e dilu

ted.

Th

e on

ly w

ay to

redu

ce the lev

el of co

ncen

tration

is by removing (bleeding-

off) w

ater from

the sy

stem. T

he am

ou

nt o

f water you should bleed-off

dep

end

s on

the q

uality

of th

e water b

eing

used

by

your system

.

Th

e amo

un

t of w

ater yo

u sh

ou

ld b

leed-o

ff dep

end

s on the water qu

alityin

yo

ur area. If y

ou

hav

e a large am

ou

nt o

f imp

urities, y

ou will need to

allow

mo

re water to

escape. If y

ou

see scale beg

inning to form on the

pad

s, yo

u w

ill need

to in

crease yo

ur b

leed-o

ff rate. The best m

ethod ford

etermin

ing

the b

leed-o

ff rate is to first fin

d o

ut h

ow m

uch evaporation iso

ccurrin

g. T

o calcu

late a rou

gh

estimate o

f yo

ur evaporation, m

ultiply thearea o

f the p

ad b

y th

e air speed

thro

ug

h th

e pad

, by

the tem

perature drop

from

on

e side to

the o

ther, th

en d

ivid

e the fin

al nu

mber by 500,000.

Ex

amp

le: assum

e yo

u h

ad 5

' tall by

60

' lon

g an

d you

r air speed is 300feet p

er min

ute. O

utsid

e temp

erature is 9

5 , an

d insid

e temperature is 75

yo

u w

ou

ld h

ave an

evap

oratio

n rate o

f 3.6

gallo

ns per m

inute.

If water is ex

tremely

hard

(that is w

ith h

igh

levels of im

purities) then the

bleed

-off rate sh

ou

ld b

e equ

al to ev

apo

ration

. In areas w

ith little minerals

in th

e water su

pp

ly, th

en b

leed-o

ff som

ewh

ere betw

een 1/4 to 1/2 theev

apo

ration

rate.

Clean

ing th

e system

1. S

hut o

ff the p

um

p an

d clean

the strainer. T

o clean in-line filter: (a)

close b

all valve b

etween

filter and

reservoir; (b) unscrew filter and

dum

p out w

ater; (c) replace filter; (d) open ball valve.

2. If po

ssible turn off fan

s. (if this is not possible, run fans at m

inimum

level). 3

. Gen

tly hose o

ff pad

s. Clean

algae from

pads and pipes. 4

. Flu

sh reservoir: (a) clo

se ball v

alve between pu

mp and 1

" diameter

exhau

st; (b) o

pen

1" d

iameter ex

haust valve; (c) turn on pum

p; (d) ad

ded to reserv

oir by

fill line as system flushes.

5. A

fter flushing reservo

ir: (a) turn off pum

p; (b) open ball valve b

etween

exhau

st and

un

ion

fitting; (c) close exhaust valve. 6

. Flu

sh head

er: (a) open

ball v

alve at end

of header; (b) turn on pum

p; (c) flush

for sev

eral minutes.

7. D

isconn

ect un

ion at end of h

eader. 8

. Insert bru

sh into

head

er. Bru

sh out debris from head

er line. 9

. Reco

nnect union

.10

. After flushing

head

er: Turn o

ff pum

p. C

lose ball valve at end of header.11. R

efill reservoir to full level.12

. Resu

me n

orm

al operation.

Win

terizing th

e system 1

. Sh

ut off pump

.

2. C

lose b

all valv

e betw

een in

-line filter and reservoir,

3. R

emo

ve filter cover. 4

. Op

en b

all valv

e betw

een strainer an

d reservoir. Draom

water from

system.

NO

TE

: exp

ect abo

ut 70 gallon

s of standing w

ater per 50 feet of reservoir pipe. 5

. Do

not rep

lace filter cov

er until recharging

thr system fo

r normal

operation.

6. L

eave all fittin

gs open

for w

inter.

* If left clo

sesd th

ey will freeze an

d b

urst.

