12/04/2005 M.Castoldi CERN-SC International HEP Safety International HEP Safety Forum Forum Stanford Linear Accelerator Stanford Linear Accelerator Center Center ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN SAFETY COMMISSION THE CERN SAFETY COMMISSION Matteo Castoldi Matteo Castoldi V HEP Safety Forum
24
Embed
12/04/2005M.Castoldi CERN-SC International HEP Safety Forum Stanford Linear Accelerator Center ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
12/04/2005 M.Castoldi CERN-SC
International HEP Safety ForumInternational HEP Safety ForumStanford Linear Accelerator CenterStanford Linear Accelerator Center
ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN SAFETY COMMISSIONTHE CERN SAFETY COMMISSION
Matteo CastoldiMatteo Castoldi
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
Aim:Aim: Present a complete model of Quality Management System Present how it could be applied to the CERN Safety Commission
(SC) Understand if Quality Management brings added value to SC
Content:Content: Role of SC at CERN Aim of SC Quality Management System CERN Integrated Management System SC Quality Management System Conclusions
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
The role of SC at CERNThe role of SC at CERN Perform all the centralized activities of CERN directly related with
health, safety and protection of the environment. Some of the SC fields of activity are:
draw up and application of Safety* rules occupational health Safety divulgation and training emergency management radiation protection environmental protection chemical safety
SC offers a service to the entire CERN
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
* Safety, with an initial capital letter, is used to cover health, safety and protection of the environment
SC organigramme
12/04/2005 M.Castoldi CERN-SC
Aim of a Quality Management System in SCAim of a Quality Management System in SC Demonstrate SC ability to consistently provide the services it is
deemed for Demonstrate SC ability to meet regulatory requirements of Host
States (France, Switzerland) Enhance the satisfaction of the CERN personnel profiting from SC
services
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
Is there an added value for SC and/or CERN ? If yes implement quality management
12/04/2005 M.Castoldi CERN-SC
CERN Integrated Management SystemCERN Integrated Management System General model of Integrated Management System
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
Safety Management
System
Integrated Management System
Environment Management
System
Quality Management
System
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
CERN Safety Management System
SC Quality Management System + departments Safety related activities quality systems, constitute the CERN Safety Management System
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
CERN Safety Management System
SC QMS
Dept’s Safety
12/04/2005 M.Castoldi CERN-SC
CERN Integrated Management System
Added value? …. but without SC Quality Management System it is not possible to build a CERN Integrated Management System
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
SC control
CERN QMS
CERN Integrated Management System
EMS
CERN Safety Management System
SC QMS
Dept’s Safety
12/04/2005 M.Castoldi CERN-SC
The Safety Commission Quality Management SystemThe Safety Commission Quality Management System Based on four pillars(*):
SC organisation quality SC personnel quality SC units/projects quality Continual improvement of the system
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
SC QMS
Organisation Quality Syste m
Personnel Quality Syste m
Unit/ pr ojec t Quality Syste m
Maintenance & Improve ment
(*) Jean Menthonnex, Lausanne, Switzerland, 2002
12/04/2005 M.Castoldi CERN-SC
I pillar: Organization Quality SystemI pillar: Organization Quality System Process approach
Processes to perform activities are the starting point Input and output requirements shall be clearly identified
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
ActivityA
ActivityB
ActivityC
Input for
Activity A
Input for
Activity C
Input for
Activity B
Outputfor
Activity A
Outputfor
Activity B
Outputfor
Activity C
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
Example of process: Mechanical Safety (approval of new device)
ConceptualDesignReview
Engineering file
preparation
EngineeringDesignReview
Preliminarydescriptionof devicefocussed
on mechanicalmatters
SCcomments
to preliminary description
Engineeringfile,
test results
SC Safety StudyReport
Fabricationand
testing
Finaltesting at
CERN
Device andmanufacturing
certificates,SC Safety Study
Report Safety InspectionReport
Safety Commission Responsible for the device
SC Safety StudyReport
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
Documentation is prepared, based on processes
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
Level A Manual
quality policy, objectives of SC implementation, review, approval and revision
of the system structure of SC, responsibility, authority and
interrelations key processes of SC reference to SC procedures for key processes
12/04/2005 M.Castoldi CERN-SC
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
Level B Procedures
for SC processes or complex activities responsibility and authority of SC and other parties scope, needs of SC and third parties input and output of processes or complex activities definition of records reference to work instructions
Example: procedure for final mechanical testing (commissioning) of an equipment
V HEP Safety Forum
Procedure example
12/04/2005 M.Castoldi CERN-SC
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
Level C: Work instructions
description of important activities
Requirements and scope
Activities description following the operations sequence
definition of related records reference to parent procedure
Example of work instruction: how to perform a pressure test, how to perform a chemical analysis on a water specimen
Form/record record data to demonstrate compliance with procedures or work
instructions permanently stored into CERN Engineering Data Management System
Examples of form/record: accident declaration, Safety Study Report
V HEP Safety Forum
Form example
Record example
12/04/2005 M.Castoldi CERN-SC
II pillar: Personnel Quality SystemII pillar: Personnel Quality System Based on standard CERN tools
Merit Advancement and Promotion Scheme (MAPS) short-term training needs evaluation
If no training is available to match post requirement: Skills and Talents Inventory
inventory of the human skills currently available at CERN
Personnel certification whenever possible and convenient
Example of SC personnel certification the firemen are certified ambulance officers by Swiss authorities
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
III pillar: Units Quality SystemIII pillar: Units Quality System Whenever necessary, SC units certified by independent body SC auto-certification when no certifier is available or convenient
Example of SC certified unit the Laboratory of Occupational Health Medicine certified QUALAB by
the Quality Control Centre Switzerland
Project Quality SystemProject Quality System Safety Audits Protocol to monitor safety in new projects
based on ISO 10006:2003 standard
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
The Safety Audits Protocol (1/6 - definitions) Audited project
selected by the Safety Commission based on the advancement of the activities and risk involved
Safety responsible the GLIMOS[1] of the experiment, or the Project Safety Responsible
Audit coordinator a member of SC appointed by the Head of SC technical competences, leadership skills
Safety Commission team of experts chosen by the Audit coordinator individually competent, motivated, and supportive
[1] For Safety matters, an experiment is represented by a Group Leader in Matters of Safety (GLIMOS), who is responsible for Safety, with the necessary authority, from the design stage and subsequently throughout the development, construction, and operational stages of the equipment until it is dismantled and correctly disposed of. The GLIMOS is appointed by the parent Department Head with the consensus of SC.
