Detailed Project Report for Rail Based Mass Transit System in Varanasi Final Report CHAPTER 13: COST ESTIMATES AND FINANCIALS February, 2016 Page 131 1 1 3 3 . . C C O O S S T T E E S S T T I I M M A A T T E E S S A A N N D D F F I I N N A A N N C C I I A A L L S S 13.1 CAPITAL COSTS 13.1.1 Coverage Cost estimate for Varanasi Metro corridors (CorridorI from BHEL to BHU and CorridorII from Benia Bagh) has been prepared covering civil, electrical, signaling and telecommunications works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost estimates, various items have generally been grouped under three major heads on the basis of (i) Route km length of alignment, (ii) Number of units of that item and (iii) Item being an independent entity. All items related with alignment, construction, permanent way, Third Rail, Signaling & Telecommunication, whether in main lines or in maintenance depot, have been estimated at rate per Route km/km basis. Cost of station structures, other electrical services at these stations and Automatic Fare Collection (AFC) installations at all stations have been assessed in terms of each station as a unit. Similarly, for items like Rolling stock costs have been estimated in terms of number of units required for each item. In remaining items, viz. land, utility diversions, rehabilitation, etc. the costs have been assessed on the basis of each item, taken as an independent entity. In order to arrive at realistic cost of various items, costs have been assessed on the basis of recently awarded rates of Lucknow Metro, DPRs of DMRC PhIV, Lucknow and other various Metros and suitable escalation factor has been applied to bring these costs to Jan’ 2016 price level. Basic cost is exclusive of various taxes and duties viz. custom duty, excise duty, Sale tax, VAT etc. and details of taxes and duties are worked out separately. Current rates of various taxes and duties have been taken into consideration and taxes / duties have been applied as per prevalent practice of DMRC. 13.1.2 Land Requirement a) Finalization of alignment, location of stations, entry / exits etc. has been done with the objective of keeping land requirement to the bare minimum. For this purpose, alignment, stations, depots, parking and Property Development (PD) have been planned in the State Government land unless and until it becomes unavoidable to plan these facilities in Central Government land or private land. Common Depot for both CorridorI & CorridorII has
60

13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Jul 31, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐1 

1133.. CCOOSSTT   EESSTTIIMMAATTEESS   AANNDD   

FFIINNAANNCCIIAALLSS    

13.1 CAPITAL COSTS   

13.1.1 Coverage 

Cost estimate for Varanasi Metro corridors (Corridor‐I from BHEL to BHU and Corridor‐II from 

Benia  Bagh)  has  been  prepared  covering  civil,  electrical,  signaling  and  telecommunications 

works, rolling stock, environmental protection, rehabilitation, etc. at  Jan’ 2016 price level.  

 

While preparing  the capital cost estimates, various  items have generally been grouped under 

three major heads on the basis of (i) Route km length of alignment, (ii) Number of units of that 

item and (iii) Item being an independent entity. All items related with alignment, construction, 

permanent  way,  Third  Rail,  Signaling  &  Telecommunication,  whether  in  main  lines  or  in 

maintenance depot, have been estimated at rate per Route km/km basis. 

 

Cost  of  station  structures,  other  electrical  services  at  these  stations  and  Automatic  Fare 

Collection  (AFC)  installations at all  stations have been assessed  in  terms of each  station as a 

unit.  Similarly,  for  items  like Rolling  stock  costs have been estimated  in  terms of number of 

units required for each item. In remaining items, viz. land, utility diversions, rehabilitation, etc. 

the costs have been assessed on the basis of each item, taken as an independent entity. 

 

In order  to arrive at  realistic cost of various  items, costs have been assessed on  the basis of 

recently awarded  rates of  Lucknow Metro, DPRs of DMRC Ph‐IV,  Lucknow and other various 

Metros and suitable escalation factor has been applied to bring these costs to Jan’ 2016 price 

level.  

 

Basic cost  is exclusive of various  taxes and duties viz. custom duty, excise duty, Sale  tax, VAT 

etc. and details of  taxes and duties are worked out separately. Current rates of various  taxes 

and duties have been  taken  into  consideration  and  taxes  / duties have been  applied  as per 

prevalent practice of DMRC. 

 

 

13.1.2 Land Requirement 

a) Finalization of  alignment,  location of  stations,  entry  /  exits  etc. has been done with  the 

objective of keeping  land requirement to the bare minimum. For this purpose, alignment, 

stations, depots, parking and Property Development  (PD) have been planned  in  the State 

Government land unless and until it becomes unavoidable to plan these facilities in Central 

Government  land  or  private  land.    Common Depot  for  both  Corridor‐I &  Corridor‐II  has 

Page 2: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐2 

been planned in the Non‐agricultural land of Ganeshpur area (Private land). As Varanasi city 

is very congested, most part of both the corridors is planned underground and stations are 

proposed in open land. The summary of land requirement for Corridor ‐ I & II is as under :‐ 

 

TABLE 13.1: LAND & STRUCTURES REQUIREMENT (IN HECTARES) FOR CORRIDOR‐I  

Ownership  Purpose Permanent 

LandTemporary 

LandStructures  (Floor area)

Central Govt (Northern Railway) 

Alignment, Station etc  0.07  0.40  0.05 

State Govt   

Alignment, Station etc  1  2.6  0.2633 

Private 

Alignment, Station etc  1.05  2.5  0.52 

Depot (Ganeshpur) 13.2 

0 0.5 

Casting Yard   0  6  0 

RSS  0.3  0  0 

 Total  14.55  8.5  1.02 

  

TABLE 13.2: LAND & STRUCTURES REQUIREMENT (IN HECTARES) FOR CORRIDOR‐II  

Ownership  Purpose Permanent 

LandTemporary 

LandStructures  (Floor area)

Central Govt  Alignment, Station etc  0.14  0  0.0242 

State Govt  

Alignment, Station etc  0.8  2.1  0.105 

RSS  0.3  0  0 

Total   1.1  2.1  0.105 

Private  

Alignment, Station etc  0.13  0  0.18 

Casting yard  0  4  0 

Total   0.13  4  0.18 

 

b) The  land  area  for piers of  elevated  alignment,  elevated  stations  falling over  the  existing 

road and entry/exit falling on road / State Government land has not been accounted for in 

the  land  requirement  and  costing  as  present  land  use  is  not  getting  affected  by  these 

facilities.  Land  requirement  for  other  metro  utilities  like  ramp,  off  the  road  elevated 

stations, depot, RSS, ancillary buildings etc. have been accounted as  far as per details  in 

subsequent paras. 

 

Page 3: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐3 

c) Rate  of  Central  Govt.  land  (Northern  Railway  at  Varanasi  Cantt  for  Corridor‐1  and  Post 

office at Sarnath for Corridor‐2), required on permanent basis has been taken as Per Circle 

rates ‐ 01st Aug'15, published by Collectorate, Varanasi. No solatium has been applied to the 

basic  land  cost. Cost of Passenger Reservation  System  (PRS)  at Varanasi Cantt.  including 

cost of structure, electrical and S&T items, terminals etc has been taken as Rs. 3.0 crores as 

per discussion with CRIS. 

d) Rate  of  Central Govt.  land  (Northern  Railway  at Varanasi  Cantt),  required  on  temporary 

basis for 3 years construction period, has been taken @ 6% Per annum of Circle rates ‐ 01st 

Aug'15, published by Collectorate, Varanasi. No solatium has been applied to the basic land 

cost.  

e) Rate  of  State  Govt.  Land  required  on  permanent  basis  has  been  taken  from  DPR  for 

Lucknow Metro with updation. No solatium has been applied to the basic land cost. In case, 

State Govt. is in a position to provide its land free of cost or at reduced rates, it will further 

improve the financial statistics of the project. 

 

f) Cost of structures for rehabilitation of squatters at Tulsi Manas Mandir has been taken as 

Rs.  25  crore  per  Hectare.  Rehabilitation  of  squatters  is  required  as  per  norms  of 

International Funding Agencies.  

g) Rate of Private  land & non commercial structures has been  taken  from Circle  rates  ‐ 01st 

Aug'15,  published  by  Collectorate.  Above  this,  100%  solatium  has  been  applied  as  per 

LARRA.  No  administrative  cost  is  added  towards  land  acquisition  activities,  as  it  is 

understood that this activity shall be carried out by State Govt. from its own resources. 

 

h) On  lines  with  DPR  for  Kanpur  MRTS,  efforts  have  been  made  to  provide  parking  for 

maximum possible stations. To make  the project  financially viable, property development 

has been proposed on suitable land pieces on preliminary stage. Moreover, in line with DPR 

for Lucknow Metro, cost of land towards parking cum PD is not loaded to the cost estimates 

and  this cost will be borne by State Govt. separately. Details of  land  required  for parking 

cum PD is mentioned separately in relevant chapter.  

i) As  advised by  LMRC, depreciated  rates  for  State Govt.  structures have been  taken  after 

applying maximum allowable depreciation of 60%.  

j) Rate  of  private  commercial  structures  including  land  is  calculated  as  300  x  specified 

monthly  rent,  published  by  Collectorate  Varanasi,  August'  15.  100%  Solatium  has  been 

applied to basic cost of structures.  

k) Annual cost of private land required on temporary basis (for construction of U/G stations at 

University, RBS college etc.) is calculated as 6% of corresponding circle rate of that locality. 

Construction period is taken as 3 years. No solatium has been applied to basic land cost.  

Page 4: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐4 

l) The total cost of Land works out to be Rs. 438.47 Crores for Corridor‐I and Rs. 36.99 Crores 

for Corridor‐II. 

 

 

13.1.3 Items other than Land: Cost of items other than land is based upon LAR / DPR 

rates as under:‐ 

TABLE 13.3: BASIS OF RATES 

Item 

No. Item  Basis of Rates 

2.0  Alignment and Formation  

2.1  Underground  section  by 

T.B.M    excluding  station 

length 

Avg.  of  Esc.  Rates  of  DMRC  Ph‐4  DPR  May'14  &  LMRC  DPR 

May'13 (Base rates are Rs. 111.00 Cr.& Rs. 105.71 Cr. Resp.) 

2.2  Underground  section  by  cut 

& cover for Ramp 

Average of escalated rates of DMRC Ph‐IV DPR May'14 & LMRC 

DPR May'13. (Base rates are Rs. 102.87 Cr.& Rs. 97.97 Cr. Resp.) 

2.3  U/G  section  by  NATM  for 

alignment and access tunnel 

Estimated rates are based upon escalated rates (excluding taxes) 

for Airport Express Metro Link Contract package no. C‐6, 2010. 

Completion  cost  is Rs. 308 Cr.  inclusive of  taxes  and duties @ 

20%.  for  2.3  Km  tunnel  &  one  tunnel  ventilation  building. 

Estimated  rates  are  worked  out  as  Rs.  (308‐8)/1.2/2.3  and 

escalation is applied. 

2.4  Elevated  section  excluding 

viaduct length in station 

Estimated  rates  are  based  upon  accepted  work  (Sept'14)  of 

elevated  priority  corridor  of  LMRC.  Total  Length  =  8250‐

8x140(stn length)‐315 (special span) + 300 (depot connectivity) = 

7115m.  Cost  of  Viaduct  is  Rs.  324.2‐7.77  =  Rs.  316.43  Cr. 

inclusive of taxes @ 18.54%. and Rs. 266.94 Cr. w/o taxes. Basic 

rates per  km  are 266.94/7.115  i.e. Rs. 37.52 Cr.  and escalated 

rates comes out to Rs. 39.88 Cr. per Km. 

2.5  Elevated  Section‐  Special 

Span 

(a) 34m+45m+34m 

Estimated rates are derived from DMRC LAR for Mayapuri‐ 

Naraina CLC ‐ 34m+60m+34m at the cost of Rs. 15 Cr. 

2.6  At‐grade Section  Estimated rates are derived from escalated rates of At‐grade 

section of Nagpur Metro DPR (June’2012, Base rate is Rs. 2.90 Cr 

per Km) 

2.7  Entry to  Depot  Estimated  rates  are  based  upon  accepted  work  (Sept'14)  of 

elevated  priority  corridor  of  LMRC.  Total  Length  =  8250‐

8x140(stn length)‐315 (special span) + 300 (depot connectivity) = 

7115m. 

Cost  of  Viaduct  is  Rs.  324.2‐7.77  =  Rs.  316.43  Cr.  inclusive  of 

taxes  @  18.54%.  and  Rs.  266.94  Cr.  w/o  taxes. 

Basic  rates  per  km  are  266.94/7.115  i.e.  Rs.  37.52  Cr.  and 

escalated rates comes out to Rs. 39.88 Cr. per Km. 

Page 5: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐5 

Item 

No. Item  Basis of Rates 

3.0  Station Buildings  

3.1  Underground Station (160 m Length, 2‐Level) incl. EM works, VAC etc. by Cut & Cover  

a  Underground  Station‐ Structural Civil works 

As the  length of station  is only 160m, rates have been taken @ 

80% of Estimated rates based upon average of escalated rates of 

DMRC Ph‐IV DPR May'14 & LMRC DPR May'13. Base rates are Rs. 

116.80 Cr.& Rs. 125.16 Cr.  

b  Underground  Station‐  EM works etc. 

As the  length of station  is only 160m, rates have been taken @ 

80% of Estimated rates based upon average of escalated rates of 

DMRC Ph‐3 LAR CE‐09 (lot 3) 06.08.13 @ Rs. 24.63 Cr.  

c  Underground Station ‐ ECS & TVS etc 

As the  length of station  is only 160m, rates have been taken @ 

80% of Estimated rates based upon average of escalated rates of 

DMRC Ph‐3 LAR CE‐10 & 11 (lot 3) 08.05.13 @ Rs. 30.12 Cr.  

3.2  Underground Station (140 m Length or less, 3‐Level) incl. EM works, VAC etc. by Cut & Cover  

a  Underground  Station‐ Structural Civil works   With  3‐level  station,  length  of  station  is  proposed  as  140m  / 

130m. The construction efforts shall be similar to 160m  long 2‐

level station. Hence, rates adopted are same as  that  for 160 m 

station with 2‐level. 

b  Underground  Station‐  EM works etc.  

c  Underground Station ‐ ECS & TVS etc  

3.3  Underground Station (100 m Length or less, 4‐Level) incl. EM works, VAC etc. by Cut & Cover  

a  Underground  Station‐ Structural Civil works 

With 4‐level  station,  length of  station  is proposed as 97m. The 

construction efforts shall be similar to 140m long 3‐level station. 

Hence, rates adopted are same as that for 140 m station with 3‐

level. 

b  Underground  Station‐  EM works etc.  

c  Underground Station ‐ ECS & TVS etc 

3.5  Underground  Station‐ Architectural Finishes 

As the  length of station  is only 160m, rates have been taken @ 

80% of Estimated rates based upon average of escalated LAR of 

LMRC ‐ accepted cost (July'15) of Rs. 58.74 Cr. inclusive of taxes 

and duties @ Rs. 18.54%    for 8 elevated  Stations(140m). Base 

cost per LMRC station (140m) comes out to Rs. 7.3425 Cr. with 

taxes and Rs. 6.19 cr. per station without taxes) are adopted. 

3.6  Elevated Station Buildings (85mx19.2 or less)   

Page 6: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐6 

Item 

No. Item  Basis of Rates 

a  Elevated station ‐ Civil Works including Viaduct 

For Kanpur MRTS  length of elevated  station  for 6‐coaches was 

kept as 140m. For Kanpur DPR, Estimated rates are based upon 

LMRC  accepted  cost  of  Rs.    261  Cr.  (Sep'14)  for  8  Stations 

inclusive of taxes & duties @ 18.54% and Rs. 220.18 Cr. without 

taxes & duties. For Kanpur MRTS, Cost of 140m x 27m and 140m 

x 24m elevated stations comes out to Rs. 32.28 Cr./station and 

Rs. 28.70 Cr./station respectively.  

As  the  length  of  elevated  station  for  Varanasi MRTS  is  85m  / 

75m,  reduced  rates @75% of  rates  for Kanpur DPR have been 

taken.  Accordingly,  for  Varanasi MRTS,  Cost  of  85m  x  19.20m 

elevated stations is worked out as Rs. 21.79 Cr./station. 

The LAR based cost of 3‐coach elevated stations at Kochi Metro 

comes out to Rs. 40 Cr./station which is higher than the awarded 

cost  of  the  6‐coach  8  numbers  elevated  stations  for  Lucknow 

Metro.  Hence,  LAR  of  Kochi metro  have  not  been  applied  to 

Varanasi Metro. 

b  Elevated station  ‐ EM Works etc. 

Estimated rates are based upon awarded rates of Kochi Metro, 

KE‐10 dt. 12.12.2014. Avg. cost 4.21 Cr./Stn plus escalation. 

3.7  Elevated  Station‐ Architectural Finishes 

As  the  length of  station  is only 85m,  rates have been  taken @ 

80% of Estimated rates based upon LMRC accepted cost (July'15) 

of Rs. 58.74 Cr. inclusive of taxes and duties @ Rs. 18.54%  for 8 

elevated Stations(140m). Cost per  LMRC  station  (140m)  comes 

out  to  Rs.  7.3425  Cr.  with  taxes  and  Rs.  6.19  cr.  per  station 

without taxes) are adopted. 

