7/29/2019 129th HSJV Weekly Meeting
1/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECT
P ease Turn o your
mobile! Or Switch to
vibration mode!
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
Check! Right Now!
7/29/2019 129th HSJV Weekly Meeting
2/29
7/28/20
SCREEN
Dont Panic11
Switch Off All Electrical Equipment22
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
Dont Run, Walk Fast!33
Go to the Assembly Point44
Wait for the Final Instruction55
1. Safety Moment
2. Previous Meeting
1. Safety Moment
2. Previous Meeting
7. Weekly Inspection
Committee Inspection
Weekly Inspection
7. Weekly Inspection
Committee Inspection
Weekly Inspection
. rograms
4. HSE Statistics
Performance per Area and Total
5. HSE Findings Summary
HSE Findings by Company
. rograms
4. HSE Statistics
Performance per Area and Total
5. HSE Findings Summary
HSE Findings by Company
8. Incident Report- NM
9. Medical Cases
10.Environmental Issues
11. Action Plans
Hanlim
8. Incident Report- NM
9. Medical Cases
10.Environmental Issues
11. Action Plans
Hanlim
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
va ua on y n ngs core6. Findings Analysis per Discipline
va ua on y n ngs core6. Findings Analysis per Discipline
Seoyong (Infra)
Jong Hap (PB)
Seoyong RWC-CAR Status
Seoyong (Infra)
Jong Hap (PB)
Seoyong RWC-CAR Status
7/29/2019 129th HSJV Weekly Meeting
3/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 129th HSJV Weekly Meeting
4/29
7/28/20
NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS ACTION BYACTION BYDUEDUE
DATEDATESTATUSSTATUS
1Low HSE
Both Seoyong(I), J onghap(PB) reported none onHSE nonconformance but HSJ V/KEPCO team Seoyong (I) Next
DONEn ngs spo e eva ons n e area. o companes o
present action plans on next meeting.J onghap(PB) ee ng
2High HSE
Findings
Hanlim E&C group acquired high number of HSE
findings with score of 4.5. This rating is based on
established scoring by HSE Department that is
proportional to the severity of given risk. The
subcontractor will present on next meeting their
corrective actions.
Hanlim E&CNext
MeetingDONE
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
3 Medical Case
HSE Manager inquired about Seoyongs action on
last week RWC. Seoyongconfirmed to verify status
of corrective action.
SeoyongNext
MeetingDONE
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 129th HSJV Weekly Meeting
5/29
7/28/20
OtherPTWissues:
WorkingwithoutapprovedJHA/PTW
CompetencyofPermitHolders/Supervisor
Relatedactions:
Screenin of Permit Holders and Permit
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
Issuers
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 129th HSJV Weekly Meeting
6/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
Current StatusCurrent Status
Batches : 2, Attendees : 34Batches : 2, Attendees : 34
7/29/2019 129th HSJV Weekly Meeting
7/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
ItemAncil lary Ar ea Camp Area Offic e Area Power Bloc k Village 1 Village 2 HSJV Total
For theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
Cum
Near Misses 0 0 0 0 0 2 3 22 0 0 0 0 3 24
Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1
(This Week From July 20 July 26, 2013)
First Aid Cases (FA) 0 4 1 4 0 9 3 69 0 7 0 3 4 96
Medical TreatmentCases (MTC) 0 4 0 3 0 5 0 12 0 0 0 1 0 25
Restricted WorkCases (RWC) 0 4 0 1 0 0 0 4 0 0 0 0 0 9
LTIs 0 0 0 0 0 0 0 3 0 0 0 0 0 3
Property/Vehicle
Accid ents 0 4 0 1 0 4 0 7 0 2 0 1 0 20
Environmental
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop
Power Block Cut Off Wall, Wharf Area, Concrete Block Area
* : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 31 (2013)
Release
Forthisweek Cumulative
OneStrike Policy 2 136*
7/29/2019 129th HSJV Weekly Meeting
8/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
(This Week From July 20 July 26, 2013)
Issued
NearMissNearMiss
CARCAR
0 1 2 3
1 20 178 199
Findings TotalKE
P
C
O
H
S
J
V
S
U
B
C
O
N
Open Closed
KEPCO HSJV Subcon KEPCO SubconHSJV
0 1 0 0 0 2
1 13 0 0 7 178
BARAKAH NUCLEAR POWER PLANT PROJECT
TOTALTOTAL
OC&
WFOC
&
WF 0 32 289 321
1 53 469 523
0 0 0 0 32 289
1 14 0 0 39 469
7/29/2019 129th HSJV Weekly Meeting
9/29
7/28/20
3334
3738
39
MaterialManagement
FirePrevention
Health&Welfare
Plant&Equipment
PPE
(This Week From July 20 July 26, 2013)
99
1015
1920
222424
2626
2931
Environmental
HotWorks
Training
Lifting
Hand&PowerTools
ElectricalSafety
ColorCoding
WasteManagement
Access&Egress
FallProtection
WorkingatHeight
Scaffolding
Signs,Barriers&barricades
BARAKAH NUCLEAR POWER PLANT PROJECT
01
233
455
0 5 10 15 20 25 30 35 40 45
SteelErection
LOTO
ConfinedSpace
PTWExcavation
Documents
PoorIllumination
RoadSafety
uperv s on
Source: CAR, Near Miss, Walkthrough and Observation Card
Regular suction or disposal
Replace eye protection with
blurred vision and scratch
lens Power Bl ockPower Block AdvanAdvan
Provide spill containment
tray for threading machine.
1 32
of toilet sewage waste
(Power Bl ock,(Power Block, AdvanAdvan))
Provide first aid kit at the
workshop (Village 1, WBG)(Village 1, WBG)
Provide rest shelter for
workers at site (Mixing(Mixing
Basin, AlBasin, Al RaeelRaeel))
Inform worker not to use
,,
Proper respirator, hand
gloves when handling
Bitumen compounds (Office(Office
Area,Area, Seob onSeobon))
Supervisor to use suitable
eye protection when exposedto laser beams. (Ancillary(Ancillary
Area,Area, HwacheonHwacheon))
,,
Warn all drivers to fil l in
equipment checklist prior
start of work (Batching(Batching
Plant, Eugene)Plant, Eugene)
Install anti-whip arrestor for
concrete pump truck
discharge pipe line.
(RCB1,(RCB1, SeoyongSeoyong))
BARAKAH NUCLEAR POWER PLANT PROJECT
drinking water for washinghands (Office Area,(Office Area, SeobonSeobon))
Flagman must us e the
approved vest color(Power(Power
Block, WBG)Block, WBG)
Ensure limit switches for
MEWP are instal led and
working .(O&M, Al Inayah)
PPE Health and WelfarePlant and Equipment
7/29/2019 129th HSJV Weekly Meeting
10/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
AncillaryAreaVillage1
42
FindingsperArea
(This Week From July 20 July 26, 2013)
Arch(I)Mech
Piping
28
FindingsperDiscipline
75
14%
CampArea
6
1%
OfficeArea
81
16%
8%19%
Elec
67
13%
49
10%
5%
BARAKAH NUCLEAR POWER PLANT PROJECT
PowerBlock
316
61%
Arch(PB)
189
36%
Civil
87
17%
7/29/2019 129th HSJV Weekly Meeting
11/29
7/28/20
(This Week From July 20 July 26, 2013)
3443
93
40
60
80
100
FindingsperCompany(ArchPB)
33
710
Supervision
Training
WasteManagement
WorkingatHeight
Findingsper
Cause
(Arch
PB)
154
0
20
Advan D&I DOW Seobon Seoyong(PB)
38
2 17 10
19
1
134
31
2
22 26
1 210
05
10152025303540
FindingsperArea(ArchPB)
25
414
115
134
216
116
131
1214
Documents
ElectricalSafety
Environmental
FallProtection
FirePrevention
Hand&PowerTools
Health&Welfare
HotWorks
Housekeeping
LIfting
MaterialManagement
Plant&Equipment
PPE
PTW
Scaffolding
Signs,Barriers&Barricades
BARAKAH NUCLEAR POWER PLANT PROJECT
1311
0 5 10 15 20 25
Access&Egress
ColorCoding
Corrective Action
Clearing of rebars, cables, and other materials exposed at ground.
