11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 1 By Jorge Chau and Ronald Woodman (IGP) Donald T. Farley and Wesley E. Swartz (ECE-CU) David Hysell (EAS-CU) The Jicamarca Radio Observatory Near Lima, Peru Jicamarca in Review Swartz 03/11/7
12
Embed
11/20/20032003 November NSF Panel Review of JicamarcaChallenges: 1 By Jorge Chau and Ronald Woodman (IGP) Donald T. Farley and Wesley E. Swartz (ECE-CU)
11/20/ November NSF Panel Review of JicamarcaChallenges: 3 Maintenance Challenges Lots of electronics Lots of antenna connections (corrosion) Aging vehicles But, there are really no single-point failure modes (baring some cataclysmic event) that would cause an extended down time: Multiple systems with multiple transmitters, receivers, computers, but final transmitter tubes now run about $80,000
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 1
ByJorge Chau and Ronald Woodman (IGP)
Donald T. Farley and Wesley E. Swartz (ECE-CU) David Hysell (EAS-CU)
The Jicamarca RadioObservatoryNear Lima, Peru
Jicamarca in Review
Swartz 03/11/7
11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 2
Jicamarca in Review, 1999-2003
•The Next Five Years (DLH)
• An Introduction to Jicamarca (DTF)• Management Overview and Changes - people (DTF)• Science Highlights - ideas (DLH)• Infrastructure Development - tools (JLC)• Other Instruments/projects (JLC)• Outreach, Education, Societal Impact (WES)• Response to the Last Panel’s Report (WES/DTF)
•Maintenance Challenges (JLC? Or WES?)• Budget Challenges (WES)
11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 3
Maintenance Challenges
• Lots of electronics• Lots of antenna connections (corrosion)• Aging vehicles• But, there are really no single-point failure modes (baring some cataclysmic event) that would cause an extended down time: Multiple systems with multiple transmitters, receivers, computers, but final transmitter tubes now run about $80,000
11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 4
Budget Challenges• Additional operational costs for new instruments
• JULIA – cost was not previously included in the main budget• SOUSY – fuel expected to be $8K/yr for 500 hours of operation• Bistatic – Equipment funded separately; routine operational costs • Operating with 4 big transmitters – increases peak demand billing
• Replacement of aging vehicles• Need a new one approximately every 2 years
• Replacement of any failure of transmitter tubes • $15K for drivers (expected lifetime is 15K hours: 2 at 13K hr, 1 at 3K hr)• $80K for finals (expected lifetime is 15K hours: 2 at 13K hr, 1 at 3K hr)• $40K for SOUSY finals
11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 5
Broad Category Budget Breakdown
The fine print: Proposed for 2004-2005: $1.5M (with wish list items)
Staff Power and Fuel Services Wish List Education/OutreachMaterials and SuppliesIDC
45%
6%8%8%
10%
7%
16%
11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 6
Budget Wish List• Electronic steering of main array (top priority)
• 128 – phase switches plus control ($120…split over 3 years)
• Restoration of electronic steering of SOUSY radar• 4-phase selection option $30K• 8-phase selection option (original) $45K
• Spare transmitter tubes• 1.5-MW Main Transmitter Final: $80K• 100-KW Main Transmitter Driver (4CX4000G): $15K• 300-KW SOUSY Final: $40K
• Misc.• Lab equipment• Computers and networking equipment to stay current
11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 7
0
50
100
150
Thou
sand
s of
Dol
lars
2004-2005
2005-2006
2006-2007
2007-2008
2008-2009
Fiscal Year
SOUSY Beam Switching
SOUSY Tx Tubes
Lab Equipment
Vans and Cars
Computers andNetworking
Main Tx Tubes
Main Beam Switching
Wish List in Perspective
Highest priority on bottom
11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 8
0
10
20
30
40
50
60
Thou
sand
s of
Dol
lars
2004-2005
2005-2006
2006-2007
2007-2008
2008-2009
Fiscal Year
SOUSY Tx Tubes
Lab Equipment
Vans and Cars
Computers andNetworking
Main Tx Tubes
Main Beam Switchinng
Bare-Bones Wish List But Retaining Electronic Steering of Main Beam
Highest priority on bottomSubject to no transmitterfailures in first three years.
11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 9
0
20
40
60
80
Thou
sand
s of
Dol
lars
2004-2005
2005-2006
2006-2007
2007-2008
2008-2009
Fiscal Year
SOUSY Beam Switching
SOUSY Tx Tubes
Lab Equipment
Vans and Cars
Computers andNetworking
Main Tx Tubes
Main Beam Switchinng
Bare-Bones Wish List Modified by a Transmitter Failure
Highest priority on bottom
11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 10
Proposed Yearly Budget Distribution
0
500
1000
1500
Thou
sand
s of
dol
lars
2004-2005
2005-2006
2006-2007
2007-2008
2008-2009
Fiscal Year
Wish List
Operations
11/20/2003 2003 November NSF Panel Review of Jicamarca Challenges: 11
Budget in Perspective
0
500
1000
1500
Thou
sand
s of
Dol
lars
1999-2000
2001-2002
2003-2004
2005-2006
2007-2008
Fiscal Year
Wish List
Operations
Funded
Partial Year