  • 7/30/2019 11.00 - Michael Cooch

    1/28

    Copyright 2010 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are trademarks of Accenture.

    Evolving your PMO

    30

    th

    September 2010

    Michael Cooch

    Adam Cowmeadow

  • 7/30/2019 11.00 - Michael Cooch

    2/28

    Copyright 2010 Accenture All Rights Reserved. 2

    Seminar Structure

    The Theory ofEvolution

    Introductionto the conceptof maturityand summaryof the Valueof a PMO

    The EvolutionaryProcess

    Differingviews ofevolution anditerative stepsto improvePMO maturity

    EvolutionaryAspiration

    Understandthe businessmotivationbehind PMOaspirations

    EnvironmentalAssessment

    Going beyondthe functionalto build aplatform forPMO success

    EvolutionaryPlan

    Definingactivities toimprove PMOfunctionalityand mitigateenvironmentalrisks

  • 7/30/2019 11.00 - Michael Cooch

    3/28

    Copyright 2010 Accenture All Rights Reserved. 3

    The Theory of Evolution

    In our previous Value of a PMO presentation

    we demonstrated that*:

    PMO uptake is increasing (from 47% in

    2000 to 77% in 2006) but project

    performance is not**

    Deploying a PMO does not lead to

    performance improvement in itself. It isonly when the PMO increases maturity

    that tangible improvement occurs***

    AccentureKnowledge

    Base

    PublishedWorks &Articles

    Center for

    BusinessPractices (CBP)

    LinkedInPMO

    Groups

    Gartner WhitePapers

    Sources Background

    *Source:Value of a PMO Keynote at ProjectChallenge Spring Show 2010

    **Source:Project Management The State of theIndustry, Centre for Business Practices (CBP) Study

    ***Source:Value of Project Management Centrefor Business Practices (CBP) Study

    ****Source:Making the Business Case for a HighlyFocused and Effective PMO Michael Hanford,Gartner 2010

    The key to obtaining an approval toform a PMO rests with the

    identification of solid benefits, andvalue, to the organization and

    their quantification that willaccrue to the organization if a PMO is

    enabled and functioning****.

  • 7/30/2019 11.00 - Michael Cooch

    4/28

    Copyright 2010 Accenture All Rights Reserved. 4

    0

    1

    2

    3

    4

    5

    0: Absent 1: Immature /

    Initial

    2: Established /

    Repeatable

    3: Grown-up /

    Defined

    4: Mature /

    Managed

    5: Best in Class /

    Optimised

    What is PMO Maturity?

    PMO Maturity levels indicate the effectiveness of project execution support

    Level 0:Absent- No identifiable PMO operating. No

    influence on project success.

    Level 1:Immature/Initial A named entity (identified

    as a PMO) is operating but, in general, processes are

    inconsistent, project data isnt collected/used and

    reporting is broadly qualitative. Has little influence on

    project success.

    Level 2:Established/Repeatable A recognised PMO is

    operating but is in need of improvement. Some

    processes have consistency, some project data is

    collected but little of it is analysed and reporting is still

    primarily commentary based. Plays a limited role in

    project success.

    Level 3: Grown-up/Defined Standard Processes

    A solid PMO which experiences more

    successes than failures. Most processes have

    consistency, most key project data is collected

    but only basic analytics are done and

    reporting has introduced some metrics. Playsa role in some project successes (and failures).

    Level 4: Mature/Managed A very

    successful PMO which has good

    sponsorship. All core processes are

    consistent, all key project data is

    collected, solid analytics are undertaken

    and reporting is primarily data-driven.

    Plays an important role in the success of

    the project environment.

    Level 5:Best in Class/Optimised A world-class

    PMO which has complete sponsorship. All core

    processes are consistent and continuously

    improved, all key project data is collected,

    analytics are comprehensive and reporting is

    completely data-driven. Plays a critical role in

    the success of the project environment.

  • 7/30/2019 11.00 - Michael Cooch

    5/28

    Copyright 2010 Accenture All Rights Reserved. 5

    Organisational Performance Improvement between Levels of PMO Maturity

    0% 0% 0% 0% 0% 0% 0% 0%0% 0%

    10% 10% 11% 18%

    36%

    27%

    11%

    23%

    39%

    24%

    43% 44%

    64% 65%

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    Organisation

    financially

    successful

    Shareholders

    satisfied

    Projects aligned to

    strategy

    Project customers

    satisfied

    Organisation w orks

    on the right projects

    Strategy executed

    to plan

    Projects on

    schedule & budget

    Resources allocated

    optimally

    Measures of Performance

    PerformanceImprovement

    How does building PMO maturity help?