Page 8: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

8" Trough Fabrication For Continuous Pad Systems -----------------------------

Assemble and Install Header Pipe -------------------------------------------------Install drip pan assembly and end brackets ----------------------------------------

Install Back Pad Support -------------------------------------------------------------

Typical Framing Details -------------------------------------------------------------Single End Feed Table of Contents ------------------------------------------------

TABLE OF CONTENTS

1098

sheet no.

sh-7

Assemble and Glue 8" Trough -----------------------------------------------------

Install Top Brackets & Deflector ---- ---------------------------------------------

Install Pads and Front Panel ---------------------------------------------------------

11

Sump Types Assembly & Feeder pipe Fabrication -------------------------------

12

Float Valve and Pump Assembly ----------------------------------------------------

13

Square Float and Valve Assembly -------------------------------------------------

15

Float Valve configurations -----------------------------------------------------------

14

7

18

19

1716

STRAIGHT END FEED SYSTEM

10' TO 70'

SEE SHEET 85 FORPOLY TANK OPTION

Page 9: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 10: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

END FEED SYSTEM

130 Dickerson Road - Franklin Georgia 30217

Reeves Supply Co.

sh-9

1-888 854 5221

GLUE 8" TROUGH FOR

Page 11: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 12: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 13: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

TROUGH FABRICATION FOR END FEED SYSTEMS

TYPICAL DRILL DETAIL

sh-12

Reeves Supply Co. 1-888 854 5221130 Dickerson Road - Franklin Georgia 30217

Page 14: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 15: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

END

FEED

SYSTEM

STEP 1

SID

E V

IEW

STEP 3

STEP 2

HEAD

ER P

IPE D

ETAIL

ASSEM

BLE

HEAD

ER P

IPE

sh-1

41

-888

-854

-522

1 fax 7

70 8

54 5

540

Reeve

s Sup

ply C

o., IN

C.

130 D

icke

rson R

oad

- Franklin G

eorg

ia 30217

Page 16: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 17: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 18: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 19: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 20: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 21: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

Trough Fabrication For Split Pad Center-Feed Systems ------------------------

Header (Distribution) Pipe Detail and finished Elevation with Sections -----

Install drip pan in Trough and End Brackets --------------------------------------

Install Back Pad Support -------------------------------------------------------------

Framing Elevation & Sections -------------------------------------------------------Center Feed Split Pad Table of Contents --------------------------------------------

TABLE OF CONTENTS

292827

25

sheet no.

23

21

22

20

sh-20

Assemble and Glue 8" Pipe Trough -----------------------------------------------

24Install Top Brackets & Deflector ---- ---------------------------------------------

26

Install Pads and Front Panel ---------------------------------------------------------

Pump assembly Float valve assembly ----------------------------------------------

CENTER FEED SPLIT PAD UP TO 80'

Float Valve Configurations in Sump------------------------------------------------ 30

SEE sh-89 forPOLY TANK OPTION

Page 22: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 23: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

130 Dickerson Road - Franklin Georgia 30217

Reeves Supply Co.

sh-22

1-888 854 5221

GLUE 8" PIPE TROUGH AND EXCAVATE FOR CENTER SUMP.

ONE SIDE OF TROUGHOTHER SIDE MIRROR THIS SIDE

SUMP SHOULD BE LOOSELY PLACED IN POSITION.

EXCAVATE FOR SUMP

TO FACILITATE FABRICATION OF THE TROUGH THE

SUMP IN CENTER

BOTTOM HANGER

CENTER-FEED SPLIT PAD SYSTEM

Page 24: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 25: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 26: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

TROUGH FABRICATIONFOR CENTER- FEED SPLIT PAD SYSTEM

TYPICAL DRILL DETAIL

sh-25

Reeves Supply Co. 1-888 854 5221130 Dickerson Road - Franklin Georgia 30217

Page 27: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 28: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 29: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

STEP 3

STEP 2

STEP 1

CENTER F

EED

SPLIT P

AD

HEAD

ER F

ABRIC

ATIO

N

SID

E V

IEW

sh-28

130 D

icke

rson R

oad

Franklin G

eorg

ia 30217

Reeve

s Sup

ply C

o. 1

-88

8 8

54 5

221

1 1

/2 Ø

UNIO

N

TO

MAIN

W

ATER S

UPPLY

1 1

/2" X

1 1

/2" X

1 1

/2" T

WIT

H 1

1/2

" BALL V

ALV

E

FILT

ER

PO

WER C

ORD

TO

PU

MP

SUM

PS

EE s

h-29

& sh-30

FO

R S

UM

P P

LUM

BIN

G

Page 30: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 31: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 32: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

Trough Fabrication Details , Trough Cutting & Drip Pan Installation -------

Header (Distribution) Pipe For Center Feed Continuous Pad System ---------

Cut Pipe for drip Pan -----------------------------------------------------------------

Install Back Pad Support -------------------------------------------------------------

Framing Elevation & Section -------------------------------------------------------Center Feed Continious Pad Contents --------------------------------------------

TABLE OF CONTENTS

38

3635

33

sheet no.

