Top Banner
w w w . a u t o s t e e l . o r g Die Development for AHSS Case Study Joe Meyecic Diversified Tooling Group
32

12 - Joe Meyecic - AHSS Tooling Technologies

Apr 02, 2018

Download

Documents

Sathish Kumar
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 1/32

w w w . a u t o s t e e l . o r g

Die Development for AHSSCase StudyJoe Meyecic

Diversified Tooling Group

Page 2: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 2/32

w w w . a u t o s t e e l . o r g

Diversified Tooling Group

Superior 

Cam

Superior Cam has established

itself as a technical leader in the

Prototype Sheet Metal Industry

during the past 30 years. We have

built a reputation as an innovative,

experienced and reliable full service

operation which emphasizes

production intent quality at every

step of the tooling process.

Midland

Design

Midland Design has 40 years of 

experience designing all types of 

vehicle sheet metal stamping dies.

Midland Design is regarded as a

leader in the field of “Solid CAD Die

Design.”

Bespro

Pattern

During the past 45 years Bespro

Pattern has developed an excellentreputation for quality, timing and

competitive prices. We are a

respected leader in the CNC

machining of poly patterns off solid

CAD die design.

American

Tooling

Center 

 American Tooling Center is a modernstate-of-the-art Tool and Die facility.

Our full service operation was

designed and constructed in 1989 as

a world class production die facility

which emphasizes a CAD/CAM/CNC

utilization.

4 companies

1 goal:

Full Service

2

Page 3: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 3/32

w w w . a u t o s t e e l . o r g

Defining the Part

• Fiat 500 Cabrio C-Pillar

• Material Specs:

– 1.2mm gage

– Dual Phase 590 steel

3

Page 4: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 4/32

w w w . a u t o s t e e l . o r g

C-Pillar Concerns

• Dimensional Tolerance

• Edge Fractures

• Splits

• Zinc Pick-up

• Excessive Die Wear

• Excessive Tonnage Requirements

4

Page 5: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 5/32

w w w . a u t o s t e e l . o r g

Product Design Modifications 

Changes driven by FEA results

Past design in red

New design in blue

Nose section

New product design also affected assembly

features resulting in modified weld sequence

5

Page 6: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 6/32

w w w . a u t o s t e e l . o r g

Fractures in Stamping 

• Dual phase steel is susceptible to fracture prior to localized necking 

6

Page 7: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 7/32w w w . a u t o s t e e l . o r g

Zinc Pick-up on Die Steels

• Dies for dual phase material are prone to excessive zinc flaking from the

material during the forming process.

7

Page 8: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 8/32w w w . a u t o s t e e l . o r g

Excessive Die Wear 

• Dual phase steel drives heavy wear on side walls in forming dies, requiring 

upgraded die materials and heat treatments / coatings.

8

Page 9: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 9/32w w w . a u t o s t e e l . o r g

Forming Force Requirements 

• Effect of Material Strength

– Increases in material strength result in increases of forming 

force requirements for typical automotive parts

40

60

80

100

120140

160

153 158 163 168 173

Crank Angle

   F   o   r   m   i   n   g   F   o   r   c   e   (   M   e   t   r   i   c

   t   o   n   s   )

100 

200 

300 

400 

500 

600 

700 

145  155  165  175  185  195 

Crank Angle 

   F  o  r  m

   i  n  g   F  o  r  c  e   (   M  e   t  r   i  c   t  o  n  s   ) DP980 

DP780 

DP600 

Binder tonnage

9

Page 10: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 10/32w w w . a u t o s t e e l . o r g

C-Pillar “Givens” 

• Have to meet dimensional requirements (nominal)

• Lead time is short (22 weeks including design)

• Little time for physical rework loops

• Restrike operations have minimal effect

• Parts have to run double

– Die investment

– Piece cost

10

Page 11: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 11/32w w w . a u t o s t e e l . o r g

Goals

• Plan for Advanced High Strength Steel Success

• Reduce / Eliminate Iterations in the press

• Increase Capability of Math-based system and

process

• Drive the iterations into Math

• Meet the short lead time requirements

• Meet the dimensional requirements

11

Page 12: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 12/32w w w . a u t o s t e e l . o r g

C-Pillar Concerns - Addressed

• Dimensional Tolerance

• Edge Fractures

• Splits

• Zinc Pick-up

• Excessive Die Wear

• Excessive Tonnage

Requirements

Full Cycle SimulationWith Part Compensation

& Minor Product Chgs.