Provide barricades at crawler crane and laydown area.
(This Week From July 20 July 26, 2013)
2428
16
22
15
20
25
30
FindingsperCompany(ArchInfra)
94
62
Signs,Barriers&Barricades
Training
WasteManagement
WorkingatHeight
FindingsperCause(ArchInfra)
3
0
5
10
Han li m S eo bo n Se oy ong T owe rs tec h Uw el l Yo oA
23
6
45
26
20
30
40
50
FindingsperArea(ArchInfra)
51
5777
102
110
112
51
ElectricalSafety
Environmental
FallProtection
FirePrevention
Hand&PowerTools
Health&Welfare
Housekeeping
LIfting
LOTO
MaterialManagement
Plant&Equipment
PoorIllumination
PPE
PTW
BARAKAH NUCLEAR POWER PLANT PROJECT
0
AncillaryArea CampArea OfficeArea Village1
2 3
0 2 4 6 8 10 12
Access&EgressColor
Coding
Corrective Action
Spill containment trays to be provided for crane, and pipe threading machine.
Arrangement o f scaffolding, wooden materials scat tered on ground.
7/29/2019 129th HSJV Weekly Meeting
12/29
7/28/20
(This Week From July 20 July 26, 2013)
44
2330
40
50
Findingsper
Company
(Civil)
13
53
Training
WorkingatHeight
Findingsper
Cause
(Civil)
5 2 310
0
10
20
AlRaeel Athena Eugene Gusan Hilalco WBG
3
31
26 4 5
19
3 5 5 4
05
101520253035
FindingsperArea(Civil)
222
3333
108
51
97
27
2
ElectricalSafety
Excavation
FirePrevention
Health&Welfare
LIfting
Plant&Equipment
RoadSafety
Signs,Barriers&Barricades
BARAKAH NUCLEAR POWER PLANT PROJECT
32
0 2 4 6 8 10 12
Access&Egress
Corrective Action
Expedite repair of water cooler intended for Hilalcos workers.
Removal of stagnant water to prevent development of il lness at site.
Drivers and HSE personnel shall use equipment checklist prior start of w ork.
(This Week From July 20 July 26, 2013)
10 11
4
16
410
15
20
FindingsperCompany(Mech)
1222
Signs,Barriers&Barricades
Supervision
WasteManagement
WorkingatHeight
FindingsperCause(Mech)
0
G eu mh wa H wa ch on S am ji n S ei l Y ou n
Chang
Sam ho AlInayah
14
8
3 2 14 3
1 2 2 1
8
02468
10121416
FindingsperArea(Mech)
111
522
1111
61
77
ConfinedSpace
Environmental
FallProtection
FirePrevention
Hand&PowerTools
Health&Welfare
HotWorks
Housekeeping
LIfting
MaterialManagement
Plant&Equipment
PoorIllumination
PPE
Scaffolding
BARAKAH NUCLEAR POWER PLANT PROJECT
2
0 1 2 3 4 5 6 7 8
Access&
Egress
o or od ng
Corrective Action
Complete main parts of scaffolding, scaf tag signed prior use of scaffolding.
Use of eye protection when exposed to rays from laser machine, and engaged in
high speed cutting machine for plywood.
7/29/2019 129th HSJV Weekly Meeting
13/29
7/28/20
(This Week From July 20 July 26, 2013)
9
19
10
15
20
FindingsperCompany(Piping)
111
l
Signs,Barriers&Barricades
WasteManagement
WorkingatHeight
Findingsper
Cause
(Piping)
0
5
SungChang YounChang(PB)
20
510
15
20
25
FindingsperArea(Piping)
21
24
13
211
33
1
l
ElectricalSafety
Environmental
FallProtection
FirePrevention
Health&Welfare
HotWorks
Housekeeping
MaterialManagement
Plant&Equipment
PPE
RoadSafety
Scaffolding
BARAKAH NUCLEAR POWER PLANT PROJECT
0
5
AncillaryArea PBABUnit1 PBTGB1
0 1 2 3 4 5
olor od ng
Corrective Action
Proper storage of gas cylinder in laydown area protected from exposure to
sunlight.
