Top Banner
IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin Desai Joseph Wei Tom Coughlin Paul Wesling Dan Lottis Mostafa Mortezaie http://bit.ly/IEEE-SCV-Liaison-Event-Materials [email protected] (“CLP” or “Liaison” in subject line)
24

12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

Dec 18, 2015

Download

Documents

Willis Burns
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It1 1/25/151

Corporate Liaison Program (CLP):“How We Did It”

John SwanEd Aoki

Sachin DesaiJoseph Wei

Tom CoughlinPaul Wesling

Dan LottisMostafa Mortezaie

http://bit.ly/IEEE-SCV-Liaison-Event-Materials

[email protected](“CLP” or “Liaison”

in subject line)

Page 2: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

Outline

• What we are doing and why• What we did

• How we did it• After one year, a summary• Discuss: What you can do

Page 3: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

What we are doing and why

• CLP is a result of SCV Section’s Corporate Relationship Initiative.

• Goal is to have a formalized way to build relationships with our corporate citizens.– vs. ad-hoc or nothing at all– The intent is a Long Term effort!

• My tenure as CS Chapter Chair alerted me to the difficulty of find meeting venues.

• We recognized this as a wider issue and an ongoing need.

Page 4: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

What we did in 2013

• 23 Liaisons (& contacts) found by Kick-off• 14 companies attended our Kick-off Liaison

lunch event in November, 2013!– We presented the Liaison Program– We presented our Section & Chapters– Opportunity: GHTC & SIGHT– Opportunity: Student Conference (~April)– Opportunity: TMC involvement– Q&A

• Liaisons wanted quarterly events!• ALL Event info at:

– http://bit.ly/IEEE-SCV-Liaison-Event-Materials

(Case Sensitive)

Page 5: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

What we did, 2013 (cont.)Kick-off luncheon 11/21/13

1 Altera2 AMD3 Cisco4 Corning5 Google6 HP7 Maxim Integrated8 NVIDIA9 Oracle

10 Renesas11 Samsung12 Silicon Image13 Underwriter Labs14 Xilinx

Attended 11/21/13

1 Cadence2 EMC3 Imagination Tech4 Intel5 NASA Ames6 SanDisk7 Seagate8 Synopsys9 Texas Instruments

Could not attend

Companies with Liaisons (or contacts):

Page 6: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

What we did, 2013 (cont.)Time Min Who Slides

12:00 15 Arrive, get food

12:15 15 Seated, eating

12:30 10 Welcome, CLP Mission, introductions Ed Aoki 5

12:40 9IEEE, Section, More about CLP, Liaisons;• Feedback

John Swan 9

12:49 10eGRID, Chapters, hot Chapter events - regular tech meetings and special seminars, etc.;• Feedback

Paul Wesling 11

12:59 7Opportunity 1: Student Congress• quick feedback

Mostafa Mortezaie 2

13:06 7Opportunity 2: GHTC & SIGHT• quick feedback

Joseph Wei, forDaniel Lottis

3

13:13 7Opportunity 3: Technical Management Council• quick feedback

John Delaney 3

13:20 5 • 3-opportunity feedback John Swan

13:25 5 General discussion John Swan

13:30 Depart

Also attended for IEEE: Sachin Desai, Ram Sivaraman

(Case Sensitive)

Page 7: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

How we did it

• Started planning Jan. 2013• Presented concept and approach to SCV

Section ExCom• Started company and contact list• May: An “Action Committee” was formed• Utilized Google Drive for common

committee access to the ‘Golden’ liaison status spreadsheet list

Page 8: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

How we did it (cont.)

• Worked to use the company contacts to identify liaisons

• Late July: Started brief but weekly conf calls

• Early October: Ended weekly conf calls• Continued to contact companies and build

Liaison (& contact list) throughout.

Page 9: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

How we did it (cont.)

• Kick-off event selected: late November– To give us the year to find liaisons

• Committee iterated on possible agenda options

• Goal of meeting was met:– A variety of brief informational presentations– Ample time for liaison feedback & discussion– Respected attendees time

Page 10: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

How we did it (cont.)

• Planned and prepared well for the liaison event on Nov. 21.– 90 min total minus 30 min. for lunch– Buffet lunch provided

• Prepared badges• IEEE Committee sat among attendees

• All event info is posted at:– http://bit.ly/IEEE-SCV-Liaison-Event-Materials(Case Sensitive)

Page 11: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

How we did it (cont.)

• We asked for, and got feedback:– Consensus for Quarterly meetings– Regular IEEE emails OK (1-2/mo.)– Nearly 100% found value, would return– Student Conference generated lot of interest

(Case Sensitive)

Page 12: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

Continuing from Kick-off mtg

• We continued with quarterly lunch events• We expanded the target Liaison list to include:

– Texas Instruments– Microsoft– Marvell– Micron– Agilent– TSMC– Citrix– LinkedIn

– Juniper Networks– Qualcomm– Broadcom– HGST (West. Dig.)– ARM– Brocade– NetApp

Page 13: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

After 1 year (10/1/14 report)

• 4 Total liaison lunch events held:– 11/21/13 14 – 2/18/14 23 – 5/8/14 19 – 8/20/14 19 – 11/20/14 12 87 company-meetings

• 34 companies total attended by 21 liaisons, 11 ‘contacts’.