    A recent global survey demonstrates the performance differentiation (against

    schedule, budget and quality) between high and low maturity PMOs.

    This includes a 24% improvement in customer satisfaction between Level 1 and Level

    3 PMOs (Level 4 and 5 are not included due to lack of statistical data at these points,

    however extrapolation clearly trends positively) and a 65% improvement in the

    optimal allocation of resources

    *Source:The State of the PMO - 2007-2008

    A Benchmark of Current Business Practices

    Center for Business Practices (CBP) Report

    Level 3 (Grown up) PMOs support

    project delivery on schedule & tobudget 64%more often that their

    Level 1 (Immature) PMO

    competitors.

    Maturity Level

    1 2 3

  • 7/30/2019 11.00 - Michael Cooch

    6/28

    Copyright 2010 Accenture All Rights Reserved. 6

    Level 1: Immature

    25.7%

    Level 2: Established, in

    need of improvement

    34.4%

    Level 3: Grown up, more

    successes than failures30.4%

    Level 4: Mature, verysuccessful

    8.7%

    Level 5: Best in class

    0.7%

    How mature are organisational PMOs?

    Less than 1 in 10 PMOs are considered high-performers (Level 4 or 5)

    Less than 1 in 100 is considered Best in Class (Level 5)

    Evidence suggests the cost to implement a Level 3 to 5 PMO is heavily

    outweighed by the delivery benefits realised within an organisation.

    *Source:The State of the PMO - 2007-2008

    A Benchmark of Current Business Practices

    Center for Business Practices (CBP) Report

    60%of all organisations could

    substantially benefit fromimproving the maturity of their

    PMO.

  • 7/30/2019 11.00 - Michael Cooch

    7/28Copyright 2010 Accenture All Rights Reserved. 7

    Seminar Structure

    The Theory ofEvolution

    Introductionto the conceptof maturityand summaryof the Valueof a PMO

    The EvolutionaryProcess

    Differingviews ofevolution anditerative stepsto improvePMO maturity

    EvolutionaryAspiration

    Understandthe businessmotivationbehind PMOaspirations

    EnvironmentalAssessment

    Going beyondthe functionalto build aplatform forPMO success

    EvolutionaryPlan

    Definingactivities toimprove PMOfunctionalityand mitigateenvironmentalrisks

  • 7/30/2019 11.00 - Michael Cooch

    8/28Copyright 2010 Accenture All Rights Reserved. 8

    The LinkedIn PMO Maturity

    Case Study*

    Over 150 responses**

    Lots of vigorous debate

    Highest proportion of responses - it is Impossible

    Nearly 7 in 10 said it was Impossible or Very Challenging

    How realistic is it to move a

    PMO from Level 0 to Level 4in 12 months?

    * Responses were categorised according to ourinterpretation i.e. This was not a formal survey

    ** Multiple responses, from the samecontributor, were unified where possible (but it ispossible that some slipped through the net)

    0%

    5%

    10%

    15%

    20%

    25%

    30%

    35%

    40%

    45%

    Impossible Very Challenging Difficult Intermediate Simple

    44%

    24%

    18%

    12%

    2%

  • 7/30/2019 11.00 - Michael Cooch

    9/28Copyright 2010 Accenture All Rights Reserved. 9

    The Evolutionary Process

    DefineAspiration

    AssessEnvironment &PMO Maturity

    DesignIntegrated Plan

    ImplementChange

    Track PMOValue

    Match the pace of evolution

    with the knowledge of theongoing (and possibly

    changing) organisational

    conditions

  • 7/30/2019 11.00 - Michael Cooch

    10/28Copyright 2010 Accenture All Rights Reserved. 10

    Seminar Structure

    The Theory ofEvolution

    Introductionto the conceptof maturityand summaryof the Valueof a PMO

    The EvolutionaryProcess

    Differingviews ofevolution anditerative stepsto improvePMO maturity

    EvolutionaryAspiration

    Understandthe businessmotivationbehind PMOaspirations

    EnvironmentalAssessment

    Going beyondthe functionalto build aplatform forPMO success

    EvolutionaryPlan

    Definingactivities toimprove PMOfunctionalityand mitigateenvironmentalrisks

  • 7/30/2019 11.00 - Michael Cooch

    11/28Copyright 2010 Accenture All Rights Reserved. 11

    Business Driven Aspiration/Motivation of

    Project Sponsor

    Aspiration/Motivation

    Focus on tracking allwork (no off-radaractivity)