3.10  Lifts & Escalators (Elevated and UG stations)   

a  Lifts  Estimated rates are based upon DMRC Ph‐3 LAR CE‐3 (lot 1 & 2) 

Dec'12, Rs. 32.27 lacs. plus escalation. 

b  Escalators  Estimated rates are based upon DMRC Ph‐3 LAR CE‐4 (lot 1 & 2) 

May'13, Rs. 68.69 lacs. plus escalation. 

4.0  Maintenance Depot   

4.1  Civil works  Estimated  rates  are  based  upon  LMRC  Depot  LAR,  April'15, 

excluding taxes and duties i.e. Rs. 107.29 Cr. 

Out of  the  two depots, Depot at Kalindi Vihar  for Corridor‐2  is 

located  in  low  lying area and cost of filling by average 2.0m has 

been included in civil cost. 

4.2  EM  works  +  Machinery  & Plant + General Works 

Estimated  rates  for  E&M  are  based  upon  LMRC  Depot  LAR, 

April'15,  excluding  taxes  and  duties @  Rs.  18.44  Cr.  Rates  for 

Machinery &  Plant  totalling  Rs.90  Cr.  are  based  upon  various 

relevant LARs. 

5.0  P‐Way   

Page 7: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐7 

Item 

No. Item  Basis of Rates 

5.1  Ballastless  track for elevated & underground Section 

Estimated  rates  are  based  upon  average  of  escalated  rates  of 

DMRC Ph‐IV DPR May'14 & LMRC DPR May'13. 

 

5.2  Ballasted track for Depot  Estimated  rates  are  based  upon  average  of  escalated  rates  of 

DMRC Ph‐IV DPR May'14 & LMRC DPR May'13. 

 

5.3  Ballastless  track  for  entry  to Depot 

Estimated  rates  are  based  upon  average  of  escalated  rates  of 

DMRC Ph‐IV DPR May'14 & LMRC DPR May'13. 

6.0  Traction & power supply incl. Third Rail, RSS, TSS, ASS etc.  

6.1  UG  Section  and  Elevated section including SCADA 

Estimated  rates  are  based  upon  awarded  rates  of  BMRCL 

Dec,2009 Rs 11.78 Cr./Km plus escalation. 

6.2  For Depot Entry  Estimated  rates  are  based  upon  awarded  rates  of  BMRCL 

Dec,2009 Rs 11.78 Cr./Km plus escalation. 

6.3  For Depot  Estimated  rates  are  based  upon  awarded  rates  of  BMRCL 

Dec,2009 Rs 11.78 Cr./Km plus escalation. 

6.4  For  132kV  GIS  and  132kV cable/transmission  line  from GSS to RSS 

Estimated  rates  are  based  upon  DMRC  Ph‐IV  DPR  plus 

escalation. 

7.0  Signalling and Telecom.   

7.1  Signalling  Estimated rates are based upon awarded rates of LMRC, Sept'15. 

7.2  Telecommunication  Estimated rates are based upon 90% of awarded rates of LMRC, 

Sept'15. 

7.3  Automatic fare collection  Estimated rates are based upon Jaipur Metro LAR, Mar'12 @3.67 

Cr. Per station plus escalation. 

7.4  Central  Clearing  House System (CCHS) 

As per prevalent DMRC rates. 

7.5  Platform Screen Doors   As 3‐coach are proposed, rates adopted are 70% of the (LAR i.e. 

DMRC  /  20/111  ‐  196/2014  (Lot  3), May'15, Rs.  2.26 Cr.  for  6 

Coaches, 24 doors).  

8.0  Rolling Stock  

Estimated rates are based upon LMRC accepted rates SEP'15.  

9.0  Environment,  R  &  R  incl. Hutments etc. 

  

a  Environmental Cost  As per details given in Chapter 12 

b  R & R  As per details given in Chapter 12 

10.0  Misc. Utilities, road works, Topographic Surveys, Geotechnical Investigation, Barricading, Tree Cutting  and  replanting,  other  civil works  such  as  signage's,  Environmental  protection  and traffic management.   

10.1 & 10.2 

Civil works & Electrical works  Estimated  rates  are  based  upon  average  of  escalated  rates  of 

DMRC Ph‐IV DPR May'14 & LMRC DPR May'13. 

 

Page 8: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐8 

Item 

No. Item  Basis of Rates 

11.0  Capital Expenditure on Security: Estimated rates are based upon average of escalated rates of 

DMRC Ph‐IV DPR May'14 & LMRC DPR May'13. The expenditure is required to cover the civil and 

Electrical items, equipments (X‐Ray machine, Metal detector etc.) 

 

12.0  Staff Quarters and OCC Building: Estimated rates are based upon average of escalated rates of DMRC  Ph‐IV DPR May'14 &  LMRC DPR May'13. OCC  building  is  included  in  cost  estimate  for corridor‐1  only  and  it will  cover  Corridor‐2  also.  As  such,  no  separate  OCC  building will  be required for corridor‐2.  Cost for Green Building concept has been taken as Rs. 7 Cr. for each corridor. This is based upon cost of Rs. 10 cr. taken for 23 Km Corridor of Kanpur MRTS.   

13.0  Capital  Expenditure  on  Inter modal  integration  including  Footpath  for  pedestrians,  Feeder Buses and Bicycles @2% of Total Cost excluding Land  ‐ As per LMRC DPR,  it  is taken @ 2% of total cost excluding land.  

 

13.1.4 Capital Cost Estimate 

The abstract of capital cost estimate of Corridor‐1 & 2  is given  in Table 13.4.   Detailed capital 

cost estimate for Corridor‐1 & 2 is given in Table 13.5 and 13.6 respectively. 

   

Page 9: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐9 

TABLE 13.4: ABSTRACT OF COST ESTIMATE OF CORRIDOR‐1 & 2 

S. No.  Item 

Corridor‐1  Corridor‐2 

Amount (Rs. in Crore) 

Amount (Rs. in Crore) 

1  Land  438.47  36.99 

2  Alignment and Formation  1950.92  960.11 

3 Station Buildings incl. Civil works, EM works, ECS, TVS, Lift, escalators & Architectural Finishes etc 

2409.98  1295.42 

4 Depot  including civil, EM, Machinery & plants, general works 

218.31  0.00 

5  P‐Way for main line, depot and depot connectivity  199.19  80.46 

6  Traction & power supply 750V DC  439.43  181.08 

7 Signalling  and  Telecom.  Incl.  AFC,    Platform  screen doors, CCHS etc. 

392.74  195.24 

8  Rolling Stock  684.18  325.80 

9  R & R incl. Hutments etc.  8.99  2.95 

10 

Misc.  Utilities,  road  works,  Topographic  Surveys, Geotechnical  Investigation,  Barricading,  Tree  Cutting and  replanting,  other  civil  works  such  as  signage's, Environmental protection and traffic management 

143.00  73.05 

11 Capital Expenditure on Security  including civil and EM works 

5.61  2.97 

12 Staff  Quarters  and  OCC  Building  and  green  building concept (Cost of OCC building is included in corridor‐1 only) 

92.83  21.63 

13 Capital  Expenditure  on  Inter  modal  integration including Footpath  for pedestrians, Feeder Buses and Bicycles @2% of Total Cost excluding Land 

130.90  62.77 

14  Total of all items except Land   6676.08  3201.49 

15 

General Charges  incl. Design charges,  including Metro Bhawan,    (Civil+EM works) @ 7% on all  items except land.  (Metro Bhawan  is charged to coridor‐1 only and it will cater to both the corridors) 

467.33  224.10 

16  Total of all items including G. Charges  7143.41  3425.59 

17  Contingencies @ 3 % on all items except land  214.30  102.77 

Gross Total including Contingencies (excluding Land Cost)  7357.71  3528.36   

Gross Total including Contingencies (including Land Cost)  7796.18  3565.35   

Insurance 0.6% of Capital cost excluding land  40.06  19.21   

Gross Total including Insurance, Contingencies and Land  7836.00  3585.00   

Taxes & Duties   1157.00  555.00   

Gross Total including Taxes & Duties  8993.00  4140.00   

Note: For quantities of various items, detailed estimate may be referred.  

 

Page 10: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐10 

 

TABLE 13.5: CAPITAL COST ESTIMATE CORRIDOR‐1 

CORRIDOR ‐ 1: BHEL TO BHU 

Total Length = 19.47 Km, From = (‐) 325m to 19025m, UG = 15.505 Km & ELEV = 3.845 Km 

Depot Entry = 0.12 Km, Stations = 17, Elevated = 4 Nos. & U/G by Cut & cover = 13 Nos. 

Jan' 2016, Price Level 

S. No. 

Item  Unit Rate (Rs. in 

Crore) Qty. 

Amount (Rs. in Crore) 

Without taxes 

1.0  Land             

a Central  Govt.  Land  ‐Permanent  (without Solatium) 

Ha  34.80  0.07  2.44 

b Central Govt. Land ‐Temporary (@ 6% of circle rates PA for 3 years, without Solatium) 

Ha  6.260  0.40  2.50 

c Central  Govt.  Structures  (PRS  at  Varansasi Cantt  including  structure,  Electrical,  S&T, Terminal etc) 

Ha  3.00  LS  3.00 

d  State Govt.  Land  ‐Permanent  (for Alignment, Depot,  RSS,  Ancillary  Bldgs,  Misc.,  without Solatium) 

Ha  5.50  1.00  5.50 

e   State Govt. Land ‐Temporary   Ha  1.32  2.60  3.43 

f  State  Govt.  Structures  ‐Permanent(Depreciated cost after 60% depreciation) 

Ha  7.01  0.2633  1.85 

g Private Land  ‐Permanent (for Depot including Solatium) 

Ha  21.85  13.20  288.42 

h Private Land  ‐Permanent (for Alignment, RSS, Ancillary Bldgs, Misc., including Solatium) 

Ha  48.40  1.35  65.34 

i Private  Land    ‐Temporary  (for  underground station  by  cut  &  cover  etc, Misc., @  6%  of circle rates PA for 3 years, including Solatium) 

Ha  5.198  2.50  13.00 

j Private  Land    ‐Temporary  (for  casting  yard including Solatium) 

Ha  5.198  6.00  31.19 

Private  Structure  ‐  Permanent  including Solatium as per LARRA (average rate has been worked  out  after  applying    relevant  circle rates Aug' 2015 for residential and commercial structures) 

Ha  20.40  1.02  20.81 

l Cost  of  Structures  for  rehabtilation  of squatters at Tulsi Manas Mandir 

Ha  25.00  0.04  1.00 

   Sub Total (1)           438.47 

2.0  Alignment and Formation             

2.1 Underground section by T.B.M  excluding station length 

R. Km.  121.39  13.072  1586.81 

2.2  Underground section by cut & cover for Ramp  R. Km.  112.50  0.224  25.20 

2.3 U/G section by NATM for alignment and access tunnel 

R. Km.  142.15  1.349  191.76 

Page 11: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐11 

S. No. 

Item  Unit Rate (Rs. in 

Crore) Qty. 

Amount (Rs. in Crore) 

Without taxes 

2.4 Elevated section excluding viaduct length in station 

R. Km.  40.37  3.525  142.30 

2.5 Elevated Section (Special Span ‐34m+45m+34m = 113m) 

Each  13.57  0.00  0.00 

2.6  At‐grade Section  R. Km.  3.45  0.00  0.00 

2.7  Entry to  Depot  R. Km.  40.37  0.12  4.84 

   Sub Total (2)           1950.92 

3.0  Station Buildings             

3.1 Underground Station (160 m length, 2 Level) incl. EM works, VAC etc. by Cut & Cover 

           

a  Underground Station‐ Structural Civil works  Each  106.43  4.00  425.72 

b  Underground Station‐ EM works etc.  Each  22.17  4.00  88.68 

c  Underground Station ‐ ECS & TVS etc  Each  27.45  4.00  109.80 

3.2 Underground Station (140 m or less length, 3 Level) incl. EM works, VAC etc. by Cut & Cover 

           

a  Underground Station‐ Structural Civil works  Each  106.43  7.00  745.01 

b  Underground Station‐ EM works etc.  Each  22.17  7.00  155.19 

c  Underground Station ‐ ECS & TVS etc  Each  27.45  7.00  192.15 

3.3 Underground Station (100 m or less length, 4 Level) incl. EM works, VAC etc. by Cut & Cover 

           

a  Underground Station‐ Structural Civil works  Each  106.43  2.00  212.86 

b  Underground Station‐ EM works etc.  Each  22.17  2.00  44.34 

c  Underground Station ‐ ECS & TVS etc  Each  27.45  2.00  54.90 

3.4 Underground Station (160 m length) incl. EM works, VAC etc. by NATM 

           

a  Underground Station‐ Structural Civil works  Each  180.00  0.00  0.00 

b  Underground Station‐ EM works etc.  Each  22.17  0.00  0.00 

c  Underground Station ‐ ECS & TVS etc  Each  27.45  0.00  0.00 

3.5  Underground Station‐ Architectural Finishes  Each  9.61  13.00  124.93 

3.6 Elevated Station Buildings (Type ‐I: 85mx19.2m)          

  

a Elevated station ‐ Civil Works including Viaduct 

Each  22.06  4.00  88.24 

b  Elevated station ‐ EM Works etc.  Each  4.44  4.00  17.76 

3.7  Elevated Station‐ Architectural Finishes  Each  5.07  4.00  20.28 

3.8  At‐grade Station Building             

a  At‐grade station ‐ Civil Works  Each  16.26  0.00  0.00 

b  At‐grade station ‐ EM Works etc.  Each  4.44  0.00  0.00 

3.9  At‐grade Station‐ Architectural Finishes  Each  5.07  0.00  0.00 

Page 12: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐12 

S. No. 

Item  Unit Rate (Rs. in 

Crore) Qty. 

Amount (Rs. in Crore) 

Without taxes 

3.10 Lifts & Escalators (Elevated, At‐grade and UG stations) 

           

a  Lifts  Each  0.38  53.00  20.14 

b  Escalators  Each  0.78  141.00  109.98 

   Sub Total (3)           2409.98 

4.0  Maintenance Depot             

4.1  Civil works  LS        109.49 

4.2 EM works + Machinery & Plant + General Works 

LS        108.82 

   Sub Total (4)           218.31 

5.0  P‐Way             

5.1 Ballastless  track for elevated & underground Section 

Route Km. 

8.14  19.35  157.51 

5.2  Ballasted track for Depot Track Km. 

4.07  10.00  40.70 

5.3  Ballastless track for entry to Depot Route Km. 

8.14  0.12  0.98 

   Sub Total (5)           199.19 

6.0  Traction & power supply (750V DC)             

6.1  UG Section & Elevated including SCADA Route Km. 

15.79  19.35  305.54 

6.2  For Depot entry Route Km. 

15.79  0.12  1.89 

6.3  For Depot Track Km. 

7.90  10.00  79.00 

6.4  Differential cost of 132kV GIS   LS        20.00 

6.5 132kV cable/transmission line from GSS to RSS. 

LS    

33.00 

   Sub Total (6)           439.43 

7.0  Signalling and Telecom.             

7.1  Signalling  R. Km.  8.78  19.35  169.89 

7.2  Telecommunication Per 

Station 4.64  17.00  78.88 

7.3  Automatic fare collection Per 

station 4.42  17.00  75.14 

7.4  Central Clearing House System (CCHS)  Each  18.00  1.00  18.00 

7.5  Platform Screen Doors  Per 

Station 1.63  17.00  27.71 

7.6  LED Screens for PD Per 

Station 1.36  17.00  23.12 

   Sub Total (7)           392.74 

8.0  Rolling Stock  Each  10.86  63.00  684.18 

   Sub Total (8)           684.18 

9.0  R & R incl. Hutments etc.             

Page 13: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐13 

S. No. 

Item  Unit Rate (Rs. in 

Crore) Qty. 

Amount (Rs. in Crore) 

Without taxes 

9.1  Environmental Cost  As per details given in Chapter 

12 

      5.50 

9.2  R & R    

3.49 

   Sub Total (9)           8.99 

10.0 

Misc. Utilities, road works, Topographic Surveys, Geotechnical Investigation, Barricading, Tree Cutting and replanting, other civil works such as signage's, Environmental protection and traffic management 

           

10.1  Civil works  R. Km.  4.04  19.350  78.17 

10.2  Electrical Works  R. Km.  3.35  19.350  64.82 

   Sub Total (10)           143.00 

11.0  Capital Expenditure on Security             

11.1  Civil works Per 

Station 0.270  17.00  4.59 

11.2  EM works Per 

Station 0.060  17.00  1.02 

   Sub Total (11)           5.61 

12.0  Staff Quarters and OCC Building             

12.1  Civil works  R. Km.  1.190  19.350  23.03 

12.2  EM works  R. Km.  0.290  19.350  5.61 

12.3  Cost of OCC Building ‐ Civil Works  LS        45.55 

12.4  Cost of OCC Building ‐ E&M Works  LS        11.64 

12.5  Cost for Green Building concept  LS        7.00 

   Sub Total (12)           92.83 

13.0 

Capital Expenditure on Inter modal integration including Footpath for pedestrians, Feeder Buses and Bicycles @2% of Total Cost excluding Land 

         130.90 

14.0  Total of all items except Land            6676.08 

15.0 General Charges including Design charges, incl. Metro Bhawan Building (Civil+EM works) @ 7% on all items except land  

         467.33 

16.0  Total of all items including G. Charges           7143.41 

17.0  Contingencies @ 3 % on all items except land           214.30 

18.0  Gross Total including Contingencies (excluding Land Cost)     7357.71 

19.0  Gross Total including Contingencies (including Land Cost)  =  7796.18 

20.0  Insurance 0.6% of Capital cost excluding land  6233.83  Crore     40.06 

Page 14: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐14 

S. No. 

Item  Unit Rate (Rs. in 

Crore) Qty. 

Amount (Rs. in Crore) 

Without taxes 

21.0  Gross Total including Insurance        =  7836.23 

            Say  7836.00 

   Taxes & Duties           1157.00 

   Total Cost including Taxes & Duties           8993.00 

Page 15: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐15 

TABLE 13.6: CAPITAL COST ESTIMATE CORRIDOR‐2 

CORRIDOR ‐ 2: BENIA BAGH TO SARNATH 

Total Length = 9.885 Km, From = (‐) 245m to 9395m, ELEV = 1.923 Km, Underground = 7.717 Km, 

Stabling (UG) = 0.245 Km 

Stations = 9 No’s, Elevated = 2 No's Underground =7 No’s. 

Jan' 2016, Price Level 

S. No.  Item  Unit Rate (Rs. in 

Crore) Qty. 

Amount (Rs. in Crore) 

Without taxes 

1.0  Land             

a  Central Govt. Land ‐Permanent (without Solatium) 

Ha  34.80  0.14  4.872 

b  Central Govt. Land ‐Temporary (@ 6% of circle rates PA for 3 years, without Solatium) 

Ha  2.43  0.0000  0.00 

c  Central Govt. Structures‐ Permanent (PRS at Cantt Rly stn, Cost of structure, electrical, S&T, Terminals etc.,) 

Ha  34.00  0.0242  0.82 

d  State Govt. Land ‐Permanent (for Alignment, Depot, RSS, Entry/Exits, Ancillary Bldgs, Misc., without Solatium) 

Ha  5.50  1.100  6.05 

e   State Govt. Land ‐Temporary   Ha  1.32  2.10  2.77 

f  State Govt. Structures ‐Permanent (Depreciated cost after 60% depreciation) 

Ha  5.854  0.105  0.61 

g Private Land  ‐Permanent (for Alignment, RSS, Entry/Exits, Ancillary Bldgs, Misc., including Solatium) 

Ha  30.965  0.130  4.03 

h Private Land  ‐Temporary (for underground station by cut & cover etc, Misc., @ 6% of circle rates PA for 3 years, including Solatium) 

Ha  5.57  0.00  0.00 

Private Structure ‐ Permanent including Solatium as per LARRA (average rate has been worked out after applying  relevant circle rates Aug' 2015 for residential and commercial structures) 

Ha  99.068  0.180  17.83 

   Sub Total (1)           36.989 

2.0  Alignment and Formation             

2.1 Underground section by T.B.M  excluding station length 

R. Km.  121.39  6.078  737.81 

2.2  Underground section by cut & cover for Ramp  R. Km.  112.50  0.402  45.23 

2.3 U/G section by NATM for alignment and access tunnel 

R. Km.  142.15  0.745  105.90 

2.4 Elevated section excluding viaduct length in station 

R. Km.  40.37  1.763  71.17 

2.5 Elevated Section (Special Span ‐34m+45m+34m = 113m) 

Each  13.57  0.00  0.00 

2.6  At‐grade Section  R. Km.  3.45  0.00  0.00 

Page 16: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐16 

2.7  Entry to  Depot  R. Km.  40.37  0.00  0.00 

   Sub Total (2)           960.11 

3.0  Station Buildings             

3.1 Underground Station (160 m length, 2 Level) incl. EM works, VAC etc. by Cut & Cover 

           

a  Underground Station‐ Structural Civil works  Each  106.43  1.00  106.43 

b  Underground Station‐ EM works etc.  Each  22.17  1.00  22.17 

c  Underground Station ‐ ECS & TVS etc  Each  27.45  1.00  27.45 

3.2 Underground Station (140 m or less length, 3 Level) incl. EM works, VAC etc. by Cut & Cover 

           

a  Underground Station‐ Structural Civil works  Each  106.43  5.00  532.15 

b  Underground Station‐ EM works etc.  Each  22.17  5.00  110.85 

c  Underground Station ‐ ECS & TVS etc  Each  27.45  5.00  137.25 

3.3 Underground Station (100 m or less length, 4 Level) incl. EM works, VAC etc. by Cut & Cover 

           

a  Underground Station‐ Structural Civil works  Each  106.43  1.00  106.43 

b  Underground Station‐ EM works etc.  Each  22.17  1.00  22.17 

c  Underground Station ‐ ECS & TVS etc  Each  27.45  1.00  27.45 

3.4 Underground Station (180 m length) incl. EM works, VAC etc. by NATM 

           

a  Underground Station‐ Structural Civil works  Each  180.00  0.00  0.00 

b  Underground Station‐ EM works etc.  Each  22.17  0.00  0.00 

c  Underground Station ‐ ECS & TVS etc  Each  27.45  0.00  0.00 

3.5  Underground Station‐ Architectural Finishes  Each  9.61  7.00  67.27 

3.6 Elevated Station Buildings (Type ‐I: 85mx19.2m)          

  

a  Elevated station ‐ Civil Works including Viaduct Each  22.06  2.00  44.12 

b  Elevated station ‐ EM Works etc.  Each  4.44  2.00  8.88 

3.7  Elevated Station‐ Architectural Finishes  Each  5.07  2.00  10.14 

3.8  At‐grade Station Building             

a  At‐grade station ‐ Civil Works  Each  16.26  0.00  0.00 

b  At‐grade station ‐ EM Works etc.  Each  4.44  0.00  0.00 

3.9  At‐grade Station‐ Architectural Finishes  Each  5.07  0.00  0.00 

3.10 Lifts & Escalators (Elevated, At‐grade and UG stations) 

           

a  Lifts  Each  0.38  27.00  10.26 

b  Escalators  Each  0.78  80.00  62.40 

   Sub Total (3)           1295.42 

4.0  Maintenance Depot             

4.1 Civil works including filling for low lying depot land 

LS        0.00 

4.2 EM works + Machinery & Plant + General Works 

LS        0.00 

Page 17: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐17 

   Sub Total (4)           0.00 

5.0  P‐Way             

5.1 Ballastless  track for elevated & underground Section 

Route Km. 

8.14  9.885  80.46 

5.2  Ballasted track for Depot Track Km. 

4.07  0.00  0.00 

5.3  Ballastless track for entry to Depot Route Km. 

8.14  0.00  0.00 

   Sub Total (5)           80.46 

6.0  Traction & power supply (750V DC)             

6.1  UG Section & Elevated including SCADA Route Km. 

15.79  9.885  156.08 

6.2  For Depot entry Route Km. 

15.79  0.00  0.00 

6.3  For Depot Track Km. 

7.90  0.00  0.00 

6.4  Differential cost of 132kV GIS   LS        10.00 

6.5  132kV cable from GSS to RSS.  LS  15.00 

   Sub Total (6)           181.08 

7.0  Signaling and Telecom.             

7.1  Signaling  R. Km.  8.78  9.885  86.79 

7.2  Telecommunication Per 

Station 4.64  9.00  41.76 

7.3  Automatic fare collection Per 

station 4.42  9.00  39.78 

7.4  Central Clearing House System (CCHS)  Each  18.00  0.00  0.00 

7.5  Platform Screen Doors  Per 

Station 1.63  9.00  14.67 

7.6  LED Screens for PD Per 

Station 1.36  9.00  12.24 

   Sub Total (7)           195.24 

8.0  Rolling Stock  Each  10.86  30.00  325.80 

   Sub Total (8)           325.80 

9.0  R & R incl. Hutments etc.             

9.1  Environmental Cost  As per details given in Chapter 

12 

      2.28 

9.2  R & R        0.67 

   Sub Total (9)           2.95 

10.0 

Misc. Utilities, road works, Topographic Surveys, Geotechnical Investigation, Barricading, Tree Cutting and replanting, other civil works such as signage's, Environmental protection and traffic management 

           

10.1  Civil works  R. Km.  4.04  9.885  39.94 

10.2  Electrical Works  R. Km.  3.35  9.885  33.11 

Page 18: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                           CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐18 

   Sub Total (10)           73.05 

11.0  Capital Expenditure on Security             

11.1  Civil works Per 

Station 0.270  9.00  2.43 

11.2  EM works Per 

Station 0.060  9.00  0.54 

   Sub Total (11)           2.97 

12.0  Staff Quarters and OCC Buiulding             

12.1  Civil works  R. Km.  1.190  9.885  11.76 

12.2  EM works  R. Km.  0.290  9.885  2.87 

12.3  Cost of OCC Building ‐ Civil Works  LS        0.00 

12.4  Cost of OCC Building ‐ E&M Works  LS        0.00 

12.5  Cost for Green Building concept  LS        7.00 

   Sub Total (12)           21.63 

13.0 

Capital Expenditure on Inter modal integration including Footpath for pedestrians, Feeder Buses and Bicycles @2% of Total Cost excluding Land 

         62.77 

14.0  Total of all items except Land            3201.49 

15.0 General Charges including Design charges, incl. Metro Bhawan Building (Civil+EM works) @ 7% on all items except land  

         224.10 

16.0  Total of all items including G. Charges           3425.59 

17.0  Contingencies @ 3 % on all items except land           102.77 

18.0  Gross Total including Contingencies (excluding Land Cost)     3528.36 

19.0  Gross Total including Contingencies (including Land Cost)  =  3565.35 

20.0  Insurance 0.6% of Capital cost excluding land  3201.49  Crore     19.21 

21.0  Gross Total including Insurance        =  3584.56 

            Say  3585.00 

   Taxes & Duties           555.00 

   Total Cost including Taxes & Duties           4140.00 

  13.1.5 Taxes and Duties 

Basic cost  is exclusive of various  taxes and duties viz. custom duty, excise duty, VAT etc. and 

details of taxes and duties are worked out separately. Current rates of various taxes and duties 

have been taken into consideration and taxes / duties have been applied as per LMRC. Central 

and state taxes and duties (customs, Excise and VAT) for Corridor ‐1 & 2 have been worked out 

to Rs. 1157 Crores and Rs. 555 Crores  respectively and are detailed in Table 13.7 and 13.8.  

Page 19: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐19 

TABLE 13.7: DETAILS OF TAXES AND DUTIES CORRIDOR – 1 

Customs Duty  =  22.85% 

Excise Duty  =  12.50% 

VAT    =  12.50% 

 

S. No. 

Description 

Total cost without Taxes & 

duties (Cr.) 

Taxes and duties Total 

Taxes & Duties (Cr.) 

Custom Duty (Cr.) 

Excise Duty (Cr.) 

VAT (Cr.) 

1  Alignment & Formation                

   Underground   1803.77  123.67  110.48  62.15  296.29 

  Elevated, At‐grade & entry to Depot  147.15     12.88  7.24  20.12 

2  Station Buildings                

   a) Underground station‐civil works  1508.52  103.42  92.40  51.97  247.79 

   b) Underground station‐EM works  775.18  53.15  57.65  32.43  143.23 

   c) Elevated station ‐ civil works  108.52     9.50  5.34  14.84 

   d) Elevated station‐EM works  17.76  0.81  1.51  0.85  3.17 

   e) At‐grade station ‐ civil works  0.00     0.00  0.00  0.00 

   f) At‐grade station‐EM works  0.00  0.00  0.00  0.00  0.00 

3  Depot                

   Civil works  109.49  7.51  6.71  3.77  17.99 

   EM works  108.82  4.97  9.25  5.20  19.43 

4  P‐Way  199.19  36.42  4.23  2.38  43.03 

5  Traction & power supply                

   a) Traction and power supply  439.43  40.17  28.01  15.76  83.94 

6  S and T Works                

   a) S & T  248.77  45.48  5.29  2.97  53.74 

   b) AFC, PSD, LED screens & CCHS  143.97  24.68  3.82  2.15  30.65 

7  Rolling stock  684.18  137.59  6.67  3.75  148.02 

8  R & R hutments  8.99        0.56  0.56 

9  Misc.                

Civil works  78.17     6.84  3.85  10.69 

   EM works  64.82     6.89  3.87  10.76 

10  Security                

   Civil works  4.59     0.40  0.28  0.68 

   EM works  1.02     0.13  0.10  0.23 

11  Staff Quarters & OCC Buildings                

   Civil works  68.58     6.00  0.44  6.44 

   EM works incl. green bldg. conept  24.25     3.03  2.18  5.21 

   Total  6545.18  577.86  371.69  207.25  1156.80 

   Total Taxes & Duties              1157 

 

   

Page 20: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐20 

TABLE 13.8: DETAILS OF TAXES AND DUTIES CORRIDOR – 2 

Customs Duty  =  22.85% 

Excise Duty  =  12.50% 

VAT    =  12.50% 

 

S. No. 

Description 

Total cost without Taxes & 

duties (Cr.) 

Taxes and duties Total 

Taxes & Duties (Cr.) 

Custom Duty (Cr.) 

Excise Duty (Cr.) 

VAT (Cr.) 

1  Alignment & Formation                

   Underground   888.94  60.94  54.45  30.63  146.02 

   Elevated & entry to Depot   71.17     6.23  3.50  9.73 

2  Station Buildings                

   a) Underground station‐civil works  812.28  55.69  49.75  27.99  133.43 

   b) Underground station‐EM works  420.00  28.79  31.24  17.57  77.60 

   c) Elevated station ‐ civil works  54.26     4.75  2.67  7.42 

   d) Elevated station‐EM works  8.88  0.41  0.75  0.42  1.59 

3  Depot                

   Civil works  0.00  0.00  0.00  0.00  0.00 

   EM works  0.00  0.00  0.00  0.00  0.00 

4  P‐Way  80.46  14.71  1.71  0.96  17.38 

5  Traction & power supply                

   a) Traction and power supply  181.08  16.55  11.54  6.49  34.59 

6  S and T Works                

   a) S & T  128.55  23.50  2.73  1.54  27.77 

   b) AFC, PSD,LED screens & CCHS  66.69  11.43  1.77  1.00  14.20 

7  Rolling stock  325.80  65.52  3.18  1.79  70.48 

8  R & R hutments  2.95        0.18  0.18 

9  Misc.                

Civil works  39.94     3.49  1.97  5.46 

   EM works  33.11     3.52  1.98  5.50 

10  Security                

   Civil works  2.43     0.21  0.15  0.36 

   EM works  0.54     0.07  0.05  0.12 

11  Staff Quarters & OCC Buildings                

   Civil works  11.76     1.03  0.08  1.10 

   EM works incl. green bldg. conept  9.87     1.23  0.88  2.12 

   Total  3138.72  277.55  177.66  99.85  555.06 

   Total Taxes & Duties              555 

 

 

 

 

 

Page 21: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐21 

 

13.2 OPERATION AND MAINTENANCE COST  

The Operation  and Maintenance  cost  for Varanasi MRTS Corridors  is worked under  three 

major heads: 

Staff cost  

Maintenance cost which  includes expenditure  towards upkeep and maintenance of  the 

system and consumables and  

Energy cost 

Staff Cost 

The O&M staff  is assumed to be provided @ 35 persons per kilometer and the annual cost 

this account is estimated considering average staff salary of Rs. 6.54 Lakhs per annum in the 

year 2016. The escalation factor used for staff costs is 9% per annum to provide for growth 

in salaries. The staff cost for the corridors of BHU to BHEL corridor and Beniabagh to Sarnath 

corridor is estimated to be Rs 81.18 crore and Rs 41.43 Crore respectively for the inception 

year i.e. 2023. 

 

Maintenance Expenses 

Maintenance expenses are taken @ Rs. 1.34 Crores/km in the year 2016. Maintenance cost 

for Varanasi Metro corridors would be Rs 43.25 Crores and Rs 22.07 crores for corridor 1 and 

corridor 2 respectively in the inception year i.e. 2023 considering escalation @ 7.5% p.a. for 

every year of operation.  

 

Energy Charges 

The energy consumption to meet the traction and non‐traction power requirement is based 

on  traffic demand  for different horizon years. The cost of electricity  is a significant part of 

O&M charges, constituting about 40‐50% of total annual working cost. The traction power 

tariff  is  taken @ Rs. 5.60 per kVAh and  fixed  charges@125/kVA/ month  in  the year 2015 

based  on UPPTCL  tariff  order  2015, which  is  escalated @  7.5%  every  year  of  operation. 

Annual energy consumption charges have been estimated as Rs. 133.79  crores in year 2023, 

Rs. 238.61 crores  in 2031, Rs 540.88 crores    in 2041, Rs. 1270.46 crores  in 2051 for BHU to 

BHEL corridor and Rs. 63.53 Crores  in year 2023, Rs. 113.31 crores  in 2031, Rs 262.09 crores 

in 2041, Rs. 599.87 crores in 2051 for Beniabagh to Sarnath. 

 

Additional Investment     

 To  cater  to  increased  traffic  demand,  additional  investment  will  have  to  be  made  for 

purchase of additional coaches. The additional investment in the year 2031 works out to Rs. 

Page 22: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐22 

131.55 Crores for purchase of 9 additional coaches for BHU to BHEL Corridor and Rs. 131.55 

Crores for 9 additional coaches for Beniabagh to Sarnath corridor in year 2031. 

An investment of Rs. 534.51 Crores  would be required for purchase of 30 additional coaches 

in the year 2041 (Rs 427.61 crores  for 24 additional coaches for BHU to BHEL Corridor and 

Rs 106.90 crores for 6 additional coaches for Beniabagh to Sarnath corridor) and Rs 586.41  

Crores  for  purchase  of  27  additional  coaches  in  the  year  2051  (Rs  390.94  crores  for  18  

coaches  for corridor 1 and Rs 195.47 crores    for 9 coaches  for corridor 2).These additional 

investments have been worked out considering an escalation factor of 2% per annum. 