Follow reverse parking of vehicles at fabrication shop.
(This Week From July 20 July 26, 2013)
17
30
1720
30
40
FindingsperCompany(Elec)
24
38
Scaffolding
Signs,Barriers&Barricades
WasteManagement
WorkingatHeight
FindingsperCause(Elec)
3
0
10
D ae my un g H yu nd aiC&I Jonghap JongHap(PB)
10
27
84 2 1 1
61 1 3 3
05
1015202530
FindingsperArea(Elec)
61
42
31
61
85
24
1
ElectricalSafety
FallProtection
FirePrevention
Hand&PowerTools
Health&Welfare
HotWorks
Housekeeping
LIfting
MaterialManagement
Plant&Equipment
PoorIllumination
PPE
PTW
BARAKAH NUCLEAR POWER PLANT PROJECT
4
0 2 4 6 8 10
Access&
Egress
Corrective Action
Follow safe use of ladder with one worker to assist and hold ladder at the base.
Provision of safe working platform for working at height jobs.
7/29/2019 129th HSJV Weekly Meeting
14/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
5150
60
3430
26
9
2421
1714
16
10
20
30
40
BARAKAH NUCLEAR POWER PLANT PROJECT
4 3 2 3 4 3 2 1 10
7/29/2019 129th HSJV Weekly Meeting
15/29
7/28/20
50
60 RoadSafetyConfinedSpace
PTW
RoadSafety
Excavation
Documents
5 Housekee in
9,Housekeeping
20
30
40 EnvironmentalTraining
ElectricalSafety
HotWorks
Hand&PowerTools
LIfting
ColorCoding
WasteManagement
Signs,Barriers&Barricades
MaterialManagement
Plant&Equipment
,
4,FallProtection
4,Access&Egress
5,Housekeeping
5,PPE5,Health&
Welfare
3,Health&
Welfare4,Plant&
Equipment
4,Health&
Welfare
4,Housekeeping
4,Housekeeping
BARAKAH NUCLEAR POWER PLANT PROJECT
0
10 FirePreventionAccess&Egress
WorkingatHeight
Fall
ProtectionScaffolding
Health&Welfare
PPE
Housekeeping
700
80090
100KEPCO/HSJV
SUBCON
(This Week From July 20 July 26, 2013)
100
200
300
400
500
600
203040506070 Manpower
BARAKAH NUCLEAR POWER PLANT PROJECT
00
Seoyong
Seoyong(PB)
TowersTech
Gusan
Jonghap
Jonghap(PB)
YounChang
YounChang(PB)
Hwachon
WBG
Hilalco
Advan
Hanlim
YooA
HyundaiC&I
Samjin
Eugene
Daemyung
Seobon
D&I
AlRaeel
DOW
Samho
Geumhwa
Sungchang
7/29/2019 129th HSJV Weekly Meeting
16/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECT
8.06.3
FindingsScore=NumberofCausalxRisk(FactorScore)FindingsScore=NumberofCausalxRisk(FactorScore)
Source: CAR, Near Miss, Walkthrough and
Observation Card reported by KEPCO & HSJV
0.0
2.0
4.0
6.0
2.6 2.52.2
0.0
1.2
3.22.5
1.5
2.8
0.41.0 1.2
2.0
0.71.5
BARAKAH NUCLEAR POWER PLANT PROJECT
ActionPlanActionPlan forCompanyrequiringassistanceandsupportfromthesystemforCompanyrequiringassistanceandsupportfromthesystem
1.JointInspection willbecarriedoutbyAreaManagementTeam.
2.SpotTrainingwillbegiven toworkersaboutmajorfindings
3.Actionplanwillbe submittedtoHSJVHSETeamdevelopby TOWERSTECH
Legend : (I) Infra, (PB) Power Block
7/29/2019 129th HSJV Weekly Meeting
17/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
Top Hazards
Cause Nos
Plant&Equipment 5
Total No. of Findings : 16
Health&Welfare,1
Signs,Barriers&Barricades,1
WasteManagement 4
Control Measure Due Date
Ensuretoturnoffswitchof
equipmentbeforeleaving
andwhennotinuse.