    Understand high-levelproject risk

    Level 1 Controlled progress

    through formalcheckpoints

    Processstandardisation

    Hub of best practice

    Improve PMcompetency

    Enhance ROI from

    Level 1

    Level 2 Comprehensive

    process standardisation

    Data-driven decision-making

    Manage projectinterdependencies

    Monitor and managescope/change control

    Use risk to calculate

    project contingency Enhance ROI fromLevel 2

    Level 3 PMO provides analytics

    & intelligence

    Project prioritization (inPortfolio environments)

    Integrated resourcemanagement (andcapacity planning inPortfolio environments)

    Enhance ROI from

    Level 3

    Level 4 PMO Organisation is

    self-iimproving

    Enhance ROI fromLevel 4

    Level 5

  • 7/30/2019 11.00 - Michael Cooch

    12/28Copyright 2010 Accenture All Rights Reserved. 12

    Seminar Structure

    The Theory ofEvolution

    Introductionto the conceptof maturityand summaryof the Valueof a PMO

    The EvolutionaryProcess

    Differingviews ofevolution anditerative stepsto improvePMO maturity

    EvolutionaryAspiration

    Understandthe businessmotivationbehind PMOaspirations

    EnvironmentalAssessment

    Going beyondthe functionalto build aplatform forPMO success

    EvolutionaryPlan

    Definingactivities toimprove PMOfunctionalityand mitigateenvironmentalrisks

  • 7/30/2019 11.00 - Michael Cooch

    13/28

    Copyright 2010 Accenture All Rights Reserved. 13

    3. Findings andRecommendations

    1. The Interviews2. The Quantitative

    Results3. Findings &

    Recommendations4. Improvement

    Log5. PMO Functional

    Plan

    The Accenture Model isbased on quantitativeassessment of functionalcapability in 11 key areasover 261 questions:

    Assessment of PMOfunctional capability against a5 tier scale for eachFunctional Area

    Functional Maturity by areadetermines the main focusareas.

    Based on Knowledge-baseand prior, collective, lessons-learned, the assessor willdefine a series of specificimprovements

    Improvements are thencrafted into a project plan forimplementation.

    PMO Functional Maturity Assessment

  • 7/30/2019 11.00 - Michael Cooch

    14/28

    Copyright 2010 Accenture All Rights Reserved. 14

    Maturity is a concept to help frame improvement. It is not the panacea to all ills

    Whilst this maturity representation is staged there are also models that are continuous which areequally valid and beneficial as frameworks

    Project Management Maturity Models can be substituted in lieu of PMO models

    The maturity spectrum was established by benchmarking a number of PCS-controlled PMOs

    Sample PMO Maturity Assessment (1/2)

  • 7/30/2019 11.00 - Michael Cooch

    15/28

    Copyright 2010 Accenture All Rights Reserved. 15

    Maturity Model Examples

    Portfolio, Programme and ProjectManagement Maturity Model(P3M3) cross referenced to P30

    OPM3 Organizational ProjectManagement Maturity Model

    Project Management MaturityModel J Kent Crawford

    Kerzner Project ManagementMaturity Model (KPMMM)

    Harold Kerzner Gartner PPM Maturity Model

    Accenture PMO MaturityAssessment

  • 7/30/2019 11.00 - Michael Cooch

    16/28

    Copyright 2010 Accenture All Rights Reserved. 16

    (The PMO) must drive much

    higher ROI than the projects itoversees. In this sense, it becomes

    a value machine... (it) must helpexecutives meet their strategic

    goals by providing a single point ofknowledge for PM intellectual

    property... (it) must helpexecutives execute*

    Structural considerations for PMO

    * Source:Advanced project portfolio managementand the PMO (paraphrased), Gerald I. Kendall,Steven C. Rollins, J. Ross Publishing, 2003

    ** Source:Clearly Define Your Goals BeforeCreating a PMO Clearly Define Your Goals BeforeCreating a PMO Daniel B. Stang Gartner 2009

    ***Source:PMOs: One Size Does Not Fit All DonnaFitzgerald Gartner 2008

    PMOs fail, by some estimates,more than 50% on their first

    try... We believe that this is thedirect result of not matching

    the PMO mission andobjectives to the real needs of

    the organization***

    When creating a PMO...first clearlyarticulate the main business

    problem you are trying to solve,and then define some key goalsfor the PMO in addressing that

    problem **

    Structural LegacyThe Socio-political factors

    affecting a PMOs organisational environment

  • 7/30/2019 11.00 - Michael Cooch

    17/28

    Copyright 2010 Accenture All Rights Reserved. 17

    It has been shown thatdeploying a PMO does notleadto performance improvement in

    itself. It is only when the PMOincreases maturity that tangible

    improvement occurs*.

