BUILDING CONSTRUCTION 1 ARC 1523PROJECT 1 : DOCUMENTATION AND ANALYSIS PREPARED BY : WONG PEAKKY (1101A13474) 10

First, Excavation

Secondly, commencent of excavation to the desired level

Thirdly, a layer of concrete is laid for a clean and firm base

Fourth, Formwork is prepared

Fifth, placement of spacer block

Sixth, lay the reinforcement main bar

Seventh, add tranverse rebar Seventh, add tranverse rebar

Eighth, erect the reinforcement for stumps

Nineth, add more ties to the formworks

Tenth, lay concrete on to the formwork

Lastly, formwork will be dismantled after the curing of concrete.

Process of Pad Foundation

4.0 FOUNDATION