Done
Soilprotectionagainst
Plant&Equipment,5
Hand&PowerTools,1
LIfting,1
BARAKAH NUCLEAR POWER PLANT PROJECT
concrete
waste
should
be
providedduringconcrete
works.
Alw ays
WasteManagement,4
FallProtection,1Housekeeping,1
PPE,1
Source: CAR, Near Miss, Walkthrough and Observation Card
7/29/2019 129th HSJV Weekly Meeting
18/29
7/28/20
Top Hazards
Total No. of Findings: 23
Scaffolding,4
Plant&Equipment,4
ConfinedSpace,1
PoorIllumination,1
Scaffolding 4
Plant&Equipment 4
Control Measure Due Date
Ensurethatscaffoldingare
inspectedandprovidedwith
greentagbeforeuse.
Done
ElectricalSafety,1
WasteManagement,1
Access&Egress,1
BARAKAH NUCLEAR POWER PLANT PROJECT
Equipmentmustbe
inspectedandcolorcoded
beforeuse
on
site.
Done
FirePrevention,3
Hand&PowerTools,2
RoadSafety,2Supervision,1
ColorCoding,1ot or s,1
Source: CAR, Near Miss, Walkthrough and Observation Card
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 129th HSJV Weekly Meeting
19/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECT
InspectionInspection DateDate AttendeesAtt endees RemarkRemark
Commi tt ee Ins pect ion 2013-07-23 HSJV, KEPCO, HSE Manag ement Team 1 Fi nd ing
Weekly Inspection 2013-07-24 HSJV HSE Team 6 Findings
2
3
FindingsperCompany
2PoorMaintenance
FindingsperCausal
2
1
2
1
0
1
AlInayah Hanlim Towerstech YounChang
BARAKAH NUCLEAR POWER PLANT PROJECT
1
1
2
0 1 2 3
NoSignages
NeedsTraining
NoInspection
Key item : MEWP
7/29/2019 129th HSJV Weekly Meeting
20/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
AREAAREA : Power Bl ock ,: Power Block, AdvanAdvan 25 June 201325 June 2013
CORRECTIVE ACTION:CORRECTIVE ACTION:
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 129th HSJV Weekly Meeting
21/29
7/28/20
AREAAREA : GIB,: GIB, SeoyongSeoyong 25 July 201325 July 2013
CORRECTIVE ACTION:CORRECTIVE ACTION:
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
AREAAREA :: GIB,GIB, JonghapJonghap 21 July21 July 20132013
CORRECTIVE ACTION:CORRECTIVE ACTION:
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 129th HSJV Weekly Meeting
22/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
No.Source of
InjuryArea Descr iption
Immediate
Act ion
Planned
Supervisor
Preventive
Act ion
1Injury left
thumb.
D&I
RebarWorker
PowerBlock
TGB1
Whiledoingrebar
activity,rebar
suddenlyslippedandIPs
glovescaughtinbetween
slingbelt
AssessedbyDr.Kim
Woundcleaningwith
salinedone
Withdressing
application
AnalgesicIMmedicine
Proper
coordination
between
riggerand
worker
Useof
crowbar to
BARAKAH NUCLEAR POWER PLANT PROJECT
21072013
21:15
.
gotinjured. g ven Referredtohospital disengage
trapped
rebars
7/29/2019 129th HSJV Weekly Meeting
23/29
7/28/20
No.Source of
InjuryArea Descr iption
Immediate
Act ion
PlannedSupervisor
Preventive Acti on
2Sprainleft
lateralankle
JONGHAP
LaundryBoy
StaffCamp
LaundryRoom
Laundryworkerentered
theroomandhave
argumentwithIPwhich
promptedtheworkerto
pushIPandloses
balancewhich
accidentall fellonthe
AssessedbyDr.
Kim
Referredto
hospitalforXRay
Personnelwere
advisedtoreport
any
disagreements.
Scheduleof
dryingisset
BARAKAH NUCLEAR POWER PLANT PROJECT
21072013
08:00
floorandsustainedpain
onhisleftankle.
whenACis
unavailable.