    Functional considerations for PMO

    *Source: Value of Project Management

    Center for Business Practices (CBP) Study

    **Source:The State of the PMO - 2007-2008

    A Benchmark of Current Business Practices

    Center for Business Practices (CBP) Report

    *** Source:Closing the Gap - Economist

    Intelligence Briefing Unit

    To prove that a project was a success, it isnecessary to measuremore than

    timeliness and adherence to budget;companies should also measure outcomesagainst project goals, determine whetherthe project delivered bottom-line resultsand assess the satisfaction of clients and

    stakeholders with the project. ***

    In low-performing organisations

    project management performance

    (and PMO performance) is not

    measured nor is appropriate

    accountability for outputs

    assigned**

    Functional Legacy The operational factors that

    influence PMO processes and tools

  • 7/30/2019 11.00 - Michael Cooch

    18/28

    Copyright 2010 Accenture All Rights Reserved. 18

    Resource considerations for PMO

    *Source:The State of the PMO - 2007-2008

    A Benchmark of Current Business Practices

    Center for Business Practices (CBP) Report

    **Source:Software Engineering Economics

    Prentice Hall, Englewood Cliffs, NJ, p431

    Boehm B (1981)

    *** Source:Closing the Gap - Economist

    Intelligence Briefing Unit

    In low-performing organisations

    PMO staff are much less likely to

    have formal project management

    qualifications, hands-on-experienceand extensive project management

    knowledge*

    A project staffed with uniformly

    very low-rated personnel on all

    capability and experience factorswould require 11 times as much

    effort to complete the project as

    would a project team with the

    highest rating in all the above

    factors**

    Training, mentoring and other

    development activities for

    project management

    professionals should be tied to

    specific skills gaps and career

    planning.

    Resource LegacyThe level of information,

    expertise and finance available for PMO activities

  • 7/30/2019 11.00 - Michael Cooch

    19/28

    Copyright 2010 Accenture All Rights Reserved. 19

    Cultural considerations for PMO

    *Source:The State of the PMO - 2007-2008

    A Benchmark of Current Business Practices

    Center for Business Practices (CBP) Report

    ** Source: Closing the Gap - Economist

    Intelligence Briefing Unit

    In low-performing organisations

    executive sponsorship is

    approximately 60% less likely to

    have an appreciation of the

    strategic value of a PMO *

    In low-performing organisations

    PMOs face much greater difficulty in

    being accepted as a real value-adding

    proposition, at all levels of their

    organisation, when compared to high-

    performers *

    To maintain a competitive

    advantage, and maximise value,

    leaders must link every PMdecision to the strategic goals of

    the organisation. Leaders who

    continue to focus on improving PM

    strategies and methodologies will

    garner the greatest long-term

    success. **

    Cultural LegacyThe level of organisational

    understanding of, and appetite for, PMO activities

  • 7/30/2019 11.00 - Michael Cooch

    20/28

    Copyright 2010 Accenture All Rights Reserved. 20

    PMO Environmental Assessment Framework

    Level of organisational resource competency(e.g. change management/projectmanagement etc)

    Level of investment (budget/FTE) availablefor change

    Level of PMO team resource competency

    Level of PMO leadership experience (todrive change)

    Level of understanding of the Value of a PMO

    Level of executive buy-in

    Level of alignment between goal-setting >results/behaviour > performance assessment

    Level of organisational buy-in

    Type/magnitude of the cultural/behaviouralchange (e.g. distributed teams)

    Required PMO functional blueprint

    Level of methodology constraint on PMO Level/value of supporting PM software(and configuration) in place

    Breadth of PMO delivery lifecycleresponsibilities (e.g. benefits realisationincluded?)

    Level of policy/contractual constraint onPMO

    Level of readiness/effectiveness of governance

    construct (e.g. unified vs. siloed)Level of project/programme/portfolio complexity

    Size of the delivery organisation (headcount)

    Level of implicit PMO power

    Type of organisational structure(projectized/matrix/functional)

