N-50/PLATTEVIEW RD, SPRINGFIELD STP-50-2(136); C.N. 22726 PUBLIC INFORMATION OPEN HOUSE MEETING PROJECT INFORMATION SHEET LOCATION The proposed project is located at the intersection of Platteview Road and Nebraska Highway 50 (N-50) at mile marker (MM) 82.60. The proposed project would extend approximately 1,100 feet west and approximately 800 feet east of the intersection on Platteview Road. Construction may begin and/or end approximately 500 feet ahead of or beyond the actual project limits to accommodate transitioning the pavement. PURPOSE AND NEED The purpose of this proposed project is to preserve the transportation asset, improve the reliability of the transportation system and perpetuate the mobility of the traveling public. The need for this project is based off a recently completed traffic study of the intersection. SCOPE OF WORK The proposed project would involve widening and/or replacing pavement, installing a traffic signal, and roadway lighting modifications. CONSTRUCTION SCHEDULE Construction of the project could begin as early as spring of 2021 and could be completed by fall of 2021. N-50 FAIRVIEW RD 132ND ST PLATTEVIEW RD 156TH ST SPRINGFIELD N LOCATION MAP Project Location LEGEND Detour Temporary Road Closure Tuesday, October 22, 2019 4:00 - 6:00 PM Springfield Community Center 104 Main Street Springfield, NE 68059
2

1234567890 abcdefghijklmnopqrstuvwxyz Bold Italic N … · 2019-10-22 · N-50/PLATTEVIEW RD, SPRINGFIELD STP-50-2(136); C.N. 22726 PUBLIC INFORMATION OPEN HOUSE MEETING PROJECT INFORMATION

Jul 09, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1234567890 abcdefghijklmnopqrstuvwxyz Bold Italic N … · 2019-10-22 · N-50/PLATTEVIEW RD, SPRINGFIELD STP-50-2(136); C.N. 22726 PUBLIC INFORMATION OPEN HOUSE MEETING PROJECT INFORMATION

N-50/PLATTEVIEW RD, SPRINGFIELD STP-50-2(136); C.N. 22726PUBLIC INFORMATION OPEN HOUSE MEETING

PROJECT INFORMATION SHEET

LOCATIONThe proposed project is located at the intersection of Platteview Road and Nebraska Highway 50 (N-50) at mile marker (MM) 82.60. The proposed project would extend approximately 1,100 feet west and approximately 800 feet east of the intersection on Platteview Road. Construction may begin and/or end approximately 500 feet ahead of or beyond the actual project limits to accommodate transitioning the pavement.

PURPOSE AND NEEDThe purpose of this proposed project is to preserve the transportation asset, improve the reliability of the transportation system and perpetuate the mobility of the traveling public. The need for this project is based off a recently completed traffic study of the intersection.

SCOPE OF WORKThe proposed project would involve widening and/or replacing pavement, installing a traffic signal, and roadway lighting modifications.

CONSTRUCTION SCHEDULEConstruction of the project could begin as early as spring of 2021 and could be completed by fall of 2021.

Light Light Italic

Regular Italic

BoldBold Italic

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ROBOTO CONDENSED | Accent copy

Secondary Brand Typefaces

Thin

Light

Regular

Bold

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ROBOTO SLAB | Accent copy

Regular Italic

BoldBold Italic

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ARIAL | Internal use

N-50

FAIRVIEW RD

132N

D ST

PLATTEVIEW RD

156T

H ST

SPRINGFIELD

N

LOCATION MAP

Project Location

LEGEND

Detour

Temporary Road Closure

Tuesday, October 22, 20194:00 - 6:00 PMSpringfield Community Center104 Main StreetSpringfield, NE 68059

Page 2: 1234567890 abcdefghijklmnopqrstuvwxyz Bold Italic N … · 2019-10-22 · N-50/PLATTEVIEW RD, SPRINGFIELD STP-50-2(136); C.N. 22726 PUBLIC INFORMATION OPEN HOUSE MEETING PROJECT INFORMATION

ACCOMMODATION OF TRAFFICThe proposed project would require a temporary closure of Platteview Road west of N-50. A designated detour would be provided and would utilize 156th Street, Fairview Road and N-50. The remainder of the project would be constructed in phases with lane closures controlled by appropriate traffic control devices and practices.

RIGHT-OF-WAYThe proposed project would require the acquisition of additional property rights, which could include new right-of-way (ROW), control of access (CA), permanent easements (PE), and/or temporary easements (TE). If your property is impacted by this project, you will be contacted by a representative once the design footprint has been established. Access to adjacent properties would be maintained during construction but may be limited at times due to traffic phasing requirements.

POTENTIAL IMPACTSNo wetland or environmental impacts are anticipated.

ESTIMATED COSTThe estimated cost of the proposed project is approximately $1.4 Million. Funding for the project would derive from federal, state, county and city funding sources.

PROJECT CONTACTS

Send Comments to:NDOT Public InvolvementSarah Soula1500 Highway 2P.O. Box 94759Lincoln, NE [email protected]

For more information:NDOT District 2 EngineerTim Weander4425 South 108th St.P.O. Box 45461Omaha, NE [email protected]

Initial 10 Years

2021 2031

10,835 12,090

12% 12%

N-50

Year

Vehicles Per Day (ADT)

% Heavy Trucks

Initial 10 Years

2021 2031

4,210 8,730

11% 11%

(West) Platteview Road

Year

Vehicles Per Day (ADT)

% Heavy Trucks

Initial 10 Years

2021 2031

6,590 10,490

8% 8%

(East) Platteview Road

Year

Vehicles Per Day (ADT)

% Heavy Trucks

TRAFFIC VOLUMES

Light Light Italic

Regular Italic

BoldBold Italic

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ROBOTO CONDENSED | Accent copy

Secondary Brand Typefaces

Thin

Light

Regular

Bold

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ROBOTO SLAB | Accent copy

Regular Italic

BoldBold Italic

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ABCDEFGHIJKLMNOPQRSTUVWXYZabcdefghijklmnopqrstuvwxyz1234567890

ARIAL | Internal use

Comments will be collected through Wednesday, November 6, 2019.Visit http://dot.nebraska.gov/projects/future-projects and click on the

“N-50/Platteview Rd, Springfield” link