• Recent focus has been on improving liaison feedback, highlighting collaborative efforts and understanding CLP needs vs. numeric growth

Focus: increase attendance, intro-duction to IEEE & Section activities

Focus: company feedback, share collaborative activities (IEEE<> cos.)

Page 14: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

After 1 year:Meeting«–»Company line-up

Maxim Integ. 1 1 1 1 4 Liaison

Microsoft 0 Liaison

NASA Ames 1 1 1 3 Contact

NetApp 1 1 Contact

NVIDIA 1 1 1 1 4 Liaison

Oracle 1 1 1 3 Liaison

Renesas 1 1 2 Liaison

Samsung 1 1 1 1 4 Liaison

SanDisk 0 Contact

Seagate Tech 1 1 2 Liaison

Silicon Image 1 1 1 1 4 Liaison

SK Telecom A. 1 1 Contact

Synopsys 1 1 2 Liaison

TI 1 1 2 Contact

UL 1 1 XX 2 None

Xilinx 1 1 1 1 4 Liaison

Altera 1 1 1 3 Liaison

AMD 1 1 1 3 Liaison

Apple 1 1 Contact

ARM 1 1 1 3 Contact

Cadence 1 1 1 3 Liaison

Cisco 1 1 1 1 4 Liaison

Corning 1 1 2 Liaison

EMC 0 ??

Google 1 1 1 1 4 Liaison

HP 1 1 1 1 4 Liaison

HGST/WD 1 1 Contact

Imagination 0 Liaison

Intel 1 1 1 3 Liaison

Juniper 1 1 2 Contact

Keysight Tech 1 1 Liaison

LG 1 1 2 Contact

Marvell Semi 1 1 Contact

11/21«––» 8/20 11/21«––» 8/20

Page 15: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

After 1 year:Company to attendance glance

0

1

2

3

4

5

6

7

8

9

4 3 2 1 0

Meetings attended

Co

mp

an

y c

ou

nt

Page 16: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

After 1 year:Topic-areas spread

Local IEEE events

Student Conference

GHTC & SIGHT Intel

TMC

WIE Altera

SPS AMD

Young Professionals Maxim

Techmanity Samsung SSI

Training - CS

Liaison Discussion

IEEE

Other

All materials posted at:http://bit.ly/ IEEE-SCV-Liaison-Event-Materials

GOAL

Page 17: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

Typical Agenda (from 8/20/14)

12:00 PM Arrive, get food

12:30 PM Welcome Tom CoughlinIEEE, Region 6 Dir. Elect

Agenda overview, new introductions John Swan IEEE

Hot Chapter, Section & Region eventsJoseph Wei &Tom Coughlin

IEEE

SPS Chapter Restart Signal Processing Society

Radha Giduthuri AMD

WIE Update Women In Engineering

Suzette Pangrle IEEE

GHTC / SIGHT Update – Global Humanitarian Tech. Conf.

Catherine Nelson Intel

New Opportunity: Techmanity

Daniel (Seung) Yoo Samsung - SSI

1:07 PM

Training: Bringing global resources to you locally – discussion • Some things we already have • What are your needs

Matt PetersIEEE Computer Society

1:22 PM Liaison Role DiscussionTom CoughlinJohn Swan

All

1:30 PM Dismissed

Page 18: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

What we will do (cont.)

• Add Universities– Universities are included in Corporate

Relations Initiative!• They were on our CLP list from the start

– Decided to hold off until the program is established with companies

• Focus our efforts for success• Learn by doing• Interests expected to be different

Page 19: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

Costs

• Average of $800 per luncheon• Region 6 has a $5,000 budget for

industry relations activities!

Page 20: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

Success stories

• A venue for the Section ExCom!• Rebirth of the SPS Chapter!• Several connections made for our WIE

Chapter!• Connections made for GHTC!

Page 21: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

Challenges

• Many are just contacts, not committed, long term liaisons.

• Many/most are not well connected in co. as we hoped.

• Attendance: due to travel and meetings highly encourage alternates!

• Finding compelling collaborations to report that will have wide interest.

Page 22: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

Discuss Your Ideas 1

Page 23: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

Discuss Your Ideas 2

Page 24: 12-CRS-0106 12/12 IEEE Region 6 2015 Training 1/25: CLP: How We Did It 1 1/25/15 1 Corporate Liaison Program (CLP): “How We Did It” John Swan Ed Aoki Sachin.

IEEE Region 6 2015 Training 1/25: CLP: How We Did It

Discuss Your Ideas 3