    Level of alignment to enterprise strategy

    Level of distributed working

    Structural

    Legacy

    Functional

    Legacy

    Resource

    Legacy

    Cultural

    Legacy

    OperationalPMO Maturity

  • 7/30/2019 11.00 - Michael Cooch

    21/28

    Copyright 2010 Accenture All Rights Reserved. 21

    Seminar Structure

    The Theory ofEvolution

    Introductionto the conceptof maturityand summaryof the Valueof a PMO

    The EvolutionaryProcess

    Differingviews ofevolution anditerative stepsto improvePMO maturity

    EvolutionaryAspiration

    Understandthe businessmotivationbehind PMOaspirations

    EnvironmentalAssessment

    Going beyondthe functionalto build aplatform forPMO success

    EvolutionaryPlan

    Definingactivities toimprove PMOfunctionalityand mitigateenvironmentalrisks

  • 7/30/2019 11.00 - Michael Cooch

    22/28

    Copyright 2010 Accenture All Rights Reserved. 22

    StructuralRiskMitigation

    UnderstandPMO Role

    Develop PMOCharter

    IntegrateDisparate PMO

    Functions

    Align PMO toEnterpriseStrategy

    DevelopFunctional

    Relationships

    Design Fit-for-

    PurposeGovernance

    StructuralLegacy

    FunctionalLegacy

    ResourceLegacy

    CulturalLegacy

    Position the PMO to enable

    Strategy execution through

    full involvement in

    Programme/Project

    Governance

    Structural Risk Mitigation

  • 7/30/2019 11.00 - Michael Cooch

    23/28

    Copyright 2010 Accenture All Rights Reserved. 23

    FunctionalRis

    kMitigation

    DevelopBusiness Case

    Regularly AssessPMO Maturity

    Tooling forautomation

    Establish andBaseline WBS

    DefinePerformance

    Metrics

    EffectiveKnowledge

    Management

    Publish Metrics

    Tailor / WaiverPMO Scope

    Improve PMMethodology

    Leverage /Record Lessons

    Learnt

    StructuralLegacy

    FunctionalLegacy

    ResourceLegacy

    CulturalLegacy

    Develop a PMO Business Case

    that harnesses Management

    Information to evolve

    Project/Programme operations

    Functional Risk Mitigation

  • 7/30/2019 11.00 - Michael Cooch

    24/28

    Copyright 2010 Accenture All Rights Reserved. 24

    Re

    sourceRisk

    Mitigation

    Develop PMO

    TrainingCurriculum RingfenceSufficient PMO

    Budget

    Build QualifiedTeam

    Build Project

    TeamRelationships

    Align Roles toPMO Objectives

    RecruitExperienced

    PMO Manager

    Resource Risk Mitigation

    StructuralLegacy

    FunctionalLegacy

    ResourceLegacy

    CulturalLegacy

    Build and maintain a qualified

    and relevant team using all the

    resources at the PMOs disposal

  • 7/30/2019 11.00 - Michael Cooch

    25/28

    Copyright 2010 Accenture All Rights Reserved. 25

    CulturalRisk

    Mitigation

    Send PMO tothe coal-face

    Manage

    StakeholderExpectations

    Collaborate &Support

    (not police)

    Design Value -Based Project

    Training

    Embed Value ofPMO Concept

    Develop Systems& Process

    Evangelists

    Create

    CompetitiveSpirit

    Embed CulturalFlexibility in

    Team

    Establish PMOSurvey

    Secure andMaintain Buy-In

    StructuralLegacy

    FunctionalLegacy

    ResourceLegacy

    CulturalLegacy

    Create a PMO value culture on

    the Programme/Project and

    constantly evaluate stakeholder

    expectations and satisfaction

    levels

    Cultural Risk Mitigation

  • 7/30/2019 11.00 - Michael Cooch

    26/28

    Copyright 2010 Accenture All Rights Reserved. 26

    Logo

    text

    text

    text

    Q6Q5Q4Q3Q2Q1Timeline

    PMOMaturity

    Level

    L5

    L4

    L3

    L2

    L1

    L0

    Accelerating your PMO Evolution*

    Baseline Plan Only takes into account the activitiesneeded to address the functional gaps and risks aredealt with on an ad-hoc basis

    Accelerated Plan Enhances the functional improvement plan

    with a defined environmental risk mitigation activities toaccelerate PMOs improvement

    PMO

    FunctionalPlan RiskMitigationPlan

    * NB: The graphics and statistics on thispage are indicative and used to demonstrateapproximate proportions and trends

    EnvironmentalAssessment Results

    PMO Functional MaturityAssessment Results

  • 7/30/2019 11.00 - Michael Cooch

    27/28

    Copyright 2010 Accenture All Rights Reserved. 27

    Summary

    Evolving PMO maturity drives real value

    Create an integrated plan(process improvement and risk mitigation)

    Be clear on the sponsors aspiration

    Assess beyond the functional

  • 7/30/2019 11.00 - Michael Cooch

    28/28

    C i ht 2010 A t All Ri ht R d 28

    Follow-ups, Questions and Answers