 

Replacement Cost  

The  replacement  costs  are  provided  for meeting  the  cost  on  account  of  replacement  of 

equipments due to wear and tear.   With the nature of equipment proposed to be provided 

for the corridor, it is expected that about 25% of the equipment comprising Electrical, Rolling 

stock and 50% of Signalling & Telecom would  require  replacement/  rehabilitation after 20 

years.  

The replacement cost for the BHU to BHEL corridor works out to be   Rs. 2407.68 Crores and 

Rs  1225.73  Crores    for  Beniabagh  to  Sarnath  corridor.  The  replacement  cost  has  been 

worked out considering an escalation factor of 5% per annum.  

 

The year wise  total Operation and Maintenance cost  for  the corridors of Varanasi MRTS  is 

indicated in Table 13.9 and Table 13.10.  

.  

 

 

 

   

Page 23: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐23 

TABLE 13.9: O & M COST FOR BHU TO BHEL CORRIDOR (COST IN RS CRORE)  

Year 

Staff Cost Maintenance 

Expenses 

Energy 

Charges  Total O&M 

cost 

Addition/ 

Replace ‐  

ment Cost 

(Cr.) Esc @9%  Esc @7.5%  Esc @7.5% 

2023  81.18  43.25  133.79  258.22    

2024  88.48  46.49  143.83  278.80    

2025  96.45  49.98  154.61  301.04    

2026  105.13  53.73  166.21  325.06    

2027  114.59  57.76  178.67  351.02    

2028  124.90  62.09  192.08  379.07    

2029  136.14  66.75  206.48  409.37    

2030  148.39  71.75  221.97  442.11      

2031  161.75  77.13  238.61  477.50  131.55  Addition of 9 coaches 

2032  176.31  82.92  282.11  541.34 

2033  192.18  89.14  303.27  584.59        

2034  209.47  95.82  326.02  631.31      

2035  228.32  103.01  350.47  681.80      

2036  248.87  110.74  376.75  736.36      

2037  271.27  119.04  405.01  795.32      

2038  295.69  127.97  435.39  859.04    

2039  322.30  137.57  468.04  927.91    

2040  351.30  147.88  503.14  1,002.33    

2041  382.92  158.98  540.88  1082.78  427.61   Addition of 24 coaches  

2042  417.38  170.90  662.65  1250.93 

2043  454.95  183.72  712.35  1351.01  2,407.68  Replacement of 25% of 

Elec. & 50% S&T assets  2044  495.89  197.50  765.77  1459.16    

2045  540.53  212.31  823.21  1576.04                                  

2046  589.17  228.23  884.95  1702.35    

2047  642.20  245.35  951.32  1838.87    

2048  700.00  263.75  1022.67  1986.41      

2049  763.00  283.53  1099.37  2145.89      

2050  831.67  304.80  1181.82  2318.28      

2051  906.51  327.65  1270.46  2504.63  390.94  Addition of 18 coaches 

2052  988.10  352.23  1521.80  2862.13 

2053  1,077.03  378.65  1635.94  3091.61        

2054  1,173.96  407.04  1758.63  3339.64    

2055  1,279.62  437.57  1890.53  3607.72    

2056  1,394.79  470.39  2032.32  3897.49    

2057  1,520.32  505.67  2184.74  4210.73    

2058  1,657.14  543.60  2348.60  4549.34 

 

Page 24: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐24 

TABLE 13.10: O & M COST FOR BENIA BAGH TO SARNATH CORRIDOR (COST IN RS CRORE) 

 

Year 

Staff Cost Maintenance 

Expenses 

Energy 

Charges  Total O&M 

cost 

Addition/ 

Replace ‐  

ment Cost 

(Cr.) Esc @9%  Esc @7.5%  Esc @7.5% 

2023  41.43  22.07  63.53  127.03    

2024  45.15  23.73  68.30  137.18    

2025  49.22  25.51  73.42  148.14    

2026  53.65  27.42  78.92  159.99    

2027  58.48  29.47  84.84  172.79    

2028  63.74  31.69  91.21  186.63    

2029  69.47  34.06  98.05  201.58    

2030  75.73  36.62  105.40  217.74      

2031  82.54  39.36  113.31  235.21  131.55  Addition of 9 coaches 

2032  89.97  42.31  136.70  268.99 

2033  98.07  45.49  146.96  290.51        

2034  106.90  48.90  157.98  313.77      

2035  116.52  52.57  169.83  338.91      

2036  127.00  56.51  182.56  366.07    

2037  138.43  60.75  196.25  395.43      

2038  150.89  65.30  210.97  427.17    

2039  164.47  70.20  226.80  461.47    

2040  179.27  75.47  243.81  498.55    

2041  195.41  81.13  262.09  538.63  106.90   Addition of 6 coaches  

2042  213.00  87.21  312.88  613.09 

2043  232.16  93.75  336.35  662.26  1,225.73  Replacement of 25% of 

Elec. & 50% S&T assets 2044  253.06  100.78  361.57  715.42    

2045  275.84  108.34  388.69  772.87                               

2046  300.66  116.47  417.84  834.97    

2047  327.72  125.20  449.18  902.10    

2048  357.21  134.59  482.87  974.68      

2049  389.36  144.69  519.09  1053.14    

2050  424.41  155.54  558.02  1137.96      

2051  462.60  167.21  599.87  1229.68  195.47  Addition of 9 coaches 

2052  504.24  179.75  720.80  1404.78 

2053  549.62  193.23  774.86  1517.71        

2054  599.08  207.72  832.98  1639.78    

2055  653.00  223.30  895.45  1771.75    

2056  711.77  240.04  962.61  1914.42    

2057  775.83  258.05  1034.80  2068.68    

2058  845.66  277.40  1112.41  2235.47 

Page 25: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐25 

13.3 ECONOMIC ANALYSIS  

13.3.1 Approach  

The economic appraisal has been carried out within  the broad  framework of Social Cost – 

Benefit Analysis Technique.  It  is based on  the  incremental costs and benefits and  involves 

comparison of project costs and benefits in economic terms under the “with” and “without” 

project  scenario.  In  the  analysis,  the  cost  and  benefit  streams  arising  under  the  above 

project scenarios have been estimated in terms of market prices and economic values have 

been  computed by  converting  the  former using appropriate  shadow prices. This has been 

done to  iron out distortions due to externalities and anomalies arising  in real world pricing 

systems.  The  annual  streams  of  project  costs  and  benefit  have  been  compared  over  the 

analysis period of 40 years to estimate the net cost / benefit and to calculate the economic 

viability of the project in terms of EIRR.  

 

The  Economic  Internal  Rate  of Return  (EIRR)  for  the  project  has  then  been  arrived  using 

Discounted Cash Flow technique to the net benefit stream at economic prices.   

 

13.3.2 Evaluation Assumptions 

The key assumptions used in the evaluation are listed in Table 13.11. 

 

TABLE 13.11: KEY EVALUATION ASSUMPTIONS 

Parameter  Assumption 

Price Level  January ’2016 

Construction period   2017‐2023 

First year of operation of MRTS  2023 

Daily to annual factor  340  

 

13.3.3 Estimation of Benefits 

The Varanasi MRTS will yield tangible and non‐tangible savings due to equivalent reduction 

in road traffic and certain socio‐economic benefits.   The Introduction of MRTS will result  in 

reduction in number of mini buses, IPT, usage of private vehicles, air pollution and increase 

in the speed of road‐based vehicles. This, in turn, will result in significant social benefits due 

to  reduction  in  fuel  consumption,  vehicle  operating  cost  and  travel  time  of  passengers. 

Reduction  in accidents, pollution and road maintenance costs are the other benefits to the 

society in general. 

The benefit stream includes: 

Capital  and  operating  cost  (on  present  congestion  norms)  of  carrying  the  total 

volume of passenger traffic by existing mini bus and IPT system and private vehicles 

in case MRTS project is not taken up. 

Page 26: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐26 

Savings in operating costs of mini buses, IPT and other vehicles due to de‐congestion 

including those that would continue to use the existing transport network even after 

the MRTS is introduced. 

Savings  in  time  of  commuters  using  the MRTS  over  the  existing  transport modes 

because of faster speed of MRTS. 

Savings  in  time  of  those  passengers  continuing  on  existing  modes,  because  of 

reduced congestion on roads. 

Savings  on  account  of  prevention  of  accidents  and  pollution with  introduction  of 

MRTS. 

Savings  in  road  infrastructure  and  development  costs  that would  be  required  to 

cater to increase in traffic, in case MRTS is not introduced. 

Savings  in  fuel  consumption  on  account  of  less  number  of  vehicles  on  road  and 

decongestion  effect  with  introduction  of MRTS  are  included  in  those  of  vehicle 

operating cost. 

Various assumptions have been made, while assessing the economic benefits to the society 

with the introduction of MRTS system. Table 13.12 gives the assumptions made for VOC and 

VOT.  

 

TABLE 13.12: ASSUMPTIONS FOR VOC & VOT 

Mode VOC*  Rs /km Value of Travel Time**Passenger/ Hr 

Car  7.78 77

2w  3.38 36

Auto  5.84 36

Bus  18.65 58

             *Source IRC SP 30 (2009) Values brought to 2015 level using factor of 5% 

 

The  Quantification  of  some  of  the  social  benefits  has  not  been  attempted  because 

universally  acceptable norms do not  exist  to  facilitate  such  an  exercise.   However,  it has 

been considered appropriate to highlight the same, as given below: 

Reduced road stress 

Better accessibility to facilities in the influence area 

Economic stimulation in the micro region of the infrastructure 

Increased business opportunities  

Overall increased mobility 

Facilitating better planning and up‐gradation of influence area 

Improving the image of the city 

 

Page 27: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐27 

13.3.4 Transport Demand on MRT Corridor Phase‐I 

At present Phase‐1 MRTS corridors are served by mini buses and  IPT modes  in addition  to 

private  vehicles.  The  total  transport  demand  and  demand  estimated  on  Phase‐1  MRTS 

corridors for various years is given in Table 13.13.  

TABLE 13.13: TRANSPORT DEMAND FORECAST ON PHASE‐I MRTS CORRIDORS 

Item  2021  2031  2041 

Daily Total Trips (Lakh)  21.72  28.11  33.76 

Daily Trips on  MRT Corridors (Lakh)  5.09  6.72  9.15 

Daily Trips by other modes (Lakh)  16.64  21.39  24.61 

 

13.3.5 Savings 

i. Capital and Operating Cost 

The  traffic on MRTS will  come due  to  shifting of  traffic  from mini buses,  IPT  and private 

modes once a more efficient system is available.  The major shifting of traffic would be from 

private vehicles. It has been estimated that 956 buses will be saved with the introduction of 

MRTS. This will save Rs. 212 Crore in the year 2023 towards capital and operating cost of bus 

system.    The  saving  in  respect of private  vehicles  and  IPT modes will be  approx. Rs.  147 

Crore. 

 

ii. Traffic Congestion 

MRT will contribute towards reducing the congestion and journey time on roads because of 

diversion of  some  traffic  to MRTS. Reduction  in  traffic  congestion will  save  the necessary 

capital  investment and vehicle operating cost as well as  increase  in time saved per vehicle. 

With  the  implementation of MRTS,  the  savings  from operating  costs due  to decongestion 

effect has been estimated to be Rs. 32 Crore  in the year 2023. 

 

iii. Passenger Time Savings 

With the introduction of proposed MRTS, there will be reduction in traffic congestion on the 

roads and correspondingly, there will be saving  in time of commuters travelling by various 

modes  of  road  transport.    Similarly,  MRTS  itself  being  faster  than  conventional  road 

transport modes will  also  lead  to  considerable  saving  in  time  of  commuters  traveling  on 

MRTS. With the implementation of the project, the passenger time savings are estimated at 

Rs. 753  Crore for the year 2023. 

 

iv. Safety 

The reduction in traffic volumes on roads brought about by modal transfer to the proposed 

MRTS is expected to reduce number of accidents.  Any reduction in number of accidents will 

involve  savings  from  damage  to  vehicles  and  savings  towards  medical  and  insurance 

expenses to persons involved in accidents. In the absence of data related to accidents on the 

corridor, this benefit could not be quantified. 

 

 

 

Page 28: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐28 

v. Reduced Air Pollution 

The  benefits  because  of  saving  in  cost  of  prevention  of  vehicular  pollution,  with  the 

implementation of Varanasi Metro in the year 2023 are expected to be approx Rs. 28 Crore. 

 

vi. Savings in Road Infrastructure 

The  proposed MRT  corridor  will  also  bring  savings  in  investment  in  road  infrastructure 

because shifting of passengers to MRT and withdrawal of vehicles in the project area.  Since 

no local data is available concerning the road infrastructure investment on this account, this 

saving has not been incorporated into economic evaluation. 

 

13.3.6 Shadow Pricing 

The value of Project cost and benefits have been expressed in terms of market prices. These 

prices, however, do not reflect the real resource cost and value of benefits derived from the 

project  to  the  economy.  The market prices  are distorted due  to  variety of  factors.  These 

factors could be controlled/administered prices of inputs, monopolistic market of inputs, tax 

structure etc. The factors used for converting project  inputs and output to economic costs 

are given in following Table 13.14. 

TABLE 13.14: FACTORS USED FOR CONVERTING PROJECT INPUTS AND OUTPUT TO 

ECONOMIC COSTS 

S. No  Item Factor 

1  Capital Cost  0.85 

2  Operations & Maintenance Cost 0.80 

3  Savings in Capital & Operating Cost of Buses 0.89 

4  Savings in Capital & Operating cost of Private Vehicles 0.8 

5  Savings in Passenger Time 1.0 

6  Savings in VOC  1.0 

7  Savings in Accident Costs 1.0 

8  Savings in  Pollution Costs 1.0 

 

13.3.7 Result of Economic Analysis 

The cost and benefit streams for 35 year period  in the economic prices have been worked 

out and presented in Table 13.15.  

 

The residual value of MRTS facilities (e.g. Metro corridors, equipment for power supply and 

tele‐communication,  rolling  stock,  etc.)  in  last  year  has  not  been  taken  into  account  as 

benefit in these tables.  

 

The total cost worked out on the above basis  is then subtracted from the total benefits to 

estimate  the  net  benefit  of  the  project.  This  flow  is  then  subjected  to  the  process  of 

discounting to work out the internal rate of return on the project, to examine the viability of 

the  project  in  economic  terms.  Thereafter,  the  Project  EIRR  has  been  arrived  by  using 

shadow prices.  

The EIRR of the project works out to 14.95 %.  

Page 29: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐29 

TABLE 13.15: COST BENEFIT STREAM: ECONOMIC PRICES 

                                Rs. in Crore 

Year  Capital 

RunningExpense of MRTS 

Total Costs 

Savings Buses 

FromOthers Vehicles 

Savings From Total Savings 

Net CashFlow 

Rs. in Cr. Time  VOC  POL 

2017‐18  702 0 702 0 0 0 0 0 0 -702

2018‐19  1277 0 1277 0 0 0 0 0 0 -1277

2019‐20  1734 0 1734 0 0 0 0 0 0 -1734

2020‐21  1864 0 1864 0 0 0 0 0 0 -1864

2021‐22  2671 0 2671 0 0 0 0 0 0 -2671

2022‐23  3590 308 3898 189 117 753 32 28 1119 -2779

2023‐24  1544 333 1876 209 130 833 35 31 1237 -639

2024‐25  0 359 359 231 143 921 39 34 1367 1008

2025‐26  0 388 388 255 158 1017 43 38 1511 1123

2026‐27  0 419 419 282 175 1125 47 42 1671 1252

2027‐28  0 453 453 312 193 1243 52 46 1847 1394

2028‐29  0 489 489 345 214 1374 58 51 2041 1552

2029‐30  0 528 528 381 236 1519 64 56 2256 1728

2030‐31  0 570 570 513 324 2051 59 63 3010 2440

2031‐32  0 648 648 567 358 2267 65 70 3328 2679

2032‐33  0 700 700 627 395 2506 72 77 3678 2978

2033‐34  0 756 756 693 437 2770 80 85 4065 3309

2034‐35  0 817 817 766 483 3062 88 94 4494 3677

2035‐36  0 882 882 847 534 3384 98 104 4967 4085

2036‐37  0 953 953 936 590 3740 108 115 5490 4537

2037‐38  0 1029 1029 1035 652 4134 119 128 6068 5039

2038‐39  0 1112 1112 1144 721 4570 132 141 6707 5596

2039‐40  0 1201 1201 1264 797 5051 146 156 7414 6213

2040‐41  454 1297 1751 1455 864 5750 418 173 8660 6908

2041‐42  0 1491 1491 1608 955 6356 462 192 9572 8080

Page 30: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐30 

Year  Capital 

RunningExpense of MRTS 

Total Costs 

Savings Buses 

FromOthers Vehicles 

Savings From Total Savings 

Net CashFlow 

Rs. in Cr. Time  VOC  POL 

2042‐43  3088 1611 4699 1777 1055 7025 510 212 10580 5881

2043‐44  0 1740 1740 1498 890 5923 430 179 8919 7180

2044‐45  0 1879 1879 1528 907 6041 439 182 9098 7219

2045‐46  0 2030 2030 1559 926 6162 447 186 9280 7250

2046‐47  0 2193 2193 1590 944 6285 456 190 9465 7273

2047‐48  0 2369 2369 1622 963 6411 466 193 9655 7286

2048‐49  0 2559 2559 1654 982 6539 475 197 9848 7288

2049‐50  0 2765 2765 1687 1002 6670 484 201 10045 7280

2050‐51  498 2987 3486 1721 1022 6803 494 205 10246 6760

2051‐52  0 3414 3414 1756 1042 6939 504 209 10450 7037

2052‐53  0 3687 3687 1791 1063 7078 514 213 10659 6972

2053‐54  0 3984 3984 1826 1084 7220 524 218 10873 6889

2054‐55  0 4304 4304 1863 1106 7364 535 222 11090 6787

2055‐56  0 4650 4650 1900 1128 7511 545 227 11312 6662

2056‐57  0 5024 5024 1938 1151 7662 556 231 11538 6515

0 5428 5428 1977 1174 7815 568 236 11769 6341

IRR 14.95%

 

 

 

Page 31: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐31 

13.3.8 Sensitivity Analysis 

A  sensitivity  analysis  of  the  EIRR  with  10%  cost  overrun  and  10%  reduction  in  traffic 

materialization (separately) has been carried out. The EIRRs under these scenarios are given 

in Table 13.16. 

TABLE 13.16: PROJECT EIRR – SENSITIVITY ANALYSIS 

                Sensitivity Parameter  EIRR (%) 

Basic EIRR  14.95 

With increase in cost by 10%  14.14 

With reduction in traffic materialization by 10%  14.20 

With 10% reduction in traffic and increase in cost by 10%  13.42 

With increase in cost by 20%  13.43 

 

It can be seen from the above table that 10% increase in cost affects economic viability more 

than  it does  in case of  reduction  in  traffic  for  the project. Accordingly,  it  is  recommended 

that controls should be exercised to keep the project cost under control. 

 

13.4 FINANCIAL ANALYSIS 

The  financial analysis has been carried out  individual corridors and also  for  the  two MRTS 

corridors combined. Accordingly, the capital costs and O&M costs for the two corridors have 

been added to arrive at the total capital and O& M costs.   

 

13.4.1 Capital Cost Estimates 

The Construction cost of  the metro corridors at  Jan’ 2016 prices  is estimated at Rs. 10946 

Crore. The cost of land is estimated at Rs. 475 Crore including Rs. 441 Crore for private land 

and the cost of government land has been estimated at Rs 35 Crore. The total cost of project 

including land cost is estimated at Rs. 11,421 Crore.  

 

The Central and State taxes and duties (Customs, Excise and VAT) amount to Rs. 1712Crore. 

The capital cost components at Jan '16 prices are given in Table 13.17.  

TABLE 13.17: CAPITAL COSTS (Rs. in Crore) 

Cost Component  Corridor I Corridor II Total

Construction Cost Including land  7836  3585 11421

Land Cost  438  37  475

Private land 419  22 441

Govt land 20  15 35

Construction Cost excluding  land  7398 3548 10946 

Taxes  1157  555  1712

        Central Taxes 950  455 1405

  State Taxes 207  100 307

Total Cost with  Land & Taxes   8993  4140  13133 

Total Cost with Central Taxes only  8786  4040  12826 

Page 32: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐32 

13.4.2 Completion Cost 

With  escalation  factor of 7.5 % p.a.,  the Completion Cost of  the project  including  land  is 

estimated to be Rs. 15,743 Crore  and  with central taxes  it is estimated at Rs 17,702 Crore. 

For financial analysis both govt and private land costs have been considered as acquisition of 

govt  land  will  also  require  payouts.  The  land  cost  has  not  been  escalated  since  land 

acquisition  would  be  completed  in  the  initial  two  years.  It  is  proposed  to  start  land 

acquisition and  construction work prior  to Year 2017 and  commission  the  system by Year 

2023. The details of completion cost under different scenarios are as per Table 13.18. 

TABLE 13.18: DETAILS OF COMPLETION COSTS (Rs in Crore) 

Particulars  Completion Cost  

 Cost  without taxes   15,743

With Central Taxes   17,702

With both Central and State taxes 18,130

 

13.4.3 Requirement of Funds     

The year wise requirement of funds under different scenarios has been given in Table 13.19 

(Without any Taxes),  in Table 13.20  (With Central and State Taxes) and Table 13.21  (With 

Central  Taxes  only).  The  cost  of  land  is  divided  into  two  initial  years  during which  it  is 

expected  that  the  land  acquisition work would  be  over  and  related  payments would  be 

released. 

TABLE 13.19: YEAR WISE FUND REQUIREMENTS WITHOUT TAXES (Rs. in Crore) 

YEAR  COMPLETION  COST LAND   COST TOTAL COMPLETION COST 

2017‐2018  588  238 826 

2018‐2019  1,265 238 1,503 

2019‐2020  2,040 2,040 

2020‐2021  2,193 2,193 

2021‐2022  3,143 3,143 

2022‐2023  4,223 4,223 

2023‐2024  1,816 1,816 

Total  15267 475 15743 

     

 

TABLE 13.20: YEAR WISE FUND REQUIREMENTS WITH TAXES (Rs in Crore) 

Year  Completion  Cost  Land   Cost  Taxes  Total Completion Cost 

2017‐2018  588  238  92  918 

2018‐2019  1265  238 198 1700 

2019‐2020  2040  319 2359 

2020‐2021  2193  343 2536 

2021‐2022  3143  492 3634 

2022‐2023  4223  660 4884 

2023‐2024  1816  284 2100 

Total  15267  475 2388 18130

 

Page 33: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐33 

TABLE 13. 21: YEAR WISE FUND REQUIREMENTS WITH CENTRAL TAXES (Rs in Crore)      

Year  Completion  Cost  Land   Cost Taxes  Total Completion Cost 

2017‐2018  588 238 76 902

2018‐2019  1265 238 162 1665

2019‐2020  2040 262 2301

2020‐2021  2193 281 2474

2021‐2022  3143 403 3546

2022‐2023  4223 542 4765

2023‐2024  1816 233 2049

Total  15267 475 1959 17702

 

13.4.4 Additional Investment 

To  cater  to  increased  traffic  demand,  investment will  have  to  be made  for  purchase  of 

additional  coaches  and  augmentation  of maintenance  infrastructure.  The  total  additional 

investment for additional Rolling Stock and related equipment to take care of the increased 

traffic will be Rs. 263 Crore  in  the Years 2031 and Rs. 535 Crore  in Year 2041 and Rs 586 

Crore would be required in the year 2051.  

 

13.4.5 Operation & Maintenance Costs 

The details of O&M costs are given at Para 10.2 of this Chapter. The total O&M cost  in the 

year 2023 is estimated at Rs. 385 Crore. The total O&M cost in the year 2031is estimated at 

Rs. 713 Crore.  

 13.4.6 Replacement Cost 

The  replacement  costs  are  provided  for meeting  the  cost  on  account  of  replacement  of 

equipments due to wear and tear.  The replacement cost for the corridors is estimated to be 

Rs. 3633 Crore in the year 2043. The year wise O&M cost and additional investments for two 

MRTS corridors are presented in Table 13.22.  

TABLE 13.22: OPERATION AND MAINTENANCE COSTS (Rs in Crore) 

Year Staff Cost 

(A) 

Maintenance Expenses 

(B) 

Energy Charges 

(C) 

Total O&M Cost 

(A+B+C) 

Additional Rolling Stock / Replacement Cost 

2023 123  65  197  385  0 

2024 134  70  212  416  0 

2025 146  75  228  449  0 

2026 159  81  245  485  0 

2027 173  87  264  524  0 

2028 189  94  283  566  0 

2029 206  101  305  611  0 

2030 224  108  327  660  0 

2031 244  116  352  713  263 

Page 34: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐34 

 

13.4.7 Revenues 

i. Projected Traffic Demand 

The  ridership  on  the  proposed  Varanasi metro  system  has  been  estimated  at  5.09  Lakh 

passenger trips per day in the year 2021 which will materialise by 2023 when MRTS comes in 

operation.  The ridership figures for key horizon years are given in Table 13.23.  After 2041, 

the traffic has been assumed to grow @ of 3% per annum. 

 

TABLE 13.23: EXPECTED RIDERSHIP ON PHASE‐I MRTS CORRIDORS IN HORIZON YEARS 

  PASSENGER TRIPS PER DAY (Lakh)

Year  CORRIDOR 1 CORRIDOR 2 TOTAL

2022  3.18 1.91 5.09

2032  4.20 2.52 6.72

2042  5.97 3.18 9.15

 

2032 266  125  419  810  0 

2033 290  135  450  875  0 

2034 316  145  484  945  0 

2035 345  156  520  1021  0 

2036 376  167  559  1102  0 

2037 410  180  601  1191  0 

2038 447  193  646  1286  0 

2039 487  208  695  1389  0 

2040 531  223  747  1501  0 

2041 578  240  803  1621  535 

2042 630  258  976  1864  0 

2043 687  277  1049  2013  3633 

2044 749  298  1127  2175  0 

2045 816  321  1212  2349  0 

2046 890  345  1303  2537  0 

2047 970  371  1401  2741  0 

2048 1057  398  1506  2961  0 

2049 1152  428  1618  3199  0 

2050 1256  460  1740  3456  0 

2051 1369  495  1870  3734  586 

2052 1492  532  2243  4267  0 

2053 1627  572  2411  4609  0 

2054 1773  615  2592  4979  0 

2055 1933  661  2786  5379  0 

2056 2107  710  2995  5812  0 

2057 2296  764  3220  6279  0 

2058 2503  821  3461  6785  0 

Page 35: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐35 

ii. Trip Length Distribution 

The trip length distribution has been taken on the basis of the available details on land use, 

corridor  composition  and  existing  traffic  characteristics  in  the  catchment  areas of  various 

sections of the corridor.  Average trip length on the corridor is about 7.7 km. The trip length 

distribution is given in Table 13.24 and Figure 13.1. 

 

TABLE 13.24: TRIP LENGTH DISTRIBUTION 

Trip Length (Km)  % Distribution 

0‐2  10.3%

2‐4  11.2%

4‐6  19.0%

06 – 09   22.0%

09 – 12  21.8%

12 – 15   9.0%

15 – 18  4.4%

18 – 21   1.0%

21 – 24   1.0%

>24   0.3%

Total   100% 

    

FIGURE 13.1: EXPECTED TRIP DISTRIBUTION ON THE PROPOSED METRO CORRIDOR 

 

 

iii. Fare Structure 

LMRC has proposed a fare structure for Lucknow Metro for the year 2018 with the increase 

by 10 % every 2nd year (Table 13.25). Same fare structure is being proposed to be adopted 

for Varanasi Metro also. 

 

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

0‐2 2‐4 4‐6 06 –09 

09 –12

12 –15 

15 –18

18 –21 

21 –24 

>24

Series1

Trip length Distribution 

Page 36: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐36 

TABLE 13.25: MRTS FARE STRUCTURE FOR VARANASI METRO 

Year Distance Slab (in Km) 

0‐2  2‐4  4‐6  6‐9  9‐12  12‐15  15‐18  18‐21  21‐24  >24 

2018  12  15  18  23  25  28  29  32  34  35 

2019  12  15  18  23  25  28  29  32  34  35 

2020  13  17  20  25  28  31  32  35  37  39 

2021  13  17  20  25  28  31  32  35  37  39 

2022  15  18  22  28  30  34  35  39  41  42 

2023  15  18  22  28  30  34  35  39  41  42 

2024  16  20  24  31  33  37  39  43  45  47 

2025  16  20  24  31  33  37  39  43  45  47 

2026  18  22  26  34  37  41  42  47  50  51 

2027  18  22  26  34  37  41  42  47  50  51 

2028  19  24  29  37  40  45  47  52  55  56 

2029  19  24  29  37  40  45  47  52  55  56 

2030  21  27  32  41  44  50  51  57  60  62 

2031  21  27  32  41  44  50  51  57  60  62 

2032  23  29  35  45  49  55  57  62  66  68 

2033  23  29  35  45  49  55  57  62  66  68 

2034  26  32  39  49  54  60  62  69  73  75 

2035  26  32  39  49  54  60  62  69  73  75 

2036  28  35  42  54  59  66  68  75  80  83 

2037  28  35  42  54  59  66  68  75  80  83 

2038  31  39  47  60  65  73  75  83  88  91 

2039  31  39  47  60  65  73  75  83  88  91 

2040  34  43  51  66  71  80  83  91  97  100 

2041  34  43  51  66  71  80  83  91  97  100 

2042  38  47  56  72  78  88  91  100  107  110 

2043  38  47  56  72  78  88  91  100  107  110 

2044  41  52  62  79  86  97  100  110  117  121 

2045  41  52  62  79  86  97  100  110  117  121 

2046  46  57  68  87  95  106  110  122  129  133 

2047  46  57  68  87  95  106  110  122  129  133 

2048  50  63  75  96  104  117  121  134  142  146 

2049  50  63  75  96  104  117  121  134  142  146 

2050  55  69  83  106  115  129  133  147  156  161 

2051  55  69  83  106  115  129  133  147  156  161 

2052  61  76  91  116  126  142  147  162  172  177 

2053  61  76  91  116  126  142  147  162  172  177 

2054  67  83  100  128  139  156  161  178  189  195 

2055  67  83  100  128  139  156  161  178  189  195 

 

Page 37: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐37 

iv. Other sources of revenues 

Other  sources  of  revenues  considered  are  the  advertisement  and  limited  property 

development within the stations. It is possible to raise resources through leasing of parking 

rights at  stations, advertisement on  trains and  tickets, advertisements within  stations and 

parking  lots,  advertisements on other metro  structures,  co‐branding  rights  to  corporates, 

film  shootings  and  special  events on metro premises.  There  could  also be  some  revenue 

from  small  kiosks  at  the  stations  including  those  for  soft  drinks,  tea  coffee,  telecom 

companies and bank ATM’s. This has been estimated at 10% of the fare box revenues during 

operations. 

 

13.4.8 Financial Internal Rate of Return  

The   project FIRR with the project costs  including only Central taxes and projected revenue 

has been worked out.    Further,  the  security  to Varanasi Metro may be provided  through 

CISF. Though the security cost is included in the Financial analysis, this may be borne by the 

Government, thereby improving the FIRR to that extent. 

 

 

 Project FIRR  for both the corridors combined works out  to  ‐0.32%.   To make  the project 

viable as per MOUD norms, additional sources of  revenue would be  required  to bring  the 

project FIRR >8%. The FIRR calculations are presented in Tables 13.26. 

 

 

 

 

 

 

 

Page 38: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐38 

 

TABLE 13.26: PROJECT FIRR  ‐ COSTS WITH  CENTRAL TAXES WITHOUT PROPERTY DEVELOPMENT ( BOTH CORRIDORS)              

 (Rs in Crore) 

Year  Completion 

Cost Land Cost 

Total   Taxes 

 Total Completion Cost 

Fare Box Revenue 

Revenue from Adv & PD 

Gross Revenue  O&M Cost 

Additional  Capital 

 Operational Surplus 

2017‐18  588 238 76 902 0.00 0.00 0 -902

2018‐19  1265 238 162 1665 0.00 0.00 0 -1665

2019‐20  2040 262 2301 0.00 0.00 0 -2301

2020‐21  2193 281 2474 0.00 0.00 0 -2474

2021‐22  3143 403 3546 0.00 0.00 0 -3546

2022‐23  4223 542 4765 0.00 0.00 0 0 -4765

2023‐24  1816 233 2049 513 51 565 385 0 -1869

2024‐25  528 53 581 416 0 165

2025‐26  597 60 657 449 0 208

2026‐27  614 61 675 485 0 190

2027‐28  694 69 764 524 0 240

2028‐29  714 71 785 566 0 220

2029‐30  808 81 888 611 0 277

2030‐31  878 88 966 660 263 43

2031‐32  993 99 1092 713 0 379

2032‐33  1021 102 1123 810 0 313

2033‐34  1155 115 1270 875 0 395

2034‐35  1187 119 1306 945 0 361

2035‐36  1343 134 1477 1021 0 456

2036‐37  1381 138 1519 1102 0 416

2037‐38  1562 156 1718 1191 0 527

2038‐39  1606 161 1766 1286 0 480

2039‐40  1816 182 1998 1389 0 608

2040‐41  1924 192 2116 1501 535 81

2041‐42  2183 218 2401 1621 0 779

2042‐43  2116 212 2328 1864 3633 -3170

2043‐44  2398 240 2638 2013 0 624

Page 39: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐39 

Year  Completion 

Cost Land Cost 

Total   Taxes 

 Total Completion Cost 

Fare Box Revenue 

Revenue from Adv & PD 

Gross Revenue  O&M Cost 

Additional  Capital 

 Operational Surplus 

2044‐45  2470 247 2717 2175 0 542

2045‐46  2798 280 3078 2349 0 729

2046‐47  2882 288 3170 2537 0 633

2047‐48  3265 327 3592 2741 0 851

2048‐49  3363 336 3700 2961 0 739

2049‐50  3811 381 4192 3199 0 993

2050‐51  3925 393 4318 3456 586 275

2051‐52  4447 445 4892 3734 0 1157

2052‐53  4580 458 5039 4267 0 772

2053‐54  5190 519 5709 4609 0 1099

2054‐55  5345 535 5880 4979 0 900

2055‐56  6056 606 6662 5379 0 1282

2056‐57  6238 624 6862 5812 0 1050

2057‐58  7068 707 7774 6279 0 1495

2058‐59  7280 728 8008 6785 0 1223

  15267 475 1959 17702 94748 9475 104223 81692 5017 -1411

  IRR -0.32%

 

 

 

 

 

 

 

 

 

 

Page 40: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐40 

a) Value Capture from Real Estate  

To make  the  project  financially  viable,    value  capture  from  real  estate  has  been 

explored. With  the  construction  of metro,  the  cost  of  property/  land  along  the 

corridor  increases manifolds due  to  improved  connectivity. Varanasi Development 

Authority may decide to capture the value of real estate along the corridor to fund 

the project. 