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
Audit procedure
initiated by SC systematic meetings four steps (see picture) terminated at the end of the
project final audit report registered in the Risk
Management Plan
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
The Safety Audits Protocol (2/6 - procedure)
V HEP Safety Forum
Risk Management Plan
12/04/2005 M.Castoldi CERN-SC
The Safety Audits Protocol (3/6 - steps) Hazard identification
at the initiation of the project the Safety responsible presents information and documents hazards with significant impact noted in the Risk Management Plan a responsible for the risk assigned for each hazard
Risk assessment
criteria and techniques decided by SC experts the responsible for the risk presents analyses assessment performed by SC following CERN Safety rules non acceptable risks noted in the Risk Management Plan
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
The Safety Audits Protocol (4/6 - steps) Risk treatment
non-acceptable risks treated the responsible for the risk presents solutions SC decides whether to retain a solution Retained solutions noted in the Risk Management Plan and implemented
Risk control
SC experts monitor the implementation of solutions SC experts and the Safety responsible watch on new risks Personnel anticipate and identify risks and report to the Safety responsible
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION The Safety Audits Protocol (5/6 - example)
Hazard identification the LHCb deputy-GLIMOS presents the envisaged structure and information
relevant to the gantry hazard mechanical safety is identified as unique hazard an LHCb engineer is assigned as responsible for the risk
Risk assessment the SC mechanical engineer gives details on the calculations and
documents to be submitted to SC. Safety requirements are recalled the LHCb engineer prepares and presents the calculations and documents the SC engineer assesses the submitted design and other documentation the SC engineer and the SC-GS/MS section leader prepare a Safety Study
Report
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
The Safety Audits Protocol (6/6 - example) Risk treatment
in case of negative Safety Study Report the LHCb engineer presents options the SC engineer and SC-GS/MS section leader may issue a positive Safety
Study Report Retained solutions are implemented and the gantry manufactured
Risk control the SC safety inspector monitors the correct construction of the gantry and
on new hazards arising in case of new hazards during the gantry construction a new hazard
identification step is undergone
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
Based on the PDCA approach Actions to improve quality are planned (Plan) Actions are implemented (Do) Result of actions is monitored (Check) Corrective actions are undergone if necessary (Act)
Both at managerial level and at process/activity level
From: D.Hortensius, et all., Towards a generic model for integrating management systems, ISO Management Systems Special Report, Jan. – Feb. 2004.
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
It applies to organisation, personnel and units/projects quality systems
Example: PDCA (environmental protection - EMS)
Managerial level1 SC management wants more efficient environmental protection
2 SC-IE group receives resources
7 results of environmental protection is reviewed by the SC management
8 environmental policy and resources review by the SC management
Process level3 SC-IE establishes the EMS (manual, procedures, etc.)
4 SC-IE implements the EMS at CERN (other Departments involved)
5 SC-IE audits EMS performance and reports to SC management
6 SC-IE modifies EMS, when necessary
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
12/04/2005 M.Castoldi CERN-SC
ConclusionsConclusions The presented Quality Management System model
can be extended to an Integrated Management System for the entire CERN
improves SC organisation, personnel, units/projects quality allows to enhance the satisfaction of CERN Director General,
Personnel, Host States
The strategic decision of implementing quality management and allocate necessary resources is under evaluation by the Safety Commission top management
ESTABLISHMENT OF A QUALITY ESTABLISHMENT OF A QUALITY MANAGEMENT SYSTEM IN THE CERN MANAGEMENT SYSTEM IN THE CERN
SAFETY COMMISSIONSAFETY COMMISSION
V HEP Safety Forum
Is there an added value for SC and/or CERN ? In our opinion yes !