D2 Inserts with Coated

Steels for Heat Treat

High Pressure calculated

For Binder System

12

13

Page 13: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 13/32w w w . a u t o s t e e l . o r g

C-Pillar Overall Approach

• Examine the historic process

• Implement every technological advantage

• Intense focus on FEA / Full cycle process

• Implement upgraded machining process

• Implement upgraded tryout process

• Intense focus on Project Management

• Meet the requirements

13

14

Page 14: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 14/32w w w . a u t o s t e e l . o r g

Historical Die Development Process

Quality

Binder Development Die DesignDuplicating Mill

Tryout Iterations

14

15

Page 15: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 15/32w w w . a u t o s t e e l . o r g

Latest Die Development Process

Accurate!

Full Cycle Simulation 3D Solid Model High Speed NC

Press Validation (include scanning + CMM)

15

ATOS SCANNER 

ATOS SCANNER 

16

Page 16: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 16/32

w w w . a u t o s t e e l . o r g

C-Pillar Process

16

17

Page 17: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 17/32

w w w . a u t o s t e e l . o r g

C-Pillar Process

17

18

Page 18: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 18/32

w w w . a u t o s t e e l . o r g

C-Pillar Process

18

19

Page 19: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 19/32

w w w . a u t o s t e e l . o r g

Forming Simulation

•Full Cycle Simulation per 3D Die Process– Analyze every operation in the line

–Morph required die faces to accommodate results

Iterate in math to get to nominal• Commercial Codes

• Proprietary Process and Methods

• Resolve forming issues in math (Virtual)

• Cut dies to morphed shape

• Inspect and compare to nominal

DTG Expertise to Highlight

19

20

Page 20: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 20/32

w w w . a u t o s t e e l . o r g

Full cycle explained

yes

no

Build / Adjust

Binder Development

Assess Draw Die

Assess Trim Die (with draw results)

Assess Form Die (with trim results)

Analyze Results

Results OK?

start

20

21

Page 21: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 21/32

w w w . a u t o s t e e l . o r g

Full cycle

• IterationD1 DRAW

D2 TRIM-PIERCE

CAM TRIM

D5 RE-STRIKE

COMPLETE

D3 TRIM-CAM TRIM

CAM PIERCE

Keep iterating & adjusting binder development and

Morphing until final results produce a nominal product.

ok 

D4 FLANGE

CAM-FLANGE

21

Page 22: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 22/32

Page 23: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 23/32

24

Page 24: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 24/32

w w w . a u t o s t e e l . o r g

Kick-off Meeting 

• Use full cycle simulation results

• Changes to cutter path programming 

• Bearing maps

• Clearance for side walls

• Variation in metal clearance

• Different tryout process

25

Page 25: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 25/32

w w w . a u t o s t e e l . o r g

 Tryout process changes

• Blank outline

• Blank location

• Binder tonnage / Ram tonnage

• Binder travel

• Lube

• Metal draw-in map

• Engineered beads per FEA force factor

Engineering = Design = Physical Reality

26

Page 26: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 26/32

w w w . a u t o s t e e l . o r g

Blank Outline & Location

Blank location to punch

27

Page 27: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 27/32

w w w . a u t o s t e e l . o r g

Binder Travel / Tonnage

Die set-up / binder travel

65.0mm ring travel

Punch

Binder Home

Position

Upper Die

Technical DataMaterial Spec: 590 Dual Phase

Material Code: 1182 Chrysler CodeThickness: 1.2 mmBlank holder force: 80 approximate tonsTotal force: 450 approximatetonsRing Travel 65 mm ring

28

Page 28: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 28/32

w w w . a u t o s t e e l . o r g

Metal Draw-in Maps

Blank run-in measured from binder set

29

Page 29: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 29/32

w w w . a u t o s t e e l . o r g

First Panel Results

• First panel through the line within 1.8mm of 

nominal on the checking fixture

• Still had one iteration to morph (3 days)

30

Page 30: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 30/32

w w w . a u t o s t e e l . o r g

Process used for Iteration

• White Light Scan

• Color map inspection reports

• Morph 120% correction factor

• Re-cut

• Re-scan

• Results after morph = OK

Total lead time = 22 weeks, including die design

Part met nominal criteria

Page 31: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 31/32

Page 32: 12 - Joe Meyecic - AHSS Tooling Technologies

7/27/2019 12 - Joe Meyecic - AHSS Tooling Technologies

http://slidepdf.com/reader/full/12-joe-meyecic-ahss-tooling-technologies 32/32