 

UP government vide  letter no 03/8‐3‐15‐198 vividh/14 dated 4th March has  issued 

guidelines for development along the transit corridors.   As per these guidelines 60% 

of  the  total area available with FAR 4  for property development  shall be used  for 

commercial  activity  development  and  balance  40%  shall  be  used  for  residential 

activity development.   

Estimation  of  revenue  generated  from  Value  capture  is  based  on  following 

assumptions: 

1. SPV will engage a developer for generating rental  income. The developer will bring 

equity of 25% and  balance amount shall be raised by SPV as market debt.  

2. The  Development  shall  include  both  residential  and  commercial  properties. 

Residential properties will be  for outright  sale whereas commercial properties will 

be given on rental basis. 

3. For  estimating  revenue  from  property  development,  rental  and  sale  rates  for 

commercial and residential properties have been worked  out based on Circle Rates 

of Varanasi.  The rates assumed are Rs 30000/ sq mt for outright sale of residential 

properties and Rs.400 /sq mt/ month as the rental rates for commercial properties. 

4. Return to the developer: 14% 

5.  Lease rental  rate would increase @ 5% every  year. 

6. The rate of interest for market debt will be 12%. 

 

Possibility  of  property  development  along  the  MRTS  corridors  was  explored  with  city 

authorities    in detail.   Total 5  locations with plot area of 3.4 hectares have been  identified 

along  the  corridors  for  property  development. As  per GoUP  guidelines  on  TOD,  property 

development  @  4  FAR  has  been  assumed  at  these  locations.  Moreover,  property 

development over MRTS depot( on 12 hectares out of  total of 15 Hectares of land )  has also 

been  assumed @ 3  FAR.     Total of 4.97  Lakh  Sq meters of  space has been  identified  for 

property  development.  Based  on  above  assumptions,    the  total  cost  of  the  property 

development will be Rs 1127 Crore. The developer will bring equity of Rs 282 Crore  (25%) 

and balance Rs 845 Crore ( 75%) would be raised  from market. the rental income will accrue 

from the year 2023‐2024 which has been escalated @5% every year. Out of the estimated 

rental income, the developer will bear the maintenance expenditure, will repay the loan and 

interest. after meeting these obligations and retaining 14% return on his equity  the residual 

rental earning will accrue to SPV. Escalation of 5% has been assumed on these calculations.  

These earnings  from PD have been  taken  into account  in FIRR  calculations. The details of 

income from property development is given in Table 13.27. 

Page 41: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐41 

TABLE 13.27: ESTIMATED RENTAL INCOME FROM PROPERTY DEVELOPMENT (Rs. in Crore) 

Year Construction Costs 

Rental Income 

O&M  Debt  IDC Total Loan 

Payment 

Loan  Repayment 

Balance Loan 

Amount 

Interest 

Return @ 14%

Residual Income to 

SPV 

17  ‐  18  166        124 124    ‐47 

18  ‐  19  174        130 15 145    ‐47 

19  ‐  20  183        137 31 168    ‐47 

20  ‐  21  192        144 47 191    ‐47 

21  ‐  22  201        151 64 215    ‐47 

22  ‐  23  211  159 82 241 ‐47 

23  ‐  24     652 65    101 101 119 1067 12  39  417

24  ‐  25     663 66     119 949 128  41  308

25  ‐  26     233 23     119 830 114  43  ‐66

26  ‐  27     245 24     119 711 100  46  ‐43

27  ‐  28     257 26     119 593 85  48  ‐21

28  ‐  29     270 27     119 474 71  50  3

29  ‐  30     283 28     119 356 57  53  27

30  ‐  31     298 30     119 237 43  55  51

31  ‐  32     312 31     119 119 28  58  76

32  ‐  33     328 33     119 0 14  61  101

33  ‐  34     344 34        64  246

34  ‐  35     362 36        67  258

35  ‐  36     380 38        71  271

36  ‐  37     399 40        74  285

37  ‐  38     419 42        78  299

38  ‐  39     440 44        82  314

39  ‐  40     462 46        86  329

40  ‐  41     485 48        90  346

41  ‐  42     509 51        95  363

42  ‐  43     534 53        100  381

43  ‐  44     561 56        105  400

44  ‐  45     589 59        110  420

45  ‐  46     619 62        115  441

46  ‐  47     650 65        121  463

47  ‐  48     682 68        127  487

48  ‐  49     716 72        134  511

49  ‐  50     752 75        140  537

50  ‐  51     790 79        147  563

51  ‐  52     829 83        155  592

52  ‐  53     870 87        162  621

53  ‐  54     914 91        170  652

54  ‐  55  960 96        179  685

55  ‐  56  1008 101        188  719

56  ‐  57  1058 106        197  755

57  ‐  58  1111 111        207  793

Page 42: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐42 

v. Total Revenue 

The total annual revenue through the fare box , property development and other sources for 

the study corridors is given in Table 13.28.  

 

TABLE 13.28: TOTAL REVENUE COLLECTION (Rs. in Crore) 

Source of Revenue  2021  2031  2041 

Fare Box Revenue  513  993  2183 

Revenue from other Sources  51  99  218 

Revenue from Real Estate  417  246  400 

Total Revenue  982  1338  2801 

 

13.4.9 Financial Internal Rate of Return  

 

The    project  FIRR  with  the  project  costs  including  only  Central  taxes    and  property 

development has been worked out.   The FIRR of the project  with limited identified property 

development improves  from ‐0.32%  to 1.94 %.   

 

To make the project viable as per MOUD norms, additional PD of 35  lakh sq mts (about 75 

Ha land) would be required to bring the project FIRR at 8.12%.   

 

The  issue  of  availability  of  government  land  required  to  increase  project  FIRR  was 

discussed with city authorities and it was communicated that Varanasi being a old city and 

availability of   government land of this magnitude is not available.  

 

Varanasi  is  a heritage  city  and  attracts  lot of  international  tourist  throughout  the  year. 

Considering  the  importance of the city, the provision of  the good  infrastructure  facilities 

becomes the responsibility of both the state and central governments. To further improve 

project FIRR , it is proposed that  both state and central governments each give 10% of the 

project  cost  as  grant  to  the  project  (  total  20%).  This would  be  in  addition  to  equity 

contribution of both the governments. 

 

With Grant scenario, The FIRR of the project  without property development improves  from 

‐0.32%    to  0.53 %  and with    property  development  of  approximately  5  Lakh  sq mts  on 

identified land along the corridor, the project IRR becomes improves from 1.94 % to  2.86%.   

 

 

13.4.10 Conclusions 

As per MOUD circular no K‐14011/1/2007‐UT‐IV dated 30th August 2013, FIRR of about 8% is 

required for an Urban Mass Transit project.  Varanasi MRTS project however, cannot support 

itself  and  shall  require  Govt.  support  for  implementation.    With  limited  property 

development and support from both state and central Governments, the project has positive 

FIRR of 2.86%.  Considering the special status of Varanasi city as heritage city and the need 

Page 43: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐43 

of  the  city  to  have  fast  efficient mass  transport  system,      it  is  recommended  that  the 

condition of 8% FIRR may be relaxed and project is approved for implementation. 

 

The FIRR calculations are presented in Tables 13.29. 

Page 44: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐44 

 TABLE 13.29: PROJECT FIRR BOTH CORRIDORS ‐ WITH PROPERTY DEVELOPMENT & GRANT FROM STATE AND CENTRRAL GOVERNMENTS  (Rs in Crore) 

Year Completion 

Cost Land Cost 

Total   Taxes 

Total Completion Cost 

Fare Box Revenue 

Revenue from Adv & PD 

Additional Revenue 

Gross Revenue 

O&M Cost Additional  Capital 

Operational Surplus 

2016‐17  471 238 60 769 0.00 0.00 0 -769

2017‐18  1012 238 130 1380 0.00 0.00 0 -1380

2018‐19  1632 209 1841 0.00 0.00 0 -1841

2019‐20  1754 225 1979 0.00 0.00 0 -1979

2020‐21  2514 323 2837 0.00 0.00 0 -2837

2021‐22  3378 434 3812 0.00 0.00 0 -3812

2022‐23  1453 186 1639 -1639

2023‐24  513 51 417 982 385 0 596

2024‐25  528 53 308 889 416 0 473

2025‐26  597 60 -66 591 449 0 142

2026‐27  614 61 -43 632 485 0 147

2027‐28  694 69 -21 743 524 0 220

2028‐29  714 71 3 788 566 0 223

2029‐30  808 81 27 915 611 0 304

2030‐31  878 88 51 1017 660 0 357

2031‐32  993 99 76 1168 713 263 192

2032‐33  1021 102 101 1224 810 0 414

2033‐34  1155 115 246 1516 875 0 641

2034‐35  1187 119 258 1564 945 0 619

2035‐36  1343 134 271 1748 1021 0 727

2036‐37  1381 138 285 1803 1102 0 701

2037‐38  1562 156 299 2016 1191 0 826

2038‐39  1606 161 314 2080 1286 0 794

2039‐40  1816 182 329 2327 1389 0 938

2040‐41  1924 192 346 2462 1501 0 961

2041‐42  2183 218 363 2764 1621 535 608

Page 45: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐45 

Year Completion 

Cost Land Cost 

Total   Taxes 

Total Completion Cost 

Fare Box Revenue 

Revenue from Adv & PD 

Additional Revenue 

Gross Revenue 

O&M Cost Additional  Capital 

Operational Surplus 

2042‐43  2116 212 381 2709 1864 0 845

2043‐44  2398 240 400 3038 2013 3633 -2609

2044‐45  2470 247 420 3137 2175 0 962

2045‐46  2798 280 441 3519 2349 0 1170

2046‐47  2882 288 463 3634 2537 0 1096

2047‐48  3265 327 487 4079 2741 0 1338

2048‐49  3363 336 511 4211 2961 0 1250

2049‐50  3811 381 537 4728 3199 0 1529

2050‐51  3925 393 563 4881 3456 0 1425

2051‐52  4447 445 592 5483 3734 586 1163

2052‐53  4580 458 621 5660 4267 0 1393

2053‐54  5190 519 652 6361 4609 0 1751

2054‐55  5345 535 685 6565 4979 0 1585

2055‐56  6056 606 719 7381 5379 0 2001

2056‐57  6238 624 755 7617 5812 0 1805

  7068 707 793 8567 6279 0 2288

  7280 728 1050 9058 6785 0 2273

  12214 475 1568 14257 87468 8747 13633 117856 81692 5017 14617

  IRR % 2.86

Page 46: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐46 

 

13.5 FUNDING OPTIONS 

Metro Rail Projects are highly  capital  intensive with  long gestation period. Given  the  tariff 

constraints, they are not commercially attractive for investment. However, the MRTS project 

have immense  economic benefits to the society.   

 

Experience all over the world reveals that both construction and operations of a metro are 

highly subsidized and funded by the Government. Singapore had a 100% capital contribution 

from the government, Hong Kong 78% for the first three lines and 66% for the subsequent 2 

lines. Others run on Governmental support and subsidies.  In India also the Phase‐I, Phase‐II 

and Phase III of Delhi MRTS , Chennai, Bangalore  Metros systems have been  funded with a 

mixture of equity and debt (ODA) by GOI and state governments.  Thus, the  involvement of 

Government in the funding metro systems is foregone conclusion. 

  

If commercial capital city of Utter Pradesh is to have Metro System on self sustainable basis, 

it  is  necessary  to  keep  down  the  capital  cost  as  much  as  possible  by  way  of  giving 

government land as grant /exempting taxes for the project and also required funding is made 

available from the Government sources. 

 

13.6 FINANCING MODELS ADOPTED IN INDIAN CITIES 

The  financing  options  depends  on  the  selection  of  the  dedicated  agency  created  to 

implemented  to  implement  the  project. Number  of  Indian  cities  have  operational  /under 

construction MRTS  system. Different  financing models have been adopted  for  financing of 

the MRTS system. These include 

 

Government Funding  

Special Purpose Vehicle (SPV)  under the State Government Control 

Public Private Partnership 

Private sector  

 SPV model  is the most successful   model of metro funding and has been adopted  in most 

cities. Subsequent paragraphs discuss the Indian experience of MRTS funding.  

 

13.6.1 Government Funding 

As  the  name  suggests,  this  funding   model  involves  the  complete  funding  of  the metro 

system  by  Central/State    Government. Metro  Railway,  Kolkata  has  been  funded  on  this 

model.  It  is  the  first underground Metro Railway  in  India. The Metro Railway Kolkata was 

constructed progressively  from 1972  to 1995 by  the  Indian Railways who also operate  the 

system on a highly subsidized fare.  The Metro Corridor has since been extended from Tolly 

Ganj to Garia. Due to capital intensive nature of the metro systems and financial constraints 

faced by the government, no metro system has been planned on this model after Metro Rail 

Kolkata. 

Page 47: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed P

Final Report

 

 

 

13.6.2 S

U

v

p

G

a

o

S

l

C

t

f

 

K

G

1

b

c

i

 

 

D

c

e

l

J

e

s

roject Report f

t                          

SPV with Jo

Under SPV p

venture betw

project  and

Government

a commercia

of  the proje

State Govern

oan  from 

Corporation,

the example

financial mod

Kolkata Met

Kolkata Metr

Government

13.77 KMs of

by  GOI  &  G

construction

n Figure13.2

                    

Delhi Metro 

Delhi Metro 

capital city.  

equity  contr

ength was  c

Japanese OD

equity  and  s

second phas

for Rail Based M

                          

oint Ventu

pattern of fin

ween Centra

  for  its  su

t of India and

al enterprise

ct  cost as  th

nment aggre

funding  ag

, Chennai M

es of success

dels of these

tro (East We

ro Rail Corpo

t with equal 

f metro.  Ou

GOWB  and 

 works are u

2.      

 FIGURE 1

 

Rail Corpora

The compan

ribution  by  t

commissione

DA  loan  thro

subordinate 

e of DMRTS

Mass Transit Sy

                          

ure Betwee

nancing patt

l Governme

ubsequent  O

d State Gove

.  As per the

heir equity  c

egating  the  t

gencies.  De

etro Rail Cor

s of such a S

e MRTS syste

st Corridor)

oration form

equity cont

t of the estim

the  balance

under progre

13.2: FUNDIN

ation was es

ny was form

these  two  g

ed  in  a phas

ough  JICA.  T

debt  apart 

 project cov

ystem in Varana

                           

February, 20

en GOI & S

tern, a Speci

nt and State

Operation  &

ernment ma

 prevalent p

contribution

total equity 

lhi  Metro 

rporation & 

SPV. Subseq

em. 

med as a Join

tribution by 

mated total 

e  45%  is  be

ess. The app

       

NG PATTERN

stablished  in

ed as a Joint

overnments

sed manner.

The  balance 

from  raisin

ering a dista

asi 

            CHAPTE

16

State Govt

ial Purpose V

e Governmen

&  Maintena

ke equal  eq

practice, Cen

n.   An equal

to 40%. Rem

Rail  Corpo

Kolkata Met

uent parVar

t Venture be

these two g

cost of Rs. 4

eing  contrib

roved fundin

N OF KOLKAT

n 1995 to co

t Venture be

.    The  first 

.   About 60%

cost was  co

ng  funds  fro

ance of 82.1

ER 13: COST EST

Vehicle (SPV

nt  for the im

ance.  Unde

uity contrib

tral Governm

 amount  ca

maining 60%

oration,  Ban

tro Rail Corp

ranasiphs giv

etween GOI 

governments

4676 crore, 5

buted  by  JIC

ng pattern o

TA METRO 

onstruct met

etween GOI &

phase  cove

% of  the pro

ontributed  b

m  Property 

1 KMs withi

TIMATES AND F

P

V)  is set up a

mplementatio

r  this  arran

ution and ru

ment contrib

n be  contrib

%  is arrange

ngalore  Me

poration are 

ve  the detai

& West Ben

s  for constru

55% has been

CA  ODA  Loa

of the line is 

tro rail syste

& GNCTD w

ring  65.1  KM

oject was  fu

by  GOI &  G

Developme

n the Delhi 

FINANCIALS 

Page 13‐47 

as a  joint 

on of the 

ngement 

un SPV as 

bute 20% 

buted by 

d as soft 

etro  Rail 

some of 

ils of  the 

gal State 

uction of 

n funded 

an.    The 

depicted 

m  in  the 

ith equal 

Ms  route 

unded by 

NCTD  as 

ent.    The 

Area has 

Page 48: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed P

Final Report

 

 

 

a

r

 

T

b

b

 

 

b

P

 

roject Report f

t                          

also been fun

raising of par

The   extensi

been undert

being contrib

Delhi Metro

being implem

Phase ‐ III is d

    

     

     

for Rail Based M

                          

nded by both

rt funding fro

on  to Nation

taken by DM

buted by the

o Phase  III n

mented with

depicted in F

   FIGURE 13

  FIGURE 13

  FIGURE 13.

Mass Transit Sy

                          

h the govern

om Property

nal Capital R

MRC as a dep

ese states.  

etwork    is o

 loans from 

Figure 13.3,1

3.3: FUNDIN

.4:  FUNDIN

.5:  FUNDING

ystem in Varana

                           

February, 20

nments in the

y Developme

Regions  (NCR

posit work w

of 103.5 Km 

JICA. The fu

13.4, & 13.5.

G PATTERN 

 

G PATTERN 

 

G PATTERN O

asi 

            CHAPTE

16

e same patte

ent and inter

R) viz., Noida

with  the enti

is expected

nding patter

.  

OF DELHI M

OF DELHI M

OF DELHI ME

ER 13: COST EST

ern with JICA

nal accruals.

a, Gurgaon a

ire cost othe

d  to  cost   Rs

rn of Delhi M

ETRO PHASE

ETRO PHASE

ETRO PHASE

TIMATES AND F

P

A funding of 

  

and Vaishali 

er  than Rolli

s 35242 Cror

Metro Phase‐

E I 

E II 

E III  

FINANCIALS 

Page 13‐48 

46% and 

are also 

ing Stock 

re and  is 

‐I,  II and 

Page 49: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed P

Final Report

 

 

 

               B

B

K

c

b

J

h

B

t

 

 

 

 

 

 

 

 

 

 

C

C

T

c

4

O

f

 

                

 

 

 

 

 

 

roject Report f

t                          

Bangalore M

Bangalore M

Karnataka St

construction

been  funded

JICA ODA Loa

has  already 

Bangalore fo

the line is de

 

Chennai Met

Chennai  Me

Tamilnadu St

construction

40.78% has b

ODA  Loan.  T

funding patte

 

               

for Rail Based M

                          

Metro  

Metro  Rail  C

tate Governm

 of 33 KM o

d by GOI & G

an. First Pha

enacted  a  l

or raising the

epicted in Fig

 FIGURE 13.

tro  

etro  Rail  Co

tate Govern

 of 45.046 K

been funded

The  construc

ern of the lin

       FIGURE

 

Mass Transit Sy

                          

Corporation 

ment with e

f metro.  Ou

GOKN and  t

ase of projec

aw  to  charg

e funds requi

gure 13. 6.  

.6:  FUNDING

rporation  h

ment with e

KM of metro

 by GOI & GO

ction works 

ne is depicte

E 13.7: FUND

ystem in Varana

                           

February, 20

has  been  fo

equal equity 

ut of the esti

he balance 4

ct has started

ge  Rs.  2  a  li

ired for Met

       

G PATTERN O

as  been  fo

equal equity 

o.   Out of  t

OTN and the

of  Phase‐I 

d in Figure 1

DING PATTER

asi 

            CHAPTE

16

ormed  as  a 

contribution

imated total

45%  is being

d operation 

tre  on  diese

ro Project.  T

OF BANGALO

rmed  as  a 

contribution

he estimate

e balance 59.

project  is  u

13.7.  

RN OF CHENN

ER 13: COST EST

Joint  Ventu

n by  these  t

 cost of Rs. 

g  raised as s

recently.  Th

el  and  petro

The approve

ORE METRO 

Joint  Ventu

n by these t

d  total  cost 

.22% is being

under  progre

NAI METRO 

TIMATES AND F

P

ure  between

wo governm

6395 Crore, 

senior debt  i

he state Gov

ol  sold  in  th

ed funding p

  

ure  between

two governm

of Rs. 1460

g contributed

ess.      The  a

FINANCIALS 

Page 13‐49 

n  GOI  & 

ments  for 

55% has 

including 

vernment 

e  city  of 

attern of 

n  GOI  & 

ments for 

00 Crore, 

d by JICA 

approved 

Page 50: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed P

Final Report

 

 

 

13.6.3 P

T

t

a

t

i

G

t

t

H

M

s

D

A

p

i

w

a

o

T

s

M

I

D

O

roject Report f

t                          

Public Priv

This model o

this model  , 

and maintain

to cost of  la

nfrastructur

Government

the project. T

to bid for su

range of 16‐1

However,  In 

Mumbai Line

systems. Sub

system. 

Delhi Airport

DMRC has  im

Airport  and 

private secto

mplemented

works with t

and DDA (54

operator wh

DMRC. The a

There  have 

system. 

         

Mumbai Me

n  contrast  t

Delhi,  Banga

Operate & Tr

for Rail Based M

                          

vate Partne

of MRTS find

the private 

ning the ent

nd only.   Un

e  projects, 

t provided  th

The metro b

ch a project

18% or a com

spite of  the

e 1&2, and H

bsequent pa

t Line under

mplemented

further  exte

or participat

d  under  a  u

the  funds be

4%) and the 

o will operat

approved fun

been  some 

  FIGURE

tro Line 1 & 

to  the  SPV m

alore,  Chenn

ransfer (BOO

Mass Transit Sy

                          

ership 

ding  involves

firm will be

tire project. 

nder Viabilit

     MRTS  pr

he  state gov

eing a social

. Besides, th

mfort of guar

e  constraint

Hyderabad M

rVaranasiph

 PPP Model

d  a High  Spe

ension  to  Se

ion. The pro

unique mode

eing contribu

cost of syste

te the system

nding pattern

issues with

E 13.8:  FUND

2  

model  adopt

nai &  Kolkat

OT) model in 

ystem in Varana

                           

February, 20

s the private

 responsible

The contribu

ty gap Fundi

roject  is  elig

vernment als

 sector proje

he private op

ranteed ride

s of  this  fun

MRTS have a

s give the de

eed Airport 

ector‐21,  Dw

oject with an

el  of  PPP wh

uted by GOI,

ems and Rol

m for 30 yea

n of the line 

h  the  conces

      

DING PATTER

ted  for  cons

a,  the Maha

the city of M

asi 

            CHAPTE

16

e sector part

e  for  financin

ution of the 

ng(VGF)  sch

gible  for  VG

so contribute

ect not much

perator expe

rship.  

nding model

adopted this 

etails of the

Link  from N

warka  cover

n estimated 

here  in  the 

, GNCTD, De

lling Stock (4

rs, after whi

is depicted i

ssionaire  an

RN OF AIRPO

struction of 

arashtra  gov

Mumbai.  So 

ER 13: COST EST

icipation on

ng designing

governmen

heme of Cen

GF  up  to  20

es  same or 

h private com

ects assured 

l,     Airport 

model for f

 financial m

New Delhi Ra

ing  a  distan

cost of Rs. 3

DMRC  has 

elhi  Internati

46%)  is being

ich the syste

n Figure 13.

nd  DMRC  is 

ORT LINE 

metro  rail  s

vernment  ha

far, 2 lines c

TIMATES AND F

P

 different m

g, building, o

t  is generall

ntral Govern

0%  from  the

more  funds 

mpanies are 

rate of retu

Line of Delh

financing the

odels of the

ailway  Statio

nce  of  22.7 

3869 Crore h

undertaken 

ional Airport

g met by the

em will rever

8.   

now  opera

system  in  th

as  opted  Bu

covering a dis

FINANCIALS 

Page 13‐50 

models.  In 

operating 

y  limited 

ment  for 

e  Central 

towards 

available 

rn in the 

hi Metro, 

eir metro 

ese MRTS 

on  to  IGI 

KM with 

has been 

the  civil 

t Limited 

e private 

rt back to 

ating  the 

he  city of 

ild Own, 

stance of 

Page 51: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed P

Final Report

 

 

 

4

c

8

V

a

 

M

L

R

L

 

 

 

G

G

c

b

C

p

m

roject Report f

t                          

44 KMs (Line

crore and Lin

8250 crore) h

Viability Gap

and Rs. 1532

Mumbai Met

Limited, a Re

Region Deve

mplement th

Line  1  is  n

implementat

         

Hyderabad M

Hyderabad 

Government 

Gap  Funding

corridors wit

build,  and  fi

Crore toward

project with 

metro.           

     

 

 

 

 

 

 

 

 

 

for Rail Based M

                          

e 1 of 11.07 K

ne 2 of 32 KM

have been a

p Funding by 

2 crore for Lin

tro One Priv

eliance ADA G

elopment Au

his project. F

ow  operati

tion mechan

    FIGURE 13

Metro  

Metro  is  t

of India. Go

g  (VGF)  sche

th total  lengt

nance,  oper

ds  land acqu

grant of   1

   

   FIGURE 13

Mass Transit Sy

                          

KMs from Ve

Ms from Cha

warded to p

GOI & Maha

ne 1 & Line 2

vate Limited 

Group Comp

uthority  (MM

Figure 13.9 g

ional.  There

nism for Line

3.9:  FUNDIN

the  first  PP

oAP has unde

eme  of  GoI.

th of about 

rate  and  tra

uisition, R&R

1,458 Crore a

3.10:  FUNDI

ystem in Varana

                           

February, 20

ersova – And

arkop – Band

private opera

arashtra Stat

2 respectivel

is a Joint Ve

pany, Veolia 

MRDA)  incor

gives the fun

e  are  some

e 2 is being re

NG PATTERN

PP  Metro  R

ertaken the H

  The MRTS 

71 km. The 

ansfer  (DBFO

R package, sh

as VGF. Figur

NG PATTERN

asi 

            CHAPTE

16

heri ‐ Ghatk

dra – Manku

ator for cons

te Governme

y.  

enture Com

Transport, F

porated und

ding pattern

e  issues  wit

evisited. 

N OF MUMBA

Rail  Project 

Hyderabad M

network  in

Project  is be

OT)  basis.  G

hifting of ut

re 13.10 give

N OF HYDER

ER 13: COST EST

opar with a t

urd with an e

struction and

ent to the ex

pany formed

rance and M

der  the Com

n of Mumbai 

th  the  conc

AI METRO LI

that  has  b

Metro Rail Pr

clude  three

eing execute

oAP will  spe

ilities and   G

es the fundin

RABAD METR

TIMATES AND F

P

total cost of 

estimated co

d operation 

xtent of Rs. 6

d by Relianc

Mumbai Metr

mpanies Act, 

Metro Line 

cessionaire 

NE 1 

been  sanctio

roject under

  high  densit

ed by L&T on

end  another

GOI will   sup

ng plan of Hy

RO  

FINANCIALS 

Page 13‐51 

Rs. 2356 

ost of Rs. 

by giving 

650 crore 

e Energy 

ropolitan 

1956  to 

1.  

and  the 

oned  by 

r Viability 

ty  traffic 

n design, 

r   1,980 

pport the 

yderabad 

Page 52: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐52 

13.6.4 Private Sector 

Gurgaon's Rapid Metro project is India’s first fully privately financed metro. With the  project 

cost of Rs 1100 crore, it has a network of 5.1 km connecting Cyber City, NH‐8 &   Sikanderpur 

station (DMRC) in Phase I. The planned route for Rapid Metro acts as a   feeder  to  the MRC’s  

Jahangirpuri‐Central Secretariat‐HUDA City Centre  (Yellow Line).   A  special purpose vehicle 

(SPV), Rapid Metro Rail Gurgaon Limited (RMGL) was formed to  construct,  operate  and 

maintain the metro. 

  

The  Indian experience of Metro Rail projects   funding suggests that those  implemented   on 

SPV  model  have  been  more  successful  than  those  implemented  with  private  sector 

participation. Under SPV model, extensive government     funding support  is   required either 

directly as equity and  subordinate debt or  through government guaranteed  Japanese ODA 

loan from JICA.  Accordingly, SPV model for funding of Varanasi MRTS is being proposed. 

 

13.7 FINANCING OPTIONS FOR VARANASI MRTS 

13.7.1 Equity 

Under DMRC/BMRC pattern of financing pattern, a Special Purpose Vehicle (SPV) will be set 

up for the implementation of the project and for its subsequent Operation & Maintenance. 

Under  this  arrangement  Government  of  India  and Government  of Utter  Pradesh  (GoUP) 

shall make equal contribution and run SPV as a commercial enterprise.  As per the prevalent 

practice, Central Government may be willing to contribute 20% of the project cost as their 

equity  contribution. An  equal  amount  can  be  contributed  by GoUP  aggregating  the  total 

equity to 40%. For the balance 60% funding requirement, options available are as follows: ‐   

13.7.2 Debt 

The balance cost can be met through loans from various bilateral partners, Local borrowing, 

loans from ADB/World Bank and Suppliers Credit.   

  

Official  Development  Assistance  from    Bilateral  Partners  :  ‐  Department  of  Economic 

affairs,  Ministry  of  Finance,  Government  of  India  has  issued  policy  guidelines  no 

3/11/2015‐PMU on official Development Assistance    for development  cooperation with 

bilateral partners.    This assistance can be availed  can be availed of for metro rail projects. 

The  prevailing  interest  rate  is  0.3%  p.a.    The  loan  is  repayable  in  40  years  including 

moratorium period of 10 years.  The  loan assistance is for the total project cost  excluding 

taxes and land costs. The loan is provided to Central Government which in turn releases the 

same to SPV under a Pass Through Assistance (PTA) mechanism.     

 

Since the loan is generally in currency of lending country, any fluctuation in exchange rate at 

the  time  of  repayment  are  generally  borne  by  the  Central  Government  and  GoUP  in 

proportion to which their share holding.   The  loan  in equivalent INR shall be repaid by SPV 

from the income streams of metro operations.   

 

Page 53: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐53 

 

Loan  from Asian Development Bank  (ADB)/World Bank:  ‐ The Loan may also be available 

from ADB/World Bank. As per the information available, the loan from World Bank/ ADB is 

available to GOI at LIBOR + 2 % per annum. It is considered that the loan shall be passed to 

project without any additional charges/ administration cost.  At present 12 month LIBOR for 

USD is 0.5%. 

   

Domestic Loan from Banks and Financial Institutions: ‐ Funds can be arranged from Indian 

Financial  Institutions  like  India  Infrastructure  Finance  Company  Limited  (IIFCL),  India 

Development Financing Corporation  (IDFC), Life  Insurance Corporation of  India  (LIC), State 

Bank of  India,  IDBI Bank,  ICICI Bank Ltd etc.   These  institutions are  increasingly engaged to 

fund  infrastructure projects subject  to  their commercial viability.   There are many models 

available  under which  the  funds  can  be  arranged  by  these  financial  institutions with  or 

without syndicating with other commercial banks.    IIFCL e.g.  fund 20% of  the project cost 

and  arrange  balance  through  the  syndication  of  commercial  banks  with  a  lead  banker 

among the consortium of bankers.    The  loan can be given for a period of 20‐30 years with 

interest  rate  ranging  from  9.50%  to  12%  PA.    The  funding  arrangement  may  require 

submission of  central  government  guarantee  as well.    Since  the  rate of  interest of  these 

financial  institutions  is much higher  than  the  interest  rates of  soft  loan provided by  JICA, 

Central  Government  and  GoUP  shall  have  to  bear  the  interest  difference  and  provide 

subsidy to the SPV.     

 

(ii) Subordinate Debt:  ‐ For existing Phase‐I  , Phase‐II   & Phase  III projects of Delhi Metro, 

land and rehabilitation and resettlement cost have been borne by GOI & GNCTD equally as 

interest  free subordinate debt.   This mezzanine  financing  is of extreme help  in quickening 

the pace of the project. In this project Subordinate debt can be procured to pay back state 

and  central  taxes and duties. The  loan  is of  longer duration and becomes  repayable only 

after other loans raised for the project are repaid.  

13.7.3 Involvement of the Government 

 Government  contribution  is  essential  to  keep  debt‐servicing  levels  low  ‐ with  a  view  to 

maintain  overall  long  term  sustainability  of  the  system.  Government  involvement  also 

generates  considerable  amount of  confidence  in other players  involved  in  the process of 

construction & operation.  The capital investment of Varanasi MRTS is estimated to give an 

economic rate of return to the tune of 15 % and the city/society can recover the investment 

within 7 to 8 years time.  The involvement of Government is very much essential to provide 

integrated, efficient public  transport system  in  the Varanasi. Apart  from  financial support, 

social  considerations  require  the  involvement  of  the  government  to  ensure  a minimum 

essential level of service to the society.  The project serving primarily a social purpose/goal, 

is needed for improving the overall health of the city. 

 

Page 54: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐54 

13.8 PROPOSED FUNDING FOR THE PROJECT 

The  total  cost of  the project  including  central  taxes    and  land at  January  '2016 has been 

estimated at Rs 12,350 Crore including  Rs 1405 Crore towards Central taxes and duties.  

 

i. Grant by State and Central Governments 

  Considering the  importance of the project,  it has been assumed that both state and central 

 governments will give grant to the extent of 10% of the project cost. Accordingly project will 

 receive    Rs 1235 Crore  as grant with both the governments  amounting to   Rs 2470 Crore.        

For remaining cost of Rs  9880 Crore at January'2016 prices, the completion costs  works out 

to Rs 13,781 Crore.  Rs 475 Crore of  land cost would be extra.     

 

 The funding pattern under SPV model would be as under: 

 

ii. Government Contribution 

GOI & GOUP to contribute equity of Rs. 5513 Crore which  is 40 % of the total completion 

cost excluding land. This means that both GOI will share 20 % of the total cost amounting to 

Rs. 2756 Crore   which  includes   Rs 2066 Crore  (15%) as equity and Rs 691 Crore  ( 5%)   as 

subordinate  debt  for  central  taxes.  GOUP  will  also  contribute    equal  amounts  towards 

equity and  subordinate debt  for  central  taxes.  In addition GOUP will provide  subordinate 

debt  of Rs 475 Crore towards land required for the project.  

iii. Contribution by Local Bodies 

 Through means of  innovative  financing,  Local bodies will  contribute Rs 200 Crore  (1.45%) 

towards project completion cost   

iv. Soft Loans from funding agencies 

 Remaining project cost of   Rs 8069 Crore ( 58.55%) of total completion cost   to be funded 

through soft loans from funding  agencies. The proposed loan shall be tied loan with interest 

rate of .03% and payback period of 40 Years including 10 years of moratorium. 

 

In  addition  to  above      state  taxes of     Rs 343 Cr   on  completion  costs basis  for both  the 

corridors has to be reimbursed or exempted by State Government. 

 

 

Figure 13.11 gives  the proposed  funding pattern and  the Table 13.30  gives  the  year wise 

funds requirement from different sources  

 

 

 

 

Page 55: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐55 

      FIGURE 13.11:  PROPOSED FUNDING PATTERN UNDER SPV MODEL 

 

 

  TABLE 13.30: PROPOSED FINANCING OF PROJECT  

(Rs in Cr) 

PARTICULARS  CORRIDOR 1 CORRIDOR  2 BOTH CORRIDORS 

   AMOUNT % AMOUNT % AMOUNT  %  

Equity by GoI  1396  14.99  670  14.99  2066  14.99 

SD for CT by GoI  467  5.01  224  5.01  691  5.01 

Equity by Govt of UP  1396  14.99  670  14.99  2066  14.99 

SD for CT by Govt of UP  467  5.01  224  5.01  691  5.01 

Contribution by Local Bodies  135  1.45  65  1.45  200  1.45 

Loan by JICA  5453  58.55  2615  58.55  8069  58.55 

Total Cost Excluding Land  9314  100  4467  100  13781  100 

SD for land by Govt of UP  438     37     475    

GRAND  TOTAL  9752     4504     14256    

 

13.8.1 Recommendations 

With above funding option as per the detail cash flow given  in Tables 13.31,  it can be seen 

that with property development  the project has positive  cash  flows. Thus,  the project has 

potential to service its debts liabilities.   

 

It is accordingly recommended that Varanasi MRTS is taken up for implementation. 

14.99

5.01

14.99

5.01

1.45

58.55

EQUITY BY GOI

SD FOR CT BY GOI

EQUITY BY GUP

SD FOR CT BY GUP

CONTRIBUTION BY LOCAL BODIES

SOFT LOANS 

Page 56: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐56 

TABLE 13.31: CASH FLOW STATEMENT FOR VARANASI MRTS FOR GRANT SCENARIO (Rs in Crore) 

Year Project 

Completion Cost 

O&M Cost Additional   & Replacement 

Capital DPRCN 

Total Costs 

Fare box PD 

&ADVT Total 

Revenue 

Net Cash Flow 

Equity From GOI & GOUP &Stake Holder 

Contribution 

Availability Of Cash 

Cumulative Cash  Cum Loan  Loan Loan 

Repayment IDC 

Cumulative Loan 

Including IDC 

Interest PBT Cash 

BalanceCumulative 

Cash 

2017‐2018  209           209           ‐209  209  0  0           0  0             

2018‐2019  1431           1431           ‐1431  1431  0  0           0  0             

2019‐2020  2403           2403           ‐2403  2403  0  0           0  0             

2020‐2021  3450           3450           ‐3450  2145  ‐1305  ‐1305  1305  1305     2  1307             

2021‐2022  3461           3461           ‐3461     ‐3461  ‐4765  4765  3461     9  4776             

2022‐2023  2194  2194           ‐2194     ‐2194  ‐6959  6959  2194     20  6988 

2023‐2024  800  385  0  306  1185  513  468  982  ‐204     ‐800  ‐7759  7759  800        7790  21  269  575  575 

2024‐2025  310  416  0  326  726  528  361  889  163     ‐310  ‐8069  8069  310        8099  23  123  450  1025 

2025‐2026     449  0  315  449  597  ‐6  591  142        ‐8069              8099  24  ‐198  117  1142 

2026‐2027     485  0  304  485  614  18  632  147        ‐8069              8099  24  ‐181  123  1265 

2027‐2028     524  0  293  524  694  49  743  220        ‐8069        270     7829  24  ‐98  195  1460 

2028‐2029     566  0  283  566  714  74  788  223        ‐8069        270     7559  23  ‐84  199  1659 

2029‐2030     611  0  273  611  808  107  915  304        ‐8069        270     7289  23  8  281  1941 

2030‐2031     660  0  264  660  878  139  1017  357        ‐8069        270     7019  22  71  335  2276 

2031‐2032     713  263  254  713  993  175  1168  455        ‐8069        270     6749  21  180  434  2710 

2032‐2033     810  0  245  810  1021  203  1224  414        ‐8069        270     6480  20  148  394  3104 

2033‐2034     875  0  246  875  1155  361  1516  641        ‐8069        270     6210  19  375  621  3725 

2034‐2035     945  0  237  945  1187  377  1564  619        ‐8069        270     5940  19  363  600  4325 

2035‐2036     1021  0  229  1021  1343  405  1748  727        ‐8069        270     5670  18  480  709  5035 

2036‐2037     1102  0  221  1102  1381  423  1803  701        ‐8069        270     5400  17  463  684  5719 

2037‐2038     1191  0  213  1191  1562  455  2016  826        ‐8069        270     5130  16  596  809  6528 

2038‐2039     1286  0  206  1286  1606  474  2080  794        ‐8069        270     4860  15  572  778  7306 

2039‐2040     1389  0  199  1389  1816  511  2327  938        ‐8069        270     4590  15  724  923  8229 

2040‐2041     1501  0  192  1501  1924  538  2462  961        ‐8069        270     4320  14  756  947  9177 

2041‐2042     1621  535  185  1621  2183  581  2764  1142        ‐8069        270     4050  13  944  1130  10306 

2042‐2043     1864  0  179  1864  2116  593  2709  845        ‐8069        270     3780  12  654  833  11139 

2043‐2044     2013  3633  191  2013  2398  640  3038  1025        ‐8069        270     3510  11  822  1013  12153 

2044‐2045     2175  0  184  2175  2470  667  3137  962        ‐8069        270     3240  11  768  952  13105 

2045‐2046     2349  0  305  2349  2798  721  3519  1170        ‐8069        270     2970  10  856  1161  14265 

2046‐2047     2537  0  294  2537  2882  752  3634  1096        ‐8069        270     2700  9  793  1088  15353 

2047‐2048     2741  0  284  2741  3265  813  4079  1338        ‐8069        270     2430  8  1045  1330  16682 

2048‐2049     2961  0  274  2961  3363  847  4211  1250        ‐8069        270     2160  7  968  1242  17925 

2049‐2050     3199  0  265  3199  3811  918  4728  1529        ‐8069        270     1890  6  1258  1523  19448 

2050‐2051     3456  0  255  3456  3925  956  4881  1425        ‐8069        270     1620  6  1164  1419  20867 

2051‐2052     3734  586  246  3734  4447  1036  5483  1749        ‐8069        270     1350  5  1498  1744  22611 

2052‐2053     4267  0  238  4267  4580  1079  5660  1393        ‐8069        270     1080  4  1151  1389  23999 

2053‐2054     4609  0  250  4609  5190  1171  6361  1751        ‐8069        270     810  3  1498  1748  25748 

2054‐2055     4979  0  241  4979  5345  1219  6565  1585        ‐8069        270     540  2  1342  1583  27330 

2055‐2056     5379  0  233  5379  6056  1325  7381  2001        ‐8069        270     270  2  1767  2000  29330 

2056‐57     5812  0  225  5812  6238  1379  7617  1805        ‐8069        270     0  1  1579  1804  31134 

2057‐58     6279  0  217  6279  7068  1499  8567  2288                             2071  2288  33422 

2058‐59     6785  0  209  6785  7280  1778  9058  2273                             2064  2273  35695 

Page 57: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐57 

13.9 IMPLEMENTATION PLAN 

13.9.1 Institutional Arrangements  

Effective  institutional  arrangements  are  needed  to  enable  the  Metro  project  to  be 

implemented  without  any  loss  of  time  and  cost  over‐run.  The  details  of  possible 

arrangements are discussed in following sections.  

Setting Up of Special Purpose Vehicle (SPV) 

Experience of  implementing Delhi Metro project has  shown  that a Special Purpose Vehicle 

(SPV),  vested  with  adequate  powers,  is  an  effective  organizational  arrangement  to 

implement and subsequently operate and maintain a metro rail project.  

 

SPV  named  VMRC  (Varanasi Metro  Rail  Corporation  Ltd.)  shall  be  incorporated with  the 

mandate “To establish, Operate and Maintain Guided Urban Transit Systems  in and around 

Varanasi City so as to meet the urban transport needs of Varanasi”. This SPV with a board of 

directors may implement the Varanasi Metro project. 

 

Metro construction is a very specialized and multi‐disciplinary job. It is therefore, impossible 

to  have  a  single  organizational  set  up which  can  be  responsible  for  all  aspects  of metro 

implementation,  namely  investigation,  planning,  design,  drawing  up  of  specifications, 

preparation of  tender documents,  fixing of contractors, supervising  the contractors’ works, 

ensuring  interface  fusion between different contractors, ensuring quality and safety during 

constructions,  planning  and  supervising  integration  system  trials  and  getting  the  project 

commissioned in time. 

 

It  is suggested  to have a  two  tier organization with well‐defined  responsibilities  for getting 

this project executed. At the apex will be the VMRC  ‐ a  lean but effective organization with 

full  mandate  and  total  power  –  with  accountability.  The  second  level  will  be  a  project 

management  team  called  “General  Consultants”  who  will  be  engaged  by  the  VMRC  on 

contract  basis  and  who  will  be  fully  responsible  for  planning,  design  and  project 

management.  In  fact  they will be  the  “Engineers”  for  the VMRC, who  is  the  “Client”.  The 

detailed design consultants as required may be engaged by General Consultants as their Sub‐

Consultants within their own contract responsibilities. Since most of the alignment  length  is 

elevated,  it  is recommended that the contracts be made on “design and build” basis, based 

on broad technical specifications and performance requirements drawn up by the G.C.  

 

International  Consultants  are  very  expensive  and  should  be  engaged  only  in  area where 

Indian experts cannot manage and they should invariably be part of the General Consultants’ 

team. 

 

High Power Committee 

During  the  implementation of  the project  several problems with  regard  to     acquisition of 

land,  diversion  of  utilities,  shifting  of  structures  falling  on  the  project  alignment, 

Page 58: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐58 

rehabilitation of project affected persons, etc. are likely to arise. For expeditious resolution of 

these  problems,  an  institutional mechanism  needs  to  be  set  up  at  the  State Government 

level.  Towards  this  end,  it  is  recommended  that  a  High  Power  Committee  under  the 

chairmanship  of  Chief  Secretary, Uttar  Pradesh  should  be  set  up. Other members  of  this 

Committee may be the Secretaries of the concerned Departments of the State Government 

and  Heads  of  civic  bodies  who  will  be  connected  in  one  way  or  the  other  with  the 

implementation  of  the  project.  Commissioner,  Varanasi  and  Municipal  Commissioner, 

Varanasi Nagar Nigam should also be the member of this committee.  

 

This Committee should meet once a month and sort out all problems brought before  it by 

VMRC and VDA. For Delhi Metro also, such a High Power Committee was set up and it proved 

very useful in smooth implementation of the Delhi Metro rail project. 

Empowered Committee 

At  the Central Government  level an Empowered Committee, under  the chairmanship of 

Cabinet Secretary, is presently functioning for Delhi Metro project. Other members of this 

Committee are Secretaries of Planning Commission, Ministry of Home Affairs, Ministry of 

Urban Development, Ministry of Road Transport and Highways, Ministry of Environment 

and  Forests,  Department  of  Expenditure,  Chief  Secretary  of  Delhi  Government  and  a 

representative  from  the  PMO.  The  Empowered  Committee meets  regularly  and  takes 

decisions  on  matters  connected  with  inter‐departmental  coordination  and  overall 

planning, financing and implementation of the Delhi Metro project.  

 

It is suggested that the role of this Empowered Committee is enlarged to include Varanasi 

Metro  project  also  and  the  Chief  Secretary,  Uttar  Pradesh  should  be  inducted  as  a 

member of this Committee. 

Implementation Schedule  

SPV may  initiate  action  for  appointment  of General  Consultants  for  project management 

including preparation of tender documents – as soon as the DPR  is approved by GoUP and 

the  project  is  approved  for  construction.  The  possible  dates  of  important milestones  are 

given in Table 13.32.  

TABLE 13.32: PROJECT IMPLEMENTATION SCHEDULE 

S.N.  Tasks  Timelines 

1  Final DPR  February, 2016 

2  State Government Approval of DPR  April, 2016 

3  In Principle Approval by GoI  July, 2016 

4  Appointment of Interim Consultant   September, 2016 

5  Appointment of DDC for Civil Works  September, 2016 

6  Packaging and Invitation of Bids for Priority Section*  October, 2016 

Page 59: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐59 

S.N.  Tasks  Timelines 

7  Final Approval of GoI  January, 2017 

8  Commencement of Civil Works on Priority Section  February, 2017 

9  Completion of Project  March, 2023 

 

 

BHEL  to  Benia  Bagh  Section  of  about  15.0  Km  shall  be  taken  up  on  priority  for 

construction.    

The commercial operation on Phase‐I corridors may start from March 2023 after providing 

about 5.5 years for construction and 6 months for safety audit and certification. 

 

13.9.2 Concessions from Government 

Metro rail projects need very heavy investment. Loans have invariably to be taken to fund a 

part  of  the  capital  cost  of  the  projects.  These  projects  yield  low  financial  internal  rate  of 

return though their economic internal rate of return is very high. With reasonable fare levels, 

servicing of these loans often pose problems. To make the project financially viable, the fares 

need  to  be  substantially  increased  to  socially  un‐acceptable  levels.  This  results  in  the 

ridership coming down significantly, as  it  is sensitive to increases in the fare level. Thus, the 

very objective of constructing the metro rail system to provide an affordable mode of mass 

travel for public is defeated. It therefore becomes necessary to keep the initial capital cost of 

a metro project as low as possible so that the fare level of the metro system can be kept at 

reasonable level.  

 

Experience of Delhi Metro project has  shown  that  the  taxes  and duties  (including  custom 

duty, Excise Duty, Sales Tax, Taxes on electricity, Municipal Taxes) constitute about 15 – 16% 

of a metro project cost. VMRC may try to get exemption from these for the implementation 

of this important infrastructure project. 

Custom Duty on all  imported  rolling  stock and other equipment needed  for 

the project. 

Excise  Duty  on  all  indigenously  manufactured  rolling  stock  and  other 

indigenously finished goods required for the project. 

Sales Tax on all purchases made  for  implementation of  the project whether 

directly  by  the  project  implementation  authority  or  by  the  contractors 

executing the project. 

Sales Tax on works contracts to be executed for the  implementation of the ‐

project. 

Tax  on  electricity  required  for  operation  and  maintenance  of  the  metro 

system. 

Page 60: 13. COST ESTIMATES AND FINANCIALS · 2019-02-13 · works, rolling stock, environmental protection, rehabilitation, etc. at Jan’ 2016 price level. While preparing the capital cost

Detailed Project Report for Rail Based Mass Transit System in Varanasi 

Final Report                                                                                                                     CHAPTER 13: COST ESTIMATES AND FINANCIALS 

 

 

  February, 2016  Page 13‐60 

Municipal Taxes.  

Further, the transfer of Govt. land required for the project could be considered free of cost or 

at the most at Govt. rates. The cost of private land could also be recovered through TDRs and 

higher FARs. 

 

VMRC may consider roping in more stakeholders, who would directly/ indirectly benefit from 

the system, for partly sharing the cost of metro construction.  

Additional  taxes due  to  improved accessibility, higher property  rates  (as a  result of metro 

availability) may also be considered in the immediate influence area of metro corridor.  

  

13.9.3 Way Forward 

On acceptance of the Detailed Project Report by VDA, the following action may be  initiated 

for implementing the Varanasi Metro:  

Approval of State Government (Cabinet Approval) to the Detailed Project Report. 

Issue of notification for the project and alignment. 

The DPR  to be  forwarded  to  the Ministry of Urban Development, Planning Commission 

and Finance Ministry with the request for approving the Metro project and for financial 

participation through equity contribution to the SPV. 

Land acquisition related issues. 

Examination and appraisal of DPR by bilateral/multilateral funding agencies for possible 

funding.  

Stakeholder consultation on environmental and social impact of the project. 

Signing of an MOU between Uttar Pradesh State Government and Government of India. 

giving all details of the Joint Venture bringing out the financial involvement of each party, 

liability for the loans raised, the administrative control in the SPV, policy in regard to fare 

structure etc. 

Loan approval 

Set up the Special Purpose Vehicle (SPV) VMRC (Varanasi Metro Rail Corporation Ltd.) for 

implementing the project and for its subsequent Operation and Maintenance. 

Appointment of General Consultants (G.C.) for the project. 

Providing legal cover for construction as well as O&M stages of the project. 

Agreement between the State and Central Government for financing the debt portion of 

the project along with the setting up of time frame for completing the project. 

Packaging and invitation of bids for various contracts.