31

sh-31

Assemble and Glue 8" Pipe Trough -----------------------------------------------

32

Install Top Brackets & Deflector ---- ---------------------------------------------34

Install Pads and Front Panel ---------------------------------------------------------End Panel Brackets & End Panels ---------------------------------------------------

37

UP TO 80'

CONTINUOUS PAD

39

4140

Float Valve Canfigurations ----------------------------------------------------------Square Float Valve Configurations -------------------------------------------------

Pump Assembly With Float valve --------------------------------------------------

4342

SEE SH- 89 FOR POLY TANK OPTION

Page 33: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 34: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

130 Dickerson Road - Franklin Georgia 30217

Reeves Supply Co.

sh-33

1-888 854 5221

GLUE 8" PIPE TROUGHCENTER-FEED CONTINUOUS PAD SYSTEM

ASSEMBLED AND GLUED PIPE

A

SECTION A

Page 35: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 36: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 37: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

PIP

ESEC

TIO

NAT

TEE

BEFO

RE

DRIP

PAN

AFTER

PIC

K-U

PPIP

EAND

PAN

HAVE

BEEN

PLA

CE

DRIP

PAN

INTRO

UG

H

TRO

UG

HFABRIC

ATIO

ND

ETA

ILS

TRO

UG

HCU

TTIN

GTE

CH

NIQ

UES

TRO

UG

HCU

TTIN

GTE

CH

NIQ

UESC

ENTE

RRO

UG

HO

PENIN

GC

ENTE

RSUM

P

INSTALLE

DA

SLIG

HT

DO

WNW

ARD

SLO

PE

OF

TEE

AND

PIC

K-U

PLIN

EIS

O.K

.

Page 38: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

AFTER CUTTING

CUT PIPE FOR DRIP PANFOR CONTINUOUS PAD SYSTEMS

sh-37

SEE SH-36 BEFORE CUTTING PIPE

1-888 854 5221130 Dickerson Road Franklin Georgia 30217

Reeves Supply Co.

Page 39: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 40: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 41: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 42: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 43: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 44: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 45: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

Trough Fabrication For Split Pad Dbl End Feed Systems ----------------------

Header (Distribution) Pipe Detail and finished Elevation with Sections ----Install drip pan in Trough and End Brackets --------------------------------------

Install Back Pad Support -------------------------------------------------------------

Framing Elevation & Sections ------------------------------------------------------Double End Feed Split Pad Contents ----------------------------------------------

TABLE OF CONTENTS

5251

50

48

sheet no.

46

44

45

sh-44

Assemble and Glue 8" Pipe Trough -----------------------------------------------47

Install Top Brackets & Deflector ---- ---------------------------------------------49

Install Pads and Front Panel ---------------------------------------------------------

SPLIT PAD ELEVATION

DOUBLE END FEED

80' TO 160'

Float Valve Configuration ---------------------------------------------------------

Sump Types and Supply Header ---------------------------------------------------

Pump Header Assembly & Float Valve Assembly ------------------------------5554

53

Square Float Configuration --------------------------------------------------------- 56

SEE sh-85 forPOLY TANK option

Page 46: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 47: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

DOUBLE END FEED SPLIT PAD SYSTEM

130 Dickerson Road - Franklin Georgia 30217

Reeves Supply Co.

sh-46

1-888 854 5221

GLUE 8" TROUGH FOR

Page 48: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 49: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 50: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

TROUGH FABRICATION FOR DOUBLE END FEED SPLIT PAD SYSTEM

TYPICAL DRILL DETAIL

sh-49

Reeves Supply Co. 1-888 854 5221130 Dickerson Road - Franklin Georgia 30217

Page 51: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 52: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 53: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 54: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 55: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 56: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 57: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 58: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

Trough Cutting & Drip Pan Installation ------------------------------------------

Header For End Feed Centrifugal System -----------------------------------------

Cut Pipe for Centrifugal Pump End Feed ----------------------------------------

Install Back Pad Support -------------------------------------------------------------

Framing Elevation & Section -------------------------------------------------------Centrifugal Pump End Feed Contents ----------------------------------------------

TABLE OF CONTENTS

57

sheet no.

sh-57

Assemble and Glue 8" Pipe Trough -----------------------------------------------

Install Top Brackets & Deflector ---- --------------------------------------------

Install Pads and Front Panel ---------------------------------------------------------

58

End Panel Brackets & End Panels --------------------------------------------------

Float Valve Box & Pick-up Tube ---------------------------------------------------

59 60

Centrifugal Pump Piping & Supply Header----------------------------------------

END MOUNTED CENTRIFUGAL PUMP

CONTINUOUS PAD LENGTHS UP TO 80'

not provided

Install Brackets For Pump Support ------------------------------------------------

Pump Support Frame ----------------------------------------------------------------

61

6566

64

62

63

7069

67

68

Page 59: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 60: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

CENTRIFUGAL PUMP END FEED

130 Dickerson Road - Franklin Georgia 30217

Reeves Supply Co.

sh-59

1-888 854 5221

GLUE 8" TROUGH FOR

Page 61: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 62: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 63: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 64: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

PLA

CE

DRIP

PAN

INTRO

UG

H

TRO

UG

HC

UTTIN

GTE

CHNIQ

UES

TRO

UG

HC

UTTIN

GTE

CHNIQ

UES

Page 65: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

CENTRIFUGAL PUMP END FEED

130 Dickerson Road - Franklin Georgia 30217

Reeves Supply Co.

sh-64

1-888 854 5221

CUT PIPE FOR

Page 66: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 67: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

END

FEED

SYSTE

M

STE

P1

SID

EVIE

WSTEP

3

STEP

2

HEAD

ER

PIP

ED

ETA

IL

ASSEM

BLE

HEAD

ER

PIP

E

sh-6

6

1-8

88

-85

4-5

22

1fax

77

0854

5540

Reeve

sSup

ply

Co.,

INC.

13

0D

icke

rson

Road

-Franklin

Georg

ia30217

Page 68: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 69: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 70: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 71: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 72: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

Trough Fabrication - Trough Cutting & Drip Pan Installation ----------------

Pump Motor Support Frame ---------------------------------------------------------

Cut Pipe for drip Pan and Float Valve----------------------------------------------

Install Back Pad Support -------------------------------------------------------------

Framing Elevation & Section -------------------------------------------------------Centrifugal Pump Center Feed Contents ------------------------------------------

TABLE OF CONTENTS

81

79

78

76

sheet no.

74

72

73

sh-71

Assemble and Glue 8" Pipe Trough -----------------------------------------------

75Install Top Brackets & Deflector ---- ---------------------------------------------

Install Pads and Front Panel ---------------------------------------------------------

End Panel Brackets & End Panels ---------------------------------------------------

80

Float Valve Box & Assembly -------------------------------------------------------82

83

71

Bottom Brackets For Pump Support -----------------------------------------------

77

Header For Center Feed Centrifugal System --------------------------------------

LENGTHS UP TO 100'

SLOPEDOWN

CONTINUOUS PAD CENTRIFUGAL PUMP CENTER FEED

Page 73: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 74: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

130 Dickerson Road - Franklin Georgia 30217

Reeves Supply Co. 1-888 854 5221

GLUE 8" PIPE TROUGH FOR CENTER FEEDCENTRIFUGAL PUMP- CONTINUOUS PAD SYSTEM

ASSEMBLED AND GLUED PIPE

A

SECTION A

Page 75: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 76: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 77: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 78: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

PIP

ESEC

TIO

NAT

TEE

BEFO

RE

DRIP

PAN

AFTER

PIC

K-U

PPIP

EAND

PAN

HAVE

BEEN

PLA

CE

DRIP

PAN

INTRO

UG

H

TRO

UG

HFABRIC

ATIO

ND

ETA

ILS

TRO

UG

HC

UTTIN

GTE

CHNIQ

UES

TRO

UG

HC

UTTIN

GTE

CHNIQ

UES

CENTE

RRO

UG

HO

PENIN

GC

ENTE

RTE

E

INSTALLE

DA

SLIG

HT

DO

WNW

ARD

SLO

PE

OF

TEE

AND

PIC

K-U

PLIN

EIS

O.K

.(P

REFERRED

)

Page 79: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate

CENTRIFUGAL PUMP CENTER FEED

130 Dickerson Road - Franklin Georgia 30217

Reeves Supply Co.

sh-78

1-888 854 5221

CUT PIPE FOR

Page 80: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 81: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 82: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 83: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 84: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 85: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 86: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 87: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate
Page 88: 130 Dickerson Road • Franklin, GA 30217 1-888-854-5221 ...€¦ · 130 dickerson road - franklin georgia 30217 reeves supply co. sh-22 1-888 854 5221 glue 8" pipe trough and excavate