No.Source of
InjuryArea Descr iption
Immediate
Act ion
Planned
Supervisor
Preventive
Act ion
3
Minormiddle
finger
laceration
ADVAN
RebarWorker
PowerBlock
AB1Unit4
IPwithhisteam
performedtherebar
erectionactivity.
Reportedly,IPhadhis
middlefingercaughtin
betweentherebars
AssessedbyDr.Kim
Woundcleaningwith
salinedone
Withdressing
application
Anal esicIM
Useof
appropriate
handgloves.
Proper
coordination
between
riggerand
BARAKAH NUCLEAR POWER PLANT PROJECT
21072013
20:45
causingminor
laceration
tothesaidfinger.medicine
given wor ers. Awarenessof
workersto
givenhazards.
7/29/2019 129th HSJV Weekly Meeting
24/29
7/28/20
No.Source of
InjuryArea Descr iption
Immediate
Act ion
PlannedSupervisor
Preventive
Act ion
4
Righteyepain
withforeign
body
SHINWOO
H/EPainter
PowerBlock
AB1
Whiletakingarestin
frontofventilationfan
hedidnotnoticethata
housekeeperissweeping
thefloorandthe
accumulatedduskflew
AssessedbyDr.Kim
Eyewashingwith
salinedone
Eyedropsmedication
iven
Settimeto
performdaily
cleaningof
restrooms.
Provide
housekeeping
tools to
BARAKAH NUCLEAR POWER PLANT PROJECT
22072013
10:00
causedirritationtohis
eyes.
collectdirton
floor dustpan,
etc.
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 129th HSJV Weekly Meeting
25/29
7/28/20
Opening Meeting NMDC Dredging AreaHeavy Equipment Shop
BARAKAH NUCLEAR POWER PLANT PROJECT
Descript ionDescript ion
CEMP 3CEMP 3rdrd Party Audit Conducted on 24Party Audit Conducted on 24 thth .July.2013.July.2013 1 Moderate f indi ng for NMDC and 2 Minor f indin gs for HSJV1 Moderate f indi ng for NMDC and 2 Minor f indin gs for HSJV The draft audit report w i l l be issued on 3rd.August .2013The draft audit report w i l l be issued on 3rd.August .2013
Batch PlantAncillaryPower Block
Issuedon11.July.2013
Waitin s are artsfromUSA
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Marine Works Wharf Phase 2
Description Crawler Crane on barge observed disch arging heavy black smoke whil e dredging works.
Act ion taken Ensure to conduct preventive maintenance according to manufacturers specification
Status OPEN
7/29/2019 129th HSJV Weekly Meeting
26/29
7/28/20
No.0 DateActio n by
CompanyS ta tu s C lo s in g D ate
Expiration
Date
Ref. No.
CARM ai n Area Sub -A re a Issu ed By
Issuer
Company
1
11 July
2013 Athena
Crawler Crane on barge with body
number LIMA 2400-B observed
discharging heavy black smoke from
the exhaust system while dredging
works in progress which contributes
to degradation of ambient air quality.
OPEN
16 July
2013
16 June
2013 1621 Wharf Phase 2Renato
PonceHSJV
BARAKAH NUCLEAR POWER PLANT PROJECT
WASTEMANAGEMENTUPDATE
Week=18/07/2013 25/07/2013
WASTETYPEThisweek Lastweek
Collected(m3) Disposal(m3) Recycled(m3) Recycle(%) Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)
Paper 48 0 45 56 0 0
Metal 32 0 0 24 0 45
Construction 104 675 0 88 405 0
Concrete 0 0 0 0 0 0
Wood(Good) 0 0 0 0 0 0
Wood(Bad) 176 90 0 104 45 0
Plastic 96 0 0 72 0 0
Municipal 0 336 0 0 376 0
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend:Collected WastefromSitetoTemporaryStorageAreaDisposal WastefromTemporaryStorageAreatoLandfillArea
Recycle Treatedwaste(GMET)toRecyclingPlants
Hazardous 0 0 0 8 8 0
TotalSolidWaste 456 1,101 45 9.87% 352 834 45 12.78%
7/29/2019 129th HSJV Weekly Meeting
27/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 129th HSJV Weekly Meeting
28/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 129th HSJV Weekly Meeting
29/